BS1192:2007 & PAS 1192-2 MR1 Consulting ltd Collaborating for Business Performance BS1192 • The BS was developed and published from practical application of the processes known as Avanti. • It has been implemented on a number of projects of various value and the savings of 10% have been sustained on all projects. • This is 50% of the target set by the BIM Strategy. Waste 1976 Building Research Establishment A discrepancy of 10mm in one dimension cost £3,000 and seriously affected the contractors programme. Lack of coordination demonstrates Waste at 10-20% Waste • The UK Government construction total expenditure per annum is £80bn. (2005) • Possible min £20bn of waste • The European Construction Institute 2003 stated that non-quality in European construction represents E80bn of waste per annum. Waste The Client buys risk every time he accepts non quality information from his supply teams Waste • The BIM Strategy has set its target at 20-25% of construction cost that is generated because information for construction is: – Inaccurate – Incomplete – And Ambiguous • The use of CAD solutions has perpetuated the problem even though it had the capacity to solve the problem. Level 2 Maturity for BIM PAS 1192-2 The CPIx Protocol PIP Project Implementation Plan Assess your IT and your Resource capability to deliver the employers requirements CPIx Execution Plan • Building Information Model and Management (BIM(M)) • Agreed Supply Chain Execution Plan(SCEP) Produce you delivery plan and agree with your supply chain and the second and third tiers CIC Scope of works:2012 • Alignment of the Industry Institutional deliverables . • Levels of Model Detail appropriate for the purpose NOT high detail because we can. • Levels of Information appropriate to the scope stages and the Employers Information Requirements (EIR). Supply Chain- Client Questions