BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING BIM: Beyond Clash Detection WHAT IS BIM? Quality Control Estimating (5D) Material Tracking xD Scheduling (4D) 3D Coordination Turnover/ Closeout RFI/Submittal Tracking Facilities Management BIM: Beyond Clash Detection THE BIG PICTURE OLD ISSUE TRACKING NEW ISSUE TRACKING Field Notes BIM Phone Calls Email How much is there to build? Are we ready to build it? Meetings & Conversation s When we will build it? Independent Lists What could prevent us from building it? BIM: Beyond Clash Detection NEED FOR CHANGE Basic Sequence Design - Project Fabricate - Project Build - Project Advanced Sequence Design - Steel Fab - Steel Design - Interiors Build - Steel Fab - Interiors Ideal Sequence Design – Steel 1 Fab – Steel 1 Design – Steel 1 Build – Steel 1 Fab – Steel 1 Design – Steel 1 Build – Steel 1 Fab – Steel 1 Build – Steel 1 Build - Interiors GREATER COMPLEXITY REQUIRES TIGHTER CONTROL AND BETTER ISSUE MANAGEMENT BIM: Beyond Clash Detection DESIGN ISSUES • Communicate requests for information through the model • Provide transparency & consensus • Avoid issue stagnation BIM: Beyond Clash Detection SUBMITTAL PROGRESS Steel Review S1-S3 Resubmittal Status 061058 - UVA South Lawn Project 405 Valley Road, Charlottesville, VA Assem bly Position • Input submittal status into model during review • Clearly identify pieces to be resubmitted • Avoid fabrication delays 12016B2 12019B1 12022B1 12024B1 12027B1 12030B1 12031B1 12032B1 12037B2 13005C1 13006C1 Profile Review Status W21X44 W24X55 W24X55 W21X44 W24X55 W24X55 W24X55 W24X55 W21X44 W14X176 W14X132 Resubmitted Resubmitted Resubmitted Resubmitted Resubmitted Resubmitted Resubmitted Resubmitted Resubmitted Revise_and_resubmit Revise_and_resubmit BIM: Beyond Clash Detection Started Fab FABRICATION STATUS • Communicate “how its coming along” Inspected Courtesy of Schuff Steel BIM: Beyond Clash Detection OVERALL PLANNING Sequence 3 Sequence 2 Sequence 1 • Show the overall plan • Helpful, but there’s more… BIM: Beyond Clash Detection DETAIL PLANNING TWO WEEKS OUT NEXT WEEK THIS WEEK • Communicates the exact items in each schedule task • Utilized at weekly onsite meetings • Ensures all items needed for the successor are completed • Helpful, but there’s still more… BIM: Beyond Clash Detection DETAIL PLANNING • Analyze quantities • Validate resources needed • Instill greater accuracy into schedules BIM: Beyond Clash Detection 1. Steel Added CHANGES 3. Other Pieces Placed on Hold Courtesy Schuff Steel 2. Quantified • Extract change quantities from model • Agree on pieces to be placed on hold until change is fully designed BIM: Beyond Clash Detection MATERIAL TRACKING 2. Logged 3. Model Updated 1. Material Rec. • Understand what’s onsite and what’s not 4. “I NEED THIS PIECE, NOW!” BIM: Beyond Clash Detection LESSONS LEARNED Project specific problems dictate BIM use and value. Quality Control Estimating (5D) Material Tracking xD PROJECT A: Scheduling (4D) 3D Coordination Turnover/ Closeout RFI/Submittal Tracking Facilities Management 3D Coordination Scheduling (4D) Quality Control Material Tracking PROJECT B: 3D Coordination RFI/Submittal Tracking Facilities Management Turnover/ Closeout BIM: Beyond Clash Detection LESSONS LEARNED Partners using BIM efficiently are absolutely necessary. Integrate BIM with Other Processes Utilize BIM for Drawing Creation Submittal Review Shop Fabrication Thanks to Schuff Steel, Goody Clancy Architects, Weldon Steel, Walter P. Moore Engineers, & Shockey Precast for the models in this presentation. BIM: Beyond Clash Detection