7th Annual Energy Conference David Adams VP Operations Technology, North America Overview - Australia ▌ Huge Reserves ▌ High Well Costs ▌ Minimal Infrastructure ▌ Community Perceptions © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2 $100MM $100MM Higher capital intensity of Australian wells necessitates an accelerated learning curve Collaboration and partnership between operators and service providers is required to mitigate risk and drive accelerated learning curve © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3 Accelerate the Learning Curve - Execution “RED COMPLETION” 16 wells (4 well pads) Simultaneous Operations PERFORMANCE 72 stages in 18 days 1200 fewer truck movements 40% time reduction 32% cost reduction © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4 Accelerate the Learning Curve - Subsurface Learn from other plays Proven workflow Optimize spend on productive zones Avoid cost on low productivity zones RESERVOIR CHARACTERIZATION © 2014 HALLIBURTON. ALL RIGHTS RESERVED. COMPLEX FRAC MODEL/ COMPLETION DESIGN WELL PLANNING AND PLACEMENT 5 PRODUCTION MATCHING/ OPTIMIZE MODEL Accelerate the Learning Curve – Social License ▌ Streamlining Regulatory Requirements ▌ Educate the Public on the benefits to the economy and the future of Australia ERIC http://www.energyresourceinformat ioncentre.org.au/about-us/ © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6 Outlook and Summary ▌ Vast Resource Potential ▌ Structural Challenges ▌ Accelerating the Learning Curve © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 7