TBARTA STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Pasco’s Northern Loop – Managed Lanes TBARTA 1. Managed Lanes an Emerging Regional Strategy 2. RSH Study- Alternative 6 Set the Stage for the Concept 3. General Support, but we must Establish Revenue Potential 4. Will Weatherford wants us to “Go On Transportation Offensive” 5. Secretary Prasad wants us to “THINK BIG” 6. FDOT wants to accelerate PPP private funding projects 7. CCC Regional Priority List made project No. 5 in the TOP TEN 8. Economic Development Interests want road and transit capacity 9. Pasco Joins Tampa Bay Economic “Big League” STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD TBARTA SR 54/56 PASCO Corridor Concept Elevated Managed Lanes (Alternative-6 , RSH/ DOT Study) BUILDABLE FUNCTIONAL BRT READY Median located and built with staged MOT with day and night schedule This elegant Segmented Precast allows 4 elevated toll lanes to flow over the 6 “free” at grade Lanes Market Driven TransitBalances ADT STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Location Map – “EXPANDED East 56” TBARTA STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD TBARTA Tour New “Smart” PASCO & 54/56 Corridor STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Tour, Talk, and Economic Focus TBARTA STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD October 30, I Learned –I’m too S L O W ! TBARTA STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Sunday November 4th Tampa Bay Times TBARTA STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Action Time IS NOW– Key Issues! TBARTA • LRTP & TBARTA Master Plan Proposes Managed Lanes • Action Needed (Capacity &Transit-Not 25 years out ) • Major Intersections / Segments Failing • PPP Opportunity Real and stressed by FDOT (Prasad) • Pasco 54/56 Developers Need ROW Requirements (Starkey, Smith 54, Wiregrass, Mitchell/Western Hub and Others) • Construction Prices Lowest and Will Rise • Interest Rates Low Point in History and Will Rise STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Stakeholder Involvement “Expansion” TBARTA Pasco County MPO & BCC DOT D7 & FDOT TBARTA Pasco Administration Capital Project Investment Team Public and Private Partnerships Pasco Planning/GM Every Player Needs a Quality Toll Revenue Planning Number! STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD TBARTA SR 54/SR 56 TRANSIT/MANAGED LANE AND TOLL STUDY Study Objectives Assess the ROW needs associated with the elevated and/or at-grade managed lane concept along the SR 54/56 corridor (US 19 to US 301) Perform planning-level build toll demand traffic estimates, assess optimal toll rates, revenue estimates, O&M costs, etc. STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD TBARTA ALTERNATIVE SIX Develop Toll and Transit Alt 6: Express Bus/Managed Lanes – 4 Lanes Elevated STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Managed Lanes Alternatives AADT TBARTA 4 Managed Lanes Grade-Separated (Alternative 6) $0.14/mile $0.21/mile STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD Managed Lanes Gross Rev. Back of Envelope! TBARTA Rate .14 /mile Trip Miles REV/Day 300 Day Segment Little-SC .14c /Mile 7.75 63500 492125 $ 68,897.50 $ 20,669,250.00 SC- 41 5 72300 361500 $ 50,610.00 $ 15,183,000.00 41-I75 3.25 86000 279500 $ 39,130.00 $ 11,739,000.00 2 54400 108800 $ 15,232.00 $ 4,569,600.00 1241925 $ 173,869.50 $ 52,160,850.00 I-75-BBD Rate .21c /Mile .21/mile Trip Miles REV/Day 300 Day Segment 7.75 39600 306900 64449 $19,334,700.00 Little-SC 5 45700 228500 47985 $14,395,500.00 SC- 41 3.25 67900 220675 46341.75 $13,902,525.00 41-I75 2 27000 54000 11340 $ 3,402,000.00 I-75-BBD 810075 170115.75 $51,034,725.00 STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD RSH Study ADT projected for 2035 Study Date TBARTA Preliminary Schedule Travel Demand Modeling 2 Months Toll Revenue 2 Months Cost Estimates/Staging Plan 2 Months Drainage/ROW Preservation 2 Months Public Outreach Throughout Study Total Schedule: 8 Months STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD CURRENT STATUS –Right of Way Lease TBARTA • 3 Phase Unsolicited Bid • DOT Received June 2013 • Open 60 Day Response • Oct 23rd Due Date • November Award Announcement STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD