Broadband Developments Road Map CP action needed 16th Release AJ September 2013 IPS, WBC FTTC: Amend order to earlier date /Preponement (BB940-13) 18th Release AK November 2013 IPS, WBC & FTTC: SiM2 (BB1059-13) IPS, WBC & FTTx: Visibility of Openreach KCI notes via B2B & Portal (BB940-13) FTTP: Product Withdrawal (BB940-13) WBC: LLU migration to BTW broadband (BB105913) WBC: Abortive Visit Charges (BB955-13) FTTC: Self Install GEA service test (BB940-13) FTTX: Automated expedite process (BB1059-13) FTTP On Demand: New Dialogue Service for Distance Based Charging (BB832-13) FTTP On Demand: Out of Term EUA charges (BB832-13) IPS, WBC FTTX: KCI enhancements (BB106213) FTTC: Select OR or CP modem in FTTC PCP only Self Serve Trial (BB832-13) FTTC: Self Install Openreach to install modem (BB1062-13) FTTC: Self Install ability to select flexible or standard appt (BB1062-13) FTTC: Self Install consume CPE enablement parameter (BB1062-13) FTTP On Demand: New dialogue service for Distance Based Charging (BB1062-13) FTTP On Demand: L2C journey change for Radial Based Charging (BB106213) FTTP: Product withdrawal (BB1062-13) N o C P a c ti o n n e e d e d CP Changes recommended FTTC: Self Install Standard or Flexible Appt for PCP only (BB941-13) FTTC: Consume EMLC speed ranges (BB106213) FTTC: Consume Openreach TRC charges T2R (BB1059-13) FTTC: Improving the transfer and winback process (BB1062-13) IPS, WBC & FTTX: Visibility of KCI’s via xml & portal (BB1062-13) Broadband Release Schedule 2012/13 Release Date Release AJ 16th September 2013 Release AK 18th November 2013 Release AL 20th January 2014 The above dates are not confirmed until 90 day legal notification has been published