Uploaded by Romnick Ilagan

Group7 CaseStudy1

advertisement
Republic of the Philippines
BATANGAS STATE UNIVERSITY
The National Engineering University
Alangilan Campus
Golden Country Homes, Alangilan Batangas City, Batangas, Philippines 4200
Tel Nos.: (+63 43) 425-0139 local 2121 / 2221
E-mail Address: ceafa@g.batstate-u.edu.ph | Website Address: http://www.batstate-u.edu.ph
College of Engineering
Department of Electronics Engineering
BACHELOR OF SCIENCE IN INSTRUMENTATION AND CONTROL ENGINEERING
Second Semester, AY 2022-2023
CASE STUDY No. 1
Submitted by:
GROUP 7
Blanco, Jan Clifford, MI
Dolor, Ma. Kriselda, S.
Ilagan, Romnick, D.
Ortega, Alyanna Christine, MI
Sarmiento, Samuel Adrian, M
Date Submitted:
March 15, 2023
Leading Innovations, Transforming Lives
Republic of the Philippines
BATANGAS STATE UNIVERSITY
The National Engineering University
Alangilan Campus
Golden Country Homes, Alangilan Batangas City, Batangas, Philippines 4200
Tel Nos.: (+63 43) 425-0139 local 2121 / 2221
E-mail Address: ceafa@g.batstate-u.edu.ph | Website Address: http://www.batstate-u.edu.ph
CASE:
The College of Engineering of the Batangas State University
– The National Engineering University has multiple
department offices, which are located on
different floors in the CEAFA building. Each department
office is interconnected using UTP cables. Anthony, the
network administration from ICT office has set up a client
server environment and has used star topology. The college
faculty and staff are unable to transmit data and information
from one department to another in an efficient manner.
PROBLEM:
The problem is the inability to transmit information
from one department to another. There are two
factors to which this problem can be attributed.
First is the choice of cable. Second is the choice of
topology. To identify its cause, the group shall first
discuss the two aforementioned factors.
SUGGESTED SOLUTION:
Leading Innovations, Transforming Lives
Download