Uploaded by suranga C. Dadallage

AR F 01 (2)

advertisement
Project Progress Monitoring
ARYANS Consulting Group
(PVT) LTD.
Prepared by:
AH
Weekly Progress Report.
Reviewed by:
Authorized by:
01. Customer details:
I.
Name of the company :
II.
Contact person
:
III.
Contact No
:
IV.
Address
:
02. Required assistance:
I.
Product
II.
Service
03. Type of product:
I.
Design
II.
Fabrication
04. Product category:
I.
Hydro Structure:
Radial Gate
Sluice Gate
Trash rack
Stop logs
II.
Automation job:
Electrical wiring
Programming
III.
Gantry cranes:
IV.
Other Machinery
Page 1 of 2
Rev no: 00
Date: 09/10/2012
Document No:
AR/F/01
Project Progress Monitoring
ARYANS Consulting Group
(PVT) LTD.
Prepared by:
AH
Rev no: 00
Date: 09/10/2012
Weekly Progress Report.
Reviewed by:
Authorized by:
Document No:
AR/F/01
05. Purpose of the product:
06. Product details (Tick the box if available and attach with the form):
I.
Drawings
III.
Photos
II.
Sketches
IV.
Description
07. Similar products and designs:
I.
Available
II.
Not available
II.
Not available
08. If available attach the detailed documents with the form.
09. Prior engagements with ARYANS Engineering (Pvt) Ltd.:
I.
Available
10. If available provide the details of the project with the form:
Page 2 of 2
Download