Generators

advertisement
Achievements
Tamil Nadu Electricity Board is a pioneer organization among the State Electricity
Boards in India in promoting Renewable Energy Programme. Tamil Nadu is blessed with
conducive natural metrological and topographical settings for wind power generation.
Four passes namely Palghat pass, Shengottah pass, Aralvoimozhi pass and Cumbum Pass
are endowed with heavy wind flows because of the tunneling effect during South west
monsoon with an average wind speed of 18 to 22 Km/Hr.
Initially during 1986, the first demo wind farm with 20 Nos. Wind Electric
Generators each 55KW were erected at Mullaikadu in Tuticorin District, in association
with Tamil Nadu Energy Development Agency (TEDA) under the aid of Ministry of Non
Conventional Energy Sources (MNES), Government of India. Subsequently various
windfarms were erected by TNEB at other places in Kayathar, Muppandal and
Puliankulam areas including Kethanoor in Coimbatore. Totally 120 windmills were
erected by TNEB from 1986 to 1993 totaling to a capacity of 19.355 MW.
Based on the successful functioning of these demonstration wind farms, private
developers had shown keen interest in this sector which has now led to an installed
capacity of Private Wind Mills of about 7262 MW as on 31.05.2014 contributing to 34%
of India’s total wind capacity . The Wind Electric Generators are installed in the Districts
of Tirunelveli, Kanyakumari, Tuticorin, Ramnad, Coimbatore, Udumalpet, Dindigul, Theni,
Tirupur and Erode. At present around 11,000 to 13,000 million units per annum are
generated from the above windmills, contributing to about 14% of the yearly energy
need of the State.
Table - I
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Year
Installed Capacity in MW
During Year
Cum Total
0.000
676.155
31.140
707.295
17.765
725.060
45.675
770.735
41.895
812.630
44.035
856.665
133.600
990.265
371.225
1361.490
678.735
2040.225
857.555
2897.780
577.910
3475.690
381.075
3856.765
430.975
4287.740
602.025
4889.765
997.400
5887.165
1083.460
6970.625
166.050
7136.675
Upto 1997
1997-1998
1998-1999
1999-2000
2000-2001
2001-2002
2002-2003
2003-2004
2004-2005
2005-2006
2006-2007
2007-2008
2008-2009
2009-2010
2010-2011
2011-2012
2012-2013
18
2013-2014
19
2014-2015 (up to May '14)
107.380
7252.605
9.750
7262.355
Table-II
YEAR
(1)
1986-1993
1993-1994
1994-1995
1995-1996
1996-1997
1997-1998
1998-1999
1999-2000
2000-2001
2001-2002
2002-2003
2003-2004
2004-2005
BOARD
(2)
96.458
31.533
29.843
22.763
19.489
18.822
23.273
27.228
17.608
17.899
19.456
24.346
18.036
GENERATION ( in M.U)
PRIVATE
TOTAL
(3)
(4)
29.790
126.248
39.700
71.233
121.250
151.093
434.900
457.663
659.646
679.135
747.032
765.854
905.592
928.865
1129.365
1156.593
1076.567
1094.175
1239.211
1257.110
1286.247
1305.703
1690.129
1714.475
2242.696
2260.732
2005-2006
2006-2007
2007-2008
2008-2009
2009-2010
2010-2011
2011-2012
2012-2013
2013-2014
14.581
17.591
12.058
10.285
11.092
12.675
12.148
3429.700
5251.391
6054.588
6644.865
8134.415
8707.370
9750.900
3444.281
5268.982
6066.646
6655.150
8145.508
8720.046
9763.048
12.660
12.584
12935.578
10917.653
12948.238
10930.237
0.107
Total 482.535
392.184
83820.769
392.291
84303.304
2014-2015 (up to April'14)
Order
a)
The Tamil Nadu Electricity Regulatory Commission (TNERC) has issued
order No.3, dt: 15.05.06 for “Tariff Related Issues for Non Conventional
Energy Sources” and the purchase price of energy has been fixed as
Rs.2.75/Kwhr for the wind mills commissioned prior to 15.05.06 and
Rs.2.90/Kwhr for the wind mills installed and commissioned on or after
15.05.06.TNEB has implemented the power purchase price to encourage
the Private Wind Mill Developers. (Refer www.tnercgov.in)
b)
On 20.03.2009,TNERC has issued Tariff order for Wind Energy Order
No:1, dt:20.03.2009. This order is applicable for the WEGs commissioned
on or after 19.09.08.The power purchase rate fixed in the order is
Rs.3.39 per unit from 01.04.2009. Now the power purchase rate fixed by
TNERC is Rs.3.51 per unit from 01.08.2012 as wind tariff order no.6
dt.31.7.12.
c)
REC Pooled cost of wind energy is Rs.2.63 per unit for the year 2013-14.
Banking
The wind energy private developers are permitted to wheel the energy
generated from their wind mills to their own /subsidiary HT Industrial and
commercial concern, situated anywhere in Tamil Nadu with banking facility for
their future use. The banking period is one year, from 1st April to 31st March of
succeeding year. The Banking Charges is 94 paise per unit drawn for adjustment.
The unutilized portion of banked energy if any available at the end of banking
period i.e. 31st march of every year shall be purchased by TANGEDCO @ 75% of
the relevant purchase rate of wind energy.
Transmission Charges: Rs.789.20 per day per MW or part thereof (40% of
Rs.1973 per day per MW, the rate applicable to conventional Generator).
Wheeling Charges: 6.94 paise per unit (40% of 17.35 paise/unit)
Scheduling and system operation charges: Rs.600/- per day for 2 MW. If
the capacity is less than 2 MW, the charges shall be proportionate.
Transmission and Distribution
Loss : Actuals.
PROCEDURE FOR OBTAINING APPROVAL AND TECHNICAL REQUIREMENTS TO
BE COMPLIED WITH.
1. Registration of WEG application
Applications shall be submitted to the CHIEF ENGINEER/NCES/TANGEDCO
Chennai with the following documents:
a) Request application
b) Filled in Proforma
c) Invoice for purchase of new WEG
d) Land Sale deed documents / FMB. With the originals for verification
e) Self certificate with power curve of WEG
f) Manufacturer certificate for WEG
g) If it is a firm, copy of Partnership deed / company, copy of Memorandum &
Articles of Association with registration of Firm/Company Certificate.
h) Indemnity bond in non judicial stamp paper of Rs.80/i) Undertaking in non judicial stamp paper of Rs.80/j) Copy of Purchase order with Order of acceptance.
k) Electrical Schematic Single line diagram
l) Copy of Type approvals/ Certificate issued by M/s C-WET
2. Payments at the time of Registration :
a) Registration fees for 1 No. WEG : Rs.13,310/- (Non – refundable)
b) Consultancy charges for 1 No. application irrespective of No. of WEGs
: Rs.33,275/- (Non – refundable).
c) Infrastructure Development Charges @ Rs.30 lakhs/MW
d) Load flow study charges Rs.2,20,000/- + Service tax.
The above charges shall be paid in the form of Demand Draft in favour of
TANGEDCO/Chennai, payable at Chennai.
Condition :
•
The application Registration is valid for a period of six months from
the date of Registration.
Any request for change in survey Number will not be permitted.
However it is permitted to change to any of the nearby location
adjacent to the proposed location based on specific field
recommendation and valid documents within the validity period of
the application.
3. Feasibility Report from Field:
After verifying the above documents and on receipt of the payments, the
application is forwarded to the concerned field Superintending Engineer/NCES
(Tirunelveli / Udumalpet).
•
The concerned Superintending Engineer shall submit the Field feasibility report
with recommendation in respect of ownership of the WEG land, Spacing distance
5D x 7D, feeder capacity and Substation capacity within a month from the date
of Registration. Then the load flow study will be carried out. Based on the
feasibility condition, the Noted for Record and grid tie up approval are issued by
the Chief Engineer/NCES/TANGEDCO. The WEG shall be commissioned within
Two years from the date of issue of Original “Noted for Record letter” and “Grid
tie up” approval.
4) Name Transfer WEG application:
•
The WEG application registered in one name to be transferred to any
other Name is permitted on production of necessary valid documents
and on payment of Rs.1,00,000/- (Rupees One Lakh only) per
application towards application name transfer fee.
•
The application will be name transferred only with the entire survey
numbers notified in the original application and not as a part of survey
numbers.
•
The above name transfer will not alter either the Date of Registration or
the Registration number allotted to the first applicant and the Original
seniority will be maintained.
5) Name Transfer of Noted for Record:
The Noted for Record and Tie up approval issued to one Company will be
name transferred to any other company on payment of Rs.1 Lakh and a fresh
Noted for Record and Tie up approval will be issued in the new name.
Download