Energy Performance Contracting Presentation Broome County, New York Restricted © Siemens AG 2013 All rights reserved. November Page 1 12, 201520XX-XX-XX Author / Department Agenda Introductions Energy Performance Contracting in New York State – Article 9 Broome County Energy Performance Contract Project Benefits Facility Improvement Measures Project Financial Summary Questions/Discussion Restricted © Siemens AG 2013 All rights reserved. Page 2 Siemens’ Broome County Team Rich Carroll – Account Executive Rich Rutishauser – Lead Energy Engineer Rob McBath – Project Manager Brian Key, GHD – Design Engineering The local offices of Siemens Industry, Inc. are located in Syracuse, Buffalo, Rochester, Corning, Malone, and Albany. These locations operate as one business unit, known as District One, employ a staff of over 200 individuals, including 75 people in our Syracuse and Corning Offices. Restricted © Siemens AG 2013 All rights reserved. Page 3 NY STATE ENERGY LAW – ARTICLE 9 An alternative means of financing building improvements • Increase energy efficiency and improve building environment • Turnkey project approach • Performance is guaranteed in writing • Guaranteed maximum price contract – no change orders • Measurement and verification serves as real time commissioning • Program is self-funding Annual energy and operational savings pay for upgrades Restricted © Siemens AG 2013 All rights reserved. Page 4 Broome County Performance Contract Broome County Benefits $3.97 million investment in Broome County Facilities Over $330,000 in annual utility savings $25,000 in associated savings related to the maintenance of old equipment Increased comfort in impacted buildings Replacement of $500,000 of equipment at the end of its useful life LED lighting conversion where fiscally sensible Water conservation at PSF includes control of population water use Restricted © Siemens AG 2013 All rights reserved. Page 5 Broome County Performance Contract Economic Benefits 16,500 Man Hours Required from Local Union Labor 8 FTEs estimated for 12 month construction $60k+ spent on lodging and meals by work crews Capital improvements justified by annual cost reduction $295,000+ in NYSEG rebates Turnkey project managed and guaranteed by Siemens Restricted © Siemens AG 2013 All rights reserved. Page 6 Broome County Performance Contract Environmental Benefits Natural Gas Savings (Therms/year) ………………………21,666 Fuel Oil Savings (Gallons/year) …………………………….38,037 Propane Savings (Gallons/year) ……………………………23,597 Grid Electricity Savings (kWhr/year) ………………………922,178 Grid Demand Reduction (kW/year) ………………………...1,124 Green House Gas (GHG) Savings (Tons CO2 / year) ……1,365 GHG equivalents: Cars removed/yr 227; miles not driven/yr 2.7million Restricted © Siemens AG 2013 All rights reserved. Page 7 Facility Improvement Measures Broome County Office Building Building Envelope Weatherization Upgrades Upgrade Heating System in Maintenance Office Install Tight Fitting OA Damper on Air Handling Unit # 1 Replace Pneumatic Actuators and Temperature Controls with DDC Actuators and Temperature Controls Water Conservation Restricted © Siemens AG 2013 All rights reserved. Page 8 Facility Improvement Measures Public Safety Building Install Walk In Freezer and Cooler Controllers LED Lighting Upgrades Install Demand Controlled Ventilation Upgrade Transformers Water Conservation Restricted © Siemens AG 2013 All rights reserved. Page 9 Facility Improvement Measures Veterans Memorial Arena Plug Load Management Water Conservation Ice Pit Improvements Court Complex Buildings Replace Absorption Chiller with an Efficient Chiller Add Morning Warm-up to Heating Schedule Restricted © Siemens AG 2013 All rights reserved. Page 10 Facility Improvement Measures Greater Binghamton Airport Replace Boilers in the Terminal building with Condensing Boilers Replace Boiler in Hangar 2 with Condensing Boiler Install High Efficiency Water Heaters Convert Propane Equipment to Natural Gas Plug Load Management Restricted © Siemens AG 2013 All rights reserved. Page 11 Facility Improvement Measures Forum Theater Harpursville Senior Center • Water Conservation • Water Conservation • Plug Load Management DPW Highway Garage Library • LED Lighting Upgrades • Water Conservation • Water Conservation • Plug Load Management • Plug Load Management Transportation Garage • Water Conservation Restricted © Siemens AG 2013 All rights reserved. Page 12 Project Financials – Broome County Facilities Project Cost (3,972,363) NYSEG Grants/Rebates $295,542 Annual Support Agreement (1st Year) ($59,394) Total Project Repayment Over Term Total Energy & Operational Savings Over Term 15 Year Cumulative Net Benefit Restricted © Siemens AG 2013 All rights reserved. Page 13 ($6,192,689) $7,063,283 $870,594 Process to Project Implementation January 2015……….…….Siemens selected through a RFP process April 2015…………….…...Investment Grade Energy Audit completed July 2015…………….….…Finish negotiation of best for Broome scope of work October 2015……….….….Identified GO Bond as most appropriate financing path November 12th, 2015….….Legislative Finance Committee Presentation December 17th, 2015…..…Full Legislative Approval for: • Contract Execution • Construction Begins January 2016 Restricted © Siemens AG 2013 All rights reserved. Page 14 Questions? Restricted © Siemens AG 2013 All rights reserved. Page 15