Solicitation Number Date Printed Date Issued Procurement Officer Phone E-Mail Address Invitation for Bid Amendment #: 2 073014-912-33605-08/14/14 08/15/14 08/15/14 Robert E Tyner, C.P.M. 843-574-6279 Robert.tyner@tridenttech.edu DESCRIPTION: Parking Lot Striping for TTC The Term "Offer" Means Your "Bid" or "Proposal". 08/20/14 @ 2:00PM EDT QUESTIONS MUST BE RECEIVED BY: deadline has passed SUBMIT OFFER BY (Opening Date/Time): NUMBER OF COPIES TO BE SUBMITTED: See "Deadline For Submission Of Offer" provision See "Questions From Offerors" provision 1 Offers must be submitted in a sealed package. Solicitation Number & Opening Date must appear on package exterior. SUBMIT YOUR SEALED OFFER TO EITHER OF THE FOLLOWING ADDRESSES: MAILING ADDRESS: Trident Technical College Procurement Office PO Box 118067 Charleston, SC 29423 PHYSICAL ADDRESS: Trident Technical College Procurement Office Building 940, Suite G, Room 110 2050 Mabeline Rd. N. Chas SC 29406 See "Submitting Your Offer" provision ALL MAIL IS PICKED UP FROM THE US POSTAL SERVICE ONCE DAILY AT AROUND 8:00 A.M. (EXCLUDING WEEKENDS AND HOLIDAYS). LOCATION:N/A CONFERENCE TYPE: N/A DATE & TIME: AWARD & AMENDMENTS Award will be posted at the Physical Address stated above on 08/25/14 The award, this solicitation, and any amendments will be posted at the following web address: http://www.tridenttech.edu/procurement.htm You must submit a signed copy of this form with Your Offer. By submitting a bid or proposal, You agree to be bound by the terms of the Solicitation. You agree to hold Your Offer open for a minimum of thirty (30) calendar days after the Opening Date. NAME OF OFFEROR (Full legal name of business submitting the offer) OFFEROR'S TYPE OF ENTITY: (Check one) □ Sole Proprietorship □ Partnership AUTHORIZED SIGNATURE (Person signing must be authorized to submit binding offer to enter contract on behalf of Offeror named above.) TITLE PRINTED NAME (Business title of person signing above) (Printed name of person signing above) DATE SIGNED □ Corporation (tax-exempt) □ Corporate entity (not tax-exempt) □ Government entity (federal, state, or local) □ Other _________________________ (See "Signing Your Offer" provision.) Instructions regarding Offeror's name: Any award issued will be issued to, and the contract will be formed with, the entity identified as the offeror above. An offer may be submitted by only one legal entity. The entity named as the offeror must be a single and distinct legal entity. Do not use the name of a branch office or a division of a larger entity if the branch or division is not a separate legal entity, i.e., a separate corporation, partnership, sole proprietorship, etc. STATE OF INCORPORATION (If offeror is a corporation, identify the state of Incorporation.) TAXPAYER IDENTIFICATION NO. (See "Taxpayer Identification Number" provision) COVER PAGE MMO (JAN. 2006) Page 2 of 12 SAP SAP PAGE TWO (Return Page Two with Your Offer) HOME OFFICE ADDRESS (Address for offeror's home office / principal place of business) NOTICE ADDRESS (Address to which all procurement and contract related notices should be sent.) (See "Notice" clause) Area Code - Number - Extension Facsimile _________________________________________________________ E-mail Address:____________________________________________ PAYMENT ADDRESS (Address to which payments will be sent.) ORDER ADDRESS (Address to which purchase orders will be sent) (See "Payment" clause) (See "Purchase Orders and "Contract Documents" clauses) ____Payment Address same as Home Office Address ____Payment Address same as Notice Address (check only one) ____Order Address same as Home Office Address ____Order Address same as Notice Address (check only one) ACKNOWLEDGMENT OF AMENDMENTS Offerors acknowledges receipt of amendments by indicating amendment number and its date of issue. (See "Amendments to Solicitation" Provision) Amendment No. Amendment Issue Date DISCOUNT FOR PROMPT PAYMENT Amendment No. 10 Calendar Days (%) Amendment Issue Date Amendment No. 20 Calendar Days (%) Amendment Issue Date Amendment No. 30 Calendar Days (%) Amendment Issue Date _____Calendar Days (%) (See "Discount for Prompt Payment" clause) PREFERENCES - A NOTICE TO VENDORS (SEP. 2009): On June 16, 2009, the South Carolina General Assembly rewrote the law governing preferences available to in-state vendors, vendors using in-state subcontractors, and vendors selling in-state or US end products. This law appears in Section 11-35-1524 of the South Carolina Code of Laws. A summary of the new preferences is available at www.procurement.sc.gov/preferences. ALL THE PREFERENCES MUST BE CLAIMED AND ARE APPLIED BY LINE ITEM, REGARDLESS OF WHETHER AWARD IS MADE BY ITEM OR LOT. VENDORS ARE CAUTIONED TO CAREFULLY REVIEW THE STATUTE BEFORE CLAIMING ANY PREFERENCES. THE REQUIREMENTS TO QUALIFY HAVE CHANGED. IF YOU REQUEST A PREFERENCE, YOU ARE CERTIFYING THAT YOUR OFFER QUALIFIES FOR THE PREFERENCE YOU'VE CLAIMED. IMPROPERLY REQUESTING A PREFERENCE CAN HAVE SERIOUS CONSEQUENCES. [11-35-1524(E)(4)&(6)]. PREFERENCES - ADDRESS AND PHONE OF IN-STATE OFFICE: Please provide the address and phone number for your in-state office in the space provided below. An in-state office is necessary to claim either the Resident Vendor Preference (11-35-1524(C)(1)(i)&(ii)) or the Resident Contractor Preference (11-35-1524(C)(1)(iii)). Accordingly, you must provide this information to qualify for the preference. An in-state office is not required, but can be beneficial, if you are claiming the Resident Subcontractor Preference (11-35-1524(D)). ____ In-State Office Address same as Home Office Address ____ In-State Office Address same as Notice Address (check only one) PAGE TWO (SEP 2009) End of PAGE TWO Bidders shall acknowledge receipt of this Amendment prior to date and time specified in the solicitation , or as amended, by one of the following methods: (1) by signing and returning the Amendment, (2) by letter, or (3) by submitting a bid that indicates in some way that the bidder received the amendment. Failure of your acknowledgement to be received at the issuing office prior to date and time specified may result in rejection of your offer. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided such telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. The college will not accept faxed amendments. Except as provided herein all terms and conditions of the document referenced as heretofore changed remain unchanged and in full force and effect. Solicitation #: 073014-912-33705-08/14/14 Title: Parking Lot Striping for TTC Is hereby amended as follows: This amendment is issued to: 1. Change Section III, Scope of Work/Specifications as follows: Delete: Special note regarding times available to perform work: Classes will resume on Monday, August 25, 2014. The campus is available daily during normal business hours of 8:00AM through 5:00PM from the date of award up Sunday, August 24, 2014 for the contractor to perform work. TTC seeks to have as many parking lots as identified on the priority list completed as possible during this time. After August 25, 2014, all work must be done over the week-ends. See attachment “A” for a map of parking lots on Main Campus. Insert: Special note regarding times available to perform work: All work must be done over the week-ends. See attachment “A” for a map of parking lots on Main Campus. 2. Update the parking lot map (attachment A) to show the locations of lots “O” and “P”. 3. Add additional markings to Lot “P”. (See amended bidding schedule). 4. Extend the opening date of the solicitation to 08/20/14. 5. Extend the award date of the solicitations to 08/25/14. Page 4 of 12 VIII. Bidding Schedule IFB #: 073014-912-33605-08/14/14 Amended Bidding Schedule Unit price shall be shown. Note: Paint colors are indicated after each bullet in parentheses). Lot 1 Item # 1 Description Price TTC Main Campus – Center Drive Paint 400 feet of double-yellow center-lines. (Yellow) Paint (2) speed bumps. (White) Paint (2) stop bars including the word “STOP” in all capital letters. (White) Paint (12) directional arrows. (White) Paint 1,232 feet of curbing, top & sides, (Yellow) $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 2 TTC Main Campus – Parking Lot “A” Paint 1,400 feet of 4” wide parking space lines (White). Paint (1) handicapped parking space (Blue) Paint (4) stop bars including the word “STOP” in all capital letters. (White) Paint (8) directional arrows (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ $_______________ Page 5 of 12 3 TTC Main Campus – Parking Lot “B” Paint 3,398 feet of 4” wide parking space lines (White). Paint (6) handicapped parking spaces (Blue). Paint (4) stop bars including the word “STOP” in all capital letters. (White) Paint (4) small cross-hatch “No Parking” areas (White). Paint (23) “Faculty/Staff” parking space identifiers (White & Black) Paint (8) directional arrows (White). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 4 TTC Main Campus – Parking Lot “C” Paint 2,151 feet of 4” wide parking space lines (White). Paint (4) handicapped parking spaces (Blue) Paint (6) stop bars including the word “STOP” in all capital letters. (White) Paint (1) cross-walk (White). Paint (16) directional arrows (White). Paint 414 feet of curbing, top & sides (Yellow). Paint (32) “Reserved” parking space identifiers (White & Black). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 5 TTC Main Campus – Parking Lot “D” Paint 4,068feet of 4” wide parking space lines (White). Paint (7) handicapped parking spaces (Blue). Paint (14) stop bars including the word “STOP” in all capital letters. (White) Paint (26) directional arrows (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ $_______________ Page 6 of 12 6 TTC Main Campus – Parking Lot “E” Paint 2,556 feet of 4” wide parking space lines (White). Paint (7) handicapped parking spaces (Blue). Paint (8) stop bars including the word “STOP” in all capital letters. (White) Paint (2) speed bumps (White). Paint (1) cross-walk (White). Paint (53) “Faculty/Staff” parking space identifiers (White & Black). Paint 300 feet of curbing, Top & Sides (Yellow). Paint (18) directional arrows (White). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 7 TTC Main Campus – Parking Lot “I” Paint 342 feet of 4” wide parking space lines (White). Paint (1) stop bar including the word “STOP” in all capital letters. (White) Paint (5) handicapped parking spaces (Blue). Paint (4) “No Parking” parking space identifiers (White). Paint (15) “Faculty/Staff” parking space identifiers (White). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 8 TTC Main Campus – Parking Lot “J” Paint 6,192 feet of 4” wide parking space lines (White). Paint (10) stop bars including the word “STOP” in all capital letters. (White) Paint 353 feet of single yellow cross-walk (Yellow). Paint (1) cross-walk (White). Paint 86 feet of curbing, Top & Sides (Yellow). Paint (1) handicapped parking space (Blue). Paint (21) directional arrows (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference $_______________ Page 7 of 12 (4%): ____ Number of subcontractors claimed: ______ 9 TTC Main Campus – Parking Lot “K” Paint 1,854 feet of 4” wide parking space lines (White). Paint (6) stop bars including the word “STOP” in all capital letters. (White) Paint (57) “Faculty/Staff” parking space identifiers (White & Black). Paint (1) cross-walk (White). Paint (21) directional arrows (White). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 10 TTC Main Campus – Parking Lot “L” Paint 3,528 feet of 4” wide parking space lines (White). Paint (9) stop bars including the word “STOP” in all capital letters. (White) Paint (1) cross-walk (White). Paint (20) directional arrows (White). Paint 432 feet of curbing, Top & Sides (Yellow). Paint (2) speed bumps (White). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 11 TTC Main Campus – Parking Lot “M” Paint 9,423 feet of 4” wide parking space lines (White). Paint (10) stop bars including the word “STOP” in all capital letters. (White) Paint (5) cross-walks (White). Paint (28) directional arrows (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ $_______________ Page 8 of 12 12 TTC Main Campus – Parking Lot “N” Paint 988 feet of 4” wide parking space lines (White). Paint (1) stop bar including the word “STOP” in all capital letters. (White) Paint 165 feet of curbing, Top & Sides (Yellow). Paint (4) handicapped parking spaces (Blue). Paint (32) “Faculty/Staff” parking space identifiers (White & Black). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 13 TTC Main Campus – Parking Lot “O” Paint 450 feet of 4” wide parking space lines (White). Paint (1) stop bar including the word “STOP” in all capital letters. (White) Paint 114 feet of curbing, Top & Sides (Yellow). Paint (25) “Faculty/Staff” parking space identifiers (White & Black). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 14 TTC Main Campus – Parking Lot “P” Paint 1,854 feet of 4” wide parking space lines (White). Paint (4) stop bars including the word “STOP” in all capital letters. (White) Paint 414 feet of double center-lines (Yellow). Paint (4) directional arrows (White). Paint (1) large cross-hatch “No Parking” area (White). Paint (5) small cross-hatch “No Parking” areas (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ $_______________ Page 9 of 12 15 TTC Main Campus – Parking Lot “Q” Paint 9,360 feet of 4” wide parking space lines (White). Paint (5) stop bars including the word “STOP” in all capital letters. (White) Paint 283 feet of curbing, Top & Sides (Yellow). Paint 36 feet of double center-line (Yellow). Paint 60 feet of single white road lines (White). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 16 TTC Main Campus – Parking Lot “R” Paint 2,594 feet of 4” wide parking space lines (White). Paint (9) stop bars including the word “STOP” in all capital letters. (White) Paint (20) directional arrows (White). Paint (6) handicapped parking spaces (Blue). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 17 TTC Main Campus – Parking Lot “S” Paint 882 feet of 4” parking space lines (White). Paint (3) stop bars including the word “STOP” in all capital letters. (White) Paint (6) directional arrows (White). Paint (33) “Faculty/Staff” parking space identifiers (White & Black). Paint (2) handicapped parking spaces (Blue). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ $_______________ Page 10 of 12 18 TTC Main Campus – Parking Lot “T” Paint 1,098feet of 4” wide parking space lines (White). Paint 270 feet of curbing, Top & Sides (Yellow). Paint (1) cross-walk (White). Paint (2) directional arrows (White). Paint (1) large “No Parking Zone” parking space identifier (White). Paint (2) “Motorcycle Parking on Curb” parking space identifiers (White) Paint (3) handicapped parking spaces (Blue). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 19 TTC Main Campus – Parking Lot “U” Paint 3,294 feet of 4” wide parking space lines (White). Paint (10) stop bars including the word “STOP” in all capital letters. (White) Paint 218 feet of curbing, Top & Sides (Yellow). Paint (1) cross-walk (White). Paint (16) directional arrows (White). Paint (3) handicapped parking spaces (Blue). $_______________ Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 20 TTC Main Campus – Parking Lot “V” Paint 1,026 feet of 4” wide parking space lines (White). Paint (3) stop bars including the word “STOP” in all capital letters. (White) Paint 2.045 feet of double center-line (Yellow). Paint (1) speed bump (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ $_______________ Page 11 of 12 21 TTC Main Campus – Parking Lot “W” $_______________ Paint 1,494 feet of 4” wide parking space lines (White). Paint (2) stop bars including the word “STOP” in all capital letters. (White) Paint (1) handicapped parking space (Blue). Paint (1) cross-hatched “No Parking” parking space identifier (White) Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 22 TTC Main Campus – Parkway Street $_______________ Paint 216 feet of 4” wide parking space lines (White) Paint (4) cross-walks (White). Paint (6) “Yield” triangle symbols (Yellow & Black). Paint (2) stop bars including the word “STOP” in all capital letters. (White) Paint (4) directional arrows (White). Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ 23 TTC Main Campus – Wetterau Ave. $_______________ Paint 730 feet of 4” wide parking space lines (White). Paint 1,025 feet of double center-line (Yellow). Paint (2) stop bars including the word “STOP” in all capital letters. (White) Resident Contractor Preference: _____ Resident Subcontractor Preference (2%): _____ Number of subcontractors claimed: _____ Resident Subcontractor Preference (4%): ____ Number of subcontractors claimed: ______ Lot 1 Total: Bidding schedule continued on next page. $_______________ Page 12 of 12 SC Certified Minority Vendor: Y N S.C. Cert. #. Certifications: I am _____, am not ________ currently in the parking lot and roadways painting and marking business. ___________________________________ Name ___________________________________ Signature ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ I do _____, do not ________ currently have the equipment and manpower in place to perform the contracted services as specified. Name ___________________________________ Signature