Green Energy Audit WALKTHROUGH – OFFICES Building characteristics Dimensional characteristics Gross volume __________ (m3) CL 6.01 Net area __________ (m2) Year of construction Retrofit action already taken Characteristics of facilities Heating system Heat generation Heating terminals Regulation control system Roof insulation year ________ External wall insulation year ______ Windows replacement year Boiler replacement year _________ Other (specify) ______________________________ year ________ Other (specify) ______________________________ year ________ Other (specify) ______________________________ year ________ Autonomous Centralized Boiler Heat pump Air heater ___________________ Heat exchanger (district heating) CHP Heat capacity (kW) ______________ Energy carrier Natural gas Diesel oil LPG Other (specify _________________________________________________ Radiators Heating panels Other (specify) ______________ _______________________________________________________________ Manual Centralised Local Zone DHW production Geyser Autonomous with storage tank Electric boiler Combined boiler (heating and DHW) Heat exchanger (district heating) Summer cooling No Air centralised Hydronic centralised (fan-coil units) Split system Multisplit Other (specify) _______________________________________________ Cooling capacity (kW) ______________ Chiller Compression cycle Absorption cycle Heat exchanger (district heating) Fuel (for absorption cycles) Natural gas LPG Other (specify) ________________________________________________ Note JOB Code Building Auditor Date Sheet ____ of____ Green Energy Audit WALKTHROUGH – OFFICES Instrumental survey Type of survey Average internal air temperature (°C) CL 6.01 Value Remarks Average temperature of external walls (°) Average floor temperature (°) Average surface temperature of the ceiling (°) Average luminance (lx) Maximum luminance (lx) Minimum luminance (lx) Building envelope (shell) Questions Has the roof deteriorated? Check Yes No NA Is the maintenance of the exterior facade scheduled? is it technically possible to apply the insulation outside with the ETICS technique? Is there surface condensation on the walls? Is the air-tightness of the windows good? Yes No NA Is the acoustic quality of the windows good? are there infiltrations of air through the external roller-blind fitment-box? Is the replacement of the windows already scheduled? Yes No NA Are the windows equipped with external shields or reflecting panes? Are the windows equipped with internal shielding? Is there the space on the roof for the installation of a solar thermal system? Is there the space on the roof for the installation of a solar PV system? Yes No NA JOB Code Building Remarks Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Auditor Date Sheet ____ of____ Green Energy Audit WALKTHROUGH – OFFICES HVAC Systems Questions Are the facilities managed through an outsourced contract? Are the boilers older than 20 years? Is the boiler replacement already planned? The thermostat, if installed, is programmable? Inside the building are there rooms too hot or too cold due to a malfunction of the terminals? The perceived thermal comfort is considered fairly good in the winter? The perceived thermal comfort is considered fairly good in the summer? Is the control system able to differentiate the management of the various heating zones? Plumbing and DHW systems The toilets are equipped with quick couplers? are the taps fitted with low-flow aerator? Check Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Is there available space for the installation of a solar storage tank? Yes No NA Lighting Are the luminaries dirty? Yes No NA Are there glare phenomena? Yes No NA Are there inefficient lamps to be replaced? Yes No NA Are there inefficient control systems? Yes No NA Are emergency lights always on? Does the lighting system consider the different needs? Is it possible to install efficient control systems (for example, electronic ballasts, dimmers, etc..)? Is it possible to differentiate the lighting? Yes No NA Yes No NA Building Remarks Yes No NA Is the DHW water temperature too warm? JOB Code CL 6.01 Yes No NA Yes No NA Auditor Date Sheet ____ of____ Green Energy Audit WALKTHROUGH – OFFICES Electrical appliances Questions Do the appliances remain switched on even outside of working hours Are the appliances often left unused? Is it possible to centralise the use of certain appliances (e.g. printers) ? Some devices are to be replaced? Are the regulatory limits for visual comfort respected? CL 6.01 Check Yes No NA Remarks Yes No NA Yes No NA Yes No NA Yes No NA Notes JOB Code Building Auditor Date Sheet ____ of____