Green Energy Audit WALKTHROUGH – RESIDENTIAL Building characteristics Building typology CL 6.00 Single family house Terraced house Multi family house Apartment block Tower building Other (specify) ______________ the building consists of ______ flats (apartments) and __________ housing unit for non residential uses (specify) _____________ Dimensional characteristics Gross volume __________ (m3) Year of construction ____________ Retrofit action already taken Roof insulation year ________ External wall insulation year ______ Windows replacement year Boiler replacement year _________ Other (specify) ______________________________ year ________ Other (specify) ______________________________ year ________ Other (specify) ______________________________ year ________ Characteristics of facilities Heating system Heat generation Heating terminals Control and regulating system Energy metering system DHW production Summer cooling Net area __________ (m2) Autonomous Centralised Boiler Heat pump Air heater ___________________ Heat exchanger (district heating) CHP Heat capacity (kW) ______________ Energy carrier Natural gas Diesel oil LPG Other (specify _________________________________________________ Radiators Heating panels Other (specify) ______________ _______________________________________________________________ Manual Centralised Local Zone Yes No Geyser Autonomous with storage tank Electric boiler Combined boiler (heating and DHW) Heat exchanger (district heating) No Air centralised Hydronic centralised (fan-coil units) Split system Multisplit Other (specify) _______________________________________________ Cooling capacity (kW) ______________ Notes JOB Code Building Auditor Date Sheet ____ of ____ Green Energy Audit WALKTHROUGH – RESIDENTIAL Instrumental survey Type of survey Average internal air temperature (°C) CL 6.00 Value Remarks Average temperature of external walls (°) Average floor temperature (°) Average surface temperature of the ceiling (°) Average luminance (lx) Maximum luminance (lx) Minimum luminance (lx) Building envelope (shell) Questions Has the roof deteriorated? Check Yes No NA Is the maintenance of the exterior facade scheduled? is technically possible to apply the insulation outside with the ETICS technique? Is there surface condensation on the walls? Is the air-tightness of the windows good? Yes No NA Is the acoustic quality of the windows good? are there infiltrations of air through the external roller-blind fitment-box? Is the replacement of the windows already scheduled? Yes No NA Are the windows equipped with external shields or reflecting panes? Are the windows equipped with internal shielding? Is there the space on the roof for the installation of a solar thermal system? Is there the space on the roof for the installation of a solar PV system? Yes No NA JOB Code Building Remarks Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Auditor Date Sheet ____ of ____ Green Energy Audit WALKTHROUGH – RESIDENTIAL HVAC Systems Questions Are the facilities managed through an outsourced contract? Are the boilers older than 20 years? Is the boiler replacement already planned? The thermostat, if installed, is programmable? Inside the building are there rooms too hot or too cold due to a malfunction of the terminals? The perceived thermal comfort is considered fairly good in the winter? The perceived thermal comfort is considered fairly good in the summer? Plumbing and DHW systems The toilets are equipped with quick couplers? are the taps fitted with low-flow aerator? Check Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Is there available space for the installation of a solar storage tank? Yes No NA Lighting Are the luminaries dirty? Yes No NA Are there glare phenomena? Yes No NA Are there inefficient lamps to be replaced? Yes No NA Are there inefficient control systems? Yes No NA Are emergency lights always on? Does the lighting system consider the different needs? Is it possible to install efficient control systems (for example, electronic ballasts, dimmers, etc..)? Is it possible to differentiate the lighting? Yes No NA Yes No NA Building Remarks Yes No NA Is the DHW water temperature too warm? JOB Code CL 6.00 Yes No NA Yes No NA Auditor Date Sheet ____ of ____