Lyon Court s t o r m d r a i n a g e September 2010 i m p r o v e m e n t p r o j e c t your storm water fees at work Dear Resident: Charlotte-Mecklenburg Storm Water Services has hired a consultant, USInfrastructure Inc., to study and investigate possible improvements to the storm drainage system in the Lyon Court project area. The project limits are roughly bounded by The Plaza to the west, Belvedere Avenue to the north, Truman Road and Morningside Drive to the east, and McClintock Road to the south. R. Joe Harris continues to collect survey information in the project area. USI will use this information to begin the planning phase of the project. The first analysis performed will be of the existing conditions within the Lyon Court project area. For more information, please visit our website at: http://stormwater.charmeck.org (Click on Storm Water Projects, Storm Water Projects again and then Lyon Court). If you have any questions about this project, please contact Project Manager William Harris at 704-353-1147 or email wtharris@charlottenc.gov. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202