Lyon Court your storm water fees at work

advertisement
Lyon Court
s t o r m
d r a i n a g e
September 2010
i m p r o v e m e n t
p r o j e c t
your storm water fees at work
Dear Resident:
Charlotte-Mecklenburg Storm Water Services has
hired a consultant, USInfrastructure Inc., to study
and investigate possible improvements to the storm
drainage system in the Lyon Court project area. The
project limits are roughly bounded by The Plaza to
the west, Belvedere Avenue to the north, Truman
Road and Morningside Drive to the east, and
McClintock Road to the south.
R. Joe Harris continues to collect survey information
in the project area. USI will use this information to
begin the planning phase of the project. The first
analysis performed will be of the existing conditions
within the Lyon Court project area.
For more information, please visit our website at:
http://stormwater.charmeck.org (Click on Storm
Water Projects, Storm Water Projects again and
then Lyon Court).
If you have any questions about this project, please
contact Project Manager William Harris at
704-353-1147 or email wtharris@charlottenc.gov.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202