UNDER CONSTRUCTION Ashley Farm Pond RESTORATION PROJECT Dear Resident: October 2014 Construction continues for the Ashley Farm Pond Restoration Project. The Contractor, Blythe Development Company, is making progress on the proposed pond improvements, including: 1. Installing erosion control measures. 2. Temporarily draining the pond and relocating the fish. 3. Installing and stabilizing a temporary bypass ditch. Construction continues with the installation of a small block wall to stabilize the pond’s shoreline. Once the pond’s shoreline has been stabilized, construction of the outlet structure and dam embankment should commence. For more information about this project, please visit our website to view project updates and exhibits at: stormwater.charmeck.org. Click on Storm Water Projects drop down menu in the green bar, then Active Projects and Ashley Farm Pond. Temporary bypass ditch to drain the pond. If you have any questions, please contact one of the following members: Construction Inspector: Charlotte Drzewiecki: 704-361-7597 Email: cdrzewiecki@charlottenc.gov Construction Supervisor: Steve Canter: 704-336-7047 Email: scanter@charlottenc.gov Project Manager: Tom Purvis: 704-336-3660 Email: tpurvis@charlottenc.gov A construction inspector is on site daily to address any questions or concerns. Please note efforts are taken to minimize disruption to nearby properties. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Ashley Farm Pond Project Update HIGHLIGHTS