Ashley Farm Pond

advertisement
UNDER CONSTRUCTION
Ashley Farm Pond
RESTORATION PROJECT
Dear Resident:
October 2014
Construction continues for the Ashley Farm Pond Restoration Project.
The Contractor, Blythe Development Company, is making progress on
the proposed pond improvements, including:
1. Installing erosion control measures.
2. Temporarily draining the pond and relocating the fish.
3. Installing and stabilizing a temporary bypass ditch.
Construction continues with the installation of a small block wall to
stabilize the pond’s shoreline. Once the pond’s shoreline has been
stabilized, construction of the outlet structure and dam embankment
should commence.
For more information about this project, please visit our website to
view project updates and exhibits at: stormwater.charmeck.org.
Click on Storm Water Projects drop down menu in the green bar,
then Active Projects and Ashley Farm Pond.
Temporary bypass ditch to drain the pond.
If you have any questions, please contact one of the following members:
Construction Inspector:
Charlotte Drzewiecki: 704-361-7597
Email: cdrzewiecki@charlottenc.gov
Construction Supervisor:
Steve Canter: 704-336-7047
Email: scanter@charlottenc.gov
Project Manager:
Tom Purvis: 704-336-3660
Email: tpurvis@charlottenc.gov
A construction inspector is on site daily to address any questions or concerns.
Please note efforts are taken to minimize disruption to nearby properties.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Ashley Farm Pond Project Update