Rea Road Widening Project December 2011

advertisement
Rea Road Widening Project
December 2011
ifakhreddin@charlottenc.gov
704-336-7926 or
Management
Engineering & Property
Senior Project Manager
Imad Fakhreddin, P.E.
please contact
on this project,
For more information
The City will continue to keep
you informed of the status of
this project.
Project Features
The Rea Road Widening
Project will widen Rea Road
from Highway 51 to Colony
Road to a median-divided
street with one travel
lane in each direction with
sidewalks, bicycle lanes and
planting strips. This project
will improve sight distance
along Rea Road and better
accommodate motorists,
pedestrians and bicyclists.
For more information epm.charmeck.org
The bid phase is underway
and includes prequalifying
contractors to insure the low
bidder has the resources and
experience to perform the
work. City Council award is
required for final construction
contract approval.
Project Status
Utility relocations are
underway. The relocation
of Time Warner’s overhead
cable will resume after the
first of the year. Piedmont
Natural Gas relocation work
has slowed as underground
rock was encountered
during the installation of the
new 8-inch gas line. This
work will continue and be
completed before the roadway
construction starts in spring
2012. Both utilities do not
anticipate any disruptions of
service to your home during
this work.
Engineering & Property
Management
600 East Fourth Street,
Charlotte NC 28202-2861