Rea Road Widening Project April 2010 ifakhreddin@charlottenc.gov 704-336-7926 or Management Engineering & Property Senior Project Manager Imad Fakhreddin, P.E. please contact on this project, For more information The City will continue to keep you informed of the status of this project. Funding for this project was included in the November 2008 bond referendum. scheduled to start in early 2011 and will be followed by constrution. For more information epm.charmeck.org Utility relocation is Project Status The project is in the real estate acquisition phase and representatives are currently working with the property owners to acquire easements necessary for construction. Project Features The Rea Road Widening Project will widen Rea Road from Highway 51 to Colony Road to a two-lane median divided roadway with sidewalks, bicycle lanes and planting strips. This project will improve safety by eliminating the sight distance problems along Rea Road. Upon completion, this project will provide safer travel for all modes of transportation including motorists, pedestrians and bicyclists. Engineering & Property Management 600 East Fourth Street, Charlotte NC 28202-2861