SMOV Status & Planning Meeting Notes 6/25/09 Notes provided by Burley (richard.j.burley@nasa.gov), Biagetti (biagetti@stsci.edu, and others as indicated. - Summary: The gyro motor current safemode limits were established for 3 gyro operations. TCS team recommends raising the temperature limits of the STIS MEB1 for “hotseason” operations. WFC3 UVIS Anneal, IR Functional, and other internals all look nominal. The WFC3 CSM test (first WFC3 external observation) was successful; M81 UVIS images and IR images are nominal and look to be near focus. COS FUV high-voltage ramp-up continues with good results. ACS remains in Suspend. STIS MAMAs and COS NUV remain idle while ARB analysis continues. [Note: Post-meeting, the SI C&DH ARB authorized the resumption of SMOV high-voltage operations, pending the development and installation of appropriate protection measures relative to a repeat of the SI C&DH anomaly. STIS CCD and COS FUV SMOV have already resumed this week. The resumption of COS NUV SMOV is planned for SMS187 (July 6). STIS MAMA SMOV resumes only after implementation of low-voltage management (2-4 weeks to complete) and proper protections put in place. rd Resumption of ACS SMOV is pending the investigation of the June 23 Suspend anomaly.] - Observatory Status o PCS/SAC The gyro motor current safemode limits were established for 3 gyro operations • Gyro 3 was removed from the vehicle control law • Bias and offset tables were loaded for the A-failed gyro triplet. • Subsequent pointing control system performance was nominal. • OBAD maps were executed per Ops Request 18554 o In each of the next two orbits to monitor vehicle attitude and bias. Vehicle bias • Estimated at 175:23:50 • Approximately sufficiently large to warrant a LBBIAS • However delays in the processing of the load prevented its uplink prior to the vehicle slew at 01:12. • The GS Acquisition at 01:45 failed due to the high gyro bias preventing the observer from converging. • A subsequent set of OBAD maps were executed at 02:55 and 03:20 to produce an updated LBBIAS o uplinked prior to the GS Acquisition at 06:12. o The acquisition and subsequent reacquisition were successful. • The MEGG appears to indicate that no science observations were being performed between 01:45 and 06:00. o EPS o TCS: JAbel Nominal TCS Team reported to Project on STIS MEB1 temperature situation (after SMOV meeting) Nominal • • - Indicates that action needs to be taken to avoid the possibility of an unplanned safing action in the hot season Recommends raising MEB1 constraint and safing limit by TBD amount o enough to allow unrestricted science operations o I&C Nominal o DMS Nominal o 486FSW Nominal o SAFING Nominal o SIC&DH & P/L FSW B-Side operation continues Support for DOY 166 CU/SDF Lockup investigation continues • ARB status report, Thursday 25 June, 9 am. SI Status o o WFC3 Engineering • Status o Operate • Previous 24 hrs o 11808 – UVIS bowtie monitor o 11420 – IR detector functional test o 11421 – WFC3 CSM test o 11424 - Initial UVIS alignment (1 of 3) UTC COS • Forward Plan o 11543 – IR tungsten lamp cross-check o 11425 – WFC3 Initial IR alignment o 11808 – UVIS bowtie monitor o 1142603 - UVIS Contamination Monitor • Science: SDeustua o Bowtie monitor results look nominal o UVIS Anneal (11431) Preliminary bias/dark analyses are nominal o IR Detecor Functional Read Noise and Dark Current are nominal o Team continues to work previously reported CALWF3 pipeline errors o For more details, see the attached WFC3SMOV_June25_science Engineering. • Status: o Operate / FUV Operate Vacuum gauge ~2.1e-6 torr FUV initial HV Turn-On visits 11 and 12 of 13 completed at 175/20:53 UTC Forward Plan o FUV-only observing until investigations into UV/MAMA imaging have been completed o FUV initial HV Turn-On continues with visit 13 of 13 at 177/11:55 UTC OR to be submitted to clear COS event flag 3 to allow FUV commanding o o • Science. TKeyes/DSahnow • Science analysis of on-going FUV High-Voltage Turn-On (Visits R1, R2) o All nominal • More details in the attached COS_SMOV_update_25June2009[updated] o FGS/OTA Nominal Analysis remains on schedule for commissioning of FGS2R2 as a guider during the SMS182 HSTAR 11898: FGS-1 Initiated Unscheduled Acquisition • At 176/06:45:54, FGS-1 began executing an acquisition. • The scheduled REAcq begins at 176/06:52:14. • HST in SAA level 1. • Possibly caused by bit flip. • FGS-1 returned to the default position (176/06:48:15) prior to the start of the REAcq. • The REAcq was successful. o ACS o STIS Engineering • Status o No change: Suspend • Forward Plan o Suspend investigation continues, formation of Tiger Team and/or ARB expected o Once recovered, CCD-only observing until investigations into UV/MAMA imaging have been completed Science. LSmith • Nothing to report Engineering • Status o Operate/CCD On o MAMAs 1&2 LV Off • Forward Plan o CCD-only observing until investigations into UV/MAMA imaging have been completed o CCD Dark & Bias Monitoring continues 177/06:00 – 07:58 UTC o - - Science. CProffitt NICMOS/NCS Status • ESM in Safe • TPS ~7.3e-7 torr • NCS CPL in Safe/Hold at -39 degC Forward Plan • Recovery plan tbd P&S Status o Calendar/SMS builds o Replans SMS180 • In work SMS182 • Expected to contain updates for FGS2R2 guiding enable Operations o FOT o PACOR Nominal From June 24 (8am) to June 25 (8am), Pacor-A received five events with fast-track observations. • The data was processed and delivered to OPUS without any problems. o OPUS Planning to install a quick fix for calwf3 (PR 62948) • To solve the failures in processing WFC3/IR subarrays. • Fix was delivered by SSB to DSB yesterday afternoon o Will be tested with regression data this morning. o After the regression data are reviewed and OKed, we will install the fix in operations. o There is a window when no quick turn-around dumps are scheduled Between 11:36 UT today and 15:37 UT tomorrow Installation can be activated with no effect on SMOV. SSB delivered a version of MultiDrizzle • Will fix problems seen in On-The-Fly Reprocessing for two ACS associations from August 2004. • We will install this only if the regression data are OKed. Nominal Supported VDT gyro configuration and gyro bias update Neither of these fixes are expected to solve the "segmentation violation" errors seen with WFC3/UVIS overnight. • If a re-delivery of calwf3 solving that problem is received soon and tested, we will consider installing it in this time window Otherwise we will have to look for suitable gaps in quick turn around dumps early next week. Data for WFC3 proposal 11424 will be fast-tracked early this morning • no other fast-track data are expected in the next 24 hours. • o Archive Nominal