SMOV Status & Planning Meeting Notes 6/24/09 Summary:

advertisement
SMOV Status & Planning Meeting Notes
6/24/09
Notes provided by Burley (richard.j.burley@nasa.gov), Biagetti (biagetti@stsci.edu, and others as
indicated.
- Summary:
The meeting included an ops briefing for the upcoming Vehicle Disturbance
Test and associated gyro reconfigurations. The SI C&DH anomaly investigation continues;
the ARB reports out tomorrow, possibly with recommendations for upcoming SMOV
operations. Pending these recommendations, COS NUV and STIS MAMA operations remain
temporarily halted. The ACS suspended mid-day, yesterday, apparently due to a loss of
communication between the CS and the ASIC. A tiger-team investigation is underway.
WFC3 has been returned to normal Operate mode and is performing internals. Its first
external observation is scheduled for late today. The COS recovery from yesterday’s
Suspend was successfully completed in time for the scheduled resumption of the FUV highvoltage ramp-up. STIS CCD internals are continuing.
- Observatory Status
-
o
PCS/SAC
 Nominal
 The VDT3 is scheduled for tomorrow, June 25 (DOY 176)
• Gyro456 configuration today
• Gyro345 post-VDT
• For ops briefing, see attached Ops Briefing_VDT_v5 24JUN09
o
EPS

o
TCS: JAbel
 Nominal
 STIS MEB1 thermal analysis report today at 2pm.
o
I&C

Nominal
o
DMS

Nominal
o
486FSW
 Nominal
o
SAFING
 Nominal
o
SIC&DH & P/L FSW
 B-Side operation continues
 Support for DOY 166 CU/SDF Lockup investigation continues
• ARB status report, Thursday 25 June, 9 am.
SI Status
Nominal
o
WFC3
 Engineering
• Status
o Operate
• Forward Plan
o IR Flats and Darks continue 175/12:49 – 19:40 UTC
o UVIS Bowtie Test 175/19:42 UTC
o CSM Test 175/20:00 – 21:20 UTC
 First external observation
o IR Tungsten Lamp Tests 175/22:00 – 176/01:25 UTC
•
o
COS

Engineering.
• Status: Suspend/Boot
o Operate / FUV Operate
 Recovery from yesterday’s Suspend
successfully completed
 Ops Request 18549-4 at 174/19:50 UTC
 FUV ramped to HVNom
 OSM1, -2, and ApM successfully commanded for
their SMS intercept positions
• G130M, G185M and PSA/FUV respectively
• OSM2 successfully initialized to home
position of 72
o Vacuum gauge ~2.2e-6 torr
o FUV initial HV Turn-On resumed with visit 11 of 13 at
175/12:00 UTC
•

Science: SDeustua
o Previous 24 hours:
 11808 – UVIS bowtie monitor
 11431 – UVIS anneal
o Some analysis results from the latest Bowtie Monitor are
found in the attached WFC3June24.summary.
Forward Plan
o FUV-only observing until investigations into UV/MAMA
imaging have been completed
o OR to be submitted to clear COS event flag 3 to allow
subsequent FUV commanding
o FUV initial HV Turn-On continues with visit 12 of 13 at
175/20:30 UTC
 OR to be submitted to clear COS event flag 3 to
allow subsequent FUV commanding
Science. TKeyes/DSahnow
• More details on the upcoming FUV activities are found in the
attached COS_SMOV_update_24June2009
o
FGS/OTA
 Nominal
 Analysis on schedule for commissioning of FGS2R2 as a guider during the
SMS182
o
ACS

Engineering

o
STIS


o
-
•
Status
o Suspend at 174/16:19:58 (HSTAR 11895)
 ACS 955, 1002 STB messages seem to indicate
loss of communication between the CS and the
ASIC
•
Forward Plan
o ACS Suspend investigation underway
 formation of Tiger Team and/or ARB expected
o UV/MAMA usage not allowed until ARB recommendation
Science. LSmith
• Nothing to report
Engineering
• Status
o Operate/CCD On
o MAMAs 1&2 LV Off
o CCD Dark & Bias Monitoring resumed 175/06:00 – 08:01
UTC
• Forward Plan
o CCD-only observing until investigations into UV/MAMA
imaging have been completed
o CCD Dark & Bias Monitoring continues 176/06:00 – 07:53
UTC
Science. CProffitt
• The STIS CCD took its first internal darks and biases since the SI
C&DH anomaly
o A very quick look suggests the data looks OK.
NICMOS/NCS
 Status
• ESM in Safe
• TPS ~7.3e-7 torr
• NCS CPL in Safe/Hold at -39 degC
 Forward Plan
• ESM recovery to Operate and PCE turn-on TBD
P&S Status
o
Calendar/SMS builds
 See Replans, below.
o
Replans
 SMS180
• 2-day sms to allow for FGS2R2 uplinks to enable FGS2 guiding
• Delivery no earlier than Friday evening
• MAT LEI may resume in this sms or the next one
 SMS182
• Contents pending SI C&DH ARM recommendations
• Goal to deliver
-
Operations
o
FOT

o
PACOR
 Nominal
o
OPUS
 Overnight 6 WFC3 associations errored in calibration
• "invalid floating point operation" Iraf error.
• WFC3 Team is investigating
 Data for proposals 11356 (COS), 11421 (WFC3), and 11424 (WFC3) will be
fast-tracked during the next 24 hours.
o
Archive
 Nominal
Nominal
Download