SMOV Status & Planning Meeting Notes 6/13/09 Notes provided by Burley (richard.j.burley@nasa.gov), Biagetti (biagetti@stsci.edu, and others as indicated. - Summary Spacecraft subsystems continue to operate nominally. The plans and procedures for gyro calibrations are in place. The COS FUV high-voltage ramp-up and NUV alignment activities continue according to plan. ACS first external observation (first light), a SMOV cross-talk check, has occurred; analysis is ongoing. The WFC3 mechanism checkouts and UVIS detector functional are proceeding per the plan; preliminary results are all positive. The replan to resume the STIS NUV high-voltage ramp-up is in place for next week. - Observatory Status o o - PCS/SAC: DSmith Plans for the gyro calibration process, scheduled to start Sunday night, are in place. • See attached SMOV_PCS_June_13 EPS Nominal o TCS: JAbel Nominal o I&C Nominal o DMS Nominal o 486FSW Nominal o SAFING Nominal o SIC&DH & P/L FSW Nominal SI Status o WFC3 Engineering • Status o Operate o Nominal Science: SDeustua • o COS Engineering. • Status o Operate, FUV Operate/HVLow o Vacuum gauge ~2.9e-6 torr o OR 18511-0 successfully completed 163/16:21 UTC to uplink GENSLEW values for use in Proposal 11469 o OR 18512-2 successfully completed 163/22:03 UTC to update COS aperture positions in FSW • Preliminary analyses have been done on the following o 11808 – UVIS bowtie monitor – nominal No evidence of bowtie Flat fields are nominal o 11422 – SOFA test – nominal Filter wheels operated successfully Filters look nominal o 11423 – IR FSM test Filter wheels operated successfully Filters look nominal o 11419 – UVIS detector functional test – nominal Readnoise is very good • <3e Dark current is good – preliminary Gain data to be taken this weekend o See attached WFC3_SMOV_2009_June_12 Forward Plan o OR 18514-0 submitted to clear COS Event Flag 3 after FUV initial turn on Part 3-4 completes o COS-to-FGS Alignment / Coarse Focus visit2 164/12:54 UTC R/T uplink to update focus/mechanism position 164/12:54 UTC o COS Fine Optical Alignment visit1 164/14:00:24 Genslew updates 164/14:07 UTC o FUV initial HV turn-on visits 11/12 (Part 3-5) scheduled 165/19:00 UTC OR to be submitted to clear COS event flag 3 to allow FUV commanding to proceed Science. TKeyes/DSahnow th • FUV HV taken to 4 intermediate ramp-up level o Diagnostics, background, wavecal spectral All nominal • COS-to-FGS Alignment/Coarse_Focus o On-going analysis Results to be uplink prior to start of COS Fine Optical Alignment (11469) o Postrg anomaly (reported yesterday) is now understood PR filed vs. TRANS Implementation for 11469 visit 7 to be performed via intercept to SMS 166 o ACQ/SEARCH & ACQ/IMAGE anomalies (reported yesterday) Possible patchable constant update for ACQ/SEARCH Investigation continues for ACQ/IMAGE Test for these anomalies to be included in the intercept sms for postrg correction, above For more details, see attached COS_SMOV_update_13June2009_updated • o FGS/OTA Nominal o ACS o STIS Engineering • Status o Nominal Science. LSmith • ACS first external observation (first light) has completed o ACS08 WFC Cross Talk (11371) o Data will be processed this morning • SBC UV contamination check (11372) o Third and last check of BEA-related UV throughput o Results are nominal and within specs o For more details, see the attached SBC_third UV contam check 12June09 Engineering • Status o Operate/CCD On, MAMAs 1&2 LVOn (SAA cycling) o NUV HV activities remain suspended until next week Science. CProffitt • Forward Plan for the revised SMS166 o Monday FUV MAMA Format Verification V01 6/15 15:53 FUV MAMA Format Verification V02 6/15 16:17 NUV HV recovery V3 6/15 18:01 - data fast tracked FUV Im Quality 6/15 20:28 - external target o o o o Tuesday CCD Throughput V01 6/16 6:34 - external target CCD Throughput V02 6/16 9:46 - external target Wednesday NUV HV recovery V4 6/17 17:00 - data fast tracked Friday NUV Format 6/19 13:59 & 14:32 NUV Dark 6/19 15:50 NUV Dark 6/19 21:25 Sunday NUV Im Qual 6/21 13:48 - external target o - - MAMA Spectro TP, V02 6/21 17:29 - external target NICMOS/NCS Status • No change • NCS Tiger Team meeting on 16 June to discuss potential restart P&S Status o Calendar/SMS builds SMS166 (with STIS replan) is delivered • Intercept sms planned for later in week o To contain COS Postrg/acqimage/acqsearch tests 2 orbits SMS180 work to start mid-week o Replans SMS173 • To contain the rest of STIS replan • Goal to deliver by Thursday Operations o FOT o PACOR: BPatel From June 12 (8am) to June 13 (8am), Pacor-A received two events with fast-track observations. • The data was processed and delivered to OPUS without any problems. o OPUS Nominal Continuing to fast-track data coming over the next 24 hours • ACS proposals 11371 and 11510 • COS proposal 11469 • STIS proposal 11351 We now have 12 WFC3 associations errored in calibration • from proposal 11419 • need a keyword rules change for these) • 6 exposures for the same proposal with a missing bias reference file. o WFC3 team is looking into the problem • We FTPed the files which have not been archived due to errors, to the WFC3 team. Mission schedule processing failed in the stisfringe process • due to a failed database query on a temporary table that wasn't found • Under investigation o Archive Nominal