SMOV Status & Planning Meeting Notes 6/23/09 Notes provided by Burley (richard.j.burley@nasa.gov), Biagetti (biagetti@stsci.edu, and others as indicated. - Summary - Observatory Status o o o - PCS/SAC Nominal EPS Nominal o TCS: JAbel Nominal STIS MEB1 thermal analysis report tomorrow at 2pm. o I&C Nominal o DMS Nominal o 486FSW Nominal o SAFING Nominal o SIC&DH & P/L FSW B-Side operation continues Support for DOY 166 CU/SDF Lockup investigation continues • ARB • Tiger Team • UV Detectors Contamination Splinter • UV Optics Contamination Splinter • MEB Reset Splinter • Project status report, Thursday 25 June, 9 am. SI Status o WFC3 Engineering • Status o Operate o OR 18545-0 completed to return WFC3 to Operate 171/04:50 UTC o Stored commanding to Anneal 173/13:00 UTC o o Transition down to nominal UVIS and IR setpoints (-83 degC and -128 degC respectively) 145/01:45 UTC WFC3 entered safe mode last Friday at 2009.170:23:53:02 UT limit violation of MEB2 side wall temperature (mnemonic IMEB2ST) • too cold, possibly because other SIs were off • o COS o Science: SDeustua o Nothing to report Engineering. • Status: Suspend/Boot o COS Suspended at 173/16:21:28 UTC on OSM2 out of tolerance during transition to Mech Operate (HSTAR 11893) o Event Status Buffer Messages: 173/16:21:28.479 COS 932 -- OSM2 Home Move Out of Tolerance 173/16:21:28.979 COS 934 -- OSM Mech Initialization Not Successful 173/16:21:29.479 COS 996 -- Slow Suspend Initiated 173/16:21:30.479 COS 995 -- Slow Suspend Complete o Recovery plan detailed in Ops Briefing following the SMOV meeting Recommend a FSW Patch to re-center OSM2 ‘FSW Home’ Position • Preserves COS activities in current SMS See attached HSTAR-COS Suspend Status Mtg v1 23Jun09 Ops briefing today at 1:30 • Guidestar WG moved to 2 pm • occurred during instrument recovery from Monday's commanded safe mode entry. A second attempt to recover WFC3 was successful • recovered to PreHeat mode • in preparation for Sunday's SMS173 Investigation of the procedure is underway Forward Plan o FUV-only observing until investigations into UV/MAMA imaging have been completed o FUV initial HV Turn-On resumes with visit 11 of 13 at 175/12:00 UTC Science. TKeyes/DSahnow • Nothing to report FGS/OTA Nominal o ACS o STIS o Analysis on schedule for commissioning of FGS2R2 as a guider during the week of SMS180 Engineering • Status: Operate/WFCOp o Successfully recovered from Safe to Operate 173/14:51 UTC o WFC TEC cooled to -81 degC o SBC LV Off • Forward Plan o CCD-only observing until investigations into UV/MAMA imaging have been completed o WFC Functionals resume 175/01:53 – 175/17:19 UTC Science. LSmith • Report on ACS/SBC SMOV focus check • Proposals 11324, 11372, 11378 • Encircled energy curves look unchanged pre- and post-servicing • See attached SBC_focus 23jun09 Engineering • Status o Operate/CCD On o MAMAs 1&2 LV Off • Forward Plan o CCD-only observing until investigations into UV/MAMA imaging have been completed o CCD Dark & Bias Monitoring resumes 175/06:00 – 08:01 UT Science. CProffitt • This week we'll only be obtaining CCD darks and biases. • Working splinter groups for o Optical Contamination (needed to allow external observations for STIS waiting to see analysis of WFPC2 mirror. Hope to decide Tuesday or Wed whether external STIS CCD observations are OK. Need to know by Thursday morning whether external CCD observations are OK. A time critical DD proposal needs to use the STIS CCD on July 1. o MAMA Safety (needed for any MAMA operations). Issue being worked May take a few days yet to complete thorough analysis. NICMOS/NCS Status • ESM in Safe • TPS ~7.3e-7 torr • NCS CPL in Safe/Hold at -39 degC Forward Plan • ESM recovery to Operate and PCE turn-on TBD o o - - Ops briefing is tbd Goal is still to restart NCS in July P&S Status o Calendar/SMS builds SMS175 delivered yesterday • Contains resumption of SMOV for WFC3 UVIS/IR, ACS/WFC, COS FUV o Replans SMS180 • 2-day sms to allow for FGS2R2 uplinks to enable FGS2 guiding • Delivery no earlier than Friday evening • MAT LEI may resume in this sms or the next one SMS182 • Contents pending SI C&DH ARM recommendations Operations o FOT o PACOR Nominal o OPUS Nominal o Archive Nominal Nominal