SMOV Status & Planning Meeting Notes 6/23/09 -

advertisement
SMOV Status & Planning Meeting Notes
6/23/09
Notes provided by Burley (richard.j.burley@nasa.gov), Biagetti (biagetti@stsci.edu, and others as
indicated.
- Summary
- Observatory Status
o
o
o
-
PCS/SAC
 Nominal
EPS

Nominal
o
TCS: JAbel
 Nominal
 STIS MEB1 thermal analysis report tomorrow at 2pm.
o
I&C

Nominal
o
DMS

Nominal
o
486FSW
 Nominal
o
SAFING
 Nominal
o
SIC&DH & P/L FSW
 B-Side operation continues
 Support for DOY 166 CU/SDF Lockup investigation continues
• ARB
• Tiger Team
• UV Detectors Contamination Splinter
• UV Optics Contamination Splinter
• MEB Reset Splinter
• Project status report, Thursday 25 June, 9 am.
SI Status
o
WFC3
 Engineering
• Status
o Operate
o OR 18545-0 completed to return WFC3 to Operate
171/04:50 UTC
o Stored commanding to Anneal 173/13:00 UTC
o
o
Transition down to nominal UVIS and IR setpoints (-83 degC
and -128 degC respectively) 145/01:45 UTC
WFC3 entered safe mode last Friday at 2009.170:23:53:02
UT
 limit violation of MEB2 side wall temperature
(mnemonic IMEB2ST)
• too cold, possibly because other SIs
were off



•
o
COS

o
Science: SDeustua
o Nothing to report
Engineering.
• Status: Suspend/Boot
o COS Suspended at 173/16:21:28 UTC on OSM2 out of
tolerance during transition to Mech Operate (HSTAR 11893)
o Event Status Buffer Messages:
 173/16:21:28.479 COS 932 -- OSM2 Home Move
Out of Tolerance
 173/16:21:28.979 COS 934 -- OSM Mech
Initialization Not Successful
 173/16:21:29.479 COS 996 -- Slow Suspend
Initiated
 173/16:21:30.479 COS 995 -- Slow Suspend
Complete
o Recovery plan detailed in Ops Briefing following the SMOV
meeting
 Recommend a FSW Patch to re-center OSM2 ‘FSW
Home’ Position
• Preserves COS activities in current SMS
 See attached HSTAR-COS Suspend Status Mtg v1
23Jun09
 Ops briefing today at 1:30
• Guidestar WG moved to 2 pm
•

occurred during instrument recovery from Monday's
commanded safe mode entry.
A second attempt to recover WFC3 was successful
• recovered to PreHeat mode
• in preparation for Sunday's SMS173
Investigation of the procedure is underway
Forward Plan
o FUV-only observing until investigations into UV/MAMA
imaging have been completed
o FUV initial HV Turn-On resumes with visit 11 of 13 at
175/12:00 UTC
Science. TKeyes/DSahnow
• Nothing to report
FGS/OTA
 Nominal

o
ACS


o
STIS


o
Analysis on schedule for commissioning of FGS2R2 as a guider during the
week of SMS180
Engineering
• Status: Operate/WFCOp
o Successfully recovered from Safe to Operate 173/14:51 UTC
o WFC TEC cooled to -81 degC
o SBC LV Off
• Forward Plan
o CCD-only observing until investigations into UV/MAMA
imaging have been completed
o WFC Functionals resume 175/01:53 – 175/17:19 UTC
Science. LSmith
• Report on ACS/SBC SMOV focus check
• Proposals 11324, 11372, 11378
• Encircled energy curves look unchanged pre- and post-servicing
• See attached SBC_focus 23jun09
Engineering
• Status
o Operate/CCD On
o MAMAs 1&2 LV Off
• Forward Plan
o CCD-only observing until investigations into UV/MAMA
imaging have been completed
o CCD Dark & Bias Monitoring resumes 175/06:00 – 08:01 UT
Science. CProffitt
• This week we'll only be obtaining CCD darks and biases.
• Working splinter groups for
o Optical Contamination (needed to allow external
observations for STIS
 waiting to see analysis of WFPC2 mirror.
 Hope to decide Tuesday or Wed whether external
STIS CCD observations are OK.
 Need to know by Thursday morning whether
external CCD observations are OK.
 A time critical DD proposal needs to use the STIS
CCD on July 1.
o MAMA Safety (needed for any MAMA operations).
 Issue being worked
 May take a few days yet to complete thorough
analysis.
NICMOS/NCS
 Status
• ESM in Safe
• TPS ~7.3e-7 torr
• NCS CPL in Safe/Hold at -39 degC
 Forward Plan
• ESM recovery to Operate and PCE turn-on TBD
o
o
-
-
Ops briefing is tbd
Goal is still to restart NCS in July
P&S Status
o
Calendar/SMS builds
 SMS175 delivered yesterday
• Contains resumption of SMOV for WFC3 UVIS/IR, ACS/WFC, COS
FUV
o
Replans
 SMS180
• 2-day sms to allow for FGS2R2 uplinks to enable FGS2 guiding
• Delivery no earlier than Friday evening
• MAT LEI may resume in this sms or the next one
 SMS182
• Contents pending SI C&DH ARM recommendations
Operations
o
FOT

o
PACOR
 Nominal
o
OPUS
 Nominal
o
Archive
 Nominal
Nominal