Spacecraft subsystems continue to operate nominally. Aft-shroud
temperature continue to be monitored closely. Parts 3 and 4 of the COS FUV high-voltage
ramp-up continues according to plan. All internals are looking good. The third FGS AMA
adjustment (S-curve optimization) has been accomplished and analysis is underway. The
ACS Tiger Team has convened in order to determine what response might be needed to the
observed anomalous output drain voltage (Vod) in the WFC. STIS MAMA FUV recovery is
complete and nominal.
- Observatory Status
o
o
-
PCS/SAC: JWirzburger
 HSTAR 11870 – Kalman Filter V2 Coarse Sun Sensor Bias State OOL
• Ground limit only
• Sun Angle ~140 degrees near orbit noon
• Places sun on edge of CSS-4 Monitor Field of View
• Kalman Filter continues to operate nominally
• Under investigation
 For a chart of gyro bias drift, see the attached SMOV_PCS_June_8
EPS
 Nominal
o
TCS: JAbel
 HSTAR 11871; FHST equipment shelf temperatures 18T and 20T, OOL.
Also HSTAR 11873 about CCS Event Analyzer showing different limit than
Limit browser.
 No update on STIS MEB.
o
I&C

Nominal
o
DMS

Nominal
o
486FSW
 Nominal
o
SAFING
 Nominal
 Ed Moy working on OR to reconfigure safing tests.
o
SIC&DH & P/L FSW
 Status: Nominal; B-side operation continues
 102 SBEs (12 since Saturday)
SI Status
o
WFC3
 Engineering
• Status
o Protect Operate
• Forward Plan
o Exit Protect mode and cool detectors (beginning June 8)
 OR 18476-0 submitted to transition Heaters from
protect to Normal, scheduled for 159/18:25
 OR 18478-1 submitted to enable IR 6-stage TEC
with a setpoint of -90C, scheduled for 161/18:53
UTC
 OR 18477-0 submitted to clear WFC3 event flag 8 to
enable UVIS TEC commanding to occur from the
SMS. First uplink opportunity 161/18:53
 OR 18479-1 submitted to enable TECFIRE with
nominal setpoints. First uplink opportunity
162/02:42 UTC
 SMS commanding to continue TEC cooldowns
scheduled to begin 162/17:00 UTC

o
COS


Science: JMackenty
• Nothing to add
Engineering. SSwain.
• Status
o Operate, FUV Operate/HVLow
o Vacuum gauge ~3.4e-6 torr
o FUV initial HV turn-on Parts 3 and 4 completed nominally
 OR 18495-0 successfully completed 157/14:28 UTC
to clear COS event flag 3 after FUV part 2
completed
o OR 18496-1 successfully completed 157/14:15 UTC to
perform a COS Time Code update
• Forward Plan
o FUV initial HV turn-on V5 (Part 3-2) scheduled for 159/19:38
UTC
 DCE memory dump (SMS) scheduled at 159/19:51
UTC
 OR 18498-0 submitted to clear COS event flag 3
after FUV part 3-1 completed to allow commanding
for Part 3-2 to proceed
o NUV detector darks scheduled 159/20:19 UTC
o COS to FGS Alignment part 1 scheduled for 162/03:47 UTC
Science. TKeyes/SOsterman.
• COS FUV High-Voltage turn-on looks nominal from detector
standpoint
o Darks are nominal, with the expected elevated background
rates, relative to ground testing
o PtNe Wavecal lamp exposure looks nominal
o NUV Functional Test Analysis
 OSM2 drift and TAGLFASH look nominal
o NUV Image locations and TA Sub-arrays are good
o COS NUV dark counts
o
 Fluctuate similar to historical STIS
For more details on all of the above, see the attached
 COS_SMOV_update_08June2009[initial]
 COS_SMOV_NUV_Darks20090608
o
FGS/OTA
 The 3rd FGS2R2 AMA Move (Ops Request 18497) was executed
158/22:30–22:39. The subsequent ITS test for move verification is scheduled
to take place 159/02:14-02:25 with only partial coverage by R/T telemetry.
The R/T TLM should include the ITS FL and part of the LOS scan. I’ll be
sending a follow-up report after this has been executed and analyzed.
• S-Curves of Target ‘A’ in any of the 3 positions (1, 5 & 8) we’ve been
using for AMA move definition aren’t scheduled until Position 1
at159/16:10 (06/08 ~ 12:10 EDT).
• This won’t have R/T TLM coverage.
• Goodrich personnel will be evaluating the 15 POL data (159/14:51 –
160/21:20), and reporting to the SMOV morning meeting no earlier
than Wednesday, 06/10.
• “I extend my thanks to the FOT staff as well as the Goodrich
personnel that supported this evening’s efforts.” DCrain
 Analysis of the ITS test, executed 159/02:23-02:27, has been completed.
The change in the ITS FL position was 1.386 a-s (X) and 2.285 a-s (Y).
 All hardware nominal, 1 HSTAR submitted #11869, the FGS 3 problem
Guide Star again, could not maintain the star in Coarse Track. Resulted in
Fine Lock Back-Up on FGS 1. 4 succeeding Acquisitions using this same
star were all successful (eventually) in Fine Lock.
 There were 15 successful Acquisitions, including the FL BU. 1 Acquisition
awaits ETR telemetry.
 There was an ITS observation following the AMA move #3.
 Predicted ITS FL position change was 1.2 asec in X and 1.5 asec in Y.Actual
ITS FL position change was 1.386 asec in X, 2.285 asec in Y.
 For the Mini-Alignment (11458), all Astrometry in Real-time was good,
waiting for the ETR telemetry.
• First FGS2R2 fine lock!
 HSTAR 11867 plan to close to a double (weak correlation), failed Walkdown,
then could not maintain Coarse Track on the second try.
 Up-coming 24 hours:
• 4 GSACQs, 4 Reacqs and the 15 POL Proposal.
• First FGS 1 Servo Maintenance will occur at 159:15:44:32, before
the Reacq.
o
ACS

Engineering
• Status
o Operate, WFC/SBC LV On
o Optimization Campaign Iteration 3 removed from SA159
SMS to Vod anomaly (See previous two meeting notes)
o Tiger Team convening today on the WF CEB-R output drain
voltage (Vod)
o WFC CEB-R to be left in current state with infinite flush
enabled, pending completion of further analysis of the output
drain voltage behavior and Tiger Team recommendations
• Forward Plan
o Post-BEA UV check (SBC) scheduled 162/20:55 UTC

o
STIS


o
-
Science. LSmith
• No report (participating in tiger team)
Engineering
• Status
o Operate/CCD On,MAMAs 1&2 LVOn (SAA cycling)
o Visit 4 of 4 for the MAMA1 (FUV) HV recovery completed
158/22:07 UTC
o OR 18468-0 successfully executed at 158/14:51 UTC to
clear STIS event flag 2 for MAMA1 Checkout Part 4
• Forward Plan
o CCD daily darks & bias monitoring continuing 159/17:53 –
21:14 UTC
o Visit 1 of 4 for the MAMA2 (NUV) HV recovery scheduled for
159/18:55 UTC
o Visit 2 of 4 for the MAMA2 (NUV) HV recovery scheduled for
160/21:40 UTC
o OR to be submitted to clear STIS event flag 3 for MAMA2
Checkout Part 2
Science. CProffitt
• Completed final visit of MAMA FUV Recovery 11350 last night
o All currents and voltages within the expected range
• Fold test looks fine with no significant shift towards the higher fold
numbers
• Flat field brightness consistent with previous trends
• Dark rate of 6.6 c/s consistent with expectations
• MAMA FUV Recovery complete and nominal.
• STIS focus is adequate at the aperture plane.
• For more details on fold test, flat fields, focus and throughput results,
see the attached STIS_SMOV_SCI_8JUN2009
NICMOS/NCS
 Status
• ESM in Operate
• TPS ~9.6e-7 torr
• PCE enabled for telemetry monitoring
• NCS CPL in Standby at -34 degC
 Forward Plan
• Draft OR 652-0 submitted to eventually transition NCS CPL from
Standby to Startup (no formal plan to pursue this yet)
P&S Status
o
Calendar/SMS builds
 SMS159
• SMS SA159T03 containing the reworked ACS SMOV schedule for
next week was successfully delivered to CCS/SSSP on Saturday.
o Thanks very much to Jack, Merle and George, for giving up
their Saturday to get this done.
o


-
PR 62772 (quick fix for the COS Tag Flash support schedule
generation) is successful.
 We have successfully generated and verified the
complete OPUS support schedule for SMS
091597C2 (SA159T03) for next week.
 Thanks very much to Mike Boyer, Fang Peng and
Leah Evans for working to make this happen on
time!
SMS166
• PASS finals are being worked today
SMS173
• Will start working tomorrow or Wed.
Operations
o
FOT


HSTAR 11865 MSIDs; are not unique, and never have been. Tag-IDs; are
unique, always have been (carryover of old SATS/IED system).
• MNEUMONIC STRING ID (says unique in ICD-26) It has broken
CLong’s trending tool. STScI believed/believes these were
permanent.
• Changes were required for ACS-R.
o PRD release letter does not include MSIDs – so it could
be easy to miss.
o Communication was not provided to/from STScI
• Actions;
o BBurkhardt will provide list of changes between PreACS-R database and current database.
o RDeyton will provide Tag-ID/MSID mapping.
o CLong will provide ACS-R SMOV schedule risk
assessment.
HSTAR; 11873, CCS Limit discrepancy. Tjacintho says investigation
underway.
o
PACOR: BPatel
 From June 7 (8am) to June 8 (8am), Pacor-A received one event with fasttrack observations.
• The data was processed and delivered to OPUS without any
problems.
o
OPUS
 We processed the new schedule for week 159 with no apparent problems,
and we now have our database populated with the required observation
records.
 Continuing to fast-track science data, with more data for COS proposal
11356 coming tonight.
 Making changes to some OPUS calibration s/w.
• This part of OPUS is not covered in the Freeze Plan.
o
Archive
 Nominal
Download