SMOV Status & Planning Meeting Notes 5/31/09 Minutes provided by Burley (richard.j.burley@nasa.gov), Biagetti (biagetti@stsci.edu, and others as indicated. - Summary: Observatory and instruments continue to perform nominally and according to plan. The first visit of the COS NUV high-voltage ramp-up has been accomplished. The SBC has performed the first ACS external observation, a UV-comtamination check, which looked nominal. The ACS Optimization Campaign analysis continues with nominal results. Other systems and operations are nominal. - Observatory Status o PCS/SAC Nominal, no new issues. DSmith. o EPS o o TCS I&C EPS performance continues to be nominal. The load is centered around 73A The system SOC is slowly continuing to increase and reached 508.5Ah in the last 24 hours. The battery temperatures remain low ranging between -4 and -1.0 deg C with excursions to just below 0 deg C when the redundant heater cycles on (once every 24 hour period). SRodgers See STIS HSTAR. No other new issues Nominal o DMS o 486FSW Nominal o SAFING Nominal o SIC&DH & P/L FSW Nominal Five more SBEs. Nominal - SI Status -- 4 instruments up in Operate o WFC3 Engineering • Nominal Science • No change; awaiting end of BEA (June 10) o COS o Science • Nothing to add. FGS/OTA Engineering (ABradley) • All hardware nominal, there are no new HSTARs. • There were 5 GSACQs (Guide star pairs) and 3 GSACQs (single guider) spanning the previous 24 hours, all were successful. • FGS 1 was used in Astrometry mode to TRANS Mode scan each of the 3 AMA target stars. • My compliments to Larry Stake/SS for dumping the ETR early. Forward Plan • 9 GSACQs (Guide star pairs) are planned over the next 24 hours and 7 sets of TRANS Mode scans with FGS 2 are planned over the next 24 hours. • All 3 AMA targets observed in Clear and Pupil filters, and at 3 positions. o Engineering Status • NUV detector turn on visit 1 nominal. • All agree to proceed to step 2. • Discussion about o small pressure blip yesterday see attached ppt COS Engineering Trends, CLong) o turn-off time for Ion gauge. Forward Plan • COS04 NUV HV RAMP UP Visit 2 of 3 is at 152/0315 (tonight at 11:15 EDT) o OR to clear Event flag 3 in works, before next step up tonight. • Visit 3 is tomorrow, just after noon. ACS Science • Nothing to add. Engineering • Status o Nominal • Forward Plan o Update to ASIC FSW values needed based on analysis of O-scope data Plan for update to be presented at SMOV morning meeting ~Tuesday o Oscilloscope mode optimization iteration #2 scheduled 154/00:15 UTC o Second End BEA check scheduled 156/06:32 UTC Science (LSmith and DGolimowski) • 11372 ACS/SBC UV Contamination check results. (See attached ppt SBC_first UV contam check 31May09, LSmith) Criterion for safe exit; at least 4 filters are within 5% of preSM4 data obtained May 2. o Results for weighted average difference in magnitude (70 stars in NCG 6681) between May 2 and May 30 data. o Safe BEA exit for HST Optics conditions have been met. o This observation was ACSSBC “First Light.” WFC Optimization Campaign (OC) (See attached ppt ACSSMOV20090531 from DGolimowski) o CTE (charge transfer efficiency) degradation is consistent (or slightly better) than estimate. EPER tests show CTE close to, but just under ‘Problematic” threshold. o May drive us to request lower CCD temperature. There is no downside to do so, but we may not be able to lower it more depending on the aft-shroud temp. o Would like to do before (internal) science cals start. o • o STIS o - Engineering • Status o @ 151/11:07:40 OMBT1 (MEB temperature) went over limit of 30.0 briefly (hit 30.28) before returning inbounds at 29.85. Again at 11:15:40. HSTAR 11855. SMO-1060 says NSSC1 will safe STIS at 34.7, and that the STIS FSW does not monitor this temperature. MEB1 isn’t ever going to be used again anyway, why would we Safe STIS because of it? Currently at 5 degrees, (8 counts) from the safing limits. • Forward Plan o Mechanism Functional Test begins 152/01:20 UTC o 1st FUV MAMA HV turn-on 153/11:35 UTC Science • Nothing new to report. NICMOS/NCS No change P&S Status o Calendar/SMS builds (No change) 09159 • Will start the PASS finals runs on Monday. • Possible changes for which AMA target to use for the 15 Points-of-Light and mini-alignment. 09166 • . o Replans Will start building the calendar on Tuesday/Wednesday once we hear about possible changes to the ACS Optimization Campaign. - None Operations o FOT Nominal • 0 Ops Requests executed • ROP NS-22 (CMOS flag reset) 5 times. • OR 18462 RMGA power on/off (152/1835 to 1935) • FRS # 1703 TDW Event 151/0951z, SSAR I24 added to dump ENG data for SMOV Analysis o PACOR From May 30 (8am) to May 31 (8am), Pacor-A received one event with fasttrack observations. The data was processed and delivered to OPUS without any problems. o OPUS & Archive No OPUS issues to report, and no fast-tracking today.