Optimizing availability and storage costs – with clever spare parts logistics

advertisement
Optimizing availability and storage costs –
with clever spare parts logistics
Service Solutions
Instrumentation, Controls & Electrical
Corrective Maintenance
Spare Parts Logistics
ensures secure global supply of spare parts and
maximum availability. The three-pillar concept
allows for efficient spare parts storage in
accordance with the customer's wishes. This
dramatically reduces expenditure to maintain
the customer's own stocks.
Your Benefits
■ Lower up-front investment
through reduction of onsite store
■ Asset optimization
■ Lower costs as a result of
optimized storage, with
a reduction in capital tied
up and cost-efficient
management of stores
■ Availability assured through
the immediate provision
of spare parts in the event
of a (threatened) plant
stoppage
The Task
When a defective component in an electrical,
field or I&C system causes or threatens to
trigger a plant stoppage, the operator must be
confident that the spare parts urgently needed
will be made available quickly. An extensive
local store is therefore often maintained,
involving considerable effort and expense yet
without fully ruling out the risk of spare parts
being unavailable.
optimization to as little as 15 percent of their
original volume. This in turn leads to a reduction in capital tied up and significantly lower
consequential costs, since unnecessary and
obsolete spare parts are not retained. On the
other hand, the central store contains critical
spare parts that are needed less frequently.
A network of logistics partners ensures that
these types of spare can reach any corner of
the globe in the shortest possible time - under
normal circumstances within the next working
day, or as an immediate emergency delivery if
required.
The optimized spare parts logistics system
guarantees exemplary response times,
especially for rarely-needed spare parts. The
operator's own extensive stock of spare parts
on site then becomes more or less superfluous.
Spare parts logistics – suitable stock levels tailored to meet all
spare parts requirements.
Our Solution
The spare parts concept is based on three
pillars: a strategic on-site store, a centrally
managed Siemens store, and rapid and efficient
logistics.
The strategic on-site store is stocked in close
consultation with the operators. This ensures
that the critical spare parts are stored where
they will also be needed in an emergency.
The benefit is a significant reduction in the
cost of initially filling the customer's own store,
the contents of which can be reduced following
Answers for energy.
Published by and copyright © 2012:
Siemens AG, Energy Sector
Freyeslebenstrasse 1
91058 Erlangen, Germany
For more information contact
service4plants.energy@siemens.com
www.siemens.com/energy/service4plants
Siemens Energy, Inc.
Instrumentation, Controls, & Electrical
1345 Ridgeland Parkway, Suite 116
Alpharetta, GA 30004, USA
SVCM3_FS_SP-Logis_e_V4-0
Order no. E50001-G230-A140-X-4A00
Printed in Germany
Dispo 05401, c4bs-Nr. 7820
Printed on elementary chlorine-free
bleached paper.
All rights reserved.
Trademarks mentioned in this document are
the property of Siemens AG, its affiliates, or
their respective owners.
Subject to change without prior notice.
The information in this document contains
general descriptions of the technical options
available, which may not apply in all cases.
The required technical options should
therefore be specified in the contract.
Download