GENERAL NOTES:
1. Comply with all local, state and federal codes, laws and regulations.
2. General contractor is responsible for all materials,
3/8"
construction methods and craftsmanship.
4"
SOLID OAK WOOD CHAIR RAIL,
STAIN TO MATCH EXISTING
WOOD DOORS
3. Prospective bidders must examine the contract documents
carefully and before bidding, must request clarification in writing prior
to the time set for bid opening. Responses will be posted electronically
as an addendum and later shall become part of the contract and binding
on all bidders.
MOUNTING HEIGHT TO BE
VERIFIED WITH PROJECT MGR.
4. Existing conditions depicted were taken from owner furnished documents.
Verify all existing conditions and notify the owner/project manager of any
and all discrepancies between drawings and actual conditions.
5. Contractors are responsible for coordinating work with other trades, and
owner's self-performed work wherever and whenever they overlap.
2 CR-1 Chair Rail Detail
A1 Scale: 1 1/2"=1'-0"
6. UCCS will be responsible for moving the furniture.
7. Construction to be completed as follows: See attached schedule
WB
3'-0"
ALL WALLS TO BE PAINTED P-1
UNLESS NOTED OTHERWISE
T.O. CR-1 =
29" A.F.F.
NEW
CPT-2
EXIST
VCT
1 Vicinity Map
A1
P-2
T.O. CR-1 =
33" A.F.F.
215a
214
WB
8. General contractor to email final bids to mfalcon@uccs.edu by 2:00pm on
xxx xx, 2014.
215
T.O. CR-1 =
29" A.F.F.
3'-0"
FINISH NOTES: (See A2 for Finish Schedule)
1'-0"
3'-0"
Classrooms- (Room numbers 214 and 216)
1'-0"
T.O. CR-1 =
33" A.F.F.
T.O. CR-1 =
29" A.F.F.
T.O. CR-1 =
33" A.F.F.
P-2
WB
215B
216
CG-1 LOCATIONS
CR-1 LOCATIONS
PAINT INSIDE AND OUTSIDE
FACE OF DOOR FRAMES AND
VISION FRAMES
3'-0"
EXIST NEW
VCT CPT-2
ALL WALLS TO BE PAINTED P-1
UNLESS NOTED OTHERWISE
EXIST NEW
VCT
CPT-2
a) Classroom 214 shall be completed between
b) Classroom 216 shall be completed between
except Dec 23 and Dec. 26 for scheduled IT maintenance work.
c) Columbine offices 2011,2013,2015,2017,
2019,2020, 2021,
2033,2035,
2037,2039, 2041 and 2043 shall be completed between
d) Columbine 4th floor corridors shall be completed between
e) Columbine Restrooms shall be completed between
Work to be phased where one floor shall be operational
before proceeding with other levels.
e)Hours of construction are between 7:00am - 10:00pm or as otherwise arranged
with the campus security. Free parking is available from Dec. 23 and January 19, 2015.
GC responsible for parking fees before and after these dates.
3 Columbine Hall 214 and 216 Classrooms
A1 Scale: 3/32"=1'-0"
1) Prep and prime walls where needed.
2) Fill holes and imperfections prior to painting.
3) Remove all existing corner guards. Repair screw holes and remove glue residue.
4) Remove existing rubber base.
5) Remove and reinstall switch plates and outlet plates. Paint around data plates.
6) Paint around existing electronic devices that are to remain (i.e. horn strobes, signage)
7) Remove and reinstall existing small bulletin boards.
8) Paint around large bulletin boards, display cases, signage and lockers
9) Protect all areas not to be painted from drips and splatters.
10) Protect all furniture.
11) Texture walls to match existing.
12) Paint all inside walls of classrooms P-1, unless noted otherwise.
13) Paint all classroom accent walls (front wall) P-2, unless noted otherwise.
14) Install rubber base B-1 at all classrooms, unless noted otherwise
15) Paint both sides of door frames, vision frames and trims P-3, unless noted otherwise.
16) Install new corner guards CG-1 in classrooms where indicated.
17) Provide CPT-2 over existing vct floor. Remove any loose vct and flash patch as
required to create a level surface for new carpet.
18) Provide and install chair rails CR-1 where indicated. Confirm mounting height with
Project Manager.
Scale:
Second Floor Plan - COLU 214 and 216
Facilities Services
COLUMBINE HALL (COLU)
As Shown
A1
Date:
11/06/2014
Drawn by:
MQF