Integrated Transport Plan for the City of Cape Town Review & Update October 2009 Integrated Transport t Plan 2006-2011 2006 To 2011 City of Cape Town – Integrated Transport Plan 2006 To 2011 Table of Contents Table of Contents ............................................................................................................... i List of Tables .................................................................................................................... iii List of Figures ................................................................................................................... vi Foreword .......................................................................................................................... 1 1 Introduction ................................................................................................................ 2 1.1 Why an Integrated Transport Plan? .................................................................... 3 1.2 Previous Transport Plans.................................................................................... 3 1.3 Objective of the Integrated Transport Plan .......................................................... 5 1.4 Scope of the Integrated Transport Plan .............................................................. 6 1.5 Structure of Integrated Transport Plan ................................................................ 8 2 Transport Vision, Goals and Objectives ....................................................................12 2.1 The Vision .........................................................................................................12 2.2 The City of Cape Town‘s Transport Vision .........................................................14 2.3 Goals .................................................................................................................15 2.4 Key Performance Indicators ...............................................................................21 3 Transport Register ....................................................................................................26 3.1 Transport Network (Supply) ...............................................................................26 3.2 Transport Network Utilisation (Demand) ............................................................45 3.3 Transport Network Performance ........................................................................52 3.4 Transport Network Safety ..................................................................................57 3.5 Transport Network Planning ..............................................................................62 3.6 Road Network Operations Management ............................................................66 3.7 Public Transport ................................................................................................72 3.8 Freight Transport ...............................................................................................99 3.9 Harbours..........................................................................................................112 3.10 Airports ............................................................................................................118 3.11 Non-Motorised Transport .................................................................................123 3.12 Transport Asset Management ..........................................................................126 3.13 Marketing and Communication ........................................................................132 3.14 Institutional Structures and Inter-Governmental Co-Operation .........................135 3.15 Current financial arrangements ........................................................................136 4 Transport Strategic Informants................................................................................144 4.1 Legal and institutional framework .....................................................................144 4.2 Policy Framework ............................................................................................150 4.3 Spatial Development Framework and Other Land Use Informants...................159 4.4 Demographics .................................................................................................167 4.5 Economic Development Framework and Other Economic Informants..............173 4.6 Public Consultation ..........................................................................................183 4.7 Strategic Environmental Informants .................................................................190 5 Transport Needs Assessment .................................................................................202 5.1 Satisfying the Vision ........................................................................................203 5.2 Transport Network (Supply) .............................................................................203 5.3 Transport Network Utilisation (Demand) ..........................................................204 5.4 Transport Network Performance ......................................................................205 5.5 Transport Network Safety ................................................................................205 5.6 Transport Network Planning ............................................................................205 5.7 Network Operations Management ...................................................................206 5.8 Public Transport ..............................................................................................206 5.9 Freight Transport .............................................................................................207 5.10 Harbours..........................................................................................................207 i List of Tables TABLE OF CONTENTS City of Cape Town – Integrated Transport Plan 2006 To 2011 Table of Contents Table of Contents 5.11 Airports ............................................................................................................208 5.12 Non-Motorised Transport .................................................................................208 5.13 Transport Asset Management ..........................................................................209 5.14 Marketing and Communication ........................................................................209 5.15 Institutional Structures and Inter-Governmental Co-Operation .........................210 5.16 Current financial arrangements ........................................................................210 5.17 Legislative Changes ........................................................................................211 5.18 A Summary of overarching needs for the transport system ..............................211 6 Strategies For Integrated Transport ........................................................................214 6.1 Transport Safety ..............................................................................................215 6.2 Congestion Management .................................................................................216 6.3 Managing Metropolitan Growth ........................................................................218 6.4 Support for Economic Growth and Development .............................................219 6.5 Environmental Protection .................................................................................220 7 Sectoral Strategies .................................................................................................222 7.1 Public Transport Operations Strategy ..............................................................222 7.2 Transport Infrastructure Strategy .....................................................................233 7.3 Travel Demand Management Strategy ............................................................234 7.4 Freight Logistics Strategy ................................................................................241 7.5 Non-motorised Transport Strategy ...................................................................247 7.6 Safety, Security, Education and Enforcement Strategy ....................................248 7.7 Ports Strategy ..................................................................................................259 7.8 Airports Strategy ..............................................................................................260 7.9 Road Network Operations Strategy .................................................................261 7.10 Coordination of Transportation Planning ..........................................................262 7.11 Asset Management Strategy............................................................................263 7.12 Public Consultation Strategy ............................................................................263 7.13 Institutional Strategy ........................................................................................265 7.14 Funding Strategy .............................................................................................266 8 Project Implementation Programme ........................................................................284 8.1 Project Prioritisation .........................................................................................284 8.2 Projects in first issue of this ITP .......................................................................289 8.3 Council Approved Projects...............................................................................289 8.4 Projects for future consideration ......................................................................289 8.5 Projects being undertaken by other spheres of government or government agencies.....................................................................................................................297 8.6 Integrated Rapid Transit System......................................................................300 8.7 2010 FIFA World Cup ......................................................................................307 9 Implementation Funding and Budgets.....................................................................314 9.1 Capital Expenditure Budget .............................................................................314 9.2 Repairs and Maintenance Primary Cost...........................................................316 10 Public Participation .................................................................................................318 10.2 Public Participation process for the 1st edition of this ITP (2006/ 2007) ............319 10.3 Further Public Engagement (2008/ 2009) ........................................................320 10.4 Public Engagement on the updated ITP (2009) ...............................................320 10.5 Public Comments on the ITP ...........................................................................322 11 Bibliography ............................................................................................................324 12 Glossary .................................................................................................................332 Appendix A: 2007 Approved Project List Status Update.................................................337 Appendix B: Additional Completed Projects ...................................................................348 Appendix C: Approved Current and Future Projects ......................................................361 Appendix D: Suite of Documents ...................................................................................374 Acknowledgements ........................................................................................................375 ii City of Cape Town – Integrated Transport Plan 2006 To 2011 List of Tables LIST OF TABLES Table 1: Key Performance Indicator Summary .................................................................21 Table 2: Matrix of Vision, Evaluation Measures, Strategy and Key Performance Indicators ........................................................................................................................................23 Table 3: KPI Matrix ..........................................................................................................24 Table 4: Historic Rail Network Service Line Capacities Based on Deployed Rolling Stock. ........................................................................................................................................29 Table 5: Current Network Capacity in peak periods based on deployed rolling stock. ......30 Table 6: City Roads by Classification ...............................................................................31 Table 7: Road Network ....................................................................................................33 Table 8: Road-based Public Transport Network ...............................................................35 Table 9: Road Freight (HGV) Network .............................................................................39 Table 10: Pedestrian Pathways and Sidewalks ................................................................42 Table 11: Bicycle Pathways and Storage Facilities ..........................................................42 Table 12: Parking Facilities ..............................................................................................43 Table 13: Other Transport Network Elements. .................................................................44 Table 14: Morning Peak-Hour, Peak Direction Utilisation of the Transport Network .........46 Table 15: 2004 and 2007 Passenger Volumes on the Metropolitan Rail Network ............54 Table 16: 2004 and 2007 Scheduled Train Trips on the Metropolitan Rail Network .........54 Table 17: Road Accident Statistics for the Cape Town Metropolitan Area. .......................58 Table 18: Modal Split by Area (NTS, 2003) ......................................................................75 Table 19: Ten Busiest Bus Terminal – Passengers per Day Boarding and Alighting ........79 Table 20: Minibus-Taxi Facilities with the Highest Number of Passengers .......................80 Table 21: Number of Boarding Passengers (Weekday) ...................................................84 Table 22: Ten Stations with Highest Number of Boarding Passengers ............................84 Table 23: Passenger Capacity of Tour Vehicles...............................................................86 Table 24:Some Key Freight Movements in the Cape Town Metropolitan Area ...............102 Table 25: Estimated Tonnages of Various Classes of Freight and Number of Container Units for Survey Points in Western Cape Urban Freight Study .......................................103 Table 27: Freight Movement for Cape Town Harbour Compared with Harbour Freight Nationally for 2007 .........................................................................................................109 Table 28: Containers Handled at the Port of Cape Town: January – December 2007 ....110 Table 29: Harbours and Boat Launching Facilities .........................................................112 Table 30: Traffic Volume on Port Roads ........................................................................116 iii Table of Contents Table 26: Comparison of Total Freight Tonnages of Ports around South Africa .............109 City of Cape Town – Integrated Transport Plan 2006 To 2011 List of Tables Table 31: Airports and Landing Strips ............................................................................118 Table 32: CTIA Modal Split ............................................................................................120 Table 33: CTIA – Parking Requirements ........................................................................121 Table 34: CTIA - Parking Provision ................................................................................121 Table 35: Walking times to Nearest Public Transport Mode (NTS, 2003) .......................125 Table 36: Current Management Systems .......................................................................131 Table 37: Existing capital grants ....................................................................................137 Table 38:Roads and Transport Budget ..........................................................................139 Table 39: Transport Budget ...........................................................................................140 Table 40: Capital finance for Roads and Transport as a proportion of total finance in the City‘s budget ..................................................................................................................141 Table 41: Operating expenditure budget for Roads and Transport .................................142 Table 42: Breakdown of ‗Operations and Assets‘ line item on operating budget ............143 Table 43: The Cape Town Draft SDF – Strategies and Policies .....................................161 Table 44: Population projections for the City of Cape Town: high migration scenario (Dorrington, 2005) ..........................................................................................................168 Table 45: Average annual population growth projections for the City of Cape Town: high migration scenario (Dorrington, 2005) ............................................................................168 Table 46: Prevalence of Special Needs Passengers (2001 Census Data) .....................170 Table 47: Derivation of Level of Living Index for the City of Cape Town .........................173 Table 48: Public Comments on ITP and Transport in Cape Town ..................................183 Table. 49: Baseline biophysical impacts........................................................................191 Table 50: Impacts Comparison for Various Transport Modes .........................................193 Table 51: Impacts Comparison for Various Freight Transport Modes .............................195 Table 52: Impact Comparison for Various Transport Infrastructures ..............................196 Table 53: Impacts comparison of operational and management process aspects of the transport register............................................................................................................198 Table 54: Strategy – Intervention matrix demonstrating crosscutting effects ..................215 Table 55: Summary of TDM measures ..........................................................................235 Table 56: Parking implications for various zones. ..........................................................239 Table 57: Current financing profile for roads and stormwater capex...............................275 List of Tables Table 58: Triple Bottom Line Measure Weightings. ........................................................286 Table 59: Relationship between Transport Strategies and Triple Bottom Line................286 Table 60: The Needs Ratings applied to each project in respect of each transport strategy. ......................................................................................................................................287 Table 61: Needs Ratings applied to transport strategies in respect of a particular project. ......................................................................................................................................287 iv City of Cape Town – Integrated Transport Plan 2006 To 2011 List of Tables Table 62: SANRAL Projects within the Cape Town Municipality. ...................................298 Table 63: PGWC Projects within the Cape Town Municipality. .......................................299 Table 64: Financial scenarios used to assess roll-out of IRT..........................................305 Table 65: IRT Impact Assessment .................................................................................306 Table 66: Total Capital Budget Projections 2009-2012. .................................................314 Table 67: Budget Allocation Spent on Completed work by Funding Source. ..................314 Table 68: Budget Allocation Spent on Completed work by Focus Area. .........................315 Table 69: Capital Budget Projections for 2009 – 2012 by Funding Source. ....................315 Table 70: Capital Budget Projections for 2009 – 2012 by Focus Area............................316 Table of Contents Table 71: Repairs and Maintenance: Primary Costs – 2009-2012 .................................316 v City of Cape Town – Integrated Transport Plan 2006 To 2011 List of Figures LIST OF FIGURES Figure 1: Transport Planning Framework. ......................................................................... 4 Figure 2:The Commonality of Guiding Elements within the ITP......................................... 6 Figure 3: Cape Town Municipal Area and Major Roads and Railways. ............................. 7 Figure 4: Minimum CITP Requirements and Structure of the City of Cape Town CITP ....10 Figure 5: A Complete Transport System ..........................................................................15 Figure 6: The Multi Faceted Nature of ―Sustainability‖......................................................16 Figure 7: Rail Network within the City of Cape Town........................................................27 Figure 8: Road Network Hierarchical Classification. .........................................................32 Figure 9: Scenic Routes. ..................................................................................................34 Figure 10: The City‘s Bus Network. ..................................................................................36 Figure 11: The City‘s Planned Integrated Rapid Transit Network. ....................................37 Figure 12: The City‘s Minibus Taxi Network. ....................................................................38 Figure 13: Industrial Areas and Freight Centres with the Primary Interlinking Transport Network ...........................................................................................................................40 Figure 14: Defined Abnormal Load Routes. .....................................................................41 Figure 15: Freight and Passenger Rail network in Cape Town. ........................................48 Figure 16: 2008 Peak-hour Traffic Volumes on the City‘s Primary Road Network ............51 Figure 17: Plot of Total and Percentage Fatal Accidents Reported Between 1997 and 2007. ...............................................................................................................................59 Figure 18: City Road Network Showing Planned ―Strategic‖ Elements as Dotted Lines. ..63 Figure 19: All Day Modal Shares .....................................................................................81 Figure 20: 2006 Rail Volumes ..........................................................................................83 Figure 21: Western Cape Urban Freight Study Survey Locations ..................................101 Figure 22: Commodity Characteristics of the N1 Corridor ..............................................104 Figure 23: Commodity Characteristics of the N2 Corridor ..............................................104 Figure 24: Commodity Characteristics of the N7 Corridor ..............................................105 Figure 25: Commodity Characteristics in the Cape Town Metropolitan Area ..................105 Figure 26: A Summary View of Freight Transport in the Western Cape with Forecasts..106 List of Figures Figure 27: Bulk and Break-Bulk Tonnages through the Port of Cape Town for the Last Three Years to Date.......................................................................................................113 Figure 28: Petroleum Product Tonnages through the Port of Cape Town for the Last Three Years to Date .................................................................................................................113 vi City of Cape Town – Integrated Transport Plan 2006-2011 List of Figures Figure 29: Containers Handled by the Port of Cape Town for the Last Three Years to Date. ..............................................................................................................................114 Figure 30: Airport Master Plan .......................................................................................122 Figure 31: Non-Motorised Transport Spatial Overview ...................................................124 Figure 32: Cooperative arrangements between the City and other Transport authorities ......................................................................................................................................136 Figure 33: Relationship between ITP and City Strategies ..............................................150 Figure 34: South African Context of ITP .........................................................................151 Figure 35: Phasing of City Growth .................................................................................164 Figure 36: Land Use Transport Network ........................................................................165 Figure 37: Age Profile of Population...............................................................................169 Figure 38: Unemployment in the City of Cape Town ......................................................174 Figure 39: Trends in City of Cape Town GDP since 2000 ..............................................176 Figure 40: Contribution of economic sectors to GDP in Cape Town and South Africa, 2007 ......................................................................................................................................176 Figure 41: Trends in GDP generated by transport in the City of Cape Town since 2000 177 Figure 42: Percent Employed Using Public Transport ....................................................181 Figure 43: Percent Employed Using Car ........................................................................182 Figure 44: A depiction of the Integrated Transport Planning Process. ............................202 Figure 45: Capital expenditure projections for public transport (all modes) ....................268 Figure 46: Projected capital expenditure for all infrastructure in the City ........................270 Figure 47: Estimate of Envelope for Capital Expenditure on Roads. ..............................271 Figure 48: A preliminary assessment of a capital finance profile for all infrastructure and systems in the City. ........................................................................................................272 Figure 49: Financing profile for public transport infrastructure and systems ...................274 Figure 50: Trends with respect to the transport operating account .................................276 Figure 51: The Project Identification Form and Prioritisation tool user interface. ............288 Figure 52: Extension of Abnormal Load Routes. ............................................................294 Figure 53: Integrated Rapid Transit................................................................................300 Figure 54:: Phases of the full Integrated Rapid Public Transport Network. .....................303 Figure 55: Full Phase 1 A. ............................................................................................304 Figure 57: 2010 World Cup – Funded Projects. .............................................................313 vii List of Figures Figure 56: Location of 68,000 Seat Green Point Stadium. .............................................308 City of Cape Town – Integrated Transport Plan 2006 To 2011 Foreword Foreword BY THE MAYOR Dear Fellow Capetonians The City continues in its quest to make Cape Town a cleaner, safer, sustainable and economically growing City. We are well on our way to ensuring that Cape Town remains Africa‘s leading city, and International centre. The key to this reality lies in creating more opportunities for the people of Cape Town, especially business and job opportunities. This means creating an attractive environment for investment through better infrastructure, better law enforcement, and better administration. The burgeoning population has translated into a growing demand for travel, and with our public transport infrastructure over stretched, people moved to private vehicles leading to congestion of unseen proportions. We aim to ease congestion by providing a public transport system that is accessible, safe, reliable, and dignified. Substantial re-investment in our transport system is underway to reverse the uncontrolled usage of less sustainable transport modes aimed at reducing the gridlock and congestion in the transport systems. Dan Plato, Executive Mayor of The majority of the City‘s inhabitants are captive to public transport to access social and The City of Cape Town Economic opportunities. The City remains committed to creating equal opportunities for all its citizens and this means improving both public transport services and infrastructure. With this first major review of the Transportation Plan we are moving toward a more sustainable transport system that is effective in moving people and ensuring a better quality of life. The revised plan anticipates active involvement by many people, agencies and entities throughout the City. I look forward to your continued input and support. Elizabeth Thompson, Dan Plato, Executive Mayor Mayoral Committee: Transport, Roads and Stormwater 1 Introduction Sincerely, City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction 1 INTRODUCTION As gazetted in Provincial Gazette 6635 of 12 June 2009 and set out in the letter 18 June 2009 from the MEC of Transport for the Western Cape Province to the City of Cape Town Mayor, the City of Cape Town is categorised as a type 1 municipality. Cape Town is thus one of twelve cities identified by the Department of Transport (DoT) to be part of their Integrated Rapid Transport Network (IRTN) initiative to prepare CITP‘s. The City of Cape Town plays an important role locally, regionally, nationally and internationally. The City of Cape Town provides a service to approximately 3.4 million1 people in over 900,0002 households and jobs to about 1.1 million people. It generates approximately 76% of the Western Cape‘s Gross Regional Product and 11% of the country's GDP3. In 2005, total exports from Cape Town amounted to R25.4 billion while the value of imports amounted to R50.79 billion1. The City of Cape Town thus requires a safe and sustainable transport system that promotes and supports economic development whilst catering for all people and goods through universal design principles. This requires appropriate planning, operation and management of the City of Cape Town‘s transport system. Transport is a vital element of any functional city, making it possible to bring people, goods and services together when and where needed. Transport is often referred to as the lifeblood of a city and the various organs within the city cannot function without a transport system that works. Transport connects people, and people with opportunities. Transport however, has some undesirable side effects on the economy, environment and society, such as: Accidents – which have a severe social impact; Congestion – which has significant social, financial and economic implications, The City of Cape Town thus requires a GDP. their of part is 2 amounted to R50.79 billion1. to prepare CITP‘s. contribution to undesirable atmospheric pollutants. billion while the value of imports nationally and internationally. Integrated a Pollution – amongst which, according to the 2004 State of Cities report, is a 52.3% Socio Economic Profile: City of Cape Town 2006. City of Cape Town. Demographic and Socio Economic Trends for Cape Town: 1996 to 2007. City of Cape Town Strategic Development Information and GIS Department. 3 Provincial Economic Review & Outlook 2007. Western Cape Provincial Government. 2 Cape Town amounted to R25.4 In 2005, total exports from Product and 11% of the country's the Western Cape‘s Gross Regional It generates approximately 76% of and jobs to about 1.1 million people. people in over 900,000 households service to approximately 3.4 million City of Cape Town provides a The important role locally, regionally, The City of Cape Town plays an Transport Network (IRTN) initiative Rapid Department of Transport (DoT) to be of twelve cities identified by the municipality. Cape Town is thus one 1 type services; as Discrimination against marginalised individuals not able to access transport categorised Town Mayor, the City of Cape Town Cape Province to the City of Cape 1 MEC of Transport for the Western the letter 18 June 2009 from the 6635 of 12 June 2009 and set out in As gazetted in Provincial Gazette Introduction resulting in two peak periods of nearly three hours each every weekday; City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction Meeting the transport needs of the community, whilst minimising negative impacts, requires ensuring that plans for improvements and the accommodation of growth in the City of Cape Town, are in place and continuously updated to reflect changing circumstances, both developmental and technological. The regularly updated Integrated Transport Plan (ITP) is a reflection of this process, and acts as a map for City leaders, officials and community, guiding development, expenditure and other planning activities to most effectively achieve the City of Cape Town‘s transport vision. 1.1 Why an Integrated Transport Plan? With a view to ensuring the co-ordination of the planning processes of all planning authorities under the jurisdiction of the provinces and the integration of transport and land use planning within planning areas, the preparation of Integrated Transport Plans is a statutory requirement in terms of both the National Land Transport Transition Act (NLTTA), (Act 22 of 2000), sections 19 and 27, and the replacing Act, the National Land Transport Act (NLTA), (Act 5 of 2009), sections 32 and 36. In terms of these acts, Integrated Transport Plans are to be updated annually and submitted to the Provincial MEC for Transport for approval. The gazetted date for the submission of this review is 20 November 2009. In conjunction with the Spatial Development Framework (SDF), the ITP is also a sectoral plan for the Integrated Development Plan (IDP), and is a tool for the delivery of projects in strategic focus areas in that Plan. In this context, the ITP establishes a prioritisation framework that supports local economic growth, development, social inclusion and environmental objectives. Finally, the ITP is an important tool for the management of transport within the city, providing an operational reference document for those directly responsible for project implementation and system management. The first major traffic study for Cape Town was undertaken in 19564. In 1975, the City of Cape Town undertook a transport study, sponsored by the Provincial Administration: 4 City Engineer‘s Department, 1956 3 Introduction 1.2 Previous Transport Plans City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction Western Cape. This was completed in 19795, and formed the basis for Cape Town‘s extensive 1980-1985 Metropolitan Transport Plan. This plan was updated, with the inclusion of various amendments and new policies until 1991. In 1995, the City started on a new transport plan6, which was concluded in 1998. Concurrent with the development of the 1995 City Transport Plan, the National Land Transport Transition Act (NLTTA) was in preparation and this included the requirement for the preparation of Integrated Transport Plans. The NLTTA was passed into law, becoming Act 22 of 2000, making it mandatory that all Cities, District Municipalities and towns of above a certain size produce an Integrated Transport Plan setting out their vision for transport, supporting and forming a part of the Integrated Development Plan of the area. It was in the context of this legislation that this 2006 to 2011 Integrated Transport Plan for the City of Cape Town was prepared. The planning framework within which the Comprehensive Integrated Transport Plan required of the City of Cape Town resides is shown in Figure 1, which remains applicable under the NLTA. National Land Transport Strategic Framework Submit to Minister (To guide land transport planning country wide) Provincial Land Relevant integrated Comprehensive ITPs development plan prepared by Type 1 PAs Transport Submit to MEC Framework e. g. CoCT Relevant integrated District ITPs Prepared development plan by Type 2 PAs (To guide land Submit to MEC transport planning provincial wide) Relevant integrated Local ITPs prepared by Type 3 development plan PAs part of Cape Metropolitan Transportation Study, Cape Town City Council, 1979 Moving Ahead, 1998 4 The City of Cape Town thus requires a to prepare CITP‘s. their categorised 6 is 5 as transportation systems across municipal, district and provincial boundaries. GDP. Integrated a Transport, are coordinated at the Provincial level, enabling the integration of amounted to R50.79 billion1. nationally and internationally. type These plans, once approved by both the Municipal Council and the Provincial MEC for billion while the value of imports Cape Town amounted to R25.4 In 2005, total exports from Product and 11% of the country's the Western Cape‘s Gross Regional It generates approximately 76% of and jobs to about 1.1 million people. people in over 900,000 households service to approximately 3.4 million City of Cape Town provides a The important role locally, regionally, The City of Cape Town plays an Transport Network (IRTN) initiative Rapid Department of Transport (DoT) to be of twelve cities identified by the municipality. Cape Town is thus one 1 Town Mayor, the City of Cape Town Cape Province to the City of Cape (Adapted from NDoT Technical Transport Planning Guidelines for CITPS to be prepared by Type 1 Planning Authorities) MEC of Transport for the Western the letter 18 June 2009 from the 6635 of 12 June 2009 and set out in As gazetted in Provincial Gazette Introduction Figure 1: Transport Planning Framework. City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction The original of this Integrated Transport Plan for the period 2006–2011 was approved by the City of Cape Town on 27 June 2007 and Provincial Government of the Western Cape as noted in the letter of 6 July 2009 from the MEC of Transport to the Mayor of the City of Cape Town. The letter also noted that the current review process should acknowledge the Provincial projects and funding within the Cape Town Municipality and that future versions adhered to the layout as prescribed in the Minimum Requirements as Gazetted on 30 November 2007, Provincial Gazette 1113. These requirements have been addressed in this review. 1.3 Objective of the Integrated Transport Plan The objective of the ITP is to provide a clear and comprehensive record of the planned programme of interventions to be taken by the relevant role players, who include local, provincial and national government, government agencies such as ACSA, PRASA and SANRAL, as well as commerce and industry, and the community at large, to achieve its vision for the future. The ITP focuses on achieving an integrated approach to all transportation planning in support of the Integrated Development Plan of the City, by seeking commonality between the City‘s Transport Vision, key themes and transport strategies and a triple bottom line approach to project selection and prioritisation of projects. This commonality is depicted in Figure 2. In particular, the premise of the City‘s Integrated Transport Plan is the provision of Sustainable Transport, wherein all transport activities are considered in terms of social, economic and environmental objectives. Sustainable transportation is the ability to move people and goods effectively, efficiently, safely and affordably without jeopardising the economy, social conditions or the environment, today and into the future. This ITP targets the achievement of a balanced transport system that promotes and gives priority to public transport and other alternative modes of transport, reinforces and compliments the Spatial Development Framework, economic development strategies and long term environmental Introduction management strategies and plans of the City. 5 the letter 18 June 2009 from the 6635 of 12 June 2009 and set out in As gazetted in Provincial Gazette Introduction annual, seek to ensure that; MEC of Transport for the Western Transport project budgets are updated and aligned with the City‘s overall budget; Goals and key performance indicators are updated; Transport planning remains aligned with the Integrated Development Plan; Sectoral plans are coordinated and in line with the overall policies and strategies of Cape Province to the City of Cape the City. categorised as a type 1 of their Integrated Rapid to prepare CITP‘s. Transport Network (IRTN) initiative part Department of Transport (DoT) to be of twelve cities identified by the municipality. Cape Town is thus one is Town Mayor, the City of Cape Town 6 The In 2005, total exports from The City of Cape Town thus requires a amounted to R50.79 billion1. billion while the value of imports Cape Town amounted to R25.4 GDP. Product and 11% of the country's the Western Cape‘s Gross Regional It generates approximately 76% of and jobs to about 1.1 million people. people in over 900,000 households service to approximately 3.4 million City of Cape Town provides a nationally and internationally. important role locally, regionally, The City of Cape Town plays an City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction Figure 2:The Commonality of Guiding Elements within the ITP 1.4 Scope of the Integrated Transport Plan Acknowledging the role that the hinterland, plays in its economy, this plan covers the jurisdictional boundary of the City of Cape Town Metropolitan area as shown in Figure 3 and is the 2009 update of the 5 year Integrated Transport Plan for the period starting on 1 July 2006 and ending on 30 June 2011. Updates, which should be but are not always City of Cape Town – Integrated Transport Plan 2006 To 2011 Figure 3: Cape Town Municipal Area and Major Roads and Railways. 7 Introduction Introduction City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction 1.5 Structure of Integrated Transport Plan The preparation of this document seeks to fulfil the minimum requirements for an integrated transport plan in terms of both the National Land Transport Transition Act and the National Land Transport Act. The minimum requirements and actual structure are set out in Figure 4. The Comprehensive Integrated Transport Plan 2006-2011 consists of a suite of five complementary statutory plans providing the detailed policy and strategic plans which comprise the elements of the ITP. These documents are listed in Appendix D and include, 1. The Integrated Transport Plan 2006-2011 (Review October 2009) Executive Summary 2. The Integrated Transport Plan 2006-2011 (Review October 2009) 3. Operating Licences Strategy 2006 – 2011 4. Public Transport Demand and Supply Analysis 2006 – 2011 5. Current Public Transport Record Summary 2006 – 2011 In the context of the guidelines for a comprehensive Integrated Transport Plan, this document comprises the following main chapters: Chapter 1 – An introduction to the ITP and its purpose, objectives and structure. Chapter 2 – The Transport Vision, Goals and overall objectives of the City, as influenced by the Provincial and National vision and objectives in respect 8 The City of Cape Town thus requires a of their and taking into account the strategic informants. GDP. to prepare CITP‘s. required to satisfy the City‘s vision for transport given the current situation part is categorised as A transport needs assessment, summarising the overarching interventions amounted to R50.79 billion1. nationally and internationally. includes the Spatial Development Framework for the City billion while the value of imports Cape Town amounted to R25.4 In 2005, total exports from Product and 11% of the country's the Western Cape‘s Gross Regional It generates approximately 76% of and jobs to about 1.1 million people. people in over 900,000 households service to approximately 3.4 million City of Cape Town provides a The important role locally, regionally, The City of Cape Town plays an Chapter 5 – An overview of the strategic informants to the planning of transport, which Integrated type Chapter 4 – A representation of the land use and transport considerations a Transport Network (IRTN) initiative A description of the entire transport network including Rapid Department of Transport (DoT) to be A summary of network utilisation, reflecting traffic conditions of twelve cities identified by the municipality. Cape Town is thus one A summary of the Current Public Transport Record 1 Town Mayor, the City of Cape Town A Transport Register that includes: Cape Province to the City of Cape Chapter 3 – MEC of Transport for the Western the letter 18 June 2009 from the 6635 of 12 June 2009 and set out in As gazetted in Provincial Gazette Introduction of transport. City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction Chapter 6 – An overview of the proposed overarching strategies for transport as seen by the City of Cape Town. (This chapter represents a deviation from the format specified in the minimum requirements, focusing on strategic themes. Modal strategies are addressed in the following Chapter. ) Chapter 7– A number of sectoral strategies that support the vision and the overarching strategies recommended from the minimum requirements. (These strategies are presented in the order recommended in the minimum requirement guidelines. ) Chapter 8 – Details of the interventions, projects and programmes planned for implementation. Chapter 9 – The Financial Framework for the implementation of transportation projects and programmes. The Public Participation Report Introduction Chapter 10 – 9 City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction 10 Figure 4: Minimum CITP Requirements and Structure of the City of Cape Town CITP City of Cape Town – Integrated Transport Plan 2006 To 2011 Introduction Introduction 11 11 City of Cape Town – Integrated Transport Plan 2006 To 201 Transport Vision, Goals and Objectives 2 TRANSPORT VISION, GOALS AND OBJECTIVES The Vision for Transport of the City of Cape Town is: A world-class sustainable transport system that moves all its people and goods effectively, efficiently, safely and affordably. The term ―integrated‖ is a vital theme of transportation and planning. In the context of theITP, not only does its achievement become critical in moving towards the City‘s vision, it facilitates additional benefits to all aspects of Cape Town‘s environment and lifestyle: both qualitative and quantitative. The term ―integrated‖ ensures that the Visions, Goals and Objectives of all related entities are aligned, ensuring that the City vision will reflect Provincial and National interests. This emphasis on integration requires that consideration be given to a variety of policies and strategies for the City, amongst which are the Integrated Development Plan and the Spatial Development Framework, along with a variety of other policies relating to environmental matters. These are addressed in Chapter 4: Transport Strategic Informants. 2.1 The Vision The City‘s vision for transport, stated above, must be seen in the context of the overall vision for the City as well as the transport visions of the Provincial and National Vision for the City of Cape Town as follows: Provincial and National interests. The overarching Integrated Development Plan (2007/8-2011/12) sets out the long-term A prosperous City in which City Government creates an enabling environment context of theITP, for shared growth and economic development; A City that distinguishes itself as a well-governed and efficiently run administration. 12 The Vision Informants. A City known for its effective and equitable service delivery; and quantitative. National governments. Plan. transportation and planning. Framework. These work in conjunction to supports the City‘s Integrated Development well as the transport visions of the Provincial and relevant being the Integrated Transport Plan and the City‘s Spatial Development seen in the context of the overall vision for the City as The City‘s vision for transport, stated above, must be are addressed in Chapter 4: Transport Strategic other policies relating to environmental matters. These Spatial Development Framework, along with a variety of which are the Integrated Development Plan and the variety of policies and strategies for the City, amongst integration requires that consideration be given to a This emphasis on aligned, ensuring that the City vision will reflect Visions, Goals and Objectives of all related entities are The term ―integrated‖ ensures that the Town‘s environment and lifestyle: both qualitative and facilitates additional benefits to all aspects of Cape become critical in moving towards the City‘s vision, it not only does its achievement In the The term “integrated” is a vital theme of In respect of the City, there are a number of concurrent planning paths the two most safely and affordably. effectively, efficiently, all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: Transport Vision, Goals and Objectives governments. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives This vision, it must be noted, covers all facets of the operation and management of the City and as such is necessarily broad in context. It may be observed however, that the Transport Vision is fully supportive of the City‘s visions for creating and enabling environment for shared growth and economic development, also promoting effectiveness and efficiency. Focusing more specifically on regional transport, the Western Cape Provincial Vision for Transport7 (WC White Paper) is: An integrated, accessible, well managed and maintained transport system throughout the Western Cape, which is recognized as making efficient use of resources and being socially just, in a way that advances broader developmental aims and objectives. The Provincial Government gives further guidance in the Provincial Land Transport Framework8 which notes as follows: Vision: The best Provincial transport system and property infrastructure for all. Mission: To deliver an integrated, accessible, safe, reliable, affordable, sustainable and quality transport system and property infrastructure through socially just, developmental and empowering processes, to improve the quality of life for all. Overarching all the above is the National Department of Transport‘s Vision for Transport9, Provide safe, reliable, effective, efficient, and fully integrated transport operations and infrastructure which will best meet the needs of freight and passenger customers at improving levels of service and cost in a fashion which supports government strategies for economic and social development whilst being environmentally and economically sustainable 7 Western Cape Provincial Government, 1997, White Paper on Western Cape Transport Policy. Provincial Land Transport Framework, 2004 9 National Department of Transport, 1996, White Paper on National Transport Policy. 8 13 Transport Vision, Goals and Objectives which is similarly reflected by the City‘s Transport Vision: City of Cape Town – Integrated Transport Plan 2006 To 201 Transport Vision, Goals and Objectives In expanding on the above, South Africa‘s National Transport Plan10 promoted the densification of corridors, more efficient transport, and transport that met the needs of Customers. These three principles were key to achieving a sustainable and customer oriented public transport system. 2.2 The City of Cape Town’s Transport Vision The following interpretation of the elements of the City of Cape Town‘s vision for transport is used to guide the Integrated Transport Plan: World Class: This indicates the need to ensure that world class benchmarks for all facets of the transport system are used to measure the performance of the transport system of the City. Sustainable: This implies that our transport system must be such as to provide the desired results for an indefinite period into the future, without degrading the ecological, economic or social environment, at a cost that can be borne by the community. All people and goods: The vision requires that the system adopts the principles of Universal Design so that it can be used equitably by all people, to the greatest extent possible, without the need for adaptation or specialised features. Simultaneously, it recognises that without the movement of goods, people would have no access to many of the necessities of life, such as food, clothing and shelter and that thus freight transportation and planning. results and objectives are achieved to the appropriate standard. Provincial and National interests. Efficiently: This requires that the transport system is robust enough to operate within the constraints by minimising the wasteful consumption of essential financial, human context of theITP, safely and affordably. and natural resources, whilst extracting maximum benefits to the economy and society. Moving South Africa, Department of Transport, 1999. 14 The Vision 10 quantitative. safe and secure environment by people of all abilities. Informants. Safely: This imperative requires that the entire transport system is experienced as a National governments. maintained in an organized, integrated and capable manner ensuring that the desired well as the transport visions of the Provincial and Effectively: This requires that the transport system is developed, operated and seen in the context of the overall vision for the City as The City‘s vision for transport, stated above, must be are addressed in Chapter 4: Transport Strategic other policies relating to environmental matters. These Spatial Development Framework, along with a variety of which are the Integrated Development Plan and the variety of policies and strategies for the City, amongst integration requires that consideration be given to a This emphasis on aligned, ensuring that the City vision will reflect Visions, Goals and Objectives of all related entities are The term ―integrated‖ ensures that the Town‘s environment and lifestyle: both qualitative and facilitates additional benefits to all aspects of Cape become critical in moving towards the City‘s vision, it not only does its achievement In the The term “integrated” is a vital theme of effectively, efficiently, all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: Transport Vision, Goals and Objectives transport must be appropriately accommodated. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives Affordably: This demands that the transport system is responsive to social challenges and offers a choice of reliable transport modes at travel costs within the reach of all citizens of Cape Town. Figure 5: A Complete Transport System 2.3 Goals Broadly speaking, the following are viewed as the broad goals of the City of Cape Town in A more compact city in which land use and transport effectively support sustainability. Priority is given to supporting infill rather than dispersed developments and densification is encouraged where population thresholds are required along public transport priority corridors. A good quality transport system that provides for basic mobility for the economically disadvantaged but also provides a competitive alternative to the private vehicle with reference to convenience, comfort, network coverage and geographical accessibility. 15 Transport Vision, Goals and Objectives respect of its transport system: City of Cape Town – Integrated Transport Plan 2006 To 201 Transport Vision, Goals and Objectives A well functioning integrated transport system that supports a growing economy and the needs of freight movement. This system must ensure coordination across the various modes to maximize service coverage and promote comfortable transfers between them. This may be conceptualised as a ―complete‖ transport system, as depicted in Figure 6. A transport system that reflects environmental sensitivities and is sustainable for future generations whilst incorporating applicable technologies and innovations to achieve its goals for the current generation. A transport system that discourages unsustainable transport modes; such as the single occupancy vehicle (SOV), and prioritises public transport and nonmotorised transport. Sustainable transport is a key structuring element for the ITP and transportation projects that incorporate environmental, economic and social sustainability will be prioritised. A public transport system that is accessible to special categories of passengers including persons with disabilities, the aged, pregnant women and those who are limited in their movements by children. With the above in mind, performance indicators are being developed to monitor, measure, and evaluate the progress to ensure that the City of Cape Town National governments. well as the transport visions of the Provincial and The Vision 16 Informants. Figure 6: The Multi Faceted Nature of “Sustainability”. seen in the context of the overall vision for the City as The City‘s vision for transport, stated above, must be are addressed in Chapter 4: Transport Strategic other policies relating to environmental matters. These Spatial Development Framework, along with a variety of which are the Integrated Development Plan and the variety of policies and strategies for the City, amongst strives. context of theITP, sustainability that the ITP integration requires that consideration be given to a is towards this view of This emphasis on depicted in Figure 6, and it Provincial and National interests. as aligned, ensuring that the City vision will reflect perceived Visions, Goals and Objectives of all related entities are be transportation and planning. may The term ―integrated‖ ensures that the system. Such sustainability quantitative. transport Town‘s environment and lifestyle: both qualitative and world-class facilitates additional benefits to all aspects of Cape become critical in moving towards the City‘s vision, it not only does its achievement a In the sustainable The term “integrated” is a vital theme of delivering safely and affordably. effectively, efficiently, all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: Transport Vision, Goals and Objectives achieves its ultimate goal of City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives 2.3.1 Sustainable Transportation Systems A key theme of this ITP is sustainability. The City has chosen to think of sustainability in terms primarily of the environmental, social and economic contexts, on the basis that it will encompass issues such as housing, food security, a safe and healthy living environment and access to opportunities, supporting a vibrant economy. 2.3.1.1 Environmental Sustainability Global awareness and familiarity with environmental sustainability was enhanced with the advent and outcome of the World Commission on Environment and Development in 1987. Subsequently, there have been the international Rio Summit of 1992 linked to the global Local Agenda 21 process, the Integrated Development Planning processes in South Africa, the World Summit on Sustainable Development in Johannesburg in 2002, the Cleaner Development Mechanisms initiative through the South/South-North international partnership, the Urban Environmental Accords of June 2005, the UN Millennium Development Goals of 2005 and other key levers such as the International Council for Local Environmental Initiatives. Arising from these events, South Africa has ratified various conventions relating to the protection of the environment and accordingly is obliged to reduce its impact on the environment. These initiatives and the outcomes thereof are the basis for the identification of key performance indicators and acceptance criteria for projects proposed in terms of this ITP. 2.3.1.2 Social Sustainability Social sustainability is perhaps less emphasised in the context of global awareness, but is an essential element of transport system design. Transport has the ability to link or divide communities, depending on circumstances. Transport, that ensures access to the consequences arising from traffic accidents, particularly those involving fatal or serious injury. It is thus an imperative that transport systems planning, operations and management should seek to ensure that the negative social impacts, especially with respect to safety, are given priority consideration. Given the fact that the ability to use services, or attend school or work, is largely dependent on the ability of people to get there, the lack of accessible transport is a serious barrier to the full integration into society of people with special needs. 17 Transport Vision, Goals and Objectives necessities of life, including social interaction, also has extremely negative social City of Cape Town – Integrated Transport Plan 2006 To 201 Transport Vision, Goals and Objectives 2.3.1.3 Economic Sustainability Finally, in the context of sustainability, it is important to recognise that transport incurs costs in several ways, but simultaneously acts as the basis for economic growth and development. There is thus a need to weigh up the economic impact of every transport intervention. The impacts must be understood in their very broad context, which encompasses not only the initial monetary cost, but also the cost of usage by various modes and the impacts of these modes or sectors, one on the other. How will a transport intervention improve commercial or industrial investment?How will it affect mode choice and the utilisation of other network elements? 2.3.2 Universal Design Transport plays a critical role in the daily lives of our citizens. That this is so requires that transport system planning strives for the goals of Universal Design. Universal Design is the design of products and environments to be useable by all people, to the greatest extent possible, without the need for adaptation or specialized design. This definition clearly covers a very broad range of issues, such as: The affordability of the system to the poor; The functionality of the system for those whose work requires rapid movement between unpredictable origin-destination pairs, such as emergency service workers; The ability to provide goods, especially food, where needed by people; The suitability of the transport system to accommodate all modes, including motorised requiring Universal Access. 11 Provincial and National interests. transportation and planning. The latter is aligned with the vision that the transport system should serve all people, safely and affordably. Our country‘s constitution, human rights laws and employment equity act have reinforced context of theITP, the importance of the social integration of people with special needs into all areas of our development of all public facilities. Special Needs Users (SNUs) are defined as persons 11 The Vision 18 Informants. quantitative. Integrated National Disability Strategy White Paper, Office Of The Deputy President, November 1997 National governments. needs. well as the transport visions of the Provincial and Ensuring that users with specific requirements are able to use the system to meet their seen in the context of the overall vision for the City as The City‘s vision for transport, stated above, must be are addressed in Chapter 4: Transport Strategic other policies relating to environmental matters. These Spatial Development Framework, along with a variety of which are the Integrated Development Plan and the variety of policies and strategies for the City, amongst integration requires that consideration be given to a This emphasis on aligned, ensuring that the City vision will reflect Visions, Goals and Objectives of all related entities are The term ―integrated‖ ensures that the Town‘s environment and lifestyle: both qualitative and facilitates additional benefits to all aspects of Cape become critical in moving towards the City‘s vision, it not only does its achievement In the society. This significant development has placed new requirements on the planning and The term “integrated” is a vital theme of effectively, efficiently, all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: Transport Vision, Goals and Objectives and non-motorised, private and public, and; City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives in a phase of the normal cycle of life which restricts their movement as well as those with impairments. Life cycle users are defined as persons who are elderly and or frail users, children, visitors, people with prams and pushchairs, expectant mothers, and mothers with children. Users with disabilities are person who are permanently and temporarily disabled and would include the visually impaired (blind and partially sighted), mobility impaired (e. g. wheel chair users, people on crutches and other walking aids), communication impaired users (include deaf, speech, intellectual and psychiatric impairments). The main challenge to the implementation of Universal Design, is maintaining the functionality of existing infrastructure and systems while they are being adapted. It is however, a challenge taken up by the City of Cape Town. 2.3.3 Support for Local Economic Development and Growth Based on the targets set in the Provincial Growth and Development Summit and the national key performance indicators for economic development and job creation, the City‘s aims are to: Increase economic growth from the current average of 3-4% to 6-7% Create jobs – especially blue collar jobs and jobs for youth and women Broaden black economic empowerment Reduce the gap between rich and poor, while increasing per capita income Develop skill levels geared to employment and income generation Develop Cape Town as a competitive visitor and business friendly destination. The Expanded Public Works Programme (EPWP) is a nationwide programme to create work opportunities within all spheres of Government and is supported by the City, as set 2.3.4 Transport Safety An important element of the vision is safety. In terms of transport, first and most important is the reduction of transport related deaths and serious injury due to road and rail accidents. Ultimately of course, the objective must be to reduce, if not eliminate accidents in general and accidents with injury in particular. Safety is also perceived by many as including security, and transport related crime prevention is thus seen as comprising an element of transport safety improvement. This is particularly relevant in light of the promotion of public transport, where security represents a significant mode choice factor. 19 Transport Vision, Goals and Objectives out in the Integrated Development Plan. City of Cape Town – Integrated Transport Plan 2006 To 201 Transport Vision, Goals and Objectives 2.3.5 Objectives of the ITP With the Vision and Goals set out above, the following objectives are stated for the ITP: To promote the systematic reduction of fatal and serious injury accidents on the transport system To promote travel demand management measures, that limit private car usage To align transport and land use planning to bring about a land-use pattern where the necessity to travel, especially by car, is minimised To promote sustainable travel patterns by encouraging walking, cycling and the use of public transport To improve safety and security at public transport interchanges, station car parks, and en-route to interchanges and stations. To provide better maintenance of facilities To provide non-motorised transport facilities and include their requirements in Traffic Impact Studies. To protect the environment from pollution through reduced vehicle emissions To manage the road network so that current road space utilisation is optimised, and to only invest in new roads where it provides accessibility and support to public transport. To promote and incorporate the Universal Design principle of design and construction of transport infrastructure and public transport services. To support the use of rail for freight use and to manage road based freight vehicles. To provide safe and convenient cycle and motor-cycle parking at stations, leisure facilities, public buildings and within employment areas, such as central business utilisation and return to the City. To provide safe access to new developments through the application of the Roads Access Policy. Provincial and National interests. context of theITP, To provide safe and affordable Park and Ride facilities at stations and other key sites. safely and affordably. To integrate land-use and transport. quantitative. 20 The Vision areas, and to apply the traffic calming policy for existing areas. Informants. To incorporate self-enforcing traffic calming measures in the design of new residential National governments. transportation and planning. parks should be made available for variable land use developments to increase their well as the transport visions of the Provincial and To make better use of existing parking facilities – municipal and privately owned car seen in the context of the overall vision for the City as The City‘s vision for transport, stated above, must be are addressed in Chapter 4: Transport Strategic other policies relating to environmental matters. These Spatial Development Framework, along with a variety of which are the Integrated Development Plan and the variety of policies and strategies for the City, amongst integration requires that consideration be given to a This emphasis on aligned, ensuring that the City vision will reflect Visions, Goals and Objectives of all related entities are The term ―integrated‖ ensures that the Town‘s environment and lifestyle: both qualitative and facilitates additional benefits to all aspects of Cape To apply reduced parking standards for developments in CBD‘s and that are on major public transport routes. become critical in moving towards the City‘s vision, it not only does its achievement In the The term “integrated” is a vital theme of effectively, efficiently, all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: Transport Vision, Goals and Objectives districts (CBD‘s). City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives 2.4 Key Performance Indicators The City is working on the development of a set of indicators that can and will be measured and monitored continuously to check progress towards a more sustainable transport system. The targeted High level Performance Indicators are indicated in Table 1. Table 1: Key Performance Indicator Summary Key Performance Indicator themes 1. Energy use 5. Congestion on major freight 2. Emissions routes 3. Full modal split 6. Congestion on peak hour 4. Public Transport commuter routes 4.1 Use 7. Loss of life and livelihood 4.2 Coverage 4.3 Service quality 8. Urban quality 4.4 Security Values for some of these indicators, such as road fatalities and injuries, and average travel speeds on certain network segments during different operating periods are already available. Others require some work to obtain and are to be developed in future updates of the ITP. The proposed indicators specific to various aspects of the transport system are provided in the appropriate sections. The matrix depicted in Table 2, shows how the key performance indicator themes relate to the City‘s Transport vision, strategies and triple bottom line evaluation criteria. Table 3 be attached to the Vision and the primary strategies of this ITP, as indicators that are already in place or for which the data is available, and whose role needs to be amplified rather than initiated. It is to be noted that two approaches have been adopted for immediate implementation as part of this ITP. The first is a very limited set of performance indicators that seek to at least to start to respond to the vision. The second is a more subjective approach that uses a scoring system for proposed projects and programmes to prioritise them in terms 21 Transport Vision, Goals and Objectives provides some more specific examples of appropriate key performance indicators that can effectively, efficiently, not only does its achievement In the The term ―integrated‖ ensures that the Visions, Goals and Objectives of all related entities are quantitative. Town‘s environment and lifestyle: both qualitative and facilitates additional benefits to all aspects of Cape become critical in moving towards the City‘s vision, it context of theITP, transportation and planning. The term “integrated” is a vital theme of safely and affordably. all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: Transport Vision, Goals and Objectives 22 This emphasis on National governments. well as the transport visions of the Provincial and seen in the context of the overall vision for the City as The City‘s vision for transport, stated above, must be The Vision Informants. of the achievement of the transport vision and strategies for the City. are addressed in Chapter 4: Transport Strategic other policies relating to environmental matters. These Spatial Development Framework, along with a variety of which are the Integrated Development Plan and the variety of policies and strategies for the City, amongst integration requires that consideration be given to a Provincial and National interests. aligned, ensuring that the City vision will reflect City of Cape Town – Integrated Transport Plan 2006 To 201 Transport Vision, Goals and Objectives This latter is discussed in Chapter 8. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives Table 2: Matrix of Vision, Evaluation Measures, Strategy and Key Performance Indicators Triple Bottom Line project Environment evaluation Primary Economic Social Environmental Protection Safety Safety Managing Urban Growth Economic Growth Environmental Protection Congestion Management Congestion Management Congestion Management Sustainable All (As per Table 1) 8 2,8 Effective 8 8 3,4.2, Efficient 1,3,5,6,8 2,3,5,6,8 3,6,8 Safety 8 7,8 4.2,4.4,7,8 Affordable 8 8 3,8 Accessibility for all users 1,4.1,2 4,4.1,8 4,4.1,4.2,4.3,4.4 Strategies Vision Focus 23 Transport Vision, Goals and Objectives The Vision for Transport of the City of Cape Town is: effectively, efficiently, to all users not only does its achievement The term ―integrated‖ ensures that the Affordability Accessibility Number of accidents. Visual Condition Index Number of fleet >70% Per costs 24 of for fatal capita > >45% usage on all Passenger trips available fleet spend on transportation and Transport cost of goods Proportion of < 35% of value household income Minimise retrofitting a) Accessibility to special needs b) c) d) passengers/users >50% all locations (Also specify key locations) 80% - 90% accessibility of all new of veils/rolling stock >50% of all 100% National governments. Safety capita Integrated City Cards well as the transport visions of the Provincial and parking < x m /p Per split seen in the context of the overall vision for the City as <min The City‘s vision for transport, stated above, must be 1:49:50 The Vision petajoules Informants. Economy are addressed in Chapter 4: Transport Strategic NMT:Public:Private other policies relating to environmental matters. These use of all transport < x Spatial Development Framework, along with a variety of 2 Modal which are the Integrated Development Plan and the Public right of way and variety of policies and strategies for the City, amongst >85% integration requires that consideration be given to a (b) This emphasis on Environment Provincial and National interests. Effectiveness aligned, ensuring that the City vision will reflect Energy Visions, Goals and Objectives of all related entities are quantitative. Non-renewable Town‘s environment and lifestyle: both qualitative and facilitates additional benefits to all aspects of Cape become critical in moving towards the City‘s vision, it context of theITP, Efficiency In the Sustainability transportation and planning. The term “integrated” is a vital theme of safely and affordably. all its people and goods A world-class sustainable transport system that moves The Vision for Transport of the City of Cape Town is: 24 Transport Vision, Goals and Objectives Table 3: KPI Matrix Society modes (a) Average journey time (a) Population within 500m of PT > 70%/p capacity Commuters using NMT > y % of all commuters infrastructure < Rx/p serious injuries. accident fatal/serious crashes < Rx/p used on transport to be < 10% City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Vision, Goals and Objectives Transport Vision, Goals and Objectives 25 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3 TRANSPORT REGISTER The Transport Register is a snapshot of the transport system of the City of Cape Town and describes the current transportation situation, system management and performance levels. It is noted that the gaps in the information will be closed in successive ITP reviews and updates. 3.1 Transport Network (Supply) In developing an Integrated Transportation Plan for the City of Cape Town, it is important that the basic role of transportation in any major urban area or city be understood. Any major urban area consists of various locations, such as residential areas, education centres, areas of employment, production and manufacturing centres and service sectors. Transportation is the ability to move people and goods between places and activities. Hence, transportation is also referred to as the ―lifeblood of cities‖12. This movement is facilitated within a system of various transportation forms (private vehicles, taxis, buses, trains, trucks, etc), operating along a network of transportation infrastructure (rail, road, etc). The transport network of Cape Town comprises two main elements, the road and rail networks. From a freight movement perspective these are augmented by pipelines for the bulk transport of crude oil and related products. 3.1.1 Rail Network Key Performance Indicators: o % Network Availability The rail network of the City of Cape Town is shown in schematically Figure 7, which also shows the commuter stations. All the commuter lines are electrified with an overhead Transport Register catenary system (3KV DC Power). (The network is show in geogrpahic format in Figure 15. ) 12 V. Vuchic, Transportation for Livable Cities, Centre Urban Policy Research, New Jersey, 2nd Edition 2000 26 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Figure 7: Rail Network within the City of Cape Town. 27 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register The total length of the network is 581km with 1 473 signals. Approximately 80% of the network is equipped with centralised traffic control (CTC), featuring automatic train routing, bi-directional signalling and electronic train registering. There are a total of 42 signal interlockings, including several junctions where branch lines merge. Signal blocks are approximately 1km in length, permitting a nominal headway of three minutes on most of the mainline tracks close to Cape Town. The process of determining priority corridors in partnership with the regional stakeholders, in accordance with the Regional Rail Plan Directives, has yielded eight functional rail corridors. They are: Khayelitsha to Cape Town corridor (Including the Kapteinsklip line) Kraaifontein to Bellville to Cape Town corridor (via Thornton and Monte Vista) Simonstown to Cape Town corridor (including the Cape Flats line Bellville to Sarepta to Langa to Cape Town corridor (including Pinelands link) Worcester to Wellington to Cape Town corridor Muldersvlei to Eersterivier Corridor (via Stellenbosch) Strand to Bellville to Cape Town Malmesbury to Cape Town Transport Register The service capacities on these lines are shown in Tables 4 and 5. 28 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 4: Historic Rail Network Service Line Capacities Based on Deployed Rolling Stock. 2000 2004 2007 (2.5 hour peak period) (3 hour peak period) (3 hour peak period) Service Line 29 1Simonstown to Cape Town 2Retreat to Cape Town via Maitland 3Kraaifontein to Cape Town via Esplanade 4Wellington to Cape Town via Woodstock 5Bellville to Cape Town via Monte Vista 6Muldersvlei to Cape Town via Esplanade 7Muldersvlei to Cape Town via Woodstock 8Strand to Cape Town via Esplanade and Bellville 9Strand to Cape Town via Bellville and Woodstock 10Bellville to Cape Town via Esplanade and Langa 11Bellville To Cape Town via Pinelands 13Kapteinsklip to Cape Town via Woodstock and Pinelands 14Kapteinsklip to Cape Town via Esplanade and Mutual 15Khayelitsha to Cape Town via Esplanade and Mutual 17Khayelitsha to Cape Town via Pinelands 19Wellington to Cape Town via Monte Vista 21Muldersvlei to Cape Town via Monte Vista 23Strand to Cape Town via Monte Vista 24Muldersvlei to Cape Town via Monte Vista Source: 2007 Rail Census. Total Metro Total Metro Metro Metro Plus Plus 13,365 11,745 25,110 12,375 10,875 23,250 4,680 7,140 11,820 4,680 7,140 11,820 1,200 1,420 2,620 Not operating in 2004 5,400 6,390 11,790 6,600 7,810 14,410 Not operating in 2000 1,770 550 2,320 600 710 1,310 Not operating in 2004 3,000 3,550 6,550 4,800 5,680 10,480 1,200 1,420 2,620 600 710 1,310 3,600 4,260 7,860 2,400 2,840 5,240 1,050 12,810 13,860 1,050 12,810 13,860 Not operational morning peak period 1,500 18,300 19,800 2,100 25,620 27,720 1,050 12,810 13,860 1,350 16,470 17,820 480 26,100 26,580 1,120 35,300 36,420 0 2,400 2,400 640 9,200 9,840 3,000 3,550 6,500 2,400 2,840 5,240 Not operating in 2000 3,000 3,550 6,550 710 710 1,310 Not operating in 2004 1,420 1,420 2,620 Not operating in 2004 Metro Total Metro Plus 10,395 9,135 19,530 4,290 6,545 10,835 600 710 1,310 3,000 3,550 6,550 4,425 1,375 5,800 Not operating in 2007 2,400 2,840 5,240 Not operating in 2007 2,400 2,840 5,240 1,050 12,810 13,860 150 1,830 1,980 1,800 21,960 23,760 750 9,150 9,900 2,240 32,200 34,440 480 6,900 7,380 600 710 1,310 2,400 2,840 5,240 1,200 1,420 2,620 Not operating in 2007 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 5: Current Network Capacity in peak periods based on deployed rolling stock. Source: Metrorail 3.1.2 Road Network The road network forms an integral part of the greater transportation network. It is the public right of way system by means of which most of the City‘s transportation needs are met. These needs include the movement of people and goods. People movement includes trips between home and work, educational trips, business trips, as well as recreational trips for social activities. An urban area that is lacking in a good road network will suffer economically and socially. Coupled with land use Transport Register planning in an intricate dynamic relationship, the road network influences and is influenced by the structure of any major urban area. The City has a well-developed road network that has strong radial routes focused on the CBD. The two main freeways, the N1 and N2, run from the CBD in a north-east and south-east direction respectively. The speed limits along these roads are generally 120 km/h. Four other freeways, the M3, M5, N7/M7 and the R300 act as link roads and primarily run in a north-south direction. Except 30 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register for the R300, which is circumferential, these are also essentially radially oriented with respect to the City Centre. Speed limits on these roads vary from 80 km/h to 120 km/h. The R27 (Marine Drive) along the Atlantic coast is also an important and heavily used road as it links the CBD with the rapidly growing Table View area. The City road network depicted in Figure 8, (also available in A0 print and GIS format), has over 10347 km of public roads the functional classification and ownership of which are shown in Table 6. Table 6: City Roads by Classification Classification CoCT PGWC. SANRAL Grand Total Freeway – Class 1 140 183 159 483 Expressway – Class 1 168 132 11 311 Primary Arterial – Class 2 470 52 521 Secondary Arterial – Class 3 804 1 804 Minor Road – Class 4 8144 3 Private Road 76 Grand Total 9803 3 8150 76 371 173 10347 Source: City of Cape Town Transport GIS – Oct 2009 This road network is depicted in Figure 8. More detail is provided in the accompanying drawings, and Transport Register detailed data is available in the GIS. 31 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 8: Road Network Hierarchical Classification. 32 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.1.2.1 Road Infrastructure The road network may be classified in terms of a number of alternative uses. As already noted, there is a hierarchical classification relating to mobility and geographical accessibility. There are also classifications in respect of use by public transport, freight and non-motorised transport and as scenic routes and so on. These classifications give rise to such aspects as navigation and signage systems. Table 7 reflects the status quo in respect of these various aspects. Table 7: Road Network Element Status Quo Hierarchical The road network may be classified in a number of ways. Within the CoCT, the Classification adopted system is that advised by the Province, and is reflected in Figure 8 and the GIS data set. There is however, discussion on this, as many favour a review and adoption of the Gauteng/NDoT Guidelines. Road Many of the CoCT owned higher order roads are proclaimed in terms of the Proclamation Province‘s Roads Ordinance (Ord. 19 of 1976). These are reflected in PGWC Plan BC 337 U and in the CoCT GIS data set. The reassignment of some of these roads is presently being considered by the Province. Route The route numbers depicted on road maps and guidance signage are part of a Navigation, comprehensive system designed to assist road users navigate the City‘s road Signs and network. The number system, as reflected in the GIS data set and on the Markings Roads Layout Plan, is due for review in areas of recent urban expansion. Associated with this is the tourist facility guidance signs system, which is important to the promotion of a visitor friendly city. The status of road traffic signs and markings is reported in the Asset Management Register. Amongst the many possible road network classifications, the City has a subnetwork that is designated as the Scenic Route Network. This network attempts to protect views from major roads, and promote access to stopping places of scenic interest within the City of Cape Town as an aid to supporting tourism and the promotion of the City in visual splendour. The scenic route sub-network is shown in Figure 9. More detail is provided in the accompanying GIS. 33 Transport Register Scenic Routes City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 9: Scenic Routes. 34 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.1.2.2 Road-based Public Transport Network The City has an extensive road-based public transport network, comprising bus and minibus taxi routes. Work is presently also underway in establishing an Integrated Rapid Transit network. These are described and depicted below. Table 8: Road-based Public Transport Network Element Bus Network Status Quo The bus network of the City is shown in Figure 10. The defined network is a relatively comprehensive network but with limited off-peak services on many routes. More detail of the bus network is Integrated provided in for thePhase accompanying The routes 1A of theGIS. IRT have been planned in detail and construction Road-based of exclusive bus-ways is well underway (Oct 2009). The routes are described in Rapid Transit Annexure B to the IRT Project Status and Financial & Strategic Assessment Network report that was attached to a report to the Council meeting of 28 October 2009. The planning of the remainder of a comprehensive network is still in a planning stage. The route network, showing the various phases of development, is shown in Figure 11. More detail is provided in the accompanying GIS dataset. The proposed system and its development are discussed in some detail in Section 8.6 and the accompanying GIS. Minibus Taxi The minibus taxi industry is limited to a route set in terms of the City‘s Operating Routes Licence Strategy and the Operating Licences issued by the Provincial Operating Licensing Board. The licensed routes are depicted in Figure 12. More detail is provided in the accompanying GIS. On-street Bus There are approximately 4000 designated on-street bus stops distributed across Stops and the network within the Cape Town Municipality. Transport Register Shelters 35 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 10: The City‟s Bus Network. 36 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 11: The City‟s Planned Integrated Rapid Transit Network. 37 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 12: The City‟s Minibus Taxi Network. 38 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.1.2.3 Freight Network Whilst not renowned for its heavy industry, the City of Cape Town nevertheless has a number of significant industrial areas, a major seaport and South Africa‘s second largest international airport. Central to a functional economy is ensuring that these freight zones are well connected. The key industrial areas, major freight centres, with the primary interlinking transport network, are shown in Figure 13. The freight network elements are considered in Table 9. Table 9: Road Freight (HGV) Network Element Status Quo Abnormal Load A subset of the freight network is that serving abnormal loads. Abnormal load Routes routes are protected to ensure that abnormal loads can be moved with the minimum of expense and interference with road signage, controls and lighting. The currently defined abnormal load routes are shown in Figure 14. More detail is provided in the accompanying GIS. Hazardous Section 27(2(h) & 5) of the NLTTA and Section 37 of the NLTA require the City Substance to determine routes for the transporting of hazardous substances and show them Routes in the ITP. Presently, Cape Town does not maintain separately defined hazardous goods routes, treating abnormal load routes as the primary hazardous goods network. When such goods are to be transported, a permit is obtained from the Provincial Government and notification given to appropriate authorities so that they can be prepared for emergencies. HGV Restraint Cape Town has numerous roads where existing infrastructure is unsuited to Roads and vehicles in excess of a certain length, height or mass and specific limitations are Zones applied as necessary. The City does not presently have any area-based HGV Overload Provincial overload control and weigh stations are located on the N7 Control (Vissershok), the N1 (Joostenberg Vlakte) and N2/TR2 (Somerset West). Overnight Truck Currently, Cape Town does not provide any truck stop areas. There is however Holding Areas single direct access service station on the N7, operational under contract to SANRAL, with facilities that allow trucks to stop safely overnight if necessary. Major filling stations fulfil a similar if unofficial role on both the N1 and N2 routes. On-Street Generally considered at locations where on-street parking is permitted, each Loading Zones application is treated on merit. 39 Transport Register restrictions on goods vehicles. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 13: Industrial Areas and Freight Centres with the Primary Interlinking Transport Network 40 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 14: Defined Abnormal Load Routes. 41 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.1.2.4 Non-motorised transport network Most of the current road network also acts as a non-motorised network although the extent of physical separation of the motorised from the non-motorised is not always the same, resulting in a fragmented dedicated NMT network. Tables 10 and 11 provide more information on the non- motorised transport network in the City. Table 10: Pedestrian Pathways and Sidewalks Element Status Quo Dedicated Pathways and The GIS data set and Infrastructure Asset Management Register has Priority Streets/Zones a record of pedestrian facilities. However, this does need review and updating in the context of public transport accessibility and that of provision of dedicated pedestrian streets. The latter debate addresses the issue of road space allocation. Road and Rail Crossings Similarly information is available in the data sets, however, it is Bridges acknowledged that there is a need to be more active in respect of Traffic signal control the provision of safe pedestrian crossings. Priority control Management There is no formal pedestrian management system in Cape Town. Safe School Access There are no programmes presently in place that aim at creating safer environments surrounding schools. Table 11: Bicycle Pathways and Storage Facilities Element Status Quo Bicycle The planned pathway network is available in the GIS data set. Work is in Pathways progress to reconsider the use of bicycles in the context of a new NMT (Classified) policy, which includes the use of peddi-cabs etc. (The issue of public bicycle parking facilities is on that agenda. ) Transport Register Public Bicycle Cape Town is presently lacking in adequate cycle holding facilities. This is Parking however due to the poor utilisation of facilities provided in the past than a Facilities lack of consideration for such interventions. 42 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.1.2.5 Parking facilities Use of the road network is reliant on the ability to temporarily store vehicles at each end of the trip. This storage necessitates parking of some sort or another. Such parking may be on- or off-street, private or public, for private vehicles or restricted to loading and off-loading and so on. Table 12 provides some basic information with respect to parking in the City. Table 12: Parking Facilities Element Status Quo Overall estimate of No detailed estimate of the total number of parking spaces in the City is parking availability. available for inclusion in this ITP. However, work being undertaken by the City indicates that the number of non-residential parking bays not owned by the City is in excess of 317000 and is more likely to be over 330000. It is to be noted that the current live vehicle population for the City is over 1023000 vehicles, all of which require some form of parking, often more than one parking space to accommodate usage patterns. Public Parking Lots A recent study of inner city parking facilities determined there to be approximately 29 770 parking bays in public parking facilities in the inner city. No detailed data for the entire city was available for inclusion in this ITP. Private Parking Lots No detailed data for the entire city was available for inclusion in this ITP and Garages review. Park ‗n Ride Cape Town has Park ‗n Ride facilities at many of its railway stations. Facilities On-street Parking No detailed data for the entire city was available for inclusion in this ITP Facilities review. 3.1.3 Other Transport Network Elements only elements. Subsumed within the road network, are the already mentioned pedestrian and cycle paths. In addition there are greenbelt routes, which may not be part of the road reserve but also form part of the movement network, in the form for example of recognised hiking or horse riding trails. As mentioned earlier, there are also pipelines that form a component of the freight transport network. Some additional information is provided in Table 13. 43 Transport Register Although Road and Rail comprise by far the largest portion of the transport network, they are not the City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 13: Other Transport Network Elements. Element Pipelines Status Quo Two strategic pipelines are situated in the City of Cape Town municipal area which is not managed by the City, namely. These are the ±126 km line between Saldanha and Montague Gardens (the refinery) and between refinery and Cape Town Harbour. Hiking and Horse There are a number of areas within the Metropolitan area that are Trails designated as hiking and horse trails. Most of these are linked with conservation areas and, whilst having importance from an urban quality of life, social and tourism perspective, do not form part of the regular Transport Register transport system of the City. 44 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.2 Transport Network Utilisation (Demand) Key Performance Indicators: o Metropolitan wide Mode Split person trips o Metropolitan wide Mode Split tonne. km An important aspect of transport network planning is an understanding of the utilisation of existing network elements, measured variously in terms of people, vehicles and tonnage of goods. The importance lies in being able to understand whether infrastructural or travel demand management solutions will best solve capacity concerns. 3.2.1 Rail Network Utilisation Key Performance Indicators: o Peak-period boarding‘s o Daily boarding‘s o % line capacity utilisation Although the rail network is capable of carrying over 100 trainsets, the City of Cape Town is presently served by 83 trainsets although not all are in service at once due to maintenance requirements. The 2007 Current Public Transport Record (CPTR) records that these carried a total of 634 837 daily trips for both AM and PM three hour peak periods (104 829 Metro Plus and 530 008 Metro class passengers). These figures are very similar to the 2004 census which record a total of 621 285 passengers for the same periods. This is supported by a comparison of ticket sales since 2004, which indicates that there has been a steady increase in sales. While the inbound volumes remained unchanged, the increase was observed in the return PM trip. One suggested reason for this is that the inbound passenger volumes may have reached the The CPTR report reflects that there has been an overall increase of 20 scheduled trips from 2004 to 2007. However, this is made up from an increase on the Bellville and Wellington lines, while the Kapteinsklip and Khayelitsha lines have lost frequency of service. 45 Transport Register capacity of the services offered. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register The most utilised railway stations, include: Cape Town 140 733 Salt River 51 982 Bellville 64 501 Langa 41 555 Mutual 54 981 Maitland 36 324 Bonteheuwel 54 926 Nyanga 30 807 Philippi Khayelitsha 29 991 52 961 Morning peak-hour passenger utilisation of the various corridors and the rail share of public transport along those corridors is shown in Table 14. In terms of passenger demand for Metro class services, the Simon‘s Town line records over-capacity conditions between Heathfield and Plumstead and between Mowbray and Salt River; demand outstrips supply between Philippi and Bonteheuwel and also particularly between Bellville and Woltemade. Table 14: Morning Peak-Hour, Peak Direction Utilisation of the Transport Network Peak-hour, Peak-direction utilisation (BASE YEAR 2007) Sub-tot Corridor PT-Rail PT-Road PT Private South East rail corridor (Khayelitsha / Mitchell's Plain) 66,969 53,016 119,985 47,626 167,610 BLE rail corridor (incl. Wellington / Strand) Southern rail corridor (s/sub's / Cape Flats) Other rail corridors (Malmesbury / Stellenbosch) Other corridors (non rail) TOTAL 42,735 48,189 90,924 157,764 248,688 13,976 9,834 23,810 81,296 105,106 4,576 45,226 7,646 110,812 12,222 156,037 21,559 211,382 33,781 367,420 173,482 43% of PT 19% of total 229,496 57% of PT 25% of total 402,978 519,627 44% of Total 56% of Total 922,606 100% Transport Register Mode Share Total 46 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.2.1.1 Freight Rail The City of Cape Town owns rail sidings in Epping Industria and there are a number of other rail sidings around the city intended exclusively for freight movement although many tend to be underutilised or not used at all. These are highlighted in Figure 15, which also shows the passenger and shared use rail lines. Rail freight in Cape Town is mainly cross-boundary freight and two lines originate from Cape Town, the first is from Cape Town to Saldanha, the 435 km Bitterfontein branch on the West coast, and secondly the line to Caledon, this line is underutilised. It is known that the freight rail network utilisation is well below its potential capacity, however, detailed information on the use of the system has not been available for inclusion in this ITP. What is clear Transport Register though is that there is capacity to move freight from road back to rail within the City. 47 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 15: Freight and Passenger Rail network in Cape Town. 48 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.2.2 Road Network Utilisation Key Performance Indicators: o Mode Splits o Estimated total vehicle kilometres per annum. o Estimated peak-hour factor o Vehicles per day, peak-hour, peak period per road type o People per day, peak-hour, peak period per road type. Recent population estimates indicate that the City‘s population is at least 3.4 million13, all people requiring goods, services and personal transport. Providing the motorised transport for these people, the eNatis system records for February 2009 indicate that there are 1 023 107 vehicles (all classes) registered in the City of Cape Town. The vehicle count currently reflects an average annual growth rate of approximately 3 8% in licensed vehicles since February 2002. Over the same the number of registered motorcars has grown by about 3.4% per annum. Private vehicles still retain a large share of the modal split between private and public transport with 40% trips to work being undertaken by private car in Cape Town 14. The 2004 household survey undertaken by the City indicated that at about 57% of all morning peak period trips include some private car travel. There is also a significant proportion of goods traffic on certain routes. Based on the current modal splits of the total number of approximately 400 200 inbound drivers/passengers to the CBD for the 13-hour period from 06h00 to 19h00, nearly 270 000 are in Morning Peak Period - 50 : 50 (private : public) Inter-Peak Period - 83 : 17 (private : public) Evening Peak Period - 59 : 41 (private : public) All Day - 69 : 31 (private : public) For some years, increasing road traffic has not been matched by the necessary investment in road or public transport infrastructure or transport demand management measures, resulting in extreme 13 As stated in the City‘s 5 Year Plan IDP 2007/12 (IDP 2009/10 Review) Draft Document 25 Feb 09. Information updated in December 2008 and provided by the City‘s Strategic Information, Strategic Development Information and GIS Departments 14 National Household Travel Survey, as cited in the Draft Western Cape Province Public Transport Improvement Program, 2006. 49 Transport Register private cars. The current Inbound Modal Splits according (CPTR, 2004/5) are as follows: City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register congestion on the City‘s major roads during peak hours. Consequently, demand for travel within the peak hour has outstripped the capacity of the supply infrastructure, and the result is congestion that extends the peak hour to a peak period of about three hours. The most affected corridors include Marine Drive, the N1 between Durban Road and Koeberg Road, the N2 between Vanguard Drive and Cape Town CBD, the M5 from Lansdowne Road to Koeberg Interchange and the M3 from Wynberg Hill. The R300 also experiences heavy traffic, as do many other primary arterials and most of the Main Roads within the City. The increases in traffic along the N1 and Marine Drive, especially, have been fuelled by rapid expansion of Durbanville and Table View/Parklands, respectively, in recent years. However, the impact of congestion is also felt on the secondary arterials, where commuters attempt to find alternative routes to the traditional mobility corridors. This search for faster routes to work, impacts on the full road network, notably roads within residential areas, leading to ‗rat-running, inappropriate speeding and an overall increase in the potential for accidents. A rapid increase in population densities in the metro south-eastern part of Cape Town, traditionally the poorer parts of Cape Town with low vehicle ownership levels, has resulted in an increase in traffic in this region, mainly through an increase in public transport use. The only representation of road network utilisation presently available is the Emme/3 transport network model for the morning peak, which is calibrated against traffic counts from around the City. Transport Register The model depiction of peak-hour network traffic volumes is shown in Figure 14. 50 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Figure 16: 2008 Peak-hour Traffic Volumes on the City‟s Primary Road Network City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.3 Transport Network Performance A concept closely related to utilisation is that of performance. The former measured the number of people or vehicles using the transport system, the latter is more interested in the travel times and speeds on the network. Key Performance Indicators: o Peak-hour V/C ratio for key road segments o Peak-hour person trips through key road segments o Average peak-hour travel speed on key road segments o Journey time on key road segments (Key road segments are mainly those perceived as of metropolitan significance or as bottlenecks on the network. ) 3.3.1 Rail Network Performance The commuter rail network is operating at considerably below its technical capacity due to a shortage of rolling stock, the system lacking about 20 train sets at present. The result is that, other things being equal, the rail services are able to operate unconstrained by technical capacity issues although there is inadequate passenger capacity on most lines. Unfortunately, the ageing fleet, in combination with theft, vandalism and other incidents, is inclined to result in services that are not always consistent in their performance and that do not always compare that favourably with other modes. The rail system does operate at speeds far in excess of those achieved on much of the road network. There is however, a perception that the rail system is not operating as well as it could. This perception gives rise to the reality of loss of mode share amongst choice users. 3.3.2 Capacity of service lines In this section the service line capacity for the morning peak period for the three years, 2000, 2004 and 2007 is set out. The 2000 present the service capacities for a 2.5-hour morning peak period, Transport Register 2004 information for a 3-hour peak period and the 2007 information for a 3-hour peak period. 3.3.3 Assessment of Capacity Utilisation For those lines operational during 2007, the observed capacity utilisation for the service lines during the morning peak hour is summarized below: Where service lines share track, the %figures are for the combined service lines 52 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Service Line 1 – Demand exceeds capacity in the morning peak hour for Metro passengers between Heathfield and Plumstead by an average of 15%, and between Mowbray and Salt River by an average of 7%. Service Line 2 – Demand exceeds capacity between Pinelands and Ndabeni by 11% for Metro Plus passengers while capacity has been reached between Ndabeni Maitland. Metro capacity is sufficient. Service Line 3 – No Problems Service Line 4 – Demand exceeds capacity for Metro passengers between Bellville and Woltemade with an average of 22%. Metro Plus capacity is sufficient. Service Line 5 – There is sufficient Metro Plus and Metro passenger capacity on this line. Service Line 7 – Demand exceeds capacity for Metro passengers between Meltonrose and Woltemade of an average of 27%. Service Line 8 – Demand exceeds capacity for Metro passengers between Meltonrose and Woltemade of an average of 27%. Metro Plus has reached capacity between Woltemade and Ysterplaat. Service Line 9 – Demand exceeds capacity for Metro passengers between Meltonrose and Woltemade with an average of 27%. Service Line 10 – Demand exceeds capacity for Metro Plus passengers between Bonteheuwel and Mutual with an average of 51%. Metro passengers‘ capacity is exceeded between Mutual and Woltemade with an average of 25%. Service Line 11 – No Problems Service Line 13 – Demand exceeds capacity for Metro Plus passengers between Nyanga and Ndabeni of an average of 72%. For Metro passengers demand exceeds capacity between Philippi and Bonteheuwel with an average of 11%. Service Line 14 – Demand exceeds capacity for Metro Plus passengers between Nyanga and Mutual with an average of 82%. For Metro passengers demand exceeds capacity Nyanga and Bonteheuwel with an average of 12%, and between Mutual and Woltemade by 25%. Service Line 15 – Demand exceeds capacity for Metro Plus passengers between Nolungile and Mutual by an average of 74%. For Metro passengers demand exceeds capacity between Nyanga and Bonteheuwel by average of 12% Ndabeni by an average of 67%. For Metro passengers demand exceeds capacity between Philippi and Bonteheuwel by an average of 11%. Service Line 19 – There is sufficient Metro Plus and Metro passenger capacity on this line. Service Line 21 – Demand exceeds capacity for Metro passengers between Bellville and Woltemade with an average of 22%. 53 Transport Register Service Line 17 – Demand exceeds capacity for Metro Plus passengers between Nolungile and City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Service Line 23 – Demand exceeds capacity for Metro passengers between Meltonrose and Bellville by an average of 42%. 3.3.4 Total Passenger Volume The 2004 and 2007 rail passenger data is compared in Table 15. Table 15: 2004 and 2007 Passenger Volumes on the Metropolitan Rail Network 2004 (3 hour peak period) Direction To AM Inter- PM peak peak peak period period period 179,273 50,991 58,601 50,267 67,547 141,918 2007 (3 hour peak period) AM Inter- peak peak period period 322,258 163,449 57,647 61,305 321,556 299,027 75,485 73,605 142,158 310,804 203,463 131,252 243,179 632,360 All day PM peak period All day Cape Town From Cape Town Both directions 229,540 118,538 200,519 621,285 Table 16 sets out the number of scheduled trains for 2007 and compares them with those in 2004. Table 16: 2004 and 2007 Scheduled Train Trips on the Metropolitan Rail Network No of Service line scheduled trains 2004 trains 2007 1 Cape Town to Simon's Town 132 130 2 Cape Town to Retreat 73 79 Cape Town - Wellington 76 97 Cape Town to Bellville via Monte Vista 23 43 7,21 Cape Town to Muldersvlei 28 29 8,9 Cape Town to Strand 58 69 10 Cape Town to Bellville via Langa 48 48 13,14 Cape Town to Kapteinsklip 105 89 15,17 Cape Town to Khayelitsha 101 78 644 662 4,19 5 Transport Register No of scheduled Total 54 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.3.4.1 Line Capacity and Utilisation The ONTRACK report analysed capacity and utilisation, using the weekday morning peak hour as the benchmarks for operations. Peak hour capacity and utilisation can be assessed in terms of four sets of components, namely: Mainline segments Terminals Junctions Staging and storage yards. In terms of constraints, the design of the signal system limits the peak hour practical capacity of the double-track to 18 trains per hour, per direction with minimum headways of 3 minutes, which compares favourably with the US standards. On this basis, the Simon‘s Town line operates at approximately 72% capacity north of Retreat while the other mainline segments operate at 60% or less. However, this line capacity is rarely the principal determinant of capacity and other factors, such as terminal configuration, at-grade junctions and staging yard capacity affect overall capacity. Capacity is also limited by the size of the fleet, the lack of spare equipment and limited staging facilities. The Monte Vista and Cape Flats lines have the greatest opportunity for improved service within the capacity of the overall network, with options varying from additional peak trains to a varied stopping pattern e. g. express services. Increased staging would overcome the imbalance in peak hour operations i. e. in and outbound traffic. Improving the inbound/outbound track usage to 6 tracks in, 4 tracks out, as opposed to the current 5 in, 5 out, would alleviate the excess reverse peak capacity issues. 3.3.4.2 Mainline Segments - Passenger Carrying Capacity A New York design capacity for standing passengers is estimated to be 2,7 persons /m2 while a crush capacity reaches 4 persons/m2. The Metrorail capacities are based on 2,2 persons/m2 and 4,5 persons/m2 crush capacity for the new 8M trainsets which indicates a degree of discomfort for most passengers on the more patronised routes. Load factors can be defined as the ratio of the passenger on-board volume, versus total (seated plus standing) capacity. The analysis demonstrated that the peak loads on all metro lines are in the central portions of the lines, a well below their passenger-carrying capacity, although the analysis combined both first and metro patrons, which tends to understate the metro use, while overstating the metro plus use. For example, Simon‘s Town operates at 53% (30%) of metro plus carrying capacity, Cape Flats Line at 40% (21%), Bellville Line at 46% (27%) and the Kapteinsklip Line at 24% (4%). The figures in brackets represent the portion of these trains assigned to Metro Plus. 55 Transport Register significant distance from Cape Town. Hence, all services approaching Cape Town Station operate City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.3.4.3 Junctions The physical configuration and patterns of traffic movement through junctions generally pose more of a constraint to system capacity than movement along mainline segments. The three most constraining junctions are Langa, operating at 88% of capacity; Maitland at 84% and east of Bellville at 77%. While train timetables, headways and crossover movements are a complex issue, some rescheduling at Langa, which would necessitate additional passenger transfer, could increase capacity. At Maitland, there is little possibility of increasing operations while at Bellville, there is room for some modest growth before an expansion or re-configuration would be required. 3.3.4.4 Terminals The nature of Cape Town Station, being a stub-end terminal, requires that inbound and outbound trains crossover tracks in the throat of the terminal. These conflicting movements typically reduce the capacity, in comparison to a ‗through‘ station. There is an imbalance in peak services from different main lines that cannot easily be addressed given the current track configuration. This imbalance results in necessary short turn-around times on the Khayelitsha line with subsequent passenger congestion. Noting that railway station capacity determination is complex, the following percentages of line utilisation within the Cape Town Station are estimated: Simon‘s Town - 49% Khayelitsha - 69% Bellville Line - 57% Monte Vista - 79% Cape Flats Line - 64% Certain potential improvements have been identified which would increase the potential capacity at Cape Town Station. These are: Lengthen platforms 16/17 and 18/19 to accommodate 12-car 8M trains Construct new platforms 25 and 26 Construct a series of parallel crossovers from Bellville Line tracks to the Simon‘s Town approach tracks to platforms 5-7. Construct a series of parallel crossovers from the Cape Flats Line to the Bellville Line tracks approaching platforms 8–11. Transport Register Modify the access to the Simon‘s Town, Bellville and Cape Flats staging yards as necessary to make the above parallel connections. 3.3.5 Road Network Performance Optimal operation of the road network requires that roads provide mobility and geographical accessibility functions for people and vehicles (the particular need of non-motorised transport (NMT) users in the road environment is dealt with elsewhere). To manage these functions, roads are 56 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register classified according to the different degrees of accessibility and mobility they are to accommodate. This distinction is essential for the coordination and integration of land use and transportation planning activities, determining where development access can be promoted and where it should be discouraged to facilitate safe transport operations. This process protects the mobility function of the city‘s main road network whilst ensuring adequate access opportunities to activity nodes and protects the quality of residential streets. In common with many cities, local traffic trends in Cape Town indicate that the total hours of delay, the litres of fuel wasted and the total costs of congestion continue to increase. Congestion impacts on people and the activities that they are involved in on a daily basis and this impact affects not only the individual but also the nation‘s economy. Commuters experience long travel times, some public transport users experiencing travel times of more than 2 hours to travel 30 kilometres. The road based daily traffic volumes to/from the Cape Town CBD have been increasing steadily at a rate of approximately 2,5 percent per annum over the past 15 years. Given that several key network elements have operated at capacity during the peaks, the result has been ever lengthening peak operating periods, extending tailbacks on major arterials and an increasing spread of journey start times. 3.3.5.1 Dedicated Public Transport Lanes Public transport services are severely affected by traffic congestion, resulting in low journey speeds and unpredictable (or inconsistent) travel times. Whilst a number of priority lanes have been designated around the City, except on the N2, these are not enforced. The N2 priority lanes have however resulted in significant performance improvements, with public transport travel times on the N2 having reduced by as much as a reported 25 minutes in the peak-periods, especially the morning peak. 3.4 Transport Network Safety 3.4.1 Rail at grade road crossings, reflecting more as a road safety than a rail safety issue. Security on the rail system is a matter of more concern, with passengers being subject to criminal elements on the trains. This trend has been undergoing a reversal with the introduction of guards on the trains. 57 Transport Register Rail safety in Cape Town is of a high standard, with rail accidents being rare and mainly the result of City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.4.2 Road Key Performance Indicators: o Total accidents per year – vehicle accidents o Total fatalities per year - people o Total serious injuries per year - people Table 17 provides a summary of road traffic accidents in the Cape Town Metropolitan area over a number of years. Table 17: Road Accident Statistics for the Cape Town Metropolitan Area. Accidents Persons No Fatal Serious Slight injury Year Fatal Serious Slight Damage Total Total 1997 622 8938 83001 62561 1998 574 8634 53320 65528 1999 672 8697 53509 62878 2000 551 11786 63635 75972 2001 580 11495 61397 73471 2002 637 12533 61461 74631 2003 598 11593 65323 77514 636 16271 2004 591 12579 65163 78333 689 17829 2005 538 14173 70687 85398 660 16317 2006 370 2383 11437 74569 88759 423 3062 15630 114665 133780 2007 367 2456 10600 78780 92203 417 3189 14268 117243 135117 2008 Only incomplete data available at time of going to print. Fix this line The total and fatal accident numbers are shown plotted in Figure 17, from which it can be seen that there has been a steady increase in the number of road accidents but a decline in the percentage of accidents resulting in fatalities. (It appears that the average annual percentage increase in total accident numbers is about half that of the live vehicle population growth. )The percentage decrease in fatal accidents also reflects as a significant reduction in the total number of fatal accidents and fatalities. The overall numbers are still totally unacceptable but the correct trend appears to have Transport Register been set and the City will continue to work towards reducing these numbers. 58 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 100000 1.2% 90000 1.0% 80000 70000 0.8% 60000 50000 0.6% 40000 Total %Fatal 0.4% 30000 20000 0.2% 10000 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 0.0% 1997 0 Figure 17: Plot of Total and Percentage Fatal Accidents Reported Between 1997 and 2007. (Generated from accident data held by the City of Cape Town Department of Transport) Although statitistics are continuously recorded and analysed, the last full Traffic Accident Report completed was that of 2005. This report includes details of the road segments and intersections where accidents are most prevalent, as well as extensive detail on the nature of the accidents and noted the following: Friday is typically the day of the week with the most accidents but the greatest number of fatalities occurs on Saturdays, both potentially correlated to the ‗recreational‘ environment and possible traffic offences such as drinking and driving, speeding etc. Sundays generally have the lowest number of accidents, reflecting the lower volume of traffic on the roads on Sundays. Twenty-five percent of drivers involved in accidents were in the 26 to 35 age group. Seventy-four percent of fatal accidents occurred at dusk/dawn/night. During a typical weekday, accident rates peak around 08h00 in the morning and 18h00 during the afternoon/evening. Weekend statistics show a more level trend with higher rates between 11h00 and 19h00. These trends relate directly to the traffic volumes on the roads during these periods. Fifty-nine comma two percent of all persons killed were pedestrians. Fifty-six percent of pedestrian accidents occured on Fridays, Saturdays and Sundays compared to 44% for all accidents. The worst time of day for pedestrian accidents is between 16h00 and 18h00 during the week when 26.4% of pedestrian accidents occur (compared with 14.2% for all accidents), and between 20h00 and 22h00 over weekends when 16% of pedestrian accidents occur (compared with 8.4% for all accidents). 59 Transport Register City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register There is a slight increase in the number of accidents during the winter, or rainy, months. However, such statistics would need to be correlated accurately with monthly rainfall figures and, again, the potential rise in vehicle-kilometres travelled, as this too increases during winter when public transport patronage can drop. The estimated cost of traffic accidents was in excess of R2.1 billion in 2003 and over R2.5 billion in 2004 and 2005,. One alarming trend reflected in the 2005 statistics is the high percentage of casualty accidents occurring to cyclists and motorcyclists. While these groups of travellers have less protection than passengers in vehicles, and are thus prone to a higher risk of injury if involved in an accident, the relatively high number of accidents shows that these groups are particularly threatened on our Transport Register roads. 60 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.4.3 Public Transport Key Performance Indicators: 3.4.3.1 o Public transport vehicle accidents o Public transport passenger Fatalities Serious injuries Security related incidents Safety The latest detailed data available at the time of preparation of this ITP is that for 2005. Lacking more recent data, it is observed from the 2005 accident data that less than 10% of road accident fatalities were linked to public transport vehicles, this being the high-end estimate due to weak vehicle classification methods. It is also not known how many of these involved vehicle passengers and not only crew. Serious accident records were a bit worse at 11.39% whilst all other accident types and overall accident involvement were lower than 8%. That there are any fatalities involving public transport vehicles is of concern and requires attention. Such attention is being given in the form of the intensive effort being placed on restructuring of public transport in Cape Town and in particular, the development of the integrated rapid transport system. 3.4.3.2 Security A comprehensive audit of safety and security of safety on minibuses and trains undertaken in 200415 determined that there are a number of safety and security issues negatively affecting public transport. In spite of perceptions, minibus taxi operations are largely incident free on a day-to-day basis but some security problems do exist, such as intimidation drivers and passengers at taxi ranks, especially relating to rivalry for business at new developments. The main crimes committed on trains in the Western Cape during 2003 were robbery, assault, vandalism and stone throwing. The areas identified where most of these reported crimes occurred Salt River stations. Robberies represented 51%, vandalism 23% assault 15% and stone throwing 11% of the total number of the reported crime incidents within the first seven months of 2003. Most of these crimes were committed during the off-peak times, which are between 09h00 and 12h00 as well as 17h30 and 20h00. 15 City of Cape Town, Public Transport Safety, Security and Enforcement Strategy, November 2004. 61 Transport Register during 2003 were Philippi, Langa, Bonteheuwel, Cape Town, Woodstock, Kraaifontein, Bellville and City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.5 Transport Network Planning Transport network planning is inevitably an ongoing exercise with a medium- to long-term focus. Some network elements being conceptualised decades prior to their implementation. This is necessary to ensure that land is reserved for transport infrastructure as reclaiming developed land is usually extremely costly when possible at all. Even within the short-term, the detailed planning processes can take several years in conjunction with approval processes, especially those relating to environmental issues. The result is that a considerable portion of transport network planning is of a strategic nature. 3.5.1 Strategic Transport Network The City maintains and continuously modifies a long-term road network plan that is taken into account in many planning and modelling exercises, including those for smaller developments, where they might be affected. The recent global movement towards improved operations and the promotion of public transport has led to a shift in the priorities associated with the strategic transport network of the City, but this network remains in place and is presently as depicted in Figure 18. The recent strategic planning priorities have been influenced by the immediate requirements for 2010 World Cup Soccer Tournament. In this regard, well-known bottlenecks to the road network, which have long been motivated for improvement, such as the Koeberg Interchange on the N1, and the hospital bend interchange where the N2 meets the M3 are being upgraded. While the motivation for the Koeberg Interchange upgrade is notably of a capacity nature, the Hospital Bend project was both capacity and traffic safety related. The City is also busy with a Strategic Transport Impact Assessment specifically targeted towards the Densification Strategy for the Metropolitan Area. In this regard, recommendations will be offered in regard to future transportation / land-use development options along with policies to guide Transport Register assessment techniques and procedures that could be applied in the future. 62 City of Cape Town – Integrated Transport Plan 2006 To 2011 Figure 18: City Road Network Showing Planned “Strategic” Elements as Dotted Lines. 63 Transport Register Transport Register City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.5.2 Transport Impact Studies At a tactical level, most development proposals are subject to transport impact studies. These are carried out in terms of the National Department Guidelines for the Conduct of such studies (PR 93/635), but the City has the right to ask for such studies even when not indicated by the guidelines, using Section 26 of the City Planning Ordinance. These documents contain guidelines for estimating the relative impact in terms of the scale of development, its geographic extent, its transport impact (trip generation) and a projected time horizon for implementation. Provincial guidelines (Provincial Gazette Extraordinary, 16 December 2006) exist in draft form currently and these too offer good guidelines for an overall assessment, with increased emphasis on public and non-motorised transport. In support of these guidelines and to reflect changing priorities, the City is currently preparing new policy documents e. g. Parking Policy, Travel Demand Management, Rights of Way Classification and a Strategic TIA report, to offer better guidance to the overall evaluation of the Transport Impact process. The main objective of these studies is to establish what measures and interventions are required to ensure that developments do not result in unacceptable traffic conditions and to apportion infrastructure development levies appropriately. (There is a formalised procedure for estimating Development Contributions for new developments. ) Currently, the submission of individual TIA‘s to the City is collated to produce a representation of traffic volumes in and around the City, using the respective traffic counts provided by each report. 3.5.2.1 Matters for future ITP revisions Two matters pertaining to transport planning were raised during this revision of the ITP but could not be addressed due to resource constraints. It is proposed that future revisions include discussion of these matters: Land use management:Linked with transport planning and systems operational management, is land use management. Here, people and goods movement flows, to an extent, could be Transport Register modified by promoting particular types and mixes of development on certain sites or in certain areas in order to minimise trips generated in the peak period travel direction. Essentially, this aims at using the specification of land use to improve network utilisation. The potential for such interventions requires further consideration and research. Outdoor Advertising:Outdoor advertising while a visual environmental issue, can have a negative impact on traffic flow and traffic safety, adding as it does to the information load on drivers. There exist guidelines and legislation relating to the placement of outdoor advertising material but due to analytical complexity, proper attention is seldom given to this matter. The 64 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register requirement for transport studies to determine the likely impact of outdoor advertising requires intensification. 3.5.3 Travel Demand Management (TDM) Key Performance Indicators: o Mode Shares o Park and Ride utilisation o Employees on Large Employer programmes City policies have been encouraging TDM since 1999, if not before, when the Public Transport Strategic Component of the Moving Ahead report advocated political and institutional commitment to implementation policies aimed at restricting unsustainable growth in private car use through TDM. The Strategic Investment and Management Plan contained in the 1999 Moving Ahead report also indicated that TDM techniques need to be implemented as part of the future transport strategy. Since then, considerable work has been undertaken in preparing a framework for the implementation of Travel Demand Management measures. Central to this has been the development of a guideline document: Towards a Travel Demand Management Strategy - “Influencing Travel Behaviour” Prepared by the City of Cape Town in conjunction with the National Department of Transport. August 2006. This led to further work on such programmes as the upgrade of Park-and Ride facilities and a large employer programme. The former is already in implementation whilst the Large Employer Programme is being worked on for implementation in the near future. The Large Employer Programme, (LEP) may appear to be a limited intervention, it is however, really a range TDM Financial Incentives for Employees (Parking Cash Out and Public Transport Allowances) On-premises and employee parking management and parking pricing Alternative Hours Scheduling (Flexi-time and Compressed Work Weeks) Telework/Telecommuting (allowing employees to work at home, and using telecommunications to substitute for physical travel in other ways) Guaranteed Ride Home (providing a ride home in emergencies for employees that usually commute by public transport) Walking and Cycling Encouragement and Improvements to Infrastructure for these modes Providing Bicycle Parking and Changing Facilities Public Transport Encouragement programs 65 Transport Register measures promoting interventions such as: City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.6 Road Network Operations Management Distinct from the previous sections on road network performance and utilisation, Road Network Operations Management deals with the operations of the road network on a dayto-day basis. In effect, what is the City doing to provide and maintain safe, efficient and convenient access and mobility for road users?Operations management encompasses the following concepts: Planning – establish a vision, goals and key performance indicators Monitoring – observe operations, control and enforcement strategies, Responding – reacting to incidents, or changes to the status quo, Evaluating – assessing the performance of manpower, skills and equipment under the auspices of the goals and key performance indicators. In this manner, the operations management is cyclical in terms of providing a feedback loop from evaluation back to planning, to facilitate the re-assessment of goals and key performance indicators to ensure a relevant and up-to-date system for the City. The following sections deal with each aspect of the Operations Management of the Road Network. 3.6.1 Intelligent Transport Area Traffic Control Key Performance Indicators: o Traffic Signal Faults Attendance time o Red Lamp Faults Attendance and repair time o Routine Lamp Faults Attendance and repair time o A great deal of Network Operations Management relies on constant adaptation to network o conditions. This in turn requires a detailed knowledge of these conditions and thus the acquisition of data from a variety of sources including traffic studies, and automatic counts Transport Register at intersections and on key network links. Currently, most traffic surveys relate to new private development proposals. Such programmes are inadequate to provide suitable information in order to effectively monitor potential inefficiencies in the system or plan for future strategies. The City‘s Area Traffic Control (ATC) system, which has a monitoring (traffic counting) capability is far more suited to appropriate monitoring but is not fully utilised, as, in order to translate traffic data collected at signalised intersections by the system, additional software modules are 66 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register required. Currently, loop detection remains the preferred technology, and the installation of inductive loops remains cheaper than the installation of non-intrusive equipment. Work is being done to overcome the maintenance problems experienced with loops, such as burying them deeper in the road surface. Whilst loops remain at the fore, a new radar technology is also being considered which shows promise, in terms of improved accuracy and robustness. The existing ATC System comprises of 1 265 signalised traffic intersections and pedestrian crossings, a number that is constantly being expanded. Of these, 600 are linked to a centralised computer system situated at the N1 City, N1 House network operations centre. The system uses the Spilt Cycle Offset Optimisation Technique (SCOOT) software application to assist in synchronising the 600 interconnected traffic signals. For certain corridors this system can automatically and also manually be manipulated in real time to adjust to changing traffic flows and traffic patterns. The City has a rental agreement with Telkom to provide a telecommunications system to the 600 traffic controller‘s on-street at an annual cost of approximately R2.5m / year. The UTC /SCOOT system hardware needs upgrading to the latest version. Alternative telecommunications methods and systems are currently under consideration and will be deployed over the next two to three years. 3.6.2 Traffic Law Enforcement Whilst technological aids are important to maintaining the operational integrity of the transport network, without law enforcement to back up the controls put in place, the technology will have little value. Enforcement also has a technological component, with speed and lane occupancy cameras having a key role to play. These do however both require the support of law enforcement officers. The City presently maintains a traffic law enforcement team of 480 uniformed officers, which includes testing station officers. They are supported by the 450 trained officers of traffic law enforcement and enforcement of Municipal by-laws. These departments are in the process of recruiting additional officers. The CCTV network of the City comprises of more than 260 cameras which covers a tremendous area from the central business district, Sea Point, Goodwood, Mitchells Plain, Bellville, Gugulethu, Khayelitsha, Klipfontein corridor, N1 and N2 bus and mini-bus taxi 67 Transport Register the Metropolitan Police Department of the City who are responsible for crime prevention, City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register lanes. The city is in the process of rolling out additional cameras to all other areas including the Green Point Stadium. Unfortunately, the current status of traffic law enforcement, in the eyes of the public, is woeful. There is scant recognition of the rules of the road amongst certain elements and, little respect for the current attempts for implementation of speeding regulations, parking conditions and shared public transport facilities on the road network. Local media regularly reports on seemingly unfair enforcement procedures and apparently inappropriate monitoring and enforcement by traffic officials. The Administrative Adjudication of Road Traffic Offences Act 46 of 1998 (the AARTO Act) is currently being rolled out in the Western Cape. This system will help to address the problems in relation to road traffic law enforcement and improve the conviction rate. 3.6.3 Traffic Calming Transport related injuries constitute a serious challenge in Cape Town with accidents involving pedestrians being of particular concern. Transport related deaths and injuries are particularly dominant in low and middle-income societies. This is ascribed mainly to the large percentage of children and youth in these populations and the inadequate separation of playing and walking from motor vehicles. An approach to reducing this problem is the use of Traffic Calming. Traffic Calming is an approach to reducing the negative impact of vehicular traffic and improving the safety of pedestrian and cyclist road users, particularly on residential streets. The main focus of the approach is the reduction of vehicle speeds through the use of landscaping and roadway geometry. Although the concept is widely recognised and accepted, the implementation of traffic calming methods in urban and transport design remain ad hoc in the City. It is a desired outcome of this integrated transport plan period that the planning and implementation of Traffic Calming measures becomes an Transport Register explicit aspect of transport system operations management. 68 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.6.4 Incident Response Key Performance Indicators: o Reduction in (Mean) time to clear incidents o Reduction in number of incidents per annum Response to changes in the status quo of the system, or the occurrence of incidents, is generally the responsibility of the Traffic Department, together with the combined effort of the various emergency services. The following status quo describes responses to a variety of incidents. 3.6.4.1 Incident Management In terms of the City‘s incident management plan, an ‗incident‘ is defined as an unplanned or extraordinary event that reduces the roadway capacity or creates a hazard for the road user. Incidents range from a simple breakdown to an accident requiring multi-disciplinary response or a hazardous chemical spill. Due to the current high levels of road utilisation, the slightest incident has the potential to exponentially escalate and cause significant adverse effects to the economy, in terms of lost time, lost productivity and even destruction of goods unable to be delivered to their final destination. An Incident Management system facilitates the effective co-ordination of the emergency services and their joint response to incidents on the metropolitan road network. This is done through prior planning and the optimal use of scarce resources (human, financial and mechanical). Incident management therefore strives to minimise traffic delays through a system of on-scene co-ordination and centralised communications, thereby minimising potential dangers to the road user and limiting frustration and the potential for secondary accidents. Incident Management was introduced into South Africa during the early 1990s and the National Transport. In September 1995, a Freeway Incident Management System (IMS) was launched in the Cape Metropolitan area, with its Communications Control Centre manned by METRO Rescue Services at the Karl Bremer Hospital. Initially, only certain portions of the metropolitan freeway network formed part of the system. These included the N1, N2, N7, R300 and part of the M5 routes. Implementation proved slow to gain momentum, mainly due to local complexities and the difficulty in coordinating the training 69 Transport Register success of numerous systems has led to it becoming a requirement in the White Paper on City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register of numerous services involved. The following core organisations participated on a voluntary basis: METRO / Emergency Medical Services, Ambulance Services, both local government and private South African Police Services South African National Road Agency Ltd (SANRAL) Disaster Management Road Maintenance departments Provincial Government: Western Cape (Transport Branch and Traffic Law Enforcement) City of Cape Town: Directorates of Transportation, Roads & Stormwater and Safety & Security (Traffic Services, Metropolitan Police and Emergency Services) Initially, the results were extremely positive, and the emergency services themselves became increasingly supportive of the concept and aims of the Incident Management System. However, the situation deteriorated since 1997 and again, more dramatically, since 2001, after a brief improvement in 1999/2000 when a major effort was made to revive and expand the project. In 2007, the Cape Metropolitan Road Incident Management System Guideline Plan and protocols were revised and approved in 2008 by the City of Cape Town Council for implementation by operational services across Cape Town. The decline was due to the restructuring of local government, the SAPS, and certain provincial services. Due to large-scale staff re-allocations and a loss of trained personnel, the IMS effectively ceased to operate and cannot operate under the present conditions. 3.6.4.2 Special Event Management Examples of special events include the Opening of Parliament, the Cape Argus Cycle Transport Register Tour, New Year celebrations, plus high profile sporting events and concerts. However, there are many events that occur that are ―smaller‖ in profile but also have an effect on the transport systems in Cape Town, e. g. sports meetings, community events, seasonal events, film shoots, tourist related events and ―vehicle free‖ events. Given the number of events that take place in Cape Town, an Events Policy and By-Law have been compiled which require that an event organiser plan, submit for approval and 70 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register implement a Transport and Traffic Management Plan (TMP) for any event. An objective of the TMP is assessment of the impact of events on the City as a whole in terms of traffic, disruption and real benefit versus cost. . The TMP requirements are being expanded to accommodate special needs users. The four equally important cornerstones of an event TMP are: - safety - accommodation of participants - accommodation of non-participants - minimising costs. In some but notably not all instances, Cape Town has enjoyed enormous planning, cooperation and management of the primary special events. In these cases, problems have been addressed timeously and adequately so that no significant emergencies arose. 3.6.4.3 Disaster Management While much work has been performed for certain key facilities, such as Koeberg Nuclear Power Station, there are further potential disasters that need attention, particularly in light of Cape Town‘s increasing position as a worldwide destination and host of international events attracting both numerous attendants, plus those of a high profile nature e. g. politicians and celebrities. The threat from bomb scares (both real and hoax scenarios), terrorism, critical fire hazards, adverse weather conditions and escalated hazardous chemical spills on the road network should all be anticipated and planned for. Cape Town has the only Nuclear Power Station in South Africa located within its metropolitan boundary. In terms of national and international requirements, an emergency procedure has been formulated as part of the evacuation plan to safely and efficiently evacuate residents within the affected area in the event of a nuclear incident that results in a radiation leak. following: Cape Town CBD evacuation General Evacuation procedures at isolated locations due to natural disasters Terrorist threats and general transportation response e. g. public transport incidents such as those witnessed in England, Spain and the Far East. 71 Transport Register The remaining potential disasters that require similar emergency procedures are the City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.7 Public Transport Key Performance Indicators: o Mode Share o Average operating speed Cape Town has a relatively extensive but poorly integrated public transport system. The City of Cape Town is presently engaged in the detailed planning and the first phases of implementation of an Integrated Rapid Transit system. The rail system plays a major role while the bus service provides access across the greater part of the metropolitan area. Rail is operated via Metrorail while the bus service is rendered by Golden Arrow Bus Services (Pty) Ltd under contract with the Provincial Government of the Western Cape. Service frequencies are very low on many routes and night services are extremely limited. Both rail and bus services are subsidised. Unsubsidised services are provided by minibus taxis, which operate over most of the metropolitan area, especially in low income and high-density residential areas. The metered taxi industry has recently seen some growth in demand through the introduction of shared metered taxi services. These services are augmented by tourist oriented bus services, such as the ‖City Sightseeing‖ service, which operates on key tourist routes. In support of tourist activities, additional train services are operated during holiday periods, mainly on the line between Muizenberg and Simon‘s Town. The City, with co-funding from the Provincial Government, provides a subsidised but limited public transport service for registered passengers who are unable to access mainstream public transport. The commuter oriented rail, bus and minibus-taxi services provide fairly good mobility during the day but night services are limited. This results in the need to own private vehicles for non-commute trips. The system would be greatly improved through implementation of integrated operations Transport Register with longer operating hours, greater service frequencies and scheduled services on all routes. The Integrated Rapid Transit system, discussed elsewhere in this document, along with related public transport improvements across the City, are intended to address these issues. The current problems and challenges in delivering an efficient and effective contracted scheduled bus service in line with the public transport vision include: 72 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Service Viability - There are inherent inefficiencies in the public transport system such as inappropriate operating environments, the lack of modal integration and destructive competition. A contributing factor is undoubtedly the urban structure characterised by low densities, extensive distances between residential and work places, absence of appropriate land use arrangements to support and encourage bi-directional and off peak demand. Increasing Subsidy Requirement – Public transport subsidies have risen sharply in recent years. Although there are many factors impacting on the provision of public transport it remains important to ensure financial efficiency and return on investment in the provision of these services. The problem has been exacerbated by the Division of Revenue Act 12 of 2009 (DORA), which has converted the subsidy payments to the Province to a conditional grant that is capped for the financial year. The City‘s economy and its goal to alleviate poverty is intertwined with public transport but government must ensure that the required level of service is provided at least cost. Dispersed Routing - The service offers a wide coverage over a much dispersed network. Whilst the service offers good coverage, it restricts the option of providing higher frequencies and route permanence which can support and enhance the Mobility Strategy, aimed at all-day, high frequency services along the development corridors on average, the route network translates to no more than 6 trips per route per day in both directions. Inspection of the bus network also shows extensive services and trips within the main public transport market areas of Mitchells Plain, Khayelitsha, and Blue Downs, which are of an internal/feeder/distribution type role. It is suggested that this role would be more appropriately left to smaller vehicles, and allow the higher capacity buses to concentrate on the line haul, higher density routes. The appropriate positioning of the various modes in their most effective and economic environment is a vitally important issue in developing Destructive Competition - A comparison between the bus and taxi network reveals a nearly complete overlap between the two services. Significantly the scheduled bus services also provides an almost equivalent collection/distribution service in most areas as that provided by the unscheduled, minibus taxi services so as to protect their line haul market. 73 Transport Register an effective integrated service. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Integration of Services - There is no effective integration of services through integrated ticketing systems. The correct positioning of the various modes in terms of their most effective and economic operating environment in terms of cost and service trade-off is a key issue. Interim Contract - The uncertainty from the continued short term extensions of the interim contract between the Provincial Government and Golden Arrow Bus Services (Pty) Ltd precludes long term investment in the service including fleet upgrading, ticketing systems, monitoring of the service, etc. Traffic Congestion – Congestion affects the trip times and is the main cause of delay to passengers. Travel time is a key factor for encouraging people to use public transport. Bus priority projects are necessary to reduce travel time. 3.7.1 Mode Share There is evidence that public transport has been losing ground against private vehicle usage in the City. A Household Interview Survey carried out by the City of Cape Town Transport Branch staff in August 2004 to establish commuter travel patterns, confirmed the change in travel pattern from public transport to private transport. The modal splits obtained from the 2004 survey were compared with the splits obtained in a previous 1991 Household Survey. The current modal split is 48%:39%:13% (private mode: public mode: walk/other) while the 1991 modal split was 44%:49%:7% (private: public: walk/other) reflecting an increase in private vehicle usage of approximately 4 percent over the past 13 years. Compared with 1991 the number of public transport passengers using the bus has decreased from 16% to 7% and rail has decreased from 27% to 13% while the taxi percentage has increased from 6% to 13%. Hence, not only has there been a significant change to private transport, but also within the public transport modes there has been a Transport Register shift away from the bus and train to the minibus taxi. The above modal split numbers are only for people entering the CBD. The recent national travel survey (NTS) provides insight into the modal split across the Metropole and this is summarised in Table 18. 74 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 18: Modal Split by Area (NTS, 2003) Percentage of trips Public transport Private transport Nonmotorised transport Northern Corridor 40.1 50.1 9.8 Kraaifontein 43.1 44.4 12.4 Parow/ Bellville 32.3 55.3 12.3 Blue Downs 54.6 39.9 5.4 Belgravia 42.1 53.0 4.8 Grassy Park 43.4 49.9 6.6 Mitchells Plain - Gugulethu 74.6 19.7 5.7 Khayelitsha 85.7 10.5 3.8 Somerset West 7.8 85.5 6.7 Central 38.8 48.0 13.2 Kuilsrivier 29.0 63.0 8.0 Durbanville 3.3 94.1 2.6 Oostenberg 4.1 95.2 0.7 Langa-Bishop Lavis 61.6 29.9 8.5 Strand 37.2 46.2 16.7 Simonstown 15.8 79.3 4.9 Wynberg 14.8 78.6 6.6 Sea Point 20.9 63.3 15.8 Metro % 47.8 44.6 7.7 Area From the National Household survey, the Metro-wide modal split is 44.6%:47.8%:7.7% which is significantly different from the modal split of people entering the CBD. What is also very interesting is the fact that the public transport split for the wider Metro area is higher than the split for people entering the CBD. This is different in comparison to many other large cities where the public transport split for people entering the CBD is higher than for the remainder of the Metro, essentially because the Metros are always well served with public transport compared to the rest of the City. Public transport management in the City of Cape Town, as in most other parts of South Africa is fragmented. The current way in which public transport activities are managed is not in line with the overall ―customer services first‖ concept, even though the majority of current public transport users are captive to their public transport mode of travel, due to 75 Transport Register 3.7.2 Management City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register lack of choice. The current public transport operating system still fails to acknowledge the customer as the eventual sustainers of the public transport system. 3.7.2.1 Bus The subsidised commuter bus service operates under contract to the Provincial Government, under the planning control of the City. This service is provided by Golden Arrow Bus Services16 which currently operates 1040 buses during peak hours, serving 900 routes in metropolitan Cape Town, covering a total area of approximately 2460 Km². The fleet travels 61.7 million kilometers, conveying 55.9 million passengers annually, at a rate of approximately 270 000 per weekday. Bus services are provided from depots at Montana, Woodstock, Atlantis, Philippi, Simon‘s Town and Blackheath. The services from Atlantis have been subcontracted to Sibanye Bus Services, a joint venture established in 2001 between Golden Arrow, Abahlobo Transport Services and Siyakhula Bus Services. In terms of the NLTA the subsidy function will become a municipal function (section 11(1)(c)). In terms of the Dsitribution of Revenue Act (DORA), a Public Transport Integration Committee has to be formed, with representation from the Province and City, to manage the transformation of the bus subsidy contracts 3.7.2.2 Other bus services There are no other local subsidised or commuter bus services operating in Cape Town. However, the City is a terminal point of many long-distance bus services and also hosts a number of sight seeing services, most notably the Hop-on Hop-off services operated by CitySightseeing. Amongst the long distance bus services are those operated by Autopax, a wholly owned subsidiary of the Passenger Rail Agency of South Africa, PRASA. Autopax operate two services, the Translux service and the City-to-City service, both of which link to destinations countrywide. There are a number of other private long-distance bus service providers, the most important of which are InterCape and Greyhound. Transport Register 3.7.2.3 Minibus Taxi The minibus taxi industry operates more or less independently of all control and only on the basis of adequate fare income. The only control available to the City is through recommendations to the Provincial Operating Licensing Board in respect of granting of operating licenses. There is however a disregard for the law amongst certain elements of 16 The information provided was as published on the Golden Arrow Wesbsite: http://www. gabs. co. za on 18 October 2009. 76 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register the minibus industry with the result that many operators do not have the necessary operating licences, but nevertheless continues to provide services. Law enforcement in respect of this industry is extremely complex and does not result in more than the most basic levels of control of the system. 3.7.2.4 Rail Services Rail function and responsibility of the national sphere, falling under the ownership and management of the system in response to passenger demands, this has in the past largely been done in isolation and without the meaningful participation of the City of Cape Town. Service management can only be said to exist through courtesy of the officials who engage in a formal manner with the City officials. The NLTA will require the establishment by the City of an Intermodal Planning Committee with representation from the Passenger Rail Agency of South Africa (PRASA – the former SARCC). Funding - There has been insufficient funding over many years for the upgrading of rolling stock, stations and other system components in the Cape Town rail system leading to a worsening service. 3.7.2.5 Minibus Recapitalisation This national process provides for a once off scrapping allowance of R50 000 per scrapped vehicle, and the operators being allowed to purchase any vehicle of their choice as long as it complies with the seating and safety specifications. The process has not met with great success and has had little direct impact on the minibus taxi fleet in Cape Town. 3.7.2.6 Metropolitan Transport Authority Although much touted, the City does not have a Metropolitan Transport Authority. The recent legislation of the National Land Transport Act is expected to facilitate rectification of this matter. ―transport authority‖ functions in its capacity as municipality, with the necessary dedicated officials. The possibility still exists of establishing one or more municipal entities in terms of the Municipal Systems Act to perform transport functions. 77 Transport Register The NLTA will abolish the notion of transport authorities. The City will have to undertake City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.7.3 Operations (Supply) Key Performance Indicators: 3.7.3.1 o Network coverage o Vehicle fleet size o Passenger spaces Bus Scheduled bus services in the City of Cape Town are provided exclusively by Golden Arrow Bus Services (GABS) under contract with the Provincial Government of the Western Cape. GABS have operated subsidised commuter services in the City over many decades, and this was last formalised as an interim contract in 1997. This contract was originally for a three year period, but has since twice been extended and now is extended on a monthly basis pending placing the service on either a tendered or negotiated contract. The current contract is an interim one that is ticket based, which means that there is no control over the amount of subsidy paid each month. The service is subsidised by the Department of Transport, and derived a subsidy of approximately R 627 million in the financial year 2008/9. There are ±1160 buses in the fleet. They operate 5,295 trips per day with up to 270 000 passengers/day on 1,530 routes on 113 timetables. The general bus route network was shown in Figure 10 whilst more specific route information may be obtained from the accompanying GIS data and CPTR records Table 19 shows the ten busiest bus terminals in terms of passengers per day boarding Transport Register and alighting as recorded during the last full CPTR conducted in the City in 2004/2005. 78 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 19: Ten Busiest Bus Terminal – Passengers per Day Boarding and Alighting Rank 1 2 3 4 5 6 7 8 9 10 TERMINAL City (Golden Acre) Mitchells Plain Bellville Wynberg Claremont Nyanga (CALA Dairies) Mowbray Killarney Hanover Park Retreat TOTAL PASSENGERS ALL DAY 38 036 20 423 11 423 9 707 9 409 5 318 5 250 3 398 3 181 2 873 Source:CPTR 2004/05 3.7.3.2 Special needs passengers The main bus system in Cape Town makes no specific provision for special needs passengers in terms of vehicle or infrastructure design. The reality is that the current bus fleet is totally inaccessible to passengers using wheelchairs and only a little more accessible to other mobility-impaired users. In order to compensate for this situation, the City provides a subsidised Dial-a-Ride service, which is available to registered special needs users by appointment. This service comprises 30 vehicles designed to carry passengers using wheelchairs and other passengers with mobility restrictions although it is argued that twice as many are required. 27 vehicles are in regular operation and 3 are contingency vehicles. The service provides about 400 trips per day to the 5000 people registered on the database. The cost of this service is approximately R48 million per annum. The Integrated Rapid Transit system currently being implemented, through a phased approach, is designed to accommodate the majority of special needs passengers and should reduce the pressure on this service. The dial-a-ride services do not cater for people with hearing, communication, intellectual or psychiatric impairments as well as people travelling with children/prams. The rail service provider in Cape Town has supported Universal Design principles to passengers using wheelchairs. There is however some way to go before the passenger rail system becomes fully accessible to all special needs passengers. At present there is little provision for sight or hearing impaired passengers, while wheelchair access to the trains themselves remains a serious problem as a result of misaligned train floors and platforms, which are difficult to negotiate for several categories of special needs user. Stairs /subways to central platforms also remain a problem in some areas. 79 Transport Register accommodate special needs passengers, with some railway stations accessible to City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.7.3.3 Minibus-Taxi Key Performance Indicators: o Network Coverage o Vehicle Fleet Size Minibuses (mostly 15 seat vehicles) are operated by owners of single vehicles and privately owned small fleets with many owners belonging to taxi associations. The current fleet size is estimated at 7,467. It is an unscheduled service which operates feeder services (30%), line haul services (55%) and distribution services (15%). The peek frequency on line haul routes is 1.2 minutes; feeder services 1.7 minutes and distribution 0.5 minutes. There are 565 routes in operation, and on a typical day 55,998 trips are undertaken with 332,407 passengers making use of the service. The network covered by minibus taxi services is shown in Table 20 whilst more specific route information may be obtained from the accompanying GIS data and CPTR records. Table 20 shows the ten busiest taxi ranks as recorded during the last full CPTR conducted in the City in 2004/2005. Table 20: Minibus-Taxi Facilities with the Highest Number of Passengers Transport Register Rank FACILITY All Day Arriving All Day TOTAL No. of Passengers Departing Passengers Passengers ALL DAY 1 Cape Town Deck 30 067 31 498 61 565 2 Mitchells Plain East 26 773 29 734 56 507 3 Bellville 17 404 30 677 48 081 4 Wynberg West 16 095 15 645 31 740 5 Khayelitsha Site C 14 729 16 563 31 292 6 Nyanga Central 9 310 14 040 23 350 7 Wynberg East 10 480 9 121 19 601 8 Retreat West 8 320 7 639 15 959 9 Delft Roosendal 7 362 8 461 15 823 10 Elsiesrivier 8 351 6 921 15 272 Source:CPTR 2004/05 80 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register The key issues facing the unscheduled services provided by minibus-taxi are: Major overtrading on a large number of routes. This leads to unsustainability of the service, inability to recapitalise the fleet and the potential for violence A large number of illegal operators. 43% of operators do not have operating licences. Some operators regard themselves as legal or ―semi-legal‖ because they have paid their dues to the relevant association, even though they do not have valid operating licences. An aging fleet Inappropriate vehicle design for large volume of passengers Conflict within industry – sometimes competition for routes and passengers results in conflict between minibus operators which sometimes lead to the tragic loss of life and affects service delivery. Safety of passengers – The Cape area has not been exempt from accidents involving minibuses where lives have been lost. While this aspect receives attention from the authorities, more needs to be done to ensure that drivers stay within speed limits, and that appropriate infrastructure is provided. 3.7.4 Utilisation (Demand) Over 1,1 million passenger trips17 are made in the City of Cape Town by the three main modes:rail, bus and minibus-taxi (this excludes metered taxi, long distance bus, etc). Rail accounts for 53% of daily passenger trips, minibus-taxi 29%, and bus 18%. The modal split is shown in Figure 19: MODE SHARE (All Day) Bus, Rail, Minibus-taxi, 332407, 29% 601940, 53% Figure 19: All Day Modal Shares 17 Current Public Transport Record 2004/2005 81 Transport Register 197444, 18% City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Detailed information on the use of the public transport system is provided in the CPTR addendum to this document. The following seeks to provide a high level overview of the current usage of public transport in the City. 3.7.4.1 Rail Key Performance Indicators: o Mode Share o Passenger. km / Space. km Apart from its predominant role of serving passengers captive to public transport, it has the potential in the longer term to attract existing and future car users. Its ability to realise its full potential in delivering high quality public transport services, has been hampered by a long standing lack of investment over many years with the result of a declining service, loss in patronage and a decline in market share in recent years. The reported daily passenger volumes were 774 000 in 1997 for a typical weekday, but there has been a declining trend in rail patronage, largely as a result of minibus taxi competition. Consequently, ridership has declined by 7% from 2000 to 2004 from 670 000 to 621 300 passengers per day. (These figures refer to the regional system and include passengers from beyond the City boundary such as Stellenbosch, Wellington, etc which account for some 19 000 passengers per day). The main decline has been on the Khayelitsha / Kapteinsklip lines amounting to a decline of 44 300 passengers per day. 53% of commuters in the City of Cape Town and adjoining areas use the passenger rail service. In contrast with other cities in the country, the rail network penetrates extensive middle to high-income areas, as well as low-income areas, and therefore has the potential to serve a wide range of travel markets. The Khayelitsha and Mitchell‘s Plain lines account for 45% of total boarding passengers, Transport Register and together with the Strand line these account for 61% of total boarding passengers. The Simon‘s Town line also has significant ridership with 92 788 boarding passengers or 15,4% of the total. Rail utilisation is depicted graphically in Figure 20. 82 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 20: 2006 Rail Volumes 83 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 21 shows the number of daily boarding passengers on the 8 lines. Table 21: Number of Boarding Passengers (Weekday) LINE BOARDING PASSENGERS/DAY % Khayelitsha 149 542 24.8% Mitchells Plain 121 640 20.2% Strand 95 571 15.9% Simon‟s Town 92 788 15.4% Kraaifontein / Parow 60 572 10.1% Lavistown 41 629 6.9% Cape Flats 37 463 6.2% Monte Vista 2 735 0.5% 601 940 100% TOTAL Source:CPTR 2004/05 Table 22 shows the 10 stations with the highest boarding passengers. Table 22: Ten Stations with Highest Number of Boarding Passengers Transport Register TO CAPE TOWN FROM CAPE TOWN Station No. of Boarding Passengers All Day Philippi 16 151 Cape Town 59 316 Nonkqubela 14 940 Mutual * 28 173 Khayelitsha ** 14 666 Salt River * 23 230 Nolungile 14 566 Bonteheuwel 20 920 Bellville * 13 608 Bellville * 15 744 Langa 12 404 Maitland 13 647 Nyanga 11 482 Langa 11 189 Heideveld 11 325 Pinelands * 10 310 Retreat 9 630 Woodstock 8 623 Mitchells Plain 9 233 Philippi 7 192 128 005 TOTAL 198 344 TOTAL Station 84 No. of Boarding Passengers All Day City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register * Stations where passengers board trains after transferring from other trains ** In the morning peak, many passengers aboard the train to Cape Town at Nonkqubela and Nolungile travelling in the direction of Khayelitsha in order to secure a seat. They remain seated when the train turns around at Khayelitsha, thus distorting the number of passengers boarding at all three of these stations. Source:CPTR 2004/05 3.7.5 Other Public Transport Other public transport services also operational in the City are: Tourist service Charter service Metered taxi Long distance bus and minibus-taxi Learner transport services under contract with the PGWC Department of Transport Unlicensed ―Amaphela‖ taxi feeder services operating from the townships to the mainstream bus and taxi ranks and rail stations 3.7.5.1 Tourist Services There are various types of services that specifically cater for the needs of tourists and the number of operators offering such services has grown enormously over the past 15 years. The basic type of service is the guided tour where a group of tourists is met by a tour guide, usually at their place(s) of accommodation and transported as a group on an itinerary to various places of interest or entertainment. Many different types of tours are available – some cater for large groups travelling around in large coaches while others cater for small groups with a special interest or who prefer to travel in a small vehicle with the individual attention of the tour guide. The Provincial Operating Licensing Board (POLB) records show that in 2004 there were Cape. These 1699 licenses were held by a total of 920 different operators, which means that the average operator holds 1.85 licenses. The POLB records also show that there were 1676 active operating licenses for ―the conveyance of other‖. This category includes operators with multiple specified authorities. It is estimated that about half of these multiple authorities have the right to transport tourists in combination with other types of 85 Transport Register 1699 active operating licenses for ―the conveyance of tourists‖ based in the Western City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register authority. Thus, there is probably a total of about 2500 tourism transport vehicles in the Western Cape with about 1500 of these based in Cape Town. Table 23 below shows the distribution of passenger capacities for the vehicles with operating licences only for the conveyance of tourists. Table 23: Passenger Capacity of Tour Vehicles Capacity of Vehicle Number of Vehicles Percentage Less than 9 passengers 1220 71.8% 10 to 19 passengers 208 12.2% 20 to 29 passengers 74 4.4% 30 to 39 passengers 15 0.9% 40 to 49 passengers 132 7.8% 50 to 59 passengers 16 0.9% 60 passengers or more 34 2.0% TOTALS 1699 100.0% It is apparent that the majority of vehicles with operating licenses for guided tours are small, and that only 16 percent of the vehicles are designed to carry 20 passengers or more. Other types of tourist transport service, excluding guided tours, are provided in response to market demands and the perceived deficiencies of the public transport system. These include the so-called ―shuttle services‖ that operate to and from transport terminals such as the airport, harbour and railway station. Prior to the licensing of the airport shuttle services (about 10 years ago) there was a scheduled bus service operating between the airport and Cape Town Station. This service no longer exists and metered taxi operators claim that the shuttle services are creating unfair competition in a market where there was Transport Register previously little competition. 3.7.5.2 Charter Services Other charter and courtesy services operate from hotels or other places of accommodation and provide pre-booked transport to guests and tourists in a completely demand-responsive manner. Similarly, there is demand for up-market ―chauffeur‖ or ―limousine‖ services where a vehicle and driver are hired for a period of time. Some of 86 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register these services are provided with the necessary operating licenses while others take place illegally or in violation of the license conditions. One of the most important means of transport for tourists and visitors is car hire and there are many companies serving this market. Tourists can also hire motorcycles, scooters and various types of bicycles. There are a number of other types of transport service used particularly by tourists to see the sights of the city or perhaps for the novelty of a different mode of travel. Regular ferries to Robben Island and a variety of boat trips are available from Cape Town, Hout Bay, Simon‘s Town and Kalk Bay harbours. The Table Mountain cableway and the Cape Point funicular services provide access to major tourist attractions. Helicopter trips are available as well as topless bus sightseeing tours. The City has received a number of proposals from prospective operators of novelty transport services such a rickshaws, tuktuks and tricycles. The City has identified a network of scenic routes and these are shown in Figure 9. These scenic routes are protected by developmental controls and restrictions on outdoor advertising. The market for tourist transport services is generally healthy and flourishing. There is certainly a need for better training – not just tour-guiding knowledge but also the special knowledge and skills to operate a transport service. At present there are no training requirements for tourist transport operators, although industry representatives recognize the need for such training. Tour operators complain that the regulatory system is unfairly restricting their ability to grow and that many of the operating conditions imposed by the authorities are unrealistic and unnecessary. Industry representatives tend to argue that the authorities should remove unnecessary restrictions to market entry while enforcing safety and other quality taken steps to streamline its administrative processes, there are still inexplicable delays in the granting of new or additional tourist transport licenses. The NLTA will introduce an accreditation system for tourist transport operators, which will be implemented by the National Public Transport Regulator (NPTR). This system was devised in consultation with the tour operators and the DEAT. 87 Transport Register standards. Despite the fact that the Provincial Operating Licensing Board (POLB) has City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.7.5.3 Metered Taxi Key Performance Indicators: o Mode Share o Passenger. km / Space. km Tourists and business visitors often use metered taxis to travel around the city because they provide a personalized door-to-door service. At present, metered taxi operators are allowed to set their own tariffs and there is inadequate regulation of service quality standards. The result is that there is wide variation in tariffs and service standards and often little relationship between tariffs and service quality. Operators are required to display their tariffs on the sides of their vehicles but many tourists do not know this and are confused by the variability. The National Department of Transport is currently drafting regulations on metered taxis, which may include standardization of tariffs and service standards. There are indications that the metered taxi industry is prepared to accept regulation of service quality and tariffs and this should improve the image of the industry. The older metered taxis are not accessible to passengers using wheelchairs unless they transfer from the chair to the seat and then have their wheelchair stored. However, a number of the newer metered taxis have been imported from Europe and are fully accessible to all passengers based on physical requirements. Improvements are still required to accommodate those with visual or hearing impairments. 3.7.6 Operating Licensing Strategy 3.7.6.1 Background Transport Register Although the recently promulgated National Land Transport Act (NLTA - Act 5 of 2009) will result in a slightly different approach in future, this Integrated Transport Plan is prepared in terms of Section 27 of the NLTTA and remains supported by a range of complementary documents, prepared in accordance with Section 23 through 26 of the National Land Transport Transition Act (NLTTA-Act 22 of 2000), that should be read in conjunction with this ITP and which include: 88 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register The Current Public Transport Record (CPTR), comprising : o 2004/5 CPTR o 2007 Rail Census The Operating Licence Strategy (OLS) of December 2007. The Rationalisation Planof June 2004 The Public Transport Plan 2007 (This plan has largely been superseded by events and the promotion of Integrated Rapid Transit in Cape Town described in this ITP) In terms of the NLTA, these plans will in future be integral to the ITP. The full incorporation of the above sub-elements into the ITP will take place over time, as the transformation of the public transport system occurs. In the mean time however, the CPTR and the OLS remain valid and important documents whilst the PTP and Rationalisation plan are, to a large extent, replaced by the Integrated Rapid Transit planning for the City. The current public transport record attempts to maintain a measure of the supply and demand for public transport throughout the City and is thus the basis of the Operating Licence Strategy. Due to the extent of the public transport system, data capture is an ongoing process, resulting in a number of elements, as noted above. The key information from the most recent CPTR dataset is incorporated into the transport register of this ITP and is not repeated here. The above-mentioned version of the OLS, is however central to the management of the public transport transformation process and is thus summarised below, noting that at the time of its preparation, neither the NLTA, nor the recent developments in respect of the Integrated Rapid Transit and World Cup 2010 projects were in place. The currently effective Operating Licence Strategy of the City is thus to be taken as modified by the content of this Integrated Transport Plan, as proposed in Section 55 of the NLTA, which speaks to the aforementioned developments. transport with the promotion of Integrated Rapid Transit, that has components in the form of Bus Rapid Transit amongst others and which will correspondingly require that the OLS be updated on an ongoing basis as the new system is rolled out. Planning for the IRT system seeks to ensure incorporation of the minibus-taxi operators, improving their business viability and creating a number of employment opportunities in 89 Transport Register In particular, the City of Cape Townhas undertaken a programme of restructuring of public City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register the process. The City of Cape Town has thus fulfilled its obligations in terms of Section 51(1) of the NLTTA, which remains in force, and which states: Withdrawal of operating licence or permit in rationalisation of public transport services 51. (1) (a) When a planning authority proposes to rationalise the operation of the public transport services in its area or where a transport plan reveals that there is a surplus of public transport services on a particular route, as a result of which an existing noncontracted public transport service is no longer required, the planning authority must use its best endeavours to offer the holder of the operating licence or permit in question any viable alternative service or services in the place of the existing service. (b) Such an offer may not be refused unreasonably by that holder. (c) Where the offer of any viable alternative service or services has been accepted (d) the holder of the existing operating licence or permit must apply forthwith to the board in accordance with this Act and applicable provincial laws for the granting of the necessary operating licence or operating licences with regard to the alternative service or services; (ii) the planning authority must forthwith furnish its recommendations to the board; (iii) that holder must surrender the operating licence or permit for the existing service to the board when it has decided the application. The City cannot allow existing services to undermine the effectiveness of the IRT system and has taken the stance of not supporting any further operating licence applications for the phase 1A area. The City has initiated engagement with the minibus taxi industry to enable their participation in the IRT and those agreeing to the transformation will be issued with licence point certificates reflecting the market share of each of the affected stakeholders. These licence point certificates confirm that the operator is now a shareholder in one of the IRT companies. Between the time of agreement and the commencement of IRT services, the City will ask the POLB to issue temporary operating licences in terms of section 20 of the Road Transportation Act (Act 74 of 1977) to holders Transport Register of such licence point certificates to allow them to operate until the implementation date of the IRT system. These operating licences will be surrendered by the company upon the signing of the contract. 90 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.7.6.2 Operating Licensing Principles Notwithstanding changes in the public transport system, every application and approval in respect of an operating licence must comply with the NLTTA and with the plans as set out in this ITP. This ITP in turn includes the development of the IRT system for the City and will thus be used as the primary guide in respect of new and renewed Operating Licence applications. The following represent the broad guidelines applicable to the issue of operating licence within the City of Cape Town as detailed more fully in the 2007 Operating Licensing Strategy document which comprises two volumes, one presenting the Strategy, the other the physical recommendations by route and node in the network. The Operating Licence Strategy the full version of which is available on request from the City of Cape Town Department of Transport, provides a comprehensive overview of the a range of aspects of import to the management of public transport within the City. The covered topics include: a) Analysis of the transport System b) Policy Framework c) Underlying Factors Contributing to Instability and Poor Performance of the Public Transport Industry d) Restructuring of the Public Transport System e) Recapitalisation Programme f) Evaluation of Demand and Supply Characteristics for non-contracted services g) (Public Transport Demand and Supply Analysis – Addendum to Operating Licence Strategy) h) Evaluation of Operating Licence Application i) Management of Public Transport Facilities j) Law Enforcement k) Prioritised Proposals and Implementation Programme Public and Stakeholder Consultation The essence of the OLS is really that contained in the Addendum ―Public Transport Demand and Supply Analysis‖. This document provides information for each route in respect of the supply and demand patterns, thus indicating where there is under, appropriate or over-supply of capacity and thus of operating licences. This document should act as the primary guide in awarding or declining operating licence applications. It is also this element of the OLS most affected by the introduction of Integrated Rapid 91 Transport Register l) City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transit Service. The IRT services will modify the supply and demand patterns in their area of operation and influence the management of non-contract services operating licences on these routes. Of course, supply and demand patterns alone are not sufficient to guide the consideration of operating licence applications and Chapter Eight of the Operating Licences Strategy sets out the principles for evaluation of these applications. This chapter focuses on the following issues: a) Conversion of a permit to an operating license b) Non-contracted services c) Conditions to be imposed when supporting an application for the granting, renewal, amendment or transfer of an operating licence for non-contracted service d) Learner services e) Staff services f) Long distance services g) Metered taxi services h) Tourist services i) Contracted services j) The issuing of proof of rank letters by the City of Cape Town k) Key matters impacting on the effective regulation and management of the public transport system. Areas that require consideration and update in the Operating Licence Strategy are the introduction of the IRT system and the advent of the Pedi-cab. The latter is essentially a non-motorised form of transport operating for-hire public transport services on public rights of way and consideration must be given as to how operating licences would apply to this mode. The City of Cape Town has prepared a draft regulatory framework for pedicabs, but this remains a work in progress, the mode being in its infancy in the region. 3.7.6.3 Operating Licensing Guidelines Transport Register The main tenets of the Operating Licence Strategy can be summarised as follows: Before considering any application for the conversion of a permit to an operating licence, the POLB must, by written notice, inform the City of Cape Town , as planning authority, of the application with the request to make recommendations to the board within the period stated in the notice. (See ―Devolution of Authority to Issue Operating Licences‖ below. ) 92 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register In respect of applications pertaining to non-contracted services, these will be assessed on the basis of whether the application relates to: o general issues relating to the service; o the transfer from indefinite permits/operating licences to definite renewal date operating licences; o straight renewal of an existing approved operating licence; o amendment of an existing approved operating licence; o a vehicle that has been replaced under the existing approved operating licence; o permission for additional authority to serve routes over and above that which was granted in terms of the existing approved operating licence; o a scheduled or unscheduled route o newor existing minibus taxi route In most cases the provision of public transport for learners is in direct competition with existing public transport services. This not conducive to an effective and efficient public transport system and in terms of the NLTTA, the scheduled transport of learners is now a considered a public transport service for which an operating licence is required. The City of Cape Town is sympathetic to applications for operating licences that transport staff and shift workers outside of core business hours of mainstream public transport. However, once the restructured public transport network is implemented, the only those non-contracted services still operating outside of the core business hours of mainstream public transport will be allowed to continue as such. The rest will be deemed in direct competition with existing public transport services, and will be subject to mandatory acquirement of an operating licence. In respect of Long distance minibus taxi services, these are seasonal resulting in an oversupply in the off-season. The City of Cape Town has thus chosen not to support dedicated long distance minibus taxi operators. The City of Cape Town has thus chosen to support existing local routes operators in respect of additional long distance authorities, allowing more flexibility in dealing with the supply –demand fluctuation that comes with seasonal fluctuations. These operators can revert back to local routes in the off-season. Further, due to the huge expense of providing facilities for the current decentralised system, all formal minibus taxi operations will in future be restricted to specific, limited and manageable origin and destination points. In respect of Long distance bus services, all require an operating licence in terms of current policy. The City of Cape Town has determined however, that irrespective of whether these 93 Transport Register City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register services are supported by private facilities, all future facilities for long distance operations will require approval. Metered taxis are categorised as either operating from a rank or a base. Surveys have indicated that 49% of all metered taxi operators were illegal. The illegal operators were responsible for transporting 41% of metered taxi passengers, and were responsible for generating 44% of all metered taxi trips. It is concluded that this fact has caused legal operators to ply their trade elsewhere from an alternative rank or base. Specifically, the City of Cape Town has taken a decision not to issue any further rank-based operating licences until this issue has been addressed. For rank based services, surveys showed adequate supply to meet the demand. There is a wide range of service quality levels in the metered taxi industry with no direct relationship between quality and tariffs. There is a proposal for standardisation in this regards, but this is being opposed by the taxi industry. Tourist services are public transport services that transport tourists to and from attractions where the tourists are accompanied by a tour guide registered under the tourism Act, 1993, and as such, these services require operating licences. It is the intention of the City of Cape Town, with the introduction of the restructured transport network, to cater for the needs of tourists on the mainstream public transport network. Any subsidised or commercial contract that is let by a competent contracting authority (being any transport authority), requires an operating licence, the issuing of which will not be opposed by the City of Cape Town . A ‗Proof of Rank Letter‘ authorises operators to utilise the official City-owned public transport facilities listed on their operating licences. This letter is required by the POLB after an application has been granted, and failure by the applicant to submit this document leads to the lapsing of the approval. The interpretation of the NLTTA is such that if the planning authority (City of Cape Town) rejects an application, the board may not grant the application. However, if the planning authority supports an application, the POLB may still reject the application. The position of the City of Cape Townis that it will respect the decision of the POLB, and will issue ‗Proof of Rank Transport Register Letters‘ even in cases where operating licences have been granted against the City of Cape Town‘s recommendations. With respect to bypassing of interchanges (re-routing), the City of Cape Townis not able to entertain minibus re-routing applications at this stage because the resulting overtrading would lead to immense financial compensation claims by affected operators. Further the imminence of the public transport restructuring plan is 94 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register prohibitive in this regard. With respect to ‗Floor crossing‘- changing of associations, the OLS strongly discourages the practice of allowing two associations to operate on the same route due the potential conflict that it holds. When an operator moves from one association to another, the City of Cape Town would recommend to the POLB that the operating licence issued under the ‗old‘ member association be cancelled. With respect to unconverted permits, the City of Cape Town will support the immediate cancellation of non-operational unconverted permits, while it will support the conversion of operational unconverted permits provided valid reasons are given. With respect to non-renewed permits, the City of Cape Town will support the cancellation of non-renewed permits, and supports the issuing of advance notice to licence holders regarding their renewals. With respect to dormant operating licences, the City of Cape Town will support the cancellation of licences that were not used for operating in the last five years, but will consider continued operation for those that were observed in the last five years, subject to verification of observations with the relevant taxi association. With respect to radius/area-based operating licences, the City of Cape Townwill request that the POLB inform holders ofthese that they are invalid, and that they must apply for the amendment thereof to route-based operating licences because applications for renewal of the radius/area-based operating licences will not be supported. The Integrated Rapid Transit (IRT) system is a bold, multi-modal initiative being developed to address the public transport dilemma in South Africa. The City has recognized the important role played by the unscheduled, unsubsidized minibus-taxi industry and a concerted has been made to consult the industry about the proposed IRT system. In Cape Town, it is anticipated that Phase 1A of the IRT project will be implemented and the construction of IRT stations and infrastructure is already underway. Phase 1A is a pilot or demonstration phase for the rest of the project, and focuses on the areas of the City that need special transport services for the 2010 FIFA World Cup. This phase will serve as a way to test operations and make the necessary adjustments. It will and the range of opportunities it offers to the minibus-taxi industry as a whole. This will include a link from the Airport to the City centre, and from the City centre to Green Point, Sea Point and Hout Bay and around the City Bowl suburbs. There will also be a route up the West Coast to Bayside Mall, along Blaauwberg Road up to Potsdam Road to Du Noon, and services to Bloubergstrand, Atlantis and Mamre. 95 Transport Register also give the City‘s minibus-taxi industry an opportunity to see how the system will work City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Within the phase 1A area there are currently eight associations whose services will be upgraded and who are directly impacted by the proposed IRT service. These include: Peninsula Taxi Association (PTA) Central Unity Taxi Association (CUTA) Vredehoek Devils Peak Taxi Association (VDPTA) Atlantis Blaauwberg Taxi Association (ABTA) United Taxi Association (UTA) Ysterplaat Taxi Association (YTA) Maitland Amalgamated Taxi Association (MATA) Du Noon Taxi Association (DTA) It is important to note that the IRT project will be implemented in phases over the next 1015 years. Phase 2 of the project will link the densely populated south east of the City, which includes Mitchells Plain and Khayelitsha to destinations across the Peninsula. More than 60% of all public transport trips are produced in this area. It is anticipated that phase 2 will only be implemented by 2013. In the interim period it remains imperative to maintain an equitable balance between public transport supply and utilization in the areas not affected by IRT to ensure that people are connected to social and economic opportunities. It is vitally important that the licensing processes be used to underpin the IRT project in a manner that reduces the financial pressure on the City. The City has therefore adopted the following policy position when dealing with operating licence applications in IRT affected areas. New applications for operating licences In short, the practice of issuing new operating licences in areas affected by IRT must be discouraged as far as possible. However where demand comprehensively exceeds supply (where commuters have to wait for more than 15-minutes during Transport Register the peak period to access services), the following approach must be adopted: a) No new applications will be supported where the implementation of IRT will take place within two years from the date of application. This will not prevent an operator from being part of the IRT process and where such an application is strongly justified from a commuter-demand point of view the City will request the POLB to issue a temporary operating licence in terms of section 20 of the Road Transportation Act (Act 74 of 1977). 96 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register b) Where the implementation of IRT will happen more than two years after the date of application, the operating licence application must be supported for a two-year period (see section 88 of NLTTA). Thereafter paragraph (a) will apply. The POLB must be requested to impose the following condition on the operating licence in terms of section 83(4) of the NLTTA: o That the operating licence will not be renewed at the end of its validity period given that will be inconsistent with the transportation plans for the City of Cape Town area. The service will be replaced by the IRT system and the operator will become a stakeholder in this process. APPLICATIONS FOR ADDITIONAL AUTHORITY No applications for additional authority will be supported where the implementation of IRT will happen within two years from the date of application. Where the implementation of IRT will take place more than two years from the date of application, the additional routes will only be supported for a maximum two-year period. Even on an indefinite licence, the additional route(s) must only be supported for a maximum of two years. This clause can be imposed as a condition on the operating licence/permit in terms of section 83(4) of the NLTTA. RENEWAL OF DEFINITE PERIOD OPERATING LICENCES Note that in IRT affected areas all minibus-taxi operating licences are considered inconsistent with the transportation plans. Where the implementation of IRT will happen within two years from the date of application, the operating licence must only be renewed for a two-year period or until IRT is implemented, whichever occurs first. Where the implementation of IRT will happen more than two years after the date of application, the operating licence must only be renewed for a maximum of two years. Thereafter, paragraph (a) under new applications will apply. The POLB must be requested to impose the following condition on the operating licence in terms of section 83(4) of the NLTTA: o That the operating licence will not be renewed at the end of its validity period given that will be inconsistent with the transportation plans for the City of Cape Town area. The service will be replaced by the IRT system and the operator will become a stakeholder in this process. 97 Transport Register City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Note that when the National Land Transport Act (Act 5 of 2009) comes into operation, this process must be done in a manner prescribed by the corresponding sections of this Act. 3.7.6.4 Devolution of Authority to Issue Operating Licences A matter of note from the above is that the NLTA promotes the transfer of the Operating Licensing function to the planning authority and in this case, it is thus anticipated that the Provincial Operating Licensing Board will, within the foreseeable future, relinquish the issue of operating licenses for operations within the Cape Town Metropolitan Area to the City. The City of Cape Town already maintains its own Operating License Records in parallel with the Provincial Operating Licensing Board and is working towards ensuring Transport Register that it is in a position to undertake the task when devolution does occur. 98 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.8 Freight Transport Key Performance Indicators: o Total ton. kilometres per annum in Municipal area o Proportion of total ton. kilometres by rail With a deep port harbour facility, an international airport and a thriving commercial sector, the Cape Town transport system is required to provide for a significant freight component. Freight to, from and through Cape Town is by means of four modes, being road, rail, sea and air. The main impact on the transport network of the City is due to the movement of a very large portion of all this freight by means of road for at least part of its journey within the Metropolitan area. Within the City, there are two main categories of freight movement. The first of these is the cross-boundary freight that enters and leaves the City via road, rail, sea or air with major freight or industrial hubs central to these movements. The second is the intra-city movement of goods between these same freight and industrial hubs to other industrial and commercial points distributed throughout the Metropolitan area. Two well-known examples of the latter are fuel distribution and the maintenance of stock at major stores, especially the major supermarket and retail chains. Another example of intra-city freight movement is the refuse collection system of the City, which is a ―freight‖ operation. The difference between the two categories is mainly in terms of the transport network links required to satisfy their respective needs, the former requiring effective links to major regional or national routes whilst the latter require ready access to all parts of the City and it is necessary to understand the specific needs of this category in more detail. 3.8.1 Road Freight Government of the Western Cape, provides the best presently accessible data in respect of major freight movements in the City of Cape Town. The study surveyed 28 points, shown in Figure 21. A summary of the vehicle counts is given in Table 24, which does not include counts of unusual heavy vehicles, such as large tow trucks, mobile cranes etc, which are indicated in the study report as representing about 5% of total heavy traffic. A 99 Transport Register The Western Cape Urban Freight Study, undertaken in 2006 by the Provincial City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register summary of estimated tonnages of various classes of freight and number of container units at the survey points is provided in Table 25. It is to be noted that there are some discrepancies in the data and the figures do not always tally. Nevertheless, the data provides an idea of the extent of freight movement in the City and perhaps more importantly, identifies areas where freight volumes are high. Practicality necessarily limits the number of count points and the survey does thus not reflect freight movements in other areas and simultaneously permits double counting, so that the values in the tables are not additive across survey stations. Given that refuse collection is carried out across the city and that there are retail stores and light industrial areas spread across the metropolitan area, it is clear that the values given here are a significant underestimate of the total freight traffic in the City. However the study has focused on the major industrial areas of the City and the Harbour as well as considering those network elements carrying significant freight most subject to congestion. What have also been identified through the survey are roads carrying considerable volumes of fuel or Transport Register other chemicals that warrant consideration for declaration as hazardous goods routes. 100 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 101 Figure 21: Western Cape Urban Freight Study Survey Locations Transport Register Transport Register Table 24:Some Key Freight Movements in the Cape Town Metropolitan Area Location 102 R302 - Durbanville N1 - Kraaifontein R300 - Kuilsriver M31 - Brackenfell R102 - Parow M10 - Modderdam Road M12 - Airport R300 - Mitchells Plain M6 - Hout Bay M14 - Plattekloof Road M5 - Montague Gardens M5 - Milnerton N7 - Goodwood R102 - Maitland M16 - Epping N7 - Vanguard Drive M52 - Epping M17 - Epping N7 - Epping M9 - Lansdowne Road N2 - Langa M16 - Elsiesriver M5 - Pinelands N2 - Woodstock M57 - Observatory N1 - Paarden Eiland R27 - Container Terminal R - Foreshore to Harbour Reported Closed Car Container Beverage AADTT Trucks Carriers Vehs 858 4392 3263 1209 1592 2077 1960 1491 128 1749 1953 2270 5424 1261 2943 2353 352 1143 3936 756 3309 1964 2960 3329 2808 2910 2408 1953 0 31 16 4 5 66 17 28 2 5 2 11 17 2 7 6 0 4 2 3 18 10 5 14 16 9 4 7 90 1157 633 348 358 582 270 394 20 244 325 930 1567 481 1061 583 198 369 1027 198 1202 738 593 252 1130 351 93 144 0 38 36 4 45 14 3 8 0 0 3 3 17 0 2 6 0 2 2 1 19 6 3 6 10 6 0 4 8 125 58 33 62 211 25 14 2 27 188 240 96 25 46 30 6 14 50 4 387 22 240 3 38 492 865 385 Dry Bulk 4 46 42 3 5 4 27 4 5 7 21 3 34 2 6 26 1 1 42 3 0 6 23 30 11 41 0 0 Flat Dropside Fridge 138 958 691 193 323 342 387 225 4 173 269 443 1011 142 415 182 23 125 603 111 568 228 452 47 388 566 802 525 124 557 373 228 128 405 414 310 28 234 227 503 646 173 379 233 84 194 458 233 459 291 382 150 494 269 130 119 53 368 188 71 126 104 47 99 35 63 120 253 401 69 153 155 27 69 348 29 235 95 126 42 162 148 43 68 Liquid Lowbed Refuse Tippers Total Bulk 12 175 124 67 81 59 33 24 5 381 114 82 339 18 40 125 4 27 215 10 23 29 104 3 49 86 38 14 8 22 40 17 35 19 32 7 0 5 3 13 20 2 10 12 1 2 7 8 26 4 13 3 7 11 8 7 24 136 12 15 13 372 118 252 16 23 239 293 444 74 99 228 15 28 277 427 1105 60 70 132 41 129 11 22 319 494 458 73 122 162 335 424 15 293 275 121 522 89 217 522 10 98 390 180 473 132 404 144 224 333 17 349 780 4107 2671 1056 1303 2340 1708 1789 132 1455 1786 2895 5114 1077 2435 2108 369 933 3421 1207 4515 1621 2415 826 2570 2441 2011 1644 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 25: Estimated Tonnages of Various Classes of Freight and Number of Container Units for Survey Points in Western Cape Urban Freight Study R302 - Durbanville N1 - Kraaifontein R300 - Kuilsriver M31 - Brackenfell R102 - Parow M10 - Modderdam Road M12 - Airport R300 - Mitchells Plain M6 - Hout Bay M14 - Plattekloof Road M5 - Montague Gardens M5 - Milnerton N7 - Goodwood R102 - Maitland M16 - Epping N7 - Vanguard Drive M52 - Epping M17 - Epping N7 - Epping M9 - Lansdowne Road N2 - Langa M16 - Elsiesriver M5 - Pinelands N2 - Woodstock M57 - Observatory N1 - Paarden Eiland R27 - Container Terminal R - Foreshore to Harbour Chemical Container Fuel Iron & Tons Tot Tons pa Tons pa Tons Steel 6240 71760 15990 79950 pa 173940 TEUs pa 4784 436500 2448900 1013100 328200 4226700 163260 439530 1088880 454350 514410 2497170 72592 318450 419430 318450 101310 1157640 27962 418320 813600 369360 154440 1755720 54240 372060 1729080 14520 276540 8100 213750 63000 4800 10800 0 227370 143100 271080 2515320 115272 997260 18436 42300 327150 14250 4800 20400 720 323070 3010590 116490 3677520 21538 197340 508860 131100 1748100 660600 67800 2607600 116540 97020 1254330 434610 39600 1825560 452970 1694070 2340450 92610 4580100 112938 621300 23800 258900 340200 1743000 68980 67500 1622400 32140 19800 60000 1640 63900 405000 14200 1242900 1404000 271800 3342900 82860 162360 1914 71100 357000 109200 1034700 246900 482100 825900 4800 24600 10800 51600 213000 76500 424200 83622 70800 122400 7920 28710 52800 4678740 134700 378600 228300 2481900 16800 45300 12300 65700 140100 3020 17400 22200 2400 4800 46800 1480 344400 4243200 285600 93600 4966800 282880 242220 6104010 122760 22110 6491100 406934 10800 2205900 151200 10800 2378700 147060 103 33660 92070 120780 134640 4986960 311916 115500 155700 784500 25240 498000 177900 3386100 165460 Transport Register Location City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Much of the freight within the City moves along the three major national corridors as shown in Figures 22 through 2418, which also provide an indication of the anticipated growth in freight movement along these corridors. Cape Town-Gauteng 80,000 Tonne-km (Millions) 70,000 60,000 50,000 40,000 30,000 20,000 10,000 - 2007 2037 Figure 22: Commodity Characteristics of the N1 Corridor Cape Town - Port Elizabeth Tonne-km (Millions 7,000 6,000 5,000 4,000 3,000 2,000 1,000 Transport Register - 2007 2037 Figure 23: Commodity Characteristics of the N2 Corridor 18 Western Cape Provincial Freight Transport & Logistics Plan, CSIR, December 2008 104 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Tonne-km (Millions 12,000 Cape Town - Namibia/Upington 10,000 8,000 6,000 4,000 2,000 - 2007 2037 Figure 24: Commodity Characteristics of the N7 Corridor Figure 25 shows the estimated tonne-kilometres of fright movement within the Metropolitan area by main type, with estimated growth. Cape Town Metro 400 Tonne-km (Millions) 350 300 250 200 150 100 50 - 2037 Figure 25: Commodity Characteristics in the Cape Town Metropolitan Area Figure 26 provides a summary of the preceding data. 105 Transport Register 2007 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 20 10 5 0 2007 2037 E D B Cape Town – Namibia/Upington 15 Tonne-km (Billions) Tonne-km (Billions) A B C C 150 Cape Town - Gauteng 100 50 0 2007 2037 D 1.0 0.8 0.6 0.4 0.2 - 15 E Cape Town - PE 40 10 5 0 2007 2037 Tonne-km (Billions) Tonne-km (Billions) Metro Traffic Tonne-km (Billions) A Rural Traffic 30 20 10 0 2007 2037 Figure 26: A Summary View of Freight Transport in the Western Cape with Forecasts 3.8.2 Environmental Impact Road freight generally employs the use of diesel-powered vehicles. In terms of a 1997 study, some 48% of the visible brown haze pollution in Cape Town was due to diesel emissions. The City embarked on a programme of emission control in 1999 and in 2003 amended its by-laws (Air pollution Control by-law 12649, 4 Feb 2003) as part of a programme of pollution management. The result of this programme is that from 2000 to 2006, the failure rate of tested vehicles dropped from 17% to 1.8%. This programme requires ongoing implementation to minimise the negative impacts of freight movement on the air quality of the City. Transport Register 3.8.3 Strategic Routes and Abnormal Load Transportation In conjunction with the other relevant road authorities, the City maintains a network of Abnormal Load Routes as shown in Figure 14. Abnormal loads make use mainly of the N7, major sections of the N1 and sections of the N2 where widths, bridge clearances etc are such as to permit such movements; the remainder of the road system is limited in its capacity to carry abnormal vehicles. 106 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register However, a network linking the main industrial nodes is in place that is protected in that construction within and immediately adjacent to the road reserve is managed so as to protect the ability to move abnormal loads along these routes. There are however, as will be noted in Figure 14, gaps in the abnormal load route network that potentially necessitate unduly long routes for certain origin-destination combination. 3.8.4 Hazardous Goods The City of Cape Town has a detailed incident management plan with regards to the management of incidents involving hazardous goods. Various legislation, policies and standards further manage the transport of hazardous goods when moving through urban areas. These include: Dangerous Goods Digest: The Orange Book of Southern Africa, published by Foresight Publications, Somerset West 2008 Emergency Response Guidebook of Southern Africa : A guidebook for first responders during the initial phase of a dangerous goods incident, published by Foresight Publications, Somerset West SANS 10232-3:2007 (SABS 0232-3) Transport of dangerous goods – Emergency information systems Part 3: Emergency response guides. There is however, no formally defined hazardous goods network established within the City. This is a matter of potential concern, especially in light of the data presented in Table 25, where it will be observed that certain routes could be considered as hazardous goods routes by default given the volumes of fuel or other potentially hazardous chemicals being regularly transported along them. The N7 and Plattekloof Road are two prime examples of this. Hazardous substances: see the comment above about the requirement in the NLTTA and NLTA to determine routes for hazardous substances. The extent of rail utilisation for freight transport in Cape Town is extremely limited in comparison with both capacity and the amount of freight moved by road. Many sidings have fallen into disuse, with calls for their closure and redeployment of the land. Exact figures for freight movement by rail in the Cape Town Metropolitan area are difficult to obtain. A figure quoted by the National Minister of Transport towards the end of 2004 107 Transport Register 3.8.5 Rail Freight City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register was that rail carried approximately 1.3 million tons within the metropolitan area. It is believed however, that rail freight between Cape Town and Gauteng amounts to around 2.7 million tonnes19 per annum and this is also accommodated within the metropolitan area. 3.8.6 Air Freight Cape Town International Airport is the main airfreight airport in Cape Town. 80% of the freight is associated with passenger movements, with freight in the aircraft belly and a very limited freight air operation from Cape Town. It is estimated that approximately 30,000 tons per annum are air lifted from Cape Town, both internationally and to O R Tambo International Airport for transhipment and transfer to international flights. Some of the goods that are transported by air are fish and crustaceans (mainly rock lobster), abalone, flowers and some ostrich products. Some chemical, pharmaceutical and photographic products are received by air as well as computer software and hardware components. 3.8.7 Sea Freight In terms of the mass of freight moved through harbours in South Africa, Cape Town harbour is a relatively small player as indicated by the values in Table 26, with an annual total of just over 4 million tonnes handled in 2007. Of this, just under 4 million tonnes arrives at or leaves the harbour via land transport, be it road, rail or pipeline. However, the nature of the freight through the harbour, which includes a lot of fresh produce, is such that the value of the cargo is relatively much greater per tonne that that handled by some other ports, such as Saldanha, where very large volumes of high mass, relatively low Transport Register volume goods are handled. 19 Transnet Strategy and Investment Plan, 2004. 108 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 26: Comparison of Total Freight Tonnages of Ports around South Africa CAPE TOWN DURBAN EAST LONDON MOSSEL BAY PORT ELIZABETH RICHARDS BAY SALDANHA TOTAL TOTAL CARGO HANDLED 4,081,968 41,883,269 1,832,894 1,802,992 5,522,362 84,517,409 43,687,290 183,328,184 The form of freight movement for the harbour is given in Table 27, which also gives a perspective of Cape Town harbour in relation to the country‘s sea freight movements. Table 27: Freight Movement for Cape Town Harbour Compared with Harbour CAPE TOWN National Total BULK CARGO HANDLED LANDED IMPORTS COASTWISE TOTAL BULK LANDED SHIPPED EXPORTS 2,211,362 535,951 2,747,313 40,977,363 2,976,035 43,953,398 388,981 112,404,018 COASTWISE TOTAL BULK SHIPPED 448,876 837,857 3,530,264 115,934,282 TRANSHIPMENT CARGO TOTAL BULK HANDLED 20 3,585,190 8,044,837 167,932,517 100,031 9,682 109,713 5,655,138 86,855 5,741,993 299,123 799 299,922 87,143 496,778 9,209,305 93,182 9,302,487 351,187 15,395,667 BREAKBULK CARGO HANDLED LANDED IMPORTS COASTWISE TOTAL BREAKBULK LANDED SHIPPED EXPORTS COASTWISE TOTAL BREAKBULK SHIPPED TRANSHIPMENT CARGO TOTAL BREAKBULK HANDLED 109 TOTAL CARGO HANDLED LANDED IMPORTS COASTWISE TOTAL CARGO LANDED SHIPPED EXPORTS COASTWISE TOTAL CARGO SHIPPED TRANSHIPMENT CARGO TOTAL CARGO HANDLED CAPE TOWN National Total 2,311,393 545,633 2,857,026 46,632,501 3,062,890 49,695,391 688,104 121,613,32 3 3,623,446 125,236,76 9 8,396,024 183,328,18 4 449,675 1,137,779 87,163 4,081,968 Transport Register Freight Nationally for 2007 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 28: Containers Handled at the Port of Cape Town: January – December 2007 FULL CAPE TOWN EMPTY TOTAL LANDED: DEEPSEA COASTWISE TRANSHIPPED 196,193 11,208 35,980 105,515 301,708 11,679 22,887 20,127 56,107 TOTAL LANDED 243,381 137,321 380,702 216,892 5,557 39,131 95,826 312,718 2,818 8,375 23,079 62,210 261,580 121,723 383,303 504,961 259,044 764,005 SHIPPED: DEEPSEA COASTWISE TRANSHIPPED TOTAL SHIPPED GRAND TOTAL 3.8.8 Pipelines The transport of crude oil and related products between the Milnerton oil refinery, Cape Town Harbour and Saldanha is by means of pipeline. Two strategic pipelines are situated in the City of Cape Town municipal area, namely: Saldanha to Cape Town, crude oil is received from tankers moored at the oil jetty. The crude oil is transported by pipeline to the underground storage tanks located on the perimeter of Saldanha harbour. From these storage tanks a pipeline transfers the crude oil for approximately 126km to the refinery at Montague Gardens in Cape Town. Port of Cape Town to Refinery, petroleum products are transported from a dedicated petroleum tanker wharf to a bulk storage tank farm within the port boundaries. It is also transported directly to and from the refinery at Montague Gardens via a pipeline of Transport Register approximately 11 km. This pipeline is understood to be about 30 years old. 110 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.8.9 Inter-modal Freight Facilities Inter-modal transport facilities are facilities where freight is moved from one mode of transport to another, three such facilities are based in the City of Cape Town municipal area: Bellville Container Terminal (Belcon) is located on the Cape main rail line, to the south of Bellville. The location of the terminal, places it at the centre of the main rail lines used for container and general cargo in the Western Cape, where transfer takes place to and from trucks. Port of Cape Town Container Terminal (Capcon), located to the north of the Ben Schoeman basin adjacent to rail lines and the road access from the Paarden Eiland side of the port via Duncan Road and Marine Drive, movement of containers are between ships, rail and trucks. Inter-modal Containerised Waste Disposal - Within the Cape Town Unicity, waste disposal is primarily performed by road vehicles but the Refuse Transfer Station at Athlone (ARTS) provides the means to transport containerised waste from the municipal collection system, by rail to the Vissershok disposal area located adjacent to the Kensington-Chempet-Atlantis railway line. Weigh-in motion detectors situated on major routes at the boundaries of the metropolitan area; improve data collection on tonnage freight movements into and out of the City, as Transport Register well as identifying possible over loaded vehicles. 111 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.9 Harbours Harbours are generally attractors of heavy traffic associated primarily with the movement of high volume cargo as well as with vessels relating to the fishing, ship repair and recreational sector. Within the Cape Town Metropolitan Area, there are two significant harbours, two lesser harbours and a number of boat launching facilities, as shown in Table 29. Table 29: Harbours and Boat Launching Facilities Element Sub-Element Status Quo Harbours Cape Town Harbour Major Freight Harbour and Simon‘s Town Harbour Naval Harbour Kalk Bay Harbour Fishing Gordons Bay Harbour Recreation and Naval Boat Launching Facilities Various Recreational Boat Launching Facilities 3.9.1 Cape Town Harbour Cape Town harbour, which is located on the edge of the Cape Town Central Business District, provides a mix of functions which include acting as a significant harbours for freight, as a fishing, ship repair and yacht harbour, and also incorporates a retail and tourist facility of note in the form of the Victoria and Alfred Waterfront. The Port of Cape Town is the major seaport in the Western Cape region for general cargo import and export. (Saldanha handles ±10 times the tonnage, but this is mainly steel and iron ore. )Transnet Port Terminals (TPT) manages several cargo specific facilities within Transport Register the port which comprises: A Container Terminal A Grain Handling Facility A Multi-Purpose Terminal A Cold Storage Facility There is an Oil Facility, not managed by TPT, but nevertheless contributing to part throughput. The tonnages of break-bulk, oil and containers handled by the harbour for the last three years to date are shown in Figures 27, 28 and 29. 112 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Figure 27: Bulk and Break-Bulk Tonnages through the Port of Cape Town for the Figure 28: Petroleum Product Tonnages through the Port of Cape Town for the Last Three Years to Date 113 Transport Register Last Three Years to Date. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Figure 29: Containers Handled by the Port of Cape Town for the Last Three Years to Date. Cape Town harbour is a preferred export node for the fruit industry with reduced sailing times to South and North America and Europe. Fruit is exported via Cape Town from as far afield as Limpopo, Mpumalanga and Swaziland. The port also handles the export of fish from the South African and Namibian fishing industries to Europe and the Far East. The harbour is one of the deep-sea fishing industry‘s main bases and large numbers of Far East fishing vessels are based at Cape Town for a large part of the year, contributing to revenues from bunkering, supplies, and repair services. The Port of Cape Town is linked to the Spoornet Railway System via two lines, from the north to the container handling area and via an underpass from the Esplanade line to the southern quays and the Clock Tower Precinct. The port also provides services to the emerging oil industry in West Africa in support, repair and maintenance facilities, with the deep entrance and complete repair capabilities Transport Register being especially attractive for work on offshore drilling platforms Freight transport to and from the harbour is one of the key areas where the City of Cape Town and the Port of Cape Town have a common interface. The majority of freight is hauled via road-based transport. Coordination and cooperation between the City of Cape Town and the Port of Cape Town are of cardinal importance to ensure a transport system that operated at acceptable levels of service. 114 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.9.1.1 External Land Based Transport System The port is currently served by road and rail networks. The road network serving the Port can be broken down into two distinct parts, 1) internal port roads that fall under the authority of the National Ports Authority; and 2) external road network which services the port directly but contains a mix of port and public traffic. The internal network is subject to access control which will become stricter in future in response to the International Maritime Organisation guidelines. This is resulting in upgrading of the port entrances and exits and will restrict public access, thus influencing the external network to some extent. The external road network giving access to and from the harbour, and those internal elements that give access to the V & A Waterfront, suffer from congestion during peak periods due mainly to their close proximity to and locations within the Cape Town CBD. This traffic congestion has an impact on the operational performance of the Port of Cape Town. There is some spare capacity on the South arm and Dock Road but this is merely a linkage road between the metropolitan road network and the internal harbour road network. There are presently two separate rail access points to the harbour and these are to be maintained. 3.9.1.2 Public Transport Access There is no passenger rail linkage to the Port or the V&A Waterfront and no formal road based public transport to the Port. Public transport traffic generated by the Port is concentrated predominantly at the South Arm and Heerengracht access intersections to the Port. The Heerengracht provides the least congested traffic route between the Cape Town Station and the Port during the weekday AM and PM commuter peaks, and should corridor is already congested for extended periods during the weekday AM and PM commuter peaks, and this situation is likely to get worse over time. Based on the projected growth in Port activities, it is likely that peak period public transport demand will increase. 115 Transport Register remain relatively free-flowing in the future. The route to South Arm via the Buitengracht City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Two way taxi and bus flows on various sections of Duncan and Container Roads are indicated in the table below: Two Way Flow (vehicles per hour) Route Section Weekday AM Weekday PM Buses Taxis Buses Taxis Duncan Road 3 18 12 83 East of South Arm 4 12 6 11 West of Heerengracht 1 10 2 14 East of Oswald Pirow 1 2 2 8 0 2 2 8 East of Container Road Container Road North of Marine Drive Table 30: Traffic Volume on Port Roads The Port is well served by both buses and taxis, predominantly as feeder services from Cape Town Station. Significant taxi flows were measured on Duncan Road in the vicinity of South Arm Road, which is possibly serving as an informal pick up point during the weekday PM peak period. The bus services are a contracted service between Cape Town Station, South Arm Road and the Container Terminal Building. 3.9.1.3 Non-Motorised Access Pedestrian access to the port is via an uncovered pedestrian bridge between Esplanade and the Port. Other pedestrian activities are from Cape Town Station via the CBD towards the Port and the Victoria & Alfred Waterfront. 3.9.2 Simon’s Town Harbour Simons Town is South Africa‘s major naval port and of major importance for the defence of the country. Land access to Simon‘s Town is via a limited coastal corridor, with both Transport Register road and rail ways or alternatively roads through mountain passes that are unsuited to much beside light vehicle traffic. The rail line is primarily used for passenger rail services and whilst the roads to the naval base can facilitate some heavy traffic, historic development of the area is such that the heavy freight requirements of the naval base are mostly provided by ships loading at other commercial harbours. 116 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.9.3 Other harbours Cape Town also has several much smaller harbours. These include: Kalk Bay fishing harbour Hout Bay fishing Harbour 2 harbours in Gordon‘s Bay These are all relatively small and self contained harbours with Hout Bay being the most commercially active, including a small industrial area focused mainly on the fishing industry. All include some pleasure boat facilities and the one Gordon‘s Bay harbour acts as a naval cadet training base linked to Simon‘s Town naval base as well as a National Transport Register Sea Rescue Institute base. 117 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.10 Airports Key Performance Indicators: o Number of planes per annum Cape Town has one international airport, one military airbase and at least one significant small aircraft airstrip. The airports and known landing strips are listed in Table 31. Table 31: Airports and Landing Strips Cape Town International Ysterplaat Airbase Fisantekraal Public and Private Landing Strips Cape Town International Airport is the most important airport of the Western Cape region and the second busiest one in South Africa. The airport is served by more than 20 airlines connecting the Western Cape Region with all the important airports in South Africa and with most of the main hubs of Europe and some important gateways in North and South America, and the Far East. Cape Town International Airport is presently experiencing significant growth of passengers, exceeding 14% per annum. In 1999 the airport handled 4.6 mppa (million passengers per annum), while in late 2007, daily throughput at the airport equated to 8.4 mppa.20. The principal airport authority of the region, the Airports Company of South Africa (ACSA) responds to the demands imposed on it by the aviation industry, and has embarked on a process of identifying the capital expenditure required to ensure that the development of Transport Register airport infrastructures will be relevant to the larger airport stakeholder community. The airport capacity is continually upgraded. The upgrading of the international terminal is completed while the upgrading of the domestic terminal enters in the construction phase. A multiple parking structure serving the domestic terminal was completed in March 2006. 20 ACSA, 2007. 118 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register The development at the airport is guided by the Masterplan of 2000 and subsequent updates. The masterplan contains the following objectives with regard to land development, access and planning. Land Development: Land development should enhance Airport capacity and primarily serve aviation uses. Priority should be given to developing projects that accommodate the needs of the aviation users of the Airport and their employees. Non-aviation land users should provide an economic return that helps support the development of aviation facilities. Special considerations should be given to land development opportunities which have significant regional economic impacts and that require on-Airport locations. Land development policies should be compatible with surrounding community land use plans. Access Roads-Parking-Ground Transportation: The definition of the overall access network concept must be clearly identified. Terminal area capacity must be supported with adequate roadway, adequate road junctions, proper curb frontage, public and staff parking. Provision for a future public transport system (railway) has to be taken into account, not only considering the airport needs but also of the surrounding communities. 3.10.1 Status Quo In 2005 about 6.8 million passengers used the Airport. According to forecasts from ACSA this number of passengers will increase to about 10 million in 2010 and about 20 million in 2020. 3.10.1.1 Access to the Airport means of a half diamond and quarter cloverleaf interchange. Further access is provided from Borchards Quarry road which connects south of the airport approach with the N2 by means of a diamond interchange and north of the airport approach road with Modderdam Road. Borchards Quarry is a Class 2 road which also provides access to the industrial development west of the road, Airport Industria and to Airport City Industrial Park situated east of Borchards Quarry Road and just north of the N2. 119 Transport Register Access to the airport is provided by the airport approach road which connects to the N2 by City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Borchards Quarry Road connects with the airport approach road by means of a half clover-leaf interchange with signalised intersection on Borchards Quarry Road. 3.10.1.2 Public Transport Access Cape Town International Airport is not connected to the scheduled metropolitan public transport network. Hire vehicles form the main component of the public transport at the airport and consists of: Metered taxi services Airport shuttle services Chartered buses Passengers, workers and visitors who wish to access the airport by scheduled metropolitan services, have to use services on Borchards Quarry Road. Similarly, people who work in the airport development precincts have poor public transport access to their work. 3.10.1.3 Modal Split Private car, including car rentals account for 79% of transport to and from the airport. Hire vehicles account for 21% and the distribution of the various modes is shown in the table below. Table 32: CTIA Modal Split Modal Split / Car Occupancy Survey Date : Thursday, 20 February 2003 Modal Split Private Car Metered Shuttle Bus Total Transport Register Taxi Vehicle 8 898 301 649 56 9 904 Occupancy 1.5 2.25 2.7 22.54 1.73 Persons 13 436 677 1 752 1 262 17 127 Modal Split (%) 79 4 10 7 100 120 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.10.1.4 Parking The existing parking facilities and predicted parking bay requirements can be seen in the table below. The estimated parking provision is shown in the next table but due to phasing of construction, at the airport, the available bays might be less till 2010, when most of the construction should be completed. Table 33: CTIA – Parking Requirements Parking Requirements Year Public Parking Staff Parking Car Rental TOTAL 2000 2 600 774 786 4 160 2005 3871 946 1 007 5 824 2008 4 431 1 000 1 007 6 438 Table 34: CTIA - Parking Provision Parking Provision Year Public Parking Staff Parking Car Rental TOTAL 2000 2 600 774 786 4 160 2006 4 000 946 1 007 5 953 2008 5 827 1 000 1 000 7 827 2010 5 827 1 000 2 000 8 827 3.10.1.5 2010 Capacity Improvements The following capacity improvements have been completed or are scheduled for Upgrading of the terminal buildings. Construction of multi-storage Parking1, completed March 2006. Construction of multi-storage Parking 2. Construction of public transport plaza between the two multi-storage parking garages. New facilities for car rental operations. Upgrading of the internal access road system. 121 Transport Register completion in 2010 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register These proposed capacity improvements are shown in the diagram below Transport Register Figure 30: Airport Master Plan 122 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.11 Non-Motorised Transport Key Performance Indicators: o Mode share of non-motorised transport o Proportion of intersections equipped for special needs users. The results, in terms of, of the national census in 2001 undertaken by Statistics South Africa indicated there in Cape Town, 19% of respondents walk and that 0.5% cycle to work or to school. That the latter is the case may be attributed to a number of factors, amongst which are distances and the strong winds commonly experienced in the Peninsula and a very limited cycle path network, although there are plans for a considerably more extensive network. Pedestrian ways are naturally a feature of most urban roads but there are still many areas where inadequate provision is made for safe walking or other non-motorised modes, especially those involving special needs users. What is unfortunately the case is that the NMT environment in Cape Town, especially the low income residential areas, is often substandard, particularly so with respect to special needs users. Public spaces, including NMT routes within road environments, are often not sociable, are poorly maintained, suffer from the infiltration of crime and as a result, are seldom used resulting in a downward spiral of deterioration. This is due to a mix of factors, including poor infrastructural planning, lack of an integrated design approach, and difficulties experienced in operation and marketing of public Transport Register spaces. Figure 31 shows NMT usage in the City. 123 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Transport Register Figure 31: Non-Motorised Transport Spatial Overview 124 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.11.1 Access to Public Transport NMT is usually an important link in the public transport trip. The National Household Survey reported that more than 70 percent of the people in the City of Cape Town are within a 10 minute walk of the nearest public transport mode. Nearly 50 percent of the residents are within a 5 minute walk of the nearest public transport mode as illustrated in the summary in Table 35. In terms of NMT, the current public transport network is adequately served. This will however have to be reassessed in terms of the public transport planning currently in progress. Table 35: Walking times to Nearest Public Transport Mode (NTS, 2003) Percentage of public transport trips Area 6 - 10 mins Northern Corridor 54.9 37.0 3.7 4.4 Kraaifontein 42.8 18.7 21.4 17.1 Parow/ Bellville 69.2 10.8 11.8 8.3 Blue Downs 49.7 24.4 18.3 7.6 Belgravia 56.0 32.4 8.3 3.3 Grassy Park 74.0 20.5 1.8 3.7 Mitchells Plain - Gugulethu 42.5 26.8 14.4 16.2 Khayelitsha 24.2 38.4 14.4 23.0 Somerset West 35.3 64.7 Central 45.9 9.6 11.2 33.3 Kuilsrivier 52.7 16.0 11.9 19.4 Durbanville 63.8 36.2 Oostenberg 78.0 14.9 7.1 Langa-Bishop Lavis 58.2 19.1 14.8 8.0 Strand 63.6 18.1 9.7 8.6 Simonstown 81.5 18.5 Wynberg 69.1 17.9 7.6 5.3 Sea Point 65.4 10.7 1.9 21.9 Metro 46.4 26.6 12.5 14.6 Transport Register 11 - 15 mins More than 15 mins Up to 5 mins 125 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.12 Transport Asset Management Key Performance Indicators: o Proportionate condition index o Managed Asset Value o Proportion of asset value due for replacement in coming year. Asset Management has been defined as the combination of systematic coordinated activities and practices involving systems and procedure management, standards, process execution, financial, economic and engineering applied to physical infrastructure with the objective of providing optimized level of service and performance with associated accountability and risk management over their lifecycle in the most cost effective way. The Municipal Finance Management Act (MFMA) of July 2004, Generally Accepted Municipal Accounting Practices (GAMAP), Immovable Asset Management Bill of 2006, Integrated Development plan and other corporate legislative frameworks requires effective management of Assets (physical infrastructure) by Municipal Managers. Municipal Managers are required to establish and manage physical infrastructure on an information, accounting and management system that promotes long-term economic sustainability. An Asset or Infrastructure Management System is required to manage the assets for which the City is responsible. An Asset Management System is defined as a system, usually computerized and comprising a database and GIS, for collecting, analyzing and reporting information on the existing assets, their utilization, performance, lifecycle management and funding. The system should be able to answer six questions: What does the City own?Information on the city‘s assets should be contained in the base information of an Asset Register. This information should include, Transport Register asset description, location, materials information, construction and acquisition details What is it worth?The same Asset Register should contain information on the assets worth in terms of current value and replacement value 126 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register What is its performance? P erformance needs to be measured through current condition, ability to meet current and future demand and the risk and consequence of failure What is the remaining service life?This is an evaluation based on performance of the asset as determined in the previous question. The information relating to all these questions should be contained in the Asset Register. What must be done and when?Output information for the Asset Register will include a maintenance plan (routine, periodic, rehabilitation / refurbishment) to restore and extend the life of the asset. New Asset Plan for new assets or the replacement of existing assets, which have reached the end of their economic lives. What are the cost implications?This is the allocation of costs to the Maintenance and New Asset Plans. The Asset Management Plan takes this information and compares this with allocated available funds (budgets) over the planning period in order to determine what is affordable and what should be implemented. An effective Asset Management System is one that is integrated with other system models (Integration within SAP & GIS) to enable the City Of Cape Town‘s Transport Department to generate meaningful reports that will promote continuous business improvement. The City is responsible for the maintenance of the following assets: Public Transport Facilities / Interchanges (190) which include some or all of the following facilities: o Pavement areas (vehicles and passengers) o Drainage o Railway Sidings o Public Transport Interchange buildings, canopies, shelters etc o Depot Building facilities o Road signs and markings o Landscaping, street furniture, fencing o Other : CCTV, access control o Bicycle lockers 127 Transport Register City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Major and local road systems including the following: o Bridges o Culverts o Sea and retaining walls o Stairs o Gulleys, catch pits and connections,reticulation outlets, underground pipe systems, silt traps o Refuse racks o Stormwater pump stations o Road traffic signs, gantries and overhead sign structures. Bus/Taxi Stops (3000 stops, 1100 shelters) which consists of pavement areas, shelters, road signs and markings 4500 on-street kerbside parking areas Open parking areas (Formal and Informal) Road Reserve Property Parking Garages Traffic Monitoring Equipment which include 15 Mikros data loggers, one portable visual speed display sign (VMS), and one LOTOS laser system (RTMS) o 29 CCTV camera o Approximately 1354 Traffic Signals o (934 Traffic Intersections and 325 Pedestrian crossings) The average age of Traffic Signal Controllers is approximately 8 years, while most Controllers need to be replaced by the time they are 10 years old. Currently there are 5 % of controllers that are as old as 18 years. 3.12.1 Existing Transportation Assets The existing transportation assets are managed by three Departments within the Transport Register Directorate Transportation, Roads and Stormwater. 128 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register In 2002 the City‘s road network was stated as being Road Type Length Bitumen surfaced – Metropolitan 1792 km Local roads and streets 7134km Gravel surfaced 185km Unmade (informal) About 400km Other (concrete and block paved) 227km Total About 9738 km The structures assets also stated in 2002 were. Structure Type Quantity Bridges, culverts, footbridges, subways About 1850 Retaining walls More than 250 km Replacement costs in 2007 Rands were stated as being Asset Replacement costs Road R18 500m Structures R4 500m Other Information R450m Total 3.12.2 R27 450m Existing Management Systems 3.12.2.1 SAP SAP, the financial and accounting software used by the City, is intended to be the platform for the Asset Register which is part of the Asset Management System. However, not all the necessary information is on the SAP platform. Some of the information, resides in individual databases or modules, other information is still to be The Asset Register is supported by a Graphical Information System (GIS) platform which allows for special viewing, searching, manipulation and analyzing of the database information. The City already has a fairly comprehensive City-wide GIS running on ArcView and ArcMap, however, only selected elements of the Asset Register on the system. 129 Transport Register collected and consolidated. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.12.2.2 Specialist Systems – Roads 3.12.2.2.1 Specialist Systems – Storm water Storm water assets are recorded in a separate register. Some of this information is also contained in a GIS system but this information comprises mainly information from the City of Cape Town administration before the uniCity was formed. It is estimated that the GIS information is less than 70% complete. 3.12.2.2.2 Pavement Management System (PMS) The City currently operates and maintains a PMS which is integrated with an IMQS viewer which allows analysis of flexible, rigid, segmented block and gravel road pavement. The system is GIS based and therefore geo-referenced. About 1500 km of the City‘s road network, mainly local roads, are not yet on the PMS. The PMS allows for lifecycle cost planning and for maintenance budgets to be prepared. 3.12.2.2.3 Bridge Management System (BMS) The City operates and maintains a BMS and a bridge GIS. The BMS manages the asset register (inventory data), conditions assessments(inspection data), remedial work required (details, prioritization, etc. ), maintenance and budgeting. The City‘s bridge GIS runs on Arc View and Arc Map and was developed to allow for geo-referencing of structures. The BMS and Bridge GIS are not linked and cannot interact with each other. 3.12.2.2.4 Sign Gantry System Transport Register A rudimentary sign gantry management system has been created on MS Access 3.12.2.3 Transport Information System The Advanced Traffic Management System (ATRAMS) comprises the following modules. Fault Logging and Subsequent Handling System (FLASH) which manages the condition of the traffic signal system and CCTV installations. 130 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Asset map which records information and manages the road signs. The information includes a photographic record and condition assessment and is used for geo-referencing for some of the signs. The Traffic Inspection Management System (TIMS) which is a management tool for the maintenance and upgrading of signalized intersections is not yet operational. The Network Performance Monitoring System which records traffic information is not operational. Some of the Advanced Traffic Management System (ATraMS) modules were developed by external companies and some were developed internally. There are a number of modules to ATraMS (listed below) but many of them were never properly utilised, mainly due to a lack of human resources. A number of the databases just need to be populated with the proper data but collection and management of the data has been problematic as there are no human resources allocated for this function. There was a significant skills drain from IS&T‘s Application Development and Maintenance ADM team and maintaining the databases and servers became problematic. The ITS systems currently being deployed would automate many of the functions and decisions regarding ATraMS have to be made. Option 1: ATraMS modules could be re-engineered/customised for use in the TMC Option 2: Incorporate elements of ATraMS into the new software integration systems Option 3: Make ATraMS obsolete and only utilise the new systems 3.12.2.4 Public Transport Facilities Information on Public Transport interchanges is recorded on a separate database. The interchanges are geo-referenced and asset and condition information is available on the GIS System. Information on bus stops is recorded on the City‘s bus stop inventory together with the condition relating the information is also geo-referenced in the City‘s oracle Table 36 A summarizes some of the typical assets managed by Roads, Transport and storm water and when the Asset Register information currently resides. Table 36: Current Management Systems 131 Transport Register database. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register CATEGORY ROADS Road pavement Road furniture Traffic aids Structures Coastal Structures Other TRANSPORTATION Public Transport Network operations Non-motorised Transport Stormwater ASSET CURRENT SYSTEM Pavement layers Surfacing Guardrails Median barriers Fencing Noise barriers Street lighting Road marking, studs Road signs Bridges, subways Culverts Retaining walls Sign gantries Parking garages Depot buildings Sea Walls Tidal Pools Slipways Coastal walkways Road reserves Vehicle / plant fleets Depots Office furniture, equipment PMS with IMQS viewer PMS with IMQS viewer - Modal interchanges Bus stops Cycle lockers Traffic signals Off street parking CCTV cameras ITS equipment Traffic monitoring equipment Off street footways Off street cycle ways Pipes Culverts Lined channels Catch pits, headwalls Manholes Separate database Separate database FLASH FLASH - Assetmap BMS with spate GIS BMS with separate GIS Rudimentary Access Database - Rewarded on separate database and GIS which is only particularly complete Transport Register 3.13 Marketing and Communication The National Land Transport Transition Act, Act No 22 of 2000 (―NLTTA‖) promotes the participation of all interested and affected parties in transport planning, including vulnerable and disadvantaged persons, when reviewing plans, policies, and/or programmes. Transport Sector stakeholders and the general public must have the 132 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register opportunity to develop the understanding, skills and capacity necessary to achieve equitable and effective participation. This consultation must be undertaken prior to any approvals of issues governed by the NLTTA and the provincial Minister may stipulate the procedures. The NLTTA requires transport authorities within local government to “encourage, promote and facilitate public consultation, participation or involvement through hearings, seminars and workshops and any other means that are appropriate to ensure effective communication with customers, communities, organised labour and transport operators, and the Minister may prescribe requirements and procedures in this regard”. It further requires that the general public be informed of the availability and location of a particular plan/document for inspection in English and at least one other official language in a newspaper that serves the relevant areas. The Requirements also have stipulations in this regard, relating for example to section 6 of the Operating Licence Strategy ―Stakeholder consultation Beyond the legal requirement to ensure consultation for the ITP process is the City‘s marketing plan. This is aimed at mobilising stakeholder and public opinion in favour of the Restructuring and Transformation of Public Transport over the short to medium term while devising priorities and strategies for long term sustainability. Institutionally, the legal frameworks that guide the City‘s Marketing and Communication, Public Participation/Consultation and Empowerment position are Transport Register amongst others; 133 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register The National Constitution Environmental Act National Land Transport Transition Act Access to Information Act Urban Transport Act Preferential Procurement Act Municipal Structures Act Structures Act Municipal Systems Act Skills Development Act Companies Act Small Business Act Provisional Illegal Eviction Act Local Government Structures Act Promotion of Access to Information Various Enabling Provincial Policies Municipal Finance Management Act Act Promotion of Equality and Prevention of Unfair Discrimination Act Compliance with the NLTTA is achieved through the City‘s public participation policy on both the Integrated Transport Plan and transport related proposed by-laws. The public participation process includes: Advertisements in all the community and daily newspapers Press release issued to all media outlets Articles in the City News and website Distributing documents to all municipal libraries and sub council offices for public viewing Publishing the documents on the website and providing a dedicated e-mail address and fax number Sending letters to registered Interested and Affected parties inviting comment and/or participation in a public hearing Arranging a public hearing Submission of reports and documents to the Transport, Roads and Stormwater Portfolio Committee and all Sub councils Information desks at large shopping malls (optional) The City regularly reviews and updates its ITP document to ensure the relevance and Transport Register accurate reflection of current transport data and trends. Specific issues and/or concerns raised are used to inform the update of the ITP document. In addition the City constantly communicates all current/topical transport related matters affecting the travelling public by print, radio and broadcast media. 134 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.14 Institutional Structures and Inter-Governmental Co- Operation The NLTA will require that functions eventually be consolidated at City level, including service level planning for passenger rail. Until the NLTA takes full effect, insitutional fragmentation remains a challenge. Current regulatory arrangements are that national government regulates passenger rail,whilst provincial government regulates buses and taxis. The City has very limited control over the passenger services operating in its area. With regard to roads, the road system in the city is provided by three bodies aligned with the three spheres of government: Organisation Length of road with in the metro boundary South African National Roads Agency (SANRAL) 148 km Provincial 352 km Government of the Western Cape: Provincial roads (under the Department of Transport and Public Works) City of Cape Town 9,810 km Note: City data for 2006 While the municipal roads are dominant the national and provincial roads tend to be higher-volume more strategically important roads. There are concerns about the extent of integration of planning arrangements relating to these roads. 3.14.1 City partnerships: stakeholders collaboration with our Partners It is evident that there is a complex group of stakeholders in the Roads and Transport sector. There are structures for managing these relationships currently, as shown in Transport Register Figure 32. 135 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Co-operative arrangements Key Ongoing week to week engagement RSC TPAC WC Province SARCC SANRAL City National Ports Authority ACSA Transnet Freight Rail Intersite Other stakeholders Figure 32: Cooperative arrangements between the City and other Transport authorities The two key forums for dealing with co-operative planning are: The Transport Planning Advisory Council (TPAC), which includes all the stakeholders shown in the diagram above, including a range of private sector institutions. TPAC meets at quarterly intervals21. The Rail Steering Committee for the Municipal Area of the City Of Cape Town (RSC): This committee is a cooperative structure between the City, the Province, National DoT and PRASA The arrangements are governed by a Memorandum of Understanding. This committee will be subsumed by the IPC. Transport Register 3.15 Current financial arrangements 3.15.1 Structure of existing capital finance arrangements From the point of view of the City, capital expenditure is financed through: 21 See CoCT document on TPAC dated January 2008. 136 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Own sources (Capital Replacement Reserve). Borrowing (External Finance Fund). Grants from national government (MIG, Housing subsidies, NDPG and PTISG). Transfers from province for infrastructure. Development Charges from property developers (BICL). From the point of view of public transport operators, vehicles are financed through: Transfers from the national fiscus for trainsets and taxi recapitalization. Private sector loans for buses and taxis. The existing capital grant arrangements are described in the following table. Table 37: Existing capital grants Code Name Purpose Controlling Total amount national allocated to department CoCT over medium term (08/09, 09/10 and 22 10/11) (R million) PTISG Public Transport Available since 2007, the PTISG is DoT 424 Infrastructure and an application-based grant 291 Systems Grant intended specifically for public 527 transport infrastructure and systems and paid out primarily to metros. MIG Municipal A formula based grant for all DPLG 289 Infrastructure municipal infrastructure serving 324 Grant poor households. MIG can be 266 applied to roads and PT infrastructure but in the latter case is more appropriate to smaller scale infrastructure. 22 Neighbourhood A grant intended to complement Partnership private sector financing for 69 Development commercial developments on 100 Grant under-developed urban areas. Source: Division of Revenue Act, 2008 137 NT 38 Transport Register NDPG City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Code Name Purpose Controlling Total amount national allocated to department CoCT over medium term (08/09, 09/10 and 22 10/11) (R million) Housing Housing subsidies, paid out Provincial subsidies through the province, are intended Dept of to fund internal infrastructure for Local Govt. poor households, including roads. and While they are applied within city Housing NA boundaries they are not reflected on the City‘s budget for roads. In the case of housing subsidies, funding is allocated by the Western Cape Department of Local Government and Housing to specific projects within the metro area. Some of this funding is used for the ‗internal infrastructure‘ for low-income housing projects and part of this is used for ‗internal‘ (or access) roads. It is not possible to estimate with any degree of accuracy how much is in fact used for roads. The amount of the other subsidies used for roads and public transport is covered in following sections. 3.15.1.1 Roads and Transport Budget 3.15.1.1.1 Expenditure The current roads and transport budget is given in the table below, with totals for four years included (the current financial year – 2008/09 - and the three coming years, up Transport Register to 2011/12). 138 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 38:Roads and Transport Budget Budget Item Capex for 4 years Average per Split of (current plus med year total term budget) R million R million Roads New roads 501 125 8.7% Roads upgrading 215 54 3.7% Roads rehabilitation 326 82 5.7% Road junctions 182 46 3.2% Road structures 16 4 0.3% 152 38 2.6% 40 10 0.7% Auxiliary Parking and embayments Traffic signals 14 3 0.2% 395 99 6.9% Greenpoint precinct 80 20 1.4% Plant and equipment 24 6 0.4% Non-motorised transport (including pavements) Sundry – mostly related to roads 55 13 0.9% 1,999 500 34.8% 3,152 788 54.8% 218 55 3.8% Public transport related infrastructure (not IRT) 90 22 1.6% Rail related infrastructure 61 15 1.1% Public transport systems Subtotal – Roads Public transport IRT infrastructure Modal Interchanges 135 34 2.3% Land acquisition 14 3 0.2% Buildings 81 20 1.4% Sub-total PT 3,750 938 65.2% Grand total - roads & public transport 5,749 1,437 100.0% Note: 3. 4. Figures are taken from 2009/10 budget. The infrastructure for the IRT system is include under Public Transport in this table whereas in the City‘s budget it is included under ‗Roads and Stormwater‘. The allocation to specific items of infrastructure has been made based on the judgement of the project team and do not necessarily conform to categories in the City‘s budget. In the case of roads it is not always evident from the description in the budget whether the road is new, or an existing road being upgraded to improve the facility it provides to users or rehabilitated to return a road into the condition that it was in when first built. Transport Register 1. 2. 139 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register 3.15.1.1.2 Capital finance The transport budget for the City for the year (2008/09) and for the three following years is summarised below: Table 39: Transport Budget Code Amount over 4 years Description (R million) National Government PTISG Public Transport Infrastructure and Systems Grant NDPG Neighbourhood Development Partnership Grant MIG Municipal Infrastructure Grant OGOV Other government grants % split 3,330 832 57.9% 218 55 3.8% 274 69 4.8% 17 4 0.3% Provincial Government WC Average amount per year (R million) - Transfers from the WC Provincial Government 323 City's own funding 81 5.6% - CRR-B Capital Replacement Reserve (BRT specific) CRR Capital Replacement Reserve EFF External Finance Fund 375 94 6.5% 43 11 0.7% 955 239 16.6% Private sector funding - BICL Bulk Infrastructure Contribution Levy Private Other contributions from the private sector Total 204 51 3.5% 10 3 0.2% 5,749 1,437 100.0% Note: Figures taken from 2009/10 budget. An interesting statistic is the proportion of the capital available to the City as a whole which is allocated to the roads and transport budget. Transport Register following table for the major funding sources: 140 This is estimated in the City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Table 40: Capital finance for Roads and Transport as a proportion of total finance in the City‟s budget Code Description Total budget Roads and % for the City public transport allocated (average over amount (average to roads MTIEF period) for 4 years) and transport (R million) PTISG (R million) Public Transport Infrastructure & Systems Grant NDPG 832 100% 69 55 80% 293 69 24% 438 81 18% 475 105 22% 1,733 239 18% 1 51 91% Neighbourhood Development Partnership Grant MIG Municipal Infrastructure Grant WC Transfers from the WC Provincial Government CRR Capital Replacement Reserve (Internal funds) EFF External Finance Fund BICL Bulk Infrastructure Contribution Levy 56 Note: 1. This figure is taken to be the total for ‗public contributions and donations in the City budget. In total the Roads and Transport department is allocated 29% of the City‘s capital budget over the current and coming three years. The dominance of this capital commitment to roads and transport is largely related to infrastructure for the IRT system which itself is allocated 21% of the total budget. 3.15.2 Structure of existing operating finance arrangements From the point of view of roads and transport in the City, there are three key transfers 23 The Local Government Equitable Share (ES) which is an unconditional grant to all municipalities and which can be used for financing some of the roads and public transport operating costs. Bus subsidies which flow via DoT and are mediated by the WC Department ot Transport and Public Works (currently at a level of R540 million a year23). Figure still to be checked. 141 Transport Register which originate from the national fiscus: City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Subsidies for PRASA (rail concessionaire) to cover part of the operating cost of the commuter rail service in the metro area (currently at a level of R385 million per year24). Currently the City has little influence over the flow of funds to the rail and bus operators. However, this position will change under the NLTA. 3.15.3 Operating budget for the City 3.15.3.1 Expenditure The preliminary budgeted expenditure for the ‗Public Transport‘ and ‗Roads and Stormwater‘ units, for the year 2009/10, is given in the table below: Table 41: Operating expenditure budget for Roads and Transport Cost item Preliminary budget (2009/10) (R millions) Public Transport Transport Management 19.7 Transport Network Ops 42.0 Public Transport 70.9 Transport Planning 6.1 Technical Support Services 8.9 Transport Network& Infrastructure Dev 50.2 Repairs and maintenance 18.2 Depreciation 30.1 Interest 19.5 Total – Public Transport 265.6 Transport Register Roads and stormwater 24 Capital Implementation 8.3 Director: R & S 8.6 Stormwater Management 16.0 Support Services 7.1 Operations & Assets 514.3 Infrastructure Maintenance: Depots 5.3 Total – Roads and Stormwater 559.5 Figure still to be checked. 142 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Register Note: appropriation amounts are excluded in order to get an indicative figure for recurrent expenditure. A breakdown of the large item for ‗Operations and Assets‘ is shown below: Table 42: Breakdown of „Operations and Assets‟ line item on operating budget Cost item Preliminary budget (2009/10) (R millions) Remuneration 44 Capital charges 221 Repairs and maintenance 232 Other 17 Sub-total Operations & assets 514 Roads and Transport represents 5.2% of the total budget for the City. The figure for Roads and Stormwater is projected to grow at 5.5% per year in the medium term. In the case of the Public Transport the medium term projections in the 2008/09 budget show a considerable amount of variability25. 3.15.3.2 Revenue Currently the Roads and Transport operating activities are funded from the Rates and General revenue raised by the City, with property rates being the largest 25 26 Medium term budget figures still to be assessed. Assuming that capital grants are stripped out of the revenue to get only recurrent items. 143 Transport Register contributor, with only a very small amount of ‗dedicated‘ revenue for this account26. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4 TRANSPORT STRATEGIC INFORMANTS 4.1 Legal and institutional framework The following relevant national, provincial and municipal legal and institutional frameworks are relevant to the ITP and are highlighted below: 4.1.1 The National Land Transport Act During the course of the review of this ITP for Cape Town, the National Land Transport Act was promulgated but not given effect pending the promulgation of the associated regulations. The preparation of this document is thus taking place during a transition period, with significant implications on the City and the way transport systems are run within the City. The most important provisions of this Act from the point of view of this ITP are summarised below. 4.1.1.1 Institutional structure The most important aspects of the roles and responsibilities of the three spheres of Government have been substantially reviewed and can be summarised as follows: National government National policy and strategy. Assigning functions to other spheres of government. Matters relating to issuing of operating licenses except were assigned to a municipality. Contracting authority for subsidised service contracts and various other contracts established under the Transition Act. Transport Strategic Informants Provincial government Provincial policy and strategy. Co-ordination between municipalities. Ensuring that municipalities that lack capacity are capacitated. Ensuring implementation of policy and strategy, with specific attention to rural areas and less capacitated municipalities, with direct implementation where necessary. 144 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Local government As the Planning authority, preparing transport policy and plans for the area of jurisdiction of the municipality. Financial planning with a focus on rehabilitation and maintenance of infrastructure. Planning, implementation and management of modally integrated public transport networks. Service level planning for passenger rail on a corridor network basis with Metrorail. Establishment and management of integrated ticketing systems, where appropriate. In the case of gross cost contracts for subsidised systems, determining fare structures. Concluding subsidised service contracts, commercial service contracts and negotiated contracts with operators. When assigned that function, deal with matters relating to issuing of operating licences. It is clear that the intention of the Act is to provide considerable responsibility to local government with provincial government playing a supportive role in municipalities which have relatively high capacity and a more direct role in the case of low capacity municipalities. Further it is notable that the Act no longer provides for the establishment of a Transport Authority. Rather, emphasis is placed on the concept of a ‗Planning Authority‘ with this responsibility specifically allocated to local government. 4.1.1.2 Operating licenses Another important feature of the Act is that the licensing and related contracts established under the Transition Act are now the responsibility of National course. Considerable attention is given in the Act to the responsibilities of a City of Cape Town which is given the operating licence function and it is presumably the intention for this to be assigned to metros within a fairly short time frame. However, even without assignment the Planning Authority must provide ‗direction‘ to the entity responsible for operating licenses. 145 Transport Strategic Informants Government, presumably to be assigned to provinces and municipalities in due City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.1.1.3 Municipal Land Transport Funds The municipality must establish a Land Transport Fund into which all funds transferred from national and provincial government, user charges and various other sources of funding must be paid. This, in essence, sets up a ‗ring fenced‘ accounting system for public transport. 4.1.1.4 Contracting arrangements The Act provides for a municipality to be a ‗Contracting Authority‘ once this function has been assigned by the Minister. Three types of contract are identified in the Act: Negotiated contracts. Subsidised service contracts. Commercial contracts. 4.1.1.5 Inter-modal planning committees Every municipality which is establishing an integrated public transport network or has significant rail services within its area must establish an inter-modal planning committee with membership of rail operators and other public transport operators, inter alia. 4.1.2 The Development Facilitation Act (DFA) The aim of the DFA was to introduce extraordinary measures to facilitate and speed up the implementation of reconstruction and development programmes and projects in relation to land; and in so doing to lay down general principles governing development throughout the Republic. While the DFA does not apply in the Western Cape, the land development principles are prescribed for all land development. The following principles are of particular Transport Strategic Informants relevance to the ITP: Positively perform in terms of convenience, equitability, efficiency and attractiveness. Land development practices should be focused on the promotion of economic growth, facilitating higher-densities in appropriate locations and thereby containing sprawl. The creation of people scaled development, good public spaces as well as land use, spatial and social integration should be core 146 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants objectives of land development. Work harmoniously with nature, avoiding hazards, respecting natural uniqueness and recognizing ecological interdependencies. Land development should be based on designing with nature, promoting ecological sustainability, respecting natural landscapes and creating a sense of place. Accelerate the pace of development (overcoming line function fragmentation and conflict resolution). Promote security of tenure (i. e. individual ownership, collective ownership and rental or communal ownership). Provide for urban and rural land development and facilitate development of formal and informal, existing and new settlements; 4.1.3 The National Environmental Management Act (NEMA) NEMA requires that its principles be applied by municipalities and used to undertake Environmental Impacts Assessments and prepare Environmental Management Frameworks. The key principles require that development be environmentally, socially and economically sustainable, protect natural resources and maintain natural systems, provide access to resources and that environmental management must place people and their needs at the forefront of its concern. NEMA requires that the City support international agreements. This is of particular importance as Cape Town has two World Heritage Sites, extensive coastline and is situated within the Cape Floristic Kingdom. 4.1.4 The National Heritage Resources Act (NHRA) NHRA and the Provincial Heritage Ordinance promulgated in terms of the NHRA, empower local authorities, with conditions, to formulate by-laws for managing local heritage resources, or other higher order heritage resources where a responsibility authority shall, must or may do to protect valuable heritage resources. The promotion of Equality and Prevention of Unfair Discrimination Act, 2000 (Act No 4 of 2000) 4.1.5 The Municipal Systems Act (MSA) The MSA requires the preparation of an Integrated Development plan (lDP). 147 A Transport Strategic Informants may be delegated. There are numerous sections in NHRA which set out what a local City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants central component of the IDP is an SDF. The requirements of an SDF are listed in the Local Government: Municipal Planning and Performance Regulations (2001) and include the following longer-term, medium-term and shorter-term products: A city-wide longer-term spatial plan/ policy/ strategy guiding the direction, nature and extent of longer-term growth and development. Guidelines for the land use management system (LUMS) A Public Infrastructure lnvestment Framework (PllF) for spatial development indicating where the authority intends to focus investment A Strategic Environment Assessment (SEA) evaluating the impact of the citywide and/ or district level plans. The city-wide longer-term spatial plan is the primary focus of this report. The MSA prescribes a much stronger link between spatial plans (forward planning) and land use management. It does not, however, prescribe a process or requirements in this regard. The National Department of Land Affairs has recognised this shortcoming and preparing a new national planning law that will replace all the existing land use regulatory laws in country and give effect to the provisions of the MSA. The Provincial Government has similarly proceeded with their Law Reform Project with its purpose to replace the existing Land Use Planning Ordinance. Both these processes have provided some indication of the how planning and land use management should be taken forward. The national process promotes a normative approach to planning and moves away from a development restrictive/control approach based on zoning schemes towards a more development encouraging/ facilitative approach. This implies a more policy driven approach to LUMS where a broader range of instruments and policies set the guidelines in which all land use decision making takes place. Zoning schemes are therefore not seen as the means Transport Strategic Informants of implementing spatial plans but as the law that regulates land use rights. Guided by these considerations the City has started updating/ redesigning the LUMS for Cape Town. A "Strategic assessment of the environmental and heritage impacts of the SDF process for the City of Cape Town" was undertaken in 2006 and Environmental Management Frameworks (EMFs) for four District SDPs have been completed. The 148 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants preparation of the EMFs for the other" four districts is underway. The findings and recommendations of the MSDF Review, phase 1 public consultation process, SEA and EMFs have been incorporated into the SDF. In terms of the Municipal Systems Act, the SDF, as part of the lDP, prevails over any other plan as defined in Section 1 of the Physical Planning Act, The PllF is an integral component of the medium to long-term City Development Strategy and it and the SDF inform the preparation of the lDP. The PllF is regularly reviewed. The future land use and development projections contained in the SDF and District are critical informants of the PllF Review. 4.1.6 The Provincial Land Use Planning Ordinance (LUPO) The Land Use Planning Ordinance (15 of 1985) (LUPO) applies to the entire Western Cape and includes provides for structure plans (forward spatial planning), zoning schemes (regulation of development), the way in which applications may be made for new development rights and the appeal rights. 4.1.7 Land Use Management Bill (LUMB) Although still being developed, the Land Use Management Bill (March 07) is intended to eventually partly replace currently existing fragmented planning legislation in the country. 4.1.8 Draft Integrated Zoning Scheme (IZS) A zoning scheme is a legal document that records all land use rights on properties in its area of jurisdiction. It also includes regulations pertaining to restrictions on such rights and how they can be exercised. throughout Cape Town, with each one applying to a specific area. In order to standardise zoning arrangements and achieve consistency and efficiency throughout the City, the department is consolidating and rationalising the zoning schemes listed above into a single standard Integrated Zoning Scheme (IZS) for the entire city. However, until the new scheme is promulgated, the existing ones remain in force. 149 Transport Strategic Informants Currently, there are a number of separate individual local zoning schemes in force City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.2 Policy Framework Based on the principle and approach of developmental local government and integrated development planning as prescribed in the Municipal Systems Act of 2000, it is imperative that the transport policies and strategies in the Integrated Transport Plan must be aligned and integrated with corporate plans policies and strategies. This section provides an overview of how various policies and strategies in the City, have been conceptualized and formulated, with a distinct integration with and relationship to transport (See Figure 33); these reports are available from the City‘s Communications Directorate. Spatial Plan, Tourism… Economic Dev. Strategy Mobility Strategy Mission Integrated To transform and restructure Transport Public Transport by Plan “Putting public transport, people first and quality of life first” Transport Strategic Informants Figure 33: Relationship between ITP and City Strategies 150 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.2.1 South African Context National The figure below shows the ITP within the South African and regional context. Integrated Transport Plan : Contextual Framework Department of Transport • National Strategic Framework National Land Transport Transport Strategic Framework •Priorities National Priorities Province Provincial Land Transport Framework (PLTF) & Spatial Development City of Cape Town CDS City Development Strategy (CDS) Integrated Development Plan (IDP): 2020 Vision IDP Mobility Strategy: Macro Transport Strategy: SDF: Spatial Development Framework PIIF: Public Infrastructure Investment Framework Service Delivery Year 2020 & Beyond (Access & Mobility Programme) Integrated Transport Plan (ITP): Statutory Plan (5 Year Horizon) • Public Transport Plan • Freight Movement & Distribution Plan • Airport Planning & Development Plan • Port & Harbour Planning & Development • Transport Infrastructure Development Plan • Transport Investment & Financial Plan Figure 34: South African Context of ITP The City‘s ITP is informed from the bottom up through the public participation process, and sectorally through the strategies adopted by its various departments, and by the legislation and policy documents on transport produced by the Provincial and National Government. Public Transport Strategy and Action Plan that sets out IRPTN‘s etc. Department of Transport (1996), National White Paper on Transport Department of Transport (1999), Moving South Africa Transport Plan Department of Transport (2005), National Freight Logistics Strategy National Government (2005), Breaking New Ground: A Comprehensive Plan for the Development of Sustainable Human Settlements 151 Transport Strategic Informants The National policies and documents that inform this ITP include: City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants National Household Travel Survey (2006) Office Of The Deputy President (November 1997), Integrated National Disability Strategy White Paper National Public Transport Strategy and Action Plan, 2007 Road Infrastructure Framework of South Africa (RIFSA) 4.2.2 The Accelerated and Shared Growth Initiative of South Africa (ASGISA) National government has set itself the target of halving poverty and unemployment by 2014. To meet this target an average growth rate of 6% of gross domestic product has been set and infrastructure programs, sector investment strategies, skills and education initiatives, second economy interventions and macro economic and public administration adjustments are advocated. 4.2.3 The National Spatial Development Perspective (NSDP) The NSDP spatially directs social and infrastructure investment within the three spheres of government. At a national scale, it advocates capital investment in areas of growth and potential, with an emphasis on providing basic services and access to social services and human resource development in areas of need and less potential. Future settlement and economic development opportunities are directed at growth centres such as Cape Town and the activity corridors that link the growth centres. 4.2.4 Regional Context (Western Cape Province) The functional urban region requires co-ordination and planning that typically Transport Strategic Informants transcends the boundaries of metropolitan areas, and encompasses a wider hinterland connected by commuter flows, economic linkages and shared facilities. Major strategic challenges transcend city boundaries and must also be addressed at a more regional scale. Determining a Cape Town functional region includes the service catchment area for larger scale services, commuting patterns and economic linkages. The functional 152 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants region probably extends in a radius of 150 kilometres from the Cape Town centre, encompassing Saldanha to the north, Worcester to the north-east and Hermanus to the east (See Figure 3). This is not a political or jurisdictional boundary and is only relevant for planning purposes. Given the dynamic and changing nature of the planning process, it should be viewed as a flexible boundary depending on the functional or planning issues under consideration. The Intergovernmental Integrated Development Task Team27 agreed on the desired outcomes as a starting point for a common intergovernmental approach to growth and development. These outcomes should be bold, simple and challenging, helping to define a shared vision of a transformed city. Four critical outcomes have been identified: Shared prosperity; An inclusive and equitable society; An ecologically sustainable future; and Increase 50% of public transport usage The following action items summarise the outcome of the intergovernmental workshop: Establish the long-term requirements for key transport hubs and axes for both passenger and freight needs. This will include investigating the respective roles of Saldanha and Cape Town as complementary ports, and their competitive positioning in the national economy as well as the long-term airport needs of the region – and whether these are adequately met by existing facilities. Promoting much higher density mixed income settlement within and adjacent to key economic areas and along the core public transport corridors Improving the quality of resource poor settlements through the creation of a hierarchy of transport and public service points that facilitates access to public 27 A Proposed Agenda for Action, An Intergovernmental Approach to the Development Challenges of Cape Town, Initial Report of the Intergovernmental Integrated Development Task Team for the Cape Town Functional Region, 28 February 2006 153 Transport Strategic Informants City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants transport, economic and social opportunity. The clustering of public facilities and transport access within walking distance will be a key principle. Facilitate maximum access to strategic locations by poorer residents and promote a safe and reliable 24/7 public transport system The 2010 transport investment must ensure the linkage of the inner core to the wider city transport system including that of the functional region encompassing Saldanha, Worcester and Hermanus. The establishment of integrated transport authority and progress towards an integrated ticket system The ultimate aim is that Cape Town achieves levels of geographical accessibility in which all citizens are within one kilometre of public transport. A major expansion in facilities for non-motorised transport. The on-going improvement of safety and security on public transport and at transport interchanges will be a common priority. The on-going expansion of the CCTV network covering key economic and transport locations as well as crime hot spots. The provision of safe and secure public environments, including transport facilities, schools and commercial districts. A business plan for public transport in Cape Town must be completed as a matter of priority, even in advance of the lead initiatives. Public transport is key to both integrated human settlement and to growth and competitiveness in the functional region. As a first step, national assistance is required to define scope and budget for, a comprehensive transport intervention at the city region scale focused on public transport. The Strategic Infrastructure Plan of the Provincial Government of the Western Cape expects the following from public transport: Providing the ability to move many people efficiently, reducing congestion in Transport Strategic Informants the transportation network, with the following resultant benefits: Reduced travel time in the delivery of people, goods and services; Improved reliability of delivery of goods, people and services, improving economic efficiencies; Reduced social and economic costs associated with externalities such as emissions, noise and accidents; Promoting and supporting economic growth directly and indirectly as follows: 154 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants A larger public transport system stimulates activity in the transport sector (increasing the market for vehicles, vehicle parts, fuel etc). The upgrading and recapitalisation of the minibus taxi industry, allowing vehicles to be maintained in a good condition would provide additional economic impetus; Supporting economic efficiencies through reducing congestion and thus saving time, particularly when diverting trips from private cars to public transport. Supporting the development of other economic sectors such as tourism, hospitality and catering, retail and communications through providing greater accessibility for those who do not have access to private vehicles. The Provincial legislation and policy documents that inform this ITP are: Provincial Government: Western Cape (1997), White Paper on Transport Provincial Government: Western Cape (2004), Provincial Land Transport Framework iKapa Elihlumayo – A Framework for the Development of the Western Cape Province 2004-2007 Provincial Government: Western Cape, Strategic Infrastructure Plan Provincial Land Transport Framework, 2004 Western Cape Provincial Spatial Development Framework July 2005 Public Transport Policy Statement wrt Special Needs Passengers The Western Cape Provincial Growth and Development Strategy, 2006 4.2.5 The Provincial Growth and Development Strategy (PGDS) Through broadening economic participation, investing in 'connectivity infrastructures', improving the public and non-motorised transport systems, creating integrated living environments, social interventions and improving governance it aims to achieve shared growth and integrated development. In terms of this Strategy transport is the ―path-breaking‖ factor to boost the economy of the Province. 155 Transport Strategic Informants The development vision put forward by this strategy is a sustainable "Home for Alf'. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.2.6 Provincial Spatial Development Framework (PSDF) The purpose of the WCPSDF is to: Be the spatial expression of the Provincial Growth and Development Strategy (PGDS); Guide municipal (district, local and metropolitan) Integrated Development Plans (IDPs) and Spatial Development Frameworks (SDFs) and provincial and municipal Spatial Development Plans (SDPs); Help prioritise and align investment and infrastructure plans of other provincial departments, as well as national departments' and parastatals' plans and programmes in the Province; Provide clear signals to the private sector about desired development directions; Increase predictability in the development environment, for example by establishing ―no go‖, ―maybe‖ and ―go‖ areas for development; and, Redress the spatial legacy of apartheid. The Framework sets out a number of strategies to address the issues specific to Cape Town. The strategies that relate to transport include: Acknowledge the City's pre-eminent role in the Provinces' demographic, social and economic affairs, but also its significant resource constraints; Reduce resource consumption, especially water and energy, and increase efficiencies; Restructure - particularly transport corridors and public transport so as to better facilitate social and economic development especially for low and middle income communities; Protect agricultural resources inside and outside urban edges to secure Transport Strategic Informants cheap food supplies (reduce transport costs); Continue encouraging investment into second economy localities; and, Directly target measures to reduce air and noise pollution by reducing factory and motor vehicle emissions, and promoting public and non-motorised transport. 156 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.2.7 Metropolitan Spatial Development Framework Redraft (MSDF - CT) The MSDF, which has been adopted as policy by the City of Cape Town, effectively defines a working strategy for the promotion of efficient and integrated land development through applying policies that bring about a more realistic social, economic and physical integration of communities. The plan encourages residential areas closer to work opportunities, mixed use development, more efficient and cheaper transportation, and the utilisation of existing resources and infrastructure, and will correct historically distorted development of Cape Town. One of the tenets of the MSDF is the need to direct a significant portion of new investment in public facilities and services to areas of greatest need and to encourage private investment in these areas. Another is to plan the development of new centres for economic and other related activities towards the creation of employment, community and new entrepreneurial opportunities along existing structures. A focal point of the MSDF – and relevant to the city‘s rapid growth, is the strategy to containing urban sprawl through clear definition of an urban edge and the promotion ofresidential densification within existing urban areas. People have to understand that residential areas will need to be a higher density to protect agricultural land and environmentally sensitive land. 4.2.8 Cape Metropolitan Guide Plan The Cape Metropolitan Guide Plan, now the Cape Metropolitan Area: Peninsula Urban Structure Plan (Guide Plan) (1998), Hottentots Holland Guide Plan (Guide of Cape Town and inform land-use management decisions. Changing legal requirements and new development trends have made these Guide Plans outdated and the intention is that they will be replaced by the Cape Town Spatial Development Framework. 157 Transport Strategic Informants Plan) (1998) are long-term Guide Plans that sought to guide the spatial development City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.2.9 Mobility Strategy By co-operating at the highest level with the National Government (the Moving South Africa Strategy), the Provincial Government (22 Delivery Plan and 5-Year Vision) and the City of Cape Town (City Development Strategy), have designed a plan of implementation which will ensure a sustainable, accessible, reliable, safe and affordable public transport system for all users. The Strategy will achieve: Better ways to work together with elected politicians, public officials and citizens Changed public transport corridors to destinations, not just through roads Changed nodes and interchanges to service villages Improved efficiency, productivity and fair competition among minibus taxis, metered taxis and scheduled services Increased safety and security through stricter law enforcement Limited private cars and encourage pedestrians and cyclists through stricter safer walkways and cycle paths Single-lane bus rapid transit systems (BRT) and low cost forms of mobility over time Improved public spaces next to corridors and nodes to restore the dignity of communities The development of transport infrastructure to encourage small businesses, larger developments and overall urban renewal, including social upliftment 4.2.10 Parking Policy A Parking Policy is a vital component of an Integrated Transport Plan for the City of Cape Town. In this sense, the parking policy supports the City‘s broad vision and Transport Strategic Informants strategic objectives. Furthermore, an appropriate and efficient parking strategy should support metropolitan and economic growth, protect the environment and offer support to Travel Demand Management while enhancing a safe and secure environment. The parking policy affects how and when people travel by car or other transport modes, potentially reducing private vehicle trip-making and encouraging sustainable alternative means of travel. Hence, parking is an essential tool in managing 158 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants congestion and by using appropriate parking locations, together with visible and effective guidance signing, vehicle emissions can be reduced with an improvement in local air quality for pedestrians and inhabitants of the City. 4.2.11 City Partnerships Transport discipline alone cannot solve the transport problems in Cape Town. It requires a multi-disciplinary approach in order to achieve the vision of achieving sustainable transport. Amongst others, the key requirements are; Multi agency co-operation Multi disciplinary approach Multi modal corridor projects Multi sectoral integration Modal integration/ intermodalism Partnership is a critical ingredient in each of these requirements and therefore the City of Cape Town will strive to engage with all its partners to make this plan a reality The City‘s partners are: Residents of the City Chamber of Business City of Cape Town Departments Provincial Government of the Western Cape CBD City Partnerships PRASA Taxi operators Ports Authority Bus operators Airports Company of South Africa Civil society National Department of Transport Western Cape Network on Disability / Academics local reps of SADA (SA Disability 4.3 Spatial Development Framework and Other Land Use Informants The spatial development framework is a long term plan to manage growth and change, as it provides the vision of the desired spatial form and structure of Cape Town. It guides the medium term (± 10 years) proposals contained in the 8 District 159 Transport Strategic Informants Alliance) City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Spatial Development Plans and more detailed Local Spatial Plans. It aligns the City‘s spatial development goals, strategies and policies with relevant national and provincial spatial principles, strategies and policies. The framework provides policy guidance to direct decision making on the nature, form, scale and location of urban development, land-use change, infrastructure development, disaster mitigation, and environmental resource protection. It identifies the areas not suited for development – where there are no development constraints – but where development needs to be managed. The 5 year Integrated Development Plan serves to spatially co-ordinate, prioritise and align public investment through the shorter term 4.3.1 Draft Cape Town Spatial Development Framework 4.3.1.1 Background and Process: In 2006 the City embarked on a process of preparing a city-wide Spatial Development Framework (SDF) which includes the development of more detailed, medium term spatial development plans (SDP‘s) for each of the 8 planning districts of the City. The intention is that these plans replace the MSDF Redraft and the Urban Structure Plans (Guide Plans) and, as far as is possible and appropriate, replace existing approved 4(6) Structure Plans that guide decisions at district and local level. Currently a rigorous and inclusive public engagement process for the Draft SDF and District SDP‘s is underway, after which the Provincial Government of the Western Cape (PGWC) approval of these plans in terms of the Land Use Planning Ordinance (LUPO), as well as the withdrawal of the outdated 4(6) structure plans will be sought. Transport Strategic Informants 4.3.1.2 Spatial Development Goal: The overarching goal of the SDF is to manage the spatial development of Cape Town in a way that provides a sustainable future and creates equity for all. Sustainability is the capacity to sustain and support, indefinitely. 160 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.3.1.3 Spatial Development Strategies: Five key spatial strategies have been proposed to help Cape Town achieve its vision for a sustainable future and realise the spatial goals associated with this vision. A series of sub-strategies and policies have been developed in the SDF that will ensure the future implementation of these Strategies. These Strategies, sub-strategies and applicable ITP policies are outlined in Table 43: Table 43: The Cape Town Draft SDF – Strategies and Policies 1 Strategy Sub-Strategy Policies applicable to the ITP Enhance the Manage urban development impacts Apply the principles of Transport Impact value and on natural resources sustainably; Assessments (TIA) and environmental policies. accessibility of the Improve access to quality natural and rural metropolitan open space system environment and (MOSS) open spaces for the people of Cape Town Enable multi-modal metropolitan access to the MOSS. Protect and enhance the rural Apply the principles of TIAs and urban/rural environment development policies. - Walking and cycling should be recognised as Develop and enhance the nonmotorised transport (NMT) system the base for movement / predominant movement system in the City; - The provision of NMT facilities should be guided by the City‘s NMT Strategy and plans - Create a hierarchy of public transport services related to the accessibility grid; - Promote the intensification of land uses along 2 integrated, grid based movement system public transport routes; Create an efficient and integrated city- - New urban development should be provided wide public transport system that with appropriate public transport supports the accessibility grid infrastructure and services; - Along Development and Activity Routes and Activity Streets the maximum parking allowance should be applied to support public transport ; services; -Industrial, commercial, mixed land uses, public Align the land-uses with the accessibility grid institutions and social facilities should be located on the accessibility grid i. e. on Developmentand Activity Routes and Activity Streets; 161 Transport Strategic Informants Establish an City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Strategy Sub-Strategy Policies applicable to the ITP - Develop an integrated system of airports; - Create and manage a functional linkage between the ports/ harbours and their Facilitate the development of strategic transport infrastructure surrounds; - Lobby for the introduction and/ or expansion of passenger rail services - Take the proposed new railway station locations into account when assessing development applications; - Ensure that the strategic economic infrastructure is in place; - Streamline land use planning processes and Enhance Cape Town and its broader improve investment sector support and region‘s global economic positioning; advise; - Maintain and enhance the high quality environment and lifestyle opportunities afforded by the City Redress the spatial dislocation between jobs and the population 3 Improve access to living in the metro south-east of the economic city - Prepare and enhance the urban core corridor, especially in the vicinity of Bellville; - Unlock other large scale / significant employment generating opportunities in / close to the metro south-east; opportunities and amenities: Support investors through the economic provision of improved strategic information and planning - Prepare and regularly update an Opportunity Zone Management Plan;; - Make developers aware of the Urban Development Zone (UDZ) incentives; Improve SMME‘s and informal traders‘ access to economic opportunities; - Introduce appropriate land use management policies and support mechanisms; - Do not support developments located on the edge of/ outside of the opportunity zones and Encourage economic activity to locate away from the accessibility grid that will on the accessibility grid negatively impact on existing proposed Transport Strategic Informants opportunity zones and/ or accessibility of public transport users; 162 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Strategy Sub-Strategy Policies applicable to the ITP - Development edges should be used to contain sprawl and protect natural and rural assets - The growth edges should not be amended on Contain the footprint of the city an ad hoc basis; - The assessment of development applications on either sde of the edge line should be guided by the management / protection zone guidelines 4 Promote appropriate densification Primarily along IRT trunk corridor. Direct urban Direct new growth to appropriate Location near places of employment to reduce growth and locations the need to travel. promote compact, Promote green living Appropriate choice of mode. integrated Promote a greater, responsible mix of development land uses and people in appropriate Location near quality public transport . locations Implement the Land Use Transport contributes through processing of Management System |(LUMS) TIAs associated with land-use change. Ensure adequate ad integrated provision of social facilities, public Location near quality public transport. institutions and public open space Transform townships and informal Upgrading of transport facilites settlements (where appropriate) into Facilitate linkages to surrounding suburbs amenities. Support land reform initiatives Enhance the value of heritage resources for the people of Cape Town Promote the development of an great people accessible city-wide system of places destination places Challenge traditional transport solutions to adapt to heritage requirements. Ensure IRT system encompasses regional destinations. - Carefully manage land uses along scenic Preserve and enhance scenic routes routes; - Identify additional scenic routes Source:SDF Working Group January 2009. Itailicised text in table added by Integrated Transport Planning. Two maps included in the Draft Spatial Development Framework that are directly related to the integration of transport and spatial planning / urban development are the maps indicating future ―Land Use Transport Network‖ and the ―Phasing of City Growth‖. These plans have been included below. 163 Transport Strategic Informants 5 Develop more Plan bulk transport infrastructure required. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Transport Strategic Informants Figure 35: Phasing of City Growth (The numbers indicate the development phases 1, 2 and 3. ) 164 City of Cape Town – Integrated Transport Plan 2006 To 2011 Figure 36: Land Use Transport Network The key aspect of this figure is the land use associated with each of the the road corridors, such as activity, connector or development corridor. influence access and mobility features of the routes. 165 This function will Transport Strategic Informants Transport Strategic Informants City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.3.2 Draft District Plans As part of the process of preparing an updated city-wide Spatial Development Framework (SDF) and more detailed, medium term spatial development plans for each of the 8 planning districts of the City have been developed. The eight district integrated Spatial Development Plans (SDP‘s) and Environmental Management Frameworks (EMF‘s) will apply the strategies and policies identified in the City‘s Spatial Development Framework at a district scale. 4.3.3 Cape Town Draft Densification Strategy Densification is viewed as a necessary step to promote longer-term sustainability of Cape Town. In August 2007, the City of Cape Town‘s Planning and Environment Portfolio Committee endorsed the establishment of a Densification Task Team to oversee the preparation of the densification strategy. The City‘s Draft Densification Strategy (August 2009), when approved will guide all decisions related to the densification of Cape Town. As an outcome to this strategy the Cape Town Spatial Development Framework seeks to adopt the policy of a ‗middle path‘ densification strategy that sets a gross base density (average density) of 25 dwellings units / hectare. Higher levels of densification will be encouraged at specified spatial locations and incremental densification will be permitted across the city where appropriate and feasible. A gross base density of 25 du/ha is the minimum target, as the City should aim for a significant greater average density over the medium to longer term (15+years). 4.3.4 Urban Edge Policy An urban edge is a demarcated line and inter-related policy that serves to mange, Transport Strategic Informants direct and limit urban expansion. The edge may perform so as to protect valuable natural and agricultural environments abutting urban settlement from urban encroachment / sprawl (resource boundary) or redirect the form, pattern and aerial extent (footprint) of urban growth towards compaction and intensification (urban growth management boundary) towards more efficient city functioning especially in the provision of services and public transport. 166 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants National legislation requires that the City prevents urban sprawl and encourages the development of more compact and efficient cities (Development Facilitation Act). The City‘s Spatial Development Framework (SDF) incorporates and reflects the urban and coastal edges as spatial structuring elements for guiding the long-term sustainable development of the City. 4.3.5 Transport Integration with Land Use Planning Land use and transport systems are reciprocal, mutually supportive and intrinsically related. Increasingly there is acceptance that transport systems cannot be planned in isolation of land use or vice versa and that urban development must take transport into consideration to be successful in an urban growth management approach. The City of Cape Town recognises the importance of the relationship between transport and land use and understands that the Integrated Transport Plan (ITP) need to incorporate and support strategies for better coordination between spatial planning, housing and other activities that impact land use and development. 4.4 Demographics 4.4.1 Population Understanding the demographics of a City is important for transport planning. Population growth is a key driver of demand for transport services. The City of Cape Town had a population of 2.89 million in 2001. Population growth between Census 1996 and Census 2001 was 2.4% per annum on average. Population projections conducted for the City in 2005 suggested that population Declining fertility rates (from 2.5 children born to each woman between the productive ages of 14 to 44 years in 1985 to 1.5 by 2021). Rising mortality rates, driven strongly by HIV/AIDS (from 8.5 deaths per 1 000 people in 1985 to 14 by 2021). Approximately constant migration (high migration scenario is that migration for Black, Coloured and Indian populations remains at the same rate as 1996 to 2001 while White net emigration ceases in 2001) (Dorrington, 2005). The projections suggest that the population of the City of Cape Town in 2021 would be 4.1 million people. 167 Transport Strategic Informants growth rates will start to decline over time due to: City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Table 44: Population projections for the City of Cape Town: high migration scenario (Dorrington, 2005) 2006 2011 2016 2021 3 304 272 3 591 794 3 840 252 4 055 219 High migration scenario: migration for Black, Coloured and Indian populations continues at the 1996 to 2001 rates. White net emigration ceases from 2001. This represents a decline in average annual population growth, as shown in the table below. Table 45: Average annual population growth projections for the City of Cape Town: high migration scenario (Dorrington, 2005) 2001 to 2006 2006 to 2011 2011 to 2016 2016 to 2021 2.7% 1.7% 1.3% 1.1% Own calculations based on populations shown in Table 1. Note that the Community Survey 2007 conducted by StatsSA suggests that the population of Cape Town in 2007 was 3.50 million. Although there has been some doubt cast on the accuracy of Community Survey 200728, this is roughly in line with the high migration scenario projections shown in Table 44. 4.4.1.1 Population Density Table 45 shows population density per km2 by metro suburb. The highest densities occur in the low-income areas of Khayelitsha, Gugulethu/Nyanga, Delft, Philippi/ Crossroads/ Browns Farm and the low/middle income areas of Mitchells Plain. A strongly contributing factor is the tightly packed extensive informal development juxtaposed to the formal housing, particularly in Khayelitsha, Nyanga, Gugulethu and Transport Strategic Informants Crossroads/Philippi. The southern suburbs is characterised by very low density and high car ownership. A number of the other metro suburbs show very low density but it should be noted that these include vast tracts of vacant land e. g. Study 28 See http://www. polity. org. za/article/community-survey-039unreliable039-2008-01-08 for ex 168 the City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Milnerton suburb, and the area to the south east of Atlantis. This arises from the metro suburb delimitations. 4.4.1.2 Age Structure The City has a young age structure, typical of a developing region. Of significance is the high number of persons between 5 and 19 falling into the school going category. The issue of transport of learners, particularly in low income households, is an important and challenging transport issue due to low levels of affordability. Figure 10 shows the age structure. Figure 37: Age Profile of Population CENSUS 2001 - AGE STRUCTURE for CITY OF CAPE TOWN 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0-4 5 - 19 20 - 34 35 - 64 Over 65 4.4.2 Passengers with Special Needs National Department of Transport, in a document entitled ―Moving South Africa‖, Life Cycle Passengers - Including children between 5 and 14 years old, people with health conditions, pregnant women and the elderly (aged 65 and above). Impairment Passengers - Any customer with physical; sensory or cognitive impairments including full or partial impairments in motor functions, sight, hearing, speech, psychiatric or intellectual impairments. 169 Transport Strategic Informants considers any passenger in the following categories, to have special needs: City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Signage Passengers - Including people who are not literate and foreigners who are unable to read or understand transport signs and notices and require non-verbal forms of communication; as well as people who are unfamiliar with transport system in use. Table 46 Shows the Prevalence of Special Needs Passengers in Cape Town Special Needs Passenger Category Life Cycle Passengers Children (between 5 and 14) Pregnant women (2 months only) Elderly (aged 65 and above) Subtotal Impairment Passengers Sight Hearing Communication Physical Intellectual Emotional Multiple Subtotal Signage Passengers TOTAL City of Cape Town % Population 518 195 Not known 144 168 662 363 18% 5% 23% 19 261 14 270 3 798 31 147 13 079 13 926 12 470 107 951 0.7% 0.5% 0.1% 1,0% 0.5% 0.5% 0.4% 3.7% Unknown - 770 314 26.6% Table 46: Prevalence of Special Needs Passengers (2001 Census Data) A total of 26% of the population falls into the category of special needs passengers taking the broad definition to include both life cycle and impairment passengers. The two most prevalent categories of impairment passengers are people with physical and sight impairments which account for 50 400 passengers or 1,7% of the Transport Strategic Informants population. These groups are impacted most acutely in terms of access and utilisation of the transport system. 4.4.3 Sustainability Due to the increasingly dispersed nature of development, rising demand for space, increasing private vehicle usage and the growing congestion in the City, the following 170 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants concerns around sustainability must be addressed through integrated land use and transport strategies. 4.4.3.1 Increasing demand for space Current growth trends in economy and population together with market demand for low-density housing are unsustainable. There is an increasing demand for space in the City, but due to natural barriers and existing development, patterns and growth in the City is directed northwards. This northward growth is problematic and in conflict with environmental issues due to major bulk infrastructure constraints. Transport infrastructure in these areas is also largely inadequate to cope with the growing travel demand generated by the additional development. The City‘s plan is to try to accommodate this growth pressure by directing development into existing infill sites and to expand the existing CBD into a broader central geographic area. This will move travel patterns away from its current radial bias to a more balanced grid travel pattern. 4.4.3.2 Transport and land use do not reinforce each other Although coordination between transport and land use has increased within the City it has taken place mostly at a planning level. Patterns for land use and transport currently still do not reinforce each other. Increasing private vehicle ownership continues to demand development forms that support its usage. Current land use does not support the thresholds that are required for effective mass operations i. e. public transport, while current public transport levels of service in turn do not support quality and liveable environments. It is important to coordinate between land use and transport to inform which corridors should be encouraged for higher development densities and prioritised for public transport and non-motorised transport 4.4.3.3 Poor liveability and integration of neighbourhoods Expansive road and rail transport infrastructure negatively impacts on the opportunities for positively integrating various neighbourhoods. The increasing demand for road space with little provision for pedestrians or special needs persons creates sterile environments that are unfriendly to people. 171 Mixed land use and Transport Strategic Informants infrastructure and service improvements. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants service activities that support dynamic and lively neighbourhoods must be implemented, underpinned by an effective and sustainable transport system. Transport connections perform specific functional roles, i. e. either mobility or connectivity. It will be necessary to plan and obtain agreement between transport and spatial planning on which roadways perform which functions and ensure that supportive land use and access is provided. 4.4.3.4 The environment is being compromised Current trend in private vehicle usage is environmentally unsustainable with respect to demand for space, air and noise pollution as well as usage of limited fossil fuel reserves. It will be necessary to develop transport and land use solutions that take Transport Strategic Informants cognisance of these environmental issues. 172 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.5 Economic Development Framework and Other Economic Informants 4.5.1 Socio-economic profile The City of Cape Town uses a Level of Living index to assess social well-being, and most notably the distribution of deprivation, in the City. The index is a composite of two other sub-indices, Socio-Economic Status (SES index) and Service Level index. 4.5.1.1 Socio-economic profile for the City of Cape Town as a whole The data used to compile these indices is all drawn from Census 2001, which makes it rather out of date. The absolute level of the indices, shown in Table 47 below, may thus no longer be relevant. However, the indices are still likely to provide a useful indication of relative deprivation across the City. The Level of Living index for Cape Town as a whole in 2001 was 25.22, and is derived as shown below. Indicator % of adults (aged 20+) with highest education levels less than matric % of the economically active population that was unemployed % of households earning less than R19 200 per annum % of the labour force employed in elementary/unskilled occupations SES index % of households living in informal dwellings % of households with no access to electricity for lighting % of households with no flush or chemical toilets % of households with no potable water on-site or in dwelling % of households with no refuse removal by local authorities weekly or less Service level index Level of Living index Value 2001 Value 2007 62% 58% 29% 39% 17% 39% 21% 21% 37.97 19% 11% 12% 16% 33.87 12% 3% 6% 7% 4% 4% 12.46 25.22 6.35 20.11 2001 data taken from “The spatial distribution of socio-economic status, service levels and levels of living in the City of Cape Town 2001 – To highlight suburbs in need” (March 2006). 2007 data taken from http://www.capetown.gov.za/en/stats/Documents/City%20stats%20summary%20page.htm The table above also provides estimates of the indices in 2007. These are the author‘s own estimates, based on information provided on the City of Cape Town 173 Transport Strategic Informants Table 47: Derivation of Level of Living Index for the City of Cape Town City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants website 29 for some of the parameters. The 2007 estimates are provided to give an indication of likely shifts in levels of living over the years since 2001. There has been an improvement in level of living in Cape Town, driven most strongly by advances in the provision of services since 200130. The decline in unemployment shown in Table 47 is also notable. Labour Force Survey data indicates that employment has declined steadily since 2001, although there was an increase in 2007. 35 29.2 % unemployed 30 23.4 25 20.8 19.6 20 17.3 16.9 15.1 15 10 5 0 1995 1996 2001 2004 2005 2006 2007 Source: Census 1996, Census 2001, Labour Force Survey 2005, Labour Force Survey 2006, Labour Force Survey 2007 ex http://www.capetown.gov.za/en/stats/Documents/Unemployment.mht Figure 38: Unemployment in the City of Cape Town Note that the percentages in the figure above are for the official definition of unemployment. Under the expanded definition unemployment in September 2007 was 22%. 4.5.1.2 The distribution of social well-being in the City of Cape Town In order to obtain a measure of relative well-being in the City of Cape Town, suburbs Transport Strategic Informants were grouped together based on their Level of Living index, using the natural break method. 29 http://www.capetown.gov.za/en/stats/Documents/City%20stats%20summary%20pag e.htm 30 Note however that no updated data was available for % of households earning less than R19 200 per month, nor for % of labour force employed in elementary/unskilled jobs. It is possible that there has been some improvement in these two parameters, which would result in further improvement in the SES index. 174 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Informal settlement areas: The worst off areas in the City of Cape Town were informal settlement areas, which registered Level of Living indices of between 56.21 and 83.97 in 2001. These areas are located largely in the South East of the City and have poor access to services combined with low levels of education, little economic activity and high levels of poverty. Public housing and low-income private residential areas: With Level of Living scores of between 34.27 and 56.20, low-income public and private housing areas are the second most deprived areas of the City. These areas are located largely in the South East of the City, as well as the far North. These areas have good access to services, but poor social and physical environments. Lower to middle-income private residential areas: With Level of Living scores of between 20.44 and 34.26, the needs of these suburbs relate largely to maintaining existing levels of services and economic activity. Middle to high income private residential areas: Scores of between 0 and 20.43 were registered by these areas. They are well serviced and have a strong social and economic environment. The analysis of Levels of Living highlights strongly the spatial distribution of deprivation in the City, with the most deprived areas concentrated on the outskirts of the City to the South East and the North. 4.5.2 Economy The City of Cape Town generated a Gross Domestic Product (GDP) of R130 billion in 2007, approximately 11.6% of the national GDP and 77.3% of the GDP of the Transport Strategic Informants Western Cape Province. 175 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 140 7% GDP % GDP grow th 6% 100 5% 80 4% 60 3% 40 2% 20 1% Rbillions 120 - 0% 2000 2001 2002 2003 2004 2005 2006 2007 Source: Quantec data received from CoCT Strategic Information unit Figure 39: Trends in City of Cape Town GDP since 2000 GDP in the City has growth steadily since 2000 with an average annual economic growth rate of 5.4%. This high growth is expected to come under pressure in the next few years due to the effects of the current international economic crisis. The three most significant sectors in terms of contribution to the GDP of the City of Cape Town are finance and business services, wholesale and retail trade and manufacturing. The former is particularly dominant, contributing 33% of the total GDP in 2007. This dominance is particularly notable when compared to South Africa as a whole. Percent contribution to GDP 40% 35% National Cape Tow n 30% 25% 20% 15% 10% Transport Strategic Informants Government, social and personal services Finance and business services Wholesale and retail trade Construction Electricity, gas and water Manufacturing Mining Agriculture, forestry and fishing 0% Transport and communication 5% Source: Quantec data received from CoCT Strategic Information unit Figure 40: Contribution of economic sectors to GDP in Cape Town and South Africa, 2007 Prospects for growth in the various sectors can be summarised as follows: The three sectors showing the biggest increase in contributions to GDP between 2000 and 2007 were Finance and Business Services, Wholesale 176 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants and Retail Trade (which includes catering and accommodation) and Transport and Communication. Construction has been a rapid growth sector in recent years, although growth in this sector slowed early in 2008 due to rising interest rates and building costs, tightening credit standards by banks and a lagged reaction to the introduction of the National Credit Act of 2007. Manufacturing has declined as a share of the economy since 2000, but remains an important contributor. Manufacturing industries such as clothing and food are important employers of people with low and medium skills. Government services and the primary sectors have declined in importance in the City economy and are likely to continue to do so. 4.5.3 Economic trends in the transport sector The transport sector has a key role as an enabler for economic growth in other sectors, as well as an employer and a direct creator of economic activities. As an enabler, a strong transport sector allows people to get to work and enables them to travel further in search of better employment opportunities. The transport sector generated a contribution of R8.2 billion in 2007, 6.3% of the GDP of the City of Cape Town. The transport sector has shown declining growth since 2003, as shown in the figure below. 9 9% % GDP grow th 8 8% 7 7% 6 6% 5 5% 4 4% 3 3% 2 2% 1 1% - 0% 2000 2001 2002 2003 2004 2005 2006 2007 Source: Quantec data received from CoCT Strategic Information unit Figure 41: Trends in GDP generated by transport in the City of Cape Town since 2000 177 Transport Strategic Informants Rbillions GDP City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants There were 31 269 people formally employed in the Transport sector in 2006, 3.3% of the total 959 164 people formally employed in that year. Note that this excludes people employed in the informal taxi industry. 4.5.4 Economic strategy for the City The economic strategy for Cape Town recognises that financial services are likely to remain the backbone of the economy, and have an important role as a creator of high-end skilled jobs. The City must also support employment of semi-skilled and unskilled workers, particularly in tourism and manufacturing as well as through support to SMMEs. Creative industries (such as film, graphic design, advertising, performing arts etc) and green industries have been recognised as key new sub-sectors for support. The City has identified a number of strategic thrusts to support economic development. 4.5.4.1 Strategy 1: Improve good governance, service delivery, public and market confidence This is identified as critical in order to attract and retain business and investment and leverage growth to address poverty. Two transport related initiatives are identified as part of this strategic thrust: Transport pricing strategies: Investigate and develop incentives to support non-motorised transport and energy efficient public transport Transport vouchers: Investigate transport vouchers for the City‘s poor and carbon credit exchange and reflect in the City‘s fare policy and programmes. 4.5.4.2 Strategy 2: Invest in Cape Town Leverage infrastructure to maximise economic growth and development. Promote direct investment in the City through Wesgro and other partnerships, as well as Transport Strategic Informants create investment incentives. Interventions relevant to transport in this regard include: Port and airport as strategic economic infrastructure: Lobby for more local control and influence over this infrastructure. Port capacity expansion: Intensify lobbying of NPA and other stakeholders for support for the Marine Industries Strategy. 178 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Transport and other linkages to northern growth corridor and Atlantis: Investigate feasibility of transport and other linkages to Atlantis to provide expanded and efficient transport passenger services to the northern growth corridor to stimulate growth in Atlantis and the surrounding areas Energy efficiency: Promote low carbon investments and energy efficiency initiatives. While this does not refer directly to transport, increasing the proportion of passenger trips undertaken on public instead of private transport can have a significant impact on the energy efficiency of the City. 4.5.4.3 Strategy 3: Spatial analysis and planning, exploiting comparative and competitive advantages, area targeting Interventions are required to overcome historical patterns of spatial isolation and exclusion, as well as to improve degraded areas with high economic potential. Interventions relevant to transport in this regard include: Provide access to Phillipi: Investigate and fast track planning and construction of link off N2 and other access requirements to Phillipi and other areas to allow for development of Philippi into mixed use growth node. Ensure IRT phase 2 is extended to this area as soon as possible. 4.5.4.4 Strategy 4: SMME business development and support SMMEs in the City provide a substantial proportion of output and employment. Business support must be provided to support existing SMMEs and encourage the development of new SMMEs. Interventions relevant to transport in this regard include: 4.5.4.5 SMME support for mini-bus taxi operators through a Business Entity. Strategy 5: Destination Marketing Maintain Cape Town‘s status as a tourism node, but also create a reputation as a Interventions relevant to transport in this regard include: Cruise Liner strategy: Contribute to the regional Cruise Liner Strategy. Additional landing slots at Cape Town International Airport: Continue to engage with SAA, ACSA, Dept of transport to secure additional direct international flights from continental Europe to support tourism and business development. 179 Transport Strategic Informants good place to do business. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Implement City’s Public Transport Strategy initiatives: Through the IRT and other programmes, redesign and restructure the City landscape to service tourism sector and improve international appeal. 4.5.4.6 Strategy 6: Promote skills development Develop the skills base of Cape Town‘s residents in order to reduce poverty and unemployment by enhancing competitiveness, productivity and sector-based skills. There are no interventions relevant to transport in this regard. 4.5.5 Socio-Economic Determinant of Mode Choice The use and demand for public transport is to a large extent by captive riders. Figure 42 shows the percent usage of public transport by employed persons. It shows the high percentage use of public transport in the metro south east, particularly the lowest income areas of Khayelitsha, Gugulethu, Nyanga and the low/middle income area of Mitchells Plain and Blue Downs. The lowest % use of public transport is the Durbanville area. This area has high car ownership but also little incentive to use public transport with a lack of convenient access to rail, and few bus services. For instance, there are extremely limited bus services to the Cape Town CBD using the N1 as a direct, fast route. It is important to recognise the relation between the perceived demand for public transport services and the provision, and which comes first. A number of aspects will need to be in place for choice riders to use public transport, both as incentives through good public transport services, and restraint measures on the use of private transport. As the Integrated Transport Planning process is developed and evolves, these strategies will need to be refined and implemented. Transport Strategic Informants It is possibly significant that the high income southern suburbs, with income levels comparable to the Durbanville area, have the tendency for greater % use of public transport, possibly due to better access to the rail system, more extensive proximity to employment areas. The findings above are also clearly demonstrated in Figure 43 which shows the percentage use of private car by employed persons. 180 City of Cape Town – Integrated Transport Plan 2006 To 2011 Figure 42: Percent Employed Using Public Transport 181 Transport Strategic Informants Transport Strategic Informants City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Transport Strategic Informants Figure 43: Percent Employed Using Car 182 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.6 Public Consultation Engagement and consultation with interested parties is a critical step within the Integrated Transport Plan (ITP) revision process. In order to meet the objectives31 of the review process, stakeholders and the public must be given an opportunity to comment on the plan to ensure that their needs and concerns are reflected and/or adequately addressed in the revised document. Potential interested parties include all public (motorised) transport users, non-motorised transport users32, private vehicle users, interest groups, organisations and service providers (e. g. Pedal Power Association, Metered and Mini-bus Taxi Associations), authority departments (e. g. Provincial Government of the Western Cape: Safety and Security - Public Transport), as well as key stakeholders (e. g. Transnet, SANRAL, Cape Town Tourism). In order to meet the National Land Transport Transition Act‘s (No 22 of 2000) public participation requirement33 for review processes, an extensive public consultation process was undertaken that included letter distribution, newspaper advertisements, a public hearing, information desks and general engagement with interested parties and/or key stakeholders and organisations. This is discussed in more detail below. A number of comments and/or issues were raised as part of the in the first public consultation processes34 in 2007. A summary of the key issues raised by the public were themed into a table and used to inform the update of the ITP document. The comments made and issues raised are listed below in Table 48. Table 48: Public Comments on ITP and Transport in Cape Town THEME Road SUMMARY OF COMMENT OR ISSUE improvement/ Intersection of Marine Drive, Paarden Eiland and Table Bay Boulevard. upgrades Widen major routes for high occupancy vehicles. 31 Revise and update the goals for transport with changing transport needs, ensure that the ITP aligns with all relevant legislation, projects etc, includes the latest transport related initiatives, reflects current transport data and trends 32 skateboarders, cyclists, pedestrians 33 public participation of all Interested parties including, vulnerable and disadvantaged persons in transport planning must be promoted, taking into account that people must have the opportunity to develop the understanding, skills and capacity necessary to achieve equitable and effective participation 34 Undertaken by City of Cape Town in 2006 and again in 2008-2009 183 Transport Strategic Informants City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants THEME Safety SUMMARY OF COMMENT OR ISSUE and Accidents due to high truck speeds on Ou Kaapse Weg. Silvermine intersection dangerous. Need for pedestrian footpaths. Need traffic calming measures in beach car parks. More effective traffic law enforcement particularly for the security taxis. MetroRail safety- Metro security guards abusive. Government needs to play more of an active role to reduce current safety and security problems. Toll roads Particularly during off-peak times. Unsupportive of Chapmans Peak toll road and other toll road proposals. Non-motorised transport Pedestrians Request safer facilities/ infrastructure including additional bridges and subways. Cyclists Better design of pedestrian and car traffic lights. Zebra crossing to allow for pedestrian priority. Request safe cycling paths into CBD and in general along Main roads as more economical means of transport. More protection for cyclists from motorcars- should be Transport Strategic Informants separated. Construction of cycle-paths along pedestrian walkways. Change unused pedestrian paths for use by cyclists. More access to cyclists of pedestrian paths. Construct cycle-paths along long arterial roads Replace white lines with gravel rows glued to the road surface to formalise barrier between cyclists and motorists. General Consider skateboarders and rollerbladers as form nonmotorised transport. Audit sidewalks reconsideration. 184 previously prohibited for NMT for City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants THEME SUMMARY OF COMMENT OR ISSUE Use of Table Mountain National Park for NMT especially cyclists. Use of floodplain for cyclists. Provide NMT along the Black River. Closed roads during peak hours should be considered for NMT. Heavy vehicles Restrict size of HGVs or limit time of travelling during the day along Ou Kaapse Weg. Information in/ content of the ITP Toll roads No mention in ITP of Toll roads and elaboration required re commitments. General Identified errors/ corrections in the ITP re roles and responsibilities. Goals require measurement criteria/ measurable targets. Suggestions regarding omissions of information. No mention of SANRAL where required. Omission of certain projects currently underway. More investigation into the safety and accessibility aspects. Suggested Statistics outdated and need to be updated. corrections Suggested changes to statements made re ACSA in the ITP. Include social, economic and environmental aspects in overall metropolitan development goals. Better integration of policies into the transport system/ policies. Incorporation of higher densities to promote more viable integrated land use patterns- tight urban edge needed. ITP must inform CoCT‘s SDF processes and vice versa. Must develop implementation approach for both infrastructure and service level improvements. Inclusion and consideration of the Land strategy. Clarity and resolution with regards to the institutional framework that underpins the restructuring of public transport. 185 Transport Strategic Informants Policy and Planning City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants THEME SUMMARY OF COMMENT OR ISSUE Legal clarity regarding who should manage public transport in the CMA. Recommendations for improvement to the transport system Establish a Transport Authority that is efficient and accountable. No negotiated contracts between monopolies in the industry- agreement must be reached re contracts and tenders. Phases and timing for the restructuring of the transport system must be set. Focus on areas that poorly serve passengers using public transport as well as infrastructure requiring improvements/ upgrades. Bus transport should link with other passenger transport services- high frequency express bus should be established including network of supporting feeder services. All government officials and relevant stakeholders should be advised on implementing the transport policy. Travel demand management must be investigated and defined in terms of the broader (national) economy. Urgently deal with the challenges wrt resolution of the operator business model. Prior to 2010 the public transport system must be successfully implemented. Public transport Accessibility Inaccessibility to public transport infrastructure. Limited/ no public transport available in key areas that rely heavily on public transport- particularly taxi and bus routes. Published timetables for more efficient public transport Transport Strategic Informants services required. Limited use for the disabled. Lack of link rail to suburban areas and other transport modes. Unreliability Public transport was considered to be unreliable as inefficient and infrequent. Taxi operations Feeder services must be scheduled and timetables published. 186 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants THEME SUMMARY OF COMMENT OR ISSUE Operators to be held accountable for reliability and quality of services rendered. Mini-bus taxi Feeder system must be integrated with transport system. Daily and consistent traffic law enforcement essential and industry needs to be regularised. Too many taxis are not roadworthy, unlicensed and operating unlawfully. Reckless driving of taxi operators. Taxi drivers bad attitude towards the passengers. Speeding taxis and lack of alternative public transport modes in Belhar Estate. Buses Uncomfortable and unsafe. Buses not adequately maintained and were old. Must be less polluting, user friendly with adjustable platforms and adequate space for wheelchairs and prams etc. Publication of schedules/ timetables. Increase operating hours with adequate security. Re-configuration of local bus network to ensure that feeds into rail and mini-bus modes. Reliable, fast and frequent bus service should be developed. Equal opportunities to tender for subsidized public transport contracts. Hygiene- buses need to be cleaned. The toilets servicing Rail Additional buses should be made available to public users. Upgrades needed. Overcrowding and trains in disrepair a concern. Development and improvement of existing rail routes required. Urgent need for modern rolling stock and signalling. Trains to be more energy-efficient, comfortable and smoothly operating. Request express line. 187 Transport Strategic Informants the bus users also require upgrading. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants THEME SUMMARY OF COMMENT OR ISSUE Vast improvement of lines to other communities e. g. Malmesbury. Increase operating hours and safety. Improvement and where required, development of intermodal network including the electrification of rail and completion of un-used rail lines. Airports Trains were unhygienic. Limited influence that ACSA has on travel demand management due to restrictive legislation, geography and ‗natural‘ economic demand. General More integration of ITP with City and PGWC public transport initiatives. Park and ride systems required for motorists. Need investment in transport infrastructure and services as well as transport interchange facilities. A comprehensive high quality passenger transport network should be developed thus providing real alternatives for private motor users. New and developing areas should be serviced with different types of public modes of transport. Passenger services must be effectively communicated, promoted and marketed. Integrated (single) ticketing, real time information and a simpler fare structure must be introduced. Recommend changes to the City of Cape Town ‘s passenger transport network. Concerns re tenders and contracts and joint ventures with GABS as a service provider. Dissatisfied with the public transport system in generalinadequate systems available. Transport Strategic Informants Government should proactively improve the quality and frequency of services- including safety and security issues. Public transport was overcrowded. More information on public transport (times etc) should be made available for tourists. Double-paying for trips due to being transferred to more direct routes unacceptable. 188 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants THEME SUMMARY OF COMMENT OR ISSUE Government should regularly inform the public on what was being done to improve the current transport problemsbetter communication. Supporting Transport Public Require street names on corners. More, larger bus shelters (bad weather). Long queues resulting long waits- negative travelling experience. Lack of actual road space to accommodate public transport resulting in congestion and longer travelling times. Need additional lanes. Need sidewalks. Transport Strategic Informants Infrastructure 189 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants 4.7 Strategic Environmental Informants 4.7.1 Introduction One of the strategic informants to the development of an integrated transportation plan is the environmental opportunities and constraints related to the suite of transportation development options. The previous version of the ITP did not explicitly include environmental informants. The strategic environmental informants presented here are a summary of a more detailed document which investigated the strategic environmental informants to transportation planning in the context of the City of Cape Town. This study provides a framework guideline with regards to the broader environmental issues which should be incorporated in the decision-making stages with regards to broad transport infrastructure plans. The methodology utilised to carry out this study incorporates four distinct steps, namely; a review of existing strategic city plans/programmes, scoping of impacts, environmental evaluation of the transport register contained in the 2006 – 2011 ITP, and the compilation of a monitoring plan. 4.7.2 Alignment with Existing Strategic City Plans / Programmes The ITP‘s transport developmental objectives were reviewed and compared to the strategic objectives of the City‘s relevant environmental policies, plans and programmes. These included the Integrated Metropolitan Environmental Policy (2003 and 2008), the Metropolitan Spatial Development Framework (2001), the Integrated Development Plan (2007), the State of the Environment Report (2003) the Transport Strategic Informants State of Energy Report (2007), and the Energy and Climate Change Strategy (2007). The details of the comparison are contained in the full Environmental Evaluation report, in tabular format. It must be noted that, in most cases, the objectives of the various environmentally related policies, plans and programmes tend to align with one another and the ITP 190 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants objectives. There are no identified objectives which are counter to one another. Scoping of Potential Impacts The potential environmental impacts that apply broadly to the range of potential transportation solutions under consideration in the transport register have been divided into two categories, namely biophysical and socio-economic impacts. The baseline conditions within these two categories are highlighted in the table below. Table. 49: Baseline biophysical impacts Impact Baseline Levels BIOPHYSICAL IMPACTS Air quality Air pollutants impact on human health, and result in smog and acid rain. Transport sector pollutants (tons/year): Biodiversity CO = 200 000 SO2 = 8 100 NOx = 26 000 VOC = 47 000 PM10 = 5 800 PM2 5 = 3 500 Development of new transport infrastructure and continued/increasing air pollution impacts on the biodiversity of the City of Cape Town , which is considered to be a biodiversity hotspot. Currently 8 of the local vegetation types are critically endangered, while 10 faunal species are endangered and 4 are on the red data species list. Climate The transport sector generates 4.8 million tons of CO2 equivalent Change emissions per year. Climate changes will induce new weather and sea level extremes, requiring frequent/proactive operational responses. Landscape It is estimated that the road network constitutes some 5% (i.e. 125 km2) of the total land surface of the city (excluding road Storm Road surfaces allow for pollutant accumulation during dry periods, and Water provide a run-off pathway during wet periods. Storm water quality from Quality road surfaces typically exceeds many of the wastewater discharge limits to surface water resources (including COD, EC, Cu, Fe, Mn, Pb, Zn). 191 Transport Strategic Informants servitudes). City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Impact Baseline Levels SOCIO-ECONOMIC IMPACTS Access Currently, the number of vehicles per household in the City is 0.68. Motor vehicle ownership is some 178 people in a 1000. In this environment, access to public transport which is affordable and reliable becomes critical. With respect to the mobility impaired, Dial-a-Ride provides a transportation service to those with sight and physical disabilities. The service currently operates 17 vehicles and provides a service to some 50 400 people in need. Equity Poor communities typically live far away from the city centre, a source of employment. Reliability of the transport services as well as safety and security are significant concerns for commuters, who need to travel large distances. Heritage Heritage issues are considered to be paramount, and a draft Cultural Heritage Strategy has been developed for the City. Heritage impacts must however be covered at an individual project specific level when required. Noise Levels should not exceed 65dBA and comply with SANS10103 standard Safety & Accident costs per year in the City of Cape Town exceed R1.9 billion. Security On the other hand, 49% of rail passengers are reported to be dissatisfied with the level of service provided, mainly related to overcrowding and safety issues. The above table provides an overview of the transport-related biophysical and socioeconomic impacts considered from a strategic level. A detailed, project specific assessment of the potential impacts related to each specific project would have to be undertaken prior to implementation, as is required by the EIA Regulations of the Transport Strategic Informants National Environmental Management Act (107 of 1998). 4.7.3 Environmental Evaluation of the Transport Register The approach taken to the environmental evaluation of the various aspects of the transport register is described below, followed by the results of the evaluation: 192 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants The transport register categories are split into two types, the first is characterised as transport vehicles and infrastructure (includes public/private/freight transport and transport infrastructure), while the second includes operational and management processes of the transport register (all other register aspects). The transport vehicles / infrastructure type is evaluated according to the scale of the biophysical impacts of the various components of that particular register aspect, which is defined as either high (represented by the colour red), medium (represented by the colour yellow), low (represented by the colour green). For the purposes of this evaluation, a high scale impact is considered likely to cause a severe change to the processes in the environment and could extend beyond the boundaries of the City of Cape Town. A medium scale impact is likely to have a notable impact on the environment and the associated processes. A low scale impact as defined for this study is likely to alter environmental functions and process slightly, and is likely to be limited to the immediate environment of the City of Cape Town. The ―operational and management processes‖ type are evaluated based on whether they have a positive (+), negative (-) or neutral (N) effect on both the biophysical and the socio-economic impacts highlighted in this report. The scale of the various impact categories for the different modes of transport is presented in the table below: Table 50: Impacts Comparison for Various Transport Modes Private (Petrol) Air Quality High Biodiversity Climate Landscape SW Change Run-off Medium High Medium High Private (Diesel) High Medium Medium Medium High Medium Bus Medium Medium Medium Medium Medium Medium Rail NA Low Medium Low Low Low Minibus (Petrol) High Medium Medium Medium Medium Medium Minibus (Diesel) Medium Medium Medium Medium Medium Medium Boats Medium Medium Medium Medium High Medium Planes Medium Low Medium Low High Medium 193 Overall Rating High Transport Strategic Informants Mode City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Table 50 above compares the biophysical impacts of various motorized transport modes from a strategic environmental perspective. The focus of these comparisons is firstly with regards to private versus public transport, and secondly with regards to various public transport types. The former comparison reveals that reduced private vehicle usage would reduce vehicle numbers on the road, and may thus necessitate less road infrastructure extensions or upgrades to accommodate greater traffic volumes (and the consequent encroachment on surrounding landscape and the associated biodiversity impacts). However, the development of dedicated public transport lanes may require extensions to road infrastructure if existing lanes are not utilized. The selection of public transport over private transport is likely to reduce storm water contamination and result in a lesser impact on climate change and air quality (except in the case of particulates and SO2 emissions) provided that sufficient controls are in place to monitor the emissions of public transport vehicles and to encourage that the requisite vehicle maintenance be undertaken. Comparing the different public transport modes, rail transport evidently provides the lowest impacts except in the case of climate change exhibiting the second highest public transport mode greenhouse gas emission factor. However, rail for commuter transportation in the City requires the use of electricity which is largely generated outside the city bounds and the impacts of this activity are thus largely deferred to other communities, typically located on the Highveld of South Africa. The promotion of efficient diesel minibus taxis is important to ensure impacts from this transport mode are reduced. Both buses and minibus taxis need to be properly controlled to ensure effective maintenance. The possible management options which exist to reduce air quality emissions, incorporate the promotion of catalytic converters in vehicles (in the case of petrol vehicles), greater vehicle exhaust testing, as well as stricter limits on sulphur levels in produced fuels (in the case of diesel vehicles). From a biodiversity and landscape Transport Strategic Informants impact basis the possible management options include control of private vehicle usage, as well as using existing road lanes for dedicated bus lanes, rather than the construction of new infrastructure. In terms of climate change, greater vehicle combustion efficiency testing serves as a possible management scenario. With respect to the transportation of freight goods, an environmental evaluation of the potential impact on the biophysical environment is presented in the table below: 194 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Table 51: Impacts Comparison for Various Freight Transport Modes Mode Air Biodiversity Quality Rail Climate Landscape Change SW Overall Run-off Rating Medium Low Medium Low Low Low Truck (Petrol) High Low Medium Medium Medium Medium Truck (Diesel) Medium Low Medium Medium Medium Medium Table 51 above compares the biophysical impacts of various freight transport modes. The comparison reveals that reduced petrol truck usage would reduce CO and NOx emissions; however diesel trucks would generate greater particulate and SO2 emissions. Consequently, from a strategic environmental evaluation perspective, rail freight is likely to offer a lower significance for all impacts evaluated except climate change. This is due to rail freight reliance on electricity which is a significant contributor to global climate change in South Africa, due to the majority of the power generated being derived from the combustion of coal. The possible management options which exist to reduce air quality emissions from the transportation sector incorporate the promotion of catalytic converters in vehicles (in the case of petrol vehicles), greater vehicle exhaust testing, stricter limits on sulphur levels in produced fuels (in the case of diesel vehicles), and gradual replacement of older less efficient locomotives with newer models. The significance of the environmental impacts related to different types of transport Transport Strategic Informants infrastructure is shown below: 195 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Table 52: Impact Comparison for Various Transport Infrastructures Mode Air Biodiversity Quality Climate Landscape Change SW Overall Run-off Rating Road Network High High High High High High Freight Network High High High High High High Rail Network Medium Medium Medium Medium Low Medium Harbours and Low Medium Low Medium High Medium Medium Low Medium Low High Medium Low Low Low Low Low Low Low Low Low Low Low Low Horse Trails Low Low Low Low Low Low Parking Low Low Low Low Medium Low Low Medium Low Low Medium Medium Low Low Low Low Medium Low HGV Routes Boat Launching Facilities Airports and Landing Strips Pedestrian Pathways / Sidewalks Bicycle Pathways / Parking Facilities Facilities Public Transport Interchanges On-Street Bus Stops / Shelters Transport Strategic Informants As is indicated in Table 53 above the road network is likely to result in the most significant environmental impacts, which is heavily influenced by the vehicular emissions. The possible management options which exist to reduce vehicle emissions incorporate reducing new road and extensions emissions footprint, reducing road friction factor, and road freight management and control through testing and weighing of freight trucks. Management options for airports to reduce emissions include controls on fuel requirements and monitoring of climatic interferences with respect to landing. From a biodiversity and landscape impact 196 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants perspective, the possible management options include careful placement of new roads to minimise impact on sensitive biodiversity and landscapes, ensuring HGV permit compliance and sufficient city disaster management personnel/resources, careful placement of boating facilities away from fish nurseries, and multiple storey parkades instead of single storey facilities. In terms of storm water quality management, removal of contaminants through the use of swales, sedimentation vessels, litter screens, etc are possible management options. Possible noise management strategies incorporate the construction of sound barriers (berms and sound-absorbent walls) in areas that are particularly noise sensitive. A possible management option in terms of sea storm surges and extreme rainfall events is the establishment of evacuation routes, and the use of contra-flow operations may become common place. This could be done through the following: More accurate and timely weather prediction and communication of storm warning in real time to those potentially threatened localities (to assist with present and short-term preparation for weather and climate conditions). Decisions about rehabilitating, retrofitting and new infrastructure and assets should be based on ensuring performance of assets with long service lives for many decades and thus should take longer-term climate projections into account. Monitoring performance and use of technology or new organisational arrangements will cut across timeframes and will offer ways to adapt in their own right and thus better incorporate climate change in transport decision making. The following table highlights whether the various operational and management process aspects of the transport register have positive (+), negative (-) or neutral (N) effect on both the biophysical and the socio-economic impacts highlighted in this Transport Strategic Informants report. 197 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Table 53: Impacts comparison of operational and management process aspects of the transport register Aspect Air Biodiversity Quality Climate Landscape Change SW Run- Access Equity Heritage Noise off Safety & Security Road Network Operations Area Traffic Control + + + + N N N N N + Intelligent Transport Systems + + + + N N N N N + CCTV N N N N + N N N N + Parking N N N N N + N N N + Traffic Flow Monitoring + + + N + N N N N + Violations Monitoring N N N N N N + N N + Traffic Accidents N N N N N N N N N + Traffic Law Enforcement + N + N + + + N + + 198 Non-motorised Transport Pedestrians + + + N + + + N + N Bicycles + + + N + + + N + N Horse Trails + N + - + + + N + N Travel Demand Management (TDM) Mode Incentives/Disincentives + N + + + - + N N N User Education/Awareness + N + N + + + N N + Land Use Interventions + + + + + + + + N N Strategies/Management Prog. + + + + + + + + + + Parking Management N N N N + + N N N + : positive effect on impact category -: negative effect on impact category N: no effect on impact City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants It is evident from Table 53 above that the road network operations in general have positive or no effect on the potential traffic and transport related impacts. Area Traffic Control and other Intelligent Transport Systems have a positive effect on all of the biophysical impacts except storm water run-off, since they reduce inefficient driving in traffic scenarios and minimise stops at intersections. They also have a positive effect on safety and security since it ensures smoother traffic flow. CCTV camera monitoring has a positive effect on storm water run-off (ability to identify HGV spillages) and safety and security monitoring. Traffic flow monitoring has a positive effect on air quality and climate change (improved driving efficiency), storm water run-off (improved driving efficiency) and safety and security. Violations monitoring improves equity and safety and security since this ensures greater compliance with regulations in an equitable manner, while traffic law enforcement has a positive effect on all impact categories (except biodiversity, landscape and heritage), since this operation ensures efficient and effective usage of transport systems. Non-motorised transport is likely to have a positive or neutral effect on all of the impact categories aside from landscape impacts since the implementation and incorporation into the transport system is likely to require extensive an amount of land. Bicycle paths especially were not generally factored into road design in the past. The various travel demand management components of the transport register all have positive or no effects on the impact categories evaluated, aside from mode incentives/disincentives having a negative effect on accessibility, since these typically reduce private vehicle accessibility into the Central Business District (CBD). 4.7.4 Conclusion This section of the ITP aims to provide a strategic evaluation of the environmental and socio-economic aspects to be considered in the integrated transport plan. A number of documents have informed this study and outlined the focus areas to be considered. The climate change, landscape, and storm water. The range of socio-economic impacts that were considered include: accessibility, equitability, heritage, noise, and safety and security. The predominant air quality pollutant in terms of quantity generated is carbon monoxide, namely 200,000 tons/year. The air pollution guidelines exceedances were reported on 75 199 Transport Strategic Informants range of bio-physical impacts that have been considered include air quality, biodiversity, City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants of the 366 days of 2008 (mainly attributed to PM10 guideline being exceeded). The estimated contribution of the transport sector in generating smog is as high as 65% (with an uncertainty of ±30%). The City of Cape Town‘s integrated transportation plan has the ability to have a significant influence over one of the key environmental impacts associated with transportation. Changing the mix of transportation modes in the City could have a significant impact on human health, pollution levels and the impact on Cape Town‘s biodiversity and heritage. The actual greenhouse gas contribution of the transport sector amounts to 4.8 million tons CO2e/year (approximately 30% of greenhouse gas emissions generated in the City of Cape Town). The City‘s transportation plan has the potential to affect the biodiversity in multiple ways. Firstly, the development of new routes and transportation corridors could result in the destruction of more of the last remnants of the above vegetation types. Furthermore, the continued or increased production of atmospheric pollutants would have a detrimental effect on the floral and faunal communities of this biodiversity hotspot. Road surfaces allow for the accumulation of pollutants during dry periods, and provide a pathway for the transportation of these pollutants into the environment via run-off during the wet periods. Storm water run-off from roads is thus a significant impact to be mitigated. The environmental evaluation has revealed that reduced private vehicle usage would reduce vehicle numbers on the road, and thus necessitate less road infrastructure extensions to accommodate greater traffic (and the consequent encroachment on the surrounding landscape and its associated biodiversity). Furthermore, the reduction of private vehicle usage would also have a significant impact on the acid rain and smog Transport Strategic Informants causing pollutants, as well as the greenhouse gas emissions from the transportation sector. However, the development of dedicated public transport lanes may require extensions to road infrastructure if existing lanes are not utilized. Public transport versus private transport offers reduced storm water contamination and lower impact on climate change and air quality (except in the case of particulates and SO 2 emissions) provided that sufficient controls are in place to monitor the maintenance of public transport vehicles. 200 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Strategic Informants Rail freight impacts are the lowest of the three assessed freight transport options for all parameters except in the case of NOx and CO emissions. Diesel trucks generate less greenhouse gases per ton-km than petrol trucks, due to their greater fuel efficiency. The different operational and management aspects of the transport register have different effects on the various impacts evaluated, and depending on their effect can be used as tools to mitigate certain impact types (eg: traffic law enforcement used to monitor safety Transport Strategic Informants and security, etc. ) 201 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment 5 TRANSPORT NEEDS ASSESSMENT The last two chapters presented a snapshot of the transport system and informants to be taken into account in preparing and implementing a transport plan for the City of Cape Town that better satisfies the City of Cape Town‘s vision for Transport: “To provide a world class sustainable transport system that moves all its people and goods effectively, efficiently, safely and affordably. ” In the context of the structure depicted in Figure 44, the following sections present a distillation of that perceived as necessary to move from the present to the desired Transport Needs Assessment situation. Figure 44: A depiction of the Integrated Transport Planning Process. 202 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment 5.1 Satisfying the Vision In assessing the transport needs of the City, the ―world class‖ concept provides the basis for benchmarking the transport system. Central to the achievement of a world-class transport system is the concept of Universal Design that ensures access and mobility for all, irrespective of physical or financial constraints. This concept must be carried further, to recognise that not only people, but the goods required to sustain those people must also be moved. However, the people and goods movements must be coordinated to minimise negative interference of the two movement systems, which have different needs. The minimisation of negative interference is important to such matters as efficiency and effectiveness, to environmental sustainability and of course, safety, heavy goods traffic and, for example, non-motorised transport modes not being compatible. In terms of world benchmarks, South Africa ranks very poorly in the world for road safety and it is clear that road safety remains a very serious and significant problem for both motorists and pedestrians. Improved safety and security are cross cutting matters that take into account spatial and network planning, engineering design, law enforcement and education amongst other things. Environmental sustainability ultimately requires that the impacts of the transport system are at an absolute minimum and are such that the negative effects can be countered. Minimisation of negative impacts relies on the one hand on technology, but on the other with the effective and efficient use of the transport system. This implies using the best modes of transport and minimising wasteful travelling though circuitous routes and or congestion problems. The transportation system can only achieve optimal effectiveness and efficiency if the solution is fully integrated. This entails integration of all modes of transport, all elements of operations and all aspects of planning and implementation. It thus includes integrated planning to achieve the City goals across all multi-disciplinary areas and the effective implementation of cohesive policies (within and across disciplines) 5.2 Transport Network (Supply) The City has a well developed transport network, rail and road. Much of this network was however established at a time when the Central Business District of Cape Town was an almost exclusive focal point within the City, resulting in a radially oriented network. Over the years however, the City structure has changed so that the activity base is more 203 Transport Needs Assessment aimed at achieving the City Vision. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment broadly spread but this has not been matched by the development of a more grid like transport network structure as would be appropriate for the facilitation of diverse travel patterns. In particular, rail and road linkages on the southeast-northwest alignment are lacking, focusing most travel on this axis onto a few key nodes in the network via northsouth or southeast-northwest alignments. This need applies equally to the rail and road networks and in both cases to the establishment of public transport routes on this axis. Overlaid on this, new industrial and commercial developments have given rise to the need for the movement of heavy goods vehicles and there are places where the linkages for freight are poor and in the case of abnormal or hazardous loads, extremely circuitous. An example is Capricorn Park near Muizenberg which is only accessibly to abnormal loads (on defined routes) from Cape Town Harbour or Paarden Eiland via the M14 in Table View. The identified need in respect of the transport network is thus the establishment of key links, especially on the rail network, and the implementation of road developments and upgrades that will lead to improved movement, particularly on the southeast-northwest alignment 5.3 Transport Network Utilisation (Demand) In spite of the diversification of travel patterns noted in Section 5.1, both the rail and road network utilisation patterns in Cape Town remain highly directional and relatively high temporal peaking. The directionality represents a considerable inefficiency, with half of the network operating at capacity and half at a small fraction of capacity. The peaking aspect also represents inefficiency although one that is eclipsed by the directionality issue. Both factors have the effect of requiring more infrastructures and, in the case of public transport rolling stock, than would be the case with reduced directionality and temporal peaking. The infrastructure required to accommodate the peaks is relatively poorly utilised in the off-peak (time and or direction) and a reduction in these peaks could Transport Needs Assessment significantly reduce capital and maintenance costs in the long run. The identified need is thus the promotion of more balanced travel patterns, especially in directional terms, but also in temporal terms. The former is best addressed through the promotion of land use diversity, whilst the latter is best addressed through travel demand management techniques, which may include incentives for adjustment of work hours. 204 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment 5.4 Transport Network Performance Many elements of both the rail and road networks in the City of Cape Town are observed to operate at capacity for several hours each working weekday. On the rail network, the capacity limitations relate primarily to inadequacy of rolling stock rather than network capacity although the issue of linkages raised in Section 5.2 are a factor. On the road network capacity constraints may be ascribed to the lack of both the appropriate southwest-northeast alignments and of public transport that is competitive with private transport. The identified needs are thus those presented in Sections 5.2 and 5.3 above. 5.5 Transport Network Safety Whilst the number of fatalities appears to be on a downward trend, the number of fatalities, serious and minor injuries and accidents in general remain completely unacceptable. Whilst some accidents may be attributable to mechanical failure, the majority of accidents are deemed to be the result of human error. Whilst modern vehicle technology is starting to play a role in accident prevention, the emphasis will have to remain, for many years to come, infrastructure design and law enforcement focused. The fact that over half of fatalities involve pedestrians implies that this is an area of key concern. With respect to transport network safety, the basic need is the reduction of accidents although the reduction of transport system crime may also be considered a safety issue. The reduction of accidents specifically, requires a number of parallel interventions, including improved law enforcement, which will also help to reduce transport system crime, an enhanced focus on transport system user education and a greatly enhanced programme of non-motorised facility improvements that will reduce the number of 5.6 Transport Network Planning Transport network planning is an ongoing process and is essentially the mechanism by means of which all other transport needs, as outlined in this chapter, are satisfied. Planning does however rely on up to date and accurate information, something that has not always been available in preparing this Integrated Transport Plan. Transport planning is also the initiation point for travel demand management measures. Such measures can, through the use of solution alternatives not based on an increase in 205 Transport Needs Assessment pedestrian fatalities. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment available infrastructure, result in improvements in overall system throughput and efficiency. The identified needs in respect of Transportation Network Planning are thus: The improvement of information acquisition, storage and dissemination mechanisms that will ensure that planning can proceed on the basis of being well informed and: The promotion of travel demand management strategies as a basis for limiting the expansion of infrastructure. 5.7 Network Operations Management One of the key mechanisms for maximising transport network efficiency, rail or road, is the operational management of the facility. Law enforcement, incident response, speed management, ramp metering, signal coordination and lane control can all play a very significant role in improving the safety and capacity of the road network, especially during periods of congestion. In rail terms, the specifics are slightly different, but operational management is actually even more critical owing the operating characteristics of trainsets. From the City‘s perspective, Road Network Operations Management is the focus. All the above mentioned factors play a role. That the City has an operational transport network is evidence of functional network operations management. It is recognised however, that growing demand calls for improved measures. The identified need of network operations management within the City are thus the expansion of the Operations Management team, especially with respect to law enforcement, but also in all other areas so that such tools as variable message signs and real-time traffic and incident management systems can be implemented. The expansion of the team would then need to be backed by the provision of the technology to improve Transport Needs Assessment network operations. 5.8 Public Transport Cape Town has a fragmented public transport system that includes rail, bus and minibus taxi services each operated under a different regime, with, in particular, the minibus industry operating in a manner that does not promote efficient and effective public transport, nor support significant improvements in the bus system. However, good public transport is central to the achievement of the City‘s vision for transport, being the cornerstone of achieving social equity, efficiency and sustainability in both operational and 206 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment environmental terms. The enactment of the NLTA brings the possibility of bringing at least all road based transport planning and management under one structure and thus the possibility of transforming the current commuter focused public transport system into a world class public transport system. The identified needs are thus that the City of Cape Town take overall control of its public transport system, including playing a greater role in rail service provision, and that it implements a programme that will see the transformation of the present situation into one where all current operators work to a common operational programme, providing city wide, scheduled services that make use of the most appropriate vehicles on designated routes that are affordable to all. 5.9 Freight Transport Presently, there is little regulation of freight movement within the city and large proportion of that freight moves by means of road, even that passing through the city between the hinterland and the port or airport. The movement of freight on City roads, whilst vital to the economy, poses a number of problems, amongst which are pavement damage and network capacity reduction at critical times. At the same time, road freight movement is often inhibited by the lack of available loading and offloading facilities, especially in business districts, and these delays deliveries at the same time as causing congestion on the roads. This lack of loading facilities is sometimes due to poor planning and often due to inadequate law enforcement in respect of existing facilities. The identified needs are in respect of freight transport are thus the development of a comprehensive freight transport policy for the City, and the improvement of law enforcement with respect to both overloading and illegal loading bay usage. Cape Town is a port city and its harbours, especially Cape Town Harbour, are of significant importance to the local economy. Cape Town Harbour, as the only major commercial port, is a freight hub and thus generates a considerable portion of the road freight in and around the City. Mainly, present congestion problems relating to freight at the Port are due to Port operations and not to the surrounding road network. However, the effects of the congestion as well as the general freight movement are felt and need to be addressed by the City. 207 Transport Needs Assessment 5.10 Harbours City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment The identified needs are firstly, the promotion of freight rail into and out of the harbour. Secondly, the development and implementation of an infrastructure plan that permits management of goods movement into and out of the port by means of dedicated links and container and vehicle holding areas external to the port. These transport needs are supplemented by the need to address stormwater run off into the harbour that brings with it pollutants and sediment that reduces the harbours effective depth. 5.11 Airports Cape Town International Airport, as the only major commercial airport in the City, is a key economic driver within the City. With a projected 10 million passenger movements for 2010, the airport is a significant traffic generator, but one with limited access. Whilst road infrastructure in the area is presently relatively good and internal infrastructure is being upgraded, the airport presently lacks any formal public transport system. Without public transport, access to the airport will deteriorate whilst also not making the most of tourism by promoting easy movement to and from the airport. The key identified needs relating to Cape Town International Airport are the maintenance of high quality road links between the airport and the surrounding major arterials and the establishment of a formal road base public transport system that links the airport with all major surrounding destinations, which include the CBD, Bellville, Claremont, Somerset West and Stellenbosch, albeit that the latter is outside of the Municipality. 5.12 Non-Motorised Transport Cape Town has a significant carless population. This, the need for learners to get to and from school, and the fact that the City is subject to congestion and vehicle related pollution Transport Needs Assessment problems is reason enough to promote non-motorised transport. However, non-motorised transport users, especially children, are considerably more vulnerable than motorized transport users when in transport related accidents. NMT users are also, by the very nature of their mode, more exposed to the elements, which in Cape Town, can be a factor of note. The identified needs are thus the promotion of NMT through a range of measures. These measures need to include greater land use diversity, so that average travel distances can be reduced, and the provision of a comprehensive non-motorised transport network that 208 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment permits a wide range of travel without conflict with motorized traffic. The latter is particularly important in the vicinity of community schools, where Safe School programmes are required to protect walking a cycling children. The NMT network should seek to provide a degree of shelter from the elements and ready access to public transport in the event that the NMT mode becomes untenable due to weather or other conditions. 5.13 Transport Asset Management An important aspect of achieving an efficient and environmentally sustainable transport system is the minimisation of lifecycle costs, financial, environmental and social, of infrastructure. The minimisation of such costs depends on appropriate maintenance and replacement programmes. The City of Cape Town already has an asset management programme that is as effective as it can be within the budgetary constraints. These constraints do however result in what is sometimes less than ideal asset maintenance. The identified need is the allocation of sufficient resources to the maintenance and management of existing infrastructure so as to minimise the overall life cycle cost. 5.14 Marketing and Communication Optimal use of the transport system can only be achieved through the possession of good information. The average network user has no direct access to information regarding road conditions, accidents, congestion, parking availability and so on. The result is that the choices made are based on average experience rather than current data and this tends to increase overall costs, as system users make less than optimal choices. This, combined with the need to promote alternative modes to the private car is key reasons for ensuring The identified needs are the establishment of a comprehensive transport information service that makes use of a range of media, including live radio and internet information services to keep the public informed of all aspects of transport operations. This information should include information about traffic levels on main roads, public transport timetable adherence, parking availability and so on. Concurrent with this information service is the need for a marketing programme that promotes the City‘s vision for transport, promoting NMT and Public transport usage, recommending alternative travel times and routes and improved driving habits that will reduce accidents and pollution. 209 Transport Needs Assessment that the City maintains a vigorous marketing and communications programme. City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment 5.15 Institutional Structures and Inter-Governmental Co-Operation Achievement of any of the goals in this Integrated Transport Plan requires the appropriate institutional structures and good inter-governmental cooperation. In the recent past, there have been a number of transport related projects that have seen less than ideal intergovernmental cooperation, with the result being duplication of effort on particular programmes. That and the limited ability of the City to influence rail operations within the City indicate that there is still room for improvement. The identified needs take two forms, both to a degree, influenced by the implementation of the NLTA, which is expected to result in devolution of a number of transport functions to the City from the Provincial Government in the near future. The one relates to internal structures, where the capacity within the City to achieve its goals is limited by the availability of appropriate and or adequate human resources and sometimes unclear lines of communication. The need is thus the clarification of the institutional structures required to meet the goals and objectives of the ITP and then the appointment of resources to those structures to ensure implementation. The other relates to the need to promote intergovernmental relationships such that wasteful effort and expenditure are avoided and the most is made of the skills and powers of each sphere, rather than that there is competition between spheres, as perceived by the public. 5.16 Current financial arrangements Funding is a critical aspect of transport system development, maintenance and management. There is a perennial lack of funds to achieve all the goals and objective, given that transport must compete with health, education, housing and other important social objectives for a limited pool of funds. Transport Needs Assessment The identified need is the development of an improved approach to attracting private investment funding in transport infrastructure through various mechanisms. Recognising that the transport system is public property, nevertheless, an innovative approach to creating precincts in which more is made of certain aspects of transport, especially in regard to public transport, needs to be investigated. 210 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment 5.17 Legislative Changes In support of the foregoing the recent introduction of the NLTA requires the City to undertake as follows: As the Planning authority, prepare transport policy and plans for the area of jurisdiction of the municipality. Financial planning with a focus on rehabilitation and maintenance of infrastructure. Planning, implementation and management of modally integrated public transport networks. Service level planning for passenger rail on a corridor network basis withPRASA. Establishment and management of integrated ticketing systems, where appropriate. In the case of gross cost contracts for subsidised systems, determining fare structures. Concluding subsidised service contracts, commercial service contracts and negotiated contracts with operators. Providing for the needs of special categories of passengers in planning and providing public transport infrastructure, facilities and services meet their needs, in so far as possible by the system provided for by mainstream public transport Emphasis is placed on the concept of a ‗Planning Authority‘ with this responsibility specifically allocated to local government. Every municipality which is establishing an integrated public transport network or has significant rail services within its area must establish an inter-modal planning committee with membership of rail operators and other public transport operators, inter alia. The following represent a high-level summary of the transport needs of the City: Comprehensive and integrated public transport. Integrated and effective planning, implementation and monitoring of transportation through appropriate Key Performance Indicators. Development of transportation and land-use policies to encourage a desirable and sustainable environment for all communities. 211 Transport Needs Assessment 5.18 A Summary of overarching needs for the transport system City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment Promotion of education and development of skills, resources and manpower. Promotion of appropriate enforcement of all transportation policy, regulation and legislation. Encouragement of investment and development contributions in the most appropriate forms of transportation services and infrastructure. Application of Universal Design principles to all planning and implementation Transport Needs Assessment projects 212 City of Cape Town – Integrated Transport Plan 2006 To 2011 Transport Needs Assessment Transport Needs Assessment 213 City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport 6 STRATEGIES FOR INTEGRATED TRANSPORT A central tenet of this ITP is integration, in the context of the City‘s vision for Transport. That vision foresees a world class transport system in a City that promotes shared growth and economic development with effective and equitable service delivery. The City has thus developed a set of overarching transportation strategies that are to be seen in their broader context of improving the overall quality of life of all the people of Cape Town. This quality of life goal aims at ensuring access to health, education and social services, to employment and social interaction opportunities and to a healthy environment in which the transport system is not a safety hazard. The strategies thus promote the concept of integration where the primary interventions tend to be crosscutting, satisfying several or all the strategies simultaneously. This is considered important as it ensures that projects supporting any strategy or mitigating measure will provide advantage in more than one way. A summary of the strategies and major interventions is shown in Table 54. In this table, the vertical list of Strategies arises from the City Vision while the interventions are those arising most prominently from the Needs Assessment, as described in Chapter 5. While Chapter 7 outlines the Sectoral Strategies, as is the requirement of legislation, this chapter outlines the benefits accruing from strategies aimed to address multidisciplinary goals. In effect, this chapter reinforces the need for cooperation within and across departments in the City in pursuit of the City‘s Vision. The following discussion, therefore, outlines the potential benefits from integrated planning and the joint pursuit of all-encompassing goals for the City, with the focus still remaining on transportation-related Strategies For Integrated Transport matters. 214 City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport Travel Demand Management Land Use Management Freight Transport Transport Safety Congestion Management Managing Metropolitan Growth Economic Growth Environmental Protection Non-Motorised transport Strategy \ Intervention Public Transport Table 54: Strategy – Intervention matrix demonstrating crosscutting effects 6.1 Transport Safety A fundamental and non-negotiable aspect of the transport system is that is must be safe for all users. It is imperative that the planning, design, implementation, management and operation of all transportation in the City must ensure that safety is treated as a priority. The primary objective is the reduction of transport related deaths and serious injuries with the associated trauma and cost to the community and economy. A secondary objective is the provision of a more secure transport environment that reduces crime on the transport system. Both safety and security must take account of all users, which includes special needs users as well as all facets of the transport system, including non-motorised and motorised, private and public transport modes. Safety and security must further encompass both the access to and use of the system. The reduction of deaths and injuries requires a multi-faceted strategy: 6.1.1 Design (Engineering) Accidents on the transport system occur because of insufficiently safe design, often population. The City‘s approach to this is twofold: a) Firstly, all new transport system design is subject to safety review prior to approval. This particularly requires the adequate geometric design and the appropriate setting of speed limits and management of access. It also requires the careful placing of appropriate signage to inform users on how to appropriately use the system, through the use of ITS for example. 215 Strategies For Integrated Transport relating to the improved performance of vehicles and increases in both traffic and City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport b) Secondly, where existing network elements are identified as being potentially unsafe or, more particularly, accident hotspots, these are prioritised for the implementation of interventions designed to improve safety. 6.1.2 Operations Although there are clear guidelines for the response of system users to certain conditions, such as for example, malfunctioning traffic signals, nevertheless, such malfunctions are often inappropriately handled by users. Operational safety is to be targeted through the establishment of targets for the repair of faulty control devices as well as programmes for user education relating safe use of the transport system. 6.1.3 Education A major cause of accidents on the transport system is inappropriate behaviour on the part of system users. This applies to all modes, with pedestrians crossing where they should not, drivers exceeding the speed limit and not adhering to other rules of the road and the use of unroadworthy vehicles or of vehicles by people not fully trained in their use. A key approach to dealing with this is education, at all levels, from kindergarten through to senior professionals, on and off the road, awareness of the rules and the safety implications of ignoring them. 6.1.4 Enforcement In parallel with education and operational management, a key approach to minimising accidents is vigorous enforcement of appropriate laws and regulation. Such enforcement needs to take account of infringements of the rules across the board, including the range of unsafe practices from jay-walking through to driving under the influence of alcohol. The implementation of improved law enforcement in respect of operations will also aid in addressing the matter of security through the visibility of law enforcement officers and Strategies For Integrated Transport equipment. 6.2 Congestion Management In support of strategies for metropolitan growth, economic growth and environmental protection, it is vital that the City has a strategy for Congestion Management. In essence, this means ensuring that the movement of people and goods is managed to achieve the objectives of the other strategies. Key to this strategy is the improved operation, reliability 216 City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport and utilisation of the transport system through improved coordination, integration and customer information services that will promote more sustainable travel through demand management. Central to the City‘s primary strategy for congestion management is the improvement of public transport in the City, which is supported by a number of parallel interventions and facilitates other transport priorities, such as event management. The city is considering congestion charges as a TDM tool as well as a revenue stream in the medium to long term in line with usage in many third world countries. 6.2.1 Public Transport As a primary intervention in managing congestion, public transport provides the opportunity to make significantly more efficient use of the transport network, by increasing the number of people moved per vehicle, thus freeing up road space for improved economic use. The City is thus focusing considerable attention on the upgrade of its public transport system. 6.2.2 Freight Transport Although the movement of people is central to the needs of a community, the movement of the goods that make that community viable is also critical. Ultimately, it is the movement of goods that ensures the food, clothing and shelter are available and also that people have the jobs necessary to purchase these commodities. Thus, management of freight movement is important to optimising transport network utilisation. The two aspects of this are: a) ensuring the appropriate transport mode and travel times are promoted and; b) ensuring that the transport network makes appropriate allowance for the movement of that freight through appropriate design and operational management. This operational management includes control of abnormal and hazardous loads in a manner that minimises both congestion and safety related aspects. In an appropriate spatial environment, many short trips can be made by means of nonmotorised transport. The main focus of such non-motorised transport will be in terms of community activities, such as school attendance, participation in local sporting activities and minor shopping activities as well as access to public transport for longer trips. An emphasis in congestion management is thus the improvement of non-motorised transport 217 Strategies For Integrated Transport 6.2.3 Non-motorised Transport City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport facilities that promote linkages between residential and other land uses in local communities as well as to public transport access points. 6.2.4 Promotion of land use diversity Fundamental to the all the above congestion management interventions is the development of appropriate land use diversity. The objective of such diversity is to encourage more local trips by providing employment opportunities close to residential opportunity on the one hand, and to increase the overall utilisation of the transport system on the other, by reducing trip directionality. This latter; leads to a reduced demand for transport infrastructure and public transport rolling stock, thus reducing congestion. 6.2.5 Travel Demand Management As an overarching approach to congestion management, general principles of travel demand management will be applied. These principles will be reinforced by revised parking policy as well as the promotion of land use diversity. These will be reinforced by the public transport system which will also have the impact of eliminating some road network capacity, travel lanes and parking, which will further promote the use of public transport. 6.3 Managing Metropolitan Growth The City of Cape Town experiences ongoing growth in its population, with the average being around 2,5% per annum. With the population standing at around the 3.5 million people mark, this means 87500 additional people each year. These people need access to the necessities of life and thus transportation. Given the objectives of maintaining an urban edge that protects our surrounding environment and promoting land use densification, whilst providing for this growth in the Metropole, a clear strategy is required Strategies For Integrated Transport for addressing the expanding needs of the community. 6.3.1 Public Transport Leading the approach to managing metropolitan growth is the improvement of public transport in the City as a mechanism to reducing the total amount of private car usage in spite of a growing population. The focus of this densification strategy is ensuring that; 218 City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport a) There is public transport available within reasonable walking distance of every place of employment or residence within the City. b) That there is adequate capacity and quality within this public transport system to accommodate the needs of all users including those with special needs. c) That priority is given to public transport over private transport to ensure consistent public transport trip times comparable with private transport travel times. 6.3.2 Travel Demand Management In support of the promotion of public transport, Metropolitan Growth will further be managed through improved travel demand management techniques. Key amongst these will be parking management in all new development through a revised parking policy for the City. 6.3.3 Land Use Management As a parallel to the implementation of public transport and the implementation of more stringent travel demand management measures, the City‘s Transport Department will work closely with the Planning Department to promote land use development that supports reduced travel and where travel is necessary, promotes public transport. 6.4 Support for Economic Growth and Development The growth in population, in combination with the undesirably high level of unemployment presently experienced in the City, dictates the need to ensure appropriate economic growth in the City. This growth needs to comprise a range of components, which will include commerce, industry and tourism. These require a combination of transport interventions. 6.4.1 Public Transport the promotion of public transport as a key means of travel for all. For the former, this provides an affordable mode (both rail and road) that does not induce economy restricting congestion. For the latter, the ability to travel by public transport reduces the number of vehicles on the road and the number of road users unfamiliar with the local network and road rules whilst attracting visitors who wish not to use private car and cannot afford personalised services. 219 Strategies For Integrated Transport Facilitation of access to employment as well as the movement of tourists is dependent on City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport 6.4.2 Freight Transport For the development of a vibrant economy, the movement of goods, which covers a wide range from heavy industrial goods, agricultural produce and food through clothing and office supplies to waste removal?It is critical to economic development that the transport system facilitates the quick and efficient movement of raw materials and finished products that result in the City being internationally competitive. This can only be achieved through a combination of interventions that: Ensure good linkages between industrial and related areas that facilitate goods movement along corridors designed to accommodate such traffic, promoting rail transport opportunities wherever possible. Within Cape Town, key areas include the harbour, the airport and all major industrial areas. Ensure access to goods loading areas, a matter of planning and law enforcement; Minimise congestion and; Regulate the access of certain classes of freight vehicle to key areas so that goods movement occurs in a manner that does not result in undue negative impacts for other network users through use of inappropriate vehicles or times of day for certain activities. 6.4.3 Non-motorised Transport As noted above, non-motorised transport plays a major role in access to public transport, and in an appropriate land use environment, also to education and employment opportunities. On the tourism front, the ability to use walking or cycling as part of the tourism experience is also important and must be facilitated by the provision of appropriate facilities, especially, in the latter case, as relating to places of interest to tourists. This strategy extends to the creation of employment through the promotion of such alternatives as pedicabs that are also beneficial environmentally as well as addressing congestion issues. The city is aware that pedicabs are not regulated in terms Strategies For Integrated Transport of the NLTTA/NLTA. The City could make by-laws to regulate them. 6.5 Environmental Protection The environmental impact of transport is significant, with transport representing a major contributor to air, noise, land, and water pollution. Key factors in worsening the air, noise 220 City of Cape Town – Integrated Transport Plan 2006 To 2011 Strategies For Integrated Transport and land use impacts are congestion and the use of vehicles that are inappropriate or in poor condition. Reduction of the negative impacts is to be addressed through: 6.5.1 Public Transport Central to reducing the environmental impact of transport is the provision and promotion of public transport. The City‘s integrated strategy targets the provision of such public transport, new vehicles for which will have environmental performance as a selection criterion. The promotion of public transport and the resultant reduction of private car use as well as the related congestion will have a positive impact on land use and air pollution in particular. 6.5.2 Non-motorised transport As with public transport, environmental protection will be enhanced through the promotion of non-motorised transport, which is linked to the promotion of diversity of land use development that limits trip distances. 6.5.3 Freight Transport Although it is necessary for economic growth to promote goods movement, it is important for the environment that goods movement is undertaken with vehicles that meet minimum standards in terms of pollutant generation. To this end, the City will act to enforce 221 Strategies For Integrated Transport regulations regarding excessive vehicle emissions. City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7 SECTORAL STRATEGIES The overarching strategies set out in Chapter 6 are fundamental to all facets of the integrated transport system of Cape Town and are the basis for evaluation of all projects and proposals. However, in support of these strategies, there are a number of sectoral, or mode related, strategies. These are set out in this chapter. 7.1 Public Transport Operations Strategy Public transport is vital to providing the opportunity for all citizens and visitors to access the full range of facilities that the City offers, whether for work, education, recreation, health, and social activities etc. It is particularly important for the poorer sections of the community, without access to private cars, in providing mobility through accessible, safe and affordable public transport. The City of Cape Town is thus committed to improving access and mobility for all its residents, goods and services by putting ―Public Transport, People and Quality of Life First‖. In achievement of this goal, the City seeks to transform the public transport system to ensure regular, integrated scheduled services operating throughout the day and much of the night. An improved public transport system is also a key tool in achieving the overarching strategies set out in Chapter [6], offering major advantages to the City by providing an alternative for car users thereby benefiting the environment, and reduced travel costs through easing congestion and lowering the costs of doing business in the City. A good public transport system also serves to promote the City for investment, for further growth in tourism, and for major events, such as the FIFA 2010 Soccer World Cup. 7.1.1 General Strategy: Improved public transport systems Sectoral Strategies The overall strategy for public transport is set out in a number of key policies: To give priority to public transport over private transport To direct investment in transport infrastructure, services and facilities to enhance social and economic development o To encourage investment and growth in sustainable mobility corridors o To focus on public transport to stimulate development on mobility corridors To provide public transport to meet the needs of all users, including those with special needs 222 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies To support the use of the most appropriate mode in terms of cost / service trade-off, with an emphasis regarding road-based public transport on the integrated rapid transit project, described in section 8.6, as follows: o To support investment in rail o To restructure the minibus-taxi industry into a unified formal public transport sector o To restructure the existing bus and minibus-taxi services operating in competition into a unified scheduled service utilising the optimum vehicle into line haul routes, distribution and feeder services. The DORA requires them to be transformed by 30 September 2009. o Transform the interim contract into tendered or negotiated contracts on a phased programme o To restructure the scheduled services to align with the Mobility Strategy and Corridor Strategy and based on the City‘s Rationalisation Plan o To develop tendered (or negotiated) contracts to provide enhanced quality of service in line with a public transport service charter, extended 18 hour day service on the primary accessibility routes, provision for Special Needs Passengers, strict monitoring of service quality and timetabling, etc o To introduce an integrated fare management system To ensure safety and security 7.1.2 Passenger Rail As a central element of the public transport system of the City, passenger rail services must be promoted and supported in all ways possible. Passenger rail is primarily the function of PRASA and out of the direct management control of the City. However the city is the planning authority and defines the controlling strategies for all public transport modes in support of the passenger rail programme. . The City’s Rail Strategy To actively engage with Metrorail / Intersite to facilitate coordination of planning of public transport for the City. To actively promote the use of rail as part of the City‘s public transport promotion campaign. 223 Sectoral Strategies 7.1.2.1 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies To ensure coordination, wherever possible, of road based and rail based public transport services, planning road-based services that support and supplement rather than compete with rail services. To facilitate non-motorised and motorised access to rail services, especially in the local context, so as to improve the customer experience of rail in terms of access to rail facilities. The short-term strategy is to bring the existing system on priority corridors to a good state of repair and good overall condition through fleet upgrading and service improvements aimed at: Retaining current ridership Regaining lost riders on priority corridors Attracting new riders in existing travel markets through a higher quality and more attractive service Priority rail corridors: focus investment on key corridors 7.1.2.2 In 2005/2006, the South African Rail Commuter Corporation (now PRASA) identified issues that were posing a serious threat to the future of the rail commuter service. The attempt to address to address these issues resulted in the identification of rail recovery strategies. The Priority Rail Corridor Strategy was selected from the identified strategies to address particular rail related operational challenges. High service specification on higher density corridors and lower priority on others Spread success to additional routes as and when rail proves itself Cost will be more than current cost however focused investment will yield value for Sectoral Strategies money 7.1.2.2.1 The Priority Rail Corridor strategy was chosen for the following reasons In an integrated public transport environment each mode must perform to its strengths The strengths of rail are most evident on higher density corridors / routes Effective, higher density corridors can be identified in each region 224 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies On these corridors, rail has the potential to play a much larger role As part of the strategy, there is an urgent need to: Accelerate the rolling stock refurbishment program Improve the condition of critical infrastructure systems Improve the level of service on priority corridors Reduce fare evasion Improve safety and security 7.1.2.2.2 The Current Corridors (Implementation Priorities) Category A Kraaifontein to Bellville to Cape Town corridor (via Thornton and Monte Vista) Simonstown to Cape Town corridor (including the Cape Flats line) Khayelitsha to Cape Town (including the Kapteinsklip line) Category B Strand to Bellville to Cape Town Bellville to Sarepta to Langa to Cape Town corridor (including the Pinelands link) Worcester to Wellington to Cape Town corridor Category C Muldersvlei to Eersterivier Corridor (via Stellenbosch) Malmesbury to Cape Town The Future Corridors (Planning priorities): Sectoral Strategies 7.1.2.2.3 Category A Blue Downs link Atlantis corridor and links Category B 225 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Philippi to Southfield link Cape Town International Airport link Category C Khayelitsha to Somerset West link The medium and long term strategies extend these investments to the other corridors in priority order and consider new and extensions to the rail system subject to full financial and economic evaluations. 7.1.2.2.4 Rail Interventions The following rail interventions are planned for the next five years New Railway Lines Airport Rail Link (to be implemented in the short to medium term in line with the national directive to link all International Airports to the CBD via rail) Blue Downs Link (planning to be prioritised in the next five years) Rail Studies for New Commuter Services on Existing Rail Corridors Kraaifontein to Fisantekraal / Klipheuwel (planning for an improved service with doubling and electrification on a C corridor) Cape Town to Du Noon / Atlantis (planning for a new commuter service on a freight line) Eerste Rivier to Strand Line Doubling (to address network deficiencies) New Rail Stations Sectoral Strategies Windermere Station – proposed name ―Century City Station‖ (to be commissioned within the next five years) North-East Corridor Railway stations (as per implementation priority to be determined) Bloekombos Station (implementation priority to be determined) 2010 Rail Projects 226 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Railway station Upgrades (Langa, Heideveld, Athlone, Cape Town Station) 7.1.3 Scheduled Bus Although rail is a central component of the public transport system of the City, road-based public transport remains the only available mode in all areas outside of the walkable catchment of the rail network. Central to this road-based public transport is the scheduled bus system, in all its forms, including conventional scheduled services as well as bus rapid transit and integrated rapid transit systems. The City‘s strategy for bus services is: To give priority to the ongoing planning and implementation of upgraded bus services in the City, ensuring both temporal and spatial coverage commensurate with the actual and realistic potential demand for public transport services. To promote high capacity bus services, such as the Integrated Rapid Transit services promoted by national government and as already being implemented in the City. To advance the coordination of all road-based services. To promote the use of bus services through the promotion of these as part of the City‘s public transport promotion campaign. 7.1.4 Minibus Taxi Minibus taxi services play a major role in public transport provision in South Africa and the industry has a significant role player in the economy. However, the vision for an integrated, effective and efficient public transport system requires a strategy of transformation for this industry. The City, in keeping with national and international trends thus seeks to implement the following strategy with respect to the minibus taxi industry: To promote the formalisation of the minibus taxi industry in such a manner that permits the current industry role players to take up an equal or greater role in a formal, scheduled public transport system of world-class standards. The NLTA will remove the requirement for minibus taxi associations and operators to be registered. The City could make by-laws to promote formalization, or request the Province to pass legislation in that regard. Alternatively other methods of formalization could be applied. 227 Sectoral Strategies City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies To engage with and support the minibus taxi industry in respect of the above, facilitating the transformation process and incorporation into formal public transport through the integrated rapid transit project described in section 8.6. To phase out minibus taxi ranks within the City, placing greater reliance on appropriate utilisation of integrated public transport interchanges. To phase out unstructured minibus taxi services, except where acting in coordination and cooperation with the formal public transport system. 7.1.5 Metered Taxi Owing to the diversity of demand for transport services, some demand simply cannot be met by conventional public transport. Such diversity includes personal preferences with respect to mode, temporal and spatial factors, and trip purpose. In order to accommodate those whose needs cannot be met by the conventional system, it is vital that the City has an active and vibrant metered taxi industry, supplementing the formal public transport system. This, it will be observed is the situation in all major cities where there is a strong formal public transport system and people become less reliant on private vehicles and as a result, tend to make considerably more use of the convenient metered taxi. In order to facilitate good quality and inexpensive metered taxi services that can be called by telephone or found at conveniently located ranks, the City embraces the following strategy: To set aside appropriate space for metered taxi facilities wherever these may be warranted in light of actual and potential demand. To promote metered taxis as a supplementary mode in the planning of public transport systems, facilitating their use where and when conventional services would not be appropriate. To promote the use of metered taxis as a mode of transport through the promotion of Sectoral Strategies these as part of the City‘s public transport promotion campaign. 7.1.6 Learner Transport Learner transport is presently a function of the Department of Education. This situation is under investigation and is expected to change in the foreseeable future. Education is a critical facet of the economic growth strategy of the City. Ensuring access to educational facilities is thus a key requirement of the public transport system. Whilst there are safety and security issues relating to the use by school pupils of the mainstream public transport 228 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies system, nevertheless, it is imperative that this system be adapted to accommodate scholars and students so as to promote access to education. In facilitation of this, the City is following the strategy below: To actively plan all public transport routes so as to ensure that all centres of learning, be they schools, colleges or universities are served by public transport. To actively plan public transport operations so as to facilitate system use by learners and students in accessing places of learning at appropriate times, if necessary, providing services geared especially to learners. To promote learner safety and security by implementing additional measures on roadbased public transport vehicles, such as closed circuit television. To promote learner safety and security by implementing training and education programmes and a public transport equivalent of the scholar patrol. To promote learner safety and security through the promotion of smart card technology, not only as a means of fare payment, but also as a means of ―keeping an eye‖ on learners, facilitating quicker response when problems do arise. 7.1.7 Long Distance Public Transport The promotion of a public transport oriented movement system has the implication of reducing car ownership and increasing dependency on public transport. Not all trips are urban trips and it is thus necessary that long distance public transport services be readily available to users, providing a wide range of opportunities. Such services, road and rail based, are already available and well supported throughout South Africa. It is incumbent on the City however, to ensure that these services are broadly promoted to which end the following strategy is adopted: To ensure integration of the Metropolitan public transport system with long distance services, both road and rail based through provision for long distance services at To ensure coordination of services such that long distance services are accessible via metropolitan public transport. To facilitate efficient long distance public transport, with respect to road-based services, by protecting preferred long distance routes within the City and giving access to dedicated bus ways for these services where this is feasible. 229 Sectoral Strategies appropriate modal interchanges. City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies To promote the use of long distance public transport as a mode of transport through the promotion of these as part of the City‘s public transport promotion campaign. 7.1.8 Tourist and Related Services Tourism is an important facet of the economy of Cape Town. From a transport perspective, central to promoting tourism is ensuring an appropriate public transport system. Such a public transport system will be of primary benefit to the citizens of Cape Town but it must also meet the expectations of visitors, necessitating a mix of services that include scheduled rail and bus, tour and charter services, metered taxis and private shuttle services and the proposed NPTR. . Achievement of such a mix of services requires a commitment by government and acceptance by operators of the principles of regulated competition. Other than in respect of safety and quality standards, there is little need to regulate market entry for most of the services that are provided specifically for tourists, as this competition is healthy. Some shuttle and other charter services (such as chauffeured services and limousines) may however need to be regulated in various ways to minimize any detrimental impacts on scheduled services and metered taxis. In using public transport as a tool for the promotion of tourism, the City will continue with the following strategy: Develop coordinated transport plans to support Tourism initiatives, through the establishment of a tourism and transport forum, comprising City, Provincial and tourism stakeholders. Such a committee should be responsible for operations and planning, but also regulate licences, manage vehicle safety and quality standards, training for guides. Sectoral Strategies Market and promote tourism through brochures, timetables, maps in multilanguage and web-based materials. Enhance the route guidance and orientation information on the roads and ensure coordination of information and consistency of policy. 230 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.1.9 Passengers with Special Needs It is considered a fundamental principle of all transport planning of the City that passengers with special needs be accommodated in the transport system. This gives rise to the adoption of the principle of Universal Access which is essentially cross-cutting, affecting non-motorised as well as motorised, private as well as public transport. As such, the matter is dealt with in a variety of paces within the City‘s Integrated Transport Plan. In respect of public transport however, the City is committed to the following strategy: The application of universal design principles to all new services and infrastructure through: o Ensuring that access to services and infrastructure can accommodate special needs users. This implies providing ramps, appropriate ablution facilities, audible information services and tactile information through walkway design as a standard component of the design and not an ―add-on‖. o Ensuring that public transport vehicles and facilities are designed to accommodate wheelchairs and assistance dogs and incorporate systems designed to assist special needs passengers. o Ensuring that the public is well informed and educated regarding the availability and use of these systems. o The training of all public transport staff in the provision of support and information to special needs users. The conversion of all existing facilities and services to accommodate special needs users, as described above, as these facilities are upgraded. 7.1.10 Monitoring Transport, including public transport is dynamic, with changes in demand levels and, on occasion, spatial demand, being the norm. In addition to the dynamics of demand, there are those of service quality, which is not necessarily maintained, due either to a lack of capacity or to external factors relating to infrastructure usage. It is the duty of the City to when and where necessary, modifying services and service quality in accordance with observed conditions. To this end, the City has the following strategy: Travel demand patterns are constantly monitored through various surveys. Potential demand is constantly monitored through two programmes: 231 Sectoral Strategies monitor the public transport system on a continuous basis, facilitating corrective action City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies o A close engagement between the transport planning department and that of the planning authorities responsible for monitoring land use development. o An ongoing programme of household surveys that monitors changes in public perceptions of what is required in terms of transport and public transport in particular. Facility utilisation is constantly monitored through on-site management teams. 7.1.11 Public Transport Safety In assessing the security of a public transport journey, passengers make their judgement on the basis that the route is only as safe as its most vulnerable part. This concept presents challenges to the operator or provider, who does not have control over some of these factors. Essentially, it involves working with the other agencies that do have responsibility for these things. It means securing commitment at the highest level, establishing a common agenda, and developing joint initiatives which will benefit both agencies and ultimately the passenger. The public transport safety strategy has three focus areas: Preventative Controls – This aspect of the public transport safety and security strategy acts as the first line of defence and cuts across both the controlled and uncontrolled environments. It requires an integrated institutional and organisational base, focused and shared information management and sound public transport safety and security physical design elements. Preventative strategies force compliance with prescribed or desired actions and therefore decrease the opportunity for aberrant events. A large number of undesirable events or factors that compromises public transport safety and security can Sectoral Strategies be blocked out through preventative interventions. Detective Control – Detection of problems within the public transport environment is the second line of defence. Detective abilities are devices, techniques and procedures designed to identify and expose undesirable events that evaded the preventative control measures of the public transport safety and security strategy. As indicated earlier some of 232 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies the same activities operative under the preventative control measures are also internalised by the detective control aspects of the strategy. Corrective Controls - The following elements comprise the corrective control: Overall Law Enforcement: this action takes place around the public transport facility and forms part of the general policing and enforcement strategy undertaken by the South African Police Services, the City Police and the Traffic Department. Public Transport Law enforcement – this action provides a safety and security blanket at public transport facilities through the provision of law enforcement programmes aimed at correcting specific ―high impact‖ incidents such as robbery, murder and assault. Emergency response – this action provides for the coordinated and focused response of multiple agency deployment in case of major incidences within the public transport environment. Post emergency response – this action provides for a ‗corrective plan of action‘ after the occurrence of major incidents within the public transport environment and requires the formation of a multi agency emergency response team to review techniques and procedures used in response to major emergencies. Lastly, where public transport safety and security design elements have failed to either prevent or detect the potential or actual occurrence of an incident, the same agency cooperation is required in undertaking ongoing safety and security audits of the physical design aspects of public transport facilities so to ensure that the flawed design elements are corrected. 7.2 Transport Infrastructure Strategy Transport Infrastructure is the fundamental component of the transport system and and roads, to cycle and walkways, with many associated facilities, such as rail stations, bus stops, and depots, even infrastructure maintenance yards. The bulk of this infrastructure is extremely costly and has a significant long-term impact on society and the environment. Once in place, this expensive infrastructure will have a long 233 Sectoral Strategies encompasses a very wide range of facilities from airports and harbours, through rail lines City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies and useful life if appropriately maintained, thus minimising the need for additional infrastructure. Given the impacts, financial, economic, social and environmental, it is critical that all new transport infrastructure is carefully considered and planned and that all existing transport infrastructure be suitably monitored and maintained. The strategy for transportation infrastructure design, monitoring, implementation and upgrading shall be the following: To improve safety on the road system; To optimise traffic flow on arterial and freeway networks ; To reduce congestion within and between nodes and activities; To co-ordinatetraffic/transit operations; To manage incidents, and reduce delays and adverse effects of incidents, weather, work zones, special events, emergencies and disaster situations; To effectively manage maintenance and construction work to minimise the impact on safety and congestion; To inform travellers with timely and accurate information; To improve the interfaces between modes of transport for passengers and freight; To eliminate bottlenecks due to inadequate geometrics; To provide reliable and convenient infrastructure for public transport services. The operations refocus is also consistent with the mission of developing Sustainable Transport, providing for the mobility needs of the customer while avoiding critical negative environmental impacts. 7.3 Travel Demand Management Strategy Amongst the approaches towards a more sustainable transportation system is Travel Demand Management (TDM). Travel Demand Management essentially seeks to modify Sectoral Strategies how people travel and goods are moved on the transport system so as to achieve the most effective and efficient use of the system through reduction in congestion and pollution whilst also facilitating access to transport for a broader community. Travel Demand Management is thus a cross-cutting theme of the Integrated Transport Plan, being a fundamental tool in the achievement of the City‘s vision for transport. 234 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies and the City as a draft Travel Demand Strategy that will eventually become a key tool in promoting all the Integrated Strategies of the City, promoting a diversity of sustainable travel modes and practices that will influence the choices made by commuters in order to reduce the overall number of trips, minimize travel time, and optimise travel cost – especially during the peak times. Three strategies will be required to encourage this approach:- : Introduce feasible and attractive alternative travel modes. Create an awareness of alternatives to private car use and change perceptions in the minds of the travelling public and that of business that car travel is not the only means of transport. This includes creating an awareness of the true cost of travel and the long-term sustainability of the system. Encourage land use activities, and a supporting legal and policy environment that promote alternatives to private car travel. Incrementally impose constraints on private vehicle usage. Achievement of the above conditions involves a mix of travel demand strategies such as those enumerated in Table 55. These strategies are categorised at three levels: local, intermediate and macro (city-wide) and influence both the physical environment and the social or cultural ethos of neighbourhoods or localities. Table 55: Summary of TDM measures TDMor Traffic Calming Strategies (Darwin Matrix) SCOPE OF Physical/Environmental Social/Cultural MEASURE („Technique‟) E („Ethos‟) C Local Local Environment Local Cultural Local Local Area Traffic Neighbourhood speed watch; Management or Residential Street Focused traffic law enforcement; neighbourhood) Management Speed and entry control Community action plans devices; Green streets‘ program; Attitudinal change communication) 235 (marketing & Sectoral Strategies (street City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies TDMor Traffic Calming Strategies (Darwin Matrix) SCOPE OF Physical/Environmental Social/Cultural MEASURE („Technique‟) E („Ethos‟) C Intermediate Intermediate Environmental Intermediate Cultural Intermediate Environmentally-adapted Voluntary behavior change: mode through roads; choice, speed (zone, precinct, Shared zones, corridor, lower-speed Traffic law enforcement zones; regional) Pedestrianised shopping Marketing & Communication precincts; Corridor projects (e. g. Klipfontein/ Koeberg Roads) Road pricing (precinct); Parking policies Macro Macro Environmental Macro Cultural Macro Travel Demand Management Cultural change; (TDM); (city-wide) Transportation System Loss of choice (e. g. energy Management constraints, (TSM) Significant drop in living standard); Total system measures (fares Population decline; police, City-wide road pricing) Futurology Manipulation or urban form Traffic law enforcement and structure Sectoral Strategies Parking policies Marketing and communication Toolbox of interventions The concept of TDM covers a broad range of tactical interventions and as part of the City‘s strategy, it is busy formulating a comprehensive TDM policy document to encourage 236 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies an integrated approach which builds on the opportunities arising from improved public transport. Such a policy document will include the following aspects: Rights of Way / Road Classification TDM (traffic calming) at three levels Parking Policy Operational Management Strategy Enforcement Strategy (speeds, parking, deliveries, HOV/PT lanes) Loading / Delivery Strategy Spatial Development Plan (integrated/densification) Public Transport Strategy Funding contributions strategy (funds, use, prioritization, implementation) Off-peak operations strategy 7.3.1 Parking Policy A Parking Policy is a vital component of an Integrated Transport Plan, and parking strategy, for the City of Cape Town. An appropriate and efficient parking strategy supports metropolitan and economic growth, protects the environment and supports to travel demand management. The objective is a pragmatic parking policy accepts that elements be periodically reviewed. The parking policy affects how and when people travel by car or other transport modes, reducing private vehicle trip-making and encouraging sustainable alternative means of travel. Hence, parking is an essential component in managing congestion. By using appropriate parking locations, together with visible and effective guidance signing vehicle emissions are reduced with an improvement in local air quality for pedestrians and inhabitants of the City. The Parking Policy combines various issues such as public transport, on and off-street management and encouragement of development at appropriate locations. The City‘s draft Integrated Zoning Scheme (IZS) 2009 supports a return to the Public Transport applied approach by addressing a number of other parking management issues. 237 Sectoral Strategies parking ratios and provision for deliveries using the parking as a vital tool in the City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Given that the perceived cost of parking is an effective deterrent to trip by private car. A sustainable road transport system relies on increased constraints on the use of private car mobility, and assumes quality of public transport service delivery which successfully absorbs future growth in travel demand. The policy anticipates a significant improvement in the metro passenger rail services that does the services revert to the 18 hours with headways not exceeding 60 minutes. A road based public transport services will similarly operate for 18 (then 24) hours with 30 to 60 minute maximum headways. At least 85% of residences and employment in the built area of the City of Cape Town within 400 m or 5 minute walking distance of public transport stop. Transport zones are designed to facilitate efficient operation of the various transport systems. Provision is made for controlled mixed-use development in certain transportation zones. All properties within the area of jurisdiction of the City of Cape Town are allocated a zone. The TR1 zone provides for all other transport undertakings which serve the public such as airports, harbours, railway lines, bus depots, taxi ranks, and cable car stations. The TR2 Zone provides for public streets and roads, as well as premises for the public parking of operable motor vehicles. On-site parking for a permitted activity in any zone is considered to be an associated use. The Overlay Zone is the mechanism to elevate specific policy guidelines to land use regulations. The Parking Policy identifies specific parking regimes each where parking is provided at a minimum ratio in accordance with the zoning scheme. These may be supplemented on the property for which the parking is required by public parking facilities available in the Sectoral Strategies vicinity. Parking for the Physically Disabled Parking that is capable of use by a physically disabled person in any parking facility serving the public, parking for physically disabled persons shall be provided. 238 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Loading Loading bays shall be provided in accordance with the following table titled ―Minimum OffStreet Loading Requirements‖. On-Street Parking The availability of on-street parking space is a limited resource and is linked to the road function. It is not desirable to eliminate all forms of on-street parking. Worldwide trends indicate that roadside parking can no longer be perceived by the public as a ‗free and exclusive right‘. On-street parking location is determined by traffic safety at pedestrian priority areas, crossings and intersections. The Parking Policy will address mechanisms for the development of Parking Zone Diagrams, establishment of parking zones within specific areas, on-street parking charges. This is exemplified in Table 56. Table 56: Parking implications for various zones. Development Environment Road Categories High Order Arterials(1) Freeway Distributors Expressway Primary(2) District(3) Local(4) Urban Intermediate Suburban Semi-Rural ZONE 1 ZONE 2 ZONE 3 Rural Source: RAG Within Zone 1, on-street parking not be permitted. In Zone 2 such on-street parallel parking can be provided Public and Private Parking Lots The distribution of these parking facilities is widespread and includes public parking lots within business activity centres, Park & Ride facilities at public transport interchanges. A number of parking lots have been established over time, often on undeveloped or underutilized land by the private sector as financial ventures. 239 Sectoral Strategies In Zone 3 on-street parking may be permitted City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Park & Ride (P&R) Facilities During the 1980‘s a number of P&R facilities were provided at rail stations throughout the Cape Town area. Each site is subject to more detailed evaluation, taking cognizance of the railway stations nodal development opportunity in the first instance. The transport linkages with attention given to pedestrian accessibility level, feeder public transport, bicycles, taxis (metered), Kiss & Ride and lastly P&R in priority order. The parking lot consumes land that could otherwise be developed. The policy provides for mechanisms to develop satellite parking locations through public engagement with users and private Sectoral Strategies sector developers. 240 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.4 Freight Logistics Strategy Key Performance Indicators: o Mode Split (as measure of tonne. kilometres) 7.4.1 The Importance of Freight Freight Logistics is important because freight movement is fundamental to almost all economic activity, be it agriculture, infrastructure development, energy production or general industry. It is thus incumbent upon the City to ensure that the movement of freight is facilitated to permit growth, development and thus job creation and the welfare of our people, as emphasised in the City‘s Integrated Development Plan (IDP). However, this very same freight movement can have significant negative impacts upon the City and society as a whole and it is thus necessary to ensure that the facilitation of freight movement is suitably directed so as to minimise the negative impacts. The National Land Transport Transition Act and subsequently, the National Land Transport Act have recognised some of the key issues (underlined) and Section 37 of the NLTA sets the following requirements for an Integrated Transport Plan Freight Strategy: Subject to requirements prescribed by the Minister under section 36(2), planning authorities must develop a freight transport strategy, with due regard to national and provincial policy, covering the transporting of goods to, from and through the area by road, taking into account— o the movement of goods to, from, and through the area by rail or pipeline; and o the movement of goods to and from ports or airports. The strategy contemplated in subsection (1) must identify routes for moving goods so as to promote their seamless movement and to avoid conflict with road traffic. The strategy must also include a plan for the movement of dangerous substances contemplated in section 2(1) of the Hazardous Substances Act, 1973 (Act No. 15 of 1973), by road along designated routes in accordance with the general strategy or plan provided for in the relevant Provincial Land Transport Framework. A person must not transport dangerous substances in the area of a planning authority except on a route so designated and indicated in an integrated transport plan, where such a route has been determined and published. 241 Sectoral Strategies City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Any person who contravenes or fails to comply with subsection (4) is guilty of an offence. By virtue of the deregulation of the road freight industry effected by the Transport Deregulation Act, 1988 (Act No. 80 of 1988), planning authorities must collaborate with the MEC and registering authorities contemplated in the National Road Traffic Act, to promote effective regulation of freight operations by means of the operator card system provided for in Chapter VI of the National Road Traffic Act, to prevent damage to the road system and to achieve the other objects of this Act. 7.4.2 Vision, Goals and KPIs In support of the visions for the City and for the City‘s transport, the vision for freight transport in Cape Town is: “Development of a safe and efficient freight transport system, that will ensure Cape Town as a world class City, building the economy by connecting markets, businesses and people in a sustainable and cost effective manner, while supporting and complementing the city’s mobility corridors and strategy. ” 7.4.3 Desirable Freight System Characteristics In facilitating the, movement of freight, and thus of economic activity of our City, it is seen as desirable that the following characteristics of the transport system, as relating to freight movement, be achieved: Strong transport linkages along main freight corridors Appropriate modal choice for various freight types Appropriate temporal use of network for freight versus passenger transport Minimum environmental impact through management of goods vehicle fleet Sectoral Strategies 7.4.4 Key Freight Centres within the Cape Town Metropolitan Area Freight centres within the Metropolitan area may be divided into heavy industrial and commercial freight centres. The commercial freight centres tend to be distributed in all the commercial activity nodes around the City and are thus widely dispersed and need to be catered for by means of the 242 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies general transport network. The key industrial freight centres within the Cape Town Metropolitan area are indicated in Figure 13, whilst the main rail and road links between these centres as well as the abnormal load routes are shown in Figure 14. Although there are many other areas of less intense industrial activity, main areas of current industrial significance include: Cape Town Harbour Cape Town International Airport Airport Industria Simon‘s Town Harbour (Naval yard) Sacks Circle Montague Gardens Epping Industria These centres require that more specific consideration Stikland Paarden Eiland Belcon Brackenfell Industria Blackheath Industrial Somerset West (N2) Phillipi be given to heavy goods movement, accessibility for large road vehicles and for rail and to access to regional and national routes that limit the movement of heavy goods within the commercial and residential areas of the City. There are other areas, zoned for industrial development, such as Capricorn Park in Muizenberg, the full development of which is yet to occur. 7.4.5 Freight Management The following are the main management aspects that the City is required to consider in achieving its vision for freight. 7.4.5.1 Freight Route Designation Whilst most elements of the road network can accommodate all standard freight vehicles, there are certain road network elements within the Cape Town Metropolitan Area that are unsuited to any heavy freight movement. Reasons for this include road widths and corner radii, road gradients, height clearances and load bearing capacity. Examples of roads of Church Street, Muizenberg: The railway bridge clearance is inadequate. Chapman‘s Peak Drive:Height limitations, road width and turning radii all play a role here. Whilst certain of these roads are marked, there remain cases of use by inappropriate vehicles of the routes with accidents or considerable inconvenience and sometimes quite extensive damage occurring. It is proposed that the City prepare and publish a map 243 Sectoral Strategies this nature are: City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies indicating route limitations through a colour coding scheme and that restricted roads be revisited for signage and other interventions, such as pavement colour, that will clearly identify restricted areas early enough to permit alternate routing. 7.4.5.2 Linkage of primary Industrial Areas and major Transport Facilities Most of the major industrial areas listed above are well served by the primary road network, most in fact being close to national roads. The problems associated with linkages between industrial areas and transport facilities are mainly related to facility capacity, with Cape Town Harbour being an example of internal capacity giving rise to traffic related problems, and general network congestion arising from overall traffic demand. Simon‘s Town is one area poorly served by road with respect to heavy goods vehicle movement, but is accessible by rail and is in fact, mainly served by naval vessels in respect of its heavy industrial needs. 7.4.5.3 Provision for movement of Abnormal Loads As depicted in Figure 14, the City maintains an abnormal load network. This network naturally satisfies the needs of more conventional heavy goods movement. However, the National Department of Transport is finalising a revised policy on the movement of abnormal loads. A key element of the policy is the categorisation of routes and a focus on minimising the impact of abnormal loads by promoting the use of off-peak times, especially weekends and public holidays for such movement. The City‘s strategy for the movement of abnormal loads follows a similar path, with the key objective being the maintenance and modification, where necessary, of a route network that links all the major industrial centres, thus providing an abnormal load network. 7.4.5.4 Provision for movement of Hazardous Loads At present, the City manages the movement of hazardous goods on an ad hoc basis. It is required in terms of this Integrated Transport Plan however, that certain key routes be Sectoral Strategies classified as hazardous goods routes and that these routes be clearly demarcated and are closely monitored by the Incident Management team, with provision for appropriate response times in the event of an incident. The major movements of hazardous materials are presented in Table 25, which should be considered the basis for evaluation of demarcated hazardous goods routes. 244 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies It is also proposed that certain areas be declared no-go areas for hazardous materials except for limited volume local deliveries. Such areas will mainly comprise central business districts and dense residential areas. The implementation of a rigorous hazardous loads movement plan will also involve regulating land use involving such hazardous materials to ensure that such development occurs only adjacent to appropriate routes. Factors35 to be considered in the preparation of a hazardous goods route network will include, but not necessarily be limited to: population density terrain considerations type of road continuity of routes types and quantities of hazardous delays in transportation climatic material 7.4.5.5 conditions emergency response capabilities alternative routes results of consultation effects on commerce exposure and other risk factors congestion and accident history Management of overall network capacity The movement of goods on the transport network of the city is fundamental to the maintenance of attractive economic conditions that promote investment and create employment. There is thus a clear need to ensure that the transport system is able to accommodate goods movement in an efficient manner. Similarly however, it is important to maintain the overall capacity of the network through ensuring that particular vehicles do not consume more than their fair share of the system‘s capacity. 7.4.5.5.1 Maintaining efficiency of Goods Movement The facilitation of goods movement may be best achieved by ensuring that the key freight along the routes as well as traffic management and law enforcement on the routes. In respect of the latter, the promotion of law enforcement in respect of illegal parking in loading zones is to be emphasised, as is the provision of proper access and egress 35 U.S. Department of Transportation, Federal Highway Administration, 1996. Highway Routing of Hazardous Materials: Guidelines for Applying Criteria. Publication No. FHWA-HI-97-003. (NHI Course No. 38064. ) http://hazmat.fmcsa.dot.gov/nhmrr/index.asp 245 Sectoral Strategies movement routes are designed to accommodate heavy vehicles in terms of clearances City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies arrangements for heavy vehicles on the premises of larger commercial and industrial properties. 7.4.5.5.2 Temporal control of freight movement on key commuter routes Certain types of freight can be associated with large and slow moving vehicles. These vehicles can significantly reduce the capacity of the transport network for a period and this in turn may have disproportionate social, economic and environmental impact on the City. It is thus seen as appropriate to restrict such freight movement to suitable travel times on these key routes. Mainly, this will limit the movement of certain classes of vehicle on certain roads during prescribed times, typically the morning and evening peak traffic periods; i.e. 06h00 to 09h00 and 16h00 to 18h00 on weekdays. 7.4.5.5.3 Limitations on vehicle classes permitted on sensitive routes A similar problem as that addressed above arises when inappropriate vehicles are used to move heavy freight over the numerous mountain passes in the Metropolitan area. Underpowered vehicles are unable to negotiate the passes at anything more than a crawl, thus considerably reducing network capacity and often promoting unsafe driving conditions, due to speed differentials, and behaviour arising from frustrated car users seeking to overtake in unsafe places. A restriction on vehicle classes (mainly in terms of power to weight ratio) on certain routes requires consideration, especially in peak commuter periods. 7.4.6 Inner City Freight It has become common practice in many major cities around the world to restrict the movement of heavy goods vehicles within the central business district of the City. In the case of Cape Town, the movement of heavy goods vehicles within the Inner City does not presently pose a problem. However, there are frequently disruptions to the movement of traffic as a result of loading and off-loading of goods vehicles for which adequate provision Sectoral Strategies has not been made, or where the loading areas allocated have been blocked by illegal use of the bay. The strategy of the City in this regard is to emphasise law enforcement with respect to the use of loading bays and also to re-examine the distribution of loading bays in the context of the needs of commerce and industry within the Inner City. This examination will also investigate the potential for temporal management of goods movement within the Inner City. 246 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.5 Non-motorised Transport Strategy Non-motorised transport (NMT), which includes walking, cycling and the use of animaldrawn carts, amongst others, is a valuable component of the transportation system and is, ultimately, an element of all journeys, most notably those made by public transport, which involves non-motorised access. Access to schools for most children also includes nonmotorised access and, in this case, access that particularly takes into account their safety. The City is thus committed to improving and promoting non-motorised transport so that it plays a more significant role in Cape Town's transport system. In the Cape Town context, NMT is represented mainly by walking and cycling and the policies and strategies are mostly developed around the needs of these users. However, the policies, strategies and resulting design and implementation projects should strive for improved universal access that also takes into consideration the needs of other users such as the special needs people that include there with impairments, perambulators, shopping trolleys, etc. Hence, the City NMT strategy is guided by the following statement:“Cape Town will be a city where all people feel safe and secure to walk and cycle, NMT is part of the transport system, public space is shared between all users (NMT and motorised users) and everyone has access to urban opportunities and mobility. ”36 The following policies shall guide the implementation of the strategies for NMT. NMT shall be recognised as an essential mode of transport. The culture and respect of NMT must be promoted throughout Cape Town through example by political leaders of City of Cape Town, evidence of projects, supportive law enforcement and visibility of NMT. The City of Cape Town should support and reinforce programmes and projects that target key markets/sectors and promote public life and NMT, such as events to reclaim public space, like ―Vehicle Free Days‖ and Night Markets. The City of Cape Town shall promote and support training of officials and stakeholders with respect to NMT planning and infrastructure design. 39 Add Reference 247 Sectoral Strategies City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies The City of Cape Town shall promote NMT by example through the provision of NMT support facilities such as showers and bicycle parking at municipal buildings that include depots, offices and the development of incentives promoting NMT, such as public transport allowances, bicycle travel allowances, etc. The NMT strategies are therefore the following:- To increase cycling and encourage walking by creating a safe and pleasant bicycle and pedestrian network of paths to serve all the citizens in the Cape Town Area. ‖ To create safer pedestrians and cyclists environments, especially where the majority of users are children, such as in the vicinity of schools. To develop a quality, attractive and dignified environment; and To promote a changed culture that accepts the use of cycling and walking as acceptable means to move around in the city and elicit more responsible NMT behaviour. 7.6 Safety, Security, Education and Enforcement Strategy The provision of safe and secure transportation is fundamental to the entire system within the City. The appropriate education and enforcement goes hand in hand with safety and security for both supply and demand of all transportation aspects. This section encompasses a vast diversity of issues as reflected below. ITP09 - Sectoral Strategies Chapter 7. 7.6.1 Incident Management The occurrence of traffic incidents on the metropolitan road network is inevitable. As an example, there are 800 to 1 000 motor vehicle accidents per month that have injuries requiring medical attention. The manner in which incidents, and their respective degrees Sectoral Strategies of severity, are handled by the emergency services is generally known as ―Incident Management‖. The City‘s strategy is therefore to: Implement and maintain an effective incident management system to co-ordinate the emergency services and their joint response to incidents on the metropolitan road network. 248 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies To date, the Road Incident Management System has been a guideline document with protocols and procedures. This however has not been a really effective (positive) contribution. Steps taken to improve this are that t has been recently endorsed by the Council of the City of Cape Town and the establishment of the Transport Management Centre. The establishment of the Transport Management Centre (TMC) in Goodwood has Road Incident Management as one of its key functions. While there is emphasis on an Intelligent Transport System (ITS) with a Freeway Management System (FMS) component, - the resources applied will have to be used on arterial and minor roads as well. An appropriate planning, monitoring and recording system for all incidents (including accidents, events, works etc. ) is an essential part of the successful operation of the TMC and the road network as a whole. This will include developing and resourcing additional items to fit the needs of the City in particular. The prime objectives of a Road Incident Management System are: 1. to improve safety, and 2. reduce incident duration. By reducing the incident duration, the first objective is also enhanced as the number of people involved (including normal traffic) and the chance for secondary incidents is less with a short rather than long duration. While the improved early stage management of road incidents (detection, verification and response) is of some benefit, by far the greatest benefit can be derived from an equally proportional improvement in the later stage, particularly the clearance, of the incident. The CCTV and monitoring resources of the TMC will assist in the early stage by the acquisition and readiness of resources (augmented by the resources with the TMC) to clear the incident. Examples are Service Patrols, specialised heavy duty recovery equipment have a significant positive effect in the effort to reduce incident duration. Service Patrols have the added advantage of being proactive in remedying minor incidents before they become major problems e. g. removing obstructions before these Sectoral Strategies cause an accident. 249 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.6.2 Disaster Management Disaster situations are usually more wide spread and may involve a wide range of interventions involving transport over a quite wide area. With a few notable exceptions e. g. Koeberg Nuclear Power Station, disaster management from a transportation perspective is generally covered under the Incident Management initiative above. 7.6.3 Special Event Management Generally, Special Events are large, well-known (―iconic‖) events that are pre-planned events and, by definition, permit a certain time to prepare and coordinate all the necessary services, routes and respective accommodation to ensure a successful event. In this regard, the City has a fine record of hosting special events and the traffic department are well experienced to offer the necessary support and enforcement thereof. In this regard, the key success factor has been the development and implementation of a Transport Management Plan (―TMP‖) for such events. This had led to an exponential increase in the number of registered events (―special‖ and ―ordinary‖) taking place in the City. The objectives of a TMP are to: ensure the safe separation of event patrons, participants and volunteers from traffic, manage the reduced capacity of the road system, -event community & the emergency services, and . The City is furthermore developing an Events Bylaw and Events Policy which include the requirement that a Traffic and Transport Management Plan be drawn up by the event organiser and submitted for approval by the City‘s Traffic, Transport, Roads and Stormwater Directorates. This is also in line with new national legislation (Safety at Sports Sectoral Strategies and Recreational Events Bill) and international best practice. More emphasis is being placed on the use and accommodation of public transport at events. The IRT project promises to provide better transport facilities to and from events around the City. 250 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies The Transport Management Centre, which will incorporate Traffic, CCTV, IRT, and TNO in one venue, will have the potential to facilitate co-ordination of many aspects of transport at events. Additional resources that are required will be available for application to future events. This will ensure that such events continue to be safely and successfully managed. 7.6.4 Incident Management The occurrence of traffic incidents on the metropolitan road network is almost inevitable. The manner in which incidents, and their respective degrees of severity, are handled by the emergency services is generally known as ―Incident Management‖. The City‘s strategy is therefore to: Implement and maintain an effective incident management system to co-ordinate the emergency services and their joint response to incidents on the metropolitan road network. 7.6.5 Disaster Management Disaster situations are usually more wide spread and may involve a wide range of interventions involving transport over a quite wide area. With a few notable exceptions e. g. Koeberg, disaster management from a transportation perspective is generally covered under the Incident Management initiative above. 7.6.6 Special Event Management Generally, Special Events are pre-planned events and, by definition, permit a certain time to prepare and coordinate all the necessary services, routes and respective hosting such events and the traffic department are well experienced to offer the necessary support and enforcement thereof. In this regard, the continued development of incident management procedures and protocols will ensure that such events continue to be safely and successfully managed. 251 Sectoral Strategies accommodation to ensure a successful event. In this regard, the City has a fine record of City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.6.7 Pedestrian Safety Based on the need for the provision of walking as a mode of transport in the City of Cape Town, especially in the low-income household and rural / semi-rural areas, the safety of these pedestrians should be ensured. The strategies to enhance pedestrian safety in the past were based on an approach where the total separation of vulnerable road users from vehicular traffic was the predominant mechanism to address traffic safety problems. The integration of road users and combination of a separated approach would be more socially acceptable and provides a more holistic platform to work from. In this regard, the proposed TDM strategies will encourage pedestrian safety and become integrated into the overall planning approach of the City. However, the policy objectives can be accomplished through implementation of the following priority strategies: Institutional Integration o Improve internal communication between pedestrian safety role players; o Obtain agreement with national and provincial authorities on strategies and implementation of pedestrian safety projects; o Establish a working group that will take ownership of the Pedestrian Safety Implementation Plan, the ongoing development of the Plan and the coordination of the application of national, provincial and local funding sources; and o Establish reporting structures within the working group for reporting of pedestrian safety related concerns. Planning Sectoral Strategies o Explore additional funding sources, e. g. national, provincial and private, for pedestrian safety improvements via different line function departments; o Develop and review transport policy, also review related policy development in other corporate sectors; o Develop a comprehensive transportation management plan for the City of Cape Town, addressing pedestrian safety at major events and venues; 252 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies o Provide pedestrian facilities where there is a reasonable expectation that such facilities will be used by pedestrians, even if the current pedestrian volumes are relatively low; o Establish a set of approved City of Cape Town pedestrian planning guidelines to improve uniformity of implementation; o Include pedestrian planning into the City of Cape Town‘s transportation network planning; o Ensure that existing pedestrian routes are protected, that development does not sever or prejudice accessibility on foot, and that the developments themselves are easily accessible on foot; o Ensure that developers provide through routes across major sites where these will result in improvements to the pedestrian network; o Identify, plan and evaluate new transport and land-use projects, schemes and interventions in terms of technical viability as well as strategic, economic, financial, social and environmental criteria; o Re-assess the appropriateness of warrants pertaining to the provision of traffic calming or pedestrian facilities; o Promote more comprehensive pedestrian accident reporting procedures and systems, especially with respect to the location of accidents; o Maintain an annual transport monitoring and research programme to, amongst others, determine pedestrian safety trends; and o Move from a reactive to a proactive approach to pedestrian safety for the long term. Road Environment o Establish a set of approved City of Cape Town pedestrian facility design guidelines or design requirements for implementation purposes, such as the DoT‘s Draft Pedestrian and Bicycle Facility Guidelines; o Identify high pedestrian accident locations through continuous audits, especially on major movement corridors and neighbourhoods, and implement remedial measures; o Assess appropriateness of posted speed limits at high pedestrian accident locations; o Assess appropriateness of signage, especially warning signs, at high pedestrian accident locations; 253 Sectoral Strategies City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies o Assess appropriateness of the proposed location of new pedestrian infrastructure, i. e. does it satisfy pedestrian desire lines or only convenience of construction; o Assess provision of street lighting at high pedestrian accident locations; o Improve pedestrian crossing facilities, e. g. raised block pedestrian crossings at schools situated on lower order roads; o Implement traffic calming measures where appropriate; o Prioritise the allocation of resources around the understanding of essential pedestrian safety needs; o Improve quality, accessibility and analysis of pedestrian accident data; o Monitor and evaluate the effectiveness of remedial measures, i. e. conduct before and after studies to investigate the effectiveness of implemented measures; o Conduct regular visual inspections for all elements of pedestrian infrastructure assets; and o Implement a comprehensive maintenance management plan that includes repair of fences, trimming of vegetation, upkeep of walkway surfaces and so forth. Awareness o Target behaviours, situations and locations through marketing and mass communication; o Improve dialogue between and awareness of pedestrian safety issues for national, provincial and local politicians in order to review strategies for pedestrian safety and to obtain political support and commitment to address pedestrian safety related issues; o Establish Community Road Safety Forums and support their pedestrian safety programmes; o Promote general community involvement in road safety; o Promote pedestrian safety awareness by use of communication media such as Sectoral Strategies radio broadcasts or community newspapers; o Improve communication between the public and officials; o Develop an appropriate public participation process before the implementation of any pedestrian safety improvements; and o Market and promote pedestrian safety improvement projects. 254 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Education o Co-ordinate and improve educational programmes between the City, Province and National Departments. (Education, Health etc. ) o Develop educational material and products aimed at pedestrians and according to specific target groups. o Create an understanding of the role of the use of alcohol and or drugs by pedestrians. o Create an understanding of the role of the use of alcohol and or drugs by drivers of motor vehicles. o Create an understanding of the role of speeding on roads in the event of a road traffic accident. o Create an understanding of the role of visibility of pedestrians in all weather conditions. Enforcement o Identify pedestrian problem areas and address same through the means of education, enforcement, engineering and evaluation. o Develop a comprehensive network operations model for the City. o Enforce all traffic laws and regulations continually. o Continue to support scholar patrols and all initiatives pertaining to safety where community involvement s required. o Evaluate the effectiveness of all initiatives on a regular basis. 7.6.8 Traffic Safety The City has over 8 500 km of public roads and traffic volumes have been growing steadily over the last ten years at approximately 3% per annum. The road network now accidents is estimated to be more than R1.9 billion. The last road safety project37 was undertaken in 2002 which had a five year plan. A summary of the report is outlined below, however it must be noted that a study to identify appropriate projects is necessary. 255 Sectoral Strategies carries about 90 million vehicle- km of travel annually and the total annual social cost of City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies The City is committed to making its roads amongst the safest in the world. To meet this goal, the Metro Road Traffic Management Coordination Committee (RTMCC) has developed a Road Traffic Safety Management Plan that outlines the broad framework for a road safety strategy based on national and provincial road traffic safety policies and strategies. The aim of the Road Traffic Management Operations Plan is to develop mechanisms that will be utilised to give effect to the implementation of these strategies in order to achieve the road safety targets. This Operations Plan aims to reduce the number of casualties resulting from road traffic accidents in the City by 10% over 5 years. The National Department of Transport has set the objective as being ―to reduce crashes, deaths and injuries on South Africa‘s road by 5% year-on-year. This means that our risk will be reduced to a similar level as in France or New Zealand. Programmes The City is taking an approach to road traffic safety that focuses attention on the most critical problem areas and priority targets, without losing sight of broader road safety issues. SPEEDING and ALCOHOL are the biggest contributors to road fatalities in the City and PEDESTRIANS are amongst those who suffer most in road accidents. While speeding and alcohol is the biggest contributor, SEATBELTS are the most effective means of reducing fatal and serious injuries in traffic accidents. When lap and shoulder belts are used correctly, they reduce the risk of fatal injury to front-seat passengers by 45 Sectoral Strategies percent and the risk of moderate to critical injury by 50 percent. The City aims to improve road safety through better community understanding of road safety issues, a systematic change in the planning, design and management of the road network and the enforcement of road traffic regulations. The City aims to pursue three key areas in meeting the road safety challenge, namely: Safer road users (better drivers and safer pedestrians) 256 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Safer roads (safe, sustainable road network) Safer vehicles (roadworthy vehicles) Safer Road Users Speed Travel speed affects the severity of accidents as well as the risk of involvement in an accident. Compliance with speed limits must be increased to achieve the target, especially in built up areas where pedestrians, cyclists and motorist share the same road space. Alcohol Alcohol remains a major factor in a large percentage of fatal accidents in the City. Alcohol, illicit and prescription drugs can affect a driver‘s performance and a pedestrian‘s ability to use the road environment safely. Seatbelts The seatbelt and child restraint are one of the most important safety features in a vehicle. In an accident the use of a seatbelt, child restraint or protective headgear reduces the risk of death or serious injury. Death and serious injuries will also be avoided if more cyclists wear helmets. Fatigue The contribution of fatigue to serious road accidents is difficult to quantity, but cannot be overlooked as a large factor in serious accidents. Driver incompetence The National Road to Safety notes that research into recurring patterns of driver error in accident points to a relationship between such error and the low levels of skill and awareness prevailing amongst thousands of drivers on South Africa‘s roads. This is in turn clearly linked to the prevalence of low standards of driver training-both informal and in many driving schools-and to widespread fraud and corruption in the driving licence testing and issuing system. Intersection offences factors that contribute to accidents at intersections. Ideally, all possible variables should be taken into account when analysing accidents at intersections, e. g. human factors, vehicle factors and environmental factors such as the area, road classification, and intersection geometry and control type. Visibility of pedestrians and cyclists 257 Sectoral Strategies Accidents as a result of an offence committed by the driver are one of a variety of City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Studies have shown that increased visibility of pedestrians and cyclists lead to a significant reduction in fatal and serious accidents. Safer Roads Speed It is essential that posted speed limits are appropriate to the road environment. Special attention should be given to areas with high pedestrian activities and vulnerable users such as the elderly and school children. Design Road design should focus on the safety of the road user and special consideration should be given to the road users who are more at risk such as pedestrians and cyclists. Improvements to the existing roads and higher safety standards in new road and intersection design will lead to a reduction in accidents. Maintenance Poor maintenance of the road surface results in potholes, flooding of the road and poor ride quality. Broken fences allow animals to stray onto roads. Inadequate road signs and lane markings are important areas that require attention. Safety Audits Road safety audits are essential in assessing the accident risk and safety potential of both existing and the planned roads. ―Black spot‖ programmes target locations with high frequency accidents. Pedestrians and cyclists The safety of pedestrians and cyclists can be improved through the provision of adequate road crossing facilities, audio-tactile signals, ramps, pedestrian bridges, cycling lanes etc. Intelligent Transport System Currently road users have limited access to information about hazards, congestion and other traffic safety issues through radio. Through ITS, traffic signal systems can be enhanced to assist law enforcement agencies. Street lighting Sectoral Strategies Visibility of the vehicle and pedestrian is enhanced through the provision of street lighting. Road policies It is the goal of the City to engineer and operate the road network in a professional manner through the implementation of best practises and compliance with appropriate national regulations. 258 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Safer Vehicles Safety standards Vehicle safety standards and vehicle design can be improved to further increase the protection provided to occupants and minimise the hazard to non-occupants struck by a vehicle. Roadworthy vehicles Although the numbers are not known, at least some vehicles on the road are unfit for use. The National Road to Safety Strategy lists the following as key problem areas: under-inflated tyres; smooth or worn tyres or fitting the wrong types of tyres; poor brakes; faulty steering; poor lights/vehicles visibility; poor general maintenance of other vehicle parts such as the chassis, body, wheel alignment and shock absorbers. This is to some extent at least, a matter of law enforcement, but can also be addressed through more frequent roadworthy testing regulations. 7.7 Ports Strategy The Port of Cape Town is a central feature of the City, a port of national importance and a key economic driver within the City. A review of the relevant land use and transport planning studies has indicated that the existing accesses to the Port by both rail and road are likely to remain for the foreseeable future. Initial indications by the Port Authorities to the proposal for an additional access via the Lower Church Street intersection (as per the Culemborg Development Framework) have been negative. It is therefore anticipated that the status quo will be maintained regarding points of access to the Port. The future traffic situation has therefore been assessed based on the assumption that the current access intersections to the Port have been maintained. Access to the proposed Port Industrial Park situated on the ICS Power Station Site has been assumed via the Marine Drive/Paarden Eiland Road intersection. The City has a duty to ensure, through good coordinated planning, excellent accessibility and all the ports in the Metropolitan area in general is thus: To maintain and expand the necessary infrastructure to enable the ports to meet their future growth projections with, in particular o Promotion of rail freight and improved container handling and storage facilities in the vicinity of the Port of Cape Town (particularly but not only Culemborg) so as to facilitate maximisation of cargo handling capacity. The 259 Sectoral Strategies to this vital facility. The City‘s strategy in respect of the Port of Cape Town in particular City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies port is currently faced with space constraints and there is a need to relocate some activities to areas outside the port, such as the Port Industrial Park, alongside Paarden Eiland, and the Culemborg Site. To facilitate port expansion by promoting appropriate zoning of land around the port. 7.8 Airports Strategy The City recognises the vital gateway to the City that is the airport facility, for both passenger and freight. In this regard, it is incumbent upon the City to ensure and maintain excellent accessibility and connectivity to facilitate future growth and development in a coordinated manner with ACSA. To this degree, the following strategies are recommended: Non-aviation related commercial development in and around the airport precincts should not compromise the primary function of the airport as an air/land transport interchange. Adjacent non-aviation development proposals (and their impact on shared infrastructure) will be assessed using the normal public sector land development management procedures and requirements. A distinct division between the aviation and non-aviation developments will be made with regard to their respective transport and bulk engineering services infrastructure requirements. This will enable the authorities to agree on the scale of infrastructure required to maintain a high level of accessibility to the airport for its main function as a transport interchange. ACSA will ensure that the internal road network serving CTIA is designed and constructed to a standard that will facilitate and recognise the growth and future access requirements of the airport. Existing and future access to CTIA will be designed to provide a high standard of Sectoral Strategies safety and convenience, taking into account existing and future traffic flows. Public transport routes to the airport will be developed and promoted. There will be integration of metropolitan public transport with airport public transport including provision for aviation and development precinct workers‘ needs. The City will continue to work together with ACSA to ensure that the road network provides and acceptable level accessibility to airport. Rail access to the Airport will remain a consideration for regular review of demand levels and service viability and land will be protected to facilitate rail development when warranted. 260 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.9 Road Network Operations Strategy The Vision for the City‘s Road Network Operations is to provide – a reliable, safe and efficient network for all road users, taking full cognisance of the needs of competing modes and different users. This should be achieved under the auspices of an appropriate budget, with the optimisation of scarce resources in an effective and sustainable manner. The goals of operations management are: Optimising traffic flow on the complete network through ongoing monitoring and assessment of and response to traffic and road environment conditions, Maximising operational safety and efficiency of the road network, especially with respect to ensuring safe and convenient pedestrian and non-motorised operations Minimising congestion and delays and particularly the negative impacts caused by recurring congestion, Managing incidents, special events, inclement weather conditions and disaster situations, and reducing congestion and delays associated with these non-recurring incidents, Ensuring effective multi-modal operations, Communicating navigational and operational information to all road users to help support their judgment on travel and relieve their mental stress while driving. Achievement of these goals involves expanding the Transport Network Operations Centre (TNOC) in Goodwood. The TNOC needs to operate on a 24/7/360 basis, integrating all the relevant services and technology such as Intelligent Transport System (ITS) technology, which will include variable message signs (VMS) and Closed Circuit Television (CCTV. )Full functionality of the TNOC requires, amongst other things, the deployment and training of additional staff as well as the implementation of additional The strategy for network operations can be summarised in the following tasks: Develop an Integrated Transport Telecommunications Strategy Develop an Integrated Transport System (ITS) Strategy Develop an Integrated Transport Information Strategy 261 Sectoral Strategies technology. City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.10 Coordination of Transportation Planning The National Land Transport Act, 2009 providesthat ―every municipality that is establishing an integrated public transport network or has significant passenger rail services in its area must establish an intermodal planning committee consisting of the prescribed technical officials and prescribed representatives of rail operators, other public transport modes, users and organised business‖, section15(1). The function of this committee is to coordinate public transport between the modes in order to achieve the objects of this act, namely, a) to further the process of transformation and restructuring the national land transport system initiated by the Transition Act; b) to give effect to national policy c) to prescribe national principles, requirements, guidelines, frameworks and national norms and standards that must be applied uniformly in the provinces and other matters contemplated in section 146 (2) of the Constitution and d) to consolidate land transport functions and replicate them in the appropriate sphere of government. To this end, the strategy for coordination shall be to formulate a committee with the sole purpose of achieving this aim and enhancing the implementation of integrated Sectoral Strategies transportation within the City. 262 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.11 Asset Management Strategy The City has to maintain its facilities and public infrastructure at an acceptable level so that the general public have access to an acceptable level of service, and also so that the taxpayer receives value for money. The City provides an: Asset Management Strategy (AMS) for the Transport Department within the ambit of the Municipal Finance Management Act (MFMA), Generally Accepted Municipal Accounting Practice (GAMAP), Immovable Assets Management Bill, 2006 and corporate legislative framework with SAP as the information monitoring system and database. The AMS strategy will include the development of the following: Asset Management Policy Fixed Asset Information Management System on SAP Plant Maintenance and GIS Movable Asset Management Register as per the Corporate Asset Control Policy and Procedures document Asset Maintenance Management Plan Staff Resource Plan will enhance a recruitment and training strategy of suitable and adequately qualified and experienced professionals to execute the legislative mandate. 7.12 Public Consultation Strategy The City of Cape Townis dedicated to informing the City‘s transport users of its vision for transport as well as provide up-to-date information on projects and policies relating to transportation and associated improvement. The City‘s Communication Strategy commits to the following actions being undertaken: compile media statements and distribute to stakeholders within the newspaper and distribute the requisite information and/or advert to corporate papers for publication, and distribute the requisite information and/or advert to all local community newspapers, and make the information/ document etc available at all public libraries, municipal offices, as well as on the City‘s website, and 263 Sectoral Strategies radio sectors, and City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies make reports available for a minimum of a 30 day public comment period, and provide adverts and summary documents in English, Afrikaans and Xhosa. The City also has a Communication and Marketing Strategy which details how the public should be consulted and/ or informed of changes to the City‘s policies, plans and programmes. There are detailed guidelines that stipulate the procedures to be followed by the Communications department. These guidelines are used by all departments (including transportation) when informing the public via advertisements, letters and other means of communication. In brief, the Communications department is required to promote open and transparent communication between the City and its stakeholders, while working within the policy framework of the City. Numerous key principles underpin the way in which the City of Cape Town communicates with the City‘s residents. These are listed below. Communication: is a pro-active, strategic function, not a reactive support function. is often part of the City‘s statutory obligation to inform people and involve the in decision-making (public participation). should be centralized with the Corporate Communication department for consistency of message, brand uniformity, synergy and cost-effectiveness. Line departments should be obliged to answer media questions and provide information where requested (in terms of the media protocol). should be considered as part of decision-making, not after the fact. is an integral part of service delivery – it prepares the way and confirms the City has done its job. is a two-way tool for contact with and feedback from residents. builds long-term relationships with staff, residents and stakeholders. The Department is the ultimate and overall custodian of effective, professional Sectoral Strategies communication by the City of Cape Town. Line specific communication such as accounts, and rates letters should be in line with corporate tone and style – simple, informative, pro-active and professional. Operational spokespersons such in departments such as Emergency Services and Safety and Security should have indirect reporting lines to the Communication department to decide when an operational matter has a corporate impact. 264 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Key principles underpin the dissemination of information to the public. Effective communication requires that appropriate language is used for the target audience and that messages are clear and written clearly for easy comprehension. Where practically possible and/or required, the three languages (English, Afrikaans and Xhosa) of the Western Cape are used. The City of Cape Town aims to integrate the various elements of communication (media, external and internal communication, marketing events and publications) to ensure that communication is optimal, integrated and the message consistent. A number of communication channels are used by the City to disseminate and/ or communicate information. These include the 34 community newspapers, ten daily newspapers, 12 radio stations, the three news agencies as well as City News. Information is also made available electronically on the City‘s website. The City News provides short summaries of technical information using images and diagrams where necessary. 7.13 Institutional Strategy The important changes to this framework are: The potential shift of operator contracting responsibility from the Province to the City (see regulatory lines on the diagram). The establishment of a new IRT entity which is intended to be a municipal entity in terms of the Municipal Systems Act. The contracting of IRT bus operators to the IRT entity. The establishment of two contractual relationships with companies who will undertake fare collection and station services for the new IRT system. IRT system: scheduling and control of vehicles (probably with procurement included). At this stage it is assumed that these activities will be done by a unit within the IRT entity. 265 Sectoral Strategies Currently there is no firm position on another important set of activities associated with the City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.14 Funding Strategy 7.14.1 Motivation Clearly it is of paramount importance for the success of this plan for there to be sufficient funding to cover both the operating costs and capital costs incurred in implementing all of the strategies identified in the earlier sections of this chapter. Costs have to be matched with revenue on the operating account and capital finance on the capital account. It is in fact a statutory requirement that a capital budget cannot be approved by Council if sufficient operating funds are not available to maintain the planned new assets as well as the already existing assets. 7.14.2 Introduction Implementing the Integrated Transport Plan requires marshalling of financial resources to do so. From a financial perspective there are currently two critical and related challenges on which the Financial Framework should seek to give guidance. Firstly, an increase in financial resources above current trajectories is required if the envisaged public sector improvements in the transport sector are to be realized Secondly, the institutional framework and associated revenue generating powers must be enhanced Any actions taken over the next few years should be consistent with a long term vision. Thus, this chapter seeks to sketch out such a vision from a financial perspective before focusing on the more immediate steps to be taken. There is some evidence of financial innovation in the transport sector. Overall, however, the current arrangements for financing transport in Cape Town represent significant missed opportunities. The first part of the chapter suggests how this could be remedied. Sectoral Strategies The second part of the chapter seeks to give a rough indication of the levels of financial resources required to address requirements, informed by the ten year perspective developed in the recently prepared Transport Authority Business Plan. It outlines the current sources of capital and operating revenue and suggests how these might be enhanced in the context of a new financing vision for transport. The third part of the chapter focuses on the practical steps that should be prioritized in the short to medium term in pursuit of that vision. 266 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.14.3 Enhancing the basis of transport funding The current basis for financing transport represents significant missed opportunities. Taxes and charges are easiest to raise in a context where: a clear link can be drawn between the revenue raised and the benefits provided the revenue raised and costs of public provision represent a relatively small proportion of the economic activity which is taxed the revenue raising activity helps limit socially or environmentally destructive behaviour All these characteristics are potentially available in the transport sector yet generally not capitalized upon because of poor institutional design, relatively poor revenue instrument design, and poor communication around the links between revenue paid and benefits received. The integrated transport plan can be funded through sources generated locally, or through grants from national government. Ultimately, grants from national or provincial government must be financed through taxation. National government has access to a wider range of higher yielding tax instruments than local government, although there are strong accountability and efficiency arguments for financing services out of local revenue sources. In practice a combination of the two is likely. Transport costs consist of both recurrent and capital costs. Unless capital is received in the form of grants it needs to be borrowed and repaid – with interest – over time, or paid directly out of recurrent revenue. Infrastructure should logically be loan financed by loans over periods which match the life of the asset provided. Thus the beneficiaries pay for the infrastructure. Once a reliable stream of revenue can be assured it should be possible to raise capital which must be sufficient to finance new infrastructure as well as maintain and operate it and the services it supports. 7.14.4 Financial Framework – capital investment The financial framework for the future investments in roads, public transport infrastructure and related systems remains much as it is currently. However, there is a new feature to 267 Sectoral Strategies finance for infrastructure provision. The key thus lies in the recurrent revenue flows, City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies this framework in that the financing of the IRT buses needs to be provided for. The options for doing this include: The bus operators finance the buses themselves using private sector sources (primarily loans). A capital subsidy is applied from the National Fiscus, mediated by DoT. A capital subsidy is provided by the City. 7.14.5 Capital expenditure envelope – public transport infrastructure and systems38 (new section) The capital expenditure envelope for public transport infrastructure and systems, a financial model developed for City of Cape Town , referred to here as the CTTP model, is applied. This includes individual line items for the key elements of the public transport systems with some key assumptions relating to the future trends with respect to this expenditure. For this draft of the plan only a summary of the capital expenditure figures is included below. However, considerable more detail can be provided for later drafts, if necessary. The preliminary estimates for capital expenditure for the public transport system, with all modes included‘ is shown in the figure below. TA Infrastructure Capital Account Summary 2,500 R'million 2,000 Total IRT 1,500 Other Modal interchanges 1,000 Rail line Category 'A' investments Sectoral Strategies 500 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Figure 45: Capital expenditure projections for public transport (all modes) 38 Note that all the figures given in this section are preliminary. Further work is required by the project team to refine and improve these estimates. 268 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies It is clear that expenditure on the IRT systems is dominant, with high levels of expenditure in the years 2012 to 2014 particularly (Phase 2 infrastructure). With regard to other items there is still work to be done: Figures for rail were taken from the Rail Plan in 2006 and need to be checked. Estimates for model interchanges beyond 2010 have still to be related to the strategy in the earlier part of this Chapter. In relation to these figures the current budget (average over the current year and three coming years) is R938 million a year (see Table 38 in Chapter 3). This is aligned with the expenditure shown in the figure above. 7.14.6 Capital expenditure envelope –Transport39 For roads and stormwater infrastructure the Municipal Services Financial Model (MSFM) developed for DBSA, DPLG (now Department of Cooperative Governance and Traditional Affairs) and National Treasury is applied. This allows for all services provided by the City to be modelled but the emphasis here is obviously on roads and stormwater. However, it is useful to assess the scale of expenditure projected by the model for roads and Sectoral Strategies stormwater in relation to other services, as shown in the figure below: 39 As with public transport the figures in this section are preliminary. 269 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Capital expenditure: Excluding land and top structure for housing 8,000 7,000 R millions 6,000 5,000 4,000 3,000 2,000 1,000 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Water Supply Sanitation Electricity Solid Waste Roads Public services Public transport Public places Economic infra and buildings Admin buildings and systems Figure 46: Projected capital expenditure for all infrastructure in the City40 The reason for the ‗bulge‘ in the graph is that the model is currently set up to assess what is required to meet national targets by 2013 and hence there is a large amount of expenditure required on ‗backlogs‘ – including internal infrastructure for low income housing developments – over the coming 6 years. The scale of capex shown here can be compared with the current capital budget for the City of approximately R4.0 billion a year. The model is indicating the need for higher expenditure, probably driven by the need for greater expenditure in rehabilitation for all infrastructure categories. But the figures for roads in the model are probably too low as discussed below. Sectoral Strategies Looking specifically at roads the figures from the model are shown below41: 40 Note that the public transport figures in this graph have no yet been aligned with those shown in the previous figure specific top public transport. 41 All figures in real terms, at constant 2008 prices. 270 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Capital Expenditure - Roads 800 700 Rmillion (real) 600 500 400 300 200 100 2007 2008 District distributor 2009 2010 District collector 2011 2012 2013 Access roads (urban) 2014 2015 2016 Access roads (rural) Figure 47: Estimate of Envelope for Capital Expenditure on Roads. Currently the figures shown in this graph for the first 6 years give an average of about R500 million a year which is what is being budgeted for presently. However, the figures require considerable revision once better estimates are available from the detailed work on each strategy. Further: The current target in this run of the model for all new roads to be in place and rehabilitated to at least an ‗adequate‘ condition is unlikely to be achieved and it is more probable that the shape of the curve will not have the bulge shown and that expenditure will not fall off as shown. Currently the model provides for approximately R220 million a year expenditure in rehabilitation and this figure needs to be checked. If is likely that expenditure on ‗district collectors‘ and ‗district distributors‘42 is too low. 7.14.7 Capital finance strategy – look at the City’s position for all infrastructure the City, once the National Land Transport Act takes effect, it will not be possible to look at the capital finance options for the roads and transport sector as a whole without understanding the financial position of the City as a whole. The main reason for this is that the ‗roads and transport‘ sector will always be funded through a mix of grant funding, 42 These term for road classes are based on the Roads Infrastructure Strategic Framework for SA (RIFSA) classification system. 271 Sectoral Strategies Although there will be the need to establish a separate Municipal Land Transport Fund for City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies the City‘s own internal resources, and borrowing. In the latter two cases the availability of capital is linked to the overall viability of the City of Cape Town and the demand for capital for other sectors. A preliminary look at how this could look over a 10-year period can be taken from the MFSM model, shown in Figure 48: Sources of finance: Excluding land and top structure for housing 8,000 7,000 R millions 6,000 5,000 4,000 3,000 2,000 1,000 2007 2008 2009 2010 2011 Housing subsidies Other grants and subsidies Service provider funding Borrowing requirement 2012 2013 2014 2015 2016 MIG Developer contributions Internal funds Figure 48: A preliminary assessment of a capital finance profile for all infrastructure and systems in the City. While the shape of the curve still has to be reviewed (as discussed under the capital expenditure sections above) and some of the financing options require adjustment, there are some important observations which can be made at this preliminary stage: The availability of housing subsidies for internal infrastructure is unlikely to continue as the national Department of Housing is pushing for all housing Sectoral Strategies subsidies to be used for ‗top structure‘. This is likely to mean that financing of internal infrastructure (including roads) will move increasingly onto the municipal account. MIG funding allocations shown are low (shown as about R200 million a year in the first few years). These are likely to increase, at least to R300 million with trends beyond 2011 being quite uncertain. 272 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies The ‗other grants‘ includes for 2010 Soccer World Cup funding and PTISG. The former will fall away but the PTISG is likely to continue and needs to be reflected in the above analysis. The modelling shows that Development Charges (Developer contributions) can provide a significant proportion of the capital requirements, with the amounts shown here of the order of R550 million a year being an upper extreme. These amounts have been calculated in the basis that development charges should cover all new bulk and connector infrastructure costs for high income residential and non-residential developments. The type of infrastructure includes water supply, sanitation, electricity, solid waste (landfills) and municipal public services. Service provider funding applies only to electricity (Eskom capital for the part of the City it serves). Internal funds are those categorised as Capital Replacement Reserve (CRR) in the City finances43. The extent to which they will remain available at the level shown will depend on the City‘s policy relating to reserve accumulation. Borrowing: The indication from the modelling is that levels of borrowing by the City will have to increase substantially if it is to finance the capital programme shown. Based on an indicator that interest payments on external loans should not exceed 7% of revenue then this programme, with this level of borrowing is just viable. However it is unlikely that the City will increase borrowing to the extent shown (up to R2.8 billion a year, up from the currently budgeted R1.8 billion a year approximately). 7.14.8 Capital finance strategy – Public Transport At the outset it is important to note that the public transport infrastructure is included with this component of the strategy, even though the current arrangement is for such Sectoral Strategies infrastructure to be implemented by the Roads and Stormwater branch. 43 The figure shown on the graph is somewhat higher than the City provides for currently (about R800 million a year vs about R600 million budgeted for the coming 3 years). 273 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies PT Infrastructure and Systems Capital Finance 2,500 R'million 2,000 City finance 1,500 PTISG MIG 1,000 Province busw ay funding DoT funding for rail 500 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Figure 49: Financing profile for public transport infrastructure and systems Key features of this funding profile are noted as follows: As with expenditure, the figures for rail are taken from the PRASA Rail Plan in 2006 and need to be checked. In the scenario shown here there is no funding included from the Province and no MIG funding. Development charges (BCIL or similar) are also not included. Overall the strong dependence on the PTISG grant is evident. However, there is currently no certainly that it will continue to be available at the level of R800 million a year shown here. But this is a reasonable assumption given national government‘s commitment to improving public transport arrangements in the country. A substantial contribution is required from the City‘s own funding (capital reserves and borrowing), particularly for Phase 2. Obviously if levels of grant funding are lower than the R800 million a year shown a greater contribution from the City will be required. Currently for the 10 year programme the mix of grant to City funding Sectoral Strategies is 3:1 which is quite reasonable. 7.14.9 Capital financing The City is currently budgeting to finance roads and stormwater (excluding public transport infrastructure but including non-motorised transport) as follows: 274 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Table 57: Current financing profile for roads and stormwater capex Finance source PTISG Amount for 4 years (R million) 366 MIG % Split 18% 270 14% 17 1% WC 177 9% CRR 43 2% EFF 918 46% BICL 209 10% Total 1,999 100% OGOV Some observations relating to this profile which have strategic relevance are: The PTISG grant is used primarily for non-motorised transport and some road junctions. The extent to which it will be available in the future for Non-IRT activity is debatable. Currently levels of MIG funding for roads and SW at about 25% of total MIG available to the City is appropriate. There is considerable uncertainty relating to levels of funding from the Province in the future. The transfers to ‗own sourced‘ funding ratio is 0.9:1 (close to 1:1). However, with the uncertainty of some of the transfers this may need to decrease with the City taking greater responsibility for financing its roads and stormwater programme. The BICL contribution is significant but it needs to be investigated further. The City urgently needs a new policy for Development Charges and it may be possible to increase the proportion of capital funded from this source somewhat44. Effort needs to be made to assess all options but, assuming that levels of capex need to increase from the level of about R500 million at present, it is probable that much of the additional funding will need to come from borrowing. Operating expenditure – Transport An estimate of the trends with respect to operating expenditure on the transport system are given below with the figures calculated using the MDFM model: 44 The benefit is likely to be far greater for the other services in comparison to roads but there is the potential for improved finance flows from this source for roads as well. 275 Sectoral Strategies 7.14.10 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Operating Expenditure - Roads 1,200 Rmillion (real) 1,000 Depreciation 800 Interest payments 600 Access roads (rural) 400 Access roads (urban) District collector 200 District distributor 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Figure 50: Trends with respect to the transport operating account The current operating expenditure budget for transport is R559 million. It is notable that a significant portion is attributable to finance charges: interest and depreciation. 7.14.11 Operating revenue –Transport There is considerable uncertainty relating to funding sources for transport. There are not firm conclusions on this yet for this ITP and work is still in progress. But suitable local revenue instruments for the financing of the transport sector are being considered. The following are to be seen as possible directions for investigation: 7.14.11.1 Fuel levy Levies on motor vehicle fuel are arguably the most suitable mechanism for financing public goods and services in the transport sector. There is a strong link between revenue raised and benefits received. The volume of fuel used is closely linked to distance travelled, while heavier vehicles – which cause more damage to the road surface – also consume more fuel. Indeed, the link is so direct that a fuel levy could almost be viewed as a form of road user charge. Sectoral Strategies In 2006, the fuel levy currently levied by national government (of R1 a litre on diesel and R1.16 a litre on petrol) represents less than one fifth of fuel costs – which, in turn, are only a limited portion of total vehicle costs. Yet in 2005/06 this was estimated to raise approximately R2.1 billion a year from within the metropolitan area of Cape Town – well in excess of the total recurrent spending by the public sector on transport in the area, including subsidization of the commuter rail and bus services. 276 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies Vehicle emissions are polluting, thus the taxation of fuel tends to reduce fuel usage and thus pollution. Concomitantly, it tends to support less fuel intensive public transport modes. However, it is not possible to levy this tax without the approval of National Treasury. Recent indications from National Treasury are positive on the one hand in that that they are likely to introduce a local fuel tax. But on the other hand these proposals are quite negative in that the levy will be raised nationally and transferred to municipalities based on a nationally standardised amount. Therefore this levy will not be unlike the current Equitable Share and will, in all probability be scaled to be at a level equal to the RSC levy replacement grant which will then be removed as a source of revenue for municipalities. 7.14.11.2 Taxation of property Property value is generally enhanced by good transport infrastructure and services. Private dwellings need access to the transport network while the commercial and retail sector needs to be conveniently and comfortably accessible. Industrial property is also dependent upon good transport linkages. The value lies not just in the link to the network but in the effectiveness of the transport network as a whole. Property can be taxed differently for different purposes. 7.14.11.3 Taxation for maintenance and general expansion of the overall network All properties benefit from the overall efficacy of the transport sector and should pay a common cent in the rand to promote and maintain it. This should be part of the general rate, but could usefully be identified separately from other general rates to enhance willingness to pay and enable ring-fencing of revenue. 7.14.11.4 Taxation for specific enhancements to the network feasible to levy an additional rate on the direct beneficiaries to finance the infrastructure. This is not currently common in South Africa, but the new Claremont Boulevard project financed to the tune of R26 million through an additional rate levied on properties falling in the Claremont Improvement District represents a highly significant example of such an instrument. The rate is to be levied over a 20-year period to pay for the interest and redemption costs of the capital project. 277 Sectoral Strategies Some enhancements have impact mainly on an area or a group of properties. Here it is City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.14.11.5 Taxation for infrastructure for new developments(development charges) Where new developments are created this often requires new infrastructure linkages to be built. Development charges, linked to the cost of new direct infrastructure requirements are currently levied. There are strong arguments, however, for broadening this to take into account some of the wider impact on network use beyond the immediate new linkages required. This may also be linked to the significant value enhancement arising from rezoning or the granting of development permission. These contributions are often provided in kind through the developer directly providing the new infrastructure required. These are once-off revenues, and are thus an instrument for financing capital expenditure directly. 7.14.11.6 Provision of facilities through public-private partnerships There is scope for expanding the use of development contributions to more pro-actively provide for new transport facilities. Railway stations and public transport interchanges, in particular, can offer huge market opportunities for the commercial and retail sector, and the costs of such infrastructure may in some cases be entirely covered by the commercial and retail beneficiaries. This would generally represent a form of capital financing, but could also extend to more recurrent uses, where, for example, a property owner bears some ongoing responsibility for the maintenance and operation of facilities provided through this mechanism. 7.14.11.7 Local business tax In some countries transport is financed to a large degree through local business taxes. The logic of this is that business efficiency is often highly dependent upon effective Sectoral Strategies transport systems. While the benefits of good transport systems are often reflected in property values this is not always the case; industrial property may be substantially dependent upon the transport network, but not have as high a value as other nonresidential property. This suggests the need to complement local property taxes on business with other local business taxes. 278 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies In France public transport is largely financed through a local payroll levy – almost identical to the payroll component of South Africa‘s recently abolished Regional Services Council levies. In recent years the total annual RSC levies (turnover and payroll components) have approximated the total recurrent expenditure on transport in Cape Town by all three spheres excluding bus and rail subsidies. National government envisages introducing new local revenue instruments to replace the RSC levies, with a new local business tax viewed as one possibility. 7.14.11.8 Vehicle licenses In 2004/05 approximately R400 million was collected in vehicle licence fees in the metropolitan area over and above the costs incurred in implementing the licensing system and collecting revenue. These revenues are paid to the provincial government, but not earmarked specifically for financing the transport system. Vehicle license fees are an appropriate instrument for financing transport costs incurred by the public sector. 7.14.11.9 Parking and congestion charges Revenue can be raised by charging levies on parking bays in designated areas, and by charging fees to enter certain areas of the city at certain times – so-called ‗congestion charges‘. However the amount of revenue that is collectable on this basis is somewhat limited. Such charges should be viewed primarily as instruments for travel demand management. elsewhere, contributing to urban sprawl rather than reducing private car use. Nevertheless, work is being done by the IRT consulting team to estimate what amount of revenue can be raised from this source. 279 Sectoral Strategies Overuse of such mechanisms can lead to inducements for developments to shift City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.14.11.10 User fees User fees are attractive since they are based on a clear link between payment and benefit received. Yet there are some important constraints on the scope for basing the financing of transport costs on user fees. 7.14.11.11 Fare revenue For public transport users, fare revenue is an obvious revenue source. The constraint is that public transport users tend to have less ability to pay, while pricing public transport too high will result in a shift to private motor vehicle use. For this reason there is a need to subsidise fare revenue contributions. International experience suggests that fare box revenue should cover about half of the operating costs of public transport providers, with the remainder covered in subsidies. Large capital investments, such as rail networks or dedicated bus lanes would have to be separately financed by the public sector. 7.14.11.12 Tolling Tolling of roads is an effective means for raising revenue for long haul routes. However, it is largely inappropriate within the boundaries of a metropolitan area since it requires significant entrance and exit control and is inimical to the network nature of metropolitan transport systems. Road tolling is not supported within the metropolitan area other than on highly specific scenic routes, such as Chapman‘s Peak drive which do not display the normal characteristics of metropolitan transport routes. 7.14.11.13 Traffic fines Traffic fines are a useful source of revenue which should accrue to the transport sector, Sectoral Strategies but should be viewed primarily as part of the enforcement system rather than as a key revenue earner. There are strong arguments for dedicating traffic fine income to improving enforcement. In 2004/05 the City of Cape Town‘s fine income was close to R100 million. 280 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.14.11.14 Carbon credits The enhancement of the public transport system in Cape Town would significantly reduce projected carbon emissions in the city. There may be potential for covering a portion of the infrastructure costs through earning carbon credits. This option needs further investigation, although initial evidence suggests that it would not yield very significant revenue compared with envisaged needs. 7.14.12 Sources of loan finance for capital expenditure As indicated above, once a continuous revenue stream can be assured it is usually possible to access loan finance. There are broadly three different approaches which can be taken to loan financing, although within each approach there are a variety of different ways in which finance can be structured mainly related to different ways of addressing risk. 7.14.13 Loans from private and public sector financial institutions These include the commercial banks, as well as public sector institutions such as Development Bank of Southern Africa, and the Industrial Development Corporation. The public sector lenders tend to offer some limited form of subsidy, often reflected in the fact that they are willing to embrace certain risks more easily. However, they are often not a substantially cheaper source of revenue than the private sector. 7.14.14 Bonds Bonds are often used internationally to raise money for transport infrastructure. They can be especially effective where they are repaid out of a clearly identified revenue stream – linked ideally to the benefits flowing from the infrastructure provided. They are not citizens – to participate profitably in the financing of infrastructure in their own city. Currently there is an expanded appetite for investing in bonds both nationally and internationally. 281 Sectoral Strategies substantially different from loans, but can offer the scope for smaller investors – and even City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies 7.14.15 Off-balance sheet financing A wide range of possibilities are available which essentially involve a private provider raising capital, rather than the public sector doing so itself. Concessions, and build, operate and transfer schemes (BOT‘s) are examples of this. In such instances a private provider raises capital and provides new infrastructure and services which generate a revenue stream out of which the private provider repays the loans and generates a profit. The advantage of such schemes lie in private providers being able to raise capital at lower interest rates and design and run the service more efficiently than the public sector. The provision of facilities through public-private partnerships, as mentioned above, would fall into this category. 7.14.16 Institutional changes to enhance revenue generation While the introduction of appropriate revenue instruments will greatly enhance the financing of the transport sector, the effectiveness of such instruments would be further enhanced by appropriate institutional change. Firstly, responsibility for the transport sector must be much better configured Secondly, revenue streams should be clearly identified and earmarked for transport provision Where responsibility for transport is clearly and suitably assigned, revenue streams can also be clearly identified and linked to benefits received. The earmarking of revenue streams further supports this. The earmarking of revenue is a contentious issue in public finance. Critics argue that it Sectoral Strategies introduces inflexibility and thus a misallocation of funds, and that it infringes on the powers of the duly elected representatives to allocate resources as they see fit. On the other hand, in a sector such as transport it: can assist very significantly in overcoming taxpayer resistance to new or increased taxes, 282 City of Cape Town – Integrated Transport Plan 2006 To 2011 Sectoral Strategies allows the benefit principle to be more rigorously applied, matching revenue streams to specific infrastructure and services can often lead to a reduced cost of capital, and can assist in ensuring adequate resources for maintenance of infrastructure, which saves substantial costs over the long term. The NLTA will provide for the establishment of an earmarked Municipal Land Transport Fund. The earmarking of revenue does not require that a Transport Authority be set up as a separate and independent entity. Indeed, earmarking may be more feasible within the context of the Transport Authority remaining a ring-fenced business unit internal to metropolitan government. 7.14.17 Comparison of fares for each mode Figures will be included in the next draft for indicative fares for each mode, with comments. 7.14.18 Affordability of public transport for poorer residents The affordability of fares for public transport is central to the success of any transport strategy. This can be gauged by estimating the percentage of household income which needs to be spent on transport. Calculations relating to affordability and associated comments are still to come and will be included in the next draft of this ITP. One of the responsibilities of the City in terms of the National Land Transport Act, 2009 is for it to Sectoral Strategies determine concessionary fares for special categories of passengers. 283 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 8 PROJECT IMPLEMENTATION PROGRAMME A key function of the Integrated Transport Plan is the presentation of information relating to current, approved and proposed future transport projects. Ultimately, all projects undertaken by the City should be geared towards promoting the overall vision as set out in the City‘s IDP. Similarly, all transport projects should promote the transport vision as set out in the ITP. Noting that there are limited resources, human and financial, a role of the Integrated Transport Plan (ITP) is thus to guide the evaluation and prioritisation of projects across a range of sectors, ensuring that investment efforts are coordinated to achieve the desired vision for transport in the City of Cape Town as well as the broader City goals as expressed in the IDP. Keeping in mind that transport is a long-term investment, the implementation programme has been developed to include a 10-year horizon to reflect the medium term context, but focus has been placed more on the short-term timeframe i. e. five-year plan, which is a building block towards achieving the overall transport vision. This chapter sets out the current and approved projects being or to be undertaken by the City and other role players in respect of transport operations and infrastructure in the Metropolitan area. It also presents a list of projects, as yet not formally adopted, but proposed for consideration and inclusion as approved projects in the next review of this integrated transport plan. Prior to presenting the project lists however, the mechanism being introduced for prioritisation of projects is discussed. Project Implementation Programme 8.1 Project Prioritisation The City of Cape Town has adopted a triple bottom line approach to the evaluation of projects. This triple bottom line addresses economic, environmental and social aspects. These in turn are influenced by the City‘s Vision for Transport, which is achieved through the implementation of its overarching and sectoral strategies. Whilst conventional economic evaluation is required to address certain questions, it is not always true that only projects with appropriate benefit cost ratio or internal rate of return or 284 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme some other economic measure should be undertaken. There are projects the social or moral value of which is extremely difficult to measure in terms of monetary value. In the absence of a formal evaluation method, a strategically focused methodology has been employed to date, which reflects the broader City goals. The evaluation process included the following steps: Projects, budgets and timeframes were assembled by transport sector as outlined in the respective ITP transport chapters. Projects were organized according to IDP categories. A high, medium or low priority was allocated for the triple bottom line measures i. e. environmental, economic and social. (The projects list in Appendix A shows this prioritisation approach. ) Projects were then incorporated based on their strength to holistically support the sustainability indicators and directed to reflect greatest geographic needs. As part of the ITP review, the City has sought to develop a tool, still in a trial stage, to facilitate and improve on this process, incorporating achievement of the transportation strategies as well as the triple bottom line imperatives. During the period of the current ITP, the model will be tested and, where necessary, modified. The project prioritisation model is aligned with the existing SAP system used for budgetary management, ensuring that data is interchangeable and that common codes are used. In principle, the system is functional and the database with all the projects contemplated in this ITP loaded into the prioritisation system is included on the accompanying compact disc. The prioritisation model is based on the concept of the Project Identification Form. This form essentially describes the project, indicating the type of project and its location, anticipated costs, funding sources, implementation period and so on. This is standard score the project in terms of the triple bottom line elements and the overarching transport strategies. These scores are preset on the basis of council approval and apply universally to all projects. The triple bottom line scoring is a weighting of the perceived importance of the three elements. At present, economic, environmental and social issues are given an equal weighting, pending a Council debate on the appropriate weightings as shown in Table 58. 285 Project Implementation Programme information. The expansion on this base is the inclusion of three underlying matrices that City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Table 58: Triple Bottom Line Measure Weightings. TBL Measure Weight Economic 0.333 Environmental 0.333 Social 0.333 As an example of the application of these weightings:There is a current emphasis on global warming, which has social impacts, and on housing and employment creation, directly social issues. It may thus be a Council decision to weight the Social and Environmental measures at 40% and the economic measure only at 20%. At some time in the future, concerns might change and this could influence project selection based on governmental policy. Not only does each triple bottom line measure have a weighting, but there is also a relationship between each of these measures and each of the transport strategies given in Table 54. These weightings should remain relatively static over time, but may also be modified by policy decisions. A matrix depicting this relationship is shown in Table 59. Table 59: Relationship between Transport Strategies and Triple Bottom Line. Strategy Economic Environmental Social Transport Safety 10 1 10 Congestion Management 7 8 5 Managing Metropolitan Growth 4 4 6 Economic Growth 9 1 7 Environmental Sustainability 1 8 7 Project Implementation Programme The principle of this matrix is that it sets the relative importance attributed to each strategy – triple bottom line pair. Thus, for example, Congestion Management is perceived to score 7 out of 10 in terms of its economic impact, 8 in terms of its environmental impact and 5 in terms of its social impact. Transportation Safety is however considered to score 10 out of 10 for Economic and Social impacts but to be almost irrelevant in terms of environmental impact. (Please note that these are examples and the actual values are to be debated and set by Council. ) 286 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme The third underlying matrix is intended to address the relationship of each project with the transport strategies. This matrix essentially provides a number of options with respect to the impact of the project on each of the transport strategies. The impacts presently being considered and their numeric values are shown in Table 60. Table 60: The Needs Ratings applied to each project in respect of each transport strategy. Value Needs Rating 3 Essential 2 Desirable 1 Acceptable 0 Not Applicable -1 Detrimental -2 Highly detrimental An example application of these Needs Ratings to the strategies relating to a project is shown in Table 61. Table 61: Needs Ratings applied to transport strategies in respect of a particular project. Strategy Importance Transport Safety Desirable Congestion Management Essential Economic Growth Essential Environmental Sustainability Acceptable At present, the prioritisation model relies on the project champion and subsequent engagement with the project review committee to determine the importance of each project in terms of the strategies. It has been proposed however, that the model be modified so that each strategy is associated with a short questionnaire the answers to which generate the importance rating. This questionnaire can possibly be used introduce certain key performance indicator concepts as part of the assessment process. (KPIs are most useful in determining if something has been achieved rather than as predictors. ) 287 Project Implementation Programme Managing Metropolitan Growth Desirable City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Once a project is captured in the system and the importance of the project to each strategy is set, the model calculates the score for the project in terms of each triple bottom line measure, as well as an overall score. These values are determined as follows: The matrix of Table 59 is multiplied by the numeric values attributable to the Importance column in Table 61 as determined from Table 60. This produces a new matrix of the same form as Table 59. The sum of each column represents the relevant triple bottom line measure score. These triple bottom line measure scores are then multiplied by their respective weightings as set out in Table 58 and summed to give an overall weighting. The higher the score, the more likely a project is to be selected for implementation. The process is not however quite complete. The Project Identification form shown in Figure 51 also contains information regarding the location of the project, the focus area and the project type. In order to ensure equitable distribution of funds, the projects can be grouped and sub-grouped according to these criteria. This provides the opportunity to select projects in each district for each focus area and project type even though the overall prioritisation score is not high enough to warrant inclusion using a global selection Project Implementation Programme process rather than a district based one. Figure 51: The Project Identification Form and Prioritisation tool user interface. 288 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 8.2 Projects in first issue of this ITP In order to ensure that it provides for growth and development, whilst maintaining its existing investments, the City has an ongoing programme of projects. These projects start out as proposals and, after a process of evaluation, are either: Approved for implementation within an agreed timeframe Set aside for future implementation or Set aside as being inappropriate – usually as a result of changed circumstances since their initial proposal. The original of this ITP, this being the first review, contained a list of projects that were being or to be implemented or for consideration as future projects. This project list is presented as Appendix A. 8.3 Council Approved Projects Subsequent to the finalisation of the first issue of this ITP, certain of the projects listed were undertaken or initiated, some since being completed. In the mean time, new projects have been taken forward for Council approval, giving rise to a set of projects currently in hand or scheduled for commencement within the next three years. This list of projects is presented as Appendix B. At this stage, the projects have not been prioritised in terms of the mechanism described above, but this process will be undertaken as part of a prioritisation model test process during the period leading to the next review of this ITP. 8.4 Projects for future consideration Perhaps the most important aspect of the Integrated Transport Plan is the proposal of new projects that will address identified needs given the City‘s transport vision and These projects tend to link to the categories comprising the sectoral strategies set out in Chapter 7. The following sections set out project and programme proposals that follow a similar structure. 8.4.1 Public Transport Projects Public transport is a central element of this Integrated Transport Plan, with the Integrated Rapid Transit (IRT) project being well under way. This broad-based public transport project encompasses nearly all facets of public transport, from infrastructure development and upgrading, through operations planning to branding, marketing, ticketing and 289 Project Implementation Programme strategies for achieving that vision. City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme information systems. As a result, there are no ―new‖ public transport proposals arising out of this ITP. The IRT, as a major current project, is presented at some length in Section 8.6. 8.4.2 Transport Infrastructure Projects As with the public transport projects, the current implementation of several major projects, which include the Koeberg Interchange and Hospital Bend upgrades as well as the construction of Granger Bay Boulevard amongst other projects is such that the ITP has not identified any ―new‖ projects of a general infrastructure nature. 8.4.3 Travel Demand Management Projects With the development of the IRT system underway, a range of opportunities for implementing a more rigorous travel demand management programme arise. These opportunities serve several purposes. Central amongst these is the achievement of a mode shift from private to public transport once the IRT is operational. This mode shift then seeks to reduce congestion and the related environmental and economic impacts thereof. Simultaneously, the City has a strategy for land use densification that, amongst other things, requires changes in trip making behaviour, something that involves travel demand management interventions. The following TDM projects are thus under investigation: Promote Higher Vehicle Occupancies. Higher vehicle occupancies are to be promoted through ride sharing and/or car-pooling. A large number of private motor vehicle trips during the peak hours are single occupant trips. Commuters prefer to travel alone due to a variety of reasons of which one is the absence of reasonable access to other modes or other commute options. The promotion of higher vehicle occupancies will focus on Project Implementation Programme commuters that will benefit from sharing cars with other commuters while providing them with more opportunities to travel. Car-Pooling Desk. Establish a phone-in service where commuters can get information on how to car pool, how to start a car pool, what the legal issues are, the different ways to share costs, and to provide realistic cost estimates of travelling. This must go together with a marketing campaign to make users aware of the Service 290 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Car Pool Website. Establish a website with information on all aspects of car-pooling. This can also include options to match commuters that would like to share rides. This must go together with a marketing campaign to make users aware of the Service Establish additional high occupancy vehicle lanes and extension of existing lanes Policies and Tax Incentives. All travel occurs within a specific legal, policy and tax environment. The policies and tax incentives in the City will be investigated and must be aimed at encouraging not only the individual to use alternative more efficient modes of transport, but also to encourage large employers to focus on the transportation needs of their employees. City Management and the Provincial Government must be encouraged to actively pursue changes in legislation, which currently inhibits car-pooling and ride sharing. Investigate tax incentives to entice large employers to encourage their employees to travel less and use modes other than private vehicles. Investigate legislation that will force large employers in the City to report annually on the trip making characteristics of their employees. Park-and-Ride. There are currently several Park-and-Ride facilities in the City of Cape Town. Many of these are under-utilised for a variety of reasons. These facilities must be identified, the use thereof revisited and strategies and implementation plans be identified to encourage their use. This action will include the following: Identify all the current park-and-ride facilities in the City and establish their current usage as well as the operational issues impeding their use. Develop a strategy to improve the usage of these facilities Programmes for Large Employers. In addition to identifying policies and tax incentives to persuade employers to focus on the travel needs of their employees, there must be encouragements. Therefore, it is proposed that large employers in the City be contacted and that a short list of employers be prepared who would volunteer to be part of a pilot study to investigate reduction in single vehicle employee trips. Specific actions to develop this focus area include the following: Identify at least three large employers in the City Bowl that would be prepared to initiate a pilot programme to encourage employees to use other modes of transportation. 291 Project Implementation Programme several large employers in the City that will do that without legal or policy City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Develop a pilot programme in conjunction with the large employers to assist them in reducing the number of single vehicles trips to/from the company. This programme could include encouraging of car pooling through preferential parking for carpools, subsidies or rewards for carpools, subsidising public transport tickets, work-at-home programs through telecommuting, subsidies for bicycles and providing bicycle parking. Congestion Pricing. Within a congested urban environment, the costs of the system are not carried equitably by all users. If road space is un-priced traffic volumes will increase until congestion limits further growth. The need and practicality of congestion pricing in Cape Town must be evaluated. Marketing and Education. The City and also the Provincial Administration must pursue the marketing of all alternative modes. This should be a concerted effort to improve the perceptions of all users. 8.4.4 Freight Projects Central to employment creation and economic development within the City is the movement of freight. This is thus an area of considerable concern in terms of ensuring the most efficient and effective use of the transport system for goods movement. Considerable work has been undertaken in studying freight in the City and Western Cape by the Provincial Government. This work has given rise to a number of proposals. The following are adapted from the Provincial ―Western Cape Urban Freight Traffic Study‖ of 2006 and extended based on the observations of the ITP review process. Establishing a directorate to promote and facilitate an optimised freight transportation system, utilising all modes of transport with coordinated planning for the future of freight transport by all modes between the City, Port (Transnet), Airport (ACSA), National DoT DOT Pretoria and the Western Cape Provincial Government. The Project Implementation Programme immediate tasks of this directorate would be: o The establishment of a freight monitoring strategy for the City. o Engaging with DOT Pretoria and the railways administration to initiate revitalisation of the freight rail services in the area. This should incorporate the development of services that will meet the local needs and then the vigorous marketing thereof. o Examining the feasibility of establishing a logistics hub outside, but close to the port precinct to relieve pressure within the port. (This would focus on balancing the flow harbour capacity with the movement of road freight vehicles. It may be 292 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme possible to create a sort of ramp metering system, but there must be penalties for holding vehicles too long in the depot. ) o Investigating the introduction on certain routes and in certain areas, of prescriptive nighttime or off-peak deliveries – as is done in certain overseas countries to free roadways of freight vehicles during the high congestion daytime hours. o The completion of the abnormal load linkage from the Harbour and Paarden Eiland through the Epping Industrial area, along the N7 to the Phillippi Agricultural area on the one hand and to the M5 and thence to Capricorn Park on the other. A conceptual proposal is shown in o The reinstatement of a detailed Hazardous Goods movement plan as required in terms of the NLTTA and NLTA. o The promotion of more extensive vehicle monitoring in respect of emissions, with the intention of reducing road transport induced atmospheric pollution. The expansion of the overload-monitoring programme, especially as part of route control where limitations and restrictions exist. The introduction of weigh in motion sensors with camera activation at key points requires consideration. Project Implementation Programme o 293 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Project Implementation Programme Figure 52: Extension of Abnormal Load Routes. (Generic proposal – details to be determined through proper study of alternatives. ) 294 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 8.4.5 Non-motorised Transport Projects An important element of the transport system that affects many facets of life and transport operation in the City is non-motorised transport. It is thus important that non-motorised transport be facilitated wherever possible, taking account of the range of needs involved. The following are key focus areas: Expansion of non-motorised transport network in accordance with the existing non-motorised transport network plan Institution of maintenance and upgrade programme to ensure safety of cycle ways and pedestrian paths. Development of cycle storage facilities at key locations to promote cycle access to public transport and other services Continued implementation of adaptations for special needs users, such as: o Dropped kerbs for people using wheelchairs or other mobility impairments users o Use of tactile paving for users with sight impairments o Audible signals at pedestrian crossings for users with sight impairments. Improved signage in key areas to facilitate NMT user guidance, especially tourists The establishment of a Transport Users Forum (TUF), comprising of representatives from different areas utilizing the various modes of transport. The purpose of the TUF is to ensure that local government acts within the legal framework and take the appropriate action where the law is not being applied. 8.4.6 Universal Design A clear policy on the provision for Special Needs Users (SNU‘s) in terms of the South African Constitution and Employment Equity Act, (Act 55 Of 1998), the UN convention on the rights of persons with disabilities, and other human rights This policy must address the retrofitting of existing facilities and the development of guidelines required for new facilities The research and development of a Universal Design (UD) policy that can be applied unilaterally across all services departments. The policy will establish a set of criteria and standards that all new facilities must follow and which upgrades to existing facilities will target. Comprehensive environmental access audits that highlight users requirements and their priorities will assist in establishing costs; interventions, levels of service and types of facilities needing upgrading. 295 Project Implementation Programme legislation should be formulated. City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Incorporate processes within design procedure to ensure that universal access requirements are met. A monitoring body/authority to be established with representatives from all the major stakeholders. 8.4.7 Developing a website for all research and development work in the transport field as well as all projects executed. Safety, Security, Education and Enforcement Projects As highlighted elsewhere in the ITP, safety is an overriding concern and must thus take precedence over all other matters. The addressing of safety matters relating to engineering is an ongoing process and does not constitute a ―project‖ for listing here. What is perceived as important are the following: Increase in enforcement staff complement to provide greater visibility and temporal coverage. Promotion of engagement of law enforcement officers in school education programmes. 8.4.8 Ports and Airports Projects The City of Cape Town has no direct control over the operation and development of either Cape Town Harbour or Cape Town International Airport. The City is however engaged with both and very much involved in ensuring that freight and passenger movement in and out of these facilities is functional. Projects achieving these goals are associated with other aspects of the transport system, such as Public Transport and Freight and are thus presented elsewhere. Project Implementation Programme 8.4.9 Road Network Operations Projects There has been a strong move from the approach of building new infrastructure to the approach of optimising utilisation of existing infrastructure. Much of this optimisation relies on traffic control measures. The following main projects are thus proposed: Introduction of Variable Message Signage to guide route selection, provide parking availability information, manage network operating speeds and provide cautionary information. 296 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Upgrade the extent and performance of the Automatic Traffic Control system, which manages signal timing at intersections, especially with respect to the prioritisation of public transport vehicles when and where necessary. Establishment of an integrated Metropolitan Transport Network Operations Centre. Roll out the existing City Smart Card to become the Integrated Ticketing medium as part of the Public Transport Restructuring Process. Roll out of the CCTV surveillance system for the Klipfontein Corridor. Roll out of the complete suite of ITS infrastructure on the N2 as part of the 2010 WC projects. 8.4.10 Strive towards an integrated CCTV model in the City. Coordination of Transportation Planning Transport projects invariably involve many role players from various spheres of Government, government agencies, parastatals and the private sector. Ensuring that planning is effective requires that everyone is kept informed of relevant planning initiatives and is also well equipped with the information to make decisions. The following projects and interventions are thus necessary: Review and update of statutory plans Demographic forecasts and land use integration Update and refinement of the transport network model (an ongoing process required Corridor and project identification feasibility studies Funding strategy and Public transport impact studies Restructuring public transport, including the Taxi Recapitalisation Programme, Transport information system User preference surveys and user attitude surveys Environmental policy for transport and alternative technologies Transport operational plans for the FIFA 2010 World Cup 8.5 Projects being undertaken by other spheres of government or government agencies Although also presented in the main lists, it is useful to have an overview of the major transport projects being undertaken in the City by agencies or authorities other than the City. A summary of such projects are provided in Tables 62 and 63. 297 Project Implementation Programme for effective strategic network planning. ) Project Implementation Programme City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Table 62: SANRAL Projects within the Cape Town Municipality. SANRAL ROAD SECTION DESCRIPTION REMARKS CURRENT R300: Stellenberg I/C to Swartklip I/C Upgrading of interchanges and carriageways Completion end 2010? Metropolitan Freeways Freeway Management System ITS, etc. combined project SANRAL, CoCT, PGWC PLANNED 298 N1 from R300 to De Doorns, N2 from N1/N2 Toll Road. Includes second tunnel beyond Paarl R300 to Botrivier and Somerset West bypass RoD received and intention to Toll approved Unlikely to proceed to construction before 2012 R300 from West Coast Road to M5 Prince R300 Toll Road includes extension to West Coast and No activity since 2005. Not sure if RoD has been George Drive to M5 received City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Table 63: PGWC Projects within the Cape Town Municipality. WESTERN CAPE PROVINCIAL ADMINISTRATION ROAD SECTION DESCRIPTION REMARKS CURRENT 299 Koeberg Interchange Upgrading of interchange Table Bay Boulevard from Church Street Upgrading of carriageways to Koeberg I/C TR2: Somerset West (Hazelden) to bottom Contruction of dual carriageway road Sir Lowry's Pass N1 Koeberg to R300: Streetlighting Installation of streetlighting M5 Services relocations Relocation of services in preparation for future road upgrading Public Transport Restructuring Conversion of GABS interim contracts and development of smaller contracts Ramp A completed 2010,Ramp B 2011 Completion 2010 Completion 2010 At tender award stage In progress In progress PLANNED TR2: De Beers Interchange to Somerset West (Hazelden) M5 Upgrade: Koeberg to Settlers Way Stellenbosch Arterial: Strand Road to Stellenbosch Chapmans Peak Drive Project Implementation Programme Upgrading of dual carriageway road Upgrading to 3 lanes per carriageway Upgrading single carriageway sections to dual carriageway Toll Plazas, slope stabilisation outside concession section Start 2011? City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 8.6 Integrated Rapid Transit System The City‘s vision is promote modal integration into the most effective possible single seamless system. For this reason the City of Cape Town has decided to implement an Integrated Rapid Transit system provisionally expected to be put in place over the next 10 to 12 years. This would involve the establishment of a full public transport network, encompassing high quality rail, Non Motorised Transport and road services, which will place at least 75% of Cape Town‘s population within 500 metres of the system. NMT Public Transport Road & Rail Travel Demand Management Road Upgrade Figure 53: Integrated Rapid Transit Full details of the IRT system and proposed roll-out is documented in a report titled Integrated Rapid Transit Project: Project Status, financial and strategic assessment dated 22nd October 2009. This report was an annexure to a Report to Council on the 28th October 2009. Project Implementation Programme 8.6.1 National Public Transport Strategy and Action Plan and Department of Transport ITP Guidelines The national policy intentions for public transport are contained in the national Public Transport Strategy and the Public Transport Action Plan (PTAP). These intentions and the alignment of the City of Cape Town‘s IRT project with these intentions are discussed below. 300 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme DOT Public Transport Action Plan: The Cabinet approved the national Public Transport Strategy in January 2007. The Strategy has two thrusts: Accelerated Modal Upgrading, and Integrated Rapid Public Transport Networks (IRPTNs) Modal Upgrading focuses on the 3-7 year transitional period with regard to improving the quality of the public transport fleet and its current operations. IRPTNs focus in the 4-20 year period and aim to implement high quality networks of car competitive services. In this regard, the aim is to upgrade both commuter rail services respectively in all major cities. As per the national ITP guidelines, the letter of confirmation from the MEC of Transport and Public Works of the Western Cape, and the Provincial Gazette 6635 of 12 June 2009, the city of Cape Town is a category 1 municipality, part of national program to prepare Integrated Rapid Transport Networks, as part if the Integrated Transport Plans. The principles and objectives of the IRT are in line with those of the Integrated Transport Plan and the DOT‘s national Public Transport Strategy and this is depicted through the Rapid Public Transport Network for the bus-based IRT system. 8.6.2 IRT overview The Cape Town Integrated Rapid Transit System is an initiative to transform the public transport sector by improving the customer experience. This initiative will seek to integrate all modal options into a coherent package for the customer. Among the modes to be integrated are: metrorail services, road-based services on trunk routes, conventional bus services, minibus taxi integration, feeder bus services, improved pedestrian and bicycle access, metered taxi integration, and park-and-ride facilities. The principal way in which the City of Cape Town will transform the road-based public transport services is a concept known as Bus Rapid Transit (BRT). BRT is a high-quality bus-based transit system that delivers fast, comfortable, and cost-effective urban mobility 301 Project Implementation Programme 301 and bus and mini-bus services to Rapid Rail and Bus Rapid Transit levels of quality City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme with segregated right-of-way infrastructure, rapid and frequent operations, and excellence in marketing and customer service. BRT has virtually all the performance and comfort of a modern rail-based transit system but at a reduced cost. The central defining feature of BRT is its focus on customer service. Dedicated, median trunk services provide customers with dramatically reduced travel times. Because the trunk vehicles move quickly in peak hour more people are encouraged to switch from private car use to public transport, which makes the whole system far more viable. The dedicated lanes also reduce operating costs so that fare levels are quite affordable. Special attention is also given to safety and security through the presence of extensive security personnel and the use of CCTV cameras. 8.6.3 Implementation program The full implementation of the project has been divided into four Phases. Phase 1 focuses on the central city and the west coast, which will then be followed in Phase 2 by the more pressing public transport needs of the metro south east, including Khayelitsha and Mitchells Plain. This will be followed by Phases 3 and 4 to include the Durbanville Project Implementation Programme area and Delft/Helderberg area respectively as schematically shown in Figure 54. 302 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 303 Figure 54:: Phases of the full Integrated Rapid Public Transport Network. (rail not indicated) Phase 1 has been divided into 2 parts: Phase 1A and the full Phase 1. Phase 1A includes the inner city and extends up the west coast to include the rapidly growing residential area in Blaauwberg north of the Diep River, as well as the low-income communities of Atlantis, Mamre, Dunoon and Doornbach. This corridor faces some of the worst peak period congestion levels in the City, especially to the south and east of the bridges over the Diep Project Implementation Programme River. The full extent of Phase 1A is shown inFigure 55. 303 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Project Implementation Programme Figure 55: Full Phase 1 A. 304 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme The roll-out of the IRT is driven substantially by availability of funds, and especially funds for infrastructure, vehicle procurement and once-off initiation and transition costs. Various IRT roll-out options for Phase 1A were assessed based on different financial scenarios. Table 64 summarises the key financial scenarios, upon which the various roll-out options were based. Table 64: Financial scenarios used to assess roll-out of IRT Base scenario: Assume Base scenario from which others are derived, with the necessary adjustments. Timeline set by required construction time; and based on operational, industry transition and statutory factors. Alternative scenario 1: Financially conservative Finance to be committed in advance, but on the understanding that it will only be paid after secured through DORA allocations for a current year, for spending after expected receipt of funds (based on past practice). Alternative scenario 2: Uses bridging finance to optimise rollout within budget All DORA and CoCT monies previously allocated for 2010/2011 and 2011/2012 are available as and when required, either through funding or through bridging; and funding in future years provided as needed. Alternative scenario 3: Additional R1bn Same as Scenario 2 plus R500m as from April 2011 / 2012, & R500m in 2012 / 2013 assuming such extra funds will be made The roll-out options were assessed in detail and are documented in the IRT Project Status, Financial and Strategic Assessment report dated 22nd October 2009. The recommendation in this report followed the financially prudent Scenario 1 plus the basic requirements to adequately provide for the 2010 World Cup event. The basic requirements cover reduced fleet size, depot requirements and an operator as discussed in detail in the report. Should additional funding, such as through the 2010/2011 PTI&SG, be received from national government, then consideration can be given to expedite and expand roll out beyond delivery as per scenario 1. The summary of the impact assessment of scenario 1 is detailed in Table 65. 305 Project Implementation Programme Description necessary funding is available City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Table 65: IRT Impact Assessment Criteria Scenario 1 amended Description Financially conservative. Spend occurs when indicated funding becomes available. What can be delivered by the World Cup Minimum requirements for 2010. What can be delivered AFTER THE WORLD CUP by the date currently allocated funds have been exhausted (referred to below as “date present funds will be spent”)? (Indicating date the relevant service will be able to commence, unless funds are secured and received earlier) Feeders: Inner City (Oct 2011) Trunks: • Airport – CBD (Jul 2010) • Bayside – CBD (Apr 2011) • Atlantis – Bayside (May 2012) Depots: Project Implementation Programme • Inner City (Sept 2011) • Atlantis staging area (May 2012) Date when funds will be exhausted (ie by when all the services described under „What can be delivered‟ are completed) Jul 2012 Estimated total implementation cost (whole of Phase 1A) R4.16 Billion Estimated annual operational deficit regarding services under „What can be delivered‟ (ie for components that can start by the date present funds will be spent) R99.1m per year (assuming re-allocation of provincial bus operating subsidy for existing services on these routes of R15.7m in terms of Regulation 1(2) of the NLTA contracting regulations, 2009 By when will all currently completed infrastructure be used? (Refers to infrastructure being constructed in terms of contracts already committed, eg trunk route Bayside to CBD) From Oct 2011 (Infrastructure will lie dormant under this scenario for 14 months after 2010 World Cup) ‘Secured’ operating subsidy once allocated funds depleted: Current national bus operating subsidy reallocated to IRT in terms of recent NLTA Contracting Regulations, by date present funds are spent Only subsidy for CBD bound services available (estimated at R15.7m pa) 306 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Should additional funding be received from national government, then consideration can be given to expedite roll-out beyond this conservative approach. As comparison for the Base financial scenario, Phase 1A can completed by end September 2011 if the necessary funding is available. Details are comprehensively discussed in the IRT Project status, financial and strategic assessment report dated 22 nd October 2009. The atbles below are indicative of the funding requirements. Construction of infrastructure for the Integrated Rapid Transit system has begun including dedicated bus ways, stations and cycle ways. Figure 3: Current construction projects The requirements for the 2010 World Cup will be met through the provision of elements of the IRT to augment transportation during this period. This will include a shuttle service to the stadium, City to Airport trunk service and a ―top-up‖ of the existing services to cater for the additional demand. 8.7 2010 FIFA World Cup South Africa, the first country on the African continent to host a Fédération Internationale de Football Association (FIFA) World Cup, will host the 2010 event. Cape Town is one of the host cities for the event. Figure 56, to host a semi-final match and to serve as a multi-purpose 55 000 seat facility thereafter. Athlone and Newlands Stadia will be match practice venues. The Green Point Stadium is surrounded by public roads such as, Western Boulevard, Granger Bay Boulevard (under construction at the time of preparation of this ITP review) Somerset Main Road, Portswood Road and Beach Road. In order to comply with FIFA‘s conditions for hosting such an event, among other things, South Africa is required to provide efficient public transport infrastructure 307 Project Implementation Programme A new 68 000 seat stadium is being constructed on the Green Point Common, shown in City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Figure 56: Location of 68,000 Seat Green Point Stadium. 8.7.1 Planning Objectives and Principles 8.7.1.1 DoT’s 2010 Transport Action Plan The DoT‘s vision, set out in the Action Agenda document and endorsed by the National Treasury, is: Project Implementation Programme To use the 2010 FIFA Soccer World Cup to speed up a lasting legacy for public transport in South Africa. To ensure that the 2010 FIFA World Cup will quietly showcase appropriate sustainable mobility solutions that will serve the majority of South Africans at the venue cities both during and after the 2010 event. To have assisted major South African cities to accelerate the implementation of the first phases of their integrated transport plans, and to fast track key public transport, non-motorised transport and transportation management projects. 308 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme For these newly integrated systems to cater for the needs of the estimated 3 million 2010 FIFA World Cup ticket holders and to demonstrate the initial benefits of the longterm economic and social transformation such a system enables. 8.7.1.2 Western Cape Transport Mission Statement The Provincial Land Transport Framework sets out its transport mission statement as follows: ―to deliver an integrated, accessible, safe, reliable, affordable, sustainable and quality transport system and property infrastructure through socially just, development and empowering processes, to improve the quality of life for all‖. In order to achieve the above mission statement, the Provincial Department of Transport & Public Works has identified the following strategic goals: Community development and economic empowerment of the poor. Job creation. Providing access and opportunities to all communities with a bias towards the disadvantaged Enhancing the mobility of all communities particularly those currently without or with limited access. Facilitation and enhancement of economic opportunities. Promotion of rural development. Internal transformation and capacity building to improve service delivery. The promotion of co-operative governance. Alignment of all planning processes with the broader development goals of the Department‘s iKapa Elihlumayo initiative. Generation of revenue. 8.7.1.3 8.7.1.3.1 FIFA Requirements and Key 2010 World Cup Transport Components World Cup FIFA Family A total of 20 200 FIFA Family members are expected to arrive in Cape Town for the World Cup. The FIFA Family includes FIFA members and officials, players and team officials, referees, medical officials, media and sponsors and suppliers. FIFA requires that 1 700 309 Project Implementation Programme City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme parking bays be provided at the match venue and also requires a dedicated transport system for the World Cup Family. 8.7.1.3.2 World Cup Accommodation Cape Town is an attractive destination, with quality accommodation and as a main 2010 host city, it is estimated there will be up to 55 000 international supporters based in Cape Town. In addition regional supporters of around 6 000 to 8 000 will also be seeking short term accommodation. Quality transport provision (both public and private transport mode) needs to be planned for all these visitors for the entire stay, and not solely for access to the match stadium. 8.7.1.3.3 Spectator Movements and Travel Demand An initial travel demand projection for South Africa was conducted by the Department of Transport. There will be approximately 400 000 international ticket holding visitors to South Africa during the 2010 World Cup. Following the most recent FIFA Soccer World Cup Guidelines, planning for 2010 assumes teams will move venues between matches, as opposed to having a ―home‖ venue for the group stage. Thus, there will be large daily movements between venues by supporters putting pressure on regional transport networks. 8.7.1.3.4 2010 Green Goal Programme In 2006 Germany hosted the first FIFA World Cup games incorporating FIFA‘s new Green Goal Programme. This initiative strives to offset carbon emissions through supporting Gold Standard projects. The Gold Standard is an internationally recognised guarantee of the highest social and environmental standards. Green Goal‘s target is to reduce the Project Implementation Programme global climate impact of the FIFA World Cup games to a minimum. There are five core areas covered by Green Goal: water, refuse, energy, mobility and climate neutrality. The event inevitably requires the transportation of vast numbers of supporters, players and officials resulting in a significant increase in greenhouse gasses. For the 2006 FIFA World Cup Germany is boosted public transport to account for 50% of transportation to strive to reduce emissions. Promoting public and non-motorised transportation plays an important role in reducing the effects of greenhouse gases on the climate. 310 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme Transportation and effective transport planning plays a major role for Cape Town and South Africa in attaining the standards set by FIFA‘s Green Goal Programme. 8.7.1.3.5 Location of Public Viewing Areas Another important part of the overall World Cup concept is the location of a number of public viewing areas (PVAs) with big screens, which can easily be accessed by non-ticket holders. The public viewing areas will play the following roles: Allow non-ticket holders to be part of the excitement and fun of the World Cup. Divert non-ticket holders away from the vicinity of the match venue. Provide important commercial opportunities for local businesses, in terms of food, beverages and World Cup merchandise. These public viewing areas have been limited in number and have been located to provide easy access to a large number of local people. Four locations for these PVAs, including the official FIFA PVA have been chosen. Grand Parade, Cape Town – FIFA Official PVA Vygieskraal, Athlone Bellville Velodrome Swartklip Sports Complex 8.7.1.3.6 Location of Practice Venues One of the SAFA‘s objectives of hosting the 2010 FIFA World Cup is to leave a legacy of improved football facilities throughout the country. One aspect of improved facilities is the construction of new, and upgrading of existing, football venues for the run-up period to the 2010 World Cup. by being selected as potential practice venues: Athlone Stadium Phillipi Stadium Transportation issues regarding these stadiums will need to be addressed in the 2010 host city transport operating plan. 311 Project Implementation Programme The following stadiums have been made part of the overall 2010 FIFA Soccer World Cup City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 8.7.2 World Cup Priority Transport Projects The World Cup transport system focuses on making the best use of air, road and rail infrastructure in place by 2010, supplemented with additional services only where necessary to ensure fast and efficient access between venues. The Department of Transport intends to use the excitement and focus of the 2010 events to catalyse a lasting legacy for public transport in South Africa. The City of Cape Town, as host city, is responsible for the management of the spectators destined for the FIFA World Cup. The performance of this function will ony be possible with the assistance of and contributions from our partners, PGWC, SANRAL, ACSA and PRASA. To-date, R 8.4 billion in new and additional monies have been allocated for 2010 transport projects including public transport and non-motorised transport projects and systems investment, with priority to venues supporting the 2010 soccer events. The DoT now oversees these monies under the Public Transport Infrastructure and Systems Grant (PTISG). The PTISG has been created as a vehicle to accelerate the pace of implementation of investment in sustainable mobility infrastructure. While support to 2010 host cities is the initial priority of the PTISG, the Government intends grants in later years and potential additional replenishments to support public transport improvement in every corner of the country. Figure 57 indicates all 2010 transport projects. 8.7.2.1 Priority Statements (Motivation to source funding from PTISG) The Priority Statements aim to accelerate and fast track projects forming part of the integrated transport strategy for the City with an emphasis on the improved delivery of public transport services, key public transport interventions including facilities, non- Project Implementation Programme motorised transport, and transport management for the 2010 FIFA Soccer World Cup. 312 City of Cape Town – Integrated Transport Plan 2006 To 2011 Project Implementation Programme 313 Figure 57: 2010 World Cup – Funded Projects. City of Cape Town – Integrated Transport Plan 2006 To 2011 Implementation Funding and Budgets 9 IMPLEMENTATION FUNDING AND BUDGETS This Chapter is to be read in conjunction with Appendices A, B and C which provide the detailed project lists from previous and this ITP. The City of Cape Town budget comprises two main components. The Capital Expenditure budget and the Repairs and Maintenance budget. 9.1 Capital Expenditure Budget The registered, uncompleted projects in Appendices B and C have an estimated total value of over R3.9 billion over the 2009 – 2012 financial period, as set out in Table 66. Table 66: Total Capital Budget Projections 2009-2012. Year 2009/10 2010/11 2011/12 Budget R1,794,218,001 R1,086,716,778 R1,081,545,588 Total R3,962,480,367 These projects, as noted in the budget tables of Appendices B and C, are funded from a variety of sources, that include internal and external funding sources. The breakdown of that spent is shown in Tables 67 and 68 whilst that still to be spent is shown in Tables 69 and 70. budget and the Repairs and Maintenance main components. The Capital Expenditure The City of Cape Town budget comprises two detailed project lists from previous and this ITP. Appendices A, B and C which provide the This Chapter is to be read in conjunction with Implementation Funding and Budgets Table 67: Budget Allocation Spent on Completed work by Funding Source. Funding Source 1 EFF 3 AFF: Ward Allocation 4 CMTF PG: WC DOT&PW 4 MIG 4 NG DOT PTI&SG 4 STATE_NT_URP Grand Total Completed 2008-2009 2009-2010 R73,385,628 R13,904,704 R600,000 R20,188,064 R48,855,148 R1,500,253 R441,002 R158,274,799 314 R600,000 City of Cape Town – Integrated Transport Plan 2006 To 2011 Implementation Funding and Budgets Table 68: Budget Allocation Spent on Completed work by Focus Area. Completed Sum of 2008Sum of 2009Focus Area 2009 2010 Non-motorised Transport R4,811,761 Parking R733,957 Public Transport R7,831,523 Roads R88,589,827 Safety & Security R276,984 Traffic Management R4,169,433 Unclassified R51,861,314 R600,000 Grand Total R158,274,799 R600,000 Table 69: Capital Budget Projections for 2009 – 2012 by Funding Source. Grand Total R54,223,508 R12,258,713 R280,098,990 R50,283,280 R1,500,000 R117,186,634 R37,700,000 R829,914,509 R40,000,000 R3,200,000 R78,900,000 R93,500,000 R647,569,109 R39,600,000 R1,559,000 R6,000,000 R17,500,000 R85,500,000 R782,256,292 R62,570,000 R1,500,000 R620,167,578 R1,635,943,202 R1,086,116,778 R1,081,545,588 315 Implementation Funding and Budgets Funding Source 1 EFF 3 AFF: Ward Allocation 3 BICL SWater:Hel 3 BICL T&Roads: Blg 3 BICL T&Roads: Hel 3 BICL T&Roads: Oos 3 BICL T&Roads: Tyg N 3 CMC INFR. FUND 3 CRR:BRT System 3 PRK AREAS DEV FUND 4 CAPE METRO TRAN FN 4 CMTF OTHER 4 CMTF PG: WC DOT&PW 4 MIG 4 NG DOT PTI&SG 4 NT NDPG 4 PRIVATE SECTOR FIN 4 STATE DEPT:OTHER Budget 2008-2009 2009-2010 2010-2011 2011-2012 R138,470,124 R290,992,498 R154,729,946 R130,219,296 R827,939 R339,561 R1,500,000 R3,000,000 R3,138,651 R15,100,000 R1,000,000 R10,346,320 R5,900,000 R12,750,967 R7,000,000 R3,000,000 R194,975 R3,556,883 R3,100,000 R45,000,000 R275,010,000 R55,000,000 R4,200,000 R1,000,000 R258,723 R6,000,000 R3,317,228 R2,000,000 R2,000,000 R2,000,000 City of Cape Town – Integrated Transport Plan 2006 To 2011 Implementation Funding and Budgets Table 70: Capital Budget Projections for 2009 – 2012 by Focus Area. Budget Sum of 2008Sum of 2009Sum of 2010Sum of 2011Focus Area 2009 2010 2011 2012 Non-motorised Transport R118,202,311 R171,358,491 R94,500,000 R14,000,000 Parking R6,050,000 R19,550,000 R24,758,723 Public Transport R237,799,758 R947,385,000 R695,500,000 R829,256,292 Roads R162,523,635 R244,474,059 R175,742,946 R140,919,296 Safety & Security R7,023,408 R4,952,920 R2,000,000 R2,000,000 Traffic Management R53,141,801 R102,357,500 R25,069,109 R8,500,000 Unclassified R35,426,665 R145,865,232 R68,546,000 R86,870,000 Grand Total R620,167,578 R1,635,943,202 R1,086,116,778 R1,081,545,588 9.2 Repairs and Maintenance Primary Cost. Along with the capital expenditure budget, the City of Cape Town is required to repair and maintain its existing assets. The primary budget for repairs and maintenance for the 2009–2012 period is shown in Table 71: Repairs and Maintenance: Primary Costs – 2009-2012 2009/10 2009/10 2009/10 Plan Costs Plan Costs Plan Costs R 223,564,147 R 243,237,791 Transport R 19,590,934 R 21,295,345 R 23,169,336 TOTAL R 226,082,989 R 244,859,492 R 266,407,127 budget and the Repairs and Maintenance R 206,493,055 main components. The Capital Expenditure Roads & Stormwater The City of Cape Town budget comprises two detailed project lists from previous and this ITP. Appendices A, B and C which provide the This Chapter is to be read in conjunction with Implementation Funding and Budgets Department 316 City of Cape Town – Integrated Transport Plan 2006 To 2011 Implementation Funding and Budgets Implementation Funding and Budgets 317 City of Cape Town – Integrated Transport Plan 2006 To 2011 Public Participation 10 PUBLIC PARTICIPATION 10.1.1 Summary of Public Participation To Date Each year the City of Cape Town‘s (CoCT) ITP document is reviewed and updated to ensure that the information provided is relevant and accurately reflects current transport data and trends. Public participation and consultation with interested parties forms an integral part of the review process for the ITP and specific issues and/or concerns raised are used to inform the update of the ITP document. In 2006, the 1st version of this ITP document was circulated for public comment and more than 800 interviews were undertaken by the City of Cape Town. As part of this ITP review, second and third rounds of public consultation were undertaken by the City in October 2008 and from August to September 2009 respectively. Table 35 illustrates the public consultation process undertaken as part of the ITP review process. Table 35: Overview of the public participation process undertaken to date Cape Town. 800 February 2007 Mayoral Transportation week to review existing transport conditions, transport plans etc. 4.4.1 318 to than June 2007 Engagement with and presentation to Council representatives (sub-councils, Transport Roads & Stormwater Portfolio Committee and full council). 35 respectively. Table 2009 September October 2008 and from August were undertaken by the City in rounds of public consultation November 2006 – February 2007 Video interviews conducted. interviews update of the ITP document. August 2006 Workshops held as part of the IDP Transportation Sector. ITP review, second and third As part of this undertaken by the City of were for public comment and more ITP document was circulated 4.4.2 In 2006, the 1st version of this and/or concerns raised are used to inform the review process for the ITP and specific issues interested parties forms an integral part of the trends. Public participation and consultation with accurately reflects current transport data and July 2006 Engagement with Council representatives (sub-councils, Transport Roads & Stormwater Portfolio Committee and full council). the information provided is relevant and document is reviewed and updated to ensure that Each year the City of Cape Town‘s (CoCT) ITP Summary of Public Participation To Date Public Participation PUBLIC CONSULTATION UNDERTAKEN BY CITY OF CAPE TOWN ~ 2006 - 2007 March 2006: 1st draft (dated June ‗06) circulated for comment- summary documents and DVDs distributed, advertisements. Presentations and workshops- stakeholders. Transport Symposium held at the Cape Town International Conference Centre. City of Cape Town – Integrated Transport Plan 2006 To 2011 Public Participation PUBLIC PARTICIPATION OF ITP REVIEW UNDERTAKEN BY CITY OF CAPE ~ 20082009 October / November 2008 Identification of key stakeholders from existing databases. November 2008 Distribution of letters to the Interested & Affected Parties detailing the ITP review process and inviting comment. Advertisements in all local community newspapers. November 2008- January 2009 Written comment submissions received from the Interested & Affected Parties. January 2009 Formalisation and grouping of comments into Comments Report for Project Team‘s consideration as part of the revision process. August 2009 – September 2009 Legal adverts placed in some regional and all local community newspapers. Hard copies of the ITP review report and public documents made available at all 106 public libraries and 23 subcouncils as well as on the City‘s website. Presentations on ITP review given at all the Sub council meetings. Six Public Information Desks held at regional shopping malls. Additional Pamphlet distribution to 5 Sub-Councils in the Metro South East area of the City. Public Hearing held for key stakeholders in the transport industry to present their issues, concerns and/ or comments on the revised ITP Report. October 2009 Formalisation and grouping of comments into Comments Report for Project Team‘s consideration. 10.2 Public Participation process for the 1st edition of this ITP (2006/ 2007) Undertaken by City of Cape Town in 2006 and 2007, various means of public This included information45 dissemination, holding a Transport Symposium for key stakeholders, presenting to Council representatives (sub-councils, Transport Roads & Stormwater Portfolio Committee and full council), holding workshops and undertaking more than 800 video interviews in 77 areas in and around the Cape Metropolitan Area. The majority of the public transport users interviewed were dissatisfied with the current public transport system that they felt was inadequate. It was believed that the government 45 ITP and summary document, DVD etc. 319 Public Participation engagement/ consultation was undertaken as part of the review of the ITP document. City of Cape Town – Integrated Transport Plan 2006 To 2011 Public Participation was not actively improving the quality and frequency of services that also included safety and security issues, which were considered to be of huge concern by those interviewed. Other issues raised included the unreliability of services (insufficient and infrequent), overcrowding, uncomfortable and unsafe minibuses, safety and security at train stations during off-peak times, and badly maintained taxis that drove recklessly. Infrastructure (more bus shelters, lanes dedicated for public transport users) also required attention. Other issues that were raised included no facilities for physically disabled users, as well as no bus/ taxi routes in many areas. This information was used as a key Strategic Informant to the latest ITP review process. 10.3 Further Public Engagement (2008/ 2009) In November 2008, the City of Cape Town advertised the ITP review process in some regional and local community newspapers. Posters were erected at all of the public libraries in the Cape Metropolitan Area and identified key-stakeholders were sent written notification of the availability of the ITP document for review and comment. The ITP document was lodged at all of the subcouncil offices within the metropolitan area, and made electronically available for download from the City of Cape Town website. A public participation register was created and included contact details of non-governmental and non-profit organisations, relevant district and local municipal representatives, national, provincial and local government officials, and stakeholders from previous public Cape Town. 10.4 Public Engagement on the updated ITP (2009) 800 Based on the comments received on the ITP document during the 2008/ 2009 consultation period, the ITP Report was updated and revised, and made available for 4.4.1 320 than comment from 26 August 2009 until 28 September 2009. 35 Table September of the ITP, public transport, and infrastructure supporting public transport. to interviews update of the ITP document. and security, toll roads, non-motorised transport, heavy vehicles, information in. / content respectively. were themed into eight main categories, namely road improvement and upgrades, safety 2009 October 2008 and from August were undertaken by the City in rounds of public consultation ITP review, second and third As part of this undertaken by the City of were for public comment and more ITP document was circulated 4.4.2 In 2006, the 1st version of this and/or concerns raised are used to inform the review process for the ITP and specific issues interested parties forms an integral part of the trends. Public participation and consultation with accurately reflects current transport data and Seventeen written comments were received from Interested & Affected Parties. Issues the information provided is relevant and document is reviewed and updated to ensure that Each year the City of Cape Town‘s (CoCT) ITP Summary of Public Participation To Date Public Participation engagement/ consultation. City of Cape Town – Integrated Transport Plan 2006 To 2011 Public Participation The ITP review process was advertised in some regional46 and all local community newspapers. A media release was also published in the regional newspapers. Interested parties on the database received written notification of the availability of the revised ITP document for review and comment. The revised ITP document, response forms in English, Afrikaans and Xhosa as well as an Executive Summary was lodged at the 23 subcouncil offices as well as the 106 public libraries within the management area. The documentation was also made electronically available for download from the City of Cape Town website. The public participation register was updated with new interested parties who submitted written comment on the revised ITP Report. As part of the consultation process, presentations were given by City officials at the subcouncil meetings that were held during the month of September. Information Desks were also held at six regional shopping malls47 within the MA to assist the public access and locate the ITP documentation, as well as to receive any relevant queries on the plan. To address the gaps in coverage in the shopping malls in the Metro South East area of the City, additional pamphlets in English, Afrikaans and Xhosa were distributed to 5 SubCouncils for distribution to it‘s affected 23 wards. A public hearing was also held on 9 September 2009 and was attended by the following Metrorail, The Department of Transport & Public Works-Planning, Transnet National Ports Authority, Disabled People of South Africa, Western Cape Metered Taxi Council, Cape Town Association for the Physically Disabled, The Institute for the Promotion of Disabled Manpower, The Western Cape Network on Disability, The National Department of Transport, Cape Peninsula University of Technology: Transport Engineering, SA National Roads Agency Ltd, 46 Cape Argus, Cape Times and Die Burger Canal Walk (Century City), Fair Bridge Mall (Brackenfell), Vangate Mall (Athlone), Kenilworth Centre (Kenilworth), Promenade Mall (Mitchells Plain), and Somerset Mall (Somerset West) 47 321 Public Participation key stakeholders from the transport industry: City of Cape Town – Integrated Transport Plan 2006 To 2011 Public Participation Provincial Government of the Western Cape: Department of Environmental Affairs and Development Planning, National Taxi Alliance, and Congress of Democratic Taxi Associations (CODETA). A total of 32 written comments/ submissions were received. All issues/ comments were summarized into the following ten themes, namely: information in/ content of the ITP, public transport, freight, port/ harbour, non-motorised transport, integrated rapid transit system, road improvement/ upgrades, safety and security, special needs passengers, and a general theme. 10.5 Public Comments on the ITP A number of comments and/or issues were raised as part of the public consultation process undertaken from 26 August 2009 to 28 September 2009. A summary of the key issues raised by the public were themed into a Comments Report and used to inform the finalisation of the updated ITP document. The key comments made and issues raised are listed below. In summary, there was general support for the revised ITP document with suggested changes being made relating to more accurate information, clarity of figures etc. Other key issues/ comments made included: The mindset amongst citizens (particularly private car users) needed to change for Cape Town. 800 public transport to be utilized. However, public transport needed to be safe, affordable and reliable in order to convert and retain private car users in the public transport system. than Improved reliability and frequency of different modes of transport, Requests for additional and better infrastructure for non-motorized transport, particularly for cyclists, 322 35 Table 2009 to private car users, September Improved safety and security of public transport to make this mode more attractive for respectively. interviews October 2008 and from August were undertaken by the City in rounds of public consultation ITP review, second and third As part of this undertaken by the City of were for public comment and more ITP document was circulated 4.4.2 In 2006, the 1st version of this facilities would be built or what services would be provided. 4.4.1 Request that the Summary document provide more specific information on what update of the ITP document. and/or concerns raised are used to inform the review process for the ITP and specific issues trends. Public participation and consultation with accurately reflects current transport data and person. interested parties forms an integral part of the Some felt that the ITP report was too complex and difficult to read for the average the information provided is relevant and document is reviewed and updated to ensure that Each year the City of Cape Town‘s (CoCT) ITP Summary of Public Participation To Date Public Participation City of Cape Town – Integrated Transport Plan 2006 To 2011 Public Participation Request for more suitable facilities and infrastructure for disabled people to effectively use public transport that is safe and convenient, Requests were made for information pertaining to the financing of transport projects, More information on the projects that the City has undertaken and timeframes for future key transport projects, Request for more information pertaining to future policies or transport developments for inclusion in the ITP. Request for more integrated transport that is accessible to all, Large support for universal access in transport, Requests for additional rail infrastructure and linkages, Recommendations provided to improve public transport, as well as bus operations, Support for the BRT, however many requests for more detailed information on the initiative, Requests to focus transport projects/ improvements in previously disadvantaged areas, Specific requests were also made for road upgrades and improvements in specific areas. Detailed comments relating to freight, the port/ harbour, the metered taxi industry, the Public Participation minibus industry, airport were also submitted and are included in the Comments Report. 323 City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 11 BIBLIOGRAPHY 1. Canadian Centre for Sustainable Transport (2002), Moving on Sustainable Transport 2. Cape Times Special Transport Supplement (Thursday 16 February 1939), 3. Central Government: Statistics SA: Community Survey (2007) 4. Central Government: Constitution and Municipal Systems Act (No 32 of 2000) 5. Central Government: Department of Transport 2010 Transport Action Plan 6. Central Government: Department of Transport Draft Pedestrian and Bicycling Facility Guidelines 7. Central Government: Department of Transport Moving South Africa Transport Plan (1999), 8. Central Government: Department of Transport National Freight Logistics Strategy. (2005), 9. Central Government: Department of Transport White Paper on National Transport (1996), 10. Central Government: Department of Transport Public Transport Infrastructure Fund (PTIF) 11. Central Government: Department of Transport White Paper Moving South Africa (1999) 12. Central Government: Department of Transport White Paper on National Transport Policy (1996) 13. Central Government: Development Facility Act 14. Central Government: Division of Revenue Act (2008) 15. Central Government: Employment Equity Bill 16. Central Government: Government Notice (GN) No 386 & 387 (of 2006) 17. Central Government: Guidelines for Conducting the Economic Evaluation of Urban Bibliography Transport Projects 18. Central Government: Labour Force Surveys 2005 / 2006 / 2007 19. Central Government: Land Transport Bill (Version D) 20. Central Government: Land Use Management Bill (March 2007) 21. Central Government: Municipal Services Financial Model 22. Central Government: Municipal Systems Act (of 2000) 23. Central Government: National Census 1996 24. Central Government: National Census 2001 324 City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 25. Central Government: National Credit Act (2007) 26. Central Government: National Environmental Act 27. Central Government: National Environmental Conservation Act (No73 of 1989) 28. Central Government: National Environmental Management Act – NEMA (No 107 of 1998) 29. Central Government: National Environmental Management Air Quality Act (No39 of 2004) 30. Central Government: National Environmental Management Biodiversity Act (No10 of 2004) 31. Central Government: National Environmental Management Protected Areas Act (No57 of 2003) 32. Central Government: National Government Breaking New Ground: A Comprehensive Plan for the Development of Sustainable Human Settlements (2005), 33. Central Government: National Government Immovable Assets Management Bill (2006) 34. Central Government: National Government Municipal Finance Management Act 35. Central Government: National Government National Household Travel Survey (2006) 36. Central Government: National Government White Paper on Local Government (1998) 37. Central Government: National Heritage Resources Act (No 29 of 1999) 38. Central Government: National Injury Mortality Surveillance System (2002) 39. Central Government: National Land Transport Act 40. Central Government: National Land Transport Act - Integrated Rapid Transport 41. Central Government: National Land Transport Transition Act (No 22 of 2000) 42. Local Government: Municipal Structures Act (Act 117 of 1998) 43. Local Government: Municipal Systems Act (Act 32 of 2000) 44. Central Government: National Spatial Development Perspective 45. National Road Traffic Act 93 of 1996 and National Road Traffic Regulations, 2000 (October 2005) 46. Central Government: National Water Act (No 36 of 1998) 47. Central Government: Provincial Land Use Planning Ordinance (15 of 1985) 48. Central Government: Road Infrastructure: Strategic Framework for South Africa Classification System 325 Bibliography Structure City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 49. Central Government: SANS 10232-3:2007 (SABS 0232-3) Transport of dangerous goods – Emergency information systems Part 3: Emergency response guides 50. Central Government: South African Constitution 51. Central Government: Statistics SA – 2001 Census Employment by (Section 52) Industry Sector 52. Central Government: Statistics SA – 2001 Census Table Income Distribution 53. Central Government: Department of Transport Technical Transport Planning Guidelines for CITPS to be prepared by Type 1 Planning Authorities (2009) 54. Central Government: The Accelerated and Shared Growth Initiative of South Africa (ASGISA) 55. Central Government: Urban Transport Act (Act 78 of 1977) 56. Chrystal C. P. The Characterization of Storm water Run off from Road Surfaces. Master Dissertation University of Kwa-Zulu Natal 2007 57. City of Cape Town: Cultural Heritage Strategy (CCT 2005) 58. City of Cape Town: Metropolitan Transportation Study (1979) 59. City of Cape Town: (Draft) Cape Town 2030: An Argument for the Long-Term Spatial Development of Cape Town (2006), 60. City of Cape Town: 5 year Integrated Development Plan (2007) 61. City of Cape Town: Air Quality Management Strategy (2005), 62. City of Cape Town: Airport Master Plan 63. City of Cape Town: Biodiversity Strategy (CCT 2003-3) 64. City of Cape Town: Cape Metropolitan Area: Peninsular Urban Structure Guide Plan (1998) 65. City of Cape Town: Capital Grants 66. City of Cape Town: City Engineers Department Report (1956) 67. City of Cape Town: Current Public Transport Record (2004/2005), 68. City of Cape Town: Current Public Transport Record (2009), 69. City of Cape Town: Documentation on TPAC 2008 70. City of Cape Town: Draft Economic and Human Development Policy Framework Bibliography (2005), 71. City of Cape Town: Draft Energy and Climate Strategy (2006), 72. City of Cape Town: Draft Integrated Zone Scheme 73. City of Cape Town: Draft Tourism Development Framework (2005), 74. City of Cape Town: EMME3 Transportation Model 75. City of Cape Town: Energy and Climate Change Strategy (CCT 2006) 326 City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 76. City of Cape Town: Generic Energy Usage figures for various vehicle types (CCT, 2006) 77. City of Cape Town: Hottentots Holland Guide Plan (1998) 78. City of Cape Town: Initial Report of the Intergovernmental Integrated Development Task Team for the Cape Town Functional Region (2006) 79. City of Cape Town: Inner City Public Transport Study (1996) 80. City of Cape Town: Integrated Development Plan (2004/05) 81. City of Cape Town: Integrated Development Plan (IDP, 2007-3), 82. City of Cape Town: Integrated Development Plan 2007/08 83. City of Cape Town: Integrated Metropolitan Environmental Policy (CCT, 2003-1), 84. City of Cape Town: Metropolitan Bicycle Plan and Pedestrian Safety Plan 85. City of Cape Town: Metropolitan Cycle Master Plan 86. City of Cape Town: Metropolitan Spatial Development Framework Re-draft (MSDF - CT) 87. City of Cape Town: Moving Ahead Transport Plan (1998) 88. City of Cape Town: Municipal Spatial Development Framework (CCT, 2001), 89. City of Cape Town: Non-motorised Transport (NMT) Policy & Strategy Volume 1: Status Quo Assessment (Oct. 2005) 90. City of Cape Town: Operating Licensing Strategy 91. City of Cape Town: Parking Policy (under review) 92. City of Cape Town: Pedestrian Safety Project Volume 2 Pedestrian Safety Implementation Plan for the City of Cape Town 93. City of Cape Town: Public Transport - Safety, Security & Enforcement Strategy (2007) 94. City of Cape Town: Public Transport 2008/09 Budget 95. City of Cape Town: Public Transport Plan (CCT 2007-2) 96. City of Cape Town: Quantec data of the Contribution of Economic Sectors to the GDP in Cape Town and South Africa as received from the City of Cape Town Strategic Information Unit (2007) 97. City of Cape Town: Quantec data of the Trends of the GDP in Cape Town as (Previously EDHS), October 2008, Economic and Human Development Department (2008) 98. City of Cape Town: Review of the Economic Development Strategy (EDS) (previously EDHS), October 2008, Department (2008) 327 Economic and Human Development Bibliography received from the City of Cape Town Strategic Information unit City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 99. City of Cape Town: Road Traffic Management Operations Plan (2002) 100. City of Cape Town: Spatial Distribution of Socio – Economic Status, Service Levels and Levels of Living in the City of Cape Town 2001 – To Highlight the Suburbs in Need (March 2006) 101. City of Cape Town: Special Planning Directive 102. City of Cape Town: State of Energy Report (CCT, 2007-5). 103. City of Cape Town: State of Energy Report for Cape Town (2003), 104. City of Cape Town: State of the Environment Report (CCT, 2003-2), 105. City of Cape Town: Strategic Assessment of the Environmental and Heritage SDF Process (2006) 106. City of Cape Town: NMT Strategic Plan 107. City of Cape Town: Sustainability Report (CCT, 2007-4); and 108. City of Cape Town: The Peninsula Urban Edge Study (2001), 109. City of Cape Town: Tourism Business Plan (Draft) 110. City of Cape Town: Traffic Accident Statistics Transport Directorate (2003) 111. City of Cape Town: Transport Authority Business Plan (2006) 112. Corporate Legislative Framework 113. CPTR 2007 114. Dorrington R. E. Projection of the Population of Cape Town 2001 to 2021. Unpublished report prepared for the City of Cape Town 115. Energy Research Institution: ―Cape Town Brown Haze Study‖ (ERI, 1997) 116. Foresight Publications: Emergency Response Guidebook of Southern Africa: A guidebook for first responders during the initial phase of a dangerous goods incident, (2008) 117. Foresight Publications: Dangerous Goods Digest: The Orange Book of Southern Bibliography Africa, 118. Htt://www. polity. org. za/article/community-survey-039unreliable039-2008-0108 119. http://www. capetown. gov. za/en/stats/Documents. htm 120. http://www. capetown. gov. za/en/stats/Documents/Unemployment. mht 121. Intergovernmental Approach to the Development Challenges of Cape Town 122. KD Govender (KDG Architects), Proposal to develop a strategy for the application of Universal Design (June 2004) 123. Litman, T and Burwell, D Issues in Sustainable Transportation, Victoria Transport Policy Institute (2003) 124. Local Government: Municipal Performance Regulation (2001) 125. Office of the Deputy President: Integrated National Disability Strategy White Paper (November 1997), 328 City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 126. Oxford University Press: Our Common Future, 127. Provincial Government Western Cape: iKapa Elihlumayo – A Framework for the Development of the Western Cape Province 2004-2007 128. Provincial Government Western Cape: Provincial Spatial Development Framework (July 2005) 129. Provincial Government Western Cape: Growth and Development Strategy 130. Provincial Government Western Cape: Land Use Planning Ordinance (Ordinance No 15 of 1995) 131. Provincial Government Western Cape: Noise Control Regulations (PN 627 of 1998) with draft amendments stipulated in PN 14 of 2007 132. Provincial Government Western Cape: Provincial Land Transport Framework (2004), 133. Provincial Government Western Cape: Provincial Spatial Development Framework (July 2005) 134. Provincial Government Western Cape: White Paper on Transport (1997), 135. Provincial Government Western Cape: Strategic Infrastructure Plan 136. Provincial Government Western Cape: Department of Transport & Public Works 137. Provincial Government Western Cape: Expanded Public Works Programme 138. Provincial Government Western Cape: Freight Data Bank (2004) 139. Provincial Government Western Cape: Freight Transport & Logistics Plan CSIR (2008) 140. Provincial Government Western Cape: Operating Licensing Board 141. Provincial Government Western Cape: Provincial Economic Review & Outlook (2007) 142. Provincial Government: Western Cape: Provincial Land Transport Framework (2004) 143. Provincial Government Western Cape: White Paper on Western Cape Transport Policy 144. Haiden R. Traffic Management and Congestion in the City of Cape Town, Draft paper prepared for Construction World, (June 2003 Edition). SAP/C. P. /T. D. – Enforcement Strategy 146. Subsidies for SARCC 147. TDM Encyclopaedia (2005) 148. The KyotoProtocol (Feb. 2005) 149. Transportation Research Board: Toward a Sustainable Future, Special Report 251 Bibliography 145. (1997), 329 City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography 150. Vuchic V. Vehicle Transport for Liveable Cities CUPR New Jersey (2nd Edition 2000) 151. Wong C. M. & Dutkiewiez R. K: Vehicle Emission Project (Phase II) Report No CER 161 Vol. 1 (Nov. 1998) 152. Working Group Spatial Development Framework (SDF) Draft (2009) 153. World Commission on Environment and Development (Brundtland Commission) (1987), www. epa. gov (accessed 05/01/2009) 155. www. sapia. co. za, accessed 05/01/2009 Bibliography 154. 330 City of Cape Town – Integrated Transport Plan 2006 To 2011 Bibliography Bibliography 331 City of Cape Town – Integrated Transport Plan 2006 To 2011 Glossary 12 GLOSSARY ABET Adult Basic Education and Training ACSA Airports Company South Africa AFS Annual Financial Statistics Survey AIDS Acquired Immune Deficiency Syndrome AMS Asset Management System ARTS Athlone Refuse Transfer Station ASGISA Accelerated and Shared Growth Initiative South Africa ATC Area Traffic Control AVL Automatic Vehicle Location BEE Black Economic Empowerment BELCON Bellville Container Terminal BICL: Bulk Infrastructure Contribution Levy (also known as Development Glossary Contributions). BMS Bridge Maintenance System BOT Build, Operate and Transfer BRT Bus Rapid Transit CAPCON Cape Town Container Terminal CBD Central Business District CCTV Close Circuit Television CDM Cleaner Development Mechanisms CF Contextual Framework CITP Comprehensive Integrated Transport Plan CMRIMS Cape Metropolitan Road Incident Management System COASA Coach Operators Association of Southern Africa CoCT City of Cape Town CPTR Current Public Transport Record CRR: Capital replacement Reserve CTC Centralised Traffic Control CTIA Cape Town International Airport DBSA Development Bank of South Africa DFA Department Facilities Act DOT Department of Transport (National) DPLG Department: Provincial and Local Government 332 City of Cape Town – Integrated Transport Plan 2006 To 2011 Glossary EFF: External Finance Fund EPWP Expanded Public Works Programme ES(P): Equitable Share of national revenue allocated to provincial ES: Equitable Share of national revenue allocated to local government FIFA Fédération Internationale de Football Association GABS Golden Arrow Bus Services GAMAP Generally Accepted Municipal Accounting Practice GIS Geographic Information System GPS Global Positioning System HIV Human Immune Virus ICLEI International Council for Local Environmental Initiatives IDP Integrated Development Plan IMS Incident Management System IRT Integrated Rapid Transit ITP Integrated Transport Plan ITS Intelligent Transport Systems KPI Key Performance Indicators LOS Level of Service LPG Liquid Petroleum Gas MFMA Municipal Finance Management Act MIG: Municipal Infrastructure Grant MSDF Metropolitan Spatial Development Framework MTI Metropolitan Transport Information NDoT National Department of Transport NDPG: Neighbourhood Development Partnership Grant NLTTA National Land Transport Transition Act NMT Non Motorised Transport NQF National Qualifications Framework PGWC Provincial Government Western Cape PIG: Provincial Infrastructure Grant POLB Provincial Operating Licensing Board PPP Public Private Partnerships PRASA: Passenger Rail Agency of South Africa PTISG: Public Transport Infrastructure and Systems Grant RSC Regional Services Council 333 Glossary government City of Cape Town – Integrated Transport Plan 2006 To 2011 Glossary RSC: Rail Steering Committee for the Municipal Area of the City of Cape Glossary Town RTMC Road Traffic Management Corporation SAFA South African Football Association SANRAL: South African National Roads Agency Limited SAP South African Police SAPO South African Port Operations SATSA Southern African Tourism Service Association SDBIP Service Delivery and Budget Implementation Plan SDF Spatial Development Framework SES Socio-Economic Status SETA Skills, Education and Training Authority SIC: Standard Industrial Classification SLA Service Level Agreements SMME Small Medium Micro Enterprises SNU Special Needs Users SOV Single Occupancy Vehicle TDM Travel Demand Management TIA Transport Impact Assessment TOACT Tour Operators Association of Cape Town TPAC: The Transport Planning Advisory Council TPT Transnet Port Terminals TSM Transportation Systems Management TUF Transport Users Forum UD Universal Design UTC Urban Traffic Control VMS Variable Message Signage WCDLG&H: Western Cape Department of Local Government and Housing WCDT&PW: Western Cape Department of Transport and Public Works WSSD World Summit on Sustainable Development Mobility: Is the ease with which people can travel at relatively high speeds without interruptions on a road. Accessibility: Is the ability of people to get to surrounding land uses such as shops, schools and residential areas. 334 City of Cape Town – Integrated Transport Plan 2006 To 2011 Glossary Universal Design48: Universal Design is the design of products and environments to be useable by all people, to the greatest extent possible, without the need for adaptation or specialized design. Sustainable Transportation49: A sustainable transportation system is one that: Allows the basic access needs of individuals and societies to be met safely and in a manner consistent with human and ecosystem health, and with equity within and between generations. Is affordable, operates efficiently, offers choice of transport mode, and supports a vibrant economy. Limits emissions and waste within the planet‘s ability to absorb them, minimizes consumption of non-renewable resources, limits consumption of renewable resources to the sustainable yield level, reuses and recycles its components, and minimizes the use of land Glossary and the production of noise. 48 49 Ron Mace as quoted on http://www.universaldesign.com/. The Centre for Sustainable Transportation on http://cst.uwinnipeg.ca/documents/Definition_Vision_E.pdf 335 City of Cape Town – Integrated Transport Plan 2006 To 2011 Glossary Key Definitions (based on Gudmundsson, 2001) Baseline (or benchmark) – existing, projected or reference conditions if change is not implemented. Goal – what you ultimately want to achieve. Index – a group of indicators aggregated into a single value. Indicator – a variable selected and defined to measure progress toward an objective. Indicator data – values used in indicators. Indicator framework – conceptual structure linking indicators to a theory, purpose or planning process. Indicator set – a group of indicators selected to measure comprehensive progress toward goals. Indicator system – a process for defining indicators, collecting and analyzing data and applying results. Indicator type – nature of data used by indicator (qualitative or quantitative, absolute or relative). Objective – a desirable change defined in a planning process, often intended to address a problem. Target – A specified, realistic, measurable objective. Glossary Sustainable Transportation Indicators, A Recommended Research Program For Developing Sustainable Transportation Indicators and Data 10 November 2008, By the Sustainable Transportation Indicators Subcommittee of the Transportation Research Board (ADD40 [1]) 336 APPENDIX A: 2007 APPROVED PROJECT LIST STATUS UPDATE Plan Title Focus Area Project Type Funding Source 2006-2009 Claremont Relief Rd& Public Transport Interchanges. Comprehensive Intervention Design & Implementation CoCT/CID R22,000,000 Strandfontein Road: Dualing of carriageway and BMT priority Comprehensive Intervention Comprehensive Intervention Comprehensive Intervention Design & Implementation CoCT/ PGWC/ DTI/ Dev Statutory Planning CoCT R1,800,000 In progress Study CoCT R1,100,000 In progress Construction Khayelitsha: Pedestrian and Bicycle Paths/ Mitchell's Pedestrian Footways Non-motorised Transport Design & Implementation R16,000,000 In progress Klipfontein Corridor: Design and Construction Public Transport Improvements Non-motorised Transport Design & Implementation R31,000,000 Complete Klipfontein Corridor: Design and Construction of Pedestrian and Cycle Improvements Non-motorised Transport Design & Implementation R10,500,000 Complete Mobility Strategy: Bicycle and Pedestrian Facilities Non-motorised Transport Design & Implementation R88,000,000 Complete NMT and Dignified Spaces Non-motorised Transport Design & Implementation R15,500,000 Complete Universal Access NMT and Dignified Urban Spaces Non-motorised Transport Design & Implementation R28,800,000 In progress Gugulethu/ Nyanga/ Crossroads Non-motorised Transport Design & Implementation R13,500,000 In progress Mitchell's Plain Non-motorised Transport Design & Implementation R11,900,000 In progress Integrated Transport Plan 337 Demographic Forecasts & Land Use Integration Other 2009-2010 2010-2011 Future Status Complete R4,000,000 R20,000,000 R32,000,000 In progress This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 338 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Future Status Philippi East/ Mandalay/ Khayelitsha(N) Non-motorised Transport Design & Implementation R14,000,000 In progress Khayelitsha (S) Non-motorised Transport Design & Implementation R6,900,000 Complete Delft/ Belhar/ Wesbank Non-motorised Transport Design & Implementation R8,900,000 In progress Signals/ Signage (NMT /Universal Access) Non-motorised Transport Design & Implementation R7,500,000 In progress Bicycle Lockers Non-motorised Transport Design & Implementation R1,300,000 In progress City Wide: Pedestrian & Cycle Non-motorised Transport Design & Implementation Other R40,000,000 In progress NMT and Dignified Spaces Non-motorised Transport Design & Implementation Other R15,500,000 In progress Ped Footways/Bicycle Path: Khayelitsha/Mitchells Plain Non-motorised Transport Design & Implementation Other R16,000,000 In progress Marine Drive & Church Street Interchanges(Pirow Str to R27) Public Transport Design & Implementation PGWC/DoT R70,000,000 R4,000,000 Public Transport Priority lanes on N1 & lane balance (incl ITS) Public Transport Design & Implementation PGWC/DoT R163,000,000 R68,000,000 R11,000,000 In progress N2 BMT lane extension to Cape Town International Airport Public Transport Design & Implementation 2010 DoT Legacy R69,000,000 R23,000,000 R5,000,000 In progress M5 BMT Lanes N2 to N1 Public Transport Design & Implementation R37,000,000 R2,000,000 BMT lane extension: NY1 to Vanguard Drive Public Transport Design & Implementation PGWC/CoCT R32,000,000 Postponed BMT lane extension: Jan Smuts Dr to Mowbray Public Transport Design & Implementation PGWC/CoCT R20,000,000 Postponed R27 : Contraflow PT lanes and TSM improvements Public Transport Design & Implementation CoCT/Dev R20,000,000 Replaced (IRT) Bayside PTI (Blaauwberg) Public Transport Design & Implementation Developers R5,000,000 Replaced (IRT) Terminated Postponed This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 339 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Koeberg Rd PT Priority lanes Public Transport Design & Implementation PGWC/DoT R39,000,000 R24,000,000 R3,000,000 Potsdam Rd PT Priority Lanes Public Transport Design & Implementation R16,000,000 R13,000,000 In progress Oostenberg: Public Transport facilities Public Transport Design & Implementation CoCT R9,000,000 R3,000,000 Postponed Bus/Taxi Embayments :General Provision Public Transport Design & Implementation Other R3,000,000 In progress General Public Transport Facilities Public Transport Design & Implementation Other R13,500,000 In progress Oostenberg Improvements - Public Transport facilities Public Transport Design & Implementation Other R5,800,000 Postponed Parow Railway station: North Side Public Transport Design & Implementation Other R5,000,000 Postponed Provision of Bus/Taxi shelters Public Transport Design & Implementation Other R2,000,000 In progress Public Transport Facilities: Signage Public Transport Design & Implementation Other R1,500,000 In progress Klipfontein Public Transport Corridor: Public Transport Improvements Public Transport Design & Implementation CoCT/Other R184,500,000 Postponed Provision of New and Improved Facilities Public Transport Design & Implementation CoCT R400,000 In progress Station Deck Long Distance Public Transport Other R6,000,000 In progress Station Deck PTI for Long Distance services Public Transport CoCT R5,000,000 In progress Hanover Park Transport Interchange Public Transport Other R5,500,000 Complete Khayelitsha CBD PTI Public Transport Other R8,500,000 In progress Design & Implementation Design & Implementation Design & Implementation Design & Implementation Future Status In progress This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 340 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Future Status Lentegeur & Mandalay Station PTI's:Const Public Transport Design & Implementation CoCT/Other R14,000,000 In progress Macassar PTI Public Transport Design & Implementation Other R1,200,000 Postponed Mitchell's Plain Station TI Public Transport Design & Implementation Other R35,100,000 Complete Mitchells Plain Station TI (East) Public Transport Design & Implementation CoCT R11,000,000 Complete Nomzamo PTI: Strand Public Transport Design & Implementation Other R4,000,000 In progress Somerset West PTI Public Transport Design & Implementation CoCT/Other R8,000,000 Postponed Ysterplaat PT Facilities Improvements Public Transport Design & Implementation CoCT/Other R8,000,000 Replaced (IRT) Allocation of Ranks in the V&A Waterfront Public Transport Design & Implementation CoCT R1,000,000 Postponed Claremont CBD:Taxi Facilities Public Transport Design & Implementation CoCT/Other R17,500,000 Complete Edgemead Taxi Rank Public Transport Design & Implementation CoCT R500,000 Postponed Imizamo Yethu Taxi Facility: Hout Bay Public Transport Design & Implementation Other R2,000,000 Postponed Kuilsrivier CBD Taxi Facilities Public Transport Design & Implementation Other R3,500,000 Postponed Masiphumelele (Site 5) Taxi Rank Public Transport Design & Implementation Other R800,000 Postponed Mfuleni Ext 5: Bus/Taxi Rank (South) Public Transport Design & Implementation CoCT R100,000 Postponed Samora Machel Taxi Rank: Philippi Public Transport Design & Implementation Other R2,500,000 Postponed Southern Delft Taxi Rank Public Transport Design & Implementation Other R2,000,000 Postponed This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 341 Plan Title Focus Area Project Type Funding Source 2006-2009 Table View Taxi Rank (Bayside) Public Transport Design & Implementation Other R1,500,000 Replaced (IRT) Wallacedene Taxi Rank Public Transport Design & Implementation Other R2,300,000 Postponed Infrastructure Needs of Taxi Recapitalisation Programme Public Transport Design & Implementation R1,600,000 Postponed Service/Call centre for metered taxis Public Transport Design & Implementation CoCT R700,000 Postponed Implementation of Comprehensive Passenger Information System Public Transport Design & Implementation CoCT R10,000,000 Postponed Current Public Transport Record Public Transport Design & Implementation CoCT R4,000,000 In progress Development of a Comprehensive Passenger Information System Public Transport Detailed Design CoCT R1,500,000 Postponed CCTV Enforcement on Public Transport lanes Public Transport Enforcement CoCT R415,300,000 In progress Corridor Feasibility Studies Public Transport Feasibility Study CoCT R3,500,000 In progress Project Identification and Feasibility Public Transport Feasibility Study CoCT R1,000,000 In progress Public Transport Management CoCT R500,000 Replaced (IRT) Public Transport Management CoCT R18,500,000 In progress OLS Management for Unscheduled Services Public Transport Management CoCT R600,000 In progress Allocation of rank V&A Waterfront Public Transport Management CoCT R400,000 In progress Accreditation of Tourist Services Public Transport Management CoCT R200,000 In progress Code of Conduct and Operating Practices for Metered taxi services Public Transport Management CoCT R400,000 In progress Accreditation of Driver Training for Metered Taxi Operators Public Transport Management CoCT R800,000 In progress Establishment of a Transport Authority Rank Management & Interchange Management Advisory Committee 2009-2010 2010-2011 Future Status This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 342 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Future Status Taxi Recapitalisation Programme Public Transport Management CoCT R800,000 In progress MTI Call Centre Public Transport Management CoCT R24,800,000 Complete Provision of Scheduled Bus Services through Interim Contract Public Transport Operations Other R630,000,000 In progress Design and Preparation of Scheduled Service Contract Documents Public Transport Operations Other R2,000,000 In progress Provision of Scheduled Service Tender Contracts/Negotiated Public Transport Operations Other R1,100,000,000 In progress Monitoring of the Scheduled Public Transport Services Public Transport Operations Other R11,000,000 In progress ModelContracts for Learner Service Public Transport Operations CoCT R200,000 In progress ModelContract for Staff Services Public Transport Operations CoCT R200,000 In progress Development of Integrated Fare Management & AVL System Public Transport Operations Other R700,000 In progress Implementation of an Integrated Fare Management System Public Transport Operations Other R60,000,000 In progress Provision of the Dial-a-Ride Service Public Transport Operations CoCT/Other R48,000,000 In progress Pilot Project of Public Transport Safety & Security Audit Public Transport Operations CoCT R1,000,000 In progress Management of Long Distance Bus and Minibus Taxi Ranks Public Transport Operations CoCT R4,100,000 In progress Deployment of Security Services Public Transport Security CoCT R62,700,000 In progress PTI's: Improved surveillance (CCTV) on Khayelitsha and Mitchells Plain Rail Corridor Public Transport Security CoCT R204,000,000 In progress Operating Licences Strategy Public Transport Statutory Planning CoCT R600,000 In progress Rationalisation Plan Public Transport Statutory Planning CoCT R400,000 In progress Public Transport Plan Public Transport Statutory Planning CoCT R2,400,000 In progress Investigate Services for SNP Public Transport Study CoCT R1,000,000 In progress This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 343 Plan Title Focus Area Project Type Funding Source 2006-2009 Demand for Learner Transport Public Transport Study CoCT R400,000 In progress Demand for Staff Services Public Transport Study CoCT R300,000 In progress Surveys for Unscheduled Services Public Transport Study CoCT R400,000 In progress Surveys of Long Distance Bus and Minibus Operators Public Transport Study CoCT R200,000 In progress Develop Public Transport Branding Public Transport Study Other R300,000 In progress Public Transport Study Other R200,000 In progress Public Transport Study CoCT R1,300,000 In progress Development of a Public Transport Charter Public Transport Study CoCT R400,000 In progress Public Transport Impact Studies Public Transport Study CoCT R900,000 Ongoing Funding Strategy Public Transport Study CoCT R300,000 In progress Environmental Policy for Transport & Alternative Technologies Public Transport Study CoCT R400,000 In progress User Preference & Attitude Surveys Public Transport Study CoCT R1,600,000 In progress Claremont Main Rd Roads Design & Implementation CoCT/CID R4,000,000 Postponed Granger Bay Boulevard Roads Design & Implementation R23,000,000 In progress Koeberg Interchange improvements (incl M5 improvements) Roads Design & Implementation PGWC/V&AW R210,000,000 R11,000,000 In progress Paarden Eiland Interchange & links to Port Roads Design & Implementation PGWC/DoT R59,000,000 R3,000,000 In progress Foreshore Freeway: Completion of reduced scheme Roads Design & Implementation NPA R345,000,000 R165,000,000 Buitengragt/Coen Steytler Ave: Pedestrian bridge and landscaping Roads Design & Implementation CoCT/PGWC R13,000,000 Develop the livery for Contracted Services Develop and Implement a Comprehensive Marketing Strategy 2009-2010 2010-2011 R25,000,000 Future Status Postponed In progress This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 344 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Future Status Berkley Road Extension: M5 to Malta Road Roads Design & Implementation CoCT R20,000,000 Frans Conradie Dr. extn & Sable Rd:Vanguard Dr. to Marine Dr. Roads Design & Implementation CoCT R114,000,000 R40,000,000 Century City Transport Improvements to permit additional bulk Roads Design & Implementation CoCT/Land Rest R68,000,000 R23,000,000 Culemborg Spine Rd: Church Street to Adderley Street Roads Design & Implementation Developers R3,000,000 R30,000,000 Hospital Bend :Westbound preselection lanes Roads Design & Implementation 2010 DoT Legacy R61,000,000 R3,000,000 In progress Hospital Bend: Eastbound preselection lanes Roads Design & Implementation 2010 DoT Legacy R21,000,000 R2,000,000 In progress Liesbeeck Parkway/Malta Rd to Salt River Roads Design & Implementation N7/M12 Interchange & M12: Potsdam to Contermanskloof Roads Design & Implementation M12: Diep River Bridge Roads Sandown Road: Braselton to Parklands Main Rd Postponed R8,000,000 Postponed In Progress R20,000,000 R3,000,000 In progress R20,000,000 In Progress CoCT R54,000,000 Complete Design & Implementation Developers R27,000,000 Complete Roads Design & Implementation Developers R15,000,000 In Progress R27: Additional lanes and intersection improvements Roads Design & Implementation PGWC R60,000,000 Parklands Main Rd: Gie Rd to Sandown Rd Roads Design & Implementation Developers R6,000,000 Raats Dr: Widening: Short to Parklands Main Rd Roads Design & Implementation Developers R4,000,000 Parklands Main Rd: 2nd carriageway: Park Dr to Sandown Rd Roads Design & Implementation Developers R16,000,000 Sandown Road:Parklands Main Rd to M12 Roads Design & Implementation Developers R14,000,000 M12: Sandown Rd to N7 & Sandown Rd to Industrial Area Roads Design & Implementation PGWC/DoT R17,000,000 R20,000,000 Postponed R3,000,000 In Progress This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 345 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Future Status DURBAN RD/SYMPHONY WAY/SHEFFIELD RD CORRIDOR Roads Design & Implementation PGWC/CoCT R50,000,000 R80,000,000 R80,000,000 R10,000,000 Postponed WETTON RD/LANSDOWNE RD CORRIDOR Roads Design & Implementation PGWC/CoCT R5,000,000 R50,000,000 R50,000,000 R5,000,000 Postponed VANGUARD DRIVE CORRIDOR Roads Design & Implementation PGWC/CoCT R65,000,000 R60,000,000 R80,000,000 R520,000,000 Postponed Roads Design & Implementation PGWC/DoT R118,000,000 R6,000,000 Postponed Roads Design & Implementation CoCT/PGWC/DTI/Dev R34,000,000 R2,000,000 In progress N2: Helderberg Freeway Roads Design & Implementation R310,000,000 R100,000,000 R20,000,000 R300(N21): Extension N1 to N7 & R27 Roads Design & Implementation R10,000,000 R100,000,000 R200,000,000 Jan Smuts Dr: N2 to Viking Way: 2nd carriageway Roads Design & Implementation CoCT R24,000,000 In progress Viking Way: 2nd carriageway Roads Design & Implementation CoCT R24,000,000 Postponed Ottery Rd/South Rd/Constantia Rd Roads Design & Implementation Baden Powell Dr: Strandfontein Rd to Prince George Dr Roads Design & Implementation M5: Additional lanes & Wetton Rd Interchange Roads Ou Kaapse Weg: Climbing lanes Cape Flats Freeway (R300) Extn:Vanguard Dr. to M5/ De Waal Rd. Steenberg Rd Extension/Zandvlei Parkway Postponed R15,000,000 R22,000,000 R30,000,000 R20,000,000 PGWC/DoT R17,000,000 R15,000,000 R2,000,000 Design & Implementation PGWC/CoCT R0 R4,000,000 R30,000,000 R22,000,000 Postponed Roads Design & Implementation CoCT R0 R4,000,000 R42,000,000 Postponed Bottelary/R300 Interchange Roads Design & Implementation CoCT R105,000,000 Brackenfell Boulevard: De Bron to Langeberg Roads Design & Implementation CoCT R24,000,000 R25,000,000 R4,000,000 Postponed Postponed Postponed Postponed Postponed This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 346 Plan Title Focus Area Project Type Funding Source 2006-2009 2009-2010 2010-2011 Wimbledon / Eersteriver Way (M12 to Hindle Rd) Roads Design & Implementation CoCT R15,000,000 R7,000,000 Postponed Buttskop Rd:Level crossing elimination & road network imp. Roads Design & Implementation CoCT R20,000,000 R17,000,000 Postponed Hindle Rd: Raymond Ackerman to Forest Rd Roads Design & Implementation CoCT R19,000,000 R1,000,000 Postponed Amandel Road: Langverwacht to Brackenfell Blvd Roads Design & Implementation CoCT R7,000,000 Postponed Brackenfell Blvd: Van Riebeeck to Old Paarl Rd Roads Design & Implementation CoCT R27,000,000 Postponed Oostenberg bridges Roads Design & Implementation CoCT R6,000,000 R3,000,000 Postponed Okavango Road - Stellenbosch Arterial to Old Paarl Rd Roads Design & Implementation R7,000,000 R26,000,000 Postponed Bottleray - Okavango to Old Paarl Roads Design & Implementation R0 R12,000,000 Postponed Church Street Roads Design & Implementation R0 R5,000,000 Postponed Cilmore Road - Amandel to Old Paarl Roads Design & Implementation R0 Langverwacht Road - Okavango to Van Riebeeck Roads Design & Implementation R0 Wellington Road Roads Design & Implementation R20,000,000 New lageberg Road Roads Design & Implementation R0 De Villiers Road Roads Design & Implementation R16,000,000 Brackenfell Blvd Roads Design & Implementation R18,000,000 Darwin (de Bron Ext) Roads Design & Implementation R6,000,000 R5,000,000 Future Status Postponed R4,000,000 Postponed Postponed R13,000,000 Postponed R8,000,000 In Progress In Progress R6,000,000 R7,000,000 In Progress This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) 347 Plan Title Focus Area Project Type Fairtrees Roads Design & Implementation R6,000,000 Carl Cronje Roads Design & Implementation R0 Bhunga Roads Design & Implementation R35,000,000 Postponed Symphony Roads Design & Implementation R42,000,000 In Progress Ph 1 Complete Hindle Roads Design & Implementation R0 Silversands Roads Design & Implementation R9,000,000 Driftsands Roads Design & Implementation R5,000,000 Update & Refinement of the Transport Model Strategic Planning Study CoCT R1,200,000 In progress Integrated Information System Traffic Management Study CoCT R1,500,000 In progress Transport Operational Plan for FIFA 2010 Unclassified Management CoCT R1,600,000 In progress Expenditure Funding Source 2006-2009 R3,820,900,000 2009-2010 2010-2011 Future R2,000,000 Status In Progress R13,000,000 Postponed R15,000,000 In Progress Complete R10,000,000 R183,000,000 In Progress R59,000,000 R35,000,000 This budget is as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) APPENDIX B: ADDITIONAL COMPLETED PROJECTS Plan Title Focus Area Project Status Funding Source 2008-2009 2010:Sea Point:Upgrading Footways Bishop Lavis-Sidewalk Construction continuation Bothasig construct sidewalk Oranje/Nassa Non-motorised Transport Completed 1 EFF R245,519 Non-motorised Transport Completed Completed 3 AFF: Ward Allocation R14,282 3 AFF: Ward Allocation R30,000 Constr. Footpath: (Westerford )Alfred Str Non-motorised Transport Completed 3 AFF: Ward Allocation R55,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R20,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R75,000 3 AFF: Ward Allocation R197,000 3 AFF: Ward Allocation R35,000 3 AFF: Ward Allocation R59,497 Constrct footway - Joe slovo Construct footway - Bloubergrant Construct Footway,kerb,channel: Lotus Riv 348 Construct Footway: Orrellaan, Retreat Construct Premix Sidewalk Petunia Street Construct sidewalks-various streets W. 41 Non-motorised Transport Completed Non-motorised Transport Non-motorised Transport Completed Completed Non-motorised Transport Completed Non-motorised Transport 3 AFF: Ward Allocation R200,000 Construction of Footways: Athlone Non-motorised Transport Completed 3 AFF: Ward Allocation R50,000 Construction of Sidewalks Non-motorised Transport Completed 3 AFF: Ward Allocation R80,000 Construction of Sidewalks in ward 41 Non-motorised Transport 3 AFF: Ward Allocation R55,142 Construction of sidewalks ward 91 Construction of Sidewalks Zone 27, Langa Non-motorised Transport Completed Completed 3 AFF: Ward Allocation R85,000 Completed 3 AFF: Ward Allocation R200,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R70,000 Continuation Bilston Rd Footway Constr. Non-motorised Transport Completed 3 AFF: Ward Allocation R90,000 Continuation of pavements (Ph2) B/Lavis Non-motorised Transport 3 AFF: Ward Allocation R119,000 Creation of cycle lanes -signage marking Non-motorised Transport Completed Completed 3 AFF: Ward Allocation R10,000 Construction of Pathway: Riverside Road Non-motorised Transport This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 Funding Source 2008-2009 Non-motorised Transport Project Status Completed 3 AFF: Ward Allocation R20,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R100,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R250,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R106,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R142,000 Footway construction - Killarney Gardens Footway Construction: Elsjieskraal Rd & a Footway on verge:MR, Hout Bay: nr Mandela Park Non-motorised Transport Completed 3 AFF: Ward Allocation R26,000 3 AFF: Ward Allocation R200,000 3 AFF: Ward Allocation R66,543 Gravel sidewalks Vissershok Rd Non-motorised Transport Completed Completed 3 AFF: Ward Allocation R40,000 Install bollards/cncr benches: Downing St Install of pedestrian Signals Bosmansdam Non-motorised Transport Completed 3 AFF: Ward Allocation R25,000 Non-motorised Transport 3 AFF: Ward Allocation R120,000 Mountain View Rd. Sidewalks Pedestrian Crossing-Delta Primary School Proposed Footway, kerb, channel: Bilston Rd Raised ped. crossings Lindenberg & Mills Non-motorised Transport Completed Completed 3 AFF: Ward Allocation R40,000 3 AFF: Ward Allocation R16,000 3 AFF: Ward Allocation R30,000 3 AFF: Ward Allocation R50,000 Raised pedestrian crossing Pinelands Reconstruct Clifton footpaths and handrails Non-motorised Transport 3 AFF: Ward Allocation R80,000 Plan Title Focus Area Cycle Lanes signage & makings Drop off bays & Sidewalk Kalkfontein Sch Footway constr - Bloubergrant Footway constr - Du noon Footway constr - Milnerton ridge 349 Sidewalks within Ward 17 Sidewalks: Wolwefontein Rd. Sidewalks: Wolwefontein/Howard Drive Tar Sidewalks in Hillview Completed Non-motorised Transport Non-motorised Transport Completed Non-motorised Transport Non-motorised Transport Completed Completed Non-motorised Transport Completed Completed Non-motorised Transport 3 AFF: Ward Allocation R60,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R100,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R120,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R160,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R120,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 Funding Source 2008-2009 Non-motorised Transport Project Status Completed 3 AFF: Ward Allocation R100,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R185,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R100,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R140,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R148,778 Non-motorised Transport Completed 3 AFF: Ward Allocation R100,000 Tarring of Sidewalks, Broadlands Prk Non-motorised Transport Completed 3 AFF: Ward Allocation R160,000 Tarring Sidewalks:Fisantekraal Non-motorised Transport Completed 3 AFF: Ward Allocation R65,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R20,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R28,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R100,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R25,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R18,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R20,000 Non-motorised Transport Completed 3 AFF: Ward Allocation R40,000 3 AFF: Ward Allocation R100,000 3 AFF: Ward Allocation R118,000 3 AFF: Ward Allocation R50,000 3 AFF: Ward Allocation R30,000 3 AFF: Ward Allocation R10,766 3 AFF: Ward Allocation R110,000 3 AFF: Ward Allocation R96,119 Plan Title Focus Area Tarring Entrances to flats Blocks 15 Tarring of Sidewalks in Greenlands Tarring of sidewalks in Ward 100 Tarring of sidewalks withinWard 11 Tarring of sidewalks withinWard 14 Tarring of sidewalks withinWard 17 Upgrade fountain pathway-R/bosch Upgrade Bicycle Lanes at Local Schools Upgrade of footways throughout Ward 350 Upgrade Sidewalks:Ward 101 Upgrading of Sidewalks:Ward 102 Upgrading of Sidewalks:Ward 7 Upgrading of Sidewalks:Ward 8 Constr. Parking Area: Lotus River Library Construct and rehab parking Pentech Stn Construct Parking area: Polaris Rd,Lansdn Extension of Parking Bays: General Street Parking Arrangement-Monte Vista Primary Parking embaym:St. Athans & Kromboom Rd Parking Facilities: Hoosain Parker Street Completed Parking Parking Completed Completed Parking Completed Parking Completed Parking Completed Parking Parking Completed This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 351 Funding Source 2008-2009 Parking Project Status Completed 3 AFF: Ward Allocation R55,000 Parking-Monte Vista Primary School Repair parking area @ M/ridge park &shop Parking Completed 3 AFF: Ward Allocation R80,000 R84,072 Claremont CBD: Taxi Facilities Public Transport Completed 3 AFF: Ward Allocation 4 CMTF PG: WC DOT&PW Claremont CBD: Taxi Facilities Public Transport Completed 1 EFF R1,800,000 Claremont CBD:Taxi Facilities (CMIP) Public Transport 4 MIG R492,326 Constrct embayment - Huis Zonnekus Container and furniture-Taxi Rank Lwandl Public Transport Completed Completed 3 AFF: Ward Allocation R52,313 3 AFF: Ward Allocation R75,305 Embayments: General Street,Athlone Public Transport Completed Completed 3 AFF: Ward Allocation R40,000 Kensington/Factreton Embayment Public Transport Completed 3 AFF: Ward Allocation R30,000 Mamre Taxi Rank:Prov of Toilet Facility Public Transport Completed 3 AFF: Ward Allocation R70,000 Mowbray Taxi RankArea Upgrade Proposed Embayment: Smuts Rd,Rondebosch Proposed Embayments: Thornton/Lawson/Repu Refurishment of Bus Shelter in Edgemead Public Transport Completed Completed 3 AFF: Ward Allocation R50,000 3 AFF: Ward Allocation R26,113 Rondebosch Construct Embayments Plan Title Focus Area Parking Space For Vehicles drop off Completed Parking Public Transport Public Transport R2,473,121 Public Transport Completed 3 AFF: Ward Allocation R90,000 Public Transport Completed Completed 3 AFF: Ward Allocation R60,000 Public Transport 3 AFF: Ward Allocation R47,092 Taxi lay-bye in Groove Street, Macassar Public Transport Completed 3 AFF: Ward Allocation R25,000 WC: PT-MTI Call Ctre: PTIF Public Transport Completed 4 NG DOT PTI&SG R1,500,253 WC:PT-MTI Call Ctre:EFF 6m d/way to Pinkster Church in Ring Aven Public Transport Completed 1 EFF R1,000,000 Roads Completed 3 AFF: Ward Allocation R20,000 6m drive way to Mosque in Link Road Roads Completed 3 AFF: Ward Allocation R25,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 Plan Title Focus Area Project Status Funding Source 2008-2009 Albert Philander Rd - Design/Upgrade Roads Completed 1 EFF R22,954 Belvedere Road CBD Upgrade Roads Completed 3 AFF: Ward Allocation R140,000 Bulk Roads: Wallacedene Roads Completed 1 EFF R1,282,841 Bulk Roads: Wallacedene Roads Completed 4 MIG R1,242,545 Completion (tarring) Bishop Lavis CBD In Roads Completed 3 AFF: Ward Allocation R80,000 Concrete rds TRS Dist 6 (EFF) Roads Completed 1 EFF R203,515 Concrete rds TRS Dist 6 (MIG) Roads Completed 4 MIG 4 CMTF DOT&PW PG: PG: IM: Rehabilitation:Metro Roads (CMTF) Roads Completed IM:Reconstruct Roads Metro Roads Completed R72,511 WC R10,000,000 352 IM:Rehabilitation:Metro Ro (CMTF) Roads Completed 1 EFF 4 CMTF DOT&PW R51,750,965 Installation of Road in Ward 60 Roads Completed 3 AFF: Ward Allocation R50,000 Langa: Rds Upgrading Roads Completed 1 EFF R100,128 Nonkqubela Minor Rds Phase 2 Proposed Widening concrete Rd: Clover Cre Roads Completed 1 EFF R2,901,648 Roads Completed 3 AFF: Ward Allocation R87,721 Rehabilitation - Minor Roads Roads Completed 1 EFF R330,443 Re-instatement of bridge: Kuils River Dur Roads Completed 3 AFF: Ward Allocation R50,000 Road & Traffic safety measures Sub-C 5 Road Improvements: Ferness Estate,Ottery Roads Completed 3 AFF: Ward Allocation R200,000 Roads Completed 3 AFF: Ward Allocation R99,847 Road Shoulders in Firgrove Way Roads Completed 3 AFF: Ward Allocation R32,800 Roads & Stormwater Rehabilitation Roads Completed 4 MIG R8,826,782 Upgrade circle at Chapel/Russel Str Roads Completed 3 AFF: Ward Allocation R70,000 Upgrade entrance Lavender Lane Roads Completed 3 AFF: Ward Allocation R102,054 Upgrade entrance Stikland Indust area Roads Completed 3 AFF: Ward Allocation R60,000 WC R7,714,943 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 353 Funding Source 2008-2009 Roads Project Status Completed 1 EFF R1,524,955 Upgrade Intersection:Spine/Ntlazane Roads Completed 4 STATE_NT_URP R341,002 Upgrade of Roads in Steenberg Roads Completed 3 AFF: Ward Allocation R20,000 Upgrade roads and pavements in Bellrail Roads Completed 3 AFF: Ward Allocation R68,889 Upgrading Concrete Roads Gugulethu Roads Completed 1 EFF R273,439 Widening of Victoria St at T2 Inters Roads Completed 1 EFF R894,845 Proposed Safety Facilities along Canals Safety & Security Completed 3 AFF: Ward Allocation R50,000 Safety barriers on pavement on both corn Wallacedene FloodDis Streetlights (CMIP) Safety & Security Completed 3 AFF: Ward Allocation R6,000 Safety & Security Completed 4 MIG R220,984 1 Speed Hump in School Street - Mfuleni Traffic Management Completed 3 AFF: Ward Allocation R3,195 CCTVforTransport and Traffic M/ment Construct 2 Speed Humps Hazel Str, E/Riv Construct 2 Speed Humps Naomi Str,E/Rive Construct 3 Speed Humps Betty Str, E/Riv Construct 3 Speed Humps CL Adams ave Construct 3 Speed Humps May Str, E/River Traffic Management Completed 1 EFF R344,594 Traffic Management Completed 3 AFF: Ward Allocation R15,900 Traffic Management Completed 3 AFF: Ward Allocation R15,900 Traffic Management Completed 3 AFF: Ward Allocation R23,850 Traffic Management Completed 3 AFF: Ward Allocation R31,897 Traffic Management Completed 3 AFF: Ward Allocation R23,850 Construct Stop Street, Constantia Traffic Management Completed 3 AFF: Ward Allocation R3,000 Construct Stop Street,Kirstenhof Construction of 1 speed hump Alexandra S Traffic Management Completed 3 AFF: Ward Allocation R3,000 Traffic Management Completed 3 AFF: Ward Allocation R15,000 Driebergen 3 speedhumps Traffic Management Completed 3 AFF: Ward Allocation R10,000 Install Directional Signs off Lansdowne Traffic Management Completed 3 AFF: Ward Allocation R2,000 Plan Title Focus Area Upgrade Intersection:Spine/Ntlazane This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 354 Plan Title Focus Area Project Status Funding Source 2008-2009 Install Traffic Calming Measures-Ward 47 Traffic Management Completed 3 AFF: Ward Allocation R38,000 Install traffic calming within Rondevlei Installation of Speedhumps: Byrnes Avenue Installation of Speedhumps: Harpford Ave. Traffic Management Completed 3 AFF: Ward Allocation R200,000 Traffic Management Completed 3 AFF: Ward Allocation R21,000 Traffic Management Completed 3 AFF: Ward Allocation R15,000 Mikpunt:Provision of Road Names Paarden Eiland replace street name poles Proposed Road Signage Ward 60 Infrastr Traffic Management Completed 3 AFF: Ward Allocation R30,000 Traffic Management Completed 3 AFF: Ward Allocation R22,000 Traffic Management Completed 3 AFF: Ward Allocation R7,150 Proposed Roadmarkings in Ward 60 Traffic Management Completed 3 AFF: Ward Allocation R60,000 Proposed Traffic Calming-Hanover Park Traffic Management Completed 3 AFF: Ward Allocation R55,000 Proposed Traffic Calming-Strandfontein Traffic Management Completed 3 AFF: Ward Allocation R24,317 Provision of traffic calming Wndemere Pr Raised crossing+S/humps Bloekombos P Sch Raised crossing+S/humps Ekuthuleni P Sch Raised crossing+S/humps Imvumelwano P Sc Traffic Management Completed 3 AFF: Ward Allocation R25,172 Traffic Management Completed 3 AFF: Ward Allocation R45,000 Traffic Management Completed 3 AFF: Ward Allocation R45,000 Traffic Management Completed 3 AFF: Ward Allocation R45,000 Speed calming W100 Speed calming, Mountain Rd Somerset West Traffic Management Completed 3 AFF: Ward Allocation R153,432 Traffic Management Completed 3 AFF: Ward Allocation R55,000 Speed hump, Hanover Belhar Speed Humps Harvester Amandal,Cranb Traffic Management Completed 3 AFF: Ward Allocation R6,100 Traffic Management Completed 3 AFF: Ward Allocation R100,000 Traffic Management Completed 3 AFF: Ward Allocation R100,000 Traffic Management Completed 3 AFF: Ward Allocation R150,000 way, Speed Humps in 6th/7th Streets, Rusthof Speed Humps-Krymekaar Str, school patrol This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 355 Plan Title Speedhump & raised ped crossingR/bosch Focus Area Project Status Funding Source 2008-2009 Traffic Management Completed 3 AFF: Ward Allocation R10,000 Speedhumps in Gqoloma Street Traffic Management Completed 3 AFF: Ward Allocation R15,000 Speedhumps in Ntokozweni Street Traffic Management Completed 3 AFF: Ward Allocation R15,000 Speedhumps-Midmar St, Groenvallei Traffic Management Completed 3 AFF: Ward Allocation R24,000 Speedhumps-Reed St, Bellville Traffic Management Completed 3 AFF: Ward Allocation R10,000 Traffc calmng - Porterfield - Tableview Traffic Management Completed 3 AFF: Ward Allocation R20,000 Traffic calming - Bluegum st - Pella Traffic Management Completed 3 AFF: Ward Allocation R5,000 Traffic calming - Briza ave - tbleview Traffic Management Completed 3 AFF: Ward Allocation R32,000 Traffic calming - Enon st - Mamre Traffic Management Completed 3 AFF: Ward Allocation R10,000 Traffic calming - Kent st - Saxonsea Traffic Management Completed 3 AFF: Ward Allocation R10,000 Traffic calming - Main rd - Mamre Traffic Management Completed 3 AFF: Ward Allocation R30,000 Traffic calming - Poeit st - Mamre Traffic Management Completed 3 AFF: Ward Allocation R10,000 Traffic calming - Sacramento st - Mamre Traffic Management Completed 3 AFF: Ward Allocation R20,000 Traffic calming - Sheridan St - Brooklyn Traffic Management Completed 3 AFF: Ward Allocation R29,000 Traffic Management Completed 3 AFF: Ward Allocation R200,000 Traffic Management Completed 3 AFF: Ward Allocation R135,000 Traffic Calming Bloubekkie,Montclair drv Traffic Management Completed 3 AFF: Ward Allocation R75,000 Traffic calming Dapper street Factreton Traffic Management Completed 3 AFF: Ward Allocation R13,000 Traffic Calming Erica Drive, Belhar Traffic Management Completed 3 AFF: Ward Allocation R50,000 Traffic Calming Factreton Prim,Maitland Traffic Management Completed 3 AFF: Ward Allocation R40,000 Traffic Calming Hazeldene Rd Traffic Management Completed 3 AFF: Ward Allocation R100,000 Traffic Calming in Site C Traffic Management Completed 3 AFF: Ward Allocation R80,000 Traffic Calming in Ward 43(Speedhumps) Traffic Management Completed 3 AFF: Ward Allocation R100,000 Traffic Calming :Ward 27 Goodwood Traffic Calming along Resevoir Mountai & This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 Focus Area Project Status Funding Source 2008-2009 Traffic Management Completed 3 AFF: Ward Allocation R60,050 Traffic Management Completed 3 AFF: Ward Allocation R66,000 Traffic Calming Measures :Vukuthu Str Traffic Management Completed 3 AFF: Ward Allocation R5,672 Traffic Calming Measures :Ward 85 Traffic Management Completed 3 AFF: Ward Allocation R50,000 Traffic Calming measures in Ward 8 Traffic Management Completed 3 AFF: Ward Allocation R100,000 Traffic Calming Measures: Ward 40 Traffic Management Completed 3 AFF: Ward Allocation R120,000 Traffic Calming Notrhpine Drive /Little/ Traffic Management Completed 3 AFF: Ward Allocation R9,587 Traffic Calming Palmerston, Mountain,Fir Traffic Calming Royal/Coronation Rds Mai Traffic Calming Suikerbossie: 2 x S/humps Traffic Management Completed 3 AFF: Ward Allocation R74,000 Traffic Management Completed 3 AFF: Ward Allocation R50,000 Traffic Management Completed 3 AFF: Ward Allocation R26,000 Traffic calming ward 17 Traffic Management Completed 3 AFF: Ward Allocation R44,372 Traffic Calming(Ward 72 - Speedhumps) Traffic Calming: Athlone: Ward48speedhump Traffic Management Completed 3 AFF: Ward Allocation R37,934 Traffic Management Completed 3 AFF: Ward Allocation R30,000 Traffic Calming: Hillview/Seawinds Traffic Calming: Mosselbank Stepping Traffic Management Completed 3 AFF: Ward Allocation R50,000 Plan Title Traffic Calming in Ward 73 Traffic Calming Jan Van Ruyterw Riebeeck 356 and Traffic Management Completed 3 AFF: Ward Allocation R13,200 Traffic Calming: Newfields/Greenhaven Traffic Management Completed 3 AFF: Ward Allocation R145,000 Traffic Calming: Fynbos, Doordekraal, Ek Traffic Management Completed 3 AFF: Ward Allocation R200,000 Traffic Calming: Helderberg Road Traffic Management Completed 3 AFF: Ward Allocation R30,000 Traffic Calming: pref Kabeljou, Magdalen Traffic Calming: Richmond Rd, Kenilworth Traffic Management Completed 3 AFF: Ward Allocation R60,000 Traffic Management Completed 3 AFF: Ward Allocation R30,000 Traffic Calming: Mini circle Stasie/v Ri Traffic Management Completed 3 AFF: Ward Allocation R14,174 Traffic Calming: Raised Int. Zinnia /Orc Traffic Management Completed 3 AFF: Ward Allocation R65,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 357 Plan Title Traffic Calming: Raised Inters. Kendal Road Traffic Signals & safety improv: Fish Hoek Focus Area Project Status Funding Source 2008-2009 Traffic Management Completed 3 AFF: Ward Allocation R6,305 Traffic Management Completed 3 AFF: Ward Allocation R39,782 Trffck calming - Bunting cresc Traffic Management Completed 3 AFF: Ward Allocation R120,000 Blocking off unmade roads Boy Briers Fis Bonga(Lwandle)DrRd safety Pama/Mongezi Bulk Roads & Stormwater for Housing Proj Unclassified Completed 3 AFF: Ward Allocation R5,506 Unclassified Completed 4 STATE_NT_URP R100,000 Unclassified Completed 4 MIG R3,000,000 Claremont Boulevard:Property Acq Unclassified Completed 1 EFF R30,000 Construct paved area: Gordon Searle Rd Unclassified Completed 3 AFF: Ward Allocation R40,000 Construct pavement in front of Yeshua Pr Unclassified Completed 3 AFF: Ward Allocation R14,377 Construct Pavement: Diep River SAPS Construct Pavement: Klaasens Rd,Bishopsct Unclassified Completed 3 AFF: Ward Allocation R30,000 Unclassified Completed 3 AFF: Ward Allocation R200,000 Construct premix: Sullivan School Contruct Pavements,Car Park Embayment Unclassified Completed 3 AFF: Ward Allocation R50,000 Unclassified Completed 3 AFF: Ward Allocation R185,500 Erect Fence along Devonshire Road Unclassified Completed 3 AFF: Ward Allocation R50,374 Erect Road Barrier: Galway Rd,Bergvliet Unclassified Completed 3 AFF: Ward Allocation R5,000 Erect street names : Hillview Unclassified Completed 3 AFF: Ward Allocation R10,000 ExtentPallisade fence @ Pastorie Park Unclassified Completed 3 AFF: Ward Allocation R20,000 ExtentPallisade fence along South Stre Unclassified Completed 3 AFF: Ward Allocation R50,000 Fence in open space: Annandale Rd Unclassified Completed 3 AFF: Ward Allocation R19,000 Fencing along Pastorie Park S/West Fencing along south Street, Somerset Wes Unclassified Completed 3 AFF: Ward Allocation R40,000 Unclassified Completed 3 AFF: Ward Allocation R125,000 & This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 R600,000 358 Plan Title Fencing under Pedestrian BridgeSteurhof Greenmarket Square Roadworks Infrastruc Hard Landscaping: Appledene & Petunia Rds Hard Landscaping: Denchwood Road,Athlone Hard Lanscaping Kerbways: Calendula Rd & Hard Lanscaping: Calendula Rd,Silvertown Hard Lanscaping: Cnr Appledene/Petunia Rd Hard Lanscaping: Cnr Wallis & Brandon Rds Hard Lanscaping: Denchworth Road,Gleemore Hard Lanscaping: Wallis & Brandis Rds,Ath Focus Area Project Status Funding Source 2008-2009 Unclassified Completed 3 AFF: Ward Allocation R30,000 Unclassified Completed 3 AFF: Ward Allocation R145,000 Unclassified Completed 3 AFF: Ward Allocation R50,000 Unclassified Completed 3 AFF: Ward Allocation R50,000 Unclassified Completed 3 AFF: Ward Allocation R85,000 Unclassified Completed 3 AFF: Ward Allocation R100,000 Unclassified Completed 3 AFF: Ward Allocation R50,000 Unclassified Completed 3 AFF: Ward Allocation R20,000 Unclassified Completed 3 AFF: Ward Allocation R20,000 Unclassified Completed 3 AFF: Ward Allocation R50,000 Hardening of pavement area, Rustdal Unclassified Completed 3 AFF: Ward Allocation R11,162 Improvements Spin/Lansdowne Inters Inform Settlmnts: Tracks&Drainage: IncrUpG Unclassified Completed 1 EFF R300,000 Unclassified Completed 1 EFF R1,500,000 InfSettlements: Trcks & Drng:Incr Upg Unclassified Completed 4 MIG R5,000,000 Install concrete palisade fence :Epping Install Gateboom/Refuse enclHughenden Unclassified Completed 3 AFF: Ward Allocation R95,000 Unclassified Completed 3 AFF: Ward Allocation R150,000 Installation of No Dumping Signage Unclassified Completed 3 AFF: Ward Allocation R3,000 Landscaping at Old Flats Unclassified Completed 3 AFF: Ward Allocation R9,825 N2 Gateway: TR&S Services: MIG Unclassified Completed 4 MIG R30,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 Focus Area Project Status Funding Source 2008-2009 Unclassified Completed 3 AFF: Ward Allocation R5,000 Unclassified Completed 3 AFF: Ward Allocation R20,000 OPS Small Plant and Equipment Unclassified Completed 1 EFF R826,138 OPS Upgrading of depot facilities Palisade Steel Fence Selbourne Rd/East B Unclassified Completed 1 EFF R326,028 Unclassified Completed 1 EFF R300,000 Paving of Meduin Island between Dur Paving of middle island Durban rd & Edwa Paving Strand Beach Front, replce asphal Unclassified Completed 3 AFF: Ward Allocation R30,000 Unclassified Completed 3 AFF: Ward Allocation R14,288 Unclassified Completed 3 AFF: Ward Allocation R170,000 Paving Strans Beach Front:continue to r Unclassified Completed 3 AFF: Ward Allocation R150,000 Paving:Edward Street, Bellville Unclassified Completed 3 AFF: Ward Allocation R50,000 PC Wall off Lynberg Road Unclassified Completed 3 AFF: Ward Allocation R30,000 Porteville 3 pnt stop c/o Akademie/La Pr Unclassified Completed 3 AFF: Ward Allocation R5,000 Prop. Acquis. - Hardship Proposed Basketball Court: St. Frusquin Rd Proposed surfacing of Verge, Hanover Pk Proposed surfacing: Emerald Crt,Gatesvill Unclassified Completed 1 EFF R5,227,616 Unclassified Completed 3 AFF: Ward Allocation R120,000 Unclassified Completed 3 AFF: Ward Allocation R35,894 Unclassified Completed 3 AFF: Ward Allocation R20,000 Proposed Verge Surfacing: Vision Child Unclassified Completed 3 AFF: Ward Allocation R30,000 Provision of fencing Rondebosch Unclassified Completed 3 AFF: Ward Allocation R52,908 Unclassified Completed 3 AFF: Ward Allocation R125,000 Unclassified Completed 3 AFF: Ward Allocation R50,000 Plan Title New Bollards Mahogany Crescent New Bollards Snowball ProteaValley 359 Renovate Rd Kerbs -Various Re-tarring of freedom Bonteheuwel Park Square This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 Plan Title Focus Area Project Status Funding Source 2008-2009 Surface Verge: 3rd Ave &Steed Rd, G/Pk Surface Verge: Edward/Hector/Bruce Rds Surfacing of verge: Liverpool Rd,Wynberg Surfacing of Verge: Mortlake Rd,Wynberg Sweet Valley Primary School: Extended par Unclassified Completed 3 AFF: Ward Allocation R40,000 Unclassified Completed 3 AFF: Ward Allocation R92,188 Unclassified Completed 3 AFF: Ward Allocation R15,790 Unclassified Completed 3 AFF: Ward Allocation R15,000 Unclassified Completed 3 AFF: Ward Allocation R15,049 Traffic Circle Lower Mountain & Pienaar Unclassified Completed 3 AFF: Ward Allocation R89,000 Unmade Roads:Residential Unclassified Completed 1 EFF R2,200,000 Vanguard-Construction of fencing Unclassified Completed 3 AFF: Ward Allocation R92,671 Walkway Pampoenkraal Unclassified Completed 3 AFF: Ward Allocation R70,000 360 TOTALS R158,274,799 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 20092010 R600,000 APPENDIX C: APPROVED CURRENT AND FUTURE PROJECTS This budget as as approved by the City of Cape Town Council in May 2009. An adjustment budget is tabled after six months and there are interim changes relating to the External Finance Fund (EFF. ) Plan Title Focus Area Bicycle & Ped Facilities: PGWC 361 Constr:Walkway: R44, Whale Lookout Point Cycle path signage for schools IM: Construct Footway and Verges IM: Construct Footway and Verges Ped Footways/Bicycle Path: Khayelitsha/ Mitchells Plain WC: City Centre Pedestrian Improvements: EFF WC: City Centre Pedestrian Improvements: PGWC Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Project Status Funding Source 2008-2009 2009-2010 2010-2011 2011-2012 In Progress 4 CMTF PG: WC DOT&PW R4,553,149 R12,000,000 R8,000,000 R3,000,000 Postponed 1 EFF R600,000 In Progress 3 AFF:Ward Allocation R7,500 In Progress 1 EFF R600,000 R600,000 R500,000 R1,000,000 In Progress 4 MIG R2,500,000 R5,000,000 R15,000,000 R10,000,000 In Progress 4 CMTF PG: WC DOT&PW R100,000 R1,406,482 In Progress 1 EFF R200,000 In Progress 4 CMTF PG: WC DOT&PW R1,200,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes Plan Title Focus Area WC: City Centre Pedestrian Improvements: PTIF WC: City-wide NMT Plan: EFF WC: City-wide NMT Plan:PGWC WC: City-wide NMT Plan:PTIF WC: Grade sep Ped Facilities(WestBlv): EFF 362 WC: Grade separated Ped Cross(BG): PGWC WC: Grade separated Ped Crossing (BG):PTIF WC: Grade separation Ped Crossing:(Buitengracht):EFF WC: Grade seperated Ped Facilities: PTIF WC: Klipfontein PT NMT Scheme: EFF WC: Klipfontein PT NMT Scheme: EFF Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Project Status Funding Source 2008-2009 2009-2010 2010-2011 In Progress 4 NG PTI&SG R3,600,000 R12,000,000 R10,000,000 In Progress 1 EFF In Progress 4 CMTF PG: WC DOT&PW R1,000,000 R4,000,000 R5,000,000 In Progress 4 NG PTI&SG R3,484,582 R10,000,000 R5,000,000 In Progress 1 EFF R11,500,000 R3,200,000 In Progress 4 CMTF PG: WC DOT&PW In Progress 4 NG PTI&SG In Progress 1 EFF In Progress 4 NG PTI&SG DOT In Progress 4 NG PTI&SG DOT In Progress 1 EFF DOT R10,000,000 DOT DOT R3,000,000 R11,000,000 R20,700,000 R5,000,000 R13,700,000 R7,000,000 R13,788,723 R10,000,000 R3,000,000 R18,000,000 R8,000,000 R7,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 2011-2012 Plan Title Focus Area WC: Klipfontein PT NMT Scheme:PGWC WC: Klipfontein PT NMT Scheme:PTIF WC: NMT Bridge:Bhunga Avenue Langa: EFF 363 WC: NMT Bridge:Bhunga Avenue Langa: PGWC WC: NMT Bridge:Bhunga Avenue Langa: PTIF WC: Ped Imprments to Somerset Rd: EFF WC: Ped Imprments to Somerset Rd: PTIF WC: Stadium Precinct Ped & Cycle Facil: PGWC WC: Stadium Precinct Ped & Cycle Facil: PTIF WC: Stadium Precinct Ped & Cycle Facil:EFF Westlake River Pedestrian Bridge, Land Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Nonmotorised Transport Project Status Funding Source 2008-2009 2009-2010 2010-2011 In Progress 4 CMTF PG: WC DOT&PW R10,000,000 R4,800,000 R5,000,000 In Progress 4 NG PTI&SG R10,000,000 In Progress 1 EFF In Progress 4 CMTF PG: WC DOT&PW In Progress 4 NG PTI&SG In Progress 1 EFF In Progress 4 NG PTI&SG In Progress 4 CMTF PG: WC DOT&PW In Progress 4 NG PTI&SG In Progress 1 EFF In Progress 1 EFF DOT R3,000,000 DOT R1,500,000 R2,000,000 R8,214,254 R5,500,000 R2,000,000 R35,063,286 R20,000,000 R3,000,000 DOT DOT R15,000,000 R900,000 R550,000 R1,500,000 R900,000 R292,826 R1,600,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes R2,000,000 2011-2012 Plan Title Focus Area Parking Development :City Wide Parking WC: Informal Prking for 3000 Veh: EFF WC: Informal Prking for 3000 Veh: PGWC WC: Informal Prking for 3000 Veh: PTIF WC: Rail based Park&Ride Facilties: EFF WC: Rail based Park&Ride Facilties: PGWC WC: Rail based Park&Ride Facilties: PTIF 364 Bus shelter c/o Milton&Sithunzi str Bus/Taxi Embyments:General Prvsn (CMTF) General PTI Improvements Integrated Rapid Transit Syst(Ph1A): CRR Integrated Rapid Transit Syst(Ph1A): PTIF IRT: AirportService: PTIF IRT: Granger Bay Blvd: PTIF IRT: InnerCityService: PTIF IRT: IntegratedFareManagement System: PTIF Parking Parking Parking Parking Parking Parking Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Project Status In Progress In Progress In Progress In Progress In Progress In Progress In Progress Postponed In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Funding Source 2008-2009 2009-2010 2010-2011 3 PRK AREAS DEV FUND R4,200,000 R1,000,000 R258,723 1 EFF R250,000 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG 1 EFF 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG 3 AFF: Ward Allocation 4 CMTF PG: WC DOT&PW 4 CMTF PG: WC DOT&PW 3 CRR:BRT System 4 NG DOT PTI&SG 4 NG DOT PTI&SG 4 NG DOT PTI&SG 4 NG DOT PTI&SG 4 NG DOT PTI&SG 2011-2012 R450,000 R500,000 R1,600,000 R100,000 R500,000 R 7,000,000 R6,000,000 R16,000,000 R18,500,000 R207,596 R500,000 R500,000 R500,000 R2,500,000 R3,000,000 R 7,600,000 R1,000,000 R25,000,000 R35,000,000 R23,500,000 R166,000,000 R1,000,000 R10,000 R1,000,000 R11,500,000 R10,500,000 R5,000,000 R80,000,000 R2,000,000 R18,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes R20,000,000 R532,556,292 Plan Title IRT: Klipfontein Corridor: PTIF IRT: PropertyAcquisition: CRR IRT: PropertyAcquisition: PTIF IRT: Public Trsprt&Bus Upgr on Corr: PTIF IRT: VehicleAcquisition: CRR 365 IRT: VehicleAcquisition: PTIF IRT: West Coast Corridor: CRR IRT: WestCoastCorridor: PTIF IRT:Traffic Management Centre:CRR Khayelitsha CBD PTI (CMIP) Khayelitsha Rail Extension Khayelitsha Rail Extention TI Lentegeur & Mandalay Station PTI's: Dsg Mitchell's Plain Station TI Nomzamo taxi rank:provide roof, toilets Onverwacht Rd:Bulk Stormwater Focus Area Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Project Status Postponed In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Funding Source 4 NG DOT PTI&SG 3 CRR:BRT System 4 NG DOT PTI&SG 4 NG DOT PTI&SG 3 CRR:BRT System 4 NG DOT PTI&SG 3 CRR:BRT System 4 NG DOT PTI&SG 3 CRR:BRT System 2008-2009 2009-2010 2010-2011 R14,000,000 R56,000,000 2011-2012 R75,010,000 R85,000,000 R49,700,000 R100,000,000 R50,000,000 R50,000,000 R30,000,000 R115,000,000 R10,000,000 R90,000,000 R260,000,000 R170,000,000 R15,000,000 R35,000,000 R10,000,000 4 MIG R400,713 R1,500,000 R1,500,000 1 EFF R495,378 4 NT NDPG R22,283,280 R20,000,000 R6,600,000 R12,000,000 4 NT NDPG R3,000,000 R18,000,000 R15,000,000 4 NT NDPG R25,000,000 R20,000,000 R15,000,000 R15,000,000 3 AFF: Ward Allocation R75,000 R500,000 R2,500,000 R2,000,000 1 EFF R300,000 R50,000,000 R20,000,000 R4,500,000 R25,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes R150,000,000 Plan Title Focus Area Provision of Bus/Taxi shelters Public transport & Related Infra Improv Public Transport Facilities:Sign (CMTF) Somerset West PTI Station Deck Long Distance 366 WC: Embayments Green Point Stadium: PTIF WC: Embayments Green Point Stadium-EFF WC: Embayments Green Point Stadium-PGWC WC: Inner City Transport SystemEFF WC: Inner City Transport SystemPGWC WC: IntegratedFareManagementSystem: PTIF WC: Klipfontein BRT Scheme: EFF WC: Klipfontein BRT Scheme: PGWC WC: Klipfontein BRT Scheme: PTIF WC: Long Distance Coach Terminals: EFF WC: Long Distance Coach Terminals: PGWC Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Public Transport Project Status In Progress Postponed In Progress Postponed In Progress In Progress In Progress In Progress In Progress In Progress Funding Source 4 CMTF PG: WC DOT&PW 4 PRIVATE SECTOR FIN 4 CMTF PG: WC DOT&PW 4 CMTF PG: WC DOT&PW 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG 1 EFF 2008-2009 2009-2010 2010-2011 R500,000 R1,700,000 R200,000 R150,000 R500,000 R165,750 R500,000 R1,500,000 R9,550,000 R1,000,000 4 CMTF PG: WC DOT&PW R2,475,000 R1,800,000 4 CMTF PG: WC DOT&PW R1,800,000 In Progress 4 NG PTI&SG R5,000,000 R5,000,000 Postponed 1 EFF R4,000,000 R2,000,000 R9,000,000 R9,000,000 Postponed Postponed In Progress In Progress DOT 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG R1,000,000 R10,000,000 1 EFF 4 CMTF PG: WC DOT&PW R500,000 R3,500,000 R2,475,000 1 EFF 2011-2012 R200,000 R1,000,000 R2,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes R8,000,000 R1,000,000 367 Plan Title Focus Area WC: Long Distance Coach Terminals: PTIF WC: PT & Busupgrade on Corridors: PGWC WC: PT and related Infrastr Upgrade: PGWC WC: PT and related Infrastr Upgrade: PTIF Albert Philander Rd Design/Upgrade Public Transport Public Transport Public Transport Public Transport Bardale (erf 451):Bulk Roads (EFF) Roads Bardale (erf 451):Bulk Roads (MIG) Roads Buttskop Rd upgrading Constr:Onverwacht Rd:Broadway to Faure Construct of Roads:Dualling Plattekloof Roads Construct Rds: Bottelary/R300 Roads Construct Rds: Broadway Extension Roads Construct Rds: De Villiers Rd Roads Construct Rds: Onverwacht Rd Roads Construct Rds: Onverwacht Rd Roads Construct Rds: Onverwacht Rd Roads Roads Roads Roads Project Status In Progress In Progress In Progress In Progress In Progress In Progress In Progress Postponed In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Funding Source 4 NG DOT PTI&SG 4 CMTF PG: WC DOT&PW 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG 3 CMC INFR. FUND 2008-2009 R1,887,041 2009-2010 2010-2011 R2,000,000 R3,000,000 R5,000,000 R5,000,000 R10,000,000 R5,900,000 R2,000,000 R6,000,000 2011-2012 R600,000 1 EFF R1,563,106 4 MIG R3,658,000 R4,000,000 1 EFF R500,000 R3,000,000 1 EFF R3,000,000 R1,000,000 3 BICL T&Roads: Blg 3 BICL T&Roads: Oos 3 BICL T&Roads: Hel 3 BICL T&Roads: Oos R4,100,000 R1,000,000 R5,046,320 R4,400,000 R8,500,000 R2,000,000 1 EFF R8,648,649 R2,650,000 4 MIG R3,000,000 R3,000,000 3 BICL T&Roads: Hel R3,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes R2,000,000 Plan Title Focus Area Project Status Funding Source Dualling: Broadway Blvd: Beach Rd: MR27 Roads Future 1 EFF Erf 17654 Strand: Roads Roads Erf 17654 Strand: Roads Roads 368 Extension of Broadway Blvd :Broadlands Foreshore Freeway:Bearing Replacement IM: ProjectVukuhmbe Concrete Roads IM: Rehabilitation:Metro Roads (CMTF) IM:Construct Road Structures Roads Roads Roads Roads Roads IM:Project Vukuhmbe Concrete Rds Roads IM:Reconstruct Roads Metro Roads Locarno/Oakhurst Road improvements Roads Main Roads:Northern Corridor Roads Melton Rd - Design & construct/Upgrade Pelican Park:Link Road (MIG) Pelican Park:Strandfontein Rd Upgr_EFF Pelican Park:Strandfontein Rd Upgr_MIG Rehabilitation - Minor Roads Roads Roads Roads Roads Roads In Progress In Progress In Progress In Progress In Progress In Progress Future In Progress In Progress In Progress In Progress In Progress Future In Progress In Progress In Progress 2008-2009 1 EFF R1,100,000 4 MIG R700,000 2009-2010 2010-2011 2011-2012 R2,000,000 R4,000,000 R5,000,000 R6,000,000 R5,000,000 R5,000,000 R1,000,000 R4,700,000 R4,000,000 R5,000,000 R10,000,000 R10,000,000 R10,000,000 R7,000,000 R1,000,000 R5,000,000 R47,542,498 R69,529,946 R45,769,296 R7,000,000 R5,000,000 R1,000,000 1 EFF 1 EFF R5,008,888 1 EFF 4 CMTF PG: WC DOT&PW 1 EFF R4,140,466 1 EFF R3,874,792 1 EFF R1,059,567 3 AFF: Ward Allocation 3 BICL T&Roads: Oos 3 CMC INFR. FUND 4 MIG R30,000 R5,000,000 R3,213,339 R1,500,000 1 EFF R5,000,000 R30,687,000 R17,313,000 R15,000,000 4 MIG R2,000,000 R10,000,000 R20,000,000 R25,000,000 R3,000,000 R3,000,000 1 EFF This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 369 Roads Project Status In Progress In Progress In Progress In Progress Future Roads Future 1 EFF Roads Future 1 EFF WC: Granger Bay Blvd: PGWC Roads In Progress WC: Granger Bay Boulevard: CMTF Roads In Progress 4 CMTF PG: WC DOT&PW 4 CAPE METRO TRAN FN WC: N2: HospB: Psl: Eb: EFF Roads WC: N2: HospB: Psl: Eb: PTIF Roads WC: N2: HospB: Psl: PGWC Roads Plan Title Focus Area Roads & Stormwater Rehabilitation Roads Rondevlei Subcouncil:road improv & infr Saxdown Road :Land Acq (Bottelary) Sheffield Rd Philippi: Plan and Design Steynsrus Rd/R44 on-ramp Upgr: Faure Marine Dr: Gordon's Bay Upgrading of Silverboomkloof Rd in So Widening MR27: Strand: Piet Retief,Newton Widening: Andries Pretorius St,Bright,Cor Widening:Lourensford Rd:MR9 Parel Vall Witsands - Bulk Roads & S/W Roads Roads Roads In Progress In Progress In Progress Funding Source 2008-2009 4 MIG 3 AFF: Ward Allocation 3 BICL T&Roads: Hel 4 STATE DEPT:OTHER 1 EFF 1 EFF 4 NG DOT PTI&SG 4 CMTF PG: WC DOT&PW 2009-2010 2010-2011 2011-2012 R1,000,000 R19,000,000 R10,000,000 R705,439 R294,561 R2,300,000 R1,500,000 R6,000,000 R500,000 R400,000 R1,000,000 R250,000 R10,003,841 R6,000,000 R42,468,286 R35,310,000 R30,000,000 R50,000,000 R17,502,942 R3,690,000 Roads Future 1 EFF R100,000 Roads Future 1 EFF R100,000 Roads Future 1 EFF R200,000 Roads In Progress 4 MIG R3,500,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes Plan Title Focus Area Klipfontein Rd CCTV Cam Traffic Safety Bureau - Projects ATC:System Upgrades (SCOOT) Construct Road Signs - City Wide Traffic Calming in Ward 44 Traffic Signal and system upgrade 370 Traffic Signals Dev (Recoverable Works) Transport Systems Management Projects Transport Systems Management Projects WC: Intelligent Transport Systems: EFF WC: Intelligent Transport Systems: PGWC WC: Intelligent Transport Systems: PTIF WC: ITS/TDManagement: PTIF WC: Road signage upgrade: EFF WC: Road Signage Upgrade: PGWC WC: Road Signage Upgrade: PTIF Safety & Security Safety & Security Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Traffic Management Project Status In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Funding Source 2008-2009 2009-2010 R3,706,180 R2,952,920 R3,317,228 1 EFF 1 EFF 4 CMTF PG: WC DOT&PW 4 CMTF OTHER 2010-2011 2011-2012 R2,000,000 R2,000,000 R2,000,000 R1,000,000 R1,000,000 R1,000,000 R1,000,000 R1,660,802 R200,000 R1,500,000 R1,500,000 3 AFF: Ward Allocation R45,000 1 EFF R1,000,000 R3,500,000 R1,500,000 R1,500,000 4 PRIVATE SECTOR FIN R1,500,000 R1,500,000 R1,500,000 R1,500,000 1 EFF R256,730 R1,200,000 R1,500,000 R1,500,000 4 CMTF PG: WC DOT&PW R884,050 R1,000,000 R1,500,000 1 EFF R801,336 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG 4 NG DOT PTI&SG R4,000,000 R9,000,000 R10,000,000 R11,075,200 R7,069,109 R2,063,113 1 EFF 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG R3,500,000 R4,500,000 R4,500,000 R13,500,000 R7,437,300 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes 371 Plan Title Focus Area WC: Traffic Management Centre: EFF WC: Traffic Management Centre: PGWC WC: Traffic Management Centre: PTIF Traffic Management Traffic Management Traffic Management Atlantis Dev Corr Unclassified Atlantis Dev Corr - M12: Unclassified Bayside Canal Unclassified Brackenfell Blvd Unclassified Brackenfell Blvd - De Bron - Lang Unclassified Bulk Roads & Stormwater for Housing Proj Croydon - roads & storm water Unclassified Unclassified ICS/Powerstation site Unclassified Imizamo Yethu:Roads and Stormwater Inform Settlmnts: Tracks&Drainage: IncrUpG InfSettlements: Trcks & Drng:Incr Upg Land Acq:Broadway Blvd,Strand Erf 33427 Land Acq:SLP Village Rd:Somerset West Unclassified Unclassified Unclassified Unclassified Unclassified Project Status In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Future In Progress In Progress In Progress In Progress In Progress In Progress Funding Source 2008-2009 1 EFF R475,770 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG 2009-2010 2010-2011 2011-2012 R10,000,000 R1,000,000 R19,900,000 R25,000,000 R35,000,000 1 EFF R2,500,000 R7,000,000 R10,000,000 3 BICL T&Roads: Blg R3,138,651 R11,000,000 R1,000,000 1 EFF R2,696,464 R5,000,000 R500,000 3 BICL T&Roads: Oos R4,250,967 1 EFF R815,771 R3,000,000 R6,000,000 4 MIG R4,000,000 R14,000,000 R20,000,000 1 EFF 4 PRIVATE SECTOR FIN R500,000 R500,000 R1,500,000 1 EFF R59,000 R500,000 R5,000,000 1 EFF R1,400,000 R2,000,000 4 MIG R5,000,000 R10,000,000 1 EFF R350,000 1 EFF R1,764,606 R110,000 R103,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes R2,000,000 R10,000,000 372 Plan Title Focus Area Project Status Funding Source 2008-2009 M12 (De Grendel) - Property Acquisition Unclassified In Progress 3 BICL T&Roads: Tyg N R194,975 Morkels Cottage Unclassified Morkels Cottage Unclassified N2 Gateway: TR&S Services: CMTF Unclassified N2 Gateway: TR&S Services: EFF Unclassified OPS Small Plant and Equipment Unclassified OPS Upgrading of depot facilities Unclassified Prop. Acquis. - Hardship Unclassified Site C TPI Unclassified Site C Transport Infrastructure D Unclassified SLP Village Rd upgrading Unclassified Soetrivier Upgrading Unclassified Somerset West erf 10490:Roads and Storm Somerset West erf 10490:Roads and Storm South Fork, Strand - roads & storm water Sunbird Park - Design&construct Rds&sw Unclassified Unclassified In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress In Progress Future In Progress In Progress 2010-2011 2011-2012 4 MIG R1,000,000 R500,000 1 EFF R1,000,000 R1,500,000 4 CMTF PG: WC DOT&PW R400,000 1 EFF R10,000,000 1 EFF 2009-2010 R1,062,232 R2,687,000 R800,000 R500,000 1 EFF R1,000,000 R500,000 1 EFF R3,500,000 R1,000,000 R2,000,000 4 NT NDPG R10,000,000 4 NT NDPG R10,570,000 1 EFF R9,350,000 3 BICL SWater:Hel R1,500,000 4 MIG R700,000 1 EFF R100,000 Unclassified Future 1 EFF Unclassified In Progress 3 CMC INFR. FUND R3,000,000 R1,300,000 R300,000 R343,544 R1,000,000 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes Plan Title Focus Area Sunbird Park - Design&construct Rds&sw Unclassified Transport Active Network Systems Unclassified Transport Active Network Systems Unclassified Unmade Roads:Residential Unclassified 373 Upgr:Gravel St's:Mission Grounds, SLP Vlakteplaas Bulk Roads & S/water Vlakteplaas Bulk Roads & S/water WC: Green Point Precinct Ifra Relat Upgra WC: LocRds On GP Common Precinct: EFF WC: LocRds On GP Common Precinct: PGWC WC: LocRds On GP Common Precinct: PTIF Unclassified Unclassified Unclassified Unclassified Unclassified Unclassified Unclassified Project Status In Progress In Progress In Progress In Progress In Progress Future Future In Progress In Progress In Progress In Progress Funding Source 2008-2009 2009-2010 1 EFF R1,000,000 R1,000,000 1 EFF R2,711,687 2010-2011 2011-2012 1 EFF R1,000,000 R1,000,000 R500,000 1 EFF R1,600,000 R3,000,000 R3,000,000 R1,000,000 R1,000,000 R1,500,000 1 EFF R1,000,000 R1,000,000 4 MIG R6,000,000 R5,000,000 R 1,086,116,778 R 1,081,545,588 1 EFF R1,000,000 1 EFF 1 EFF 4 CMTF PG: WC DOT&PW 4 NG DOT PTI&SG TOTALS R80,000,000 R2,500,000 R1,900,000 R2,000,000 R6,500,000 R 620,167,578 R 1,635,943,202 This project list and budget is subject to the City of Cape Town‘s financial approval procedures and processes City of Cape Town – Integrated Transport Plan 2006 To 2011 Suite of Documents APPENDIX D: SUITE OF DOCUMENTS 1. The Integrated Transport Plan 2006-2011 (Review October 2009) Executive Summary 2. The Integrated Transport Plan 2006-2011 (Review October 2009) 3. Operating Licences Strategy 2006 – 2011 4. Public Transport Demand and Supply Analysis 2006 – 2011 Suite of Documents 5. Current Public Transport Record Summary 2006 – 2011 374 City of Cape Town – Integrated Transport Plan 2006 To 2011 Acknowledgements ACKNOWLEDGEMENTS This report is one of a series of efforts comprising of the ITP. The City of Cape Town City of Cape Town, Transport Department, Transport Planning Branch. City of Cape Town, Creative Services Unit. 375 Implementation Funding C and Budgets Appendix would like to acknowledge the valuable contributions made by the following: