resources Performance time Project Planning Phase : Identifying Roles and Responsibilities 1 resources Performance time Roles and Responsibilities resources Roles and responsibilities Performance time • Organizational planning involves identifying, documenting, and assigning project roles and responsibilities and reporting relationships 3 resources Process Performance time List required skills Select team members Document 4 Negotiate roles and responsibilities Gain commitments resources Determining Skills Set Performance time • A Skills Matrix will help the project team in two ways: – Used with an existing group of people, it can determine what skills are present and what are lacking thus making the search for a new person more focused – Used in relation to a project which still has not be assigned people , it can determine what skills are needed 5 resources Skills Matrix Name Adam Brian Candy Debby 6 Trainer Writer Analyst 2 Analyst 1 Programmer 2 Skill Programmer 1 Performance time resources RAM Performance time • Project roles and responsibilities are closely linked to the project scope. This linkage can be visualized by creating a Responsibility Assignment Matrix (RAM) 7 resources Performance Responsibility Matrix for a Market Research Project time R = Responsible S = Supports/assists Task Project team Richard Dan Dave Linda Elizabeth Identify target customers R S Develop draft questionnaire R S Pilot-test questionnaire Finalize questionnaire S S R R S S S S Print questionnaire R Prepare mailing labels R Mail questionnaires R Receive and monitor returned questionnaires R Input response data R Analyze results Prepare draft of report S Prepare final report R 8 R S S R S S S S resources Performance time Responsibility Matrix for the Computer Controlled Conveyor Belt Project Organization Design Deliverables Develop- Documen- Assembly ment tation Architechural design 1 2 Hardware specifications 2 1 Kernal specifications 1 3 Utilities specification 2 1 Hardware design 1 Disk drivers 3 1 Memory management 1 3 Operating system documentation 2 2 Prototypes 5 Integrated acceptance test 5 Testing Purchas- Quality Manufacing assurance turing 2 3 2 3 3 3 2 3 1 4 3 1 2 3 3 1 Legend 9 3 3 3 2 3 1 Responsible 3 Consult 5 Approval 2 Support 4 Notification 3 4 5 5 resources Project Kick-Off Performance time • Once the project proposal has been signed, this meeting sets the tone and lays down the groundwork for the duration of the project. • Rakos [1998] recommends having a management session first then a technical session afterwards – Management session: invite everyone, to introduce everyone, set the interfaces and discuss the general background and objectives – Technical session: establish technical guidelines, procedures and so on 10