V.Aravind Prasad Contact No- +965-90911057 (KUWAIT) E-Mail: r20.aravind@yahoo.com Senior level assignments in Construction/ Project Management and Infrastructure Development with a leading organization. CAREER OVERVIEW Core Competencies Construction Project Management Site Selection / Supervision Quality Control Contract Management Team / Training A Civil Engineer with over 11 years of rich experience in Project Management, Construction, Quality Assurance and Site Management. Presently working with Nasser AL-Baddah & Partners General Trading & Contracting Company (NBTC) -Kuwait, as Construction Engineer. Adept in planning, executing and spearheading construction projects involving Method Engineering, Development, Contract Administration, Resource Planning with a flair for adopting modern construction methodologies in compliance with quality standards. A project planner with expertise in planning, executing and spearheading construction projects. Well versed in swiftly ramping up projects in close co-ordination with Contract Cell, Materials Purchase/ Procurement Cell, Consultants, Architects & Contractors and ensuring on time deliverables. Well versed in handling quality related activities involving resource planning and in-process inspection. Deft at establishing & maintaining project documentation including correspondence, technical, progress reports & contracts. Expertise in all civil engineering activities in all infrastructure projects which includes Oil and Gas Refinery Plants,Pipelines,LNG Tanks and High Rise Buildings. Disciplined and self-motivated with skills in handling multiple tasks and leading cross-functional teams. ORGANIZATIONAL DETAILS Apr‘06 –Till date May’04 -Feb'06 Apr’03- Jan’04 Nasser.M.AL-Baddah & Partners General Construction Engineer Trading & Contracting Company (NBTC) -Kuwait Silver Lining Trading & Contracting Company, Oman Nagarjuna Construction Company Ltd(NCC) Hyderabad,India Project Engineer Site Engineer KEY RESULT AREAS Project Planning & Management: Directing evaluation of project, present cost / benefits analysis at project decision points for construction of residential / commercial complex, Utility & Infrastructures. Finalizing requirements and specifications in consultation with collaborators / promoters as well as project scheduling including material & manpower planning. Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output. Participating in project review meetings for tracking project progress & de-bottlenecking & implementation of QA/QC procedures as per norms and standards. Contract Administration & Management: Maintaining sustained coordination among consultants, contractors and clients. Appointing sub-vendors & sub-contractors for various activities & evaluating their performance.. Valuating & executing (Sub) Contracting Works as well as negotiating, awarding and reviewing (Sub) Contracts as per contract regimes. Supervising all construction activities including providing technical inputs for methodologies of construction & coordination with site management activities. Materials Management: Directing the development and implementation of key procurement strategies / contingency plans and ensuring that strategies & plans are aligned with project requirements. Developing long-term partnerships with suppliers; managing day-to-day supplier performance to ensure meeting of service, cost, delivery and quality norms. Planning and monitoring for work progress, material supply, subcontractors, equipment & labour resources for sites. Ensuring that equipment as well as materials received are in accordance with the quantity & quality. Site & Construction Management/Resource Planning: Supervising all construction activities including providing technical inputs for methodologies of construction & coordination with Site Management. Undertaking soil investigation and, field test, field quality control as well as concrete production and installation. Leading of a team of engineers for various types of job and resolving bottlenecks. Coordinating with Finance, Legal & Liaison Department & external entities. Liaising: Liaising with external agencies, architects, consultants for determining technical specifications, approvals for execution & obtaining on-time clearances. Working on proposals and contracts aimed at developing external contracts. Coordinating with consultant, client and local authorities, etc. Coordinating with the contactors, vendors, etc, ensuring smooth and profitable operations. PROJECTS HANDLED Handled all types of oil & petrochemical sector projects like EQUATE phase – 2 and New Booster station – 132 comprises the construction of sub-station building, road works, compressor foundation and equipment foundations with the sophisticated clients M/s Fluor (KNPC) and M/s AMEC (KOC) respectively. Teamwork, scheduled time and planning, well resource arrangement leads to early completion of the projects. Moreover in addition, an environmental project named Oil pit remediation and reclaim at Wafra with Joint Operations (Chevron) possess the quality and construction of remediate of existing oil pits and reclaim of the same on the land surface of approx. 5 lakh quantity with field and laboratory test. On-going project : New Distribution network for ESP’s Owner Contractor Position Assigned Project value : : : : K.O.C Petrofac International Limited Construction Engineer 6 million Kuwait Dinars Previous Projects : Project # 1 Owner PMC Position Assigned Project value : : : : : New BS- 132 and Enhancements to BS-131 K.O.C AMEC, Kuwait Construction Engineer 9.5 million Kuwait Dinars Project # 2 Owner PMC Position Assigned Project value : : : : : Remediation of Evaporation pits at Wafra Phase 3 K.O.C Joint Operation (Chevron & K.G.O.C.) Project Engineer 2.5 million Kuwait Dinars Project # 3 Owner PMC Position Assigned Project value : : : : : EPC for firefighting facilities for Tank K.N.P.C, Kuwait. K.N.P.C Project Division Project Engineer 11 million US dollars Project # 4 Owner PMC Position Assigned Project duration : : : : : Fourth Gas Train Project – Site Preparation works K.N.P.C., Kuwait S.K.Engineering & Construction Project Engineer Jan ’09 to July ‘09 Project # 5 : Owner PMC Position Assigned Project duration : : : : CIVIL – 3 Utility, (Sub-station Building, Structural Mat & Tank Foundations, Trenches, Paving, etc.) EQUATE, DOW & PIC M/s. Fluor Daniel, Kuwait. Site-Engineer May ’06 to June ‘07 Project # 6 : Owner PMC Position Assigned Project duration : : : : Mechanical – 3 Utility , ( All Vessel Foundation , Sub-station Building , Structural Mat Foundations, Trenches, Paving, etc.) EQUATE, DOW & PIC M/s. Fluor Daniel, Kuwait. Site-Engineer June ’07 to Dec ‘08 Responsibilities handled: Execute the work to the requirements, specification, project scope and safety Entire responsible of construction of BS-132 process area and flare area Achieve target to meet the schedule Good co-ordination with the sub-ordinates Continuous monitoring of supervisors and foreman to in-line with construction activities and allocation of all resource Ensure the quality system with the execution by understanding the contracts and specification Provided assurance that the code and the owner’s requirements are met Tracks ,monitors & communicates project / job progress against, project/jobplan Reporting to and receives direction from construction engineer Controlling and coordinating the heavy earth equipment’s for the project Responsible for communicating the QC requirements to project suppliers and sub-contractors Responsible for periodical training for the project quality and construction personnel Ensure all the construction activities are in line with quality control procedures and inspection test & plan Provided information on existing facilities with elevations and coordinates to assist the design people Getting contractual variations involved in the field and will be resolved withclient representation Calculating the work efficiency of the heavy earth moving equipment’s Project Engineer, Silver Ring Trad. & Contg. Co. (2004 – 2006) Major sub-contract projects handled at Oman Petroleum Development and some individual building projects and commercial building like Mazda car showroom at Barka region with all undertaking the complete resource arrangement includes manpower schedule, material and equipments to the site location. Direct contact and interaction with the client and fulfill their basic requirements and the needs to complete the projects. Site Engineer, Nagarjuna Construction Co. (2003-2004) Involved in structural works and equipment foundations for Hyderabad LPG unit followed the basic safety rules of construction and high-rise buildings for “Singapore class township project”. Obtained initial experience for the construction of high-rise buildings from base foundation to the terrace slab casting. Moreover got more experience in working with the new tools like lightweight AEROCON building blocks and terrace tile. Accomplishments NBTC, Kuwait Obtained “ Safety Engineer Award” from M/s. Fluor for the project EQUATE – phase 2 (Utilities) Approval with Major clients AMEC (KOC), Joint Operation and KNPC as a acceptable “Construction Engineer” for the projects. Involved in safety trainings and seminars about SOLAR (KNPC), BBS (Joint Operation) and the same established within the job location. Trained with electronic permit system (KOC) Education University of Madras, India (2002) – Bachelor of Civil Engineering Software Proficiency AUTOCADD STAAD PRO-2000 Microsoft Project SAP-PS MODULE PERSONAL INFORMATION: Name Date of Birth Driving License Nationality Approvals Languages known Passport details : : : : : : : Date Date Vijayakumar Aravind Prasad 17/05/1981 Light Driving License of Kuwait (GCC) Indian KNPC,JO & KOC (attached) English, Hindi, Malayalam and Arabic (Manageable) E6833503. of issue: 12-11-2003. of expiry: 22-11-2013. Your’s sincerely V.Aravind Prasad