National Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT - NH 45 TAMBARAM TO TINDIVANAM (KM 28.000 TO KM 121.000) MONTHLY O&M REPORT SEPTEMBER– 2014 INDEPENDENT ENGINEER M/S. CDM SMITH INDIA PVT. LTD. 307,Thamarabarani Square, Periyar Nagar, Villupuram-626501. Submitted by CONCESSIONAIRE GMR Tambaram -Tindivanam Expressways Private Limited No.1 C/B First Floor, R.V. Street, Opposite: Govt. Arts College Chengalpattu – 603 001. Project Details NH-45 (popularly known as GST Road) is one of the important National Highways, which connects Chennai, the Capital City of Tamilnadu with the southern districts of the State, including major towns such as Trichy, Madurai, etc. This National Highway has been entrusted to National Highways Authority of India (NHAI) for development and maintenance. NHAI has taken up the project road from Km 28/0 (starting from Tambaram at the outskirts of Chennai city) to Km 121/0 (Tindivanam junction) for development under the Annuity Scheme. Total length of the project road is 93 Kms. The project has been awarded to the Concessionaire, M/s GMR Tambaram-Tindivanam Expressways Pvt. Ltd. As per the Concession Agreement signed between NHAI and the Concessionaire on 9th October 2001. Under the provision of the Concession Agreement, the Concessionaire is awarded a Concession to Design, Finance, Construct, Operate and Maintain the Project Highway for a Concession Period of 17.5 years out of which the project has to be constructed within the first 30 months. For supervision of the project works, the role of Independent Engineer has been envisaged in the Concession Agreement and, accordingly, DORSCH Consultant has been appointed as the Independent Engineer. The Concessionaire has appointed M/s UE Development India Pvt. Ltd., Bangalore as their EPC / O&M Contractor for the execution / Operation & Maintenance of the project. Salient dates are: S.No Description Date 1 Date of signing of Concession Agreement 9 October 2001 2 Commencement date of Concession 9 May 2002 3 Schedule Commencement date of O&M 8 Nov 2004 4 Actual Commencement date of O&M 11 Oct 2004 5 Scheduled End of Concession 8 Nov 2019 The Project details are as follows: Sr. Description 1 Scope of Construction Details Four laning of the entire Project highway of length 93 kms from Km.28/000 to Km.121/000 2 Project Length 93 kms (Urban - 31.3 kms ; Rural - 61.7 kms) 3 Pavement 4 lane divided carriageway with raised median Service road of 5.5/7 m – 20.265/3.750 km 4 Bridges Minor - 15 no. Major - 2 no. 5 ROB’s 52/000 ; 55/400 & 101/118 – 3 no. 6 Trumpet One at Km.80/655 7 Culverts Pipe culverts – 96 Slab culverts - 93 8 Toll Plaza 12 laned at Km.52/820 10 laned at Km.103/250 9 Underpasses 91/461 ; 91/907 ; 92/072 ; 95/575 ; 100/975 – 5 no. 10 Fly over 56/1 & 61/1 11 Wayside amenities On RHS carriageway at km.72/208 On LHS carriageway at km.119/138 12 Other facilities Truck laybys-2 x 2 LHS - KM.69/900 to 70/400 RHS - KM.70/425 to 70/925 LHS & RHS – KM.113/700 to 114/200 The address and telephone Numbers of the Concessionaire, Independent Engineer Registered Office: Site Office: M/s GMR Tambaram Tindivanam Expressways Pvt.Ltd. Skip House 25/1, Museum Road Bangalore – 560 025 Tel: 080-2570100 Fax: 080-2075044 M/s GMR Tambaram Tindivanam Expressways Pvt.Ltd. No. 1 C/B, First Floor Rajeswari Vedhachalam Road Chengalpattu – 603 001 Tel: 044-27431162/27430960 Managing Director: Mr. O.B.Raju Mobile: 98450 – 10060 are as below: Project Manager: Mr.R.Barathi. Mobile No: 95666 99194 Maintenance Activity during “Sep-2014” Highway Patrol Highway patrolling is carried out regularly with two teams round the clock. The patrol team monitors the traffic flow and encroachments into NH property, emergency action in case of accidents like first aid, calling ambulance, information to all concerned, clearing vehicles from road way to ensure smooth traffic flow. The various other activities carried out like removal of parked vehicles, safety arrangement to breakdown vehicles, removal of private approaches, timely assistance to road users in emergency & keep utmost vigilant for road safety to road users and road assets. Turf Maintenance Turf maintenance is being carried out using the grass-cutting machine @ Km 50+000 to 60+000, Km 80+000 to 90+000 & Km 110+000 to 121+000 as per monthly task. Sl.No Week Chainage 1 I 2 II 3 III 4 IV Km 50+000 – Km 52+000,Km 80+00 – Km 82+000,Km 110+00 – Km 112+000 Km 52+000 – Km 54+000, Km 82+000 – Km 85+000, Km 112+000 – Km 115+000 Km 54+000 – Km 57+000, Km 85+000 – Km 87+000, Km 115+000 – Km 118+000 Km 57+000 – Km 60+000, Km 87+000 – Km90+000, Km 118+000 – Km121+000 Remarks Land Scalping Watering to the plants was carried out as and when required. Basin formation and blowing of soil to the plants were carried out. Removing the unwanted plants was carried out. Replacing of dead/missed plants is in progress. ROW Clearance Removal of Undesirable growth and vegetation in areas within the ROW is being carried out regularly using the manpower. Watering is carried out as and when required for the ROW trees. The clearance work carried out between Km 40+000 to 60+000, Km 80+000 to 90+000 & Km 110+000 to 121+000. Avenue plantation Replacing of Dead/missed avenue plants has been carried out during this month from Km 28-121 Cleaning of MCW & SR Cleaning of MCW & SR is being carried out using power Broomers and man power to the entire project based on observation on daily basis. Debris / Road Obstruction Our patrol team & maintenance team removed debris on the carriage way regularly by using men & machinery. Culverts The total no of culverts is 186. As per the schedule the cleaning of culverts are to be done once at 6 months frequency. The cleaning of culverts between KM 55 to KM 60 - 14 nos., KM 84 to KM 90 – 9 nos. & KM 120 to KM 121– 6 nos. is completed during this month. Drainage The total length of concrete drain is 21625m. As per the schedule the Clearing of concrete drains are to be done at 4 months frequency. The clearing work carried out between Km 33.650-34.700R (1050), Km 35.700-37.700L (200), Km76.340-76.850R (510), Km 92.00-92.240R (240), Km 100.305-100.455L (150), Km 100.305-100.525R ( 220) Building Maintenance Building maintenance such as Toll plazas @ 103+000 & 53+000, Rest areas @ 72+000 RHS, 119+000 LHS & Truck lay bye @ 113+000 LHS & RHS, 70+000 LHS & RHS are done regularly. Shoulder Maintenance Shoulder maintenance is maintained by using the approved borrow gravel with compaction using the Roller is in progress and grader is used for removal of excess soil and for levelling the shoulder on weekly/daily Basis at required locations. Electrical Street lighting, High mast, Feeder Pillar and Building lighting are being maintained regularly. Rectification of Damaged electrical poles, fused bulbs & other electrical faults are progressed and in progress on daily basis with our electrical team. Encroachment removal Encroachments were cleared from Km 28+000 to Km 121+000 on both LHS & RHS on daily basis with our detected team. Periodic Removal at service roads and ROW areas will also be taken up as scheduled. Tests BBD test have been carried out during this Month. Painting works Painting of faded locations like Median kerb, Pedestrian fencing & Road marking have been carried out during this month in-between km 60-121. Periodic maintenance activities To improve Raiding Quality 80 Km BC Inlay work have been completed in the month of March-2014 as 10th year periodic maintenance. O&M Performed Task for the month of Sep-2014 as per the Yearly Planner Sl. No. Description/Item 1 a b 2 a Maintenance in ROW Bushes cutting, Toe drain, slope, scatter papers removal & Avenue plantation Avenue plantation Median maintenance Grass cutting b weeds removal c Basin work d e Median plantation Median plants/trees trimming Median drain/slot drain cleaning Drain cleaning in divided kerb locations Watering to the plantations Cleaning of Debris/Litter/ Garbage MCW Service road Junctions Bus bays & Bus shelters f g h 3 a b c d e Garbage removal 4 a Cleaning of C/D works Culverts b Bridges Planed Locations for this month as per O&M plan Unit Planed Qty for this month as per O&M plan Km 2860 Km 60121 Remark KM50-60, 8090, 110-121 Km(B/ S) 62 20 42 Completed Km 28-121 No.s 650 300 350 Completed KM50-60, 8090, 110-121 Km 49-60,8090,110-121 Km 31 10 21 Completed Km 40 20 19.9 Completed KM50-60, 8090, 110-121 Km 28-121 KM50-60, 8090, 110-121 KM50-60, 8090, 110-121 KM50-60, 8090, 110-121 Km28-121 km 31 13.6 51.9 Completed No.s km 5000 31 2000 10 3000 21 Completed Completed Km 9.43 4.04 5.39 Completed Km 2 0 2 Completed km 93 32 61 Completed 28-121 28-121 28-121 28-121 km km No.s No.s 93 22.37 44 49 Will progress on daily basis With Man & Machinary 28-121 Locati ons 20 10 10 Km 55-60(14) ,Km 8490(9),Km 120121(6) Km 55-60 ,Km 84-90,Km 120121 No.s 29 14 15 No.s 1 1 0 As per site condition, where ever required weekly once Monthly Twice Monsoon maintenanc e Completed 5 Cleaning of Drainage 6 7 a Cleaning of Road furniture Sign boards,Delinators,KM & HM stones Building Maintenance Toilets b Truck lay bys 2 c Public amenities 2 8 Electrical Maintenance Street lighting High mast Building lighting Bus lay byes a a b c d 33.65034.700R, 35.70037.700L, 76.34076.850R, 92.0092.240R(240), 100.305100.455L(150), 100.305100.525R(220) Km 4170 3050 1120 Monsoon maintenanc e Completed Km 28-39,6070,90-100 KM 32 11 21 Completed 16 Daily No's Daily No's Daily No's 16 16 On daily basis 2 2 2 2 28-121 28-121 28-121 28-121 Km No's No's No's 19.75 47 2 20 12.5 12 1 15 7.25 35 1 5 221 74 9 Encroachment removal-Daily activities Km 28-121 Nos 295 10 Shoulder maintenance KM 29-33BHS, 44-46 BHS, 5254 BHS, 63-66 BHS, 84-85 BHS, 90-94 BHS. Km 32 11 Repair Works a PGR KM 28-121 RM b RCC Handrails KM 28-121 RM Accidental Damaged locations Maintenanc e on daily basis with our electricians & Team Daily - Road side vendors, Political board ,Huts & shop projections Monthly once due to frequent damages Based on site observation a Boundary stones KM 28-121 Nos during the month of 15th Aug and up to 15th Sep-14 d Kerb KM 28-121 RM e Head walls KM 28-121 Nos f KM/Hm Stones KM 28-121 Nos g Pavement Defects KM 28-121 Sqm h Potholes KM 28-121 Sqm i Drainage Slabs KM 28-121 Nos j Sign boards KM 28-121 Nos 12 Painting works: a Kerb (Median & Service road) 28-121 Km Truck lay bay Km.70 & 113 BHS b RCC Hand rails 28-121 RM Completed c Tree Band 28-121 Nos Completed d Road marking 28-121 Sqm Completed 13 ERP Km 28-121 Km(B/ S) 93 and damages 220 Km's Already completed, during Jan2014 to July-14 6 Km's Already completed, during Jan2014 to July-14 6721 nos Already completed during Feb to June-14 Completed along with periodic maintenanc e in march2014 Patrolling 365*24 with Two patrol teams in progress Executive Summary- Sep 2014 Activities Executed along with Regular O&M 1. 10th year Periodic maintenance works comprising BC overlay & Road marking works has been completed for 80 km in length. BC works with HIP process has been completed for 8km in length during the month of April’2014 2. All accidental repair works like RCC Handrails, PGR, Sign boards, MBCB & Electrical pole are completed up to date, to enhance safety. 3. Illumination level is well maintained on highway for the purpose of safety. The maintenance of the same is in progress on daily basis. 4. Removal of encroachments like private advertisement boards, petty shops & platform vendors are removed then and there on daily basis. 5. Kerb painting & RCC Handrails painting works at all faded locations in between km 28-115 completed. Remaining in progress. 6. Tree band for clear visibility during Night travel has been completed to the entire project on Median and ROW. 7. Damaged Culvert parapet wall & Kerb on Service road, MCW are rectified to improve safety. 8. TLB & Rest place Maintenance works are in progress at all TLB’s km 70, 72, 113 & 119. 9. Sign post painting, Gantry board painting, Boundary stone fixing & shoulder rectification at all required locations are in progress. Need support from client for future works: 1. Even though our continuous effort with concern local authorities, we are unable to control the disposal of garbage on service road rendering the same not being utilised fully at singaperumal koil, Guduvancherry & Urappakkam. We request your intervention with district level panchayath administration on this issue to maintain service roads clean and tidy at all times and free flow of traffic too. 2. The construction of RCC Drain in place of panchayath brick drain is to be considered under COS to solve flooding of drain overflow water during rainy season on service road. The proposals along with IE recommendations are pending at your end. 3. As part of safety improvement the kidney island at some junctions are on the MCW are to be rectified under COS to avoid two wheelers fatal accident. The issue still under pending at your end for the approval of the same. 4. The Regularising of unauthorised median openings as suggested by Then CGM & as recommended by “Then independent Engineer under COS “still pending for approval from Authority. 5. Unauthorised/illegal parking at Melmaruvathue km 91-96 BHS by devotees of Temple & Km 72-76 BHS by sand quarry Gov. of TN, request your support to stop this parking on the interest of road safety on NH-45. 6. Encroachment like private approaches & Commercial establishments are developing in TT NH 45 on daily basis, we put our effort to stop & remove the same but in vain. Need your intervention for the same to avoid such unlawful events in future.