AVAILABILITY BASED TARIFF (ABT) AND OPEN ACCESS - REGULATIONS T SRINIVAS SRLDC 1 INTRODUCTION ABT OPEN ACCESS CASE STUDIES OPEN ACCESS REGULATIONS OA DETAILS & RATES 2 REGIONAL GRIDS QUICK FACTS 3 REGIONAL GRIDS NORTHERN REGION INSTALLED CAPACITY NORTHERN :- 34,207 MW EASTERN :- 16,478 MW SOUTHERN :- 36,921 MW WESTERN :- 37,100 MW NORTH-EASTERN :NORTHEASTERN REGION TOTAL 2,404 MW 127,110 MW EASTERN REGION WESTERN REGION SOUTHERN REGION 4 THE NATIONAL GRID : PHASE 1 500 MW SASARAM 500 MW VINDHYACHAL WR-NR HVDC B2B LINK NORTHERN REGION Commissioned in Nov. 1989 WR-NR HVDC B2B LINK Commissioned in June 2001 NORTHEASTERN REGION ER WESTERN REGION EASTERN REGION BIRPARA(ER) – SALAKATI(NER) 220 KV AC LINK in April 87 (400 KV Malda-Boangigaon in April 2000) 500 MW GAZUWAKA ER-SR HVDC B2B LINK Commissioned in Sep. 1999 (2nd pole in March, 2005) 500 MW BHADRAWATI WR-SR HVDC B2B LINK SOUTHERN REGION Commissioned in Sept. 1997 (2nd pole in March, 1998) 5 NATIONAL GRID PHASE-1 COMPLETE THE NATIONAL GRID : PHASE II GORAKHPUR(NR) - MUZZAFARPUR(ER) 400 KV AC D/C Commissioned in Aug. 2006 500 MW SASARAM 500 MW VINDHYACHAL WR-NR HVDC B2B LINK NORTHERN REGION WR-NR HVDC B2B LINK Commissioned in June 2001 Commissioned in Nov. 1989 NORTHEASTERN REGION ER WESTERN REGION EASTERN REGION BIRPARA(ER) – SALAKATI(NER) KV AC LINK in April 87 220 (400 KV Malda-Boangigaon in April2000) 500 MW GAZUWAKA ER-SR HVDC B2B LINK Commissioned in Sep. 1999 (2nd pole in March, 2005) 500 MW BHADRAWATI WR-SR HVDC B2B LINK Commissioned in Sept. 1997 (2nd pole in March, 1998) SOUTHERN REGION RAIPUR(WR) – ROURKELA(ER) 400 KV AC D/C Commissioned Mar. 2003 2000 MW TALCHER(ER)-KOLAR(SR) HVDC LINK comissioned in SEP 2002 6 Inter Regional Links – Current Capacity 1650 MW 2700 MW 1850 MW 900 MW 33,782 MW 2433 16,680 34,867 MW 1200 MW 1200MW 2000MW 36,921 MW Present IR Capacity = 11,500 MW 7 Name of the link By 2007 Inter-regional capacity 18,400MW NR AGRA AURAIYA GORAKHPUR MUZAFFARPUR BALIA KOTA PATNA B'SHARIFF MALANPUR BIRPARA MALDA GWALIOR UJJAIN VINDHYACHAL SAHU PURI NER BONGAIGAON SALAKATI SASARAM KORBA SIPAT CHANDRAPUR RAIPUR 2000 Biharshariff – Balia 400kV D/c (Quad) 2000 Sub-total 4000 East-West Ranchi- Sipat 400kV D/c with series compensation Upgradation of Talcher-Kolar HVDC bipole 1000 BALIMELA MW Sub-total U.SILERU BELGAUM Legend HVDC BIPOLE KS LA KOLAR 765 kV 400 kV 220 kV & P EE DW HA HVDC BACK-TO-BACK N ANDAMA R NICOBA SR 1200 500 500 West-North GAZUWAKA NAGJHARI 1200 East-South KOLHAPUR PONDA Patna – Balia 400kV D/c (Quad) RANCHI ROURKELA TALCHER WR East-North Sub-total ER DEHRI BUDHIPADAR Capacity(MW) Gwalior – Agra 765kV S/c (initially ch. at 400kV) 1200 Sub-total 1200 Inter-regional capacity – By 2006 11500 GRAND TOTAL 18400 8 Inter-regional Links – By 2007 Sahupuri Dehri Sasaram Allahabad Northern Auraiya Kota Singrauli Agra Gorakhpur Balia Balia Muzaffarpur Patna Biharshariff Vindhyachal Western Kolhapur Ponda Malda Nagjhari Korba Bongaigaon Budhipadar Raipur Ranchi Rourkela Sipat Chandrapur 2850 MW Ramagundam Northeastern Eastern Jeypore Talcher Balimela 1400 MW Belgaum Salakati 1200 MW 6650 MW 2100 MW Ujjain Gwalior Malanpur Birpara 3650MW Gazuwaka Southern Kolar Upper Sileru 9 INTER-REGIONAL TRANSFER BY END OF 11th PLAN (2012) 4000 MW NORTHERN REGION 11850 MW 5500 MW NORTHEASTERN REGION 6050 MW WESTERN REGION Eastern Region EASTERN REGION 1400 MW SOUTHERN REGION 1200 MW 6150 MW 36,700 MW OF INTERREGIONAL POWER BY 2012 10 EHV Infrastructure TRANSMISSION VOLTAGE OWNERSHIP CENTRAL TOTAL STATE Circuit Kilometer + 500 kV HVDC 765 kV 4,372 1,504 5,876 917 409 1,326 400 kV 220 kV 40,854 9,220 22,607 98,521 63,461 107,741 132 kV* Total 2,152 57,515 93,126 216,167 95,278 273,682 charged at 400 kV 11 INDIAN POWER SECTOR - HIERARCHICAL SET UP CENTRAL GOVT. CEA RPC CERC CTU State Govt. SERC IPPs SGC CPPs STU RLDC SLDC CGS Distn Cos. Consumers CENTRAL TRANSMISSION UTILITYREGIONAL LOAD DESPATCH CENTRE – APEX BODY – RUN BY POWERGRID POWERGRID REGIONAL POWER COMMITTEE (FORMERLY REB) – ONE AT EACH REGION CENTRAL ELECTRICITY AUTHORITY REGIONAL LOAD DESPATCH CENTRE – CENTRAL GENERATING STATION SECRETARIAT TO THE ELECTRICITY UNDER CENTRAL GOVT.POWER APEX BODY – RUN BY POWERGRID 12 BOARDS OF THE REGION JOINTLY OWNED UNITS CONSTRUCTED BY MINISTRY – PLANNING AND ASSISITING PUBLIC SECTOR UNDERTAKINGS GOVT ALL INDIA MARKET COMPOSITION (1,27,110 in 2006) AS on 31-07-06 3% 9% 5% 46% State Sector long term PPA Central Sector long term PPA IPP generation Short Term Trading 37% Balancing market 13 Source wise composition of installed capacity in India (1,27,110 in 2006) AS on 31-07-06 6158, 5% 3310, 3% 32135, 26% Hydro Thermal Nuclear Wind & Others 82227, 66% 14 Energy Resource Map Hydro Jammu Ludhiana SIKKIM Delhi NEPAL BHUTAN Partabpur Guwahati Lucknow Patna Gandhinagar Pipavav Bhopal WR BANGLA DESH AN ER Vindhyachal Indore NER CHICKEN NECK Kolkata Korba MM AR RAPP Jaipur MY NR Talcher/Ib Valley Raipur Bhubaneswar Coal Tarapur Mumbai Hyderabad Vizag Simhadri SR Bangalore Kayamkulam Thiruvananthapuram Generation Load-Centre Coal Krishnapatnam Kaiga Kozhikode Mangalore LEGEND Ennore South Madras Chennai Hydro Cuddalore Lignite Coastal Kudankulam COLOMBO Nuclear SRI LANKA 15 ALL INDIA GENERATION COMPOSITION 16.8, (3%) Total Market Size = 587.4 BU 84.5, (14%) Thermal Hydro Nuclear 486.1, (83%) Total Installed Capacity 1,27,110 MW 16 Sector wise consumption of electricity in India 6% 5% 35% 29% 3% 22% Total Installed Capacity 1,27,110 MW Industry Domestic Railways Agriculture Commercial Others 17 SOUTHERN REGIONAL GRID OVERVIEW 18 SOUTHERN REGION – GEOGRAPHY KARNATAKA ANDHRA PRADESH POPULATION :- 22.5 CRORES ( 22% OF INDIA) AREA :- 651 (‘000 SQ KM)(19% OF INDIA) INSTALLED CAPACITY:- 36,921 MW(29.0%) WEATHER :- South-west monsoon North-east monsoon SEA COAST :- AROUND 4000 KM TAMIL NADU 19 SR STATES – POWER SYSTEM STATISTICS KARNATAKA ANDHRA PRADESH INSTALLED CAPACITY – 6180 MW INSTALLED CAPACITY – 8944 MW MAX DEMAND MET – 5612 MW MAX DEMAND MET – 8241 MW DAILY CONSUMPTION MAX – 125 MU DAILY CONSUMPTION MAX – 171 MU DAILY CONSUMPTION AVG – 95 MU DAILY CONSUMPTION AVG – 142 MU CONSUMER PROFILE – CONSUMER PROFILE – INDS -26%, DOM-19%, COMM7%, IRRI-39% & OTHERS-9% INDS -27%, DOM-22%, COMM5%, IRRI-39% & OTHERS-7% KERALA TAMIL NADU INSTALLED CAPACITY – 2284 MW INSTALLED CAPACITY – 10015 MW MAX DEMAND MET – 2602 MW MAX DEMAND MET – 8371 MW DAILY CONSUMPTION MAX – 41 MU DAILY CONSUMPTION MAX – 166 MU DAILY CONSUMPTION AVG – 34 MU DAILY CONSUMPTION AVG – 135 MU CONSUMER PROFILE – CONSUMER PROFILE – INDS -34%, DOM-44%, COMM13%, IRRI-2%& OTHERS-7% INDS -39%, DOM-25%, COMM7%, IRRI-24% & OTHERS-5% 20 SR STATES – GEOGRAPHY KARNATAKA POPULATION :- 5.3 CRORES ANDHRA PRADESH AREA :- 192 (‘000 SQ KM) POPULATION :- 7.6 CRORES NO OF CONSUMERS :- 105 LAKHS AREA :- 275 (‘000 SQ KM) PER CAPITA CONS. :- 642 UNITS NO OF CONSUMERS :- 162 LAKHS MAIN AGRICULTURE CROP :COFFEE & RAGI PER CAPITA CONS. :- 719 UNITS MAIN AGRICULTURE CROP :- RICE CLIMATIC CONDITION :- HOT AND HOT & HUMID CLIMATIC CONDITION :- HOT AND HOT & HUMID KERALA POPULATION :- 3.2 CRORES AREA :- 39 (‘000 SQ KM) NO OF CONSUMERS :- 61 LAKHS TAMIL NADU PER CAPITA CONS. :- 386 UNITS POPULATION :- 6.2 CRORES MAIN AGRICULTURE CROP :COCONUT & SPICES AREA :- 130 (‘000 SQ KM) CLIMATIC CONDITION :- HUMID NO OF CONSUMERS :- 152 LAKHS PER CAPITA CONS. :- 866 UNITS MAIN AGRICULTURE CROP :SUGAR CANE & OIL SEEDS CLIMATIC CONDITION :- HOT AND HOT & HUMID 21 INSTALLED CAPACITY IN SR SUMMARY OF INSTALLED CAPACITY(MW) AS ON 31.07.2006 AGENCY HYDRO THERMAL GAS/DIESEL WIND/OTHERS NUCLEAR TOTAL ANDHRA PRADESH 3587 2963 272 2 --- 6824 KARNATAKA 3389 1470 128 4 --- 4991 KERALA 1835 --- 235 2 --- 2072 TAMILNADU 2137 2970 423 19 --- 5549 PONDICHERRY --- --- 32 --- --- 32 CENTRAL SECTOR --- 8090 360 --- 880 9330 IPP 278 387 3149 4309 --- 8123 TOTAL 11226 (30%) 15880 (43%) 4599 (13%) 4336 (12%) 880 (2%) 36921 (100%) 22 SOURCE-WISE INSTALLED CAPACITY OF SR WIND/OTHERS 4337 (12%) NUCLEAR 880 (2%) NAPTHA/GAS/DIESEL 4599 (13%) THERMAL All Figures In MW 15880 (43%) HYDRO 11226 (30%) TOTAL 36,921 MW 23 GENERATING UNITS IN SOUTHERN REGION UNIT CAPACITY AP KAR KER TN THERMAL (500 MW) 2 THERMAL (200-250 MW) 10 7 GAS/THERMAL (100-150 MW) 9 2 3 10 24 HYDRO (>50 MW) 27 29 16 15 87 TOTAL 48 38 19 38 165 13 TYPICAL CGS TOTAL 8 10 15 45 KAR A.P GENERATOR SPREAD IN SR - HYDRO GENERATORS ABOVE 1000 MW KER TN - THERMAL - GAS / NAPTHA GENERATORS 500 – 1000 MW GENERATORS BELOW 500 MW - NUCLEAR CPP/IPP PLANTS IN SOUTHERN REGION Station Name I/C in MW Variable Cost (Ps) TATA ELECTRIC 79.1 390 JINDAL 260 280 THANNEERBAVI 220 500 A.P KAR Station Name I/C in MW Variable Cost (Ps) KASARGOD PCL 22 470 BSES 157 560 KUTHUNGAL 21 --- MANIYAR 12 --- KAYAMKULAM 360 580 KER TN Station Name I/C MW Variable Cost (Ps) SIMHADRI 1000 104 BSES 220 168 VEMAGIRI PGL 233 SPECTRUM 208 JEGURUPADU EXT. 220 JEGURUPADU 216 102 LANCO 355 125 Station Name I/C in MW Variable Cost (Ps) HITEC 15 TCPL 63.5 GMR VASAVI 196 444 SAMALPATTY 105 474 ST-CMS 250 161 P P NALLUR 330.5 550 ABAN 113 88 MADURAI POWER 106 456 ARKAY 38 104 TYPICAL LOAD SPREAD IN SR LOAD 500-1500 MW LOAD 200-500 MW 26 400KV SUB-STATIONS IN SR POWERGRID STATE OTHERS TOTAL AP 8 9 2 19 KAR 6 5 1 12 KER 2 TN 6 KALPAKKA RAMAGUNDAM 2 1 2 SIMHADRI 1 GAZUWAKA 9 KHAMMAM HYDERABAD TOTAL 22 15 5 GMR P VEMAGIRI P JEGRUPADU EXTN P 42 MAMIDIPALLY VIJAYAWADA MEHA BOOB NAGAR RAICHUR NAGARJUNASAGAR P P MUNIRABAD SRI SAILAM P KURNOOL P GOOTY NARENDRA P CUDDAPAH NELLORE DAVANAGERE KAIGA HIRIYUR CHITTOOR NELAMANGALA ALMATHI BANGALORE TALAGUPPA P MYSORE HOODY KOLAR P MADRAS HOSUR NEYVELI TPS I (EXP) SALEM P NEYVELI -- OF NTPC -- OF ANDHRA PRADESH -- OF TAMIL NADU UDUMALPET TRICHUR -- OF POWERGRID P TRICHY P P P MADURAI -- OF KARNATAKA -- OF NLC -- OF NPC TRIVENDRUM TRANSMISSION IN SOUTHERN INDIA VOLTAGE LEVEL AP KAR 400 KV 2680 1616 220/230 KV 10274 7839 2692 6538 132/110 KV 12360 6060 3720 10220 TOTAL 25314 15515 6412 16758 KER TN CGS TOTAL 10905 15201 366 27709 32360 11271 75270 ABOUT 3000 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS 28 TALCHER BHADRAVATI JEYPORE RSTPP KALPAKKA KHAMMAM HYDERABAD VEMAGIRI GMR N’SAGAR GVK VIJAYAWADA KURNOOL MUNIRABAD NARENDRA SIMHADRI MMDP P MAHABOOB NAGAR RAICHUR GAZUWAKA SSLMM GOOTY KAIGA P GUTTUR KADAPA P NELLORE HIRIYUR TALGUPPA HOODY NELAMANGALA CHITTOOR MADRAS MAPS KOLAR BANGALORE 1000 MW HVDC BACK TO BACK LINK 2000 MW HVDC BIPOLE HOSUR 500 KV HVDC LINE NEYVELI 400 KV LINE POWERGRID SALEM NEYVELI TPS – 1 (EXP) 400 KV LINE APTRANSCO 400 KV LINE KPTCL UDUMALPET TRICHUR P TRICHY 400 KV LINE OPERATED AT 220 KV P THERMAL GENERATING STATION MADURAI 400KV SUB-STATION NUCLEAR STATION 29 TRIVANDRUM SRLDC, BANGALORE TYPICAL LOAD CURVE OF SR 23000 SUMMER 21000 EVENING PEAK DEMAND IN MW---> 19000 17000 WINTER 15000 MONSOON 13000 11000 1 2 3 4 5 6 7 8 9 10 11 12 13 HOUR ----> 14 15 16 17 18 19 20 21 22 23 30 24 TALCHER KOLAR SCHEMATIC TALCHER Electrode Station Electrode Station KOLAR +/- 500 KV DC line 1370 KM 400kv System B’lore Hoody Cudappah 220kv system Hosur Salem Udumalpet Kolar Madras Chintamani 31 UI vs STOA market (All regions) 100% power market 92% long term market 5% UI market 3% STOA market 32 DETAILS OF REGION WISE STOA TRANSACTIONS IN 2005-06 12000 10126 10561 10000 8000 6000 4000 2263 2000 1241 772 623 109 35 290 444 0 NR WR No.Of Transactions SR ER NER Energy Approved in MU 33 Constituent-wise STOA Import/Export Energy 2004 – 05 Import 2005 – 06 All figures in MUs Import Export 2000 2000 1800 1800 1600 1600 1400 1400 1200 1200 1000 1000 Export 1717 808 800 800 600 600 519 503 434 358 400 200 0 0 AP 356 400 185 200 0 842 KPTCL 0 KSEB 0 TNEB 0 3 0 AP KPTCL 0 KSEB TNEB 34 JINDAL Jun-06 May-06 Apr-06 Mar-06 Feb-06 Jan-06 Dec-05 Nov-05 Oct-05 Sep-05 Aug-05 Jul-05 Jun-05 May-05 Apr-05 ENERGY IN MUs ---> MONTHWISE EXPORT STOA BY CPPs/ IPPs 160 140 120 100 80 60 40 20 0 NAVBHARAT 35 SHORT TERM OPEN ACCESS(STOA) RATES (2006-07) NORTHERN REGION 521.37 (2.2) NORTHEASTERN REGION EASTERN 441.24 (1.8) WESTERN WR-ER REGION 407.87 (1.7) REGION 345.10 (1.4) SOUTHERN REGION 757.04 (3.2) Notes: i) The indicated STOA Rates are in Rs./MW/Day. ii) The figures shown in bracket correspond to the indicative STOA Rates in Paise/Unit. (approx.) 36 TALCHER-KOLAR IMPORT OF 35,726MUs FROM ER THROUGH TALCHER-KOLAR UPTO OCT – 06 YEAR ---> 2002 2003 2004 2005 2006 ENERGY (IN MU) MAX FLOW (IN MW) ENERGY (IN MU) MAX FLOW (IN MW) ENERGY (IN MU) MAX FLOW (IN MW) ENERGY (IN MU) MAX FLOW (IN MW) ENERGY (IN MU) MAX FLOW (IN MW) JAN --- --- 311 850 805 1528 852 1583 1096 1915 FEB --- --- 273 1010 701 1508 775 1865 1046 1801 MAR --- --- 491 1316 837 1600 884 1507 1117 1850 APR --- --- 473 1183 923 1500 878 1600 1083 1764 MAY --- --- 172 1026 652 1385 704 1500 1126 2000 JUN --- --- 277 994 688 1416 691 1605 929 1724 JUL --- --- 319 1075 759 1490 1254 1880 1098 1700 AUG --- --- 346 1088 628 1341 857 1600 1130 1887 SEP 6 200 512 1533 742 1552 732 1881 1155 2030 OCT 58 500 508 1458 829 1550 895 1834 1212 2030 NOV 77 500 470 1048 719 1600 999 1880 DEC 241 750 630 1383 882 1615 884 1827 TOTAL 382 4782 9165 10405 10992 AVERAGE 96 399 764 867 1099 MONTHS MAX FLOW 750 1533 1615 1881 2030 37 RESERVOIR LEVEL - COMPARISON LEVEL LEVEL ENERGY ENERGY RISE IN MU LEVEL IN MTS 31-Oct-05 31-Oct-06 31-Oct-05 % RISE 31-Oct-06 JALAPUT 837.00 837.39 473 493 20 4 LINGANMAKKI 554.23 553.38 4492 4212 -280 -6 SUPA 560.79 561.52 2866 2931 65 2 IDUKKI 729.25 724.17 1926 1527 -399 -21 KAKKI 979.55 977.60 829 761 -68 --8 NILGIRIS 1469 1345 -125 --8 TOTAL 12055 11269 -787 -7 38 MAXIMUM & MINIMUM DRAWAL IN MW Oct-06 STATE AP AVG DRAWAL 1090 MAX DRAWAL OCT 06 2820 ENTITLEMENT MIN DRAWAL TILL NOW 3360 OCT 06 TILL NOW 1459 - 580 -1280 SEP-06 KAR 830 1930 2410 AUG-06 1417 40 NOV-05 MAY 05 KER 730 1210 1260 1148 - 120 1610 2500 3140 2361 230 MAY 06 PONDY 190 250 260 SEP-06 -301 SEP-05 AUG-06 TN - 170 - 100 OCT-03 304 80 10 APR-04 39 KADAMPARAI GENERATION/PUMP ENERGY FROM JAN - 2003 2003 2004 2005 GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE GENERATOR MODE JAN 39 38 44 58 FEB 39 46 21 MAR 32 51 APR 35 MAY 2006 PUMP MODE GENERATOR MODE PUMP MODE 0 0 72 93 21 0 0 53 56 6 18 0 0 31 38 40 26 35 0 3 12 24 37 43 41 48 30 46 30 35 JUN 29 45 55 35 45 51 50 49 JUL 47 49 50 49 79 62 60 42 AUG 54 55 55 41 50 25 60 46 SEP 36 48 30 25 41 15 44 44 OCT 26 15 0 0 47 45 45 47 NOV 23 24 0 0 64 59 DEC 49 53 0 0 70 63 TOTAL 446 507 328 330 426 369 457 474 40