July 30, 2010 Secretariat IT Consolidation Plan Update Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative Agenda • Secretariat IT Plan Update Planning Process • IT Consolidation Roadmap to Substantial Completion “A phased approach” • Secretariat IT Plan Update Executive Summary – Progress to date • Benchmarks • Secretariat IT Consolidation Plan Summary by Service • Secretariat IT Consolidation Plan Summaries by Secretariat ANF EOHHS EOEEA EOLWD EOE EOPSS EOHED MassDOT • Potential Challenges Going Forward • Next Steps 2 Secretariat IT Consolidation Update Planning Process Secretariat IT Consolidation Plan Update Process: – Leveraged existing Secretariat IT Consolidation Plans dated 1/25/10 • Reviewed existing IT Consolidation Plans for continued accuracy • Secretariat stakeholders pulled updated Governance, Organizational and Financial Data for plan refreshes. • Secretariat stakeholders met with their internal teams to review IT Services Consolidation Workplans Meetings held with each SCIO to review and assist in data compilation efforts. • The future state documented. Secretariat IT Consolidation Plans • EOHHS plan was submitted in March 2010 and is being revisited by new SCIO with revised plan targeted for Aug 30, 2010. PM Review & Executive Summary Development: – Met with ANF, EEA, EOE, LWD, HED, EOPSS, and MassDOT to: • Review Current State and Plan to Achieve Substantial Consolidation. • Identify remaining FY’11 actions and key organizational changes. • Review and update as needed IT Services Consolidation plans pertaining Helpdesk, Desktop / LAN, Web Information Architecture and Applications Services plans. – Review and combine Infrastructure Wave refresh plans. – Compile all data and review with Secretariat stakeholders for final approval. – Compiled executive summaries for senior management review. 3 Secretariat IT Consolidation Roadmap – a phased approach The Secretariat Consolidation Roadmap update provide a framework for consolidation activity completion and context from which to set specific future phase milestones The IT Consolidation Work Plan is broken into 3 month phases to focus on specific milestones, mange progress forward and allow for effective tracking of all related work effort from an enterprise vantage point. Currently IT Consolidation is in the Implementation Phase, which extends from July – September. The overall goal of Consolidation is for each secretariat to migrate to the most efficient model for the delivery of the IT services listed below. • HelpDesk: • HelpDesk organizations consolidated to centrally managed organization. • HelpDesk toolsets consolidated to ITIL based toolsets. • Helpdesk Process Standards consolidated to ITIL based framework(s). • HelpDesk SLA’s consolidated to a standard multi-tiered SLA driven by agency needs. • Desktop / LAN: • Desktop / LAN service organizations potentially consolidated to centrally managed HelpDesk organization. • Desktop / LAN service processes potentially consolidated to ITIL based framework(s). • Desktop / LAN service SLA’s potentially consolidated to a standard multi-tiered SLA driven by agency needs. • Web IA: • The establishment and or standardization of processes responsible for organization, labeling and navigation schemes within Mass. Gov, including standards around “look & feel” and a common user experience for static web-based content. • Applications Services: • The consolidation of applications services at the Secretariat level is up to the discretion for the SCIO. Secretariat Consolidation is progressing well, and is on track barring any budgetary or resource constraints. 4 Secretariat IT Consolidation Plan Executive Summary Each Secretariat modified their plans to achieve consolidation objectives with the understanding that these plans are under continual re-evaluation and represent a snapshot in time as of July 31, 2010. Plan highlights are is as follows: (Details: see appendix A) HelpDesk Services Consolidation: HelpDesk Services are consolidated at ANF, EOLWD and EOEEA, with consolidation efforts in the final stages at EOPSS. EOHHS, EOE & MassDOT plan on having consolidated HelpDesk organizations in place by 12/31/10 EOHED created a centralized HelpDesk organizational structure with 2 distinct HelpDesk Groups utilizing a singular toolset Desktop / LAN Services Consolidation: Centralized Support Model implemented for consolidated Desktop / LAN services at ANF & EOEEA. EOPSS and EOLWD plan to move to a centralized support model for Desktop / LAN Svcs by the end of Q3 ’10. EOE and EOHHS have initiated planning and plan to complete their Desktop / LAN Services consolidation by the end of Q1 ’11. Web Information Architecture Services Consolidation: > 75% of agency websites are currently hosted on Mass.Gov. 50% of Secretariats (EOLWD, EOHHS, EOHED, & EOPSS) initiated planning for Web IA consolidation and target completion in Q4 ’10. EOE centralized its Web IA at the secretariat level and MassDOT in process of developing centralized content management. ANF & EOEEA plan on completing Web IA consolidation by the end of Q2 ’11, with dependencies on resource and capital availability. Applications Services Consolidation: MassDOT has identified 42 applications and initiated applications consolidation efforts by completing their Badging Application upgrade, and is planning quarterly application consolidations through Q1 ’11; including Ice & Snow, Fleet Management and Construction Management applications . EOHED is actively planning the implementation of a new core security application, “BitArmor” slated for delivery 12/31/10. EOEEA has completed its Time and Attendance application implementation. balance of Secretariats are currently prioritizing their centralized HelpDesk – Desktop / LAN organizations and plan on initiating planning and analysis of application consolidation efforts with implementation efforts targeted between Q4 ’10 – Q2 ‘11 . The 5 HelpDesk & Desktop / LAN consolidation is tracking to target These HelpDesk and Desktop / LAN benchmarks are derived from the Benefits Tracking information available as of 6/30/10 HelpDesk Secretariat Baseline Last Quarter This Quarter Target % Reduced from Baseline ANF 6 5 1 1 EOE 0 0 0 1 EOEEA 6 6 3 1 EOHED 2 2 2 1 EOLWD 2 1 1 1 EOHHS 11 9 9 1 EOPSS 12 12 12 1 MassDOT 3 2 2 1 CMW 1 1 1 1 Total 43 38 31 9 28% % Reduced from Baseline Desktop / LAN Secretariat Baseline Last Quarter This Quarter Target ANF 9 7 1 1 EOE 4 4 4 1 EOEEA 6 6 6 1 EOHED 2 2 2 1 EOLWD 4 4 4 1 EOHHS 16 11 10 1 EOPSS 12 12 12 1 MassDOT 2 2 2 1 CMW 0 0 0 0 Total 55 48 41 8 25% 6 Secretariat IT Consolidation Work Plan Visual by Service HelpDesk Services Consolidation FY'10 - FY'11 J F M A M J J Desktop / LAN Services Consolidation A S O N D J F M A M J FY'10 - FY'11 ANF ANF EOEEA EOEEA EOE EOE EOHED EOHED EOHHS EOHHS EOLWD EOLWD EOPSS EOPSS MassDOT MassDOT J F M A M FY'10 FY'11 J F M A M J J A S O N D J F M A M J FY'10 - FY'11 ANF EOEEA EOEEA EOE EOE EOHED EOHED EOHHS EOHHS EOLWD EOLWD EOPSS EOPSS MassDOT MassDOT J F M A M FY'10 FY'11 Inventory A S O N D J F M A M J S O N D J F M A M J Applications Services Consolidation ANF Legend: J FY'10 FY'11 Web IA Services Consolidation FY'10 - FY'11 J J J A FY'10 FY'11 Analysis/ Planning Consolidation Initiated Completed 7 2010 Secretariat IT Consolidation Roadmap Summary ANF Helpdesk Services Desktop / LAN Services Profile: Pre-Consolidation: 7of the 14 agencies have their own internal Helpdesks utilizing differing toolsets, all governed by differing processes, standards and technologies. The remaining 7 utilize ITD as their Helpdesk organization. Action Plan Summary: ANF implemented a systematic approach to Helpdesk consolidation. Standardizing processes, procedures, staffing models and agreeing upon a singular Helpdesk toolset, including the implementation of automated call distribution systems, ANF piloted HD consolidation with a single agency (BSB). ANF proceeded to develop & implement customer svc training and SLA’s for migration to full User Support Model. Complete implementation of User Support Model with all agencies targeted for 7/3/10. Key Milestones: Consolidation to central services support model complete Target Dates: 7/3/2010 Web IA Services Action Plan Summary: ANF’s goal is complete consolidation of 9 Desktop / LAN service organizations to 1 ITIL based framework. Utilizing a singular SLA to cover both Desktop/LAN and Helpdesk services, ANF will consolidate their IT Service groups and staff into 1 centrally managed organization. Key Milestones: Target Dates: Transition IT Support Staff to Secretariat Level 6/30/2010 Complete implt. of User Support Model for agency groups 1-3 7/3/2010 Application Services Profile: Pre-Consolidation: 14 agencies portalized on MASS.GOV, with 4 of 14 agencies working toward adoption of new ANF secretariat information architecture structure. Action Plan Summary: ANF plans on creating a secretariat based Web IA services organization. Beginning in July ’10 and culminating in October ’10, ANF will conduct staffing and website content inventories. Followed by detailed planning and governance development ANF plans on completing SLA’s ,KPI’s and activating their Web IA Services team by March ’11. Completed Website IA Services rollout slated for end of FY’11. Key Milestones: Profile: Pre-Consolidation: 9 decentralized and independently managed Desktop / LAN service groups. Target Dates: Profile: Pre-Consolidation: 5 categories of applications identified and prioritized as potential candidates for consolidation. Action Plan Summary: ANF broke out two major categories for consolidation based on function: (1) Foundational, (2) Business Applications. The secretariat identified 30 applications which have redundancies across 4 ANF agencies. These applications are targeted for consolidation. Completed application consolidation targeted for end of FY’11. Key Milestones: Target Dates: Staffing and web content inventories complete 10/30/2010 Obtain business buy in for consolidation plan 7/30/2010 Complete planning and Web IA Svcs governance development 12/31/2010 Governance, Operating and Staffing models complete 12/31/2010 SLA’s & KPI’s complete – activation of Web IA Svcs team 3/31/2011 Full application consolidation complete 6/30/2011 Complete Website IA Svcs rollout 6/30/2011 8 2010 Secretariat IT Consolidation Roadmap Summary EOEEA Desktop / LAN Services Helpdesk Services Profile: Pre-Consolidation: 8 internal Helpdesks utilizing 3 differing toolsets, all governed by differing processes, standards and technologies. Profile: Pre-Consolidation: 8 decentralized and independently managed Desktop / LAN service groups. Action Plan Summary: EOEEA selected a common Helpdesk toolset “ Open Source,” and announced a new centralized Helpdesk organizational structure in May ‘10. EOEEA is targeting completion of consolidation to a centralized services support model in July ’10, followed by the rollout of a virtual staffing model across the secretariat in October ’10. Action Plan Summary: EOEEA transitioned support staff to Secretariat level in April ’10. Project team is currently reviewing staffing models and establishing standards for processes and procedures, as well as developing and refining their Desktop / LAN Services SLA in an iterative process. Targeting full migration to Secretariat level Support Model in July ’10. Key Milestones: Key Milestones: Target Dates: Target Dates: Consolidation to central services support model complete 7/31/2010 Complete SLA & establish standard policies & procedures 6/30/2010 Rollout of virtual staffing model complete 10/31/2010 Transition IT Support Staff to Secretariat Level 6/30/2010 Migrate 11 remaining agencies to Centralized Support Model 7/31/2010 Web IA Services Profile: Pre-Consolidation: 6 agencies with static, non-portalized, independently managed websites, operating without a unified information architectural structure. Action Plan Summary: EOEEA separated Web IA Consolidation into 2 distinct and concurrent work streams: (1)Web IA & (2)Non-Compliant Site Mgmt. (1); EOEEA created a centralized Web IA team to define staffing models and establish procedures and training on web toolsets. Currently EOEEA is managing the portalization of agency sites in 2 groups. The portalization of these groups is dependant on budget. (2); EOEEA determined decommissioning timeline for non-compliant websites and established content mgmt governance- targeting June ’10 completion. They will begin decommissioning by July ’10 - targeting completion in February ’11. Key Milestones: Target Dates: Application Services Profile: Pre-Consolidation: Multiple agencies with high maintenance and licensing costs. 12 applications identified for potential consolidation. Action Plan Summary: EOEEA project team conducted due diligence exercises to determine appropriate apps. for consolidation. Currently EEA has consolidated their Time & Attendance application completing in June ’10. Project team is currently designing governance ops. models and consolidation plans – targeting September ’10. EOEEA plans to commence execution in October ’10 upon approval from leadership – targeting February ’11 completion. Key Milestones: Target Dates: Establish Web IA and Content Mgmt Governance 6/30/2010 Consolidation of Time & Attendance Application complete 6/30/2010 Migration of Group 1 agency sites to MASS.GOV 10/31/2010 Governance Operating Model and Consolidation Plan complete 9/30/2010 Decommissioning & migration of non-compliant websites 2/28/2011 Full application consolidation complete 2/28/2011 Migration of Group 2 agency sites to MASS.GOV 6/30/2011 9 2010 Secretariat IT Consolidation Roadmap Summary EOE Desktop / LAN Services Helpdesk Services Profile: Pre-Consolidation: No internal Helpdesks & 2 external Helpdesks utilizing 2 differing toolsets, all governed by differing processes, standards and technologies. Profile: Pre-Consolidation: 4 decentralized, understaffed and independently managed Desktop / LAN service groups. Action Plan Summary: EOE Has conducted due diligence and planning in order to create a centralized internal Helpdesk to provide Tier 1, 2 and 3 services. EOE Helpdesk is actively participating in ITD’s IBM/Tivoli implementation and will pilot the use of this software to create their new centralized model as soon as it is available. Targeting set up and configuration in Tivoli by 10/30/10. Staffing will be identified and a new organization put in place and expect to be fully operational 12/31/10. Action Plan Summary: EOE Project team is currently assembling DT/LAN services team from current agency staffing. EOE will review staffing models and levels, create a separately managed group and establish standards for processes and procedures for operation and integrate with the Tivoli –Helpdesk effort to implement ITIL standards by Oct. ’10. Development of SLA and full implementation of new model expected Feb. ’11. Key Milestones: Key Milestones: Target Dates: Target Dates: EOE established as Secretariat entity in Tivoli 10/31/2010 Create staffing model and appoint management 10/31/2010 EOE Centralized Helpdesk fully operational 12/31/2010 Develop SLA’s and complete implementation 02/01/2011 Application Services Web IA Services Profile: Pre-Consolidation: 4 agencies with static, non-portalized, independently managed and silo-focused websites, operating without a unified IA structure. Profile: Pre-Consolidation: Multiple agencies with high maintenance and licensing costs. 2 application areas identified for potential consolidation. Action Plan Summary: EOE gathered and organized the Web IA requirements for the Secretariat which entailed wide opportunities and activities for education. EOE conducted detailed design and contracted with HHS to build a new consolidated Web IA service for the Secretariat; bringing the 4 agencies’ static content into the Mass.gov portal. EOE trained staff to maintain the Sec. site and will launch in mid-late July 2010. Moving into Phase 3d, EOE will develop a plan to begin migrating static content from the remaining agencies into the portal as well as separating static content from applications at the agency level. EOE will also, create a single centralized group to support the agencies and Secretariat site as an integrated whole with SLA by Dec. ’10. Action Plan Summary: EOE project team conducted due diligence exercises to determine appropriate apps. for consolidation. Currently no consolidation of agency applications identified. Key Milestones: Key Milestones: Target Dates: Launch sec level Web IA services 7/30/2010 Conduct org and staff planning for consol. for agency sites 9/30/2010 Full cut over to Sec level Web IA Service Delivery 12/31/2010 Target Dates: 10 2010 Secretariat IT Consolidation Roadmap Summary EOHED Helpdesk Services Desktop / LAN Services Profile: Pre-Consolidation: 4 out of 9 agencies without Helpdesk organizations and sporadic use of proprietary toolsets. Profile: Pre-Consolidation: 2 Desktop /LAN service providers decentralized across all agencies with overlapping service delivery and differing processes and procedures. Action Plan Summary: Three phase plan: First- Implement the HelpStar toolset at OCA. Second integrate with existing tool at DHCD allowing for full sharing of data via XML. Third- Enable full XML transfer of data between DHCD / OCA & IBM Tivoli toolset once available and stabile and consolidate all service function to a single Helpdesk organization. SLA’s and staffing models have been drafted, and training has begun. Targeting the HED completion in Jul ’11. Plans to rollout a virtual staffing model across the secretariat once central support model is fully functional. Action Plan Summary: Planning to centralize desktop / LAN services consolidating to a single service providers across OCABR and OCD. Establishing standard processes, reviewing staffing model requirements and complete SLA development and refinement by Dec ’10. Targeting the transition of staff to secretariat level and the completion of consolidation to a centralized support model by Jul ’11. Key Milestones: Target Dates: Key Milestones: Target Dates: Establish Standard processes and staffing model requirements 6/30/2010 Helpdesk Services Consolidation Completes 7/15/2011 Complete SLA development and refinement 12/31/2010 Tivoli integration, Virtual Staffing Model and process refinements complete TBD Completion of Consolidation to Central Support Model 7/31/2011 Web IA Services Application Services Profile: Pre-Consolidation- Most of the EOHED agencies currently standardized content management processes and portalized on MASS.GOV. Profile: Pre-Consolidation: 2 categories of Applications with consolidation potential identified (Document management and information security.) Action Plan Summary: Create a centralized Web IA team while defining and standardizing content and Web information architecture across all agencies. Designed a Secretariat Web IA model in Apr ’10 full migration by Jun ‘10. Decommissioning of non-compliant websites and migration of content to follow – targeting Dec’10 completion. Action Plan Summary: Two stage approach: First – Analyze Document Mgmt. processes & procedures to identify singular approach for consol. across the sec.- targeting Dec ‘11 impl. Second: Analyze Data Mgmt. model and prepare to impl. core security addition (BitArmor) placing data controls / rights within the data structure. Key Milestones: Key Milestones: Target Dates: Target Dates: Complete Agency migrations 6/30/2010 Implement core security application (BitArmor) 12/31/2010 Completion of non-compliant website decommissioning 12/31/2010 Implement Document Management consolidation 12/31/2011 11 2010 Secretariat IT Consolidation Roadmap Summary EOHHS Helpdesk Services Desktop / LAN Services Profile: Pre-Consolidation: 9 Helpdesk organizations with 2 distinct toolsets. As of 3/31/10 15 of 16 agencies were supported by a centralized Helpdesk and using a singular CA Service Desk toolset. Profile: Pre-Consolidation: 10 providers of Desktop / LAN services with a decentralized model exhibiting significant overlaps and only 6 of 16 agencies supported by a centralized service model. Action Plan Summary: Initiation of a Consolidated Service Desk model will be performed in phases and broken out by service: Incident, Request Fulfillment, Change Mgmt. & Asset Mgmt. These phases are projected to complete by December 2010. Consolidation will incorporate the completion of VoIP implement and the finalizing of the EDS Contract Renewal Strategy - targeted for March 2011. Action Plan Summary: Project team is currently reviewing business and staffing model requirements and establishing standards for processes and procedures. EOHHS plans to transition support staff to Secretariat level October ’10. Targeting full migration to Secretariat level Support Model by March ’11. Key Milestones: Target Dates: Helpdesk Services Consolidation Completes 12/31/2010 EOHHS VoIP Implementation complete TBD EDS Contract Renewal Strategy finalized 3/31/2011 Key Milestones: Target Dates: Establish Standard processes and staffing model requirements 7/31/2010 Complete SLA development and refinement 9/30/2010 Transition IT Support Staff to Secretariat Level 10/31/2010 Migrate 11 remaining agencies to Centralized Support Model 3/31/2011 Web IA Services Profile: Pre-Consolidation- All of EOHHS compliant website portalized on MASS.GOV.. Action Plan Summary: Focus on non-compliant / rogue websites; Completed identification & documentation of rogue sites, develop a decommissioning timeline by August ’10. EOHHS will establish and implement new governance model for Web IA by 6/30/10 and begin decommissioning of old sites while migrating content – targeting completion by December ’10. Key Milestones: Target Dates: Establish & Implement new governance models 6/30/2010 Completion of non-compliant website decommissioning 11/30/2010 Application Services Profile: Pre-Consolidation: Identified 123 applications with consolidation potential Action Plan Summary: EOHHS completed application inventory and governance model design by August ‘10. Currently in process of application portfolio analysis and consolidation prioritization targeting completion by January ’11. EOHHS plans to commence execution of apps. Consolidation in April ’11 upon approval from leadership., with completion target TBD. Key Milestones: Target Dates: Inventory Applications and consolidation prioritization plan 1/15/2011 Apps. consolidation plan approval 3/31/2011 12 2010 Secretariat IT Consolidation Plan Summary EOLWD Helpdesk Services Desktop / LAN Services Profile: Pre-Consolidation: Formal Helpdesk support not universally available across the secretariat. Action Plan Summary: LWD’s completed it’s plan to utilize lessons learned during the consolidation of Helpdesk Services within DWD and DIA, including the selection of a singular ITIL Based Helpdesk toolset ( c.Support) by GWI, to model best practices and implement a centralized support model across the secretariat. Currently LWD offers a robust, dedicated, secretariat level helpdesk team. Final implementation of all Helpdesk system functionality targeted end of December ’10, with implementation of VoIP systems and optimization of staffing models to follow. Key Milestones: Final impl. of Helpdesk toolset functionality complete Target Dates: Profile: Pre-Consolidation: 6 of 16 agencies supported by a centralized IT support structure. The remaining 10 agencies utilize independent, overlapping, decentralized desktop /LAN service provider models. Action Plan Summary: LWD completed the establishment of processes and procedures, reviewed staffing models and developed SLA’s, which supported the transition of Desktop / LAN support staff to ITD. Currently targeting the migration of 8 agencies to a centralized support model, completing their consolidation by July ’10. This consolidation will be followed by an iterative process of SLA refinement. Key Milestones: Complete Impl. of Centralized Support Model for all agencies 8/31/2010 Refinement of SLA’s and policies TBD 12/31/2010 Web IA Services Target Dates: Application Services Profile: Pre-Consolidation: Completed migration of all static web content to MASS.GOV Profile: Pre-Consolidation: Limited consolidation potential. LWD to focus on the reduction of redundant “Time Matters” applications across the secretariat to reduce maintenance and licensure costs. Action Plan Summary: LWD plans to complete due diligence related to the LMI website to determine inclusion in portalization efforts. This exercise is followed by work effort involved in decommissioning non-compliant websites targeted completion in December ’10. Action Plan Summary: EOLWD conducted a complete inventory of LexusNexus “Time Matters” application installations across the secretariat. Project team currently designing applications governance operating models and full consolidation plan – targeted completion 6/30/2010. EOLWD plans to commence execution of consolidation plan in August of ’10 upon final approval from leadership, with projected completion in December ’10. Key Milestones: Key Milestones: Target Dates: Target Dates: Timeline for decommissioning of rogue websites complete 6/30/2010 Governance, Operating models & Consolidation plan complete 6/30/2010 Governance for content mgmt. & IA design complete 7/30/2010 Full application consolidation complete 12/31/2010 Complete rogue website decommissioning 12/31/2010 13 2010 Secretariat IT Consolidation Roadmap Summary EOPSS Helpdesk Services Desktop / LAN Services Profile: Pre-Consolidation: Noncontiguous Helpdesk Organization with 12 providers utilizing 4 different tools. Profile: Pre-Consolidation: 12 Decentralized providers of Desktop / LAN services with varied services procedures. Action Plan Summary: EOPSS selected a common Helpdesk tool – MSP and is currently implementing Incident & Problem Mgmt., Asset Mgmt., and Request Fulfillment components. Targeted Consolidation Completion 10/01/10 (per 3d dashboard). Virtual staffing model to be refined through December ’10. Action Plan Summary: Planning and implementation transition in process; project teams baselining processes, establishing standards, reviewing staff model requirements and developing SLA’s. Targeted to staffing and process model completion by Feb. ’11, with migration to secretarial level and complete consolidation of Desktop / LAN services by August ’11. Key Milestones: Key Milestones: Target Dates: Target Dates: Helpdesk Services Consolidation Completes 10/1/2010 Desktop / LAN completes process and staffing models 2/01/2011 Virtual Staffing Model and process refinements complete 12/31/2010 Desktop / LAN consolidation complete 8/30/2011 Web IA Services Application Services Profile: Pre-Consolidation- 2 Websites not portalized on Mass.Gov: Mass National Guard & MASSCOR Industries Profile: Pre-Consolidation: 5 categories of Applications with consolidation potential identified. Action Plan Summary: Developed IA and Content Standards for Mass National Guard during early 2010. Completed portalization of Mass National Guard and MASSCOR Industries. Plan to conduct a thorough review of non-compliant websites and domain names in Fall 2010. Decommissioning efforts to follow. Action Plan Summary: Completed identification of potential applications for consolidation. Consolidated web-based Time and Attendance reporting for all IT staff. Project team currently designing application governance operating model and consolidation plan – targeting 6/30/10 completion. Plan to commence execution in September ’10 upon approval from leadership. Targeting completion February ’11. Key Milestones: Key Milestones: Target Dates: Target Dates: All compliant websites portalized 4/30/2010 Apps. governance ops models and consolidation plan complete 8/30/2010 Completion of non-compliant webiste review 12/31/2010 Apps. consolidation complete 2/28/2011 14 2010 Secretariat IT Consolidation Roadmap Summary MassDOT Helpdesk Services Desktop / LAN Services Profile: Pre‐Consolidation: Formal helpdesk support was not universally available across the secretariat. We had three internal transportation agency helpdesks governed by different sets of processes, standards, and technologies. RMV Helpdesk ‐ USD, MTA Helpdesk – TrackIT!, EOT Helpdesk – a different version of TrackIT!. Profile: Pre‐Consolidation: No consistent Desktop / LAN Services were available across the secretariat. We had two internal transportation agency Desktop / LAN Services Teams: One for the Mass. Turnpike Authority and one for the Executive Office of Transportation.. Action Plan Summary: MassDOT is consolidating three helpdesk organizations with different processes, standards, and technologies into one helpdesk organization with one toolset. We are evolving our TrackIT! Application towards ITIL compliance. Action Plan Summary: We are merging these two separate Desktop / LAN Services teams into one organization with a single set of processes. This consolidation will be followed by an iterative process of SLA refinement. Key Milestones: Implement new Helpdesk Incident Tracking System Key Milestones: Create Standards & Policies for centralized model Target Dates: 7/30/2010 Target Dates: 7/30/2010 Rollout customer facing, self-service web forms 8/20/2010 Migrate remaining 20% of Desktop Svcs to new model 9/30/2010 Final impl. of Helpdesk toolset functionality complete 12/31/2010 Refinement of SLA’s and policies 12/31/2010 Web IA Services Application Services Profile: Pre‐Consolidation: We began the consolidation and transformation of Web Sites towards standardization with the creation of MassDOT last Fall. Action Plan Summary: In parallel with ITD, MassDOT is implementing a Web Site content management systems solution with the open source product .Net Nuke. MassDOT is tracking the progress on the Mass.gov Web Sites redesign and working closely with the Mass.gov implementation team. Key Milestones: Target Dates: Profile: Pre‐Consolidation: There was limited application services consolidation potential. We identified and have consolidated a single application Employee and Contractor Badging.. Action Plan Summary: Since consolidation we have identified 42 additional application services for consolidation. We will commence execution of the application services consolidation plan in August of 2010 upon final approval from leadership. Key Milestones: Target Dates: Implementation of Content Management System 9/01/2010 Governance, Operating models & Consolidation plan complete 6/30/2010 Migration of external websites complete 12/31/2010 Snow & Ice Application Consolidation complete 9/30/2010 Fleet Management Application Consolidation complete 12/31/2011 Construction Management Application Consolidation complete 3/30/2012 15 Potential Challenges Going Forward • Budgetary & Resource constraints • Infrastructure dependencies • Agency consensus related to consolidated services adoption • Consistent measurements & program results reporting for Benefits Tracking. 16 Next Steps and Considerations for Success • Continue working with Secretariats to facilitate progress on Secretariat Services FY ’11 consolidation priorities within established timeframes. (HelpDesk & Desktop / LAN services) • Facilitate a HelpDesk Discussion Group to foster collaboration in Secretariat development of consolidated HelpDesk Services centralized support models and processes. • Continue to monitor progress within Phase 3d and plan for Phase 3e implementation come September 2010. •Operationalize consistent benefits tracking results & reporting for FY ‘11 17