Commissionerate of Municipal Administration Coimbatore, Tiruppur and Tiruchirappalli transport proposal Sustainable Cities through Transport February 2014 Sustainable Cities through Transport • Strategic planning for transport systems that are equitable, cost-effective, and environmentally friendly • Support from: Salem Tiruppur Coimbatore Tiruchirappalli Madurai Planning process • Planning Session / 19 Nov / Chennai – Discussion on data requirements. • Surveys & data collection – Public transport frequency-occupancy, traffic counts – Discussions with city teams • Transport Budgeting Workshop / 28 Nov / Coimbatore – Keynote by Enrique Peñalosa, former mayor of Bogotá, Colombia, on the need for bus rapid transit system (BRT), of cycle tracks, footpaths, and public spaces – City teams worked collaboratively to develop conceptual transport plans • Meetings and site visits with city officials • Review of Final Transport Proposals / 23 Jan / Chennai Planning Session / 19 November / Chennai Transport Budgeting Workshop / 28 November / Coimbatore with Enrique Penelosa Transport Budgeting Workshop / 28 November / Coimbatore Madurai city team Transport Budgeting Workshop / 28 November / Coimbatore Coimbatore city team Site visits with transport stakeholders Lack of dedicated pedestrian, cycle infrastructure Near General Hospital, Coimbatore Inadequate public transport service Town Hall bus stop, Coimbatore Public transport demand (persons/hour/direction) Mettupalayam Rd 5,600 pphpd 70 buses / hour Palakkad Rd 5,700 pphpd 71 buses / hour Avinashi Rd 6,100 pphpd 76 buses / hour Trichy Rd 3,900 pphpd 49 buses / hour Unregulated, underpriced (free!) parking Near District Court, Madurai Transport goals: modes shares Coimbatore scenrios 2013 2018: Status quo 2018: Goal Walk 28 % 26 % 30 % Cycle 7% 5% 9% 20 % 16 % 23 % 9% 7% 4% 36 % 46 % 34 % Bus Paratransit Private vehicles Transport proposals • Each city prepared a strategic transport proposal covering three areas: – Walking and cycling – Public transport – Travel demand management Public transport • City bus fleet expansion • Bus rapid transit (BRT) • Cycle sharing • City bus infrastructure: – – – – Terminals Depots Bus stops ITS & customer service Non-motorised transport Travel demand management • • • • • On-street parking management Footpaths Cycle tracks Greenways Pedestrian zones 3 cities identified for immediate, comprehensive implementation with KfW support Salem Tiruppur Coimbatore Tiruchirappalli Madurai Coimbatore public transport proposal Project BRT: 72 km network Cycle sharing system Corridor Length/area Cost (crore Rs) Avinashi Rd 20 km 300 Sathyamangalam Rd 14 km 210 Tiruchi Rd 15 km 225 Mettupalayam Rd 23 km 345 19 sq km 29 Mettupalayam Rd - BRT corridor (before) Mettupalayam Rd - BRT corridor (after) Coimbatore non-motorised transport proposal Project Length (km) Cost (crore Rs) Footpaths 54 54 Cycle tracks and footpaths 48 96 Pedestrian zones 13 16 Greenways 48 96 Parking management 46 17 Trichy public transport proposal Project BRT: 18 km corridor Cycle Sharing System Length /area Cost (Rs crore) Central BS Palakkarai RdNH 67 13 km 195 Central BS Mannarpuram Rajaram salai K.K.nagar 5 km 75 25 sq km 38 Corridor Bharathiar Salai Bharathiar Salai Trichy non-motorised transport proposal Project Length (km) Cost (crore Rs) Footpaths 53 53 Cycle tracks and footpaths 26 52 Pedestrian zone 14 18 8 16 32 12 Greenways Parking Management Tiruppur public transport proposal Project BRT: 24 km network Cycle Sharing System Cost (crore Rs) Corridor Length /area Tiruppur Palladam Rd - SH 172 - Dharapuram Rd 14 km 210 Avinashi Tiruppur Rd - Kumaran Rd Avinashi Rd 10 km 150 17 sq km 26 Tiruppur non-motorised transport proposal Project Length (km) Cost (crore Rs) Footpaths 22 22 Cycle tracks and footpaths 20 40 2 3 Greenways 11 22 Parking Management 27 10 Pedestrian zone Eswaran Koil St: existing Eswaran Koil St: proposed Sabari Odai: existing Sabari Odai: proposed Investment Summary Investment (crore Rs) Area Non-motorised Transport Public Transport Project Total Trichy Tiruppur Footpaths 54 53 22 Cycle tracks and footpath upgrade 96 52 40 Pedestrian zones 16 18 3 Greenways 96 16 22 1,080 270 348 City bus fleet expansion 84 60 150 New bus depots 50 10 30 New bus terminals 15 15 25 New bus stops 20 10 - 7 7 7 Cycle Sharing 29 38 26 On-street Parking management 17 12 10 1,564 561 683 BRT ITS & Customer Service Travel Demand Management Coimbatore Implementation stages Stage 1 • • • Stage 2 • • • Stage 3 Footpaths Cycle tracks Pedestrian zones Greenways Cycle sharing Parking management • TOR being issued to 6 cities by CMA • TORs in preparation • Design/planning in 3 cities in 2014 • Remaining cities in 2015 • Bus fleet expansion • Implementation by TNSTC • City bus infrastructure • Bus rapid transit • Design/planning in 3 cities in 2014 • Remaining cities in 2016 Financing For KfW focus cities: Coimbatore, Tiruchirappalli, Tiruppur Stage 1 Stage 2 Stage 3 DPR Implementation • Footpaths • Cycle tracks • Pedestrian zones CMA KfW • Greenways • Cycle sharing • Parking management CMA KfW TNSTC KfW KfW KfW • Bus fleet expansion • City bus infrastructure • Bus rapid transit Implementation timeline Capacity building • Study tours for city officials and mayors: – Guangzhou & Lanzhou, China: BRT, cycle sharing, greenways, cycle tracks, footpaths, public space – Mexico City: BRT, cycle sharing, on-street parking management, pedestrianisation Gangding BRT station in the evening peak, peak direction (Ghangzhou) • BRT Standard Workshop: on the features of high quality BRT • Street Design Workshops: footpaths, intersections, and other elements Mexico City Ecobici cycle sharing system