to - Proposed Project Summary

advertisement
Introduction
BBMB – Satluj & Beas Basins
2
Introduction
BBMB Catchments and Sub-catchments
3
• BBMB – Responsible for management and operation of
• Bhakra, Pong, Nangal and Pandoh Dams
Introduction
RTDSS - Introduction
• Distribution of water from
• Ravi, Satluj and Beas Rivers
• The need for RTDSS
•
•
•
•
For accurate inflow forecast at reservoirs
Scenario generation for various forecasts
Flood control and early warning systems
Equitable distribution of water among partner states
4
• Project Objectives
• The objective of BBMB Real time decision support system (RTDSS) is
to incorporate state- of- the- art data acquisition system (DAS) and
advanced communication system , for real time operational
management of the BHAKRA and BEAS reservoirs in an integrated
manner
Introduction
Real Time Decision Support System
• Components of RTDSS
•
•
•
•
Data Acquisition system
Data Storage and management
Modeling Tools
Results Visualization and dissemination
5
Allocation under Expenditure
Likely
the project as upto March 2014 expenditure by
per PIP
(Rs. Crores)
May 31, 2014
(Rs. Crores)
(Rs. Crores)
39.23
24.02
Financial Status
Financial Summary
13.93
6
•
•
•
•
Telemetry Data – Imported from DAS server every hour
Quality checked and filtered
Updated into Database Server
Data received for
•
•
•
•
•
Rainfall and precipitation stations (16)
Automatic water level recorders (42)
Full Climatic Stations Temperature, humidity, sunshine, wind etc. (12)
Snow Water Equivalent – Snow Pillow (9)
Snow Depth Sensors (9)
Data Acquisition System
Telemetry data
7
New Stations installed (10)
Sr. No.
1
Name of Station
Sidhmukh Feeder at Haryana-Rajasthan Border- RD 123100 of Sidhmukh
Feeder (200 ft d/s of bridge at RD 122900)
2
Rajasthan Feeder at RD 15900 left bank of Rajasthan Feeder (d/s of bridge
RD 15569)
3
Rajasthan Feeder d/s of Link with Sirhind Feeder
4
Jasana Major Head D/s 100 m of curved portion D/s of Head.
5
Makhu Canal
6
Bikaner Canal at RD 86500
7
Head of Ferozepur Feeder.
8
Madhopur Beas Link at Head
9
Kashmir Canal at Head
10
D/s Thein Dam (Gammon Bridge)
8
PROPOSED
STATIONS 85
SATLUJ 58
GAUGING
24
BEAS 27
HYDRO-MET.
34
BUBBLER AND
CABLEWAY 5
GAUGING
18
S.W.E. 9
A.R.G. 14
RADAR 12
FULL CLIMATE
6
SNOW DEPTH
ON IMD 5
BBMB
UPGRAD. 1
Total stations 95 civil work completed 83
Balance 12 stations under progress
BUBBLER AND
CABLEWAY 5
HYDRO-MET.
9
S.W.E 0
A.R.G. 3
FULL
CLIMATE 5
SNOW DEPTH
ON IMD 1
Data Acquisition System
Data Acquisition System
9
Data Acquisition System
Telemetry Data – Full Climatic Station
10
Full Climatic Station Installed at Kalpa, Elevation 9046 ft
Data Acquisition System
Telemetry Data – Full Climatic Station
11
Full Climatic Station Installed at Pandoh Dam, Elevation 2949 ft
Data Acquisition System
Telemetry Data – Snow Water Equivalent
12
Snow Pillow Installed at Chumar, Elevation 14668 ft
Data Acquisition System
Telemetry Data – Snow Water Equivalent
13
Snow Pillow Installed at Tso-Morari, Elevation 14845 ft
Data Acquisition System
Telemetry data – Water level recorders
14
Automatic Water Level Recorder Installed at Olinda, Elevation : 1200 mft AMSL
Data Acquisition System
ADCP in Operation - Rampur
15
Data Transmission from
Remote Stations
Data Transmission
through satellite
Raw
Data
Module
Modeling
Server
(300GB)
Workstation
Database
Server (1 TB)
Data
Decoding
Module
Data Acquisition System
Satellite Data Communication
DAS Server
(1 TB)
Workstation
Backup
Server (1 TB)
Workstation
DMS/ Backup
Server
(1 TB)
16
Data Acquisition System
BBMB – Control Room
17
Data Acquisition System
Real Time Data - Snapshot
18
Installed Stations – 28
Balance - 30
Data Acquisition System
Data Acquisition – IMD data
19
Rainfall and Temperature Data downloaded for 30 IMD Stations
Data Acquisition System
Data Acquisition – RIMES
Forecast
20
RIMES Forecast received for 3 days, at 6 hour interval
Data Acquisition System
Data Acquisition – MODIS
Imageries
21
MODIS Imageries for Snow Cover downloaded twice daily
Data Acquisition System
Data Acquisition – TRMM Satellite
Precipitation
22
Near Real time Precipitation data downloaded at 3 hours interval
• Telemetry data received from DAS system every hour
• Scheduled scripts
Database
Data Flow
• Run every hour to read data
• Filter and populate into database software
• Scheduled Download using Scripts
• IMD rainfall and Temperatures, TRMM and MODIS imageries
• Automatic Email Attachment download scheduled
• Reads RIMES forecast from email
• Reads manual data received by email
• All the data populated into database in structured time series hierarchy
23
Models
Modeling - Process
Weighted
Average
Precipitation
• IMD Rainfall
• Telemetry Precipitation
• Satellite Precipitation
• RIMES forecast
• Geographical shapes
Rainfall Runoff
Model
• Sub catchments Area
• Parameters
• Snow coverage and depth
• Temperatures
Hydrodynamic
Model
• Cross sections
• DEM
• Flow parameters
• Structures
Inflow and
water levels
forecasts
24
Simulation for 5 days before Time of Forecast (ToF) and 3 days after ToF
Actual Rainfall data till time of forecast
RIMES forecasted rainfall for 3 days
Simulation Period
Models
HD Modeling - Results
Forecast Period
25
Models
Flood Modeling
26
•
•
•
•
•
SMS and Email Alerts
Website based on Dashboard
Real Time manager Interface
Trainings and Workshops
Skill Enhancements
Dissemination
Outreach Activities
27
Dissemination
Dashboard - Discharge
28
Snapshot of Website with Discharge Data
Dissemination
Dashboard - Rainfall
29
Snapshot of Website with Rainfall Data
Dissemination
Dashboard - Temperature
30
Snapshot of Website with Temperature Data
Dissemination
Results Visualization - RTDSS
31
• O & M RTDSS FOR TWO YEARS UNDER PROCESS
• TWO YEARS WARRANTY AND O&M FOR DAS
• THREE YEARS WARRANTY AND O&M HARDWARE
Lessons Learned
POST PROJECT PLAN
32
THANK YOU
33