Introduction BBMB – Satluj & Beas Basins 2 Introduction BBMB Catchments and Sub-catchments 3 • BBMB – Responsible for management and operation of • Bhakra, Pong, Nangal and Pandoh Dams Introduction RTDSS - Introduction • Distribution of water from • Ravi, Satluj and Beas Rivers • The need for RTDSS • • • • For accurate inflow forecast at reservoirs Scenario generation for various forecasts Flood control and early warning systems Equitable distribution of water among partner states 4 • Project Objectives • The objective of BBMB Real time decision support system (RTDSS) is to incorporate state- of- the- art data acquisition system (DAS) and advanced communication system , for real time operational management of the BHAKRA and BEAS reservoirs in an integrated manner Introduction Real Time Decision Support System • Components of RTDSS • • • • Data Acquisition system Data Storage and management Modeling Tools Results Visualization and dissemination 5 Allocation under Expenditure Likely the project as upto March 2014 expenditure by per PIP (Rs. Crores) May 31, 2014 (Rs. Crores) (Rs. Crores) 39.23 24.02 Financial Status Financial Summary 13.93 6 • • • • Telemetry Data – Imported from DAS server every hour Quality checked and filtered Updated into Database Server Data received for • • • • • Rainfall and precipitation stations (16) Automatic water level recorders (42) Full Climatic Stations Temperature, humidity, sunshine, wind etc. (12) Snow Water Equivalent – Snow Pillow (9) Snow Depth Sensors (9) Data Acquisition System Telemetry data 7 New Stations installed (10) Sr. No. 1 Name of Station Sidhmukh Feeder at Haryana-Rajasthan Border- RD 123100 of Sidhmukh Feeder (200 ft d/s of bridge at RD 122900) 2 Rajasthan Feeder at RD 15900 left bank of Rajasthan Feeder (d/s of bridge RD 15569) 3 Rajasthan Feeder d/s of Link with Sirhind Feeder 4 Jasana Major Head D/s 100 m of curved portion D/s of Head. 5 Makhu Canal 6 Bikaner Canal at RD 86500 7 Head of Ferozepur Feeder. 8 Madhopur Beas Link at Head 9 Kashmir Canal at Head 10 D/s Thein Dam (Gammon Bridge) 8 PROPOSED STATIONS 85 SATLUJ 58 GAUGING 24 BEAS 27 HYDRO-MET. 34 BUBBLER AND CABLEWAY 5 GAUGING 18 S.W.E. 9 A.R.G. 14 RADAR 12 FULL CLIMATE 6 SNOW DEPTH ON IMD 5 BBMB UPGRAD. 1 Total stations 95 civil work completed 83 Balance 12 stations under progress BUBBLER AND CABLEWAY 5 HYDRO-MET. 9 S.W.E 0 A.R.G. 3 FULL CLIMATE 5 SNOW DEPTH ON IMD 1 Data Acquisition System Data Acquisition System 9 Data Acquisition System Telemetry Data – Full Climatic Station 10 Full Climatic Station Installed at Kalpa, Elevation 9046 ft Data Acquisition System Telemetry Data – Full Climatic Station 11 Full Climatic Station Installed at Pandoh Dam, Elevation 2949 ft Data Acquisition System Telemetry Data – Snow Water Equivalent 12 Snow Pillow Installed at Chumar, Elevation 14668 ft Data Acquisition System Telemetry Data – Snow Water Equivalent 13 Snow Pillow Installed at Tso-Morari, Elevation 14845 ft Data Acquisition System Telemetry data – Water level recorders 14 Automatic Water Level Recorder Installed at Olinda, Elevation : 1200 mft AMSL Data Acquisition System ADCP in Operation - Rampur 15 Data Transmission from Remote Stations Data Transmission through satellite Raw Data Module Modeling Server (300GB) Workstation Database Server (1 TB) Data Decoding Module Data Acquisition System Satellite Data Communication DAS Server (1 TB) Workstation Backup Server (1 TB) Workstation DMS/ Backup Server (1 TB) 16 Data Acquisition System BBMB – Control Room 17 Data Acquisition System Real Time Data - Snapshot 18 Installed Stations – 28 Balance - 30 Data Acquisition System Data Acquisition – IMD data 19 Rainfall and Temperature Data downloaded for 30 IMD Stations Data Acquisition System Data Acquisition – RIMES Forecast 20 RIMES Forecast received for 3 days, at 6 hour interval Data Acquisition System Data Acquisition – MODIS Imageries 21 MODIS Imageries for Snow Cover downloaded twice daily Data Acquisition System Data Acquisition – TRMM Satellite Precipitation 22 Near Real time Precipitation data downloaded at 3 hours interval • Telemetry data received from DAS system every hour • Scheduled scripts Database Data Flow • Run every hour to read data • Filter and populate into database software • Scheduled Download using Scripts • IMD rainfall and Temperatures, TRMM and MODIS imageries • Automatic Email Attachment download scheduled • Reads RIMES forecast from email • Reads manual data received by email • All the data populated into database in structured time series hierarchy 23 Models Modeling - Process Weighted Average Precipitation • IMD Rainfall • Telemetry Precipitation • Satellite Precipitation • RIMES forecast • Geographical shapes Rainfall Runoff Model • Sub catchments Area • Parameters • Snow coverage and depth • Temperatures Hydrodynamic Model • Cross sections • DEM • Flow parameters • Structures Inflow and water levels forecasts 24 Simulation for 5 days before Time of Forecast (ToF) and 3 days after ToF Actual Rainfall data till time of forecast RIMES forecasted rainfall for 3 days Simulation Period Models HD Modeling - Results Forecast Period 25 Models Flood Modeling 26 • • • • • SMS and Email Alerts Website based on Dashboard Real Time manager Interface Trainings and Workshops Skill Enhancements Dissemination Outreach Activities 27 Dissemination Dashboard - Discharge 28 Snapshot of Website with Discharge Data Dissemination Dashboard - Rainfall 29 Snapshot of Website with Rainfall Data Dissemination Dashboard - Temperature 30 Snapshot of Website with Temperature Data Dissemination Results Visualization - RTDSS 31 • O & M RTDSS FOR TWO YEARS UNDER PROCESS • TWO YEARS WARRANTY AND O&M FOR DAS • THREE YEARS WARRANTY AND O&M HARDWARE Lessons Learned POST PROJECT PLAN 32 THANK YOU 33