Test Readiness Review March 5, 2015 Project Manager: Gabrielle Massone Systems Engineer: Jesse Ellison Deputy Project Manager Financial Lead Tanya Hardon Software Lead: Cy Parker Optics Lead: Jon Stewart Mechanical Lead Jake Broadway Customers: Brian Sanders Colorado Space Grant (COSGC) JB Young and Keith Morris Lockheed Martin (LMCO) Test and Safety Lead: Franklin Hinckley Thermal Lead: Brenden Hogan Faculty Advisor: Dr. Xinlin Li Dept. Aerospace Engineering Laboratory for Atmospheric and Space Physics (LASP) Electrical Lead: Logan Smith Purpose and Objectives Testing Readiness Schedule Budget 1 Presentation Overview Project Purpose and Objectives Schedule Test Readiness • • • • System Test Plan Optical and Mechanical Thermal Electronics and Software Budget Concluding Statements Purpose and Objectives Testing Readiness Schedule Budget 2 PROJECT PURPOSE AND OBJECTIVES Purpose and Objectives Testing Readiness Schedule Budget 3 Phoenix Mission Objective Develop a proto-flight, angular-velocity sensor payload that can observe an object in mid-wave infrared and determine the angular velocity of the object in the field of view Proto-flight Unit: Defined as hardware that is designed to flight form-factor, but will be tested exclusively on the ground and is not required to undergo environmental testing. Purpose and Objectives Testing Readiness Schedule Budget 4 Mission Concept Example angular velocity sensor concept ω 6U CubeSat with Rate Sensor Payload Observing asteroid in FOV Bennu 101955 Asteroid Characterize rotation of asteroid for rendezvous operations Video courtesy of www.asteroidmission.org Purpose and Objectives Testing Readiness Schedule Budget 5 Mission Concept Use this sequence of images to determine the object’s angular velocity vector in the camera FOV Report this observed rate to the bus Effectively an infrared angular velocity sensor Purpose and Objectives Testing Readiness Schedule Budget 6 Design Overview Phoenix Interfaces with the 6U LMCO Bus • Inhabits 1/3 of spacecraft volume Phoenix CPE’s: 1. Optics and Mid Wave IR Imaging system 2. Thermal Control System 3. Supporting Electronics 4. Software Angular Velocity Determination Algorithm 10 cm Purpose and Objectives Testing Readiness Schedule Budget 7 Functional Block Diagram Purpose and Objectives Testing Readiness Schedule Budget 8 Levels of Success Level 1 1. Capture a mid-wave infrared image with a spot size of 1.3 cm and read all pixel values in software 2. All measured temperatures match thermal model within 5K. Level 2 1. Capture MWIR image with a spot-size of TBD 2. Determine observed ω within ±10% in software 3. Maintain critical components at a temperature below passive steady-state temperature 4. Integrate all optics and support structure into 2U form-factor Level 3 1. Successful optics integrated test 2. Determine the observed angular rate to ±10% and observed axis of rotation to ± 10◦ of known values in software 3. Control and monitor all thermal hardware 4. Integrate all components into 2U payload form-factor Level 4 1. Successful optics and thermal integrated test 2. Determine the observed ω to ±5% and the observed axis of rotation to ±5◦ of known values in software 3. Satifsy 6U Bus mass, power, data, and thermal requirements Purpose and Objectives Testing Readiness Schedule Budget 9 Critical Project Elements Critical Element Subsystem Driving Requirements Capture Mid Wave Infrared (MWIR) image Optical The payload shall determine the angular velocity and axis of rotation of an observed object (O.2), The payload shall use the 3.5 µm mid-wave infrared (MWIR) wavelength (O.3) Control focalplane to operating temperature of ≤ 150 K Thermal The payload shall maintain all components in their operating temperature ranges (O.4) Determine angular velocity vector of object in sensor field of view Software The payload shall determine the angular velocity and axis of rotation of an observed object (O.2) Provide a hardware platform for the software Electrical The payload shall determine the angular velocity and axis of rotation of an observed object (O.2) Purpose and Objectives Testing Readiness Schedule Budget 10 SYSTEM Purpose and Objectives Testing Readiness Schedule Budget 11 System Testing Flow-down Integrated System Optics Test Subsystem Component Tests Subsystem Integration Tests Integrated System Thermal Test Component Tests Tests requiring a single subsystem. (optical flow module, power regulator output) Purpose and Objectives Subsystem Verification Tests involving multiple subsystems but short of full system testing. (e.g. testing software on electronics instead of host computer) Testing Readiness Schedule System Verification Full system testing, requires integration of all subsystems Budget 12 Integrated System Fit Check Verify all components correctly integrate into system as they are machined or procured Allows time to fix issues prior to additional dev. Purpose and Objectives Testing Readiness Schedule Budget 13 Integrated System Optics Test Test Objectives 1. 2. Requirements Verified Verify Image Capture from nBn 1.SYS.2 - Capture MWIR 3.5 µm Image Sensor 1.SYS.3 - Determine ω of target Verify Software Image Processing Level of Success Achieved Algorithms able to determine angular velocity vector of target Level 3: Successful Demonstration of Test Level 4: Test Completed with Required Accuracy of ω Test Target located at “eye-piece” Telescope as Collimated Light Source Purpose and Objectives Testing Readiness Schedule Budget 14 Integrated System Optics Test Test Setup Cooling Jacket: Steel structure filled with dry ice/methanol mixture Atmosphere: Argon or Nitrogen purge for low-humidity, no carbon dioxide (deposition at 195K) Clean Environment: clean-room not required Purpose and Objectives Testing Readiness 1. 2. 3. 4. Test Procedure Capture first image Rotate target known amount Capture second image Compute vector field and angular velocity vector 1 2 3 4 Schedule Budget Vector Field Output 15 Integrated Thermal Test LMCO TVAC Chamber Thermal-Vacuum Chamber Coordinated with LMCO for April Test Objectives 1. 2. Verify Thermal Monitoring Verify Thermal Control Requirements Verified 1.SYS.4 – Maintain Operating Temperatures (esp. nBn sensor) Level of Success Achieved Bus Heat Sim Ethernet Voltage 12V/3.3V/Bat Bus Simulator Purpose and Objectives Testing Readiness Level 1: Measured Steady-State Temperatures Match Model ±5K Level 2: Monitor and control all thermal hardware Level 3: Thermal control reduces steadystate temperatures Level 4: Maintain all operating temperatures Schedule Budget 16 Integrated Thermal Test Test Setup LMCO TVAC Chamber Thermal Vacuum Chamber: Provides cold surroundings, solely radiative heat transfer Test Procedure Bus Heat Sim Ethernet Voltage 12V/3.3V/Bat Bus Simulator Purpose and Objectives Testing Readiness 1. Provide power to payload, verify only electronics heaters are running 2. Once operating temperature is reached verify power board starts up 3. Start image processing board 4. Read out and record all temperatures 5. Start active thermal control 6. Read out and record all temperatures until steady state is reached 7. Start bus simulator heaters 8. Read out and record all temperatures until steady state is reached Schedule Budget 17 Integrated Thermal Test Temperature (K) Anticipated TVAC Test Profile Phase Durations Purpose and Objectives Testing Readiness Schedule Budget 18 ELECTRONICS Purpose and Objectives Testing Readiness Schedule Budget 19 Electronics Overview Bus Simulator Phoenix Avionics Stack TEC Control Battery PSU PC (7.4V nom.) Ethernet RTD RTD RTD Reg. Power Power and Thermal Board Image Processing Board Spi,I2C,GigE ( PTB ) Sensor Module Proprietary ( IPB ) JTAG, Reset JTAG HDMI USB Debug Debug Programmers Display Terminal 2.ELEC.1 The electrical system shall interface with the LMCO 6U CubeSat Bus 2.ELEC.2 The electrical system shall interface with the MWIR Image Sensor 2.ELEC.3 The electrical system shall provide a hardware platform for the flight software 2.ELEC.4 The electrical system shall provide all hardware necessary for thermal monitoring and control Purpose and Objectives Testing Readiness Schedule Budget 20 Power and Thermal Board Test Flow Digital Rails (1.0V, 1.35V, 1.8V, 3.3V, 5.0V) Power Regulation Image Sensor Rails (0.9V, 1.6V, 3.3V) Under Voltage Lockout (ULVO) Protection Circuity Overcurrent Protection (OCP) Integrated Optics Test Heaters Thermal Electric Coolers (TEC) Thermal Control Temperature Sensors (RTDs) Under Thermal Lockout (UTLO) Purpose and Objectives Testing Readiness Schedule Budget 21 Power and Thermal Board Purpose and Objectives Testing Readiness Schedule Budget 22 Power and Thermal Board Temp Sensors Heaters TEC Digital Power OCP UTLO Sensor Power Purpose and Objectives Testing Readiness Schedule Budget 23 Power and Thermal Board Tests Power Regulation (3.ELEC.4) • Verify all rails are within tolerances under nominal and high-load cases Protection Circuitry (3.ELEC.4) • Apply high current load to check response of protection • Verify out-of-range voltages never seen on IPB rails Thermal Control (3.ELEC.7, 3.ELEC.8, 3.ELEC.9) • Control TECs to 150k using dry-ice cooled heat-sink • Cold start of electronics to show UTLO and heaters work • Read thermal sensors to 2 degC accuracy The electrical system shall guarantee all power provided to the sensitive hardware is within specifications The electrical system shall be able to convert thermal readings into engineering units with an 3.ELEC.7 uncertainty less than 2 degC 3.ELEC.8 The electrical system shall provide hardware to control a heater 3.ELEC.9 The electrical system shall provide hardware to control two thermal electric coolers 3.ELEC.4 Purpose and Objectives Testing Readiness Schedule Budget 2.ELEC.2 2.ELEC.4 2.ELEC.4 2.ELEC.4 24 Image Processing Board Test Flow HDMI Test (draw test pattern) Video Streaming Sensor Readout (read test pattern) Ethernet (Ping Device) Power & Thermal Board Communication (I2C Read/Write) Bus Communication Integrated Optics Test SPI (Fallback for Ethernet) DDR3 (MemTest) Image Capture Video DMA Engine (Read sensor data from CPU) Purpose and Objectives Testing Readiness Schedule Budget 25 Image Processing Board Purpose and Objectives Testing Readiness Schedule Budget 26 Image Processing Board Boot Flash Ethernet Sensor Interface SD Card Purpose and Objectives Processor & FPGA HDMI Transmitter Testing Readiness DDR3L RAM USB Debug Schedule Budget 27 Image Processing Board Tests Video Streaming (3.ELEC.3) • Validates sensor interface • Stream the image sensor’s test pattern out through HDMI Image Capture (3.ELEC.6) • Store a frame from input video stream to RAM Bus Communication (3.ELEC.5) • Verify the communication interfaces required by the Bus • Ethernet - Ping the Device • I2C / SPI - Read and Write Test via BusPirate The electrical system shall utilize an FPGA to house the image sensor module interface IP core 3.ELEC.5 The electrical system shall utilize the I2C, SPI, and Ethernet specifications. The electrical system shall be capable of at least a 280Mbps transfer rate for the image 3.ELEC.6 sensor interface core. 3.ELEC.3 Purpose and Objectives Testing Readiness Schedule Budget 2.ELEC.2 2.ELEC.1 2.ELEC.2 28 SOFTWARE Purpose and Objectives Testing Readiness Schedule Budget 29 Testing Flowdown Bus Communication Module Functional Testing Integrated Communication Test (Testing Hardware) Thermal Control Module Functional Test Integrated Thermal Control Test Level 2 Success (Software Only) Image Processing Test Level 3,4 Success Image Interface Module Functional Testing (Software Only) Purpose and Objectives Integrated Optics Test Level 4 (Software Only) Schedule Test Readiness Budget 30 Integrated Communication Test Test communication between Phoenix and Bus Response to op-code with data Preformatted packets with commands and data Integrated Phoenix Software + Electronics Bus Simulator W/ Test Program Success: All op-codes return correct return data 2.SFW.1 The software shall communicate with the LMCO 6U CubeSat Bus Purpose and Objectives Testing Readiness Schedule Budget 31 Integrated Thermal Control Test Verify ability to control the thermal environment, this includes reading RTDs and controlling TECs Integrated Phoenix Software + Electronics Payload RTDS Temperature Measurement Device TECs Success: Temperature data read from the RTDs matches the data from the external device. When commanded the TECs changed temperature. 2.SFW.3 The software shall monitor the thermal state of the Phoenix payload Purpose and Objectives Testing Readiness Schedule Budget 32 Image Processing Verification Initial Image Rotated 2 Degrees Image Gradient: 𝐼𝑥 , 𝐼𝑦 Time Gradient: 𝐼𝑡 Motion Vectors (unknown): 𝑉𝑥 , 𝑉𝑦 Solve system of equations for the unknowns 𝑉𝑥 , 𝑉𝑦 𝐼 𝑥, 𝑦, 𝑡 𝐼 𝑥, 𝑦, 𝑡 = 𝐼(𝑥 + 𝑑𝑥, 𝑦 + 𝑑𝑦, 𝑡 + 𝑑𝑡) 2.SFW.2 The software shall determine the angular velocity vector of a target object utilizing an image captured by the Phoenix payload. Purpose and Objectives Testing Readiness Schedule Budget 33 Image Processing Verification Final Result: Zoomed In Part Of Vector Field 2.SFW.2 The software shall determine the angular velocity vector of a target object utilizing an image captured by the Phoenix payload. Purpose and Objectives Testing Readiness Schedule Budget 34 Optically Induced Error For an f-number of 4.2 (i.e. Phoenix optics), must have a gradient of at least 2 LSB for one pixel movement With current design, optical errors can be neglected When ratio of red section to orange section is > 5/3, a feature translation can be detected Purpose and Objectives Testing Readiness Schedule Budget 35 Solution Errors Worst case rate error is within bounds when 100 vectors are averaged • According to equation 𝑒𝑟𝑟𝑜𝑟 = 1 𝑁 • Occurs with very gradual gradient Worst case axis knowledge: 8.9° 2𝑑 • According to equation 𝑒𝑟𝑟𝑜𝑟 = sin−1 ( 1− 𝐷 2𝑑 2 +1 𝐷 ) where 𝑑 = 𝑝𝑖𝑥𝑒𝑙 𝑠𝑖𝑧𝑒 and 𝐷 = 𝑡𝑎𝑟𝑔𝑒𝑡 𝑑𝑖𝑎𝑚𝑒𝑡𝑒𝑟 • Slightly higher than required 7.2° Purpose and Objectives Testing Readiness Schedule Budget 36 Image Processing Test Verify our angular velocity determination algorithm. • Check this against the expected value to get error • Is this error bounded by our error model? • Can be performed with or without the hardware Angular Rate Determination Algorithm Test Images Observed Angular Velocity Success Determine the magnitude of the observed angular velocity vector to Level 2 within ± 10% in software Success Determine the observed angular velocity to ± 10% and observed axis of Level 3 rotation to ± 10% in software Success Determine the observed angular velocity to ± 5% and observed axis of Level 4 rotation to ± 5% in software Purpose and Objectives Testing Readiness Schedule Budget 37 OPTICAL AND MECHANICAL Purpose and Objectives Testing Readiness Schedule Budget 38 Optics Testing Plan Visible Wavefront Test IR Collimation Test Visible Focal Length Test Purpose and Objectives Testing Readiness Optical PSF Test Schedule Integrated Optics Test Budget 39 PSF Test Overview Test Objective • To compare actual optics system (aberrations and spot size) with Zemax model Expected Results • Obtain pictures of the Point Spread Function (PSF) across entire field of view Targetted Requirements • 2.OPT.1 – Optics shall have a spot size less than 20 𝜇m • 2.OPT.3 – Optics shall image at 3.5 𝜇m wavelength • 2.OPT.4 – Tolerances shall not change spot size by more than 15% Level of Success Targets • Level 1 – Capture image with 1.3 cm spot size • Level 2 – Capture image with 20 𝜇m spot size. Integrate optics & support structure into the 2U form-factor Purpose and Objectives Testing Readiness Schedule Budget 40 PSF Test Overview Optical Bench 3.39 µm HeNe Laser Beam Expander (10.5x Mag) Spatial Filter Including Telescope (6x Mag) Phoenix Camera Telescope/Collimator Purpose and Objectives Testing Readiness Schedule Budget 41 Mirror Manufacturing Update Manufacturing 3 sets of primary and secondary mirrors Plating of mirrors by North American EN • Finish date: March 6th Diamond turning of mirrors by Nanophorm LLC • Finish date: March 13th Nickel Coating Thickness: 0.010” After DiamondBefore DiamondTurning Turning Nickel Deposit Aluminum Substrate Purpose and Objectives Testing Readiness Schedule Required Surface Roughness: 120 Angstroms (5e-7 inches) Budget 42 THERMAL Purpose and Objectives Testing Readiness Schedule Budget 43 Thermal Testing Flowdown Substitute TEC Test TEC Test RTD Characterization Integrated Thermal Vacuum Test TEC Cold Image Warm use of Image Sensor LN2 Assisted Cold Image Electronics Ambient Thermal Test Purpose and Objectives Testing Readiness Schedule Budget 44 TEC Test • • • Overview: • Using final configuration TEC’s a 5/2 stack is created. • This stack is placed between two plates and then the PTB executes control of the TEC’s Verifies • TEC control and algorithm feedback • Functionality of 5/2 stage TEC stack up • Accuracy of TEC calculations Products • Gains for controller to effectively achieve temperature in a timely manner. • DeltaT achieved at room temperature Hot TEC’s x2 RTD’s x4 Requirements Description 1.SYS.4 Maintain all components in operating range 2.THM.7 Maintain nBn sensor at or below 150K ± 5K 3.THM.2 Utilizing an active thermal mechanism to cool sensor 3.ELEC.9 Controlling two TEC’s Purpose and Objectives Testing Readiness Cold Schedule Budget 45 Thermal Verification • Thermal Desktop model • Controlled environment Test Cases data(TVAC) will be used to All off improve the model • Verified within ±5 K of test data Bus Simulator Full System TVAC Cases Description Steady state when everything off Steady state with bus heater on Steady state with bus heater and electronics on Verification Locations Sense Location Relevant Node Structural Panel STRUCTURE.12 Primary Mirror PRIMARY.20 Focal Plane FOCALPLANE.5 IPB ELEC.5 PTB ELEC.17 TEC1 TEC.2 TEC2 TEC.7 Purpose and Objectives Testing Readiness Schedule Budget 46 SCHEDULE Purpose and Objectives Testing Readiness Schedule Budget 47 Schedule Today Major Milestones: Finished Mirrors – 3/20 Manufactured Structure – 3/16 Thermal Desktop Model Validation Complete – 4/23 Purpose and Objectives Testing Readiness Schedule Budget 48 Schedule Today Major Milestones: Electronic Board Bring Completion – 3/30 Integrated Software Test Completion – 3/20 Phoenix subsystems ready for integrated tests – 3/31 Integrated subsystem test complete – 4/20 Purpose and Objectives Testing Readiness Schedule Budget 49 BUDGET Purpose and Objectives Testing Readiness Schedule Budget 50 Budget Status Current vs. Projected Project Cost Subsystem Current Cost Electronics $ 4,330.77 Optics $ 5,045.00 Thermal $ 1,111.71 Structures $ 1,080 Miscellaneous $ 479.27 Testing $ 242.38 Total $ 12,289.13 Budget $ 20,000.00 Budget Remaining $ 7,710.87 Percentages show the cumulative subsystem cost out of the $20,000 budget Purpose and Objectives Testing Readiness Schedule Budget 51 Cost Plan Component Cost Contingency Total Lead Time Gold Plating for Mirrors $ 300 100% $ 600 5 days Patch Heaters $ 30 60% $ 50 3-5 days Dry Ice/LN2 $ 90 100% $ 180 1 day Isopropyl Alcohol $ 150 33% $ 200 3-5 days Thermal Paint $ 350 0% $ 350 Thermal Epoxy $ 150.98 50% $226.47 3-5 days Symposium Supplies $ 50 100% $ 100 1 day Binding - SFR $ 50 0% $ 50 1 day Miscellaneous (Shipping) $ 200 50% $ 300 N/A HeNe Laser $ 2,790 0% $ 2,790 ~ 10 days Optics Testing Equipment $ 669.18 0% $ 669.18 3-10 days Total $ 5,515.65 Budget Remaining $ 7,710.87 Final $ 2,195.22 Margin 10.9% Purpose and Objectives Testing Readiness Schedule Budget 52 CONCLUDING STATEMENTS 53 Conclusions Thank you for your time Acknowledgements PAB Faculty and Staff Faculty Advisor • Dr. Xinlin Li Our customers • Brian Sanders (COSGC) • JB Young (LMCO) • Keith Morris (LMCO) 54 References [1] Adams, Arn. "ADVANCES IN DETECTORS: HOT IR Sensors Improve IR Camera Size, Weight, and Power." Laser Focus World. PennWell Corporation, 17 Jan. 2014. Web. 13 Sept. 2014. [2] "An Introduction to the NBn Photodetector." UR Research. University of Rochester, 2011. Web. 12 Sept. 2014. [3] "ARCTIC: A CubeSat Thermal Infrared Camera." TU Delft. Delft University of Technology, 2013. Web. 13 Sept. 2014. [4] Cantella, Michael J. "Space Surveillance with Infrared Sensors." The Lincoln Laboratory Journal 1.1 (1989): n. pag.Lincoln Laboratory. MIT, June 2010. Web. 9 Sept. 2014. [5] Cleve, Jeffrey V., and Doug Caldwel. "Kepler: A Search for Extraterrestrial Planets." Kepler Instrument Handbook (2009): n. pag. 15 July 2009. Web. 12 Sept. 2014. [6] "James Webb Space Telescope - Integrated Science Instrument Module."ISIM. Space Telescope Science Institute, n.d. Web. 13 Sept. 2014. [7] "NBn Technology." IR Cameras. IRC LLC, n.d. Web. 13 Sept. 2014. [8] Nolan, M.C. et al, “Shape model and surface properties of the OSIRIS-Rex target Asteroid (101955) Bennu from radar and lightcurve observations,” Icarus, Vol. 226, Issue 1, 2013, pp. 663-670. [9] Otake, Hisashi, Tatsuaki Okada, Ryu Funase, Hiroki Hihara, Ryoiki Kashikawa, Isamu Higashino, and Tetsuya Masuda. "Thermal-IR Imaging of a Near-Earth Asteroid." SPIE: International Society of Optics and Photonics. SPIE, 2014. Web. 13 Sept. 2014. [10] "Spitzer Space Telescope Handbook." Spitzer Space Telescope Handbook 2.1 (2013): n. pag. Spitzer Space Center, 8 Mar. 2013. Web. 8 Sept. 2014. [11] Vanbebber, Craig. "Lockheed Martin Licenses New Breakthrough Infrared Technology." Lockheed Martin Corporation, 7 Dec. 2010. Web. 9 Sept. 2014. 55 BACKUP SLIDES 56 CubeSat Bus Design Constraints Bus Electrical Constraints 3.3 V 6.0 A Max 12 V 4.0 A Max Unregulated Voltage 6.5 V – 8.6 V 6.0 A Max Total Power 5 W Nominal Average 15 W Peak Command Communication Bus SPI Slave High-Speed Communication Bus Ethernet, Magnetics-Less Differential Backup Communication Bus I2C Regulated Voltage Lines Bus Structural Constraints Total Volume 2U (10x10x20 cm) Total Mass 2.66 kg + 0.1 kg/ - 0.5 kg 57 OPTICS BACKUP 58 ELECTRONICS BACKUP 59 THERMAL BACKUP 60 Thermal Model Motivation • Once model can accurately simulate TVAC environment it is validated for use in space conditions • Model can then be used by Lockheed Martin for bus planning and to help drive con-ops • Allows for easier integration of Bus/Payload thermal analysis Valid requirements: 1.SYS.6 61 TEC Test • Setup • PTB is controlling TEC’s using RTD sensor feedback. • Temperature of the plates are monitored • Procedure • PTB provides power to both the IPB and sensor. • Software request image. • Hardware returns and stores returned image. 62 Substitute TEC Test • Overview: • Using inexpensive single stage TEC’s a stack is assembled consisting of 2 stages. • This stack is placed between two plates and then the PTB executes control of the TEC’s • Verifies • TEC control and handling procedures • Ability to control 2 TEC’s in series • Assembly procedures For testing only Valid requirements: 1.SYS.4 2.THM.7 3.THM.2 3.ELEC.9 • Products • Ability to proceed with more advanced test of the actual TEC’s Purpose and Objectives Schedule Test Readiness Budget 63 Substitute TEC Test • Setup • PTB is controlling TEC’s using RTD sensor feedback. • Temperature of the plates are monitored • Procedure • Assemble TEC’s into plate assembly • Control using the PTB • Observe results and damage to devices 64 Electronics Ambient Thermal Test Overview: • Benchtop observation of running electronics in nominal scenario. • Thermal profile will be obtained for all boards. Valid requirements: 1.SYS.4 1.SYS.6 2.THM.4 2.THM.6 Verify • Electronics do not exceed limits in atmosphere. • Determine heating distribution and concentrations. Products • Temperature profiles of all boards at room temperature. • Results fed back into thermal desktop model heating distributions on board level. Purpose and Objectives Schedule Test Readiness Budget 65 Electronics Ambient Thermal Test Set up • All boards connected and running • Flir thermal camera used as well as temperature sensors Procedure • Allow boards to operate both together and separate • Record temperature profiles 66 Warm use of Image Sensor Overview: • On a benchtop at room temperature all electronics boards are connected. • A image is requested and recorded. Verifies • Sensor functionality. • Software image capture capability. • Hardware transport of image. Products Valid requirements: 2.ELEC.2 3.ELEC.4 3.ELEC.6 • Allows cold test of sensor to begin • Gives noise comparison for other test Purpose and Objectives Schedule Test Readiness Budget 67 Warm use of Image Sensor Setup • IPB and PTB connected and functioning. • IPB connected to sensor. • RTD’s on sensor. Procedure • PTB provides power to both the IPB and sensor. • Software request image. • Hardware returns and stores returned image 68 RTD Characterization Verifies • Functionality • Calibration Products • Approved sensors are functional and within tolerance. Setup • Ohmmeter sensing RTD leads • Cup of boiling and ice water Procedure • Insert each temperature sensor into the calibration source and record the resistance value • Post process the data to ensure that all sensors are both precise and accurate. Results • All 12 RTD’s reported the same temperature to within 0.1C • Accurate to within 1C of each calibration source. Purpose and Objectives Schedule Test Readiness Budget 69 LN2 Assisted Cold Image • Overview • A LN2 cold finger is attached to the sensor on a benchtop. • An image is requested from the sensor and recorded • Verifies • Sensor functionality. • Software image capture capability. • Hardware transport of image. • Noise at operating temperature • Products • Allows optics test with sensor to begin • Gives noise comparison for other test Purpose and Objectives Schedule Sensor LN2 Reservoir Valid requirements: 2.ELEC.2 3.ELEC.4 3.ELEC.6 2.SFW.3 3.SFW.5 3.SFW.6 Test Readiness Budget IPB PTB 2.THM.7 2.THM.1 3.THM.2 3.THM.3 70 LN2 Assisted Cold Image • • Setup • IPB and PTB connected and functioning. • IPB connected to sensor. • Cooled using a plumbing assembly with LN2 • RTD’s on sensor. Procedure • PTB provides power to both the IPB and sensor. • Software request image. • Hardware returns and stores returned image. 71 Passive and Active Heater Testing • Overview • The system is placed in the cooling jacket. • Temperatures are recorded as the system maintains survival temperatures • The system is turned on and actively regulates operating temperature Valid requirements: O4 1.SYS.4 2.THM.1 2.THM.6 3.THM.1 2.ELEC.4 3.ELEC.8 • Verifies • Heater capability • Control of boards to survival temperatures • Products • Board can safely be used in the integrated optics test and TVAC • Heating response time characterized Purpose and Objectives Schedule Test Readiness Budget 72 Passive and Active Heater Testing • • Setup • Structure and boards inserted into testing setup cooling jacket • RTDs are used for internal temperatures • Thermocouples used for external temperatures Procedure • Boards are off with power off • Jacket is filled and structure begins to cool to operating temperature • At -20C boards are provided power and heating is observed • The system is allowed to come to steady state 73 TEC cold test • Overview • The system is placed in the cooling jacket. • The TEC assembly actively cools focal plane to operating temperature • An image is captured and recorded • Verifies • Ability of system to capture an image at nominal temperature with active cooling • Products • • Ability of system to achieve required DeltaT at operating temperature. Image capture ability in form factor Valid requirements: 2.ELEC.2 3.ELEC.4 3.ELEC.6 2.SFW.3 3.SFW.5 3.SFW.6 2.THM.7 2.THM.1 3.THM.2 3.THM.3 O4 1.SYS.4 3.ELEC.9 74 TESTING BACKUP 75 LOGISTICS BACKUP 76 Work Products Breakdown Structure Structures Electronics* Thermal Software • Primary & Secondary Mirror Drawings • Rev 1 Board Schematics • Block Diagram of Thermal Paths • Communications Module • Rev 1 Board Layout • Focusing Mechanism Drawings • Rev 1 Populated Board • Resistance Values for Thermal Contacts • Sensor Interface Module • Thermal Mounting Hardware Drawings • Load/Vibration Analysis on Mirror Supports • Drawing Package for all Components • Drawing Tree • CAD Model • Machined Components • Rev 1 Board Test Report • Rev 2 Board Schematics • Rev 2 Board Layout • Rev 2 Populated Board • Rev 2 Board Test Report • Integrated Electronics • Simulink Model • Thermal Desktop Model • Integrated Thermal System • Rate Determination Module • Image Interface Module • Temperature Control Module Optics • Thermal Background Calculations • Photon & SNR Budgets • Mirror Designs • Baffle & Cold-Stop Design • Focused Optical Assembly • OP Code Dictionary • Software Reference Document • Software Package • Assembled Units * These deliverables pertain to both the Power and Image Processing Board 77 Work Products Breakdown Structure Management Testing Systems • PDD • Procedure for TVAC Test • CDD • Procedure for Optics Test • Test Procedures per Subsystem • PDR Presentation • Integration Procedures • ICD per Subsystem • CDR Presentation • MSDS Documentation • Integrated Payload • FFR • Liner for Optics Test • MSR Presentation • Payload Bracket for Optics Test • TRR Presentation • AIAA Paper • Payload to Bus ICD • SFR • Aligned & Focused Collimator • Test Target • Bus Simulator for TVAC Test • Test Results 78 Management Schedule 79