Fair Head Tidal & West Islay Tidal An overview of the consenting process Fourth Annual HMRC Forum 24th April 2013 Clodagh McGrath: Environmental Manager DP Marine Energy Ltd Presentation • DPME and DBE Joint Venture • West Islay Tidal and Fair Head Tidal Overview • Consent Application – Design Envelope • Project Design Envelope Goals • Achieving goals • Challenges • Key Areas for focus DPME & DBE Joint Venture West Islay Tidal Energy Site Currently holding two Crown Estate Agreement for Lease (AfL) • Islay 30MW, • Fair Head 100MW Fair Head Tidal Energy Site West Islay Tidal • Consent submission (site & western cable) Q2 2013 • Technology Neutral but designed around MCT SeaGen S/Alstom TGL • Build schedule 2015 – 2016 • 6MW with EU FP7 Fair Head Tidal • 100MW AfL Fair Head Granted Oct 12 • Technology Neutral Approach • Scoping – Q2 2013 • Application – “Q3 2014” (Subject to....) • Installation – Grid dependent Three Phases to Consent Application • Scoping Report • Survey scope and methodology • Baseline Surveys • Existing Data • Site Survey • Environmental Impact Assessment • Site/device specific • Habitats Regulations Appraisal • Cumulative Impact Assessment Project Definition • • • • • • • • DEVELOPER REGULATOR FLEXIBILITY Original Equipment Manufacture (OEM) Contracts New Site Information New Technology Cost Reduction Supplier Agreements Device Failure OEM Withdrawal Industry Consolidation DEFINITION EIA Verification Single Pass Assessment Not complex Device Data Experience History • • PROJECT DESCRIPTION • • • Design Envelope “Rochdale Envelope” • • • • • R. v Rochdale MBC ex parte Milne (No. 2) [2000] Endorsed by Scottish Government Define a “worst case” approach to assessing impacts Consolidation in Industry ...BUT.... Recognition that detailed definition is not possible due to: – – – – Unknown seabed geology Insufficient operational experience of devices Insufficient detailed knowledge of resource Lack of security from supply chain Project Design Envelope - What do we know? • • • • • • • • • 30MW TEC will be HATT Between 1 & 2MW per Unit Between 15 & 30 TEC`s 6MW planned SeaGenS (FP7) Revised AfL Area (TBC) Inter-array Cabling Preferred Export Cable Route Islay Landfall(s) Project Design Envelope – WHERE/WHAT? MCT SeaGen S Mark 2 (2MW) – 15 TEC • • • • • TGL (1MW) + 3 MCT – 27 TEC 3 to 15 MCT SeaGen S Mark 2 TEC`s (2MW) Up to 24 TGL TEC`s (1MW) Flying leads from each TGL TEC SeaGen TEC for marshalling & export connection Export voltage probably 33kV Project Design Envelope Goals • Compromise between FLEXIBILITY & DEFINITION • Focus on TEC, the rest is methodology • Need to ensure that issues with “less likely” scenarios don’t impact on “most likely” BUT • Critical we have enough flexibility for viability Achieving the goals - Assessors Achieving the goals – Regulators • Regular Meetings and updates SNH & MS – Project Design Envelope – Cumulative Impacts – HRA • Balance open dialogue with regulators with FOI requests Achieving the goals – Consultation Challenges • • • • • Technology Installation Costs O&M Costs Grid Availability Consenting – Offshore Works – Onshore Infrastructure (Substation/line) Key Areas for Focus • • • • Fishing and other Commercial Interests Recreational Users and any knock on effect Locally Potential Visibility on and offshore Local Benefit – Consenting: surveys, vessels, assessors – Installation: Onshore construction – O&M: If site maintenance strategy RIB/Workboat access • Safety - Navigation • Cumulative Impact Effects Thank you Clodagh.mcgrath@dpenergy.com 087 737 5642 www.westislaytidal.com www.fairheadtidal.com DP Marine Energy Ltd, Mill House, Buttevant, Co Cork