BERNARDS TOWNSHIP SEWERAGE AUTHORITY MEETING MINUTES SEPTEMBER 13, 2011 CALL TO ORDER The chairperson called the meeting to order at 6:30 PM. Those assembled saluted the flag and the chairperson read the open public meeting statement in accordance with the law. ROLL CALL Present: Absent: Also Present: Carpenter, Gaziano, Malay, Spitzer Pavlini Director Timko, Superintendent Bowlby, Hatch Mott MacDonald Consultant Wohlleb, Attorney Belardo CORRESPONDENCE None PUBLIC COMMENT None APPROVAL OF MINUTES Motioned by Spitzer, seconded by Malay, to approve the Minutes of: 8/9/2011. All were in favor; motion carried. ACTION/DISCUSSION ITEMS Discussion - Budget Introduction The 2012 draft budget proposes an overall decrease of 6.15% and Rate Stabilization of $1,492,927.00, down $417,360.00 from the draft budget stabilization of $1,910,287. This change reflects a $40 increase on the sewer rate from $320 to $360. It was noted that no additional personnel has been added, postage costs declined, and that data processing fees increased due to new software and associated annual subscriptions. The SCREC revenue was inadvertently omitted from the draft budget and the budget will be amended it include it. a. Resolution #1170-2011 Budget Introduction Motioned by Carpenter, seconded by Malay to approve Resolution #1170 be amended, approved as amended, to include SREC’s revenue of $500,000.00. ROLL CALL Aye: Carpenter, Gaziano, Malay, Spitzer Nay: Abstain: Motion: Carried Discussion – NJUA JIF Membership The membership in the NJUA JIF terminates as of December 31, 2011, therefore a resolution to renew for another 3-year period is required. b. Resolution #1171-NJUA JIF Membership Motioned by Malay, seconded by Carpenter, to approve Resolution #1171 ROLL CALL Aye: Carpenter, Gaziano, Malay, Spitzer Nay: Abstain: Motion: Carried Discussion – Township Interlocal Contract The current contract with the Township expires on December 31, 2014 and costs $372,579. The contract addresses administrative services but is expanded to include the following services: Salting of Harrison Brook Treatment Plant roads Closed Circuit Internal Video inspection of sewers Vactor Truck cleaning of sewers and catch basins Pumps and other equipment Harrison Brook Treatment Plant lab services Sewer service to all Township Facilities within the Sewer Service Area at no charge Including these items would increase costs to $409,836.90 in 2012. After 2012 the amount will be calculated based on the New York-Northern New Jersey CPI-U Index established for the month of May. c. Resolution #1172-Township Interlocal Contract Motioned by Malay, seconded by Carpenter, to approve Resolution #1172 ROLL CALL Aye: Carpenter, Gaziano, Malay, Spitzer Nay: Abstain: Motion: Carried Discussion-Madisonville Road Pump Station-T&M Associates CO #1 Change Order #1 increases T&M’s 2009 construction management contract by $11,000 for a new contract amount of $76,000. This change order is due to continued problems with the contractor, DCM Construction. The increase will only be used as necessary based on issues from the summer and it may be some time before the project and related legal issues are resolved. d. Resolution #1173 – T&M Associates CO #1 – Madisonville Road PS Construction Mgmt. Motioned by Carpenter, seconded by Spitzer, to approve Resolution #1173 ROLL CALL Aye: Carpenter, Gaziano, Malay, Spitzer Nay: Abstain: Motion: Carried Discussion-Climber Screen Replacement Project This machine removes debris from sewage, was installed in 1991, and is in need of replacement. The vendor is new to BTSA but is recommended by our consultant. e. Resolution #1174-Bid Award – JoGi Construction, Inc., Climber Screen Replacement Project Motioned by Malay, seconded by Carpenter, to approve Resolution #1174 ROLL CALL Aye: Carpenter, Gaziano, Malay, Spitzer Nay: Abstain: Motion: Carried f. Consulting Engineer’s Report BTSA ENGINEER’S REPORT September 2011 Meeting DEVELOPERS PROJECTS: Davis Subdivision/DCI Builders/Lyons Road We await sewer testing to be completed by the developer. AUTHORITY PROJECTS: Belt Filter Press Construction The Contractor is continuing to work to complete the remaining punch list items. completion of these items in September. We anticipate Sluice Gate Replacement Project The Contractor with guidance from the manufacturer corrected the misalignment of the valve stem guide in one of the newly installed gates. The Contractor was deemed complete on August 11, 2011. We are currently working with the Contractor on project closeout. The maintenance bond has been submitted to the BTSA for acceptance. Annin Road Pumping Station Standby Power The project is out to bid. A bid opening date is scheduled for September 21, 2011. Raw Sewage Pump Replacement The project is out to bid. A bid opening date is scheduled for September 21, 2011. Final Settling Tank Building Leak Repairs The project is out to bid. A bid opening date is scheduled for September 21, 2011. OPERATOR’S REPORT August 2011 Report FLOWS Total Flow Average Flow Maximum Flow Minimum Flow 86,744,000 2,798,000 9,259,000 1,483,000 Gallons Gallons Gallons Gallons OPERATION Suspended Solids Dry Weight NJDEP Limit Influent 1892 Kg Effluent 48 Kg Net 1844 Kg Suspended Solids In Effluent 4.9 Mg/l 97.5 % Removed 280 Kg/Day 85% 30 Mg/l CBOD Dry Weight NJDEP Limit Influent Effluent Net CBOD in Effluent 1120 23 1097 2.4 75.7 Kg/Day 85% 8 Mg/l Phosphorus Dry Weight NJDEP Limit Influent Effluent Phosphorus in Effluent 23.5 Kg 4.7 Kg 0.48 Mg/l 5.0 Mg/l Kg Kg Kg Mg/l 97.9 % Removed Remarks Hypochlorite Used: 1125 Gals. Sulfur Dioxide Used: 711 Lbs. Alum Used: 5420 Gals. Influent pH: 7.4 S.U. Effluent pH: 7.4 S.U. Total Precipitation 20.05 Inches Comments This period we performed the quarterly grease trap inspections. Readied equipment for auction. Installed Crown Court commintor motor. TV’d and marked out 15 Winding Lane for protruding lateral. Carbonetti repaired. TV’d 35 Winding Lane to inspect check valve. TV’d 155 Thackeray Drive. Roto rooter needed to clear line then rechecked. OK. Responded to odor complaint at 3187 Valley Road. Found rotting meat in downstairs garbage can. Installed lower drive shaft on RSP #2. Replaced battery in 242. TV’d easement manholes JW-03-04 to JW-03-06, SRPS-06-15 to SRPS-06-14, LM-07-06 to LM-07-05, HBW-10-02 to HBW-10-01, HBW-10-09 to HBW-10-06, HBW-04-15 to HBW-0414& SM-18-10 to SM-18-14. TV’d 49 Peachtree Road lateral for home owner. No blockages. TV’d #80 Bernard Drive, no problems found. Inspected capping of 48 East Oak Street. Unclogged #2 pump at Crown Court. Changed carbon at Juniper Way. Checked syphons. Foley performed quarterly generator inspections. Exercised station and plant generators. Hurricane Irene caused numerous outages. Juniper Way Pump Station had two telephone poles down. Power restored Saturday September 3. The plant was manned around the clock for a week. We continue to meet permit parameters without any problems. SAFETY Monthly fire extinguisher, lighting, safety shower checks completed. Storm drain inspection performed. Attended safety meeting at Toms River. Lost time accident free for 222 days. PROJECTS I&I : No report Madisonville Road: Station on line. Waiting for old station demo. Belt Filter Press: Working on punch list. East Oak Pump Station: Waiting on new door and acoustical blinds for generator. Solar Field: Waiting on customer interface connection between Noveda and JCP&L. Fieldstone Drive Pump Station: Construction to begin September. . BERNARDS TOWNSHIP SEWERAGE AUTHORITY Resolution #1175 Approval of the Bill List Dated: September 13, 2011 BE IT RESOLVED, that this bill list dated 9/13/2011 be audited, and if found correct, be paid. Amounts listed as PY Unencumbered Bills will be transferred from Unrestricted Net Assets to the current liability line Accounts Payable Accounts Payable Current - Operating Accounts Payable Current – Capital $ 75,779.30 $ 33,818.31 Prior Year Bills-Capitol 2010 Total Prior Year Bills-Capital $ Payroll - Current - S&W Payroll - Current - FICA $ 57,286.51 $ 4,236.75 Total Payroll 133.00 $ 133.00 Sub-Total $ 61,523.26 $171,253.87 $ 1,525.50 Total $172,779.37 Developer’s Escrow Resolution #1175- Approval of Bill List Dated: September 13, 2011 Motion by Malay, seconded by Spitzer, to approve the Bill List Dated September 13, 2011 ROLL CALL Aye: Carpenter, Gaziano, Malay, Spitzer Nay: Abstain: Motion: Carried MEMBER/STAFF COMMENTS Director Timko commended the staff of the Sewerage Authority in their handling of issues during Hurricane Irene. Attorney Belardo will attend a four-hour Wastewater Management training on 09/14/2011. Member Carpenter reiterated his request for IT to update security of technology at the plant. Timko will follow up on this. ADJOURNMENT Motioned by Malay, seconded by Carpenter, to adjourn at 7:05 PM. All were in favor; motion carried. Respectfully submitted, Rhonda Pisano