LIST OF INVESTMENT PROJECTS
IN THE SPHERE OF AIC TO ATTRACT FOREIGN
INVESTORS
ASTANA 2009
Wholesale agricultural market
(with regional terminals)
Project objective: construction of modern advanced wholesale market with
regional terminals
Location: wholesale market in Astana, regional terminals in the towns of Arys,
Aktau, Ust-Kamenogorsk
Project capacity: provision of capital’s population with food products
with the output of: fruit and vegetables – 90 thousand ton; meat foods,
fish- up to 40 thousand tons a year
Project Cost: 33 760,911mln. KZT (US$226,6 mln.), the Republican Fund
allocates: 10 763,54 mln. KZT, in 2008 - 298 mln..KZT, 2 in 2009 . – 1 000
mln. KZT, in 2010 – 4 538 mln. KZT, in 2011 – 4 927,54 mln. KZT.
Recoupment term : 10 years
. Launch: December 2011
Progress: the choice and adjustment of lots for construction of the
wholesale agricultural market and regional terminals and their procurement
have been made. The Feasibility Study (FS)of the construction of wholesale
agricultural market was drawn up and confirmed in Astana (hereinafter
WAM). Design Estimates of WAM have been made in Astana. The
elaboration of FS of regional terminals in Arys, Ust-Kamenogorsk and Aktau
is in the process. The term of completion is late February 2009. Collection of
specifications is being done to link-up networks.
Initiator: JSC NC Prodcorporation
1
Grain processing factory in North-Kazakhstan oblast
Project objective: construction of grain processing factory in
North-Kazakhstan oblast
Location: village of Novoishimskoe, G.Musrepov rayon of NorthKazakhstan oblast
Capacity: production of gluten– 34, 2 thousand tons, starch-175
thousand tons, feeding scalpings- 66 thousand tons.
Project cost: 25 832,0 mln. KZT (US$173,4 mln.), the Republican fund
allocates: 2 335,25 mln.KZT, in 2010 – 441,5 mln. KZT, in 2011– 1 893,75
mln.KZT.
Recoupment term : 7,9 years.
Launch: IV quarter of 2012
Progress: At present search of potential partner-investors is being
made. A number of meetings with foreign companies like MAN
Ferrostal (Germany), Cargill (the USA) was conducted. However,
the issue of the project investment is left open.
Initiator: JSC NC “Prodcorporation”
2
Bio ethanol production complex
of two industrial objects in the territory of the Republic of Kazakhstan and
Czech Republic
Project objective: construction and launch of a single bio ethanol
production complex of two industrial objects in the territory of the
Republic of Kazakhstan and Czech Republic.
Location: Czech Republic, Karlovary oblast, Vrzhesova, the Repubic of
Kazakhstan, Chemolgan station, Ilyiiskii rayon, Almaty oblast.
Capacity: bio ethanol production- 63 148 700 litres a year in Czech
Republic, 72 621 005 litres a year in the Republic of Kazakhstan;
Production of dry fodder for cattle- 54 thousand tons a year in Czech
Republic, in the Republic of Kazakhstan – 54 thousand tons a year
112 600 000 Euros, required investments –bio ethanol
factory in Czech Republic – 62 mln. Euros, bio ethanol factory in Kazakhstan
-49 mln. Euros.
Project Cost:
Recoupment term : 6 years
Launch: May 2010 .
Progress: business-plan of the project is elaborated
Initiator: LLP «Chebio- Hebio», the Republic of Kazakhstan, CHEBIO, a.s.
/JSC «Hebio»/, Czech Republic
3
Construction of livestock complex jointly with meat processing and fodder
production factory
Project objective: creation of vertically integrated production
structure and high-quality agricultural products processing with closed
cycle in North-Kazakhstan oblast;
Increase of export potential of the country due to agricultural raw
products processing.
Location: North Kazakhstan oblast, the village of Tainsha
Capacity: Pig-breeding complex for 100 thousand heads a year;
Fodder production factory -210 thousand tons a year;
Meat-packing plant – 15 thousand tons of meat a year,
9 thousand tons of sausages;
Poultry factory – 420 thousand laying hens a year.
Launch: from 2007 to 2013 (gradually)
Project Cost: 17 billion KZT (US$ 143 mln)
Progress :
- adopted pig-breeding complex of 1 line;
- held preparatory works on construction of pig-breeding complex of 2
line;
- Livestock complex (1 line) is built and launched.
Initiator: LLP «Basko»
4
Rape processing production into rapeseed oil and raw milk
in North-Kazakhstan oblast
Project objective: creation of rape processing production into
rapeseed oil and raw milk
Location: North-Kazakhstan oblast
Capacity: increase of initial seed processing factory output from 65
thousand tons a year to 180 thousand tons a year;
Increase of milk processing factory output from 65 thousand tons a year to
140 thousand tons a year, establishment of 5 livestock complexes for 6
thousand heads of livestock, construction of fodder production factory with
the output of 200 tons in 24 hours.
Project Cost: US$ 120 mln, financing from the Republican fund is not
envisaged
Launch: IV quarter of 2011
Recoupment term: for rape processing - 7 years, for milk processing –
15 years;
Progress: by the project “Construction of industrial livestock
complexes” the location of the complex is determined, preliminary
FS is elaborated, Design Estimates (DE)are being prepared.
By the project “initial seeds processing factory modernization in the village
of Novoishimsk” the site for additional equipment installation is defined, the
work on infrastructure improvement is done., the outputs are increased to
store rape, the applications were proceeded to the oblast akimat for
training staff, preliminary FS is prepared.
Initiator: LLP «Maslo-del»
5
Development of virgin and fallow lands on the area of 30 000 hectares
Project objective: further development of the group of companies “Bogwi”
directed at agricultural production and processing to gain maximum possible
competitive advantages through agro industrial infrastructure modernization to
intensify trade cooperation in the world markets
Location: Akmola and North-Kazakhstan oblasts.
Capacity: increase of grain production output up to 850 thousand tons
annually due to enlargement of arable areas of the group of companies
“Bogwi” from 2009 to 2011 from 400 thousand hectares to 700 thousand
hectares and yields increase.
Project Cost: US$ 50. The funds will be directed to the following:
purchase of fuels and lubricants for mechanical irrigation of lands - US$
16,5 mln, purchase of stock seeds of high quality wheat varieties - US$
14,7 mln , purchase of items for chemical protection of plants – US$ 13,5
mln. Other expenses – US$ 5,3 mln
Recoupment term: 6 years
Launch: 2008- 2017
Initiator: Group of companies «Bogwi»
6
Construction of fair exhibition complex in Astana
Project objective: increase efficiency of agribusiness through wide
access of AIC entities to fair exhibition activities by:
- Raising agricultural competitiveness;
- Enhancement of agricultural goods and services and conclusion of
agreements by the participants of agricultural sector;
- Expansion of interregional and international relations;
- formation of civilized attitude to the market by providing the opportunity to
study market trends for AIC entities and evaluate the position of the business
in the market;
- provision of equal opportunities for competition for all AIC entities –
participants of fair exhibition activities.
Location: Astana
Capacity: 14 000 sq. metres of display spaces
Project Cost: 3 440 mln KZT
Launch:
Completion of FS, DE (2007-2009)
Completion of construction (2010-2011)
Progress:
FS of the project is elaborated and undergoing state examination;
The work is o the development of DE;
The work is on legalization of the lot.
Initiator: JSC «KazAgroMarketing»
7
Creation of vertically integrated structure on agricultural production,
storage, distribution and export
Project objective: Construction of milk factories in Ust-Kamenogorsk
and Kostanai, enlargement of actual milk factory in Almaty;
Creation of processing plant for baby food production (reconstruction of the
baby food plant “Bobek”);
Construction of regional and distribution centers (industrial plants with fridge
equipment, fruit and vegetable storehouses);
Creation of the chain of wholesale markets with their own production.
Location: Almaty oblast (Panfillov, Enbekshikazak, Uigur rayons), West
Kazakhstan oblast
Chain of distribution – oblast centres around Kazakhstan
Capacity: orchards - 2 thousand hectares with enlargement up to 10-12
thousand hectares, 4 milk farms with 2 thousand heads of animals each.
Project Cost: 99,4 billion KZT ( US$ 818mln.).
Launch: 2008- 2017.
Progress: project block: orchards (the lot is chosen); developed 25
hectares (planted young orchard);
Project block: milk farms – equipment suppliers chosen; conducted
topography, geology and geodesy of the lot for farm construction, DE is
prepared.
Project block: milk factory, former Ust-Kamenogorsk milk factory was
acquired; jointly with the company “Tetra Pak Central Asia”, technological
project for product output is worked out; leasing contract with the firm “Tetra
Laval Credit” is signed for supply of technological equipment.
Initiator: Holding of companies «Rayimbek Group»
8
Making of intensive orchards in the area of 2000 hectares in Almaty oblast
Project objective: creation of fruit plantations of high quality to
sell fresh products in the domestic market of the RK and export of
Russian Federation, and for processing adopting the technology
of intensive gardening having established required production
infrastructure.
Location: Almaty oblast – Uigur and Panfillov rayons
Planned capacity: within 3-5 years to create 2000 hectares of
orchards. Density for planting is 3500 trees per hectare (880
large and stone fruit trees per hectare).
Project cost: US$ 2,2 mln
Required amount: US$ 1, 8 mln
Recoupment term : 10 years
Term for project implementation: making of orchards within 5
years, industrial exploitation for 15 years
Short description of the project: project plans to make
intensive orchards in Almaty oblast applying anti-virus highly
productive planting stock.
Initiator: LLP «Alma-Prodex»
9
Construction of commercial sturgeon automated piscicultural complex with
the productivity of 100 tons of commercial fish and 3 tons of caviar a year
and production of young sturgeons
Project objective: Construction of closed water supply installations for
commodity production of caviar and sturgeon-breed fish preserving the
manufacturers and obtaining the young fish from such endangered
species like beluga, sturgeon, stellate sturgeon, sterlet.
Location: Atyrau oblast, village of Ganushkino
Capacity: Creation of new production with further enlargement
and increase of output up to 300 tons of commercial fish and 5
tons of caviar.
Project Cost: US$ 5 mln
Required amount: US$ 3,5 mln
Recoupment term : 4 years
Term for project implementation: 7-12 months (period of
construction and factory launch)
Short description of the project: adoption of new technologies
for growing sturgeon fish. Production of commercial fish, caviar
and reproduction of young sturgeon breed in the Red Book.
Provision of internal and external markets with delicacy product.
Rearing of silver carp and grass carp in open ponds
Initiator: LLP « RBFCaspyi»
10
Flour and fodder production
Project objective: Flour and fodder production
Project location: Akmola oblast, the town of Kokshetau
.
Capacity: Elevator’s capacity is 50 thousand tons,
Production capacity: flour manufacture up to 300 tons in 24 hours,
fodder – 100-200 tons in 24 hours.
Project Cost: US$ 18, 1mln
Required amount: US$ 18, 1 mln
Recoupment term : 6 years
Term for project implementation: 11 months
Short description of the project: installation and adoption of grain
elevator equipment, flour and feed mills
Initiator: JSC «Kazakhstan financial corporation»
11
Construction of greenhouse complex on the area of 10 hectares applying
alternative source of energy
Project objective: production of green products
Location: Akmola oblast, the town of Kokshetau
Capacity: 10hectares
Project Cost: US$ 17 ,0 mln.
Required amount: US$ 17,0 mln.
Recoupment term: 6 years
Term for project implementation: 10 months
Short description of the project: installation and exploitation of:
bio gas installations and greenhouse complex to provide the capital
with fresh and cheap agricultural products
Initiator: JSC «Кazakhstan financial corporation»
12
Livestock product processing claster from cattle feeding to ready-made
products of “Halal” standard
Project objective: provision of full and completed cycle of livestock
production of “Halal” standard (from cattle feeding to meat and
sausages ready made for sale)
Location: meat-packing plant -Aktobe, cattle feeding depot – the lot
with the area of 2 hectares 50 km far from Aktobe
Capacity: meat-packing plant –8 tons in 24 hours, cattle-feeding depot
- 2000 heads
Cost: 2,7 bln KZT ( US$ 18,1mln)
Mechanism for attraction: direct investment in terms of 20%
transfer out of capital stock, concessionary crediting up to 10%
Recoupment term: 5 years
Term for implementation: 1 year
Progress: the 1st stage of the project is implemented. Meat packing
plant was launched in June 2008. Its products have the quality
certificate “Halal” . Financing is necessary for the 2nd stage: organization
of he cattle feeding depot «Halal»
Initiator: LLP «Тandem W»
13
Construction of grain storage and processing and all-mash production
complex
Project objective: construction of specialized complex for storage
and processing of grain and all-mash production
Location: the countryside of Astana
Capacity: mill - 300 tons in 24 hours, elevator - 50 thousand tons,
production of all-mash – 100 tons in 24 hours
Cost: 2,7 bln KZT (US $ 18,1mln)
Recoupment term: 7 years
Term for implementation: 1 year
Mechanism of attraction: direct investment – in terms of transfer of 49%
out of capital stock, concessionary crediting up to 10 %
Initiator: JSC «Kazakhstan financial corporation»
14
«Eurasia» - growth, processing and marketing of poultry meat
Project objective: creation of vertically integrated holding for growth,
processing and marketing of poultry meat including feed grain
production, deep processing and manufacture of poultry meat products,
system of storage and transportation of ready made products
Location : Almaty and East Kazakhstan oblasts
Capacity : 60 thousand tons of poultry meat a year
Project Cost: US$ 134,7 mln
Required amount: US$ 119,4 mln
Mechanism of attraction: - direct financing as well as
concessionary crediting
Recoupment term : 10 years
Launch: December 2011
Progress: 1. completed the construction of new processing plant
(launch in April 2009) on the basis of Ust-Kamenogorsk poultry plant
2. determined the lots to grow feed grain 3. defined the equipment
suppliers
Initiator: JSC «Ust-Kamenogorsk poultry plant»
15
Irrigation of Zhaushykumsk massif lands of Shardary rayon of South
Kazakhstan oblast adopting water-saving technologies (1line)
Project objective: development of massif’s lands adopting new
technologies of irrigation. The water is delivered by pumping
stations from Shardary reservoir. In the 2nd line it is planned to
provide with full completed production cycle, processing and
transportation of fruit and vegetable products
Location: Shardary rayon, Zhaushykum rayon
Capacity: development of 13.0 thousand hectares of dry lands,
annual croppage of fruit and vegetable crops will be 523.0
thousand tons for the amount of 11 bln. KZT, and there will be
jobs for 7200 people.
Preliminary project cost: US$ 122,7mln.
Recoupment term : 2 years (from implementation is 4 years)
Mechanism of investor’s attraction: direct investment, state
guarantees, short term of recoupment
Term for implementation : 2years
Initiator: akimat of South-Kazakhstan oblast
16
Construction of semi combed yarn production plant
Project objective:
- Facilitate wool production in the Republic of Kazakhstan;
- create the base for processing semithin and semicoarse wool into
ready made products;
- create the conditions for further deep wool processing
Location: Tekes village, Rayimbek rayon Almaty oblast
Capacity: 1100 tons a year of semicombed yarn from semithin and
semicoarse wool for carpet and cloth manufacture.
Cost: US$ 11 mln.
The funds will be directed in the following way:
- purchase of equipment– US$ 9 mln
- reconstruction of buildings – US$ 1mln
- circulating assets – US$ 1 mln
Recoupment term: 6 years since launch
Progress: business-plan is elaborated, preliminary engineering project is
made up (the chain of equipment is counted and defined, equipment
suppliers are defined)
Initiator: Group of companies JSC Stroikontrakt Corporation, LLP “Kuat
Ltd ”
17
Investments to grain production
Project objective: organization of joint activity for production and sale
of grain and processing products
Location: Akmola, Kostanai and North-Kazakhstan oblasts
Cost: US$ 1,5 bln of foreign investments.
Potential project parties: domestic grain companies and strategic
investors
Cooperation: participation of foreign investors in the capital of
domestic grain companies.
Party contributions:
• domestic grain companies– 2 mln hectares of arable areas, technical
resources;
•Foreign investors – finance.
Initiator: «Grain Union of Kazakhstan»
18
Construction of greenhouse complex
Project objective: provision with fruit and vegetable products
Location: Karasai region, Almaty oblast
Capacity: growth of tomatoes and cucumbers in greenhouse on the
protected ground of 12 hectares
Cost: US$ 25,2 mln
Required amount: US$ 25,2 mln
Mechanism of attraction: - direct investment in the terms of 40-
49% transfer out of capital stock. At present attraction of
Japanese investors is being worked out
Recoupment term: 7 years
Term for project implementation: 2 years 3 months (March of 2011)
Initiator: LLP «Almaty Greenhouse Plant»
19
Construction of vegetable oil production factory
Project objective: development of oil-yield crop production, meeting
the demands of vegetable oil in domestic market
Location : 110000, Republic of Kazakhstan,
Kostanai, 36 Karbysheva street
Capacity: production of 36-tons of vegetable oil in 24 hours with
further increase up to 100 tons
Cost: 2 717 183 000 KZT
Required amount: 1 310 226 000 KZT
Mechanism of attraction: investment share up to 50 % of
Project Cost
Recoupment term : 7,5 years
Launch: March-April 2010
Progress: built and launched elevator with capacity of 20 000 tons
of seeds, built and launched oilseed processing plant with the
capacity of 100 tons of seeds and production of 36 tons of oil and
64 tons of oilcake in 24 hours
Initiator: LLP «Sodruzhestvo»
20
Creation of vertically-integrated complex (cluster)of enterprises on poultry
food production with use of non-polluting closed technology
Project objective: Creation of highly profitable automated poultry
food production.
Location: Republic of Kazakhstan,
Maiskoe v., Taranovsk rayon, Kostanai region
Capacity: PPF "Kostanayskiy" - 115 thousand of parent animals;
Broiler poultry factory - 5 thousand ton per a year; egg factory - 480
thousand heads; Grain processing complex: mixed fodder factory - 20
tons per an hour, grain storage - 100 thousand tons, grinding complex
- 150 tons per a day; Poultry processing factory: slaughter workshop –
3 thousands per an hour, meat processing workshop; deep egg
processing factory with productivity of 1 million eggs per a shift;
biogas production complex.
Required amount: 11 137 000 000 KZT
Recoupment term : 2,7 years
Launch: 2009 – 2010 years
Progress: Business plan was worked out; construction documents
were prepared; the land for construction of all the complex was
allocated; the Contracts with equipment suppliers were concluded.
Initiator: LLP PPF "Kostanayskiy"
21