Henichesk District Expansion of the existing meat and dairy production capacities Idea of the project: production of first class milk for TM «DANONE». ІInitiator: PE AF ”Promin”. Place of realization: Henichesk district, Shchorsivka Village Council, Shchorsivka village, the land plot area– 6,5 ha. Total cost of the project: 1,5 mln. $, involved funds 1, 2 mln. $, 0,3 mln. $ required. Scheme of financing (own funds and investment needs): Total cost of the project is 1,5 mln. $ which includes purchase of 99 heads of Holstein cows ( credit resource – 178,2 thousand €), the herd of 132 cows if formed, 110 heads are out of lactating period , 81 heads are purchased, 600 thousand $are invested, the purchase of Holstein heifers for the total sum of 640 thousand $. Expected result: development of dairy husbandry in the district and production of high quality milk. Full and maximum efficient use of land resources. Supplying of plant growing branch of the district with pure organic fertilizers. Pay-back period: 4 years. Advantages of the project: • Modernization program is developed • Full staff of qualified workers Growing, collecting, transportation, laying in, storing and feeding of animals with fodder. • Dairy and cattle complex includes a new cowshed for 350 cows, milking room with throughput of 600 cows a day upon the condition of 3 time milking. Room for young animals for growing of 80 heads. Storehouse for concentrated fodder designed for 1500 tons. • Concrete platforms for silage storing for 5000 • • • Concrete pus storage for 4500 tons of pus Autonomous water supply 60 kWh diesel generator for emergency electric energy supply . Infrastructure and resources: highways KharkivSimferopol, 1.8 km away from railway tracks ( Novooleksiivka urban type settlement – 1km). Access roads are asphalted. Engineering communications are available. Job creation and social effect: 44 new jobs Profitability: 54,7%.