John F. Kennedy Space Center LAUNCH SERVICES PROGRAM THEMIS Mission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5 Delta - Ground Operations Review (GOR) November 29, 2006 KARS Park, KSC, Florida Hosts: Garrett Skrobot, NASA Mission Manager (MM) William Van Dyke, NASA Launch Site Integration Manager (LSIM) Agenda November 29, 2006 Meet-Me-Number: 1-877-991-5876 Passcode: 698067# John F. Kennedy Space Center LAUNCH SERVICES PROGRAM MISSION INTEGRATION WORKING GROUP (MIWG) #7 • THEMIS Project Status – • • • P. Harvey/UCB Payload Schedule Update (Astrotech and Launch Site Schedules) Delta Program Status – LV Hardware Status – Program Issues Mission Integration Status – Integration Schedule – Requirements Verification Matrix – SCN Review – Release of ICD Rev A – Action Item Review L. Loucks/Boeing L. Loucks/Boeing D. Tran/Boeing Launch Site Integration Status – Side by Side Testing/Ladder Mods/SSS Installation V. Segall/Boeing – Fueling & Procedure Status C. Davis/NASA – Range Status on Required Deliverables & Procedures J. Wethern/45SW Agenda November 29, 2006 Meet-Me-Number: 1-877-991-5876 Passcode: 698067# John F. Kennedy Space Center LAUNCH SERVICES PROGRAM MISSION INTEGRATION WORKING GROUP (MIWG) #7 - Continued • Analysis Results L. Loucks/Boeing DTO Update – Thermal – RF Link Analysis – Controls/ACS Gas Budget Update • Mobile Telemetry Coverage L. Loucks/Boeing • Launch Management Update KSC • Mission Success Overview KSC • Review Spacecraft Mandatory / Required Launch Criteria KSC Agenda November 29, 2006 Meet-Me-Number: 1-877-991-5876 Passcode: 698067# John F. Kennedy Space Center LAUNCH SERVICES PROGRAM GROUND OPERATIONS WORKING GROUP (GOWG) #5/ Delta GOR • Astrotech Readiness/Issues G. Gleeson/ASO FL • THEMIS Badging & Training Plan K. Kerr/Analex KSC • Launch Site Safety Status/Readiness C. Loftin/NASA Safety • Telemetry and Communications Status/Readiness M. Lougheed/NASA KSC • Spacecraft Procedure Status/Review R. Sterling/UCB • Launch Site Readiness Poll (Go/No Go) – THEMIS Project P. Harvey – NASA KSC Public Affairs G. Diller – Boeing Delta Mission Integration V. Segall – Astrotech Mission Management G. Gleeson – NASA LS Telemetry & Communicaitons M. Lougheed – NASA KSC Safety C. Loftin – NASA MM G. Skrobot – NASA LS Launch Site Integration W. Van Dyke – NASA LS Launch Site Integration Branch F. Stone John F. Kennedy Space Center LAUNCH SERVICES PROGRAM THEMIS PAYLOAD STATUS Peter R. Harvey Project Manager University of California - Berkeley Payload Status John F. Kennedy Space Center • PCA Assembly and Test LAUNCH SERVICES PROGRAM Payload Status John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Acoustics & Shock Vibration Thermal Vacuum Spin Balance FM2/FM3 Thermal Storage Vacuum ASO/PAD Schedule 1 John F. Kennedy Space Center DATE LAUNCH SERVICES PROGRAM ASO (F1) ASO (F2) ASO (F3) ASO (F4) ASO (F5) Unpack Probe Unpack Probe Unpack Probe Unpack Probe Unpack Probe and EGSE and EGSE and EGSE (ASO1) (ASO1) (ASO1) (ASO1) (ASO1) 11-Dec EGSE1 Setup, EGSE2 Setup, EGSE3 Setup, Install Bolt Thermal Thermal Cutters Closeouts Closeouts Install Bolt Cutters Install Bolt Cutters Thermal Closeouts Thermal Closeouts ASO (PC and PCA) PC Unpack (ASO2) 12-Dec Thermal Closeouts Install Bolt Cutters Install Bolt Cutters 13-Dec RCS MEOP & LEAK LPT, S/A Test 14-Dec RCS MEOP & LPT, S/A Test LEAK 15-Dec RCS MEOP & LPT, S/A Test LEAK 16-Dec PC-VCO TEST PAD ASO/PAD Schedule 2 John F. Kennedy Space Center DATE LAUNCH SERVICES PROGRAM ASO (F1) ASO (F2) ASO (F3) ASO (F4) RCS MEOP & LEAK ASO (F5) ASO (PC and PCA) LPT, S/A Test INSTALL SEP HARNESS PAD 18-Dec LPT, S/A Test RCS MEOP & INSTALL SMD LEAK LINES 19-Dec Probe Transport to ASO2 Probe Transport to ASO2 Probe Transport to ASO2 Probe Transport to ASO2 Probe Transport to ASO2 20-Dec 21-Dec Weigh, Move Weigh, Move Weigh, Move Weigh, Move Weigh, Move to Stands to Stands to Stands to Stands to Stands 22-Dec Note: RCS MEOP & Leak are performed after hours ASO/PAD Schedule 3 John F. Kennedy Space Center DATE LAUNCH SERVICES PROGRAM ASO (F1) ASO (F2) ASO (F3) ASO (F4) ASO (F5) SLACK 1-Jan SLACK 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan ASO (PC and PCA) Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe Fueling Probe RCS Electrical Verifications Probe RCS Electrical Verifications Probe RCS Electrical Verifications Probe RCS Electrical Verifications Probe RCS Electrical Verifications Wet Weigh, Probe to PC, Attach Pyro Wet Weigh, Probe to PC, Attach Pyro Wet Weigh, Probe to PC, Attach Pyro Wet Weigh, Probe to PC, Attach Pyro Wet Weigh, Probe to PC, Attach Pyro Bag PCA 9-Jan 10-Jan PCA FNL 11-Jan PCA FNL 12-Jan SLACK PAD ASO/PAD Schedule 4 John F. Kennedy Space Center DATE LAUNCH SERVICES PROGRAM ASO (F1) ASO (F2) ASO (F3) ASO (F4) ASO (F5) ASO (PC and PCA) PAD Spin Balance and Weigh 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan PCA FNL SLACK SLACK SLACK SLACK SLACK SLACK SLACK 23-Jan 24-Jan SLACK 25-Jan SLACK 26-Jan Mate to 3rd Stage PCA EGSE TO BLKHSE PCA COMM CHECK PCA COMM CHECK ASO/PAD Schedule 5 John F. Kennedy Space Center DATE 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb LAUNCH SERVICES PROGRAM ASO (F1) ASO (F2) ASO (F3) ASO (F4) ASO (F5) ASO (PC and PCA) PAD S/C Clampband 3rd Stage and S/C Can Up Encapsulation Transport to Pad T-10 S/C Functional & RF Test 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb T-9 S/C Launch Rehearsal T-8 Power On Stray Voltage T-7 Power Off Stray Voltage T-6 Remove Bag, Fairing Installation T-5 Fairing Finaling ASO/PAD Schedule 6 John F. Kennedy Space Center DATE LAUNCH SERVICES PROGRAM ASO (F1) ASO (F2) ASO (F3) ASO (F4) ASO (F5) ASO (PC and PCA) PAD T-4 FRR, Prop Load Prep 12-Feb 13-Feb T-3 Second Stage Fueling, Ordnance 14-Feb T-2 Launch Readiness Review T-1 Launch Countdown Start **Launch ** 15-Feb Pack-UP 16-Feb 17-Feb 18-Feb 19-Feb SHIP ASO/PAD Manpower John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Manpower 27 Max while at ASO 31 Max while at PAD 35 30 25 20 15 10 5 2/19/07 2/12/07 2/5/07 1/29/07 1/22/07 1/15/07 1/8/07 1/1/07 12/25/06 12/18/06 12/11/06 0 Summary John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Summary Status Probes and Probe Carrier are Flight Ready Plans and Procedures for ASO/PAD in Good Shape Shipment Contracted Two Trucks w/ Lead Car Ready Issues Potentially Impeding Launch Processing None John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Side by Side Testing / Ladder Mods / SSS Installations V. Segall / Boeing KSC Cape Status John F. Kennedy Space Center • LAUNCH SERVICES PROGRAM Access Ladder – Ladder modified, proof loaded, available for use • Side-by-Side Testing – Procedure written and reviewed; ready for use – Date (15 Dec) coordinated – Logistics of delivery (14 Dec) discussed » Fork lift identified and available » Mission Integration will facilitate access for non-badged people » Actual delivery schedule discussion planned for post Astrotech THEMIS delivery Cape Status John F. Kennedy Space Center • LAUNCH SERVICES PROGRAM SSS Installation – Installation will be at Astrotech » Task is a payload support function; not a liability issue » Procedure (DCI) is written and in the review process » Date is under review: THEMIS requests the week of 18 Dec, but Boeing may not be ready until after the 3rd of Jan. See schedule • • Later date needs real time coordination in parallel with THEMIS fueling activities in the HPF The SSS installation is planned for a separate bay so that mechanical operations will be deconflicted THEMIS Upperstage Processing THE DELTA PROGRAM John F.NOVEMBER Kennedy Space Center 20 27 Level 6 Schedule 2006 4 DECEMBER 18 11 25 Date 22 November 2006 Rev: 27 now 2007 JANUARY 1 8 LAUNCH SERVICES PROGRAM 15 LPD Pulls G200, G201, G202, G203 Motor Dome Clean Check - (FACD) - (DCI: TBD) Equipment Transfer & Data Station Preps & Quals - (G200 T1) PAF Receiving & Mech Preps in Airlock - (G200 T1) PAF Elec Equipment Installation - (G200 T2) PAF Telemetry Preps - (G200 T3) Motor Offload & Leak Check/Transfer - (G202 T1) PAF Telemetry Test - (G200 T3) Spintable Mechanical and Electrical Preps - (G201 T1) Motor Bracket & Standoff Installation - (G203 T1) PAF NCS Checks - (G200 T4) PAF NCS N2H4 Load Preps - (G200 T5) PAF NCS Test Securing - (G200 T4) Spacecraft Probe Carrier - Available PAF NCS N2H4 Load - (G200 T5) PAF/Spacecraft SBS Test Preps - (G200 T3) - (DCI: 1) NCS Vehicle N2H4 Load Securing - (G200 T5) PAF Mate Preps - (G203 T1) Receive and Inspect SSS Ordnance PAF Mate to Motor - (G203 T1) PAF/Spacecraft SBS Test - (G200 T3) - (DCI: 1) PAF/Spacecraft SBS Test Securing - (G200 T3) - (DCI: 1) Wire Harness Routing & Inst'l - (G203 T1) PAF/Motor Rec'v & Ord Inst'l - (G203 T2) Spintable Ordnance Inst'l - (G207 T1) SSS Ordnance Installation TM Antenna Build - (G203 T1) Yo Weight Inst'l - (G203 T1) 22-NOV-06 15:35 [Delta Schedules - Publish]/CII_THEMIS_US_now Page 1 of 2 THEMIS Upperstage Processing THE DELTA PROGRAM Level 6 Schedule Date 22 November 2006 Rev: 27 now 2007 JANUARY FEBRUARY John F. Kennedy Space Center 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31LAUNCH 1 2 SERVICES 3 4 5PROGRAM 6 7 8 TM Antenna Inst'l - (G203 T2) 9 10 11 NCS & ETA Blanket Inst'l - (G203 T2) Motor Buildup Securing - (G203 T1) Motor Weigh - (G203 T3) Spin Balance Preps/Adapter Balance - (G204 T1) Transfer Motor to DPF & Align SBM - (G204 T2) Balance PAM - (G204 T2) Preps for Motor Mate - (G205 T1) Clampband Inst'l - (G205 T2) Motor Transfer to NPF/ Mate to Spintable - (G205 T1) Clampband Finaling - (G205 T2) Composite Electrical Preps - (G206 T1) Third Stage Ignition S&A/Delivery/Installation - (G205 T2) Composite Electrical Testing - (G206 T1) Composite Electrical Test Securing - (G206 T1) Spintable Ordnance Finaling - (G207 T1) Transport Canister Preps - (G209 T3) Third Stage/Spacecraft Mate Preps - (G208 T2) Spacecraft Weigh Preps (Astrotech) - (G208 T1) Third Stage Close-out - (G207 T1) Transfer Third Stage to Astrotech - (G208 T3) Spacecraft Weigh - (G208 T1) Spacecraft Mate/Clampband Inst'l/Tensioning - (G208 T2) Spacecraft Clampband Finaling - (G208 T2) Spacecraft Finaling - (Spacecraft Ops) Engineering Walkdown - (G209 T1) Third Stage & Spacecraft Can-up & Transport Preps - (G209 T1) Third Stage & Spacecraft Transport to Pad - (G209 T1) 22-NOV-06 15:35 [Delta Schedules - Publish]/CII_THEMIS_US_now Page 2 of 2 John F. Kennedy Space Center LAUNCH SERVICES PROGRAM KSC Fueling Team Status for THEMIS Presented to: THEMIS Pre-Ship GOR By: Chuck Davis Fueling Team Lead, TA-E3 November 29, 2006 KSC KSC Fueling Team Status John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Procedures: – THEMIS-specific deviations to OMI’s E5534 & E5502 are complete & under final review prior to obtaining signatures – OMI E5535 off-load procedure & pre-planned THEMIS-specific deviations will be available if required • • • • ICD “Appx. C” is complete MSPSP - Fueling GSE portion is complete All GSE will be in-calibration at the time of use Schedule: – Mobilize to Astrotech and set up GSE week of Dec 11 – Connect to spacecraft ~ Jan 3 – Prop load Jan 4 • Prop Loading Team is GO for THEMIS shipment John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Range Status on Required Deliverables & Procedures J. Wethern/45SW Range & Deliverables Status John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • MSPSP RELEASED & APPROVED • All required deliverables are up to date • PC handling procedure & Side by Side test are in review – All hazardous procedures in the NPF require Range Safety approval John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Astrotech Readiness / Issues Gerard Gleeson / ASO FL Mission Specific Items John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Item 1005 Phone installation in Control Room – to be performed after arrival, units available • Item 1030 Training and Badging - to be performed after arrival • Item 1101 SCAPE Suits – to be delivered as required prior to loading operations • Item 1180 Training for Cranes and Forklifts - to be performed after arrival • Item 4000 LAN configuration – to be completed on arrival – infrastructure is ready • Item 4110 IONet configuration – to be completed on arrival – infrastructure is ready • Item 4500 Voice Stations - to be installed after arrival, units available • Documentation • UCB Procedures received and reviewed, Comments sent to UCB • No major issues associated with Themis processing at Astrotech • Deliverables • All deliverables on site and ready for use, certificates presented in Data package as required Astrotech is ready to receive THEMIS ASO Occupancy John F. Kennedy Space Center LAUNCH SERVICES PROGRAM 2006 Projected Occupancy Plan ASO Revision date: 11-20-06 Month Start of Week Monday January 2 9 16 Atlas February 23 30 6 13 M arch 20 27 6 13 20 Delta April 27 3 10 17 M ay 24 1 8 15 ASO June 22 29 5 12 July 19 26 3 10 17 August 24 31 Main Conf. Room 7 14 21 28 Sept ember 4 11 18 Oct ober 25 2 9 16 23 30 November 6 13 20 27 December 4 11 18 January 25 1 8 15 February 22 ST P - AV5 4 BC/DL CONT INGENCY A High Bay A Control Room Astra-AV4 A Office B High Bay ST P - AV5 4 BC/DL B Control Room B Office C High Bay T hemis - D2 GG/RF C Control Room P P F C Office Stereo D High Bay ASO Laminar Flow D Control Room GOES- N D Office D Conf Room Downstairs Stereo - D2 GG/DL - VS GOES- N E Control Room E Office E Conf Room Upstairs F Office Quad 1 F Office Quad 2 GOES- N (Opt 1) ASO Mod Astra-AV4 Stereo F Office Quad 3 F Office Quad 4 S Encap Bay S High Bay H P F Spin Bay D2 & Stereo D2 D2-T S D2 & Stereo N Encap Bay Th T hemis & D2 N High Bay 5 12 19 John F. Kennedy Space Center LAUNCH SERVICES PROGRAM THEMIS Badging & Training Kathy Kerr / Analex KSC KSC Badging & Training Status John F. Kennedy Space Center • LAUNCH SERVICES PROGRAM SLC-17 Badging & Training – 41 THEMIS personnel identified for unescorted access to SLC-17 » 36 have good NAC/PRP; 5 are In Process – 5 THEMIS personnel identified for SCAPE operations. » 4 have completed SCAPE training; 1 person remaining • Open items: – Required training: ELSA, CCAFS Safety and SLC-17 walk downs to be scheduled post spacecraft arrival. – Schedule SCAPE training for one remaining person – AF Form 2856s have been completed and submitted to me. They will be submitted to Pass & ID about 1 month prior to required pad access. – Air Force Badging once prerequisites have been completed. • Launch Site Planning Readiness Statement: – Plans are in place to complete remaining open items. – KSC Badging & Training is ready for THEMIS flight hardware arrival. John F. Kennedy Space Center LAUNCH SERVICES PROGRAM NASA / KSC Safety Readiness for THEMIS Chuck Loftin System Safety Engineer KSC Safety & Mission Assurance Launch Services Division 29 November 2006 Safety Documentation Status John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • MSPSP - Final MSPSP approved 2 Nov 06 • S/C Processing - Ground Processing Approval letter provided prior to THEMIS Delta GOR • Procedures - Integrated and Contingency Procedures under review Readiness Statement John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • NASA/KSC Safety and Mission Assurance, Launch Services Division has assessed the readiness of the THEMIS spacecraft for NASA at Astrotech, and has no constraints to the arrival of the Spacecraft. - Any open items or issues are being tracked via the Verification Tracking Log (VTL). John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Telemetry and Communications Status / Readiness Marty Lougheed / NASA KSC TELEMETRY & COMMUNICATIONS READINESS John F. Kennedy Space Center LAUNCH SERVICES PROGRAM NASA Communications has had no change in our position since the THEMIS GOR …………… we are "GO" for the THEMIS 11 Dec arrival. John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Status of Launch Site Procedures Rick Sterling Themis I & T Manager Launch Site Procedures John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Following charts show status, where used and whether hazardous. THEMIS I&T: LAUNCH SITE PLANS AND PROCEDURES PLANS thm-sys-002 thm-sys-046 thm-sys-047 thm-sys-052 PROCEDURES thm-mint-proc-010 thm-mint-proc-011 thm-mint-proc-013 thm-mint-proc-014 thm-mint-proc-015 thm-mint-proc-019 thm-mint-proc-032 thm-mint-proc-034 thm-mint-proc-051 thm-mint-proc-053 thm-mint-proc-054 thm-mint-proc-055 thm-mint-proc-062 thm-mint-proc-063 thm-mint-proc-065 THEMIS THEMIS THEMIS THEMIS Magnetics Contamination Control Plan Probe Shipping Plan Launch Site Test Plan Launch Site Contamination Control Plan Status Complete Complete Complete Complete Complete THEMIS Probe Power On/Off Procedure Complete THEMIS Probe Umbilical Safe-to-Mate Complete THEMIS Probe LPT Procedure Complete THEMIS Probe AT Procedure Complete THEMIS Probe Handling Procedure Complete THEMIS Probe Solar Array Illumination Procedure Complete THEMIS Instrument LPT Procedure Complete THEMIS Instrument AT Procedure Complete \THEMIS Probe Fueling Procedure (KSC Proc) Complete THEMIS Probe Pre-Launch Closeout Procedure Complete THEMIS Probe Battery Ops Procedure Complete THEMIS Probe RCS Pressure Test and Leak Check Complete THEMIS PCA LV Mate Procedure Complete THEMIS PCA Electrical Test Procedure House) Complete THEMIS PCA Launch Tower Electrical Test Procedure (at Block ASO YES YES YES YES PAD YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES HAZ HAZ HAZ HAZ YES HAZ HAZ YES Launch Site Procedures John F. Kennedy Space Center LAUNCH SERVICES PROGRAM To download procedures or see more detailed listing including author, revision number, etc: ftp://apollo.ssl.berkeley.edu/pub/THEMIS/2 Space Segment/2.2 Spacecraft/2.2.7 Launch Site Processing/2.2.7.1 Launch Vehicle Integration thm-mint-proc-066 thm-mint-proc-067 thm-mint-proc-068 thm-mint-proc-069 thm-mint-proc-070 thm-mint-proc-071 thm-mint-proc-073 thm-mint-proc-077 thm-mint-proc-076 thm-mint-proc-077 thm-mint-proc-086 thm-mint-proc-105 thm-mint-proc-106 thm-mint-proc-107 thm-mint-proc-120 thm-mint-proc-122 thm-mint-proc-125 thm-mint-proc-126 thm-mint-proc-128 thm-mint-proc-132 thm-mint-proc-141 thm-sai-proc1668 THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS THEMIS PCA Pre Launch Closeout Proc Complete YES PCA Spin Balance Procedure Complete YES PCA Lifting and Handling Procedure Complete YES PCA Assembly Procedure Complete YES PCA Separation System Test Procedure Complete YES PCA Purge Bag Installation and Removal Complete YES PCA EGSE Safe-to-Mate Complete YES Probe Simulator to Blockhouse EGSE Verification Check-Out In Progress Procedure PCA to USPP Safe-to-Mate In Progress YES PCA Launch Countdown Complete YES RF Chirp Test In Progress YES Simulated Pyro Test Procedure Complete YES Battery Trending Test Procedure Complete YES PPMU Safe-to-Mate Procedure Complete YES Facility and MGSE Magnetic Test Procedures Complete YES ESA/SST Purge Hookup Procedure Complete YES Probe ESC Closeout Procedure Complete YES Magnetic Screening and Degaussing Procedure Complete YES Handling of Pyrotechnic Devices Complete YES EGSE RACKS Moving Procedure Complete YES Separation System Stow Procedure Complete YES Side by Side Test Complete YES YES HAZ HAZ HAZ HAZ YES YES YES YES HAZ YES HAZ YES YES HAZ HAZ HAZ John F. Kennedy Space Center LAUNCH SERVICES PROGRAM Launch Site Readiness Poll William Van Dyke / NASA KSC John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Launch Site Readiness Poll (Go/No Go) – THEMIS Project Peter Harvey – NASA KSC Public Affairs George Diller – Boeing Delta Mission Integration Vic Segall – Astrotech Mission Management Gerard Gleeson – NASA LS Telemetry & Communicaitons Marty Lougheed – NASA KSC Safety Chuck Loftin – NASA MM Garrett Skrobot – NASA LS Launch Site Integration William Van Dyke – NASA LS Launch Site Integration Branch Frank Stone