- Viet Nam Discovery

advertisement
QUANG NINH PROVINCIAL PEOPLE’S COMMITTEE
QUANG NINH INVESTMENT AND PROMOTION AGENCY
LIST OF PROJECTS CALLED FOR INVESTMENT IN QUANG NINH PROVINCE
PERIOD 2015-2020 AND ORIENTATION TO 2030
(Issued together with Decision No 1315/QĐ-UBND dated 19 May 2015 of Quang Ninh Provincial People’s Committee)
No
NAME OF
PROJECT
LOCATION
TECHNICAL SPECIFICATION
(OBJECTIVES, PROJECT SCALE)
ESTIMATED TOTAL
INVESTMENT
CAPITAL
FORM OF
INVESTME
NT
CONTACT
UNIT
Around 7,000 billion dong
(~333 million USD)
PPP, ODA
Department
of Transport
Around 12,600 billion
dong
(~600 million USD)
PPP, ODA
Department
of Transport
VND 1,000 billion
(USD 47 million)
PPP,BOT,
ODA
Department
of Transport
VND 1,000 billion
(USD 47 million)
PPP,BOT,
ODA
Department
of Transport
I. TRANSPORT SECTOR (12 Projects)
1
Van Don – Tien Yen
Highway (including
Van Tien bridge)
Van Don, Tien
Yen
- Build a highway standard A including 4-6 lanes,
with allowed speed of 80-120 km/h.
- Total route length is around 32.0 km.
2
Tien Yen – Mong Cai
Highway
Tien Yen, Mong
Cai
- Build a highway standard A including 4-6 lanes,
with allowed speed of 80-120 km/h.
- Total route length is around 57.2 km.
3
Mui Chua Port
4
Van Gia Port
Tien Yen district
Mong Cai city
- Area: 5,5 ha.
- To 2020: Capacity reaches 500,000 tones/year, the
number of berth/length is 02 berths/200 metre,
handling vessels of 1,000-3,000 DWT.
- Investment to upgrade and increase the port’s
capacity to 1 million tones per year by 2020. The
investor can research and propose investment
1
appropriate with the demand.
5
6
7
Hon Gai Tourist Port
Halong city
- Investment on building a tourist port which can
handle domestic passenger ship from North to South
and international passenger ship.
- A quay with length of 280m, width of 28m, capable
to handle cruise ship with loading capicity of 70,000
GRT.
- Dredging, building buoy, terminal station of 16000
m2, purchasing specialized equipments and other
ancillary works.
- The scale to 2020 is: handling cruise ship with
loading capacity of 100,000 GRT and 950 thousands
passengers/year.
Traffic roads and
parking lots in Hoanh
Mo and Dong Van
border gates
- Dong Mo
commune, Dong
Van commune,
Binh Lieu
District – At the
right site of
National road
18C at Km 48
+150 in Dong
Mo Village,
Hoanh Mo
commune, Binh
Lieu District
- Hoanh Mo Parking area:
+ Total area: 4.03 hectare; Capacity: 135 cars;
Container parking area: 2,6 hectare.
+ Road: designing a road connecting National road
18C with the parking area (do not build an access
path).
- Dong Van Parking area:
+ Total area of land use: 2.82 hectare; Capacity: 110
cars; Container parking area: 2.3 hectare.
+ Road: L=558.3m.
+ Road of standard of grade III Highland, speed of 60
km/h
Noi Bai – Ha Long
Highway
Dong Trieu,
Uong Bi, Ha
Long
- Standard A Highway
- Total route length: L = 55km
- Scale: 4 lanes
- Designed speed: 100 – 120 Km/h
2
VND 320 billion
(USD 15 million)
PPP,BOT,
ODA
Department
of Transport
VND 100 billion
(USD 5 million)
PPP,BOT
Binh Lieu
District
12,128 billion dong
(~577 million USD)
PPP
Department
of Transport
8
9
10
Main route linking
the function zones
and
Van
Don
economical
zone
(period 2)
Main route in Cai
Rong urban area
center, Van Don
economic
zone,
Quang Ninh
Doan Ket
commune, Dai
Xuyen, Binh
Dan, Van Yen,
Van Don ward
Dong Xa
commune, Cai
Rong town, Ha
Long commune,
Van Don ward
Bac Cai Bau port
Northern, Cai
Bau island, Van
Don
11
Widen, renovate Cai
Rong port
12
Multifunctional port
project at Hon Mieu
and
Cai
Chien
islands, Hai Ha ward.
- Aim: link the function zones, Van Don economical
zone
- Length: 13 Km
- Scale: level II road.
Aim: improve traffic infrastructure in Cai Rong urban
area, length: 10Km
- Build a general port
- Research area: 700 ha
Construct at the
current location,
Cai Rong town,
Van Don ward
-
- Aim:
+ Widen, renovate Cai Rong port to the northeast,
southwest and southeast (to the sea); invest in
constructing infrastructure to improve imparting,
loading and mooring ability to become a general
port (guest, cargo, fish port).
+ Plan the southwest of the port to become a service
area serving for the port’s activities.
- Aim:
+ Implement the Decisions and documents of
Transportation Department, Vietnam Maritime
Hon Mieu island
Administration about the agreement on the
at Hai Ha sea
multifunctional port’s 1st period construction
port industrial
location at Hon Mieu and Cai Chien islands, Hai Ha
zone and Cai
ward, Quang Ninh province to directly serve for
Chien island, Hai
Mong Cai border gate economic zone and Hai Ha
Ha ward
sea port industrial zone combining exploiting
general port, containers that help to develop Quang
Ninh’s socio-economy.
3
650 billion dong
(~31 million USD)
PPP;
100%
investor’s
capital;
Joint-venture
QUEZA
1,100 billion dong
(~52 million USD)
PPP;
100%
investor’s
capital, JV
QUEZA
25,200 billion dong
(~1,200 million USD)
PPP;
100%
investor’s
capital, JV
QUEZA
412.942 billion dong
(~20 million USD)
PPP;
100%
investor’s
capital, JV
QUEZA
~6,500 billion dong
- 1st period: ~3,260 billion
dong
- 2nd period: ~3,240
billion dong
100%
investor’s
capital
QUEZA
-
-
-
+ Ensure consistent and long lasting development
between the sea port and the fairways, the port’s
infrastructure and the transportation infrastructure
connecting Hon Mieu and Cai Chien islands with
Mong cai border gate economic zone and Hai Ha
sea port industrial zone. Exploiting effectively the
potentials and advantages of the land and water’
surfaces. Organizing functional areas with modern
and synchronized infrastructure to ensure to meet
the requirements for both technical and social
ỉnfastructure. Protecting natural environment
heading to lasting development, creating a space,
architecture sight suitable with the plans of socioeconomic development and the area’s space
development.
- Feature: Being a part of Hai Ha sea port that directly
serves for Mong Cai border gate economic zone
combining with exploiting general goods serving for
Quang Ninh and the area’s socio-economic
development.
- Expected scale and investment’s progression: Total
area: 882.25 ha (Hon Mieu island: 490 ha; Cai
Chien island:380 ha)
II. TECHNICAL INFRASTRUCTURE IN INDUSTRIAL AND URBAN ZONES (10 Projects)
1
2
Non-tariff area - clean
industrial park at Van
Don Economic Zone.
Dam
Nha
Industrial
Services Zone
Mac
and
Binh Dan
commune, Cai
Bau Island, Van
Don District
Communes:
Phong Coc, Yen
Hai, Lien Vi,
Tien Phong;
Quang Yen
- Building a clean industrial zone with special free tax
policy (duty free) to promote advantages of an airport
(planned nearby), to stimulate and promote
investment in Van Don economic zone.
- Total area of land use: 250 – 500 hectare.
VND 27,300-31,500
billion
(USD 1.3 – 1.5 billion)
100%
investor’s
capital,
Joint-venture
QUEZA
- Total area of land use: 3170 hectare.
- Investment on building and operating the Industrial
zone and accompanying services. Industrial zone area
is 1500 hectare.
Around
VND
11,000 billion
(USD 530 million)
Base on the investment rate
100%
investor’s
capital,
Joint-venture
QUEZA
4
District.
regulated in Decision No.
439/QD-BXD dated 26
April 2013
3
Communes:
Xuan Son, Kim - Investment on building and operating the industrial
Quan Trieu Industrial
Son, Binh Khe in zone’s infrastructure
Zone
Dong Trieu
- Total area: 150 hectare
District
4
Viet Hung Industrial
Zone (Phase 2)
Viet Hung ward,
Ha Long City
Phuong
Nam
Industrial Zone
Phuong Nam and
- Investment on building and operating the industrial
Phuong Dong
zone’s infrastructure.
wards, Uong Bi
- Total area: 709.01 hectare including 459.64 hectare
City
of industrial area.
5
6
Tien Yen Industrial
zone (1st period)
Tien Yen
- Investment on building and operating the industrial
zone’s infrastructure and accompanying services.
- Total area: 130 hectare.
-Aim: Investment on building and operating the
industrial zone’s infrastructure and supporting service
area.
- Research area: 100 ha over the total area of 350 ha.
5
Around
VND 1,224 billion
(USD 58 million)
Base on the investment rate
regulated in Decision No.
439/QD-BXD dated 26
April 2013
Around
VND
1,000 billion
(USD 50 million)
Base on the investment rate
regulated in Decision No.
439/QD-BXD dated 26
April 2013
Around
VND 5,296 billion
(USD 251 million)
Base on the investment rate
regulated in Decision No.
439/QD-BXD dated 26
April 2013
8,000 billion dong
(~381 million USD)
100%
investor’s
capital,
JV
QUEZA
100%
investor’s
capital,
JV
QUEZA
100%
investor’s
capital,
JV
QUEZA
PPP;
100%
investor’s
capital, JV
Constructio
n
Department
7
Administration area
in Van Don economic
zone
8
Non-tariff
infrastructure
area’s
Van Don ward
-Aim: Build Van
Administration center;
- Total area: 23 ha
Don
Economic
zone’s
Hoanh Mo –
Dong Van
border gate
economic zone
Research area: 50.45 ha
Dong Mai
Industrial zone,
Quang Yen
Aim: Build manufacturing factories investing in:
mechanical manufacture, traffic facilities assembly;
construction
materials
manufacture,
interior
decoration; accurate mechanical manufacture and
assembly; agricultural products, food processing;
medical
equipment
manufacturing
industry;
electronic devices manufacture and assembly;
consumer goods manufacture; textile and other
industries.
9
Component projects
in
Dong
Mai
industrial zone
10
Cemetory park and
Hai Tien
Invest in building cemetory and crematorium serve
Km15 crematorium commune, Mong
for local residents’ needs.
construction
Cai city
619.931 billion dong
(~30 million USD)
PPP
QUEZA
440 billion dong
(~21 million USD)
PPP;
100%
investor’s
capital, JV
QUEZA
Proposed by investor
JV;
100%
investor’s
capital
QUEZA
Proposed by investor
100%
investor’s
capital
Mong Cai
III. CULTURE, TOURISM SERVICES AND TRADE (27 Projects)
1
Eco-tourism resort on
Phuong Hoang Island
Phuong Hoang
Island, Van Don
District
- Land-use area: 6,91 km2.
- Building an eco-tourism resort (beaches, villas,
hotels, marina in the eco-tourism resorts, etc)
- To diversify tourism products based on exploiting
the maximum advantage of the terrain and landscape
of the area, in accordance with the requirements of
economic development and environmental protection
of Bai Tu Long Bay landscape.
6
VND 5,250 billion
(USD 250 million)
PPP,100%
investor’s
capital,
JV
QUEZA
2
- Land-use area: 1.16 km2.
- Building an eco-tourism resort (beaches, villas,
hotels, marina in the eco-tourism resorts, etc). To
Eco-tourism resort on Nat Dat Island, diversify tourism products based on exploiting the
Nat Dat Island
Van Don District maximum advantage of the terrain and landscape of
the area, in accordance with the requirements of
economic development and environmental protection
of Bai Tu Long Bay landscape.
3
Yen Trung Lake
resort, Uong Bi City
4
5
6
7
Phuong Dong
Ward, Uong Bi
City
- Building an eco-tourism resort.
- Studying area: 472.8 ha
- Building an integrated complex with a golf course
and 5-star hotel which will become a typical highRecreation center
Ao Tien, Ha
standard entertainment centre to meet the needs of
4
complex (including
Long commune, tourists at home and abroad visiting Quang Ninh
Ao Tien Golf course) Van Don District province.
- Scale: land – use area of 300 hectare, 27-hole golf
course
Total area: ~380 ha, including 11 relics (temples,
fanes, piles site)and security area, tourism supporting
Battle of Bach Dang
Yen Giang ward, services promote the surrounding relics’ value.
historical
6
site
Quang Yen
- Security area I: 79.47 ha;
conservation and
commune
- Security area II: 114.78 ha;
promotion project
- Tourism supporting services and promoting relics’
value area: 167.75 ha
Hon Chin, Van
Build a group of hotels, resorts, entertainment center
High
6 class ecotourism
Yen commune,
with international standard.
complex
Van Don ward
Total area: ~28 ha
Soi Nhu island,
- Build a 5-star marine ecotourism site
Marine
7
ecotourism
Ha Long
- Total area: ~ 120 ha total area of the island (19 ha
site
commune, Van
for building all the categories, the remaining area is
Don ward
rocky mountains and forest).
7
VND 3,150 billion
(USD 150 million)
PPP,100%
investor’s
capital,
JV
QUEZA
Proposed by investor
PPP,100%
investor’s
capital,
JV
Uong Bi
City
Proposed by investor
PPP,100%
investor’s
capital,JV
IPA
446.5 billion dong
PPP
Quang Yen
People
Commitee
2,500 billion dong
100%
investor’s
capital
QUEZA
637 billion dong
(30 million USD)
100%
investor’s
capital
QUEZA
8
9
10
11
12
Golf course,
ecotourism site on
8
Minh Chau – Quan
Lan island, Van Don
economic zone
Minh Chau
commune, Quan
Lan commune,
Van Don
Component projects
in Ben Doan high standard
9
service area
plan (from Bai Tho 1
bridge to old Bai
Chay ferry)
Hong Gai ward,
Ha Long ciry
Component projects
1
in Ha Long Xanh
urban complexplan
Quang Yen
commune, Ha
Long city
Component projects
1
in Hoang Tan island
ecotourism site
Hoang Tan
commune,
Quang Yen
commune
Ecotourism
1
resort site
on west Co To beach
Western, Co To
island district
- Aim: Build golf course , marine ecotourism site,
3,4,5,6-star hotels, completed supporting
constructions.
- Expected area: ~452 ha
-Being a high-standard service area which was
invested synchronously as a mixed multistoried
construction system with international general
hospital, creating a high-class and synchronized
service and business center; being the focal point and
utmost important feature in Ha Long city.
- Total research area: 683,500m2; including: planned
area of water surface: 253,198m2; planned area of
land: 430,302m2
- Make Ha Long become a developing center of the
province, take services and culture development as
focal point and convert the development method from
“brown” to “green”; be a green tourism city, civilized
and modern international sea port.
- Total research area: ~8,449.1 ha (land: 5,182.1 ha;
water surface: 3,267 ha)
-Build a standard urban area, ecotourism site with
clean and green environment that meets the
development criteria in the future, become an
international standard urban and ecotourism area.
- Total area: ~328.6 ha
-Build an ecotourism site (beach, villas, hotels,
marina habor...); diversify the tourism products on the
basis of exploiting thoroughly the geographical
advantages and the landscapes of the area, fit with the
requirements for Co To island’s economic
development and environment protection.
- Research area: 15 ha
8
3,500 billion dong
100%
investor’s
capital
Proposed by investor
PPP,100%
investor’s
capital, JV
IPA
Proposed by investor
PPP,100%
investor’s
capital, JV
IPA
Proposed by investor
PPP,100%
investor’s
capital, JV
IPA
300 billion dong
(~14 million USD)
PPP,100%
investor’s
capital, JV
Constructio
n
department
QUEZA
13
Ecotourism
1
resort site
on north Co To beach
Northern, Co To
island district
14
Cai
1 Chien tourism
site, Hai Ha ward
Cai Chien, Hai
Ha ward
-Build an ecotourism site (beach, villas, hotels,
marina habor...); diversify the tourism products on the
basis of exploiting thoroughly the geographical
advantages and the landscapes of the area, fit with the
requirements for Co To island’s economic
development and environment protection.
- Research area: 15 ha
- Build infrastructure for the tourism site, service
constructions inside the site.
- Research area: 380 ha
15
Tra
1 Co tourist spot,
Mong Cai city
Tra Co, Mong
Cai city
- Build infrastructure for the tourism site, service
constructions inside the site.
- Research area: 280 ha
5,600 billion dong
(~267 million USD)
PPP,100%
investor’s
capital, JV
Constructio
n
department
- Build infrastructure for the tourism site, service
constructions inside the site.
- Research area: 40 ha
800 billion dong
(~38 million USD)
PPP,100%
investor’s
capital, JV
Constructio
n
department
Hoanh Mo –
Dong Van
border gate
economic zone
Hung
Thang
Golf
1 course on Hung
Ward, Ha Long
Thang Hill
City
Le
Loi
1
commune,
An Bien Golf course
Hoanh
Bo
District
An
Sinh
1
Khe Che Golf course commune, Dong
Trieu District
- Build infrastructure for the tourism site, service
constructions inside the site.
- Research area: 48.15 ha
800 billion dong
(~38 million USD)
PPP,100%
investor’s
capital, JV
QUEZA
Proposed by investor
PPP,100%
investor’s
capital, JV
IPA
- Studied area: 100 hectare
- Building a 18-hole golf course
Proposed by investor
PPP,100%
investor’s
capital, JV
IPA
- Studied area: 100 hectare
- Building a 27-hole golf course
Proposed by investor
PPP,100%
investor’s
capital, JV
IPA
Road
* The part from the 18 National Road to Suoi Tam
16
17
18
19
20
21
Tourism site (walking
1
exploration) in Binh
Lieu ward
Binh Lieu ward
Cao
1 Ba Lanh tourism
site
and
services
Phuong Dong
- Studied area: 173 hectare
- Building a 36-hole Golf course
9
340 billion dong
(~16 million USD)
PPP,100%
investor’s
capital, JV
Constructio
n
department
7,600 billion dong
(~362 million USD)
PPP,100%
investor’s
capital, JV
Constructio
n
department
Proposed by investor
PPP,100%
Uong Bi
system on two road
sides to Yen Tu relic
site.
22
23
24
International
exhibition centre in
Mong Cai City
Ha Long Financial
service centre
Northeast sports
center
Ward, Uong Bi
City
Mong Cai City
Hung Thang
Ward, Ha Long
City
Dai Yen ward,
Ha Long – The
east is adjacent
to village 2
residential, Dai
Yen commune;
The west is
adjacent to Hot
river; the north is
adjacent to
Route 18
investor’s
capital,
JV
pagoda:
L=3Km;
cross
section:
3m+7.5m+3m+7.5m+3m=24m.
The start point of the road is at the interjunction point
between the National road No 18 with the current
road going to the historic site of Yen Tu, the end
point of the road nears Suoi Tam pagoda.
* The part from Suoi Tam pagoda to Giai Oan busstop: have not been approved.
* Land – use area for services along the roadsides:
166.7 hectare
- Land – use area: 5 hectare
- Building a typical Financial services centre in Ha
Long City.
- Land – use area: 10 hectare, 12 – 25 storeys,
construction density 24-40%
- The land is under the management of Halong
investment and production development company.
Infrastructure has been relatively fully put in place
and uniform with convenient transportation.
-Build an area wide sports center in the northeast with
total research area of 2,426,187 m2, including:
A 5000-seat versatile stadium; 30,000-seat stadium;
water sports area; center square; tennis court;
rehabilitation area; practicing area, athletes’
dormitary; exhibition center, museum...
-Aim: serve for national and international
competitions practicing.
10
City
VND 4,200 billion
(USD 200 million)
PPP,100%
investor’s
capital,
JV
Mong Cai
City
Proposed by investor
PPP,100%
investor’s
capital,
JV
Ha Long
City
PPP
Culture and
sports
works
investment
managemen
t board
8,000 billion dong
(~381 million USD)
25
Renovating
oldapartment
blocks
number 5,6,7,8 in
Tran Hung Dao ward
26
30 floor apartment
block combined with
shopping
center,
offices for rent
Tran Hung Dao
ward, Ha Long
city
27
Ha Long star golf
course
Hong Ha ward,
Ha Long city
Tran Hung Dao
Ward, Ha Long
City
Building new modern and high-rise buildings, using
for public housing and mixed services, to create the
highlight for the urban landscape.
-Build a superior and modern multifunctional
building (30 floor apartment block combined with
shopping center and offices for rent) which is
synchronized in infrastructure to create a standing out
feature in the area’s space;
-Total area: ~4,378.6 m2
-Research area:~310 ha, including 3 functional sites:
+ 27-hole golf course and supporting services area
(85ha);
+ High standard villas (30 ha);
+ Landscape forest park (185 ha)
Proposed by investor
PPP,100%
investor’s
capital,
JV
IPA
Proposed by investor
PPP,100%
investor’s
capital,
JV
IPA
Proposed by investor
100%
investor’s
capital
IPA
PPP,100%
investor’s
capital,
JV
Department
of Health
PPP,100%
investor’s
capital,
JV
Department
of Health
PPP,100%
investor’s
capital,
Department
of Health
IV. ECUDATION, TRAINING AND HEALTH CARE (07 Projects)
1
Ha Long international
hospital
Dai Yen Ward,
Ha Long City
2
Van
Don
International hospital
Dong Xa
commune, Van
Don District
3
Mong
Cai
International hospital
Ninh Duong
Ward,
Mong Cai City
Approx:
- Scale: 300 - 500 beds.
VND 420-676 billion
+ Stage 1 (2014-2020): 300 beds.
(USD 20-32 million)
+ Stage 2 (2020-2030): develop to 500 beds.
Base on the investment rate
- Area: 12 hectare. Located next to National road regulated in decision No.
No.18, overlooking Halong Bay.
439/QĐ-BXD dated 26th
April 2013
Approx VND 420-676
billion
- Scale: 300 - 500 beds.
(USD 20-32 million)
+ Stage 1 (2014-2020): 300 beds.
Base on the investment rate
+ Stage 2 (2020-2030): develop to 500 beds
regulated in decision No.
- Area: 7 hectare.
439/QĐ-BXD dated 26th
April 2013
- Scale: 200 – 400 beds.
Approx
+ Stage 1 (2014-2020): 200 beds.
VND 280-540 billion
+ Stage 2 (2020-2030): develop to 400 beds.
(Approx
11
- Area: 3.36 hectares
4
5
6
7
Cam Pha
hospital
private
Cam Pha city
USD 14-26 million)
Base on the investment rate
regulated in decision No.
439/QĐ-BXD dated 26th
April 2013
Scale: 150 beds
Proposed by investor
JV
100%
investor’s
capital; JV
Approx:
- Enrollment scale: 1,500 students per year; training
VND
vocation at 3 levels: college, secondary and
217 billion
elementary in the fields of: Tourism - Hotel PPP,100%
(Approx
Zone 6, Hai Yen Entertainment, Agriculture - Forestry - Fishery, High
investor’s
Mong Cai Vocational
Ward, Mong Cai quality commercial and financial services,
USD 10 million)
capital,
college
City
Technology, Construction, Economy - Information Base on the investment rate
JV
technology - Language. Training scale: 2,500 - 3,000 regulated in decision No.
students; teaching staff of about 150 teachers
439/QĐ-BXD dated 26th
- Land-use area: 12-15 hectares
April 2013
Approx:
VND 539-1.310 billion
PPP,100%
- Enrollment scale: 4,000-10,000 students per year.
(USD 26-62 million)
investor’s
Ha Long University Nam Khe Ward, Traning levels: Bachelor, College and Professional
Base on the investment rate
capital,
(Phase 2)
Uong Bi City
secondary.
regulated in decision No.
- Land-use area: 49.2 hectares
JV
439/QĐ-BXD dated 26th
April 2013
Mong
Cai
PPP,100%
-Total area: 50ha
185 billion dong
international
Mong Cai city
investor’s
-Standard: international standard university
(~9 million USD)
university
capital, JV
Department
of Health
Department
of Labour,
invalids and
social
affairs
Department
of Training
and
education
Constructio
n
department
V. ENVIRONMENT (06 Projects).
1
1. Total area about 10 hectares
Projected in
2. Estimated consumption capacity: 150.000-180.000
Waste treatment plant
Zone 7, Quang
tones of waste/ year.
for Ha Long City,
Hanh ward, Cam
Hoanh Bo District,
3. Estimated electric production capacity: about
Pha City
Cam Pha City
50,000MWh electricity/year.
(Treat domestic and industrial waste for the areas of
12
VND
1,260-1,302 billion (USD
60-62 million)
PPP, BOT
Department
of Natural
resources
and
Environmen
t
Ha Long City, Hoanh Bo District and Cam Pha City)
2
Sewage
treatment
system for the cities
of Ha Long, Cam
Pha, Uong Bi and
Van Don District.
Cities of Ha
Long, Cam Pha,
Uong Bi and
Van Don District
1. In Ha Long city: 01 station with capacity of 22,000
cubic metre per day and pump station with capacity
of 15 cubic metre per minute; 01 station with capacity
of 31, 000 cubic metre per day; Building collecting
and drainage pipe lines.
2. In Cam Pha city: 02 stations with capacity of
34.000 cubic metre per day and 29,000 cubic metre
per day; Building collecting and drainage pipe lines.
3. In Uong Bi city: capacity: 52,000 cubic metre per
day, Building collecting and drainage pipe lines.
4. In Van Don: 02 stations with capacity of 30,000
cubic metre per day and 31,000 cubic metre per day;
Building collecting and drainage pipe lines.
3
Sewage treatment in
Hai Ha ward
Hai Ha ward
Build a focused sewage treatment system in Hai Ha
ward with capacity of 3,000m3/day and a 19km long
collecting pipeline.
4
Construction
sand
processing
projects
from stone shreds in
Rhyolite
rocks,
gritstone processing; The East and
gravels in the East coal producing
and
gritstone, regions
conglomerate
in
waste rocks from the
coal mines in Quang
Ninh.
To exploit thoroughly, utilize efficiently and
effectively the natural resources in association with
protecting the environment, encouraging thorough
processing to produce new products with high value
that meet both domestic needs and exportation to
create added value for the minerals.
13
Proposed by Investor
2,741 billion dong
(129 million USD)
Proposed by investor
PPP, BOT
Department
of Natural
resources
and
Environmen
t
PPP
Department
of Natural
resources
and
Environmen
t
100%
investor’s
capital
Department
of Natural
resources
and
Environmen
t
5
Khe
Cat
waterworks
lake
6
Khe
Tau
waterworks
lake
Hai
Lang Capacity of 3,000m3/day
commune, Tien
Yen
50 billion dong
Dong
Ngu Capacity of 3,000m3/day
commune, Tien
Yen
40 billion dong
PPP,100%
investor’s
capital,
JV
PPP,100%
investor’s
capital,
JV
Tien Yen
Tien Yen
VI. AGRICULTURE (08 Projects).
Total area: 914,976 square metres including:
- Administration centre area: 46,634 square metres;
- Production area called for investment: 720,071
square metres;
- Land area for technical infrastructure and
communication for production: 148,271 square
metres;
(public technical infrastructure will be invested by the
State)
- Aim: To make the breeding industry in the province
become the main production sector, contributing to
the economic restructuring in agriculture towards
industrialization and modernization.
- Scale: 150ha (including recovered area of JSC Tea
Orient 80 ha; 70 ha of land clearance)
1
Secondary projects in
Hightech Agriculture
Park
Hong Thai Tay
commune, Dong
Trieu district
2
Investment
in
construction
of
focused
breeding
development center
Quang Phong
commune, Hai
Ha ward
3
Dairy cows breeding
and milk processing
project
Quang Son
commune, Hai
Ha ward
Breed 3,000 dairy cows and build a milk processing
factory
4
Develop the raw
materials region and
premium
exporting
tea factory
Hai Ha ward,
Dam Ha
- Aim: Construct a tea material region with highquality breds suitable to gradually replace old area
with low capacity and quality tea. Build a modern
processing plant with a capacity of 8,000-10,000 tons
of fresh buds / year
- Scale: Current tea area of 1,200 ha and reach 1,500
14
Proposed by Investor
PPP,100%
investor’s
capital,
JV
People’s
Committee
of Dong
Trieu
District
450 billion dong
(~21 million USD)
100%
investor’s
capital
Hai Ha
100 billion dong
(~5 million USD)
100%
investor’s
capital
Hai Ha
Proposed by investor
PPP,100%
investor’s
capital, JV
Agriculture
and rural
developmen
t department
ha in 2020
Component projects
in focused mollusc
production area
Van Yen
commune, Van
Don ward
-Aim: Construct a focused mollusc production area to
attract investors to build mollusc hatcheries and nondisease, high quality mollusc nursery areas, provide
for farming areas in. Quang Ninh and the Northern
coastal provinces.
-Scale: total area of 300ha, including water surface
area of 292.4ha and land area of 7.6ha
6
Focused cattle and
poultry breeding farm
project
Dong Tam
village, Duc Yen
commune and
Dong Ha Tan
Lap and Son
Hai, Dam Ha
ward
-Total area in Dong Tam village, Duc Yen commune:
29.07ha
-Total area in Dong Ha Tan Lap and Son Hai: 28.79
ha
7
Hightech
seafood
processing
line
constructing project
Co To town
8
Breeding
and
processing
peanut
worms project
Quang Minh
commune, Hai
Ha
5
Proposed by investor
PPP,100%
investor’s
capital, JV
Agriculture
and rural
developmen
t department
82 billion dong
PPP,100%
investor’s
capital, JV
Dam Ha
ward
-Processing high quality seafood products to improve
the economic performance.
-Scale: 30,000tons/year
120 billion dong
100%
investor’s
capital
Co To
-Forming a focused breeding farm
-Scale: 300 ha
30 billion dong
100%
investor’s
capital
Hai Ha
The number of project called for investment : 70 projects of 6 sectors:
- Transport: 12 projects.
- Technical infrastructure in industrial and urban zones: 10 projects.
- Culture, tourism services and trade: 27 projects.
- Ecudation, training and healthcare: 7 projects.
- Environment: 6 projects.
- Agriculture: 8 projects.
15
Download