QUANG NINH PROVINCIAL PEOPLE’S COMMITTEE QUANG NINH INVESTMENT AND PROMOTION AGENCY LIST OF PROJECTS CALLED FOR INVESTMENT IN QUANG NINH PROVINCE PERIOD 2015-2020 AND ORIENTATION TO 2030 (Issued together with Decision No 1315/QĐ-UBND dated 19 May 2015 of Quang Ninh Provincial People’s Committee) No NAME OF PROJECT LOCATION TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE) ESTIMATED TOTAL INVESTMENT CAPITAL FORM OF INVESTME NT CONTACT UNIT Around 7,000 billion dong (~333 million USD) PPP, ODA Department of Transport Around 12,600 billion dong (~600 million USD) PPP, ODA Department of Transport VND 1,000 billion (USD 47 million) PPP,BOT, ODA Department of Transport VND 1,000 billion (USD 47 million) PPP,BOT, ODA Department of Transport I. TRANSPORT SECTOR (12 Projects) 1 Van Don – Tien Yen Highway (including Van Tien bridge) Van Don, Tien Yen - Build a highway standard A including 4-6 lanes, with allowed speed of 80-120 km/h. - Total route length is around 32.0 km. 2 Tien Yen – Mong Cai Highway Tien Yen, Mong Cai - Build a highway standard A including 4-6 lanes, with allowed speed of 80-120 km/h. - Total route length is around 57.2 km. 3 Mui Chua Port 4 Van Gia Port Tien Yen district Mong Cai city - Area: 5,5 ha. - To 2020: Capacity reaches 500,000 tones/year, the number of berth/length is 02 berths/200 metre, handling vessels of 1,000-3,000 DWT. - Investment to upgrade and increase the port’s capacity to 1 million tones per year by 2020. The investor can research and propose investment 1 appropriate with the demand. 5 6 7 Hon Gai Tourist Port Halong city - Investment on building a tourist port which can handle domestic passenger ship from North to South and international passenger ship. - A quay with length of 280m, width of 28m, capable to handle cruise ship with loading capicity of 70,000 GRT. - Dredging, building buoy, terminal station of 16000 m2, purchasing specialized equipments and other ancillary works. - The scale to 2020 is: handling cruise ship with loading capacity of 100,000 GRT and 950 thousands passengers/year. Traffic roads and parking lots in Hoanh Mo and Dong Van border gates - Dong Mo commune, Dong Van commune, Binh Lieu District – At the right site of National road 18C at Km 48 +150 in Dong Mo Village, Hoanh Mo commune, Binh Lieu District - Hoanh Mo Parking area: + Total area: 4.03 hectare; Capacity: 135 cars; Container parking area: 2,6 hectare. + Road: designing a road connecting National road 18C with the parking area (do not build an access path). - Dong Van Parking area: + Total area of land use: 2.82 hectare; Capacity: 110 cars; Container parking area: 2.3 hectare. + Road: L=558.3m. + Road of standard of grade III Highland, speed of 60 km/h Noi Bai – Ha Long Highway Dong Trieu, Uong Bi, Ha Long - Standard A Highway - Total route length: L = 55km - Scale: 4 lanes - Designed speed: 100 – 120 Km/h 2 VND 320 billion (USD 15 million) PPP,BOT, ODA Department of Transport VND 100 billion (USD 5 million) PPP,BOT Binh Lieu District 12,128 billion dong (~577 million USD) PPP Department of Transport 8 9 10 Main route linking the function zones and Van Don economical zone (period 2) Main route in Cai Rong urban area center, Van Don economic zone, Quang Ninh Doan Ket commune, Dai Xuyen, Binh Dan, Van Yen, Van Don ward Dong Xa commune, Cai Rong town, Ha Long commune, Van Don ward Bac Cai Bau port Northern, Cai Bau island, Van Don 11 Widen, renovate Cai Rong port 12 Multifunctional port project at Hon Mieu and Cai Chien islands, Hai Ha ward. - Aim: link the function zones, Van Don economical zone - Length: 13 Km - Scale: level II road. Aim: improve traffic infrastructure in Cai Rong urban area, length: 10Km - Build a general port - Research area: 700 ha Construct at the current location, Cai Rong town, Van Don ward - - Aim: + Widen, renovate Cai Rong port to the northeast, southwest and southeast (to the sea); invest in constructing infrastructure to improve imparting, loading and mooring ability to become a general port (guest, cargo, fish port). + Plan the southwest of the port to become a service area serving for the port’s activities. - Aim: + Implement the Decisions and documents of Transportation Department, Vietnam Maritime Hon Mieu island Administration about the agreement on the at Hai Ha sea multifunctional port’s 1st period construction port industrial location at Hon Mieu and Cai Chien islands, Hai Ha zone and Cai ward, Quang Ninh province to directly serve for Chien island, Hai Mong Cai border gate economic zone and Hai Ha Ha ward sea port industrial zone combining exploiting general port, containers that help to develop Quang Ninh’s socio-economy. 3 650 billion dong (~31 million USD) PPP; 100% investor’s capital; Joint-venture QUEZA 1,100 billion dong (~52 million USD) PPP; 100% investor’s capital, JV QUEZA 25,200 billion dong (~1,200 million USD) PPP; 100% investor’s capital, JV QUEZA 412.942 billion dong (~20 million USD) PPP; 100% investor’s capital, JV QUEZA ~6,500 billion dong - 1st period: ~3,260 billion dong - 2nd period: ~3,240 billion dong 100% investor’s capital QUEZA - - - + Ensure consistent and long lasting development between the sea port and the fairways, the port’s infrastructure and the transportation infrastructure connecting Hon Mieu and Cai Chien islands with Mong cai border gate economic zone and Hai Ha sea port industrial zone. Exploiting effectively the potentials and advantages of the land and water’ surfaces. Organizing functional areas with modern and synchronized infrastructure to ensure to meet the requirements for both technical and social ỉnfastructure. Protecting natural environment heading to lasting development, creating a space, architecture sight suitable with the plans of socioeconomic development and the area’s space development. - Feature: Being a part of Hai Ha sea port that directly serves for Mong Cai border gate economic zone combining with exploiting general goods serving for Quang Ninh and the area’s socio-economic development. - Expected scale and investment’s progression: Total area: 882.25 ha (Hon Mieu island: 490 ha; Cai Chien island:380 ha) II. TECHNICAL INFRASTRUCTURE IN INDUSTRIAL AND URBAN ZONES (10 Projects) 1 2 Non-tariff area - clean industrial park at Van Don Economic Zone. Dam Nha Industrial Services Zone Mac and Binh Dan commune, Cai Bau Island, Van Don District Communes: Phong Coc, Yen Hai, Lien Vi, Tien Phong; Quang Yen - Building a clean industrial zone with special free tax policy (duty free) to promote advantages of an airport (planned nearby), to stimulate and promote investment in Van Don economic zone. - Total area of land use: 250 – 500 hectare. VND 27,300-31,500 billion (USD 1.3 – 1.5 billion) 100% investor’s capital, Joint-venture QUEZA - Total area of land use: 3170 hectare. - Investment on building and operating the Industrial zone and accompanying services. Industrial zone area is 1500 hectare. Around VND 11,000 billion (USD 530 million) Base on the investment rate 100% investor’s capital, Joint-venture QUEZA 4 District. regulated in Decision No. 439/QD-BXD dated 26 April 2013 3 Communes: Xuan Son, Kim - Investment on building and operating the industrial Quan Trieu Industrial Son, Binh Khe in zone’s infrastructure Zone Dong Trieu - Total area: 150 hectare District 4 Viet Hung Industrial Zone (Phase 2) Viet Hung ward, Ha Long City Phuong Nam Industrial Zone Phuong Nam and - Investment on building and operating the industrial Phuong Dong zone’s infrastructure. wards, Uong Bi - Total area: 709.01 hectare including 459.64 hectare City of industrial area. 5 6 Tien Yen Industrial zone (1st period) Tien Yen - Investment on building and operating the industrial zone’s infrastructure and accompanying services. - Total area: 130 hectare. -Aim: Investment on building and operating the industrial zone’s infrastructure and supporting service area. - Research area: 100 ha over the total area of 350 ha. 5 Around VND 1,224 billion (USD 58 million) Base on the investment rate regulated in Decision No. 439/QD-BXD dated 26 April 2013 Around VND 1,000 billion (USD 50 million) Base on the investment rate regulated in Decision No. 439/QD-BXD dated 26 April 2013 Around VND 5,296 billion (USD 251 million) Base on the investment rate regulated in Decision No. 439/QD-BXD dated 26 April 2013 8,000 billion dong (~381 million USD) 100% investor’s capital, JV QUEZA 100% investor’s capital, JV QUEZA 100% investor’s capital, JV QUEZA PPP; 100% investor’s capital, JV Constructio n Department 7 Administration area in Van Don economic zone 8 Non-tariff infrastructure area’s Van Don ward -Aim: Build Van Administration center; - Total area: 23 ha Don Economic zone’s Hoanh Mo – Dong Van border gate economic zone Research area: 50.45 ha Dong Mai Industrial zone, Quang Yen Aim: Build manufacturing factories investing in: mechanical manufacture, traffic facilities assembly; construction materials manufacture, interior decoration; accurate mechanical manufacture and assembly; agricultural products, food processing; medical equipment manufacturing industry; electronic devices manufacture and assembly; consumer goods manufacture; textile and other industries. 9 Component projects in Dong Mai industrial zone 10 Cemetory park and Hai Tien Invest in building cemetory and crematorium serve Km15 crematorium commune, Mong for local residents’ needs. construction Cai city 619.931 billion dong (~30 million USD) PPP QUEZA 440 billion dong (~21 million USD) PPP; 100% investor’s capital, JV QUEZA Proposed by investor JV; 100% investor’s capital QUEZA Proposed by investor 100% investor’s capital Mong Cai III. CULTURE, TOURISM SERVICES AND TRADE (27 Projects) 1 Eco-tourism resort on Phuong Hoang Island Phuong Hoang Island, Van Don District - Land-use area: 6,91 km2. - Building an eco-tourism resort (beaches, villas, hotels, marina in the eco-tourism resorts, etc) - To diversify tourism products based on exploiting the maximum advantage of the terrain and landscape of the area, in accordance with the requirements of economic development and environmental protection of Bai Tu Long Bay landscape. 6 VND 5,250 billion (USD 250 million) PPP,100% investor’s capital, JV QUEZA 2 - Land-use area: 1.16 km2. - Building an eco-tourism resort (beaches, villas, hotels, marina in the eco-tourism resorts, etc). To Eco-tourism resort on Nat Dat Island, diversify tourism products based on exploiting the Nat Dat Island Van Don District maximum advantage of the terrain and landscape of the area, in accordance with the requirements of economic development and environmental protection of Bai Tu Long Bay landscape. 3 Yen Trung Lake resort, Uong Bi City 4 5 6 7 Phuong Dong Ward, Uong Bi City - Building an eco-tourism resort. - Studying area: 472.8 ha - Building an integrated complex with a golf course and 5-star hotel which will become a typical highRecreation center Ao Tien, Ha standard entertainment centre to meet the needs of 4 complex (including Long commune, tourists at home and abroad visiting Quang Ninh Ao Tien Golf course) Van Don District province. - Scale: land – use area of 300 hectare, 27-hole golf course Total area: ~380 ha, including 11 relics (temples, fanes, piles site)and security area, tourism supporting Battle of Bach Dang Yen Giang ward, services promote the surrounding relics’ value. historical 6 site Quang Yen - Security area I: 79.47 ha; conservation and commune - Security area II: 114.78 ha; promotion project - Tourism supporting services and promoting relics’ value area: 167.75 ha Hon Chin, Van Build a group of hotels, resorts, entertainment center High 6 class ecotourism Yen commune, with international standard. complex Van Don ward Total area: ~28 ha Soi Nhu island, - Build a 5-star marine ecotourism site Marine 7 ecotourism Ha Long - Total area: ~ 120 ha total area of the island (19 ha site commune, Van for building all the categories, the remaining area is Don ward rocky mountains and forest). 7 VND 3,150 billion (USD 150 million) PPP,100% investor’s capital, JV QUEZA Proposed by investor PPP,100% investor’s capital, JV Uong Bi City Proposed by investor PPP,100% investor’s capital,JV IPA 446.5 billion dong PPP Quang Yen People Commitee 2,500 billion dong 100% investor’s capital QUEZA 637 billion dong (30 million USD) 100% investor’s capital QUEZA 8 9 10 11 12 Golf course, ecotourism site on 8 Minh Chau – Quan Lan island, Van Don economic zone Minh Chau commune, Quan Lan commune, Van Don Component projects in Ben Doan high standard 9 service area plan (from Bai Tho 1 bridge to old Bai Chay ferry) Hong Gai ward, Ha Long ciry Component projects 1 in Ha Long Xanh urban complexplan Quang Yen commune, Ha Long city Component projects 1 in Hoang Tan island ecotourism site Hoang Tan commune, Quang Yen commune Ecotourism 1 resort site on west Co To beach Western, Co To island district - Aim: Build golf course , marine ecotourism site, 3,4,5,6-star hotels, completed supporting constructions. - Expected area: ~452 ha -Being a high-standard service area which was invested synchronously as a mixed multistoried construction system with international general hospital, creating a high-class and synchronized service and business center; being the focal point and utmost important feature in Ha Long city. - Total research area: 683,500m2; including: planned area of water surface: 253,198m2; planned area of land: 430,302m2 - Make Ha Long become a developing center of the province, take services and culture development as focal point and convert the development method from “brown” to “green”; be a green tourism city, civilized and modern international sea port. - Total research area: ~8,449.1 ha (land: 5,182.1 ha; water surface: 3,267 ha) -Build a standard urban area, ecotourism site with clean and green environment that meets the development criteria in the future, become an international standard urban and ecotourism area. - Total area: ~328.6 ha -Build an ecotourism site (beach, villas, hotels, marina habor...); diversify the tourism products on the basis of exploiting thoroughly the geographical advantages and the landscapes of the area, fit with the requirements for Co To island’s economic development and environment protection. - Research area: 15 ha 8 3,500 billion dong 100% investor’s capital Proposed by investor PPP,100% investor’s capital, JV IPA Proposed by investor PPP,100% investor’s capital, JV IPA Proposed by investor PPP,100% investor’s capital, JV IPA 300 billion dong (~14 million USD) PPP,100% investor’s capital, JV Constructio n department QUEZA 13 Ecotourism 1 resort site on north Co To beach Northern, Co To island district 14 Cai 1 Chien tourism site, Hai Ha ward Cai Chien, Hai Ha ward -Build an ecotourism site (beach, villas, hotels, marina habor...); diversify the tourism products on the basis of exploiting thoroughly the geographical advantages and the landscapes of the area, fit with the requirements for Co To island’s economic development and environment protection. - Research area: 15 ha - Build infrastructure for the tourism site, service constructions inside the site. - Research area: 380 ha 15 Tra 1 Co tourist spot, Mong Cai city Tra Co, Mong Cai city - Build infrastructure for the tourism site, service constructions inside the site. - Research area: 280 ha 5,600 billion dong (~267 million USD) PPP,100% investor’s capital, JV Constructio n department - Build infrastructure for the tourism site, service constructions inside the site. - Research area: 40 ha 800 billion dong (~38 million USD) PPP,100% investor’s capital, JV Constructio n department Hoanh Mo – Dong Van border gate economic zone Hung Thang Golf 1 course on Hung Ward, Ha Long Thang Hill City Le Loi 1 commune, An Bien Golf course Hoanh Bo District An Sinh 1 Khe Che Golf course commune, Dong Trieu District - Build infrastructure for the tourism site, service constructions inside the site. - Research area: 48.15 ha 800 billion dong (~38 million USD) PPP,100% investor’s capital, JV QUEZA Proposed by investor PPP,100% investor’s capital, JV IPA - Studied area: 100 hectare - Building a 18-hole golf course Proposed by investor PPP,100% investor’s capital, JV IPA - Studied area: 100 hectare - Building a 27-hole golf course Proposed by investor PPP,100% investor’s capital, JV IPA Road * The part from the 18 National Road to Suoi Tam 16 17 18 19 20 21 Tourism site (walking 1 exploration) in Binh Lieu ward Binh Lieu ward Cao 1 Ba Lanh tourism site and services Phuong Dong - Studied area: 173 hectare - Building a 36-hole Golf course 9 340 billion dong (~16 million USD) PPP,100% investor’s capital, JV Constructio n department 7,600 billion dong (~362 million USD) PPP,100% investor’s capital, JV Constructio n department Proposed by investor PPP,100% Uong Bi system on two road sides to Yen Tu relic site. 22 23 24 International exhibition centre in Mong Cai City Ha Long Financial service centre Northeast sports center Ward, Uong Bi City Mong Cai City Hung Thang Ward, Ha Long City Dai Yen ward, Ha Long – The east is adjacent to village 2 residential, Dai Yen commune; The west is adjacent to Hot river; the north is adjacent to Route 18 investor’s capital, JV pagoda: L=3Km; cross section: 3m+7.5m+3m+7.5m+3m=24m. The start point of the road is at the interjunction point between the National road No 18 with the current road going to the historic site of Yen Tu, the end point of the road nears Suoi Tam pagoda. * The part from Suoi Tam pagoda to Giai Oan busstop: have not been approved. * Land – use area for services along the roadsides: 166.7 hectare - Land – use area: 5 hectare - Building a typical Financial services centre in Ha Long City. - Land – use area: 10 hectare, 12 – 25 storeys, construction density 24-40% - The land is under the management of Halong investment and production development company. Infrastructure has been relatively fully put in place and uniform with convenient transportation. -Build an area wide sports center in the northeast with total research area of 2,426,187 m2, including: A 5000-seat versatile stadium; 30,000-seat stadium; water sports area; center square; tennis court; rehabilitation area; practicing area, athletes’ dormitary; exhibition center, museum... -Aim: serve for national and international competitions practicing. 10 City VND 4,200 billion (USD 200 million) PPP,100% investor’s capital, JV Mong Cai City Proposed by investor PPP,100% investor’s capital, JV Ha Long City PPP Culture and sports works investment managemen t board 8,000 billion dong (~381 million USD) 25 Renovating oldapartment blocks number 5,6,7,8 in Tran Hung Dao ward 26 30 floor apartment block combined with shopping center, offices for rent Tran Hung Dao ward, Ha Long city 27 Ha Long star golf course Hong Ha ward, Ha Long city Tran Hung Dao Ward, Ha Long City Building new modern and high-rise buildings, using for public housing and mixed services, to create the highlight for the urban landscape. -Build a superior and modern multifunctional building (30 floor apartment block combined with shopping center and offices for rent) which is synchronized in infrastructure to create a standing out feature in the area’s space; -Total area: ~4,378.6 m2 -Research area:~310 ha, including 3 functional sites: + 27-hole golf course and supporting services area (85ha); + High standard villas (30 ha); + Landscape forest park (185 ha) Proposed by investor PPP,100% investor’s capital, JV IPA Proposed by investor PPP,100% investor’s capital, JV IPA Proposed by investor 100% investor’s capital IPA PPP,100% investor’s capital, JV Department of Health PPP,100% investor’s capital, JV Department of Health PPP,100% investor’s capital, Department of Health IV. ECUDATION, TRAINING AND HEALTH CARE (07 Projects) 1 Ha Long international hospital Dai Yen Ward, Ha Long City 2 Van Don International hospital Dong Xa commune, Van Don District 3 Mong Cai International hospital Ninh Duong Ward, Mong Cai City Approx: - Scale: 300 - 500 beds. VND 420-676 billion + Stage 1 (2014-2020): 300 beds. (USD 20-32 million) + Stage 2 (2020-2030): develop to 500 beds. Base on the investment rate - Area: 12 hectare. Located next to National road regulated in decision No. No.18, overlooking Halong Bay. 439/QĐ-BXD dated 26th April 2013 Approx VND 420-676 billion - Scale: 300 - 500 beds. (USD 20-32 million) + Stage 1 (2014-2020): 300 beds. Base on the investment rate + Stage 2 (2020-2030): develop to 500 beds regulated in decision No. - Area: 7 hectare. 439/QĐ-BXD dated 26th April 2013 - Scale: 200 – 400 beds. Approx + Stage 1 (2014-2020): 200 beds. VND 280-540 billion + Stage 2 (2020-2030): develop to 400 beds. (Approx 11 - Area: 3.36 hectares 4 5 6 7 Cam Pha hospital private Cam Pha city USD 14-26 million) Base on the investment rate regulated in decision No. 439/QĐ-BXD dated 26th April 2013 Scale: 150 beds Proposed by investor JV 100% investor’s capital; JV Approx: - Enrollment scale: 1,500 students per year; training VND vocation at 3 levels: college, secondary and 217 billion elementary in the fields of: Tourism - Hotel PPP,100% (Approx Zone 6, Hai Yen Entertainment, Agriculture - Forestry - Fishery, High investor’s Mong Cai Vocational Ward, Mong Cai quality commercial and financial services, USD 10 million) capital, college City Technology, Construction, Economy - Information Base on the investment rate JV technology - Language. Training scale: 2,500 - 3,000 regulated in decision No. students; teaching staff of about 150 teachers 439/QĐ-BXD dated 26th - Land-use area: 12-15 hectares April 2013 Approx: VND 539-1.310 billion PPP,100% - Enrollment scale: 4,000-10,000 students per year. (USD 26-62 million) investor’s Ha Long University Nam Khe Ward, Traning levels: Bachelor, College and Professional Base on the investment rate capital, (Phase 2) Uong Bi City secondary. regulated in decision No. - Land-use area: 49.2 hectares JV 439/QĐ-BXD dated 26th April 2013 Mong Cai PPP,100% -Total area: 50ha 185 billion dong international Mong Cai city investor’s -Standard: international standard university (~9 million USD) university capital, JV Department of Health Department of Labour, invalids and social affairs Department of Training and education Constructio n department V. ENVIRONMENT (06 Projects). 1 1. Total area about 10 hectares Projected in 2. Estimated consumption capacity: 150.000-180.000 Waste treatment plant Zone 7, Quang tones of waste/ year. for Ha Long City, Hanh ward, Cam Hoanh Bo District, 3. Estimated electric production capacity: about Pha City Cam Pha City 50,000MWh electricity/year. (Treat domestic and industrial waste for the areas of 12 VND 1,260-1,302 billion (USD 60-62 million) PPP, BOT Department of Natural resources and Environmen t Ha Long City, Hoanh Bo District and Cam Pha City) 2 Sewage treatment system for the cities of Ha Long, Cam Pha, Uong Bi and Van Don District. Cities of Ha Long, Cam Pha, Uong Bi and Van Don District 1. In Ha Long city: 01 station with capacity of 22,000 cubic metre per day and pump station with capacity of 15 cubic metre per minute; 01 station with capacity of 31, 000 cubic metre per day; Building collecting and drainage pipe lines. 2. In Cam Pha city: 02 stations with capacity of 34.000 cubic metre per day and 29,000 cubic metre per day; Building collecting and drainage pipe lines. 3. In Uong Bi city: capacity: 52,000 cubic metre per day, Building collecting and drainage pipe lines. 4. In Van Don: 02 stations with capacity of 30,000 cubic metre per day and 31,000 cubic metre per day; Building collecting and drainage pipe lines. 3 Sewage treatment in Hai Ha ward Hai Ha ward Build a focused sewage treatment system in Hai Ha ward with capacity of 3,000m3/day and a 19km long collecting pipeline. 4 Construction sand processing projects from stone shreds in Rhyolite rocks, gritstone processing; The East and gravels in the East coal producing and gritstone, regions conglomerate in waste rocks from the coal mines in Quang Ninh. To exploit thoroughly, utilize efficiently and effectively the natural resources in association with protecting the environment, encouraging thorough processing to produce new products with high value that meet both domestic needs and exportation to create added value for the minerals. 13 Proposed by Investor 2,741 billion dong (129 million USD) Proposed by investor PPP, BOT Department of Natural resources and Environmen t PPP Department of Natural resources and Environmen t 100% investor’s capital Department of Natural resources and Environmen t 5 Khe Cat waterworks lake 6 Khe Tau waterworks lake Hai Lang Capacity of 3,000m3/day commune, Tien Yen 50 billion dong Dong Ngu Capacity of 3,000m3/day commune, Tien Yen 40 billion dong PPP,100% investor’s capital, JV PPP,100% investor’s capital, JV Tien Yen Tien Yen VI. AGRICULTURE (08 Projects). Total area: 914,976 square metres including: - Administration centre area: 46,634 square metres; - Production area called for investment: 720,071 square metres; - Land area for technical infrastructure and communication for production: 148,271 square metres; (public technical infrastructure will be invested by the State) - Aim: To make the breeding industry in the province become the main production sector, contributing to the economic restructuring in agriculture towards industrialization and modernization. - Scale: 150ha (including recovered area of JSC Tea Orient 80 ha; 70 ha of land clearance) 1 Secondary projects in Hightech Agriculture Park Hong Thai Tay commune, Dong Trieu district 2 Investment in construction of focused breeding development center Quang Phong commune, Hai Ha ward 3 Dairy cows breeding and milk processing project Quang Son commune, Hai Ha ward Breed 3,000 dairy cows and build a milk processing factory 4 Develop the raw materials region and premium exporting tea factory Hai Ha ward, Dam Ha - Aim: Construct a tea material region with highquality breds suitable to gradually replace old area with low capacity and quality tea. Build a modern processing plant with a capacity of 8,000-10,000 tons of fresh buds / year - Scale: Current tea area of 1,200 ha and reach 1,500 14 Proposed by Investor PPP,100% investor’s capital, JV People’s Committee of Dong Trieu District 450 billion dong (~21 million USD) 100% investor’s capital Hai Ha 100 billion dong (~5 million USD) 100% investor’s capital Hai Ha Proposed by investor PPP,100% investor’s capital, JV Agriculture and rural developmen t department ha in 2020 Component projects in focused mollusc production area Van Yen commune, Van Don ward -Aim: Construct a focused mollusc production area to attract investors to build mollusc hatcheries and nondisease, high quality mollusc nursery areas, provide for farming areas in. Quang Ninh and the Northern coastal provinces. -Scale: total area of 300ha, including water surface area of 292.4ha and land area of 7.6ha 6 Focused cattle and poultry breeding farm project Dong Tam village, Duc Yen commune and Dong Ha Tan Lap and Son Hai, Dam Ha ward -Total area in Dong Tam village, Duc Yen commune: 29.07ha -Total area in Dong Ha Tan Lap and Son Hai: 28.79 ha 7 Hightech seafood processing line constructing project Co To town 8 Breeding and processing peanut worms project Quang Minh commune, Hai Ha 5 Proposed by investor PPP,100% investor’s capital, JV Agriculture and rural developmen t department 82 billion dong PPP,100% investor’s capital, JV Dam Ha ward -Processing high quality seafood products to improve the economic performance. -Scale: 30,000tons/year 120 billion dong 100% investor’s capital Co To -Forming a focused breeding farm -Scale: 300 ha 30 billion dong 100% investor’s capital Hai Ha The number of project called for investment : 70 projects of 6 sectors: - Transport: 12 projects. - Technical infrastructure in industrial and urban zones: 10 projects. - Culture, tourism services and trade: 27 projects. - Ecudation, training and healthcare: 7 projects. - Environment: 6 projects. - Agriculture: 8 projects. 15