Global Project Opportunities: June, 2013 GLOBAL PROJECT OPPORTUNITIES June: 2013 Compiled by Satpreet Kaur PROJECT EXPORTS PROMOTION COUNCIL OF INDIA (Set up by Ministry of Commerce & Industry, Government of India) 1112 Arunachal Building, 19 Barakhamba Road, New Delhi-110001 Tel.:+91-11-41514673 E-mail : info@projectexports.com Web-site : www.projectexports.com 1 Global Project Opportunities: June, 2013 2 Global Project Opportunities: June, 2013 INDEX 1.0 1.0 FOCUS 2 2.0 UPDATE : 3 PROJECT EPC Members Institutions 3.0 FORTHCOMING EVENTS : 7 (i) Fairs/Exhibitions (ii) Business Delegations (iii) Symposia/ Conferences/Training Programmes 4.0 EXPORT PROMOTION SCHEME 4.1 11 Financial Assistance 8. PROJECT CONSTRUCTION ITEMS : 110 (PROJECT GOODS)OVERSEAS ENQUIRIES 9.0 POLICY & PROCEDURES 125 10.0 ARTICLES OF INTEREST 133 11.0 COUNTRY PROFILE: Tunisia 142 12.0 PEPC: WORKING COMMITTEE 145 13.0 ANNEXURES: 147 i. MDA Scheme ii. MAI Scheme iii. Screening Committee- Guidelenes 14.0 SOURCES OF INFORMATION 157 (MDA & MAI Schemes) 5.0 PROJECT OPPORTUNITIES (Construction/Turnkey/Consultancy) 5.1 CONSTRUCTION / TURNKEY 5.2 Water Social Infrastructure Energy CONSULTANCY 12 42 59 62 6.0 PROJECT REPORTS 75 7.0 WORLD DEVELOPMENT NEWS: 78 I News Clippings II Market/Country news A. World Region / markets (a) Asia (b) Africa (c) Middle East (d) Others B. India news 105 PROJECT EXPORTS PROMOTION COUNCIL OF INDIA 1112 Arunachal Building, 19 Barakhamba Road, New Delhi-110001 Tel.:+91-11-41514673 E-mail : info@projectexports.com Web-site : www.projectexports.com The news items and information published herein have been collected from various sources, which are considered to be reliable . While every care has been taken for authenticity of the material published, PROJECT EPC accepts no responsibility for authenticity or accuracy of such items. 3 Global Project Opportunities: June, 2013 2.0 FOCUS The GCC represents one of the few fast-growing project markets in the world today. Over the last 10 years more than $800bn worth of projects have been awarded in the region, while there are another $1 trillion worth of schemes in the tendering or planning stages. The GCC has one of the world’s most ambitious renewable energy plans - Saudi Arabia alone is planning more than 50GW of alternative and renewable energy schemes over the next 20 decades in a programme likely to require more than $200bn of investment. The region has some of the most exciting new-build rail opportunities, with new metro projects planned in Riyadh, Doha, Kuwait City, Jeddah, Mecca and Abu Dhabi and standard high-speed networks in every GCC state. In total more than 3,000km of new rail lines are in the pipeline. The hosting of the World Cup in Qatar in 2022 and potentially the World Expo in Dubai in 2020 will result in at least $150bn of new infrastructure schemes primarily in sports infrastructure, roads, metros, and hotels. The Qatar project market’s future prospects are much brighter. More than $110bn-worth of projects have been announced but not awarded. Transportation, taking in rail, roads, airport and port projects, accounts for two-thirds of the total with buildings, real estate, power and water making up the remainder. Compared with its neighbours in the GCC, Oman has a small projects market. In terms of annual contract awards, it is regularly the fifth-largest market in the region behind Kuwait but ahead of Bahrain. It is, however, by far the most stable market rarely experiencing wide fluctuations in the value of contracts awarded each year. The comparative stability of the projects market compared with its neighbours makes it relatively easy to forecast future project activity. However, with some large-scale projects in the pipeline, there is a distinct possibility that Oman could experience a substantial increase in activity over the medium term. Downstream investment will continue to remain high: Kuwait alone will invest more than $30bn in its refineries programme over the next five years. Qatar, UAE and Saudi Arabia will continue their economic diversification efforts with development of some of the world’s largest petrochemical complexes. FROM “GPO” DESK 4 Global Project Opportunities: June, 2013 2.0 UPDATE P. E.P.C. PROJECT EXPORTS PROMOTION COUNCIL OF INDIA (PEPC) India is a country with large and diverse infrastructure sector. The Government of India recognized the imperative need for the infrastructure sector and takes several initiatives like Committee of Infrastructure, National Highway Development Project (NHDP), National Maritime Development Programme (NMDP), Tax Holidays etc for the development and promotion of the sector. In the recent years, there has been several improvements in sectors like roads & highways, ports, railways and airports, the policy and regulatory framework is already in place and investment in infrastructure has risen considerably however there are still significant gaps that need to be bridged. With a view to create a platform for all the stakeholders and for the conclusive growth & development of the Infrastructure sector, PEPC works with the Central and Foreign Governments, National & International development organizations like World Bank, Asian Development Bank etc, Government Agencies, and various other stakeholders to promote the Project exports. PEPC discusses policy, regulatory and procedural issues with its members, industry experts etc. and advice appropriate reforms to the government for the development of the project exports. For making conducive business environment PEPC highlights encumbrances being faced by the industry players in the process of development of the sector and interacts with various national / international agencies for making feasible measures to overcome those encumbrances. PEPC supports the Government in its efforts towards projecting the project exports. It act as a reference point for investors (Domestic & International) interested in the sector and provide information related to government guidelines, investment opportunities, government & development agencies (which are involved in the development process of the sector). For promotion of the sector PEPC works proactively and suggests necessary procedures during the process of policy formation, budgetary allocation, forming legal framework etc. by the government. To maintain smooth progress PEPC also insist government to make essential provision for timely upgradation of the policies on the basis of regular feedback from its members and industry players. PEPC organizes several investment promotion programmes, conferences, seminars, workshops, etc on regular basis for facilitating interaction between various government agencies, international bodies, industry players and its members that provide prospects to raises issues pertaining to the sector and exchange ideas. These networking events provide a platform to share thoughts, explore business opportunities among the varied stakeholders of the project sector. These measures help to analyse the present developments and identifies the ways to overcome the constraint of the sector. PROJECT EXPORTS Project Exports from India commenced with a modest beginning in the late 1970s. Since then, project exports have evolved over the years, with Indian companies demonstrating capabilities and expertise spanning a wide range of sectors. The nature of Project Exports being undertaken reflects the technological maturity and industrial capabilities in the country. Project exports are broadly divided into four categories: Civil construction Turnkey modules Consultancy services Supplies, primarily of capital goods and industrial manufactures Each of the above are explained here: 5 Global Project Opportunities: June, 2013 Civil construction projects Construction projects involve civil works, steel structural work, erection of utility equipment and include projects for building dams, bridges, airports, railway lines, roads and bridges, apartments, office complexes, hospitals, hotels, and desalination plants. Turnkey projects Turnkey projects involve supply of equipment along with related services and cover activities from the conception stage to the commissioning of a project. Typical examples of turnkey projects are: supply, erection and commissioning of boilers, power plants, transmission lines, sub-stations, plants for manufacture of cement, sugar, textiles and chemicals. Consultancy services Services contracts, involving provision of know-how, skills, personnel and training are categorised as consultancy projects. Typical examples of services contracts are: project implementation services, management contracts for industrial plants, hospitals, hotels, oil exploration, charter hire of rigs and locomotives, supervision of erection of plants, CAD/ CAM solutions in software exports, finance and accounting systems. Supply contracts Supply contracts involve primarily export of capital goods and industrial manufactures. Typical examples of supply contracts are: supply of stainless steel slabs and ferro-chrome manufacturing equipments, diesel generators, pumps and compressors. Project export contracts are generally of high value and exporters undertaking them are required to offer competitive credit terms to be able to secure orders from foreign buyers in the face of stiff international competition. Exim Bank plays a pivotal role in promoting and financing Indian companies in the execution of projects. It has been closely associated with the growth of project exports from India by way of providing finance, information and business advisory services. The bank supports Indian companies at all stages of the project cycle from advance tender information, guidance in preparation of competitive bids to providing financial facilities, including loans and guarantees. It extends funded and non-funded facilities for overseas industrial turnkey projects, civil construction contracts, as well as technical and consultancy service contracts. Exim Bank has in place a specialised cell to provide advance information to Indian companies on projects being funded by multilateral funding agencies in various countries. Over the past two decades, increasing number of projects have been executed by Indian companies in North Africa, West Asia, South & South East Asia, CIS and Latin America. The Reserve Bank of India has simplified the procedures for project and service exports, such as deployment of temporary cash surpluses and inter-project transfer of machinery and funds. These measures, first announced in the Mid-Term Review of Annual Policy Statement for 2006-07, will provide more flexibility to exporters. The RBI said that the measures were subject to monitoring by banks. Exporters will now be allowed to use the machinery or equipment used for a turnkey or construction abroad, for executing a contract in another country. Currently, exporters are required to dispose of the equipment, machinery, vehicles purchased abroad or arrange their import into India after completion of the contracts. If it has to be used for another overseas project, the market value should be recovered from the second project. Under the modified procedures, the RBI has permitted exporters to deploy their temporary cash surpluses, generated outside India, in instruments such as deposits with overseas branches or subsidiaries of a bank in India, a triple `A' rate short term paper abroad, including treasury bills and other monetary instruments with a maturity or remaining maturity of one year or less. Now, exporters are required to approach the RBI for overseas deployment of their temporary cash surpluses. The apex bank has also permitted exporters to open, maintain and operate one or more foreign currency account in a currency of their choice with inter-project transferability of funds in any currency or country. 6 Global Project Opportunities: June, 2013 SCREENING COMMITTEE In accordance with the guidelines of Memorandum PEM (Project Export Manual) of the Reserve Bank of India, the Working Group considers proposals pertaining to civil construction contracts only from the Indian contractors who are on the approved list of the Ministry of Commerce & Industry(Govt. of India) on the basis of meeting the requisite criteria set by the screening committee as under: Minimum acceptance criteria Screening Committee clearance for Prime Contractor Sub-contractor Contractor to Foreign Prime Sub-contractor to Indian Prime Contractor Turnover Networth Experience required Rs. 10 Crores Rs. 1 Crores 10 Years Rs. 10 Crores Rs. 25 Lakhs 7 Years Rs.10 Crores Rs. 10 Lakhs 3 Years 7 Global Project Opportunities: June, 2013 3.0 FORTHCOMING EVENTS FAIRS/EXHIBITIONS A – OVERSEAS Oman Projects Forum 2013 Date: 28 - 30 October 2013 Venue: Grand Hyatt, Muscat, Oman Reviewing Oman’s Project Market and upcoming Opportunities Oman Projects Forum 2013 is the must-attend event for generating new businesses in the Sultanate. Held on the back of two successful events in 2012 & 2011, Oman Projects Forum 2013 will once again gather the Sultanate’s leading projects owners, clients, contractors, consultants, financiers and legal firms to discuss the major project opportunities in Oman, the critical challenges for procurement and delivery, as well as the strategies to add in-country value across its major sectors. Highlights for 2013 Conference: Three days of strategic insights into the latest project opportunities Oman has to offer in 2014 and insider information on timelines, challenges and business opportunities Exclusive access to 150 dignitaries, delegates, sponsors and guests 40 exceptional speakers from both the Oman’s private and public sectors to provide invaluable insights into upcoming opportunities A breakfast briefing led by an expert from MEED Insight to provide essential facts and figures for the region’s projects markets More than 20 interactive conference content sessions comprising of panel debates, insight case studies and presentations to offer in-depth detail into all aspects of key industries Over 12 hours of dedicated networking sessions to encourage generate new businesses and actual deals - Interactive “Ask The Audience” provided insights into key industries 8 Global Project Opportunities: June, 2013 Saudi Mega Transport & Infrastructure Projects Date: 15 - 17 September 2013 Venue: Riyadh Mariott Hote, Riyadh, Saudi Arabia The focus will be on the core sectors that are driving the massive growth in construction activity MEED’s Saudi Mega Transport & Infrastructure Projects 2013 will be the definitive event in Saudi Arabia for all those seeking opportunities in the Kingdom’s transportation, construction, housing and social infrastructure projects markets. With mega project growth forecasted at nearly US$80bn in 2013, the Saudi Mega Transport & Infrastructure Projects conference is a unique opportunity to gain unprecedented insight and access into the biggest projects market in the Middle East – both by the value of contracts awarded in 2012 and in terms of the pipeline of future projects. Apart from its size, what makes the Saudi Arabian market just as attractive is that it is driven the twin fundamentals of oil prices and demographic growth, which together ensure the market’s relative stability and underpins its growth potential. What’s more is the fact that Saudi Arabia’s capita, projects programme covers all major sectors and industries, meaning there is work available for everyone. New Features for 2013: The following NEW features will be incorporated into the 2013 event to make it even more relevant and useful Saudi Mega Transport & Infrastructure Focus Day – one full day dedicated to providing even more information, case studies, plenary sessions and interactive debates on the hottest and most promising infrastructure sector Enhanced Transport Infrastructure Content – 2 full days of conference activity covering all major transport infrastructure sectors including, roads, rail, ports and airports and the underpinning developments issues around procurement, operations and planning. For the first time, the event will include tailored stream sessions Additional Content on Housing & Social Infrastructure – reflecting the increased opportunities associated with the Kingdom’s focus on improving the quality of life for its citizens through major housing and social infrastructure projects New tailored networking opportunities – the opportunity to connect with clients, contractors and key stakeholders at a series of networking events including: breakfast briefings, speed networking sessions, interactive round-table sessions, site-visit, conference lunches and MEED’s exclusive on-line networking New interactive formats: plenary presentations, debates, streamed sessions, panel discussions, round-table Q&A sessions and group project showcases Exclusive VIP Breakfast Briefing: Tap into MEED’s intelligence until and get first-hand information on the potential of Saudi Arabia’s project market and its impact and critical role within the GCC 9 Global Project Opportunities: June, 2013 Iraq Infrastructure 2013 Date: 15 - 17 September 2013 Venue: Westin Dubai Mina Seyahi, Dubai, UAE Detailing project project opportunties and trends across the housing and real estate, social infrastructure, transport, aviation, water and wastewater sectors Key speakers include H.E Mohammed Al Daraji, Minister of Construction & Housing, Republic of Iraq Ministry of Construction & Housing H.E Adel Radhi Mhoder Minister of Ministry of Municipalities & Public Works, Republic of Iraq Ministry of Ministry of Municipalities & Public Works Fouad Khudair Waheed, Director General Sewerage Systems, Ministry of Municipalities & Public Works Why should you attend Iraq Infrastructure 2013? Unrivalled for the number of Iraqi decision makers driving infrastructure projects in one place meet and network directly with both central government and regional figures Brings together key players in supply chains for Transport, Public works, Housing & Urban planning, Social infrastructure, Airports and Water - build new contacts serious about Iraq Gain real clarity on project opportunities and budget, understand what is immediate and longterm and the process for prequalification Learn from successful case studies in real partnerships between Investor and Government teams Benefit from candid discussions and take aways to overcome, security, legal and logistic challenges, corruption, and real policy for the advancement of economic development and pulling foreign investment in Iraq Plans to secure a regulatory and legal framework that supports the involvement of private sector Unveiling finance unknowns - meet with finance facilitators and learn what they can provide and what the government needs To register or download the brochure, visit: To register for this event please call MEED Events customer service on +971 (0)4 390 0699 or register online at www.IraqInfrastructureProjects.com 10 Global Project Opportunities: June, 2013 Kurdistan Projects 2013 Date: 10 - 12 June 2013 Venue: Rotana Hotel, Erbil, Kurdistan Procurement and development strategies for new entrants to win work in Kurdistan’s projects market The Kurdistan Regional Government along with major private sector project sponsors will convene to reveal various projects opportunities across key sectors including:oil & Gas, electricity, housing and construction, heavy industry, hospitality and tourism, infrastructure and transport, water and agriculture. Being the only event in Kurdistan catering to all major areas of the region’s economy and attracting all the region’s leading stakeholders, speakers and VIP guests that can actually make a difference, this is a must attend event for any organisation looking to expand existing business in Kurdistan or enter this booming market to explore new business opportunities. Top reasons to attend: 1.Gain project visibility from the regions policy makers and project owners about new upcoming opportunities across the regions energy and non-energy industries 2.Learn first-hand from the KRGs top ranking officials about the regions master plans and bottlenecks to support foreign investment and sector developments so that you can align your strategic interests 3.Understand exactly what opportunities are available for the private sector and how well supported these are by the KRG.As of Aug 2012 there was an estimated $15bn worth of planned projects to be awarded 4.If you’re serious about the energy business in Iraq, Iraq Energy Projects is the only integrated energy event of its kind covering, upstream, midstream, downstream, power, natural gas industries and water requirements as a pre-requisite for energy developments. Buyers meet sellers! 5.Discover the surprising ways in which you can benefit from others with experience in the region. To register or download the brochure, visit: www.kurdistanprojects.com 11 Global Project Opportunities: June, 2013 4.0 EXPORT PROMOTION SCHEMES (FINANCIAL ASSISTANCE) MARKET DEVEVELOPMENT ASSISTANCE Under this scheme assistance is given to individual exporters for participation in following export promotion activities abroad Trade Delegations BSMs Trade Fairs/Exhibitions The details of scheme is given as ANNEXURE-I. MARKET ACCESS INITIATIVE (MAI) The scheme is formulated on focus product- focus country approach to evolve specific strategy for specific market and specific product through market studies/survey. Assistance would be provide to Export Promotion Organizations/ Trade Promotion Organizations / Exporters etc. for enhancement of export through accessing new markets or through increasing the share in the existing markets. Under the Scheme the level of assistance for each eligible activities has been fixed. The following activities will be eligible for financial assistance under the Scheme : Research studies consistent with the priorities; WTO Studies for evolving WTO compatible strategy; To support EPCs/Trade Promotion Organistions in undertaking market studies/survey for evolving proper strategies. To support marketing projects abroad based on focus product - focus country approach. Under marketing projects, the following activities will be funded: o o o o o o o o o o o o Opening of Showrooms Opening of Warehouses Display in international departmental stores Publicity Campaign and Brand Promotion Participation in Trade Fairs, etc., abroad Research and Product Development Reverse visits of the prominent buyers etc. from the project focus countries Export Potential Survey of the States; Registration charges for product registration abroad for pharmaceuticals, bio-technology and agro-chemicals; Testing charges for engineering products abroad; To support Cottage and handicrafts units; To support Recognized associations in industrial clusters for marketing abroad The details of schemes are given as ANNEXURE-II. 12 Global Project Opportunities: June, 2013 5.0 PROJECTS OPPORTUNITIES (Construciton/Turnkey/Consultancy) 5.1 ENGINEERING /TURNKEY WATER Rehabilitation of Water Supply and Wastewater Networks in Dilijan Town, ASMWP-WORKS-2013-03 Project ID: 40718 Borrower/Bid No: 7095-IFT-40718 Invitation for tenders Armenian Water and Sewerage Company CJSC, hereinafter referred to as “the Employer”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank), the European Investment Bank [EIB] and a grant from the European Union Neighbourhood Investment Facility [EU NIF] towards the cost of Armenian Small Municipalities Water Rehabilitation Project. The Employer now invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loans and grants: Dilijan – Water Supply System and Sewer Network consists of: 1. Water Supply System in Shamakhyan district 2. Demolition and Reinstatement of asphalt and/or concrete roads 3. Construction of approximately 1km length OD 200-355 water main 4. Construction of approximately 3.6km length OD 110-160 pressure water main 5. Construction of approximately 14 km length OD 32-OD160 water lines in distribution network 6. Construction of approximately 2.3 km length, OD25 water lines for house connections 7. Installation of approximately 324 water meter chambers 8. Rehabilitation of 500m3 Daily Regulation Reservoir including earthwork, pipe works and civil works 9. Construction of 300m3 new Daily Regulation Reservoir including earthwork, pipe works and civil works 10. Construction of a pumping station, including equipments, earthwork, pipe works and civil works 11. Waste Water System 12. Reconstruction of approximately 3.144km sewer collector, including OD 680mm PE pipe -2.203km, DN 600mm steel pipes - 0.769km, DN 800mm steel pipes – 0.172km 13. Construction of 57 chambers on sewer collector 14. Construction of 7.088km length civil sewer collecting network, including PE pipes OD160-460mm – 6.530km, steel pipes OD200-500mm - 0.558km. 15. Construction of 205 chambers on sewer network Tendering for contracts to be financed with the proceeds of a loans and grants from the Bank is open to firms from any country. The works shall be executed within 365 days. 13 Global Project Opportunities: June, 2013 To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria: Historical non-performance: Non-performance of a contract did not occur within the last three (3) years prior to the deadline for tenders submission, based on all information on fully settled disputes or litigation. All pending litigation shall in total not represent more than ten percent (10%) of the Tenderer’s net worth and shall be treated as resolved against the Tenderer. Historical financial performance: The audited balance sheets for the last three (3) years shall be submitted and must demonstrate the soundness of the Tenderer’s financial position, showing long-term profitability Average Annual Turnover: Minimum average annual construction turnover of EUR 2,000,000.00 (two million), calculated as total certified payments received for contracts in progress or completed, within the last three (3) years Financial Resources: The Tenderer must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means net of other contractual commitments, other than any contractual advance payments to meet the following cash-flow requirement: EURO 500,000.00 (three hundred thousand) Experience: The Tenderer shall demonstrate that it has successful experience as prime contractor in the execution of at least two (2) projects of a nature and complexity comparable to the proposed contract within the last three (3) years. In addition, the following specific experience: 1. Participation as contractor or management contractor in at least two (2) contracts within the last three (3) years, each with a value of at least EUR 500,000, that have been successfully and substantially completed and that are similar to the proposed Works. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section VI, Employer’s Requirements 2. 2. For the above or other contracts executed during the last three (3) years a minimum experience in the following key activities: (a) Construction of HDPE pressure pipes OD 25 to OD 450 or larger. Total constructed length (all diameters) shall be at least 1000m; (b) Construction of steel pressure pipes DN100 to DN 600 or larger. Total constructed length(all diameters) shall be at least 500m; and Construction of HDPE sewer pipes DN 150 to DN500 shall be at least 1000m; Personnel (Position / Total work similar experience, years / In similar work experience, years): 1. 2. 3. 4. 5. Equipment (Equipment Type and Characteristics – minimum number required): 1. 2. 3. 4. 5. 6. Project manager – 10 – 5 Construction site engineer – 10 – 5 Quality assurance / quality control engineer – 10 – 5 Health, safety and environment engineer – 10 – 5 Quantity surveyor – 5 – 3 Mini excavator operation weight 2-6 t – 2 Wheel based excavator operation weight at least 18 t – 2 Backhoe loader – 1 Paving machine – 1 Compactor – 2 Dump truck total weight 16 t – 2 Criteria for joint ventures, consortiums and associations (JVCA): participation of JVCA is permitted. Detailed criteria for JVCA is included in Part 1 – Section III Evaluation and Qualification Criteria of the tender document. The Local Tenderers should submit a reference (issued not earlier than 15 days prior to the bid submission deadline) on not having any arrears to the RA Tax authorities. 14 Global Project Opportunities: June, 2013 The Tenderers shall hold a valid and effective license/permit for hydro-technical facilities, issued by the RA Urban Development Ministry. In case of the absence of this license/permit the Tenderers shall submit with the bid a signed statement that if the bidder is awarded the Contract he will obtain the required license from the RA Urban Development Ministry. More details on the qualifying requirements are specified in Part 1 – Section III Evaluation and Qualification Criteria. Tender documents may be obtained from the office at the address below upon submission of written application and payment of a non-refundable fee of 100EUR or 55 000 AMD. The method of payment will be direct deposit to Armenian Water and Sewerage CJSC’s cash box or direct payment to Armenian Water and Sewerage CJSC’s below specified account number: Account No. 247010078175 with ARDSHININVESTBANK (SWIFT Code: ASHBAM22), 13, Grigor Lusavorich Street, 0010, Yerevan, Republic of Armenia. For Euro: account No. 16048000395500 with VTB Bank Armenia (SWIFT Code: ARMJAM22), 46, Nalbandyan Street, 0010, Yerevan, Republic of Armenia Upon receipt of appropriate evidence of payment of the non-refundable fee and written application, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery. In addition, if requested, the documents can be dispatched electronically after presentation by the prospective tenderer of an appropriate evidence of payment of the non-refundable fee. In the event of discrepancy between electronic and hard copies of the documents, the hard copy shall prevail. All tenders must be accompanied by a tender security of EUR 40,000.00 EUR or its equivalent in a convertible currency. Tenders must be delivered to the office at the address below on or before 04.07.2013 at 15:00 (local Armenian time) at which time they will be opened in the presence of those tenderers’ representatives who choose to attend. A register of potential tenderers who have purchased the tender documents may be inspected at the address below. Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office: CONTACTS Armenian Water and Sewerage CJSC Mr. Norik Gevorgyan, Director of IPCD Ms. Kristine Ghambaryan, Procurement Officer 8a, Vardanants Blind Alley, Floor 3 0010 Yerevan, Republic of Armenia Tel.: +374 10 54 28 77 Fax.: +374 10 54 28 77 Email: ngevorgyan@armwater.am, kghambaryan@armwater.am 15 Global Project Opportunities: June, 2013 Improvement of Water Supply Systems in Hrazdan Town and Qaghsi Village Borrower/Bid No: L2860-ICB-1-03 Invitation for Bids 1. The Republic of Armenia has received financing from the Asian Development Bank (ADB) towards the cost of 2860-ARM: Water Supply and Sanitation Sector Project-Additional Financing. Part of this financing will be used for payments under the contract named above. This contract will be jointly financed by the Armenian Government. Bidding is open to all bidders from eligible source countries of the ADB. 2. The Armenian Water and Sewerage CJSC (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of L2860-ICB-1-03: Improvement of water supply systems in Hrazdan town and Qaghsi village: Hrazdan town (Mikro-1, Mikro-2, Centre, Jrarat and Maqravan areas) -- Construction of 19.5km length, de63-de315 PE internal water lines, -- Construction of 4.3km length, de63-de110 PE inlet lines for residential buildings, -- Construction of 2.6km length, de20-de32 PE inlet lines for private houses with installation of 365 water meter chambers, -- Reconstruction of 3.2km length, de20-de32 PE inlet lines for business entities with installation of 284 water meter chambers. Qaghsi village --Construction of 9.9km length, de50-de1110 PE internal water lines, --Construction of 2.8km length, de20-de32 PE inlet lines for private houses, --Installation of 295 water meter chambers. International Competitive Bidding (ICB) will be conducted in accordance with ADB’s Single-Stage: OneEnvelope bidding procedure and is open to all Bidders from eligible source countries. 3. Only eligible bidders with the following key qualifications should participate in this bidding: -- Minimum average annual construction turnover of US$ 2,250,000 (two million two hundred fifty thousand US dollars) calculated as total certified payments received for contracts in progress or completed, within the last 3 (three) years. -- Access to or availability of financial resources such as liquid assets, unencumbered real assets, lines of credit and other financial means, other than any contractual advance payments for the amount of US$ 750,000 (seven hundred fifty thousand US dollars). -- Participation as contractor, management contractor, within the last 3 (three) years, each with a value of at thousand US dollars) that have been successfully or are the proposed works. The similarity shall be or subcontractor, in at least 1 (one) contract least US$ 1,200,000 (one million two hundred substantially completed and that are similar to construction of 8km of PE Pipelines. -- All pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than 50 percent of the Bidder’s net worth. The Bidder shall hold a valid and effective license/permit for hydro-technical facilities, issued by the RA Urban Development Ministry. In case of the absence of this license/permit the Bidders shall submit with the bid a signed statement that if the bidder is awarded the Contract he will obtain the required license from the RA Urban Development Ministry. 4. To obtain further information and inspect the bidding document, bidders should contact: 16 Global Project Opportunities: June, 2013 Armenian Water and Sewerage CJSC (AWSC), Investment Programs Coordination Department (IPCD), To:Mr. Norik Gevorgyan, AWSC IPCD director Attn.: Mr. Eduard Chil-Akopyan, AWSC IPCD, Project Manager, Ms. Kristine Ghambaryan, Procurement officer, Address: Floor 3, Vardanants Blind Alley 8a, 0010, Yerevan, Armenia Tel./Fax: +374 10 54 28 77 E-mail: ngevorgyan@armwater.am ; echilakopyan@armwater.am; kghambaryan@armwater.am 5. To purchase the bidding document in English, eligible bidders should: Write to the address above requesting the bidding document for L2860-ICB-1-03: Improvement of water supply systems in Hrazdan town and Qaghsi village Pay a non-refundable fee of USD 100 or AMD 40 000 payable to the account indicated below. The method of payment will be direct deposit to Armenian Water and Sewerage CJSC’s cash box or direct payment to Armenian Water and Sewerage CJSC’s below specified account numbers: For US Dollars: account No. 160483054419 with VTB Bank Armenia (SWIFT Code: ARMJAM22), 46, Nalbandyan Street, 0010, Yerevan, Republic of Armenia Or For Armenian Drams: account No. 247010078175 with ARDSHININVESTBANK (SWIFT Code: ASHBAM22), 13, Grigor Lusavorich Street, 0010, Yerevan, Republic of Armenia. 6. Deliver your bid: To the address above. On or before the deadline: 09 July 2013, 15:00 hours (local time). Together with a Bid Security as described in the Bidding Document. Bids will be opened immediately after the deadline for bid submission in the presence of bidders’ representatives who choose to attend. Water Utilities Development Programme Firladeni Water Source Project ID: 40267 Borrower/Bid No: 7100-IFT-40267 Invitation for tenders JSC “AMEN-VER”, hereinafter referred to as “the Employer”, intends using part of the loan from the European Bank for Reconstruction and Development (the Bank), European Investment Bank and a grant from the EU’s Neighbourhood Investment Facility (NIF) for the Moldova-Water Utilities Development Programme. The Employer now invites sealed tenders from contractors for the following contract “Firladeni Water Source” to be funded from part of the proceeds of the loan: The works comprise finalising the detail design and the construction of the Firladeni water source for Hincesti with the construction of 3 deep wells, transfer pumping station, trunk main of 11km sized at 250mm de connected to an existing service reservoir in Hincesti. The contract duration is 20 months, including 12 months for Defects Notification Period. 17 Global Project Opportunities: June, 2013 Tendering for contracts to be financed with the proceeds of a loan from the EBRD is open to firms, joint ventures, consortia or other unincorporated groupings of two or more persons from any country or countries. The Tenderer shall furnish, as part of its tender, documentary evidence of the Tenderer’s qualifications to perform the contract if its Tender is accepted establishing to the Employer’s satisfaction that: (i) an average annual turnover as main contractor (defined as billing for work in progress and completed) over the last three (3) years of: €1,600,000 or equivalent. (ii) successful experience as prime contractor in 3 projects of a nature and complexity comparable to the proposed contract over the last 5 years, each with a value of at least: € 600,000 or the equivalent. (iii) has executed at least one construction project of a similar nature in the region within the last five (5) years. (vi) The Tenderer shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and/or other financial means sufficient to meet the construction for a period of 3 months estimated at not less than €200,000 or equivalent, taking into account the applicant’s commitments to other contracts. (vii) The Tenderer, and each partner in case of a joint venture, shall provide accurate information on any current or past litigation or arbitration resulting from contracts completed or under execution by him over the last five (5) years. (viii) Joint ventures must satisfy the following minimum qualification criteria: (a) The lead partner shall meet at least fifty (50%) percent of the minimum qualifying criteria for general experience and financial position required above; (b) Other partners shall meet at least twenty (20%) percent of the minimum qualifying criteria for general experience and financial position required above All Tenderers including all partners in a joint venture shall submit audited balance sheets for the last three (3) years which should demonstrate the soundness of the Tenderer’s financial position by showing long-term profitability. Tender documents may be obtained from the office at the address below upon payment of a nonrefundable fee of 1,600 Moldovan Lei and will be provided free for those tenderers who submitted offers for HI-WSS-02 which had to be cancelled Payment may be made by cheque to JSC “AMEN-VER”, in cash directly to the cashier of IM “AMEN-VER”, or by inter-bank transfer to JSC “AMEN-VER” BC MOLDINDCONBANK S.A, account no. in CODUL BANCII: MOLDMD2X323 DENUMIREA BANCII: BC MOLDINDCONBANK S.A. filiala Hîncesti c.f.1002600028096 BENEFICIARUL: 222462300609 SC”AMEN-VER”SA TRANSFERULUI: C/F 1003605000182 Cheque and bank transfer charges to be paid by the applicant. Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery. In addition, if requested, the documents can be dispatched electronically after presentation by the prospective 18 Global Project Opportunities: June, 2013 Tenderer of an appropriate evidence of payment of the non-refundable fee. In the event of discrepancy between electronic and hard copies of the documents, the hard copy shall prevail. All tenders must be accompanied by a tender security in the amount of €14,000 or the equivalent in Moldovan Lei at the exchange rate published by the National Bank of Moldova http://bnm.md/medium_exchange_rates on the day the IFT was published. Tenders must be delivered to the office at the address below on or before 8 July 2013 12:00 hrs local time, at which time they will be opened in the presence of those tenderers’ representatives who choose to attend. A register of potential tenderers who have purchased the tender documents may be inspected at the address below. Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office: CONTACTS Contact name: Gheorghe LICA Employer: JSC “AMEN-VER” Address: 119 M. Hîncu Street, Hîncesti, MD-3401, Moldova Tel: + 373 269 22463/ +373 69126157 Fax: +373 269 22463 E-mail: apa_canal_hincesti@mail.md Urban Water Supply and Wastewater Project Improvement of Raw Water Intake Work, Construction of Raw Water Mains and Pumping Station Project ID: P119077 Borrower/Bid No: BDWS04 The Socialist Republic of Vietnam has applied for financing from the World Bank toward the cost of the Vietnam Urban Water Supply and Wastewater Project, and intends to apply part of the proceeds toward payments under the contract for Improvement of Raw Water Intake Work, Construction of Raw Water Mains and Pumping Station, under the My Phuoc Urban and Industrial Water Supply Subproject. The Binh Duong Water Supply Sewerage Environment Co., Ltd now invite sealed bids from eligible bidders for construction and performance of the contract BDWS04: Improvement of Raw Water Intake Work, Construction of Raw Water Mains and Pumping Station. Bidding will be conducted through the International Competitive Bidding procedures as specified in the World Bank's guidelines on Procurement of Small Works, edited in April 2008, revised November 2010 and is opened to all eligible bidders as defined in the Procurement Guidelines. Interested eligible bidders may obtain further information from: Project Management Unit for South Thu Dau Mot Water Supply Project Address 11 Ngo Van Tri, Phu Loi Ward, Thu Dau Mot city, Binh Duong Province, Tel: + 84 650 3840055 Fax: +84 650 3827 738 E-mail: ppmubiwase@yahoo.com, web-site: www.biwase.com.vn and inspect the bidding documents during office hours from 7:30 to 16:30 at the address given above. 19 Global Project Opportunities: June, 2013 A complete set of bidding documents in English and Vietnamese may be purchased and obtained by interested eligible bidders upon the submission of a written application to the address above and upon payment of a nonrefundable fee of US dollar 100. The method of payment will be in cash. Bids must be delivered to the address above on or before 09:00 am on 22nd July 2013. Electronic bidding will not be permitted. Late bids will be rejected. Bids will be publicly opened in the presence of the bidders' designated representatives and anyone who choose to attend at the address above: Bid opening time: 09:30 am on 22nd July 2013. All bids must be accompanied by a bid guarantee amount of 2 billion VND or one kind of freely convertible currency. Bid guarantee for Joint venture must list the names of members in such Joint venture. Project Management Unit for South Thu Dau Mot Water Supply Project Address 11 Ngo Van Tri, Phu Loi Ward, Thu Dau Mot city, Binh Duong Province Tel: + 84 650 3840055 Fax: +84 650 3827 738 E-mail: ppmubiwase@yahoo.com Web-site: www.biwase.com.vn Urgent Water Supply and Sanitation Rehabilitation Project, Republic of Zimbabwe Rehabilitation of Ponds at the Sewage Treatment Works in Chegutu Grant No: 58500155000051 1. The Government of the Republic of Zimbabwe has received a grant from the Zimbabwe Multi-Donor Trust Fund (Zim-Fund) administered by the African Development Bank towards the cost of the Urgent Water Supply and Sanitation Rehabilitation Project, and it intends to apply part of the proceeds of this grant to payments for: ment Works in Chegutu 2.The Ministry of Finance has appointed The Crown Agents for Oversea Administrations and Governments (Crown Agents) to act as it’s Procurement Agent. Crown Agents now invites sealed bids from eligible bidders for the execution of the works: Rehabilitation of Ponds at the Sewage Treatment Works in Chegutu comprising: 3. Postqualification will be conducted through the postqualification procedures specified in the Bank’s Rules and Procedures for Procurement of Goods and Works, and is open to all bidders from eligible firms and voluntarily formed joint ventures from all countries, as defined in the Rules and Procedures and the Operations Manual of the Zim-Fund to all bidders from eligible source countries, as defined in the Rules and Procedures. 4.A site visit and pre-bid meeting will be held on 18thJune2013. Details are in the bidding documents. 20 Global Project Opportunities: June, 2013 5.A complete set of bidding documents may be obtained by interested bidders on the submission of a written application to the emailaddresszimfundpa@crownagents.co.uk. No fee is due. The bidding documents will only be available electronically. 6. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the African Development Bank Standard Bidding Document: Procurement of Worksand the Operations Manual of the Zim-Fund.Bidding shall be by National Competitive Bidding (NCB). Bidders registered outsideofthe Republic of Zimbabwe may submit bids if they wish provided they agree to the terms and conditions of the bidding documents. 7.Bids must be delivered to the officeat 10below on or before 13.00 hours (British Summer Time)on 9thJuly2013and must be accompanied by a security of USD 15,000 (Fifteenthousand United Stated Dollars) 8.Bids will be opened in the presence of bidders’ representatives who choose to attend at 14.00 hours (British Summer Time) at the address at 10 below. Alternatively Bidders may attend the office of the ZIm-Fund as the opening will also be transmitted live by Video Communication. Full details will be provided in the Invitation for Bids. 9.Bids must be clearly marked “Bidfor Urgent Water Supply and Sanitation Rehabilitation Project, Contract Ref: UWSSRP/013Rehabilitation of Ponds at the Sewage Treatment Works in Chegutu” and delivered to: SCS Tender Box The Crown Agents for Oversea Governments and Administrations Limited St Nicholas House Sutton Surrey SM1 1EL United Kingdom Telephone (for courier purposes only) +44 208 643 3311 Republic of Zimbabwe Urgent Water Supply and Sanitation Rehabilitation Project Rehabilitation of Ponds at the Sewage Treatment Works in Harare and Chitungwiza Grant No: 58500155000051 1. The Government of the Republic of Zimbabwe has applied for a grant from the Zimbabwe Multi-Donor Trust Fund (Zim-Fund) administered by the African Development Bank towards the cost of the Urgent Water Supply and Sanitation Rehabilitation Project, and it intends to apply part of the proceeds of this grant to payments for: Chitungwiza 2.The Ministry of Finance has appointed The Crown Agents for Oversea Administrations and Governments (Crown Agents) to act as itsProcurement Agent. Crown Agents now invites sealed bids from eligible bidders for the execution of the works: Rehabilitation of Ponds at the Sewage Treatment Works in Harare and Chitungwiza comprising: tial rehabilitation of Pond System at Firle Waste Water Treatment Works, Harare; 21 Global Project Opportunities: June, 2013 ter Treatment Works, Chitungwiza. 3. Postqualification will be conducted through the postqualification procedures specified in the Bank’s Rules and Procedures for Procurement of Goods and Works, and is open to all bidders from eligible firms and voluntarily formed joint ventures from all countries, as defined in the Rules and Procedures and the Operations Manual of the Zim-Fund. 4.A complete set of bidding documents may be obtained by interested bidders on the submission of a written application to the emailaddresszimfundpa@crownagents.co.uk. No fee is due. The bidding documents will only be available electronically. 5. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the African Development Bank Standard Bidding Document: Procurement of Worksand the Operations Manual of the Zim-Fund.Bidding shall be by National Competitive Bidding (NCB). Bidders registered outsideofthe Republic of Zimbabwe may submit bids if they wish provided they agree to the terms and conditions of the bidding documents. 6.Bids must be delivered to the officeat 10below on or before 13.00 hours (British Summer Time)on 25thJune 2013and must be accompanied by a security of USD 50,000 (Fifty thousand United Stated Dollars) 7.Bids will be opened in the presence of bidders’ representatives who choose to attend at 14.00 hours (British Summer Time) at the address at 10 below. 8.Bids must be clearly marked “Bid for Urgent Water Supply and Sanitation Rehabilitation Project, Contract Ref: UWSSRP/012 Rehabilitation of Ponds at the Sewage Treatment Works in Harare and Chitungwiza” and delivered to: SCS Tender Box The Crown Agents for Oversea Governments and Administrations Limited St Nicholas House Sutton Surrey SM1 1EL United Kingdom Telephone (for courier purposes only) +44 208 643 3311 REPUBLIC OF MOZAMBIQUE NIASSA PROVINCIAL TOWNS WATER SUPPLY AND SANITATION PROJECT (NPTWSSP) Rehabilitation and Expansion of Cuamba City Water Supply System African Development Bank Loan No: 2100150019951 Contract Identification No: FIPAG/ NPTWSSP/ W-02/12 1. The Government of Mozambique has received a loan from the African Development Bank (AfDB) towards the cost of the Niassa Provincial Towns Water Supply and Sanitation Project. It is intended that part of the proceeds of this loan will be applied to eligible payments under the Contract for the Rehabilitation and Expansion of the Cuamba City Water Supply System. 2. The Fundo do Investimento e Património do Abastecimento de Água (FIPAG), now invites sealed bids from eligible bidders for the Rehabilitation and Expansion of the Cuamba City Water Supply System 22 Global Project Opportunities: June, 2013 (hereinafter call “the Works”). International Competitive Bidding will be conducted in accordance with the Banks “Rules and Procedures for Goods and Works”. The Works will include the following components: Water Treatment Plant utilizing slow sand filtration modules with 10.000m3 capacity; Ground water reservoir with 2500 m3 capacity; Elevated water reservoir 250 m3 capacity; Pumping station; Approximately 41 km of ductile iron transmission main 500 mm diameter. 3. Interested eligible Bidders may obtain further information from FIPAG, and inspect the Bidding Documents at the address given below from 8:30am to 12:30 hrs and from 14:00 to 17:00 hrs (Mozambique local time). 4. A complete set of Bidding Documents may be purchased by interested Bidders on submission of a written application to FIPAG and upon payment of a non-refundable fee of 4.500,00Mt (four thousand and five hundred Meticais). The Bidding Documents can be collected at the address below or will be sent by courier if the prospective bidder has paid the courier charges. 5. The provisions in the Instructions to Bidders and in the General Conditions of Contract are those of the African Development Bank’s Standard Bidding Document for Procurement of Works. 6. Bids must be delivered to the address indicated above on or before 14:30 local time on 8th July 2013 and must be accompanied by a Bid Security in the amount of US Dollars $300,000 (three hundred thousand) in the form of a Bank Guarantee. Electronic Bidding shall not be permitted. 7. Bids shall remain valid for 120 days after the deadline for bid submission prescribed above. 8. Bids will be opened in the presence of bidder’s representatives who choose to attend at 14:30 local time on 8th July 2013 at the address bellow: 9. The address referred to above is: Director General FIPAG – Fundo do Investimento e Património do Abastecimento de Água Rua Filipe Samuel Magaia, Nr 1297 Maputo, Mozambique Telefone: +258 21 308840 Email: fipag@fipag.co.mz Facsimile: +258 21 308881 www.fipag.co.mz Improvements to Ninh Co river estuary: Protection works at Northern disposal area (protection bund Km 0+000 - Km 1+339 and cofferdam); and northern breakwater Km 0+000 - Km 0+050) Project ID: P095129 Borrower/Bid No: CV-A2.1-NDTDP 1. The Socialist Republic of Vietnam has received a credit from the International Development Association (IDA) in various currencies towards the cost of the Northern Delta Transport Development Project (NDTDP). It is intended that part of the proceeds of this loan will be applied to eligible payments under the contracts for ICB package CV-A2.1-NDTDP. The Project Management Unit of Northern Inland Waterways (PMU-NIW) on behalf of Vietnam Inland Waterway Administration (VIWA) now invites sealed bids from eligible bidders for construction and completion of Protection works at Northern disposal area (protection bund Km0+00-Km 1+339) and cofferdam and Northern breakwater (Km0+00-Km0+ 050) ("the Works"). 23 Global Project Opportunities: June, 2013 The main Works consists of: Construction and completion of stones with the weight at 200kg - 3000kg each block, concrete block Haro, T-Block, L-Block, Reno mattress. Bidding will be conducted through the International Competitive Bidding (ICB) procedures as specified in the World Bank's Guidelines: Procurement of Goods, Works and Non-consulting Services under IBRD Loans and IDA Credits & Grants by World bank Borrowers (Procurement Guidelines), edition May 2005, revised October 2006 and May 2010, and is open to all eligible bidders as defined in the Procurement Guidelines. Interested eligible bidders may obtain further information from and inspect the bidding documents at the office of PMU-NIW at the address below from 08:00 to 17:00 (local time) since May 20, 2013 (from Monday to Friday, except public holidays): Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi Floor/Room number: The Sixth Floor Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com 5. A complete set of bidding documents may be purchased by interested bidders on the submission of a written application to the above and upon payment of a non-refundable fee of VND 3,000,000 or US$ 150. The method of payment will be cash or direct deposit to specified account number: AGRIBANK VIETNAM - OPERATIONS CENTRE 2 Lang Ha Street, Ba Dinh District Hanoi, Vietnam Tel: (84- 4) 38313729 Name of Account: The Project Management Unit of Northern Inland Waterway Account No. 1200 2080 11121 (USD) Account No. 1200 2080 11144 (VND) 6. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the World Bank Standard Bidding Documents: Procurement of Works. 7. Bids must be delivered to the above PMU-NIW's office on or before 9:00AM (local time) on July 2, 2013 and must be accompanied by a Bid Security of 4,000,000,000 VND 8. Bids will be opened in the presence of bidders' representatives who choose to attend at 09:00 AM (local time) on July 2, 2013 at the above said address. Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi Floor/Room number: The Sixth Floor Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com 24 Global Project Opportunities: June, 2013 Improvements to Ninh Co River Estuary: Protection works at southern disposal area (protection bund Km 0+050 - Km 1+487) Protection works at southern disposal area (protection bund Km 1+487-Km 2+422); and groins G1, G2, G3, G4 and southern breakwater Project ID: P095129 Borrower/Bid No: CV-A2.2-NDTDP 1. The Socialist Republic of Vietnam has received a credit from the International Development Association (IDA) in various currencies towards the cost of the Northern Delta Transport Development Project (NDTDP). It is intended that part of the proceeds of this loan will be applied to eligible payments under the contracts for ICB package CV-A2.2-NDTDP. 2. The Project Management Unit of Northern Inland Waterways (PMU-NIW) on behalf of Vietnam Inland Waterway Administration (VIWA) now invites sealed bids from eligible bidders for construction and completion of Improvements to Ninh Co River Estuary ("the Works"). The contract package consists of two (02) individual contracts CV-A2.2a-NDTDP: Protection works at southern disposal area (protection bund Km 0+050 - Km 1+487) and CV-A2.2b-NDTDP: Protection works at southern disposal area (protection bund Km 1+487-Km 2+422); and groins G1, G2, G3, G4 and southern breakwater (Km 0+000 - Km 0+050). The main Works consist of: Construction and completion of stones with the weight at 200kg - 3000kg each block, concrete block Haro, T-Block, L-Block, Reno mattress; groins and southern breakwater. The bidding procedure will follow the approach of Slide-and-Package. Bidders may bid for one or two (02) contracts, as further defined in the bidding document. Bidders wishing to offer discounts in case they are awarded more than one contract will be allowed to do so, provided those discounts are included in the Letter of Bid. Bidding will be conducted through the International Competitive Bidding (ICB) procedures as specified in the World Bank's Guidelines: Procurement of Goods, Works and Non-consulting Services under IBRD Loans and IDA Credits & Grants by World bank Borrowers (Procurement Guidelines), edition May 2005, revised October 2006 and May 2010, and is open to all eligible bidders as defined in the Procurement Guidelines. Interested eligible bidders may obtain further information from and inspect the bidding documents at the office of PMU-NIW at the address below from 08:00 to 17:00 (local time) since May 20, 2013 (from Monday to Friday, except public holidays): Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi The sixth floor Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com 5. A complete set of bidding documents may be purchased by interested bidders on the submission of a written application to the above and upon payment of a non-refundable fee of VND 3,000,000 or US$ 150. The method of payment will be cash or direct deposit to specified account number: AGRIBANK VIETNAM - OPERATIONS CENTRE Address: 2 Lang Ha Street, Ba Dinh District, Hanoi, Vietnam Tel: (84- 4) 38313729 25 Global Project Opportunities: June, 2013 Name of Account: The Project Management Unit of Northern Inland Waterway Account No. 1200 2080 11121 (USD) Account No. 1200 2080 11144 (VND) 6. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the World Bank Standard Bidding Documents: Procurement of Works. 7. Bids must be delivered to the above PMU-NIW's office on or before 9:00AM (local time) on July 16, 2013 and must be accompanied by a Bid Security specified for individual contract as follows: *For Contract No. CV-A2.2a-NDTDP: 3,500,000,000 VND *For Contract No. CV-A2.2b-NDTDP: 7,000,000,000 VND *For more than one contract: will be the sum of requirements for each contract 8. Bids will be opened in the presence of bidders' representatives who choose to attend at 09:00 AM (local time) on July 16, 2013 at the above said address. Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi The sixth floor Ha Noi, Vietnam Tel: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com Improvement to Ninh Co River Estuary: Southern Breakwater Km0+050 Km0+590 Project ID: P095129 Borrower/Bid No: CV-A2.4-NDTDP 1. The Socialist Republic of Vietnam has received a credit from the International Development Association (IDA) in various currencies towards the cost of the Northern Delta Transport Development Project (NDTDP). It is intended that part of the proceeds of this loan will be applied to eligible payments under the contracts for ICB package CV-A2.4-NDTDP. 2. The Project Management Unit of Northern Inland Waterways (PMU-NIW) on behalf of Vietnam Inland Waterway Administration (VIWA) now invites sealed bids from eligible bidders for construction and completion of Southern breakwater Km0+050 - Km0+590 ("the Works"). The main Works consist of: Construction and completion of stones with the weight at 200kg - 3000kg each block, concrete block Haro, T-Block, L-Block, Reno mattress. 3. Bidding will be conducted through the International Competitive Bidding (ICB) procedures as specified in the World Bank's Guidelines: Procurement of Goods, Works and Non-consulting Services under IBRD Loans and IDA Credits & Grants by World bank Borrowers (Procurement Guidelines), edition May 2005, revised October 2006 and May 2010, and is open to all eligible bidders as defined in the Procurement Guidelines. 4. Interested eligible bidders may obtain further information from and inspect the bidding documents at the office of PMU-NIW at the address below from 08:00 to 17:00 (local time) since May 20, 2013 (from Monday to Friday, except public holidays): 26 Global Project Opportunities: June, 2013 Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi Floor/Room number: The Sixth Floor Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com 5. A complete set of bidding documents may be purchased by interested bidders on the submission of a written application to the above and upon payment of a non-refundable fee of VND 3,000,000 or US$ 150. The method of payment will be cash or direct deposit to specified account number: AGRIBANK VIETNAM - OPERATIONS CENTRE 2 Lang Ha Street, Ba Dinh District Hanoi, Vietnam Tel: (84- 4) 38313729 Name of Account: The Project Management Unit of Northern Inland Waterway Account No. 1200 2080 11121 (USD) Account No. 1200 2080 11144 (VND) 6. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the World Bank Standard Bidding Documents: Procurement of Works. 7. Bids must be delivered to the above PMU-NIW's office on or before 9:00AM (local time) on July 2, 2013 and must be accompanied by a Bid Security of 5,200,000,000 VND 8. Bids will be opened in the presence of bidders' representatives who choose to attend at 09:00 AM (local time) on July 2, 2013 at the above said address. Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi Floor/Room number: The Sixth Floor Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com Improvements to Ninh Co River Estuary: CV-A2.5a-NDTDP: Channel dredging and Protection works (Km 0+00 - Km 2+450) and CV-A2.5b-NDTDP: Channel dredging and Protection works (Km 2+450 - Km 3+500) Project ID: P095129 Borrower/Bid No: CV-A2.5-NDTDP 1. The Socialist Republic of Vietnam has received a credit from the International Development Association (IDA) in various currencies towards the cost of the Northern Delta Transport Development Project (NDTDP). It is intended that part of the proceeds of this loan will be applied to eligible payments under the contracts for ICB package CV-A2.5-NDTDP. 2. The Project Management Unit of Northern Inland Waterways (PMU-NIW) on behalf of Vietnam Inland Waterway Administration (VIWA) now invites sealed bids from eligible bidders for construction and completion of Improvements to Ninh Co River Estuary ("the Works"). The contract package consists of two 27 Global Project Opportunities: June, 2013 (02) individual contracts CV-A2.5a-NDTDP: Channel dredging and Protection works (Km 0+00 - Km 2+450) and CV-A2.5b-NDTDP: Channel dredging and Protection works (Km 2+450 - Km 3+500) The main Works consist of: Dredging and bank protection by reno mattress and riprap. The bidding procedure will follow the approach of Slide-and-Package. Bidders may bid for one or two (02) contracts, as further defined in the bidding document. Bidders wishing to offer discounts in case they are awarded more than one contract will be allowed to do so provided those discounts are included in the Letter of Bid. Bidding will be conducted through the International Competitive Bidding (ICB) procedures as specified in the World Bank's Guidelines: Procurement of Goods, Works and Non-consulting Services under IBRD Loans and IDA Credits & Grants by World bank Borrowers (Procurement Guidelines), edition May 2005, revised October 2006 and May 2010, and is open to all eligible bidders as defined in the Procurement Guidelines. Interested eligible bidders may obtain further information from and inspect the bidding documents at the office of PMU-NIW at the address below from 08:00 to 17:00 (local time) since May 20, 2013 (from Monday to Friday, except public holidays): Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi The Sixth floor Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com 5. A complete set of bidding documents may be purchased by interested bidders on the submission of a written application to the above and upon payment of a non-refundable fee of VND 3,000,000 or US$ 150. The method of payment will be cash or direct deposit to specified account number: AGRIBANK VIETNAM - OPERATIONS CENTRE Address: 2 Lang Ha Street, Ba Dinh District, Hanoi, Vietnam Tel: (84- 4) 38313729 Name of Account: The Project Management Unit of Northern Inland Waterway Account No. 1200 2080 11121 (USD) Account No. 1200 2080 11144 (VND) 6. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the World Bank Standard Bidding Documents: Procurement of Works. 7. Bids must be delivered to the above PMU-NIW's office on or before 9:00AM (local time) on July 02, 2013 and must be accompanied by a Bid Security specified for individual contract as follows: *For Contract No. CV-A2.5a-NDTDP: 3,500,000,000 VND *For Contract No. CV-A2.5b-NDTDP: 3,500,000,000 VND *For more than one contract: will be the sum of requirements for each contract 8. Bids will be opened in the presence of bidders' representatives who choose to attend at 09:00 AM (local time) on July 02, 2013 at the above said address. Project Management Unit of Northern Inland Waterways (PMU-NIW) 87 Tran Dai Nghia str., Hai Ba Trung Dist., Hanoi The Sixth floor 28 Global Project Opportunities: June, 2013 Ha Noi, Vietnam Telephone: (84-4) 39747633 Fax: (84-4) 39747637 E-mail: pmuwhanoi@gmail.com Contract 2: Batrawi South and West Water Networks Restructuring and Rehabilitation Borrower/Bid No: Central Tender No. (28/2013)-MCC Invitation For Bids (IFB): General Information City/Locality: Zarqa/Zarqa Governorate Deadline: 12:00 PM (noon) Jordan Local Time on July 21st, 2013. Funding Agency: Millennium Challenge Corporation (MCC). Buyer: Millennium Challenge Account-Jordan (MCA-Jordan) Eligibility of Bidders: MCA-Jordan through the Government Tenders Directorate (Procurement Agent) now invites eligible and qualified entities (“Bidders”) either alone or in association for bid to provide the above works. The detailed requirements towards Bidders’ eligibility and qualification are contained in the Bidding Documents. The Invitation for Bid is open to all Bidders from eligible source countries. Contact Information Address: Government Tenders Directorate Ministry of Public Works and Housings King Abdullah II Circle (8th Circle), King Abdullah II Street City: Amman. Country: Jordan. Telephone number: 00 962 6 585 8 / 311, 312, 313, or 314. Fax number: 00 962 6 585 7 / 583 or 639. Email: w-biddings@gtd.gov.jo Type of Procurement: (Works) This Specific Procurement Notice (SPN) follows the General Procurement Notice that appeared in dgMarket online of April 1st, 2013, in the UN Development Business (UNDB) online of April 1st, 2013, on 29 Global Project Opportunities: June, 2013 GTD website www.gtd.gov.jo, local newspapers: Al Rai, Al Dustour and the Jordan Times of April 1st, 2013 and was posted on MCA-Jordan website www.mca-jordan.gov.jo The Millennium Challenge Corporation (“MCC”) and the Government of Jordan (the “Government” or (“GoJ”) have entered into a Millennium Challenge Compact for Millennium Challenge Account assistance to help facilitate poverty reduction through economic growth in Jordan (the “Compact”) in the amount of approximately 275,100,000 USD (“MCC Funding”).The Government, acting through the Millennium Challenge Account – Jordan (the Employer) (“MCA-Jordan”), is a Limited Liability Company owned by the Government of Jordan. MCA-Jordan was established in June 2010 to manage and implement the program funded by the Millennium Challenge Corporation (MCC) in accordance with the Compact Agreement and international best practices. The Employer intends to apply a portion of the proceeds of MCC Funding to eligible payments under a Contract associated with the Invitation for Bids (“IFB”). Payment by the Employer will be subject, in all respects, to the terms and conditions of the Compact and related documents, including restrictions on the use of MCC funding and conditions to the disbursement of MCC funding. No party other than the Government and the Employer shall derive any rights from the Compact or have any claim to the proceeds of MCC Funding. The Compact program includes several water and wastewater projects in Zarqa Governorate, which have been identified by the Government of Jordan as priority projects that can effectively contribute to poverty alleviation in Jordan. The technical, social and environmental feasibility studies for the identified projects, which are fully funded by MCC through grant agreement signed between the Government of Jordan and MCC in June 2009, were started in late 2009. Subsequently, the program entered into its implementation phase, on 13th Dec. 2011 for a period of 5 years. DESCRIPTION OF MAIN ITEMS OF WORK Contract 2: Batrawi South and West Water Networks Restructuring and Rehabilitation. The overall scope of work of this Contract 2 comprises restructuring and rehabilitation of the Batrawi South and West Water Networks including, but not limited to, the following: 1. Construction of around 97 km of new tertiary network pipelines. The new pipelines are 10.8 km DI of 300mm and 400mm and 86.2 km of HDPE of 63mm to 250mm. 2. Construction of around 39.7 km of HDPE pipeline of 25mm and 32mm for houses connections, including the replacement of existing water meters with Employer-furnished meters. 3. Reuse of and incorporating into the Works around 12 km of existing pipelines. 4. Construction and isolation of 10 new District Meter Areas (DMA) and connecting the new networks through the connection points established under Contract C1. 5. Furnishing and installing new gate valves, butterfly valves, air release valves. 6. Construction of new booster station; 7. Commissioning and transitioning from the old pipelines system to the new networks avoiding interruption of water supply to consumers. 8. Coordination and cooperation with all other contracts and contractors to ensure proper and seamless commissioning and transitioning. Bidding Documents and Invitation for Bids are available on CDs at the Government Tenders Directorate (GTD) at the Address mentioned below. Or may be downloaded from Government Tenders Directorate (GTD) and MCA-Jordan websites: 30 Global Project Opportunities: June, 2013 www.gtd.gov.jo and www.mca-jordan.gov.jo Bidder submissions should make reference to Bidding Documents and must be received no later than July 21st, 2013 by 12:00 PM (noon) Jordan local time at the following address: Government Tenders Directorate Ministry of Public Works and Housing King Abdallah II Circle/ King Abdallah II Street P.O Box: 1220 Amman 11118 Jordan Eng. Mohammad Khaled Alhazaimeh Chairman of Central Tenders Committee Director General Contract 3: Russaifah Low Water Networks Restructuring and Rehabilitation Borrower/Bid No: Central Tender No. (29/2013)-MCC Invitation For Bids (IFB) General Information City/Locality: Zarqa/Zarqa Governorate Deadline: 12:00 PM (noon) Jordan Local Time on July 9th, 2013. Funding Agency: Millennium Challenge Corporation (MCC). Buyer: Millennium Challenge Account-Jordan (MCA-Jordan) Eligibility of Bidders: MCA-Jordan through the Government Tenders Directorate (Procurement Agent) now invites eligible and qualified entities (“Bidders”) either alone or in association for bid to provide the above works. The detailed requirements towards Bidders’ eligibility and qualification are contained in the Bidding Documents. The Invitation for Bid is open to all Bidders from eligible source countries. Contact Information Address: Government Tenders Directorate Ministry of Public Works and Housings King Abdullah II Circle (8th Circle), King Abdullah II Street City: Amman. 31 Global Project Opportunities: June, 2013 Country: Jordan. Telephone number: 00 962 6 585 8 / 311, 312, 313, or 314. Fax number: 00 962 6 585 7 / 583 or 639. Email: w-biddings@gtd.gov.jo Type of Procurement: (Works) This Specific Procurement Notice (SPN) follows the General Procurement Notice that appeared in dgMarket online of April 1st, 2013, in the UN Development Business (UNDB) online of April 1st, 2013, on GTD website www.gtd.gov.jo, local newspapers: Al Rai, Al Dustour and the Jordan Times of April 1st, 2013 and was posted on MCA-Jordan website www.mca-jordan.gov.jo The Millennium Challenge Corporation (“MCC”) and the Government of Jordan (the “Government” or (“GoJ”) have entered into a Millennium Challenge Compact for Millennium Challenge Account assistance to help facilitate poverty reduction through economic growth in Jordan (the “Compact”) in the amount of approximately 275,100,000 USD (“MCC Funding”).The Government, acting through the Millennium Challenge Account – Jordan (the Employer) (“MCA-Jordan”), is a Limited Liability Company owned by the Government of Jordan. MCA-Jordan was established in June 2010 to manage and implement the program funded by the Millennium Challenge Corporation (MCC) in accordance with the Compact Agreement and international best practices. The Employer intends to apply a portion of the proceeds of MCC Funding to eligible payments under a Contract associated with the Invitation for Bids (“IFB”). Payment by the Employer will be subject, in all respects, to the terms and conditions of the Compact and related documents, including restrictions on the use of MCC funding and conditions to the disbursement of MCC funding. No party other than the Government and the Employer shall derive any rights from the Compact or have any claim to the proceeds of MCC Funding. The Compact program includes several water and wastewater projects in Zarqa Governorate, which have been identified by the Government of Jordan as priority projects that can effectively contribute to poverty alleviation in Jordan. The technical, social and environmental feasibility studies for the identified projects, which are fully funded by MCC through grant agreement signed between the Government of Jordan and MCC in June 2009, were started in late 2009. Subsequently, the program entered into its implementation phase, on 13th Dec. 2011 for a period of 5 years. DESCRIPTION OF MAIN ITEMS OF WORK Contract 3: Russaifah Low Water Networks Restructuring and Rehabilitation. The overall scope of work for this Contract 3 comprises restructuring of tertiary water systems including, but not limited to, the following: 1. Construction of around 77 km of new tertiary pipelines, around 4km pipelines of DI pipe of 300mm to 600mm, and 73km pipelines of HDPE of 63 to 250mm. 2. Construction of around 30km of HDPE pipelines of 25mm and 32mm for house connection. 3. Reuse of and incorporating into the Works around 7 km of existing pipelines. 4. Construction of 4 new District Meter Area (DMA). 5. And connecting the new network with the connection point established under Contract C1. 6. Furnishing and installing replacement and/or new gate valves, butterfly valves, air release valves. 32 Global Project Opportunities: June, 2013 7. Commissioning and transitioning from the old pipelines system to the new networks and avoiding interruption of water supply to consumers. 8. Coordination and cooperation with all other contracts and contractors to ensure proper and seamless commissioning and transitioning. Bidding Documents and Invitation for Bids are available on CDs at the Government Tenders Directorate (GTD) at the Address mentioned below. Or may be downloaded from Government Tenders Directorate (GTD) and MCA-Jordan websites: www.gtd.gov.jo and www.mca-jordan.gov.jo Bidder submissions should make reference to Bidding Documents and must be received no later than July 9th, 2013 by 12:00 PM (noon) Jordan local time at the following address: Government Tenders Directorate Ministry of Public Works and Housing King Abdallah II Circle/ King Abdallah II Street P.O Box: 1220 Amman 11118 Jordan Eng. Mohammad Khaled Alhazaimeh Chairman of Central Tenders Committee Director General Contract 4: Russaifah High Water Networks Restructuring and Rehabilitation Borrower/Bid No: Central Tender No. (30/2013)-MCC Invitation For Bids (IFB) General Information City/Locality: Zarqa/Zarqa Governorate Deadline: 12:00 PM (noon) Jordan Local Time on July 3rd, 2013. Funding Agency: Millennium Challenge Corporation (MCC). Buyer: Millennium Challenge Account-Jordan (MCA-Jordan) Eligibility of Bidders: MCA-Jordan through the Government Tenders Directorate (Procurement Agent) now invites eligible and qualified entities (“Bidders”) either alone or in association for bid to provide the above works. The detailed requirements towards Bidders’ eligibility and qualification are contained in the Bidding Documents. The Invitation for Bid is open to all Bidders from eligible source countries. 33 Global Project Opportunities: June, 2013 Contact Information Address: Government Tenders Directorate Ministry of Public Works and Housings King Abdullah II Circle (8th Circle), King Abdullah II Street City: Amman. Country: Jordan. Telephone number: 00 962 6 585 8 / 311, 312, 313, or 314. Fax number: 00 962 6 585 7 / 583 or 639. Email: w-biddings@gtd.gov.jo Type of Procurement: (Works) This Specific Procurement Notice (SPN) follows the General Procurement Notice that appeared in dgMarket online of April 1st, 2013, in the UN Development Business (UNDB) online of April 1st, 2013, on GTD website www.gtd.gov.jo, local newspapers: Al Rai, Al Dustour and the Jordan Times of April 1st, 2013 and was posted on MCA-Jordan website www.mca-jordan.gov.jo The Millennium Challenge Corporation (“MCC”) and the Government of Jordan (the “Government” or (“GoJ”) have entered into a Millennium Challenge Compact for Millennium Challenge Account assistance to help facilitate poverty reduction through economic growth in Jordan (the “Compact”) in the amount of approximately 275,100,000 USD (“MCC Funding”).The Government, acting through the Millennium Challenge Account – Jordan (the Employer) (“MCA-Jordan”), is a Limited Liability Company owned by the Government of Jordan. MCA-Jordan was established in June 2010 to manage and implement the program funded by the Millennium Challenge Corporation (MCC) in accordance with the Compact Agreement and international best practices. The Employer intends to apply a portion of the proceeds of MCC Funding to eligible payments under a Contract associated with the Invitation for Bids (“IFB”). Payment by the Employer will be subject, in all respects, to the terms and conditions of the Compact and related documents, including restrictions on the use of MCC funding and conditions to the disbursement of MCC funding. No party other than the Government and the Employer shall derive any rights from the Compact or have any claim to the proceeds of MCC Funding. The Compact program includes several water and wastewater projects in Zarqa Governorate, which have been identified by the Government of Jordan as priority projects that can effectively contribute to poverty alleviation in Jordan. The technical, social and environmental feasibility studies for the identified projects, which are fully funded by MCC through grant agreement signed between the Government of Jordan and MCC in June 2009, were started in late 2009. Subsequently, the program entered into its implementation phase, on 13th Dec. 2011 for a period of 5 years. DESCRIPTION OF MAIN ITEMS OF WORK Contract 4: Russaifah High Water Networks Restructuring and Rehabilitation. The overall scope of work of this Contract 4 comprises restructuring and rehabilitation of the Batrawi South and West Water Networks including, but not limited to, the following: 1. Construction of around 131.7 km of new tertiary network pipelines. The new pipelines are 1.5 km DI of 300mm and 400mm and 130.2 km of HDPE of 63mm to 250mm. 34 Global Project Opportunities: June, 2013 2. Construction of around 38.4 km of HDPE pipeline of 25mm and 32mm for houses connections, including the replacement of existing water meters with Employer-furnished meters. 3. Reuse of and incorporating into the Works around 18 km of existing pipelines. 4. Construction and isolation of 7 new District Meter Areas (DMA) and connecting the new networks through the connection points established under Contract C1. 5. Furnishing and installing new gate valves, butterfly valves, air release valves. 6. Commissioning and transitioning from the old pipelines system to the new networks avoiding interruption of water supply to consumers. 7. Coordination and cooperation with all other contracts and contractors to ensure proper and seamless commissioning and transitioning. Bidding Documents and Invitation for Bids are available on CDs at the Government Tenders Directorate (GTD) at the Address mentioned below. Or may be downloaded from Government Tenders Directorate (GTD) and MCA-Jordan websites: www.gtd.gov.jo and www.mca-jordan.gov.jo Bidder submissions should make reference to Bidding Documents and must be received no later than July 3rd, 2013 by 12:00 PM (noon) Jordan local time at the following address: Government Tenders Directorate Ministry of Public Works and Housing King Abdallah II Circle/ King Abdallah II Street P.O Box: 1220 Amman 11118 Jordan Eng. Mohammad Khaled Alhazaimeh Chairman of Central Tenders Committee Director General 35 Global Project Opportunities: June, 2013 Contract 5: Zarqa High and Batrawi East Water Networks Restructuring and Rehabilitation Borrower/Bid No: Central Tender No. (31/2013) - MCC Invitation For Bids (IFB) General Information City/Locality: Zarqa/Zarqa Governorate Deadline: 12:00 PM (noon) Jordan Local Time on June 26th, 2013. Funding Agency: Millennium Challenge Corporation (MCC). Buyer: Millennium Challenge Account-Jordan (MCA-Jordan) Eligibility of Bidders: MCA-Jordan through the Government Tenders Directorate (Procurement Agent) now invites eligible and qualified entities (“Bidders”) either alone or in association for bid to provide the above works. The detailed requirements towards Bidders’ eligibility and qualification are contained in the Bidding Documents. The Invitation for Bid is open to all Bidders from eligible source countries. Contact Information Address: Government Tenders Directorate Ministry of Public Works and Housings King Abdullah II Circle (8th Circle), King Abdullah II Street City: Amman. Country: Jordan. Telephone number: 00 962 6 585 8 / 311, 312, 313, or 314. Fax number: 00 962 6 585 7 / 583 or 639. Email: w-biddings@gtd.gov.jo Type of Procurement: (Works) This Specific Procurement Notice (SPN) follows the General Procurement Notice that appeared in dgMarket online of April 1st, 2013, in the UN Development Business (UNDB) online of April 1st, 2013, on GTD website www.gtd.gov.jo, local newspapers: Al Rai, Al Dustour and the Jordan Times of April 1st, 2013 and was posted on MCA-Jordan website www.mca-jordan.gov.jo The Millennium Challenge Corporation (“MCC”) and the Government of Jordan (the “Government” or (“GoJ”) have entered into a Millennium Challenge Compact for Millennium Challenge Account assistance to help facilitate poverty reduction through economic growth in Jordan (the “Compact”) in the amount of approximately 275,100,000 USD (“MCC Funding”).The Government, acting through the Millennium Challenge Account – Jordan (the Employer) (“MCA-Jordan”), is a Limited Liability Company owned by the 36 Global Project Opportunities: June, 2013 Government of Jordan. MCA-Jordan was established in June 2010 to manage and implement the program funded by the Millennium Challenge Corporation (MCC) in accordance with the Compact Agreement and international best practices. The Employer intends to apply a portion of the proceeds of MCC Funding to eligible payments under a Contract associated with the Invitation for Bids (“IFB”). Payment by the Employer will be subject, in all respects, to the terms and conditions of the Compact and related documents, including restrictions on the use of MCC funding and conditions to the disbursement of MCC funding. No party other than the Government and the Employer shall derive any rights from the Compact or have any claim to the proceeds of MCC Funding. The Compact program includes several water and wastewater projects in Zarqa Governorate, which have been identified by the Government of Jordan as priority projects that can effectively contribute to poverty alleviation in Jordan. The technical, social and environmental feasibility studies for the identified projects, which are fully funded by MCC through grant agreement signed between the Government of Jordan and MCC in June 2009, were started in late 2009. Subsequently, the program entered into its implementation phase, on 13th Dec. 2011 for a period of 5 years. DESCRIPTION OF MAIN ITEMS OF WORK Contract 5: Zarqa High and Batrawi East Water Networks Restructuring and Rehabilitation. The overall scope of work of this Contract 5 comprises restructuring and rehabilitation of the Batrawi South and West Water Networks including, but not limited to, the following: 1. Construction of around 224 km of new tertiary network pipelines. The new pipelines are 4 km DI of 300mm and 400mm and 220 km of HDPE of 63mm to 250mm. 2. Construction of around 114.km of HDPE pipeline of 25mm and 32mm for houses connections, including the replacement of existing water meters with Employer-furnished meters. 3. Reuse of and incorporating into the Works around 10.7 km of existing pipelines. 4. Construction and isolation of 11 new District Meter Areas (DMA) and connecting the new networks through the connection points established under Contract C1. 5. Furnishing and installing new gate valves, butterfly valves, air release valves. 6. Construction of new booster station; 7. Commissioning and transitioning from the old pipelines system to the new networks avoiding interruption of water supply to consumers. 8. Coordination and cooperation with all other contracts and contractors to ensure proper and seamless commissioning and transitioning. Bidding Documents and Invitation for Bids are available on CDs at the Government Tenders Directorate (GTD) at the Address mentioned below. Or may be downloaded from Government Tenders Directorate (GTD) and MCA-Jordan websites: www.gtd.gov.jo and www.mca-jordan.gov.jo Bidder submissions should make reference to Bidding Documents and must be received no later than June 26th, 2013 by 12:00 PM (noon) Jordan local time at the following address: Government Tenders Directorate 37 Global Project Opportunities: June, 2013 Ministry of Public Works and Housing King Abdallah II Circle/ King Abdallah II Street P.O Box: 1220 Amman 11118 Jordan Eng. Mohammad Khaled Alhazaimeh Chairman of Central Tenders Committee Director General Improvement of Water Supply Systems in Ararat Marz Settlements, comprising of 3 lots Loan No. and Title: 2860-ARM (SF): Water Supply and Sanitation Sector Project – Additional Financing Contract No. and Title: L2860-ICB-1-02: Improvement of Water Supply Systems in Ararat Marz Settlements, comprising of 3 lots Deadline for Submission of Bids: 05 July 2013; 15:00 hours (local time) The Republic of Armenia has received financing from the Asian Development Bank (ADB) towards the cost of 2860-ARM: Water Supply and Sanitation Sector Project-Additional Financing. Part of this financing will be used for payments under the contract named above. This contract will be jointly financed by the Armenian Government. Bidding is open to all bidders from eligible source countries of the ADB. 2. Bidders may bid for one or several contracts, as further defined in the bidding document. Bidders wishing to offer discounts in case they are awarded more than one contract will be allowed to do so, provided those discounts are included in the letter of Bid. 3. The Armenian Water and Sewerage CJSC (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of L2860-ICB-1-02: Improvement of Water Supply Systems in Ararat Marz Settlements, comprising of 3 lots (“the Works”), consisting of: Lot-1 No.: L2860-ICB-1-02/1, Improvement of water supply systems in Vedi and Ararat towns and Banavan GMF, Ararat,Vosketap villages The works for Vedi and Ararat towns and Banavan GMF, Ararat,Vosketap villages include: Construction of 2.3km length, de160 PE external water main, Construction of 43.3 km length, de50-de250 PE internal water line, Construction of 30.4 km length, de20-de32 PE inlet lines for private houses, Installation of 2600 water meter chambers Lot-2 No.: L2860-ICB-1-02/2, Improvement of water supply systems in Masis, Burastan, Azatavan, Baghramyan, Berkanush, Dalar, Mrgavan, Shahumyan and Dimitrov villages 38 Global Project Opportunities: June, 2013 The works for Masis, Burastan, Azatavan, Baghramyan, Berkanush, Dalar, Mrgavan, Shahumyan and Dimitrov villages include: Construction of 2.5km length, de110-de400 PE external water main for Garni-Erashk and Garni-Zod, Construction of 52.4 km length, de50-de250 PE internal water line, Construction of 33.0 km length, de20-de32 PE inlet lines for private houses, Installation of 3108 water meter chambers Lot-3 No.: L2860-ICB-1-02/3, Improvement of water supply systems in Aygezard, Verin Artashat, Mrganush, Byuravan, Nshavan, Hovtashen, Mrgavet and reconstruction of Abovyan village external water main The works for Aygezard, Verin Artashat, Mrganush, Byuravan, Nshavan, Hovtashen, Mrgavet and Abovyan village include: Construction of 3.5km length, de110 PE external water main, Construction of 42.9 km length, de50-de250 PE internal water line, Construction of 25.9 km length, de20-de32 PE inlet lines for private houses, Installation of 2447 water meter chambers International Competitive Bidding (ICB) will be conducted in accordance with ADB’s Single-Stage: One-Envelope bidding procedure and is open to all Bidders from eligible source countries. 4. Only eligible bidders with the following key qualifications should participate in this bidding: Lot-1 No.: L2860-ICB-1-02/1, Improvement of water supply systems in Vedi and Ararat towns and Banavan GMF, Ararat,Vosketap villages - Minimum average annual construction turnover of US$ 3.700.000 (three million seven hundred thousand US dollars) calculated as total certified payments received for contracts in progress or completed, within the last 3 (three) years. - Access to or availability of financial resources such as liquid assets, unencumbered real assets, lines of credit and other financial means, other than any contractual advance payments for the amount of US$ 1.225.000 ( one million two hundred twenty-five thousand US dollars) - Participation as contractor, management contractor, or subcontractor, in at least 1 (one) contract within the last 3 (three) years, each with a value of at least US$ 1.960.000 (one million nine hundred sixty thousand US dollars) that has been successfully or is substantially completed and that is similar to the proposed works. The similarity shall be construction of 13km of PE Pipelines. - All pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than 50 percent of the Bidder’s net worth. Lot-2 No.: L2860-ICB-1-02/2, Improvement of water supply systems in Masis, Burastan, Azatavan, Baghramyan, Berkanush, Dalar, Mrgavan, Shahumyan and Dimitrov villages - Minimum average annual construction turnover of US$ 3.450.000 (three million four hundred fifty thousand US dollars) calculated as total certified payments received for contracts in progress or completed, within the last 3 (three) years. - Access to or availability of financial resources such as liquid assets, unencumbered real assets, lines of credit and other financial means, other than any contractual advance payments for the amount of US$ 1.150.000 (one million one hundred fifty thousand US dollars) - Participation as contractor, management contractor, or subcontractor, in at least 1 (one) contract within the last 3 (three) years, each with a value of at least US$ 1.800.000 (one million eight hundred thousand US dollars) that has been successfully or is substantially completed and that is similar to the proposed works. The similarity shall be construction of 10km of PE Pipelines. - All pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than 50 percent of the Bidder’s net worth. Lot-3 No.: L2860-ICB-1-02/3, Improvement of water supply systems in Aygezard, Verin Artashat, Mrganush, Byuravan, Nshavan, Hovtashen, Mrgavet and reconstruction of Abovyan village external water main 39 Global Project Opportunities: June, 2013 - Minimum average annual construction turnover of US$ 2.250.000 (two million two hundred fifty thousand US dollars) calculated as total certified payments received for contracts in progress or completed, within the last 3 (three) years. - Access to or availability of financial resources such as liquid assets, unencumbered real assets, lines of credit and other financial means, other than any contractual advance payments for the amount of US$ 750.000 (seven hundred fifty thousand US dollars) - Participation as contractor, management contractor, or subcontractor, in at least 1 (one) contract within the last 3 (three) years, each with a value of at least US$ 1.200.000 (one million two hundred thousand US dollars) that has been successfully or is substantially completed and that is similar to the proposed works. The similarity shall be construction of 8km of PE Pipelines. - All pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than 50 percent of the Bidder’s net worth. The Bidder for three lots shall hold a valid and effective license/permit for hydro-technical facilities, issued by the RA Urban Development Ministry. In case of the absence of this license/permit the Bidders shall submit with the bid a signed statement that if the bidder is awarded the Contract he will obtain the required license from the RA Urban Development Ministry. 5. To obtain further information and inspect the bidding document, bidders should contact: Armenian Water and Sewerage CJSC (AWSC), Investment Programs Coordination Department (IPCD), To: Dr. Eduard Chil-Akopyan, AWSC IPCD, Project Manager, Attn.: Ms. Kristine Ghambaryan, Procurement officer, Address: Floor 3, Vardanants Blind Alley 8a, 0010, Yerevan, Armenia Tel./Fax: +374 10 54 28 77 E-mail: ngevorgyan@armwater.am; echilakopyan@armwater.am; kghambaryan@armwater.am 6. To purchase the bidding document in English, eligible bidders should: Write to the address above requesting the bidding document for L2860-ICB-1-02: Improvement of water supply systems in Ararat marz settlements, comprising of 3 lots Pay a non-refundable fee of USD 100 or AMD 40 000 payable to the account indicated below. The method of payment will be direct deposit to Armenian Water and Sewerage CJSC’s cash box or direct payment to Armenian Water and Sewerage CJSC’s below specified account numbers: For US Dollars: account No. 160483054419 with VTB Bank Armenia (SWIFT Code: ARMJAM22), 46, Nalbandyan Street, 0010, Yerevan, Republic of Armenia or For Armenian Drams: account No. 247010078175 with ARDSHININVESTBANK (SWIFT Code: ASHBAM22), 13, Grigor Lusavorich Street, 0010, Yerevan, Republic of Armenia. 7. Deliver your bid: To the address above. On or before the deadline: 05 July 2013, 15:00 hours (local time). Together with a Bid Security as described in the Bidding Document. Bids will be opened immediately after the deadline for bid submission in the presence of bidders’ representatives who choose to attend. 40 Global Project Opportunities: June, 2013 Country/ Borrower: Nepal Loan 2650-NEP (SF): Secondary Towns Integrated Urban Environmental Improvement Project Name and Address of Executing Agency: The Project Director Project Coordination Office Secondary Towns Integrated Urban Environmental Improvement Project Department of Urban Development and Building Construction Kathmandu, Nepal Telephone No.: +977 1 4262535 E mail: stiueip@gmail.com Brief Description of the Project: 1. The Government of Nepal has received a USD 60.0 million loan from the Asian Development Bank (ADB) and USD 17.0 million from OFID to finance the cost of Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP) in Nepal. Additional funding of USD 19.72 million from Government of Nepal and USD 9.61 million from municipalities/beneficiaries will be available. The total project cost is USD 106.33 million. 2. The main objective of the project is to develop reliable, affordable, and effective municipal infrastructure and the sub-project objectives are to: (a) improve drainage and sewerage systems in Biratnagar and Birgunj (b) improve urban roads and lanes in Biratnagar and Birgunj (c) improve solid waste management systems in Birgunj and Butwal (d) expand water supply systems in Kavre valley and Butwal (e) improve urban infrastructure facilities in Butwal 3. The contract sizes, procurement methods and tentative date of publication of bid notice shall be as follows: S. N. General Description Approximate Contract Value (Million USD) Procurement Method Tentative Bid Notice Date 1 Biratnagar: Construction of 63 Km sewerage network, 26 Km drainage network, 7 MLD WWTP including electromechanical reinstatement/rec onstruction of 64km road and lanes for sewerage and drainage subproject. 30.00 ICB Last week of May, 2013 41 Global Project Opportunities: June, 2013 2 3 4 5 6 Birgunj: Construction of 49 Km sewerage network, 94 Km drainage network, 7 MLD WWTP including electromechanic al equipments, Reinstatement/ Reconstruction of 59 Km road and lanes for sewerage and drainage subproject Birgunj: Construction of 10 Ha. Landfill Site for solid waste management subproject Butwal: Construction of 60 Km transmission pipeline, 60 Km distribution pipeline, 900 m3 Reservoir Tank and other structures for water supply sub-project Butwal: Construction of 5 Ha. Landfill site for solid waste management subproject Butwal: Construction of infrastructure facilities for Auto-Village sub-project 26.00 ICB Third week of June, 2013 1.80 ICB Last week of July, 2013 2.00 ICB First week of June, 2013 1.70 ICB Last week of July, 2013 2.50 ICB September, 2013 42 Global Project Opportunities: June, 2013 SOCIAL INFRASTRUCTURE Package No. 03: Construction and Management of Secondary Transfer Station (STS) in Dhaka, Rajshahi and Sylhet City Corporations Borrower/Bid No: Package No. 03 Invitation for Bids 1. The Peoples Republic of Bangladesh has received a loan from the Asian Development Bank (ADB) towards the cost of Urban Public and Environmental Health Sector Development Project. Part of this loan will be used for payments under the contract named above. Bidding is open to bidders from eligible source countries of the ADB. 2. The Urban Public and Environmental Health Sector Development Project of Local Government Division (the Employer) invites sealed bids from eligible bidders for the Construction of Secondary Transfer Station (STS) in Dhaka, Rajshahi and Sylhet City Corporations. International Competitive Bidding (ICB) will be conducted in accordance with ADB’s Single-Stage: Two-Envelope Bidding Procedure. Sl. Brief Description of Works , Goods and Services to be bid as a Single package Location of Work STS-1 Construction & Supply of Equipment & Service delivery for STS Uttara Jasimuddin Road, Dhaka Dhaka STS-2 Construction & Supply of Equipment & Service delivery for STS Uttara Rajuk College, Dhaka Dhaka STS-3 Construction & Supply of Equipment & Service delivery for STS Golar Tek Mirpur, Dhaka Dhaka STS-4 Construction & Supply of Equipment & Service delivery for STS Kawran Bazar, Dhaka. Dhaka STS-5 Construction & Supply of Equipment & Service delivery for STS Berry Bandh Mohammadpur, Dhaka. Dhaka STS-6 Construction & Supply of Equipment & Service delivery for STS Berry Bandh Rayer Bazarl, Dhaka. Dhaka STS-7 Construction & Supply of Equipment & Service delivery for STS Berry Bandh Hazaribag Progoti, Dhaka. Dhaka STS-8 Construction & Supply of Equipment & Service delivery for STS Berry Bandh Hazaribag, Matador, Dhaka. Dhaka STS-9 Construction & Supply of Equipment & Service delivery for STS South Corner of Jurain Grave Road, Dhaka. Dhaka No. DHAKA STS 43 Global Project Opportunities: June, 2013 STS- 10 Construction & Supply of Equipment & Service delivery for STS Jatrabari Crossing, Dhaka. Dhaka STS- 11 Construction & Supply of Equipment & Service delivery for STS Golapshah Mazar, Gulistan, Dhaka. Dhaka STS- 12 Construction & Supply of Equipment & Service delivery for STS Dhaka University playground Dhaka Medical College Hospitalt, Dhaka. Dhaka RAJSHAHI STS STS-1 Construction & Supply of Equipment & Service delivery for STS Court Station Walton Center, Rajshahi. Rajshahi STS-2 Construction & Supply of Equipment & Service delivery for STS Rajshahi Medical College, Rajshahi. Rajshahi STS-3 Construction & Supply of Equipment & Service delivery for STS Tarokhadia Woman Sports Complex, Rajshahi. Rajshahi STS-4 Construction & Supply of Equipment & Service delivery for STS Rashik Composting Plant, Rajshahi. Rajshahi STS-5 Construction & Supply of Equipment & Service delivery for STS Calamari Adarsha School, Rajshahi. Rajshahi STS-6 Construction & Supply of Equipment & Service delivery for STS Near Kajla Water Pump, Rajshahi. Rajshahi STS-1 Construction & Supply of Equipment & Service delivery for STS Swarnashika, Kadantali,Sylhet. Sylhet STS-2 Construction & Supply of Equipment & Service delivery for STS Near West Shahi Eidgah, Sylhet. Sylhet STS-3 Construction & Supply of Equipment & Service delivery for STS Rikabi Bazar Police Line, Sylhet. Sylhet STS-4 Construction & Supply of Equipment & Service delivery for STS MC College Shahidd Tower, Sylhet. Sylhet SYLHET STS 3. To be qualified for the contract package, bidder should meet the minimum requirements as shown below. The complete eligibility and qualification requirements are stipulated in Section 3: Evaluation and Qualification Criteria. Minimum average annual turnover of US$ 4.5 million. Calculated at total certified payments received for contracts in progress or completed, within the last three (3) years. General Experience under contracts in the role of contractor, subcontractor, or management contractor for at least the last five (5) years prior to the bid submission deadline. For Specific experience, the participation as contractor, subcontractor or management contractor in at least two (2) contracts within the last five (5) years, with a value of at least 3.6 million USD, that have been successfully or are substantially completed and that are similar to the proposed plant and 44 Global Project Opportunities: June, 2013 services or experience in the civil construction works of building including RCC structures/steel structures with truss, sheet roofing. 4. To obtain further information and inspect the Bidding Document, bidders should contact the Project Director at the following address during the working days starting 22 May 2013: Office of the Project Director Urban Public and Environmental Health Sector Development Project (UPEHSDP) Room No. 1223, Level-11, Nagar Bhaban, Dhaka South City Corporation 5 Phoenix Road, Dhaka-1000, Bangladesh Telephone: 880-2-9513786 Fax: 880-2-9513786 E-mail: pdupehsdp@gmail.com 5. To purchase the Bidding Document in English, eligible bidders should: Write to the address above requesting the bidding document for Package No.03: Construction and Management of Secondary Transfer Station (STS) in Dhaka, Rajshahi and Sylhet City Corporations. Pay a non-refundable fee of US$200 only (Two hundred US Dollar) or BDT 15,000 only (Fifteen Thousand Taka) through Demand Draft/Pay Order freely convertible in Bangladesh in favor Officer of The Project Director Urban Public and Environmental Health Sector Development Project, Local Government Division, MoLGRD&C. The Bidding Document will be sent via courier for an additional fee of BDT 2000 only (TwoThousand Taka) for domestic delivery and US$200 only (Two hundred US Dollar) for overseas delivery. No liability will be accepted for loss or late delivery of the Bidding Document. Pre-bid conference will be held 11:00 a.m. on 17 June 2013 at above address. 6. Deliver your bid: To the address above On or before 13:00 hours on 08 July 2013. Together with the Bid Security of an equivalent amount indicated in the bidding document. For the purpose of determining the equivalent amount of the required Bid Security, the exchange rates published by Bangladesh Bank Selling rate at the time of submitted the date of document prevailing on the date 28 days prior to the deadline for bid submission shall be applied. Bids will be opened at 14:00 hours on 08 July 2013 in the presence of Bidder’s representatives who choose to attend at the address above. 7. The Employer will not be responsible for cost or expenses incurred by bidders in connection with the delivery or preparation of bids. 45 Global Project Opportunities: June, 2013 Construction of the Vlora By-Pass, Albania Project ID: 42319 Borrower/Bid No: 7102-pre-42319 Invitation for pre-qualification The Ministry of Public Works and Transport, the Albanian Road Authority, hereinafter referred to as “the Client”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development, European Investment Bank and EU Delegation hereinafter referred to as “the Bank”, towards the cost of the Construction of Vlora By-Pass. The Client intends prequalifying firms and consortia to tender for the following contract, hereinafter referred to as “the Contract”, to be funded from part of the proceeds of the loan: Vlora bypass consists of a 29 km long route composed of a new single carriageway highway, numerous new bridges and 8 at grade junctions. The project starts from the Roundabout at the end of the Double Carriageway Levan Vlora. Vlora by-pass connects the Fier Vlore Road with the -sea-side Road Vlore Saranda in south of Vlore. Considering the traffic (between 5000 and 12000 Veh/day) the cross section will Comprise 2 lanes with 3.5m lane + 1.5m hard shoulder. Due to the slope of the longitudinal profile, climbing lanes have been foreseen. The descending direction will comprise one 3.75 m lane with a reduced 1m hard shoulder. For the climbing direction, and following Safety Audit recommendations the slow vehicle lane will be 3.5m which is the minimum width for a category C Road. The fast lane will be 3.25m. The hard shoulder will be 1m which is the minimum width for a road according to ARDM. Earthworks Excavation in soft or intermediate soils 508 000 m3 Excavation in rock 1 273 000 m3 Embankment formation 683 000 m3 Road Pavement Sub-base layer 175 000 m3 Bituminous base course 353 000 m2 Binder course 353 000 m2 Bituminous wearing course 353 000 m2 46 Global Project Opportunities: June, 2013 Drainage Concrete pipe culvert Ø 800mm 392 m Concrete pipe culvert Ø 1000 mm 660 m Concrete pipe culvert Ø 1200 mm 510 m Structures Structural excavation 54 000 m3 Structural concrete class 30/37 17 000 m3 For the bridges only 2 types of beams are used. Beams with span 25m and Beam with span 30 m The following table shows the location and types of all the structures: KP Type Spans No. of Lanes Height Length Radius 1+050 underpass 8 2 5m 20m straight 2+050 bridge 4x25m 3 13m 100m 120m 11+280 bridge 4x25m 2 25m 100m 80m 13+600 bridge 4x25m 3 52m 100m 90m 19+700 bridge 5x30m 3 54m 150m straight 26+500 underpass 1 2 5m 21m straight 28+850 bridge 2x25m 2 7m 50m straight 47 Global Project Opportunities: June, 2013 Construction Period is 30 months. Prequalification and tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms and joint ventures of firms from any country. Prequalification documents may be obtained from the office at the address below upon payment of a nonrefundable fee of Euro 100.00 (one hundred) or equivalent in a convertible currency. Payment to obtain the Tender Documents can be made by bank transfer. The address of the Bank is: Intesa San Paolo Bank, Tirane, Albania. Name of Account is: Segmenti Fier – (Levan) – Tepelene. Account No: 4520811008 0000002022430701. Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery. If requested, the documents can be dispatched electronically in PDF format free of charge. The prequalification documents must be duly completed and delivered to the address below, on or before 25th July 2013. Documents which are received late may be rejected and returned unopened. Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office: CONTACTS Mr. Andi TOMA Director General Albanian Road Authority Rr. Sami Frasheri, No.33 Tel: + 355 4 22 347 89 Fax: + 355 4 22 236 00 E-mail: ermalnuri@yahoo.com 48 Global Project Opportunities: June, 2013 Provincial Roads Improvement Project, Kingdom of Cambodia Loan No. and Title: Contract No. and Title: Deadline for Submission of Bids: 2839/8254-CAM (SF): Provincial Roads Improvement Project PRIP-CW-C-ICB-2013-01: Improvement ofPR150B, NR53 and PR151B 08 July 2013; 15:00 hours (Cambodia Standard time The Kingdom of Cambodia has received a loan from the Asian Development Bank (ADB) towards the cost of the Provincial Roads Improvement Project. Part of this loan will be used for payments under the contract named above. International Competitive Bidding (ICB) is open to bidders from eligible source countries of the ADB. The eligibility rules and procedures of ADB will govern the bidding process. The bidding will be in accordance with ADB’s Single-Stage: One-Envelope bidding procedure. 2. The Ministry of Public Works and Transport (MPWT) of the Kingdom of Cambodia (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Improvement of approximately 70.6km covering PR150B (34.7km), NR53 (32.3km) and PR151B (3.6km) (“The Works”). 3. The Works to be carried out generally comprise the followings: improvement of the existing road, generally on the same alignment by widening the road width, and paving; raising of the road level in areas subjected to frequent flooding; widening and paving of shoulders; construction of box culverts and minor drainage structures; construction of bridges; improvement of side drainage and slope protection; traffic safety features, road signs and road marking; environmental mitigation measures; and detection and neutralization of unexploded ordnance (UXO) and mines clearance 4. Only eligible bidders with the following key qualifications should participate in this bidding: all pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than seventy five (75) percent of the Bidder’s net worth; bidder’s net worth calculated as the difference between total assets and total liabilities for each year should be positive for the last three (3) years; minimum average annual construction turnover of US$ 11.85 million calculated as total certified payments received for contracts in progress or completed, within the last three (3) years; 49 Global Project Opportunities: June, 2013 availability of financial resources indicated in Form FIN-3 in Section 4: Availability of financial resources shall be adequate to cover the bidder’s financial resources requirement given in Form FIN-4 in Section 4: Bidding Forms; participation as contractor, management contractor, or subcontractor, in at least two (2)contracts within the last five (5) years, each with a value of at least US$ 14.22 million that have been successfully or are substantially completed and that are similar to the proposed works; and contracts executed during the last five (5) years, minimum construction experience in the following key activities must meet all requirements: i) Embankment : 715,075cu.m ii) Cemented Sub-base Course : 107,189cu.m iii) Aggregate Base Course : 136,474cu.m iv) Bituminous Surface Treatment (SBST) Aggregate, 19mm : 410,844sq.m 5. To obtain further information and inspect the bidding document, bidders should contact: Project Management Unit 3 Ministry of Public Works and Transport 4th Floor, Eastern Building, Corner Norodom Blvd. and St. 106, Phnom Penh, Cambodia Telephone: (855) 23 724 565; Facsimile: (855) 23 724 595 E-mail: psovicheano@online.com.kh 6. A complete set of bidding documents may be purchased by interested eligible bidders on submission of a written application to the address above from 22 May 2013 from 7:30 hours to 12:00 hours and from 14:00 hours to 17:30 hours (Cambodia Standard Time) and upon payment of a non-refundable fee of US$200. Payment will be made by cashier’s check to the following account: Bank: National Bank of Cambodia Account Name: MEF Current Account Account No.:000000001333 7. Bids shall be delivered: to the address above on or before the deadline of 08 July 2013, on or before 15:00 hours (Cambodia Standard Time). together with a bid security as described in the Bidding Document. Bids will be opened at 15:30 hours (Cambodia Standard Time) on the same day thereafter in the presence of bidder’s representatives who choose to attend. Any bid received by the Employer after the deadline for submission of bids prescribed in the above-mentioned date will be rejected and returned unopened to the bidder. 8. When comparing bids, ADB’s Domestic Preference Scheme will be applied in accordance with the provisions stipulated in the bidding documents 9. MPWT will not be responsible for any costs or expenses incurred by the Bidders in connection with the preparation of Bid 50 Global Project Opportunities: June, 2013 Procurement of Works for the Emergency Reconstruction of DBST Provincial Road No.159 (34.60km) in Banteay Meanchey and Battambang Provinces, Cambodia Loan/Grant Nos. and Title: 2852/0285-CAM: Flood Damage Emergency Reconstruction Project Contract No. and Title: FDERP/MPWT-ICB-CW8: Procurement of Works for the Emergency Reconstruction of DBST Provincial Road No.159 (34.60km) in Banteay Meanchey and Battambang Provinces 02 July 2013 9:00 hours (local time) Deadline for Submission of Bids: The Royal Government of Cambodia (RGC) represented by the Ministry of Economy and Finance has received a loan from the Asian Development Bank (ADB) and a grant from the Government of Australia (AusAID) towards the cost of Flood Damage Emergency Reconstruction Project (FDERP), and intends to apply part of the Loan and Grant for payments under the Contract name above. The bidding is open to bidders from eligible source countries of the ADB. The Single-Stage: One-Envelope Bidding Procedure under International Competitive Bidding (ICB) procurement method will be applied. The eligibility rules and procedures of ADB will govern the bidding process. 2. The Ministry of Public Works and Transport (MPWT) of the Kingdom of Cambodia (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of CW8: Emergency Reconstruction of DBST Provincial Road No.159 in Banteay Meanchey and Battambang Provinces (“the Works”). The major Works consist of, but not limited to the following: Construction of approximately 34.60km road (including embankment, subbase course/road base, asphalt wearing course, surface treatment (DBST), pavement markings and other road furniture; Constructions of one (1) RC Bridge and RC Box Culverts with approximate total length110m; Drainage System consists of approximately 950 meters total length of RC Pipe; Culverts of various diameters in sizes, headwall / wingwall, and Slope Protection Works; UXO Ordinance, Survey Detection and Disposal 3. Only eligible bidders with the following key qualifications should participate in this bidding: Experience under construction contracts in the role of contractor, subcontractor, or management contractor for at least the last five (5) years prior to the bid submission deadline. Participation as contractor, management contractor, or subcontractor, in at least two (2) contracts within the last six (6) years, each with a value of at least US$ 7.5 million that have been successfully or are substantially completed and that are similar to the proposed works. Experience in similar works such as road construction, specifically with surface treatments of DBST, construction of embankment/ sub-grade/ sub-base/ road base, and pavement markings, as well as implementation of an Environmental Management Plan (EMP) or an equivalent strategy to mitigate environmental impacts of the works (Lead Firm only). Minimum average annual construction turnover of US$ 11.24 million calculated as total certified payments received for contracts in progress or completed, within the last three (3) years. 51 Global Project Opportunities: June, 2013 Financial resources, in terms of at least the bidder’s latest year’s working capital and lines of credit, will be adequate to cover the Bidder’s Bid Price and current work. No pending litigation occurred within the last two years. All pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than seventy five (75) percent of the Bidder’s net worth. The Bids will be evaluated on the basis of the "pass" or "fail" criterion. Procurement of Contracts shall be governed by ADB Procurement Guidelines. 4. To obtain further information and inspect the bidding document, bidders should contact: Attention: H.E. KEM Borey, Project Director of FDERP Ministry of Public Works and Transport (MPWT) Meeting Room of General Directorate of Public Works 1st Floor Main Building, Corner Norodom Blvd. Street 106 Phnom Penh, CAMBODIA, 12000 Tel. 023-991194 Fax.: 023-864318 Email: kemborey12@yahoo.com 5. A complete set of the bidding document may be purchased by interested eligible bidders: on submission of a written application to the following office from 07:30 to 12:00 hours and from 14:00 to 17:30 hours (local time), Monday to Friday from 17 May 2013 to 02 July 2013 at 9:00 hours (local time): Mr. Nay Chamnang Project Manager, PIU-FDERP Ground Floor, Road Infrastructure Department Building 598 Street, Sangkat Chang Chamres, Khan Russy Keo, Phnom Penh, Cambodia upon payment of a non-refundable fee of US$200 by cashier’s check, or by telegraphic transfer to the following account: Bank: National Bank of Cambodia Account Name: MEF Current Account: No.:000000006048 If requested, upon confirmation of payment including courier fee of US$ 100.00, the bidding documents will be sent by courier. 6. Bids must be delivered to the above office (as stated in paragraph 4) on or before 02 July 2013, 9:00 hours (local time) and must be accompanied by a Bid Security in the amount as stated in the bidding document (Bid Data Sheet). Bids will be opened immediately after the deadline in the presence of bidder’s representatives and other interested persons who choose to attend. For the purpose of determining the equivalent amount of the required bid security in a freely convertible currency, the exchange rates published by the National Bank of Cambodia prevailing on date 28 days prior to the deadline for bid submission shall be applied. 7. Any bid received by the Employer after the deadline for submission of bids prescribed in the abovementioned date will be rejected and returned unopened to the bidder. 8. When comparing Bids, ADB’s Domestic Preference Scheme will be applied in accordance with the provisions stipulated in the bidding documents 9. MPWT will not be responsible for any costs or expenses incurred by the Bidders in connection with the preparation of Bid. 52 Global Project Opportunities: June, 2013 Civil Works for Constructing a 6.6 kilometer Asphalt Concrete Road in Botanic-Sharhad, Horoo 7, 8, 9, 10, and 17, Bayanzurh district, Ulaanbaatar, Mongolia Loan No. and Title: Contract No. and Title: Deadline for Submission of Bids: 2301-MON: Urban Development Sector Project CWC 05/2011: Civil Works for Constructing a 6.6 kilometer Asphalt Concrete Road in Botanic-Sharhad, Horoo 7, 8, 9, 10, and 17, Bayanzurh district, Ulaanbaatar, Mongolia 04 July 2013, 11:00 a.m. (Ulaanbaatar Time) 1. Mongolia has received a loan from the Asian Development Bank (ADB) towards the cost of the Urban Development Sector Project and it intends to apply part of this loan to payments under the contract named above. Bidding is open to bidders from eligible source countries of the ADB. 2. The Ministry of Construction and Urban Development, Mongolia (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of a 6.6 km asphalt concrete road in Botanic-Sharhad, Horoo 7, 8, 9, 10, and 17, Bayanzurh district, Ulaanbaatar, Mongolia (“the Works”). The general scope of work will include but not be limited to the following: The road is asphalt concrete and consists of A, B, C, D, E, and F sections. Must have reinforced concrete box culverts in 7 locations. The road must have traffic signs, markings, and traffic signals to comply with the traffic safety requirements, and have 13 bus stops and shelters. Auto road street lighting must be LED. Communication cable line, 0.4 kilowatt (kW) and 10 kW electricity air lines, water pipe, and sewer pipe in the road ROW must be shifted and renewed. 3. Only eligible bidders with the following key qualifications should participate in this bidding: Have participated as contractor, management contractor, or subcontractor, in at least 1 (one) contract within the last 5 (five) years, each with a value of at least US$ 4.2 million that have been successfully or are substantially completed and that are similar to the proposed works. Have experience under construction contracts in the role of contractor, subcontractor, or management contractor for at least the last 5 (five) years prior to the bid submission deadline. Must have a minimum average annual construction turnover of US$ 5.3 million within the last 3 (three) years. 4. Interested bidders are invited to attend Pre-Bid meetings on 05 and 12 June 2013 at 11:00 a.m. in the meeting room of the Project Implementation Unit of L2301-MON: Urban Development Sector Project at the address given below. 5. To obtain further information and inspect the bidding document, bidders should contact: Project Management Unit of L2301-MON: Urban Development Sector Project A.Tserendejid, Procurement Specialist Room No. 2, 2nd floor, Administration of Land Affairs, Geodesy and Cartography, Building #3, Revolutionary Avenue, Chingeltei District, Ulaanbaatar-14201, Mongolia Facsimile number: +976 11 319712 / 321187 Electronic mail address: mon2301@udsp.mn 53 Global Project Opportunities: June, 2013 6. To purchase the bidding document in English, eligible bidders should: write to address above requesting the bidding document for the proposed Works pay a non-refundable fee of US$150 (one hundred and fifty US dollars) by transmitting to the following bank account: Project Management Unit L2301-MON: Urban Development Sector Project CAPITAL BANK Bank Account: 20000011524 Swift Code: CBMNMNUB CORRESPONDENT BANK: COMMERZBANK A. G. Address: Commerzbank AG 60261 Frankfurt Am Main De Germany Account No. 400-878-518-000 USD Swift Code: COBADEFF 7. Deliver your bid: to the address above, one original and three copies on or before the deadline: 04 July 2013, 11:00 a.m. (Ulaanbaatar time) together with a bid security in an amount of not less than 2% (two per cent) of the Bid Price or an equivalent amount in a freely convertible currency in the form of a guarantee from a reputable bank. For purposes of determining the equivalent amount of Bid Security in other freely convertible currency, the selling exchange rates published by the Bank of Mongolia (Central Bank) on the date 28 days prior to the deadline for bid submission shall be applied. Bids will be opened immediately after the deadline in the presence of bidders’ representatives who choose to attend. 8. International Competitive Bidding (ICB) will be conducted in accordance with ADB’s Single-Stage: One-Envelope procedure. 54 Global Project Opportunities: June, 2013 Saudi Arabia: Education complex - Tender Details Description Construction of the Al-Khansaa education complex Bid closing date Tender no. 15 July, 2013 74/34 Details Available on Payment of SR8,000 Client Education Ministry Department Procurement & Tenders Address Airport Road, PO Box 3734, Riyadh 11148 Phone (9661) 4042888/ 4042952/4415555/ 4351284 Fax (9661) 4012365/ 4037229/ 4419004 Website www.moe.gov.sa Kuwait: Building construction and maintenance - Tender Details Description Bid closing date Bid Bond Tender no. Miscellaneous Details Available on Payment of Documents availiable from Client Address Construction, completion and maintenance of a building for the Interior Ministry’s General Directorate of Constructions & Maintenance – the Construction Engineering Department 9 July, 2013 KD5,000 1-2013/2014 A pre-bid meeting will be held on 9 June. The client is Interior Ministry. Tender documents must be collected from the Central Tenders Committee KD120 Central Tenders Committee Interior Ministry PO Box 1070, Safat 13011 Phone (965) 2401200 Fax (965) 2416574 Email info@ctc.gov.kw Website www.ctc.gov.kw 55 Global Project Opportunities: June, 2013 Oman: Road project - Tender Details Carrying out the Diba-Lima-Khasab road project for the Transport & Communications Ministry Description Bid closing date Tender no. 11 July, 2013 Prequalification (no. 52/2013) Miscellaneous The client is the Transport & Communications Ministry. Tender documents must be collected from the Tender Board Details Available From 27 May, 2013 Details Available Until 20 June, 2013 Details Available on Payment of Documents availiable from Client RO175 Tender Board Transport & Communications Ministry Address PO Box 787, Al-Khuwair 133 Phone (96824) 602073/ 602556 Fax (96824) 602063 Website www.tenderboard.gov.om Saudi Arabia: Residence works - Tender Details Description Bid closing date Tender no. Details Available on Payment of Client Address Phone Fax Carrying out additions and improvement works to residences at the AlTwali port in Riyadh 29 June, 2013 1508 SR10,000 Finance Ministry Airport Road, PO Box 6902, Riyadh 11177 (9661) 4050000/ 4050080/ 4055000 (9661) 4059202/ 4035422 Email info@mof.gov.sa Website www.mof.gov.sa 56 Global Project Opportunities: June, 2013 Saudi Arabia: University department expansion - Tender Details Description Bid closing date Tender no. Details Available on Payment of Client Address Phone Fax Expansion and rehabilitation of an arts education department at King Saud University in Riyadh 1 July, 2013 40/34 SR10,000 King Saud University University Street, Dirriyeh, PO Box 2454, Riyadh 11451 (9661) 4670000/ 4676935/ 4674000 (9661) 4677008/ 4677580 Email eng@ksu.edu.sa Website www.ksu.edu.sa Saudi Arabia: Urban centre - Tender Details Description Bid closing date Tender no. Construction of an urban centre in Riyadh 24 June, 2013 11/402/434/1435 Details Available on Payment of SR1,500 Client Address Phone Fax Email Website Riyadh Municipality Al-Wazeer Street, PO Box 953, Riyadh 11146 (9661) 4112222/ 4026400/ 4121865 (9661) 4118832 webmaster@alriyadh.gov.sa www.alriyadh.gov.sa 57 Global Project Opportunities: June, 2013 Saudi Arabia: Buildings - Tender Details Description Construction of buildings in the eastern region Bid closing date 2 July, 2013 Details Available on Payment of SR20,000 Client Eastern Province Municipality Address Emara, PO Box 2870, Dammam Phone (9663) 8241000 Fax (9663) 8337711 Email info@dammam.gov.sa Website www.easternemara.gov.sa Lebanon: Hospital construction - Tender Details Description Bid closing date Bid Bond Source of financing Miscellaneous Details Available on Payment of Client Department Address Construction and completion of the Tyre governmental hospital in south Lebanon including architectural, structural, electrical, mechanical and HVAC works. The project will take 24 months 21 June, 2013 $300,000 Islamic Development Bank Open to contractors with experience in building works to the value of at least $5m $1,000 Council for Development & Reconstruction Tenders Tallet el-Serail, PO Box 11/3170, Beirut Central District Phone (9611) 981431 Fax (9611) 981255 Website www.cdr.gov.lb 58 Global Project Opportunities: June, 2013 Saudi Arabia: Buildings and facilities - Tender Details Maintenance of reinforced concrete buildings and facilities at the East Corridor area. The scope of works comprises the provision of operation and maintenance (O&M) services at designated Royal Commission buildings and facilities within the Jubail industrial city. The areas covered include Haii Yanbu, Haii al-Bahar, Haii alShati,Haii al-Lulu, Haii al-Huwaylat, Shati al-Huwaylat, support industries area and Haii-al-Khaleej Description Bid closing date Tender no. 29 June, 2013 840-S62 Miscellaneous Details Available on Payment of Client A pre-bid meeting will be held on 8 June. Open to 100 per cent Saudi-owned companies only SR5,000 Royal Commission for Jubail & Yanbu Department Supply Management Directorate-General for Royal Commission in Jubail, Director, Contracts Section, PO Box 10001, Madinat al-Jubail al-Sinaiyah 31961 Address Phone (9663) 3414127/63 Fax (9663) 3412201 Saudi Arabia: Shoreline development - Tender Details Description Bid closing date Tender no. Miscellaneous Details Available on Payment of Client Department Address Phone Fax Development of the Jalmudah shoreline over about 6.5 kilometres, phase 1, within the Jubail industrial city. The width of the shoreline various from 50 metres to 500 metres. The scope of works includes site preparation, earthwork, grading and storm drainage, roadway including pavement markings and traffic signs, pedestrian paths, sanitary wastewater system, potable and fire water distribution, irrigation system, landscaping works, electrical power distribution, street lighting system, landscaping works, telecommunications and IPTV network 24 July, 2013 692-C03 A pre-bid meeting will be held on 19 June SR14,000 Royal Commission for Jubail & Yanbu Supply Management Directorate-General for Royal Commission in Jubail, Director, Contracts Section, PO Box 10001, Madinat al-Jubail al-Sinaiyah 31961 (9663) 3414127/63 (9663) 3412201 59 Global Project Opportunities: June, 2013 ENERGY Power System Expansion and Efficiency Improvement Investment Program (Tranche 1) Procurement of Plant-Design, Supply, Installation, Testing and Commissioning for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project on Turnkey Basis. Invitation for Bids 1. The People’s Republic of Bangladesh has applied for a loan from the Asian Development Bank (ADB) towards the cost of Power System Expansion and Efficiency Improvement Investment Program (Tranche 1) - Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project. Part of this loan will be used for payments under the contract named above. 2. North-West Power Generation Company Limited (NWPGCL) (“the Employer”) now invites sealed bids from eligible bidders for Procurement of Plant-Design, Supply, Installation, Testing and Commissioning for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project on Turnkey Basis. 3. International Competitive Bidding (ICB) will be conducted in accordance with ADB’s Single Stage: Two-Envelope Bidding Procedure and is open to all bidders from eligible source countries of the ADB. 4. Bidders are required to have experience in supply, erection, installation, testing and commissioning of Power Plant on Turnkey basis under a single contract during last ten (10) years; The similarity of the plant shall be based on the physical size (more than 200 MW capacities) in one unit CCPP, including any type of CCPP configuration. Such power plants shall be in continuous commercial operation for minimum two (2) years.Moreover, Except the bidders from Borrower’s country, all the bidder must have experience at least one (1) construction contract (of any nature) with a value of at least USD 43 Million (as prime contractor or subcontractor) outside of its home country within the last 10 (ten) years. (Note: To know the other eligibility criteria, intending bidders are advised to inspect the Bidding Document along with the “Amendment-1” by visiting the website of NWPGCL at www.nwpgcl.org.bd.). 5. To obtain further information and inspect the bidding document, bidder should contact: Project Director : Upgradation of Khulna 150MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project Organization : North-West Power Generation Company Limited (NWPGCL) Floor/Room number : Bidyut Bhaban (Level 14) Street Address : 1, Abdul Gani Road City : Dhaka-1000 Country : Bangladesh Telephone : +88-02-9560984, +88-01730066985 Facsimile number : +88-02-9564630 Web-site Address : www.nwpgcl.org.bd 6. To purchase the Bidding Document in English, eligible bidders should: 60 Global Project Opportunities: June, 2013 Visit the office of the Project Director - Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project at the address indicated above between 9:00 hours and 17:00 hours on working days from 13 May 2013 to 02 July 2013 and pay a nonrefundable fee of Bangladesh Taka (BDT) 20,000.00 (Twenty Thousand Bangladesh Taka) in the form of bank draft written in favor of North-West Power Generation Company Limited, Dhaka, Bangladesh; or Request for delivery by sending a written application to the address above requesting the bidding document for Procurement of Plant-Design, Supply, Installation, Testing and Commissioning for Upgradation of Khulna 150 MW Peaking Power Plant to 225 MW Combined Cycle Power Plant Project on Turnkey Basis. The application must include a bank draft in favor of North-West Power Generation Company Limited for the amount of BDT 20,000.00 (domestic delivery) or US$250.00 (Overseas delivery). The document will sent by courier. No liability will be accepted for loss or late delivery. be 7. Bids must be delivered to the address below: To the Company Secretary North-West Power Generation Company Limited (NWPGCL) Floor/Room number: Bidyut Bhaban (Level 14) Street Address: 1, Abdul Gani Road, City: Dhaka-1000 Country: Bangladesh Phone:+88-02-9513533 Email: cs@nwpgcl.org.bd On or before the deadline: 11:00 hours on 03 July 2013 Together with a Bid Security in the amount indicated in the bidding document. Bids will be opened immediately after the deadline in the presence of Bidders’ representative who choose to attend. 8. NWPGCL will not be responsible for any costs or expenses incurred by bidders in connection with the preparation or delivery of bids, site visits etc. 9. NWPGCL reserves the right to accept or reject all bids without explaining any reason. 61 Global Project Opportunities: June, 2013 Upgradation of Distribution Line , Nepal Loan No. and Title: Contract No. and Title: Deadline for Submission of Bids: 2808-NEP: Electricity Transmission Expansion and Supply Improvement Project EED–069/70-03: Upgradation of Distribution Line 24 June 2013; 12:00 hours (Nepal Standard Time) Nepal has received a loan from the Asian Development Bank (ADB) towards the cost of Electricity Transmission Expansion and Supply Improvement Project. Part of this loan will be used for payments under the contract named above. Bidding is open to bidders from eligible source countries of the ADB. 2. The Nepal Electricity Authority (“the Employer”) invites sealed bids from eligible bidders for the construction and completion of Supply, Delivery, Installation, Testing and Commissioning of 11 & 0.4 kV Distribution Line and Distribution Transformers along the Khimti-Kathmandu Transmission Lines in 6 (Six) Distribution Centers under the Kathmandu Regional Office of Nepal Electricity Authority. International Competitive Bidding (ICB) will be conducted in accordance with ADB's Single-Stage: Two-Envelope Bidding Procedure. 3. To obtain further information and inspect the bidding document, bidders should contact: Electricity Transmission Expansion and Supply Improvement Project Planning and Technical Service Department Durbarmarg, Kathmandu, Nepal Tel.: +977-1-4153153 Fax.: +977-1-4153155 Email: neatscd@gmail.com, chaudharyvijay@hotmail.com 4. The Bidding Document, in the English language, may be purchased by interested Bidders upon submission of a written application to the address given above and upon payment of a nonrefundable fee of Nepalese Rupees 30,000.00 (Nepalese Rupees Thirty Thousand only) or an equivalent amount in US$ by bank voucher to the Current Account No 610003 at the Nepal Rastra Bank, Thapathali, Kathmandu, Nepal. If requested, and on payment of an additional fee of NR5,000 (in words, Nepali Rupees five thousand only) towards postal charges, the documents can be sent by courier. However, no liability will be accepted for lost or late delivery. 5. All Bids must be accompanied by a Bid Security in the amount as specified in Clause 21.1 of the Bid Data Sheet. For the purpose of determining the equivalent amount of the required Bid Security in a freely convertible currency, the exchange rates (selling) published by Nepal Rastra Bank prevailing on the date 28 days prior to the deadline for bid submission shall be applied. 6. Bids must be delivered to the address given above at or before 12:00 hours (Nepal Standard Time) on 24 June 2013. Late Bids shall be rejected. Bids will be opened immediately after the deadline for bid submission on 24 June 2013 in the presence of the Bidder's representatives who choose to attend at the address above. 7. In the comparison of Bids, ADB's Domestic Preference Scheme will be applied in accordance with the provisions stipulated in the Instruction to Bidders 62 Global Project Opportunities: June, 2013 CONSULTANCY Construction Supervision of St. John's River Flood Mitigation – Revised Project ID: P117871 Borrower/Bid No: No.: DVRP/LCS/02 Request for Expression of Interest Grenada has received financing from the World Bank toward the cost of the Regional Disaster Vulnerability Reduction Project, and intends to apply part of the proceeds for consulting services. The consulting services ("the Services") include but not limited to the following: Scope of Services The Consultant will report to the Project Coordinator of the Project Coordination Unit (PCU), Ministry of Finance and will be responsible for carrying out construction supervision services to ensure compliance with the approved engineering designs, bill of quantities, working drawings and technical specifications for the various flood mitigation measures which will include new bridge structures, river works, flood defenses and embankment landscaping works in accordance with acceptable international design standards and engineering code of practices. The professional services of the consultants should cover all responsibilities including technical, environment and social aspects required in the execution of the different work activities. These responsibilities will include: (i) a proper technical review of all design reports; (ii) recommend modifications if required as per site conditions; and (iii) implementation of all works consistent with quality control (QC) procedures needed to verify production quality and quantity, and the quality assurance (QA) procedures needed for the acceptance or rejection of the Project at completion. The services shall be carried out in accordance with generally accepted Standards of professional practice, following recognized engineering and management principles and practices for construction supervision services. The consultant's scope of work is understood to cover all activities necessary to accomplish the stated objectives of these services while adhering to the aforementioned principles and practices, whether or not a specific activity is cited in these ToR. The services will include a review of the proposed detailed engineering designs, technical specifications and Bid Documentation; procurement of contractors following World Bank procedures; construction supervision and contract closeout. The assignment should be completed over an 18 month period. The Project Coordination Unit, Ministry of Finance acting on behalf of the Government of Grenada now invites eligible consulting firms ("Consultants") to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications ( description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, at least ten (10) years experience in the area of supervising large civil works for hydraulics/river/irrigation/drainage, river embankment protection works, bridges, material testing for the construction of bridges and concrete and soil density testing with not less than one successfully completed similar assignments during the past 5 years.) 63 Global Project Opportunities: June, 2013 The attention of interested Consultants is drawn to paragraph 1.9 of the World Bank's Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers published by the Bank in May 2004 and revised in October 2006 and May 2010 ("Consultant Guidelines"), setting forth the World Bank's policy on conflict of interest. Consultants may associate with other firms in the form of a joint venture or a sub-consultancy to enhance their qualifications. Consultants should indicate the form of the association. A Consultant will be selected in accordance with the Least Cost Selection (LCS) method set out in the Consultant Guidelines. Further information can be obtained at the address below during office hours 8:00 a.m. to 4:00 p.m. Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by Friday June 21, 2013. The Project Coordinator The Project Coordination Unit GCNA Complex, Lagoon Road St. George's, Grenada Tel: (473) 443-0532 Fax: (473) 443-0533 E-mail: margaret.belfon@gmail.com; jenlaki@gmail.com Line Route and Environmental and Social Impact Assessment Study for the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project Request for Expressions of Interest The West African Power Pool (hereinafter referred to as “the Borrower”) has applied for funding from the New Partnership for Africa Development- Infrastructure Project Preparatory Facility (NEPAD-IPPF) of the African Development Bank (AfDB), towards the cost of the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project. This International Call for Expressions of Interest relates to the contract for Consultancy Services for a Line Route and Environmental and Social Impact Assessment Study for the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project. This contract shall include: Line Route Study: Proposal of Line Route corridor Detailed Survey and Profiling of Line Route Proposal of Substation Sites Detailed Survey of Substation Sites Preparation of maps and drawings. Catalogue all eligible villages/town/communities in the Line Route Study Report describing among others, their exact power line route distance from the proposed line route/substation, population, and general geographical layout to enable the Consultant preparing the Update of Feasibility Study to make an appropriate proposal. 64 Global Project Opportunities: June, 2013 Close collaboration with Consultant preparing Feasibility Study and Functional Bidding Documents. Environmental and Social Impact Assessment (ESIA): Study of Existing Environment Identification & Assessment of Potential Environmental Impacts Identification of Mitigation Measures Conduct Public Consultations Preparation of a Resettlement Action Plan (RAP) Preparation of Environmental Impact Statement (EIS) Preparation of Environmental & Social Management Plan (ESMP) Preparation of Illustrative Materials Training: Transfer of technological know-how through training of counterpart staff. This contract is expected to be implemented from October 2013 to September 2014. All firms are invited to respond to the Expression of Interest (EOI) by making submissions in hard and soft copies. Interested Consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc). Interested Consultants should note that a separate Call for EOI in carrying out a Feasibility Study and Preparation Functional Bidding Documents has also been published. Consultants can respond to either Calls for EOI, but not both. Consultants may associate to enhance their qualifications. A Consultant will be selected in accordance with the African Development Bank’s “Rules and Procedures for the use of Consultants” May 2008 edition, Revised July 2012, which is available on the Bank’s website at http://www.afdb.org. and subject to approval of funding from AfDB. Interested eligible Consultants may obtain further information from: Mr. Amadou Diallo Secretary General West African Power Pool Secretariat 06 BP 2907 Cotonou Republic of Benin Tel: +229 21 37 41 95, +229 21 37 71 44 Fax : +229 21 37 71 43 Email: info@ecowapp.org, nash@ecowapp.org All Expressions of Interest must be delivered in closed envelopes bearing the mention 65 Global Project Opportunities: June, 2013 “Expression of Interest for the Line Route and Environmental and Social Impact Assessment Study for the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project” not later than 12 noon local time Benin, June 20th, 2013 at the following address: West African Power Pool Secretariat Zones des Ambassades, PK-6 06 BP 2907 Cotonou Republic of Benin Update of Feasibility Study and Preparation of Bidding Documents for the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project Request for Expressions of Interest The West African Power Pool (hereinafter referred to as “the Borrower”) has applied for funding from the New Partnership for Africa Development- Infrastructure Project Preparatory Facility (NEPAD-IPPF) of the African Development Bank (AfDB), towards the cost of the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project. This International Call for Expressions of Interest relates to the contract for Consultancy Services for an Update of Feasibility Study and Preparation of Bidding Documents for the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project. This contract shall include: Feasibility Study: Determination of technical feasibility of the project Economic and financial evaluation of the project including Sensitivity Analyses Preliminary Engineering design at feasibility level and preparation of functional specifications Close collaboration with Consultant executing Line Route and Environmental and Social Impact Assessment Study. Proposal of an appropriate institutional framework and organization to be put in place that shall among others, minimize the risks of the project not being implemented within the best conditions of cost and time, and facilitate the coordinated operation of the interconnection when commissioned Preliminary engineering and specifications for medium and low voltage systems, for conducting rural electrification of communities/villages/towns both around the indicated substations and along the line routing using shield-wire technology and/or other appropriate technology Preparation of Bidding Documents: Preparation of Functional Bidding Documents Proposal of Project Packaging suitable for Design and Build Procurement Commercial Framework Tariff Proposals Update and/or Preparation of Commercial Agreements Assistance during Contract Negotiations Optional Services: Assistance during Bidding Assistance during Bid Evaluation and Contract Negotiation Award of Contract 66 Global Project Opportunities: June, 2013 Training Training by transfer of technological know-how through training of counterpart staff in project preparation This contract is expected to be implemented from October 2013 to September 2014. All firms are invited to respond to the Call for Expression of Interest (EOI) by making submissions in hard and soft copies. Interested Consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc). Interested Consultants should note that a separate Call for EOI for carrying out a Line Route Study and an Environmental and Social Impact Assessment Study has also been published. Consultants can respond to either Calls for EOI and not both. Consultants may associate to enhance their qualifications. A Consultant will be selected in accordance with the African Development Bank’s “Rules and Procedures for the use of Consultants” May 2008 edition, Revised July 2012, which is available on the Bank’s website at http://www.afdb.org and subject to approval of funding from AfDB. . Interested eligible Consultants may obtain further information from: Mr. Amadou Diallo Secretary General West African Power Pool Secretariat 06 BP 2907 Cotonou Republic of Benin Tel: +229 21 37 41 95, +229 21 37 71 44 Fax: +229 21 37 71 43 Email: info@ecowapp.org, nash@ecowapp.org All Expressions of Interest must be delivered in closed envelopes bearing the mention “Expression of Interest for the Feasibility Study and Preparation of Bidding Documents for the 330 kV WAPP Nigeria – Benin Interconnection Reinforcement Project” not later than 12 noon local time Benin, June 20th, 2013 at the following address: West African Power Pool Secretariat Zones des Ambassades, PK-6 06 BP 2907 Cotonou Republic of Benin 67 Global Project Opportunities: June, 2013 Feasibility Study & Detailed Design for Irrigation & Drainage, Consultative Scheme, Training & Mobilization Project ID: P121186 Borrower/Bid No: MAFCP/CS/003 This request for expressions of interest follows the General Procurement Notice for this project that appeared in Development Business online No. May 25, 2010 and the GPN Update published on December 20, 2012, DB Reference No. WB5260-12/12. The Government of Albania has received financing in the amount of EUR 31 million equivalent from the World Bank toward the cost of the Water Resources and Irrigation Project, and it intends to apply part of the proceeds to payments for goods, works, related services and consulting services to be procured under this project for the Feasibility Study & Detailed Design for I&D, Consultative Scheme, Training & Mobilization The services include: preparation of all feasibility studies and detailed designs for 15 irrigation and drainage schemes aiming to improve the existing infrastructure or to introduce modern infrastructure where from the feasibility study investment is proven to be economically efficient. The Irrigation and Drainage systems will be mostly located in the associated Drin-Buna and Semani river basins. Nr. Irrigation Scheme District/commune Village Irrigated Area Original Design (ha) (ha) 1 Murriz Thana LushnjeShegan Thane 32,300 2 Kurjan Fier – Kurjan Kurjan 5,430 3 Strumi Fier – Strum Strum As per Kurjani 4 Leminoti Korce – Pirg Leminot 400 5 Duhanas Berat – Rroshnice Duhanas 550 6 Belesova Berat – Lumas Belesova 1280 7 Tregtan 2 Has – Fajze Tregtan 28 8 Tregtan 3 Has – Fajze Tregtan 315 Fier 68 Global Project Opportunities: June, 2013 9 Vranisht 2 Has – Fajze Vranisht 217 10 Koshnica 1 Devoll – Miras Menkula 850 11 Staravecke Skrapar – Potom Staravecka 12 T'Pla Tropoje – Fierze T'Pla 470 13 Zharrëz Fier – Zharres Zharres 600 14 Slanica Berat – Velebisht Slanice 320 15 Xarre Vlore- Sarande Xarre 80 2000 The Ministry of Agriculture, Food and Consumer Protection (MAFCP) now invites eligible consulting firms to indicate their interest in providing the services. Interested consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc.). Consultants may associate to enhance their qualifications. Minimum qualification requirements are: *Documents defining the constitution or legal status, place of registration and principal place of business of the Consultant; *Consultants' organization and capacities (technical and managerial organization of the firm, qualifications of key staff); *Experience in similar projects (for every listed project please submit the following information: name of the project, donator/investors, contract value, realization data and contact info from donor/investor side); *Other documents (brochures, description of similar assignments, letters of recommendations, etc.). Assignment is estimate to commence in December 2013. A consultant will be selected in accordance with the Quality and Cost-Based Selection Procedures set out in the World Bank's Guidelines: Selection and Employment of Consultants by World Bank Borrowers edition of January 2011. Interested consultants may obtain further information at the address below during office hours 0800 to 1630 hours. Expressions of interest must be delivered to the address below no later than 1700 hours (local time) on Monday, July 1st, 2013. Ministry of Agriculture, Food and Consumer Protection, "Skenderbeg" Square, No.2 Tirana, Albania Attn: Mr. Albert Kushti General Secretary Attn: Andi Vila E-mail: andivila@yahoo.com 69 Global Project Opportunities: June, 2013 Tel/fax: 00355 4 223917 Attn: Eralda Lameborshi E-mail: eralda.lameborshi@gmail.com Technical Assistance and Capacity Building for Development of Cost Effective Small Hydro Projects the Promotion and Project ID: P112780 Borrower/Bid No: 2013/2.2bc/cs The Government of Jamaica (GoJ) has received financing from the International Bank for Reconstruction and Development (IBRD) towards the cost of the Energy Security and Efficiency Enhancement Project (ESEEP). This project is being implemented by the Ministry of Science, Technology, Energy and Mining (MSTEM) the executing agency in collaboration with several other state implementing partners. The GoJ intends to apply part of the proceeds toward payments under the contract for a Consulting Firm to provide Technical Assistance and Capacity Building to the Ministry of Science, Technology, Energy and Mining (MSTEM) and the Petroleum Corporation of Jamaica (PCJ) for the promotion and development of costeffective small hydropower projects. MSTEM and the PCJ intend to carry out investment promotion activities for several hydropower schemes, including: Two (2) small hydro sites for which feasibility studies have already been completed (Great River in Hanover and Laughlands Great River in St. Ann); Five rivers for which feasibility studies have commenced and should be completed by July 2014. These rivers are Morgan's, Spanish and Negro rivers in St. Thomas; Rio Cobre in St. Catherine and Martha Brae in Trelawny. The PCJ intends to initiate the procurement of another set of hydropower feasibility studies for five (5) additional rivers by mid-2013. The objectives of this consultancy are to: 1) Provide technical assistance and guidance administration of hydropower developments; 2) to key stakeholder agencies in the Support the development and implementation of departmental policies and procedures; 3) Support the creation of an interactive web-based platform for easier information exchange with project developers, interested investors and the relevant local agencies; 4) Provide feasibility study evaluation support; 5) Plan, coordinate and implement promotional activities for feasible hydropower schemes to developers and investors (local and overseas) and 6) Provide training support based on gaps identified within MSTEM and PCJ. This assignment requires an estimated level of effort equivalent to ten (10) man-months 70 Global Project Opportunities: June, 2013 INVITATION MSTEM now re-invites eligible Consultants to indicate their interest in providing the above services. Interested consultants should provide information demonstrating that they have the required qualifications and relevant experience in field of hydropower project development and financing. The consultant will be selected under the procedures of Quality and Cost Based Selection in accordance with the procedures set out in the World Bank's Guidelines: Selection and Employment of Consultants by World Bank (current edition). Consultants may associate with other firms in the form of a joint venture or subconsultancy to enhance their qualifications. Any association must be clearly stated with the country of registration for the lead firm on the front page of the proposal. However, Consultants who are contracted by MSTEM to complete the Hydro Feasibility Studies under the IBRD loan shall not be short-listed for the Request for Proposals to provide Technical Assistance and Capacity Building. Further information can be obtained at the address below during office hours Monday – Friday 9:00 AM to 4:00 PM EST. Expression of interest (EOI) forms and the requisite shortlisting criteria are on the Ministry's website, http://www.mstem.gov.jm as of Monday May 20, 2013. Firms seeking clarification to the Request for Expressions of Interest should send an email to ibrdeseep@mstem.gov.jm, or fax 876-968-2082 or mail to the address below no less than ten (10) days before the final submission date of the EOI. One (1) Original and five (5) copies of the Expressions of Interest must be delivered no later than the following date and time 10:00 a.m. EST, on Monday, June 24, 2013. The opening of the Expressions of Interest is scheduled for 10:15 a.m. on Monday, June 24, 2013 at the PCJ resource Centre, 36 Trafalgar Road, Kingston 10 in the second floor conference Room. Interested consultants may submit Expression of Interest to: The Procurement Officer Energy Security and Efficiency Enhancement Project Ministry of Science, Technology, Energy and Mining Second floor Conference Room PCJ Resource Centre 36 Trafalgar Road Kingston 10, Jamaica E-mail: ibrdeseep@mstem.gov.jm 71 Global Project Opportunities: June, 2013 Construction Supervision of the Civil Works Contract(s) for the Rehabilitation of the Centralized Irrigation Systems along Nistru River (‘Jora De Jos’, ‘Cosnita’, ‘Puhaceni’ & ‘Roscani’) Borrower/Bid No: PP5/THVAP/CS/QCBS/14 1. The Millennium Challenge Corporation (the “MCC”) and the Government of Moldova (the “Government”) have entered into a Millennium Challenge Compact for Millennium Challenge Account assistance to help facilitate poverty reduction through economic growth in Republic of Moldova (the “Compact”) in the amount of approximately 262,000,000 USD (the “MCC Funding”). The Government, acting through the Millennium Challenge Account – Moldova, a public institution established under the laws of the Republic of Moldova as the Accountable Entity for the Compact (the “MCA-Moldova”), intends to apply a portion of the MCC Funding to eligible payments under a contract for which the Request for Proposals is issued. Any payments made under the proposed contract will be subject, in all respects, to the terms and conditions of the Compact and related documents, including restrictions on the use of MCC funding and conditions to the disbursements of MCC funding. No party other than the Government and the MCA-Moldova shall derive any rights from the Compact or have any claim to the proceeds of MCC Funding. 2. The goal of a Compact would be to reduce poverty through economic growth. The Compact contains the following components: * Road Rehabilitation Project (RRP). The project shall improve profitability and marketability of goods carried on the roads, improve access to social services among communities serviced by the roads, and improve road safety. The proposed project comprises the rehabilitation of existing paved four-lane roads. * Transition to High Value-added Agriculture (THVA) Project. The project objective is to increase income in rural agricultural communities through transition to higher value-added production through rehabilitation of irrigation infrastructure, radical changes to its management, and increased access to finance, training, and market information, beneficiaries will transition to more intensive and varied crop production and better marketing of the production. The Works for the rehabilitation of irrigation infrastructure include (i) repairs and reconstruction of the existing facilities of pumping stations, including replacement of electro-mechanical equipment; (ii) rehabilitation of suction pipes and fish protection structures; (iii) partial replacement of existing steel, reinforced-concrete and asbestos cement pipes with new steel and HDPE pipes; (iv) installation of new network fittings, manholes and appurtenant structures; (v) rehabilitation of water hammer protection systems; and (vi) installation of new control and automation systems and SCADA. Rehabilitation Works may be bundled with 2-3 Centralized Irrigation Systems (CISs) per contract which could result in up to four (4) different construction supervision contracts and up to four (4) different civil works contracts to rehabilitate up to 11 CISs. 3. This Invitation for Proposals follows the General Procurement Notice posted on the MCA-Moldova website http://www.mca.gov.md/en/General-procurements-notice.html on April 12, 2012, dgMarket on April 11, 2012, and UN Development Business Online on April 13, 2012, and published in the local newspapers Ekonomicheskoie Obozrenie on April 13, 2012 and Monitorul Oficial on April 27, 2012. 4. The MCA-Moldova acting through the Procurement Agent now invites proposals to provide the consultant services referenced above (“Proposals”). The Construction Supervision Consultant acting as Engineer in accordance with FIDIC Conditions of Contract (Red Book) will be responsible for: (a) establishment of systems of managerial control for contract(s) to rehabilitate CIS ‘Cosnita’, CIS ‘Jora de Jos’, CIS ‘Puhaceni’ and CIS ‘Roscani’ (the “Works Contract”); (b) administration and management of the Works Contract; 72 Global Project Opportunities: June, 2013 (c) control over estimated works quantities and contract outcome costs, in monitoring the progress of the Works and technical records; (d) control and acceptance of Contractor’s interim and final payment certificates; (e) acceptance and/or approval of Contractors’ key staff, insurances, guarantees, licenses, programs, method statements, traffic management plans, safety measures, suppliers and materials for incorporation in the Works, the quality assurance and control plans, laboratory provisions and execution of the testing program, subcontractors, plant, equipment and environmental protection; (f) direct supervision of the Works and monitoring of progress; (g) preparation of progress, technical and contractual reports; (h) execution of the control tests of all materials intended for incorporation into permanent works and all executed works. The Services to be provided by the Construction Supervision Consultant shall cover: (i) Pre-construction activities (ii) Administration and management of the Works Contract (iii) Approval of Contractor's materials, construction techniques and programs of Works (iv) Supervision of the Works and monitoring of progress (v) Approval and Supervision of the Contractor’s Environmental and Social Management Plan implementation, including Health and Safety, Trafficking in Persons and Social and Gender Integration Plan (vi) Review variations/change orders and Claims provided by the Works Contractor and make appropriate recommendations to the Employer (vii) Defects Notification Period (post-construction services for monitoring the Contractor’s operations and for issuing any required certificates). More details on these consultant services are provided in the Terms of Reference (the “TOR”). The Contract will be divided into: * Base Contract – a twelve (12) month fixed price lump sum contract, including one (1) month prior to the mobilization of Works Contractor(s) and eleven (11) months Construction Supervision (CS) activities for all four CISs along Nistru River (‘Jora De Jos’, ‘Cosnita’, ‘Puhaceni’ and ‘Roscani’). * Option Contract – a fixed price lump sum contract to cover the CS activities during the remaining period of the construction Works, to be activated at the end of the Base Period at the sole discretion of MCA-Moldova. This Option is for twenty-one (21) months, including nine (9) months construction period for all four CISs along Nistru River (‘Jora De Jos’, ‘Cosnita’, ‘Puhaceni’ and ‘Roscani’) followed by twelve (12) months Defect Notification Period for all four CISs along Nistru River (‘Jora De Jos’, ‘Cosnita’, ‘Puhaceni’ and ‘Roscani’). The Base Contract shall automatically extend for a successive Option Contract unless MCA-Moldova, at its sole discretion, notifies the Consultant in writing of its election not to renew the Base Contract, at least ninety (90) days prior to the end of the term of the Base Contract. 73 Global Project Opportunities: June, 2013 This RFP also includes two (2) Unpriced Options for the provision of Construction Supervision services that are to be activated at the sole discretion of MCA-Moldova. The Unpriced Options are as follows: * Unpriced Option #1: Provision of CS services in accordance with FIDIC Conditions of Contract (Red Book) for the rehabilitation Works for Upper Prut CISs (‘Blindesti’, ‘Grozesti’ and ‘Leova’) with nineteen (19) months Construction Period and twelve (12) months Defects Notification Period, which are to be procured under a single Works Contract. A detailed Scope of Services will be provided to the Consultant in a reasonable time upon MCA-Moldova decision, at its sole discretion, to request the provision of services under the Unpriced Option #1, The Consultant shall not address or include the Unpriced Option #1 in its Technical and Financial Proposal at this time. * Unpriced Option #2: Provision of CS of the rehabilitation Works for Lower Prut CISs (‘Cahul’ and ‘Chircani-Zirnesti’), which are to be procured under a single Works Contract likely under the modality of Design/Build (D/B) based of FIDIC Conditions of Contract (Yellow Book), with estimated fifteen (15) months for Design and Construction Works and twelve (12) months Defects Notification Period. A detailed Scope of Services will be provided to the Consultant in a reasonable time upon MCA-Moldova decision, at its sole discretion, to request the provision of services under the Unpriced Option #2, The Consultant shall not address or include the above Unpriced Option #2 in its Technical Proposal at this time. However, a brief description of the Engineer responsibilities in supervision of a D/B contract and the potential skill sets needed to fulfill this responsibilities is provided in this RFP, based on which the Consultant shall include proposed fully loaded rates for the Unpriced Option #2 in its Financial Proposal at this time (in addition to the fully loaded rates for the key personnel and support staff needed for the Base Contract and Option Contract), which information shall not be considered in any way in the Proposal evaluation. 5. The Request for Proposal (“RFP”) is open to all eligible entities (“Consultants”) who wish to respond. Consultants may associate with each other in the form of a joint venture or in a sub-consultancy agreement to complement their respective areas of expertise to enhance their capacity to successfully carry out the assignment and so long as any association is otherwise formed in accordance with the terms of the RFP. 6. A Consultant will be selected under the QCBS method, the evaluation procedure for which is described in sections of the RFP in accordance with MCC Program Procurement Guidelines as amended on September 2010 and May 2011, and April 2013, to be found on MCC website at http://www.mcc.gov/pages/business/guidelines. 7. Consultants interested in submitting a Proposal should register their interest by sending an e-mail with “Construction Supervision of the Works Contract(s) for Rehabilitation of Centralized Irrigation Systems along Nistru River” in the subject line To: Millennium Challenge Account – Moldova Attention: Leonid Mazilu Procurement Director Email: leonid.mazilu@mca.gov.md c/o: Procurement Agent Attention: Roumen Tarkalanov Procurement Agent Manager Booz | Allen | Hamilton Procurement Agent for MCA-Moldova Email: r.tarkalanov@premium-bg.com Cc: Rotaru_Valeriu@bah.com ramishvili_nino@bah.com Armasaru_Vadim@bah.com International Business Center “Skytower” 74 Global Project Opportunities: June, 2013 Office D, 10th floor 63, Vlaicu Parcalab Str. Chisinau MD-2012, Moldova providing their full contact details, for the Procurement Agent to send the RFP by e-mail. 8. The closing time for receipt of Proposals is 3:00 p.m. local time in Moldova on July 5, 2013 at the following address: Booz | Allen | Hamilton Procurement Agent for MCA-Moldova International Business Center “Skytower” Office D, 10th floor 63, Vlaicu Parcalab Str. Chisinau MD-2012, Moldova Proposals received after this time and date shall not be considered and will be returned unopened 75 Global Project Opportunities: June, 2013 6.0 PROJECT REPORTS PROJECT REPORTS Chinese firm gets US$75m unsolicited contract from Bangladesh Sharier Khan The Daily Star Publication Date : 13-05-2013 Bangladesh’s state-owned North West Power Generation Company (NWPGC) has awarded an unsolicited US$75 million contract to a Chinese company to increase the production capacity of an underconstruction power project in Sirajganj. The China National Machinery Import & Export Corporation (CMC) was implementing its 2010 contract for building a 150 MW gas turbine- based power plant when it was awarded a fresh contract in August last year to increase the plant’s production capacity by 75 MW. The plant was commissioned in November last year.The Asian Development Bank funded the original project involving US$108.72 million. This plant will now be expanded by installing equipment to use the heat of the gas turbine-based power generator to produce the extra power. This widely used “combined cycle technology” would not require extra gas to produce this extra 75 MW power. In this project, the CMC is represented by Sahco, the family company of former communications minister Syed Abul Hossain. Managing Director of the NWPGC Khurshedul Alam claimed, “As per the Public Procurment Regulation (PPR) 2008, we followed the Direct Purchase Method (DPM).” The DPM allows unsolicited deals. He explained, “The DPM is applicable to both emergency procurement and saving project implementation time by avoiding a long tender process.” The PPR says such procurement could take place when the government is buying patented equipment that cannot be obtained from other sources or in similar situations. But it does not have any provision to go for the DPM for speedy expansion of an ongoing power project. The NWPGC took approval of the Executive Committee of National Economic Council (Ecnec) for the unsolicited expansion deal, arguing that it would help reduce the country’s power crisis urgently by avoiding competitive tender. This rationale can be applied to any power project and therefore all tenders can be awarded on the basis of unsolicited negotiation, said a Power Development Board official. The government now has 14 large gas-based, three dual-fuel (gas or oil) and one coal- fired power projects in hand to be implemented by 2015 with close to 6,000 megawatt production capacity, which is 76 Global Project Opportunities: June, 2013 equivalent to the present regular power generation level. Besides, there are many long-term power sector initiatives by the government. The NWPGC chief also claimed the DPM has saved money. He noted that the per kilowatt construction cost of a new power plant of similar size in Bhola stands at US$929 and cost of the same in Sirajganj plant is US$763. In the past, the low-priced Tongi 80 MW plant tripped hundreds of times following its 2005 commissioning due to its substandard equipment. In case of the Sirajganj plant, the CMC was also accused of providing substandard equipment. On February 28 last year, the NWPGC objected to the CMC’s import from China and the UAE equipment like air intake system, compressor, combustion chamber, turbine, diffuser, exhaust system etc. The MD wrote a note to the company’s chairman that said: As per the contract, they are supposed to import gas booster compressor from America. But against this item, over 45 percent of parts are coming from China. He also sought the board and the ADB’s approval of the equipment which were not consistent with the agreement. The MD told The Daily Star that the board and the ADB’s consultant had accepted these equipment. Khurshid explained, “These equipment were not the main machinery. These were supporting equipment. And the parts that came from the UAE were racks. These do not affect performance of the plant.” He further said, the main equipment came from Germany and the USA. But other officials said the CMC managed to save US$15-20 million by giving cheaper and non-compliant equipment. Greek firm wins $1bn Iraq power deal 9 May 2013, 6:35 GMT | By Andrew Roscoe Metka will build 1,642MW plant in western Iraq Greece’s Metka has been awarded a $1bn contract to build the 1,642MW Al-Anbar power plant, located in western Iraq. The contractor received a letter of award in the last week of April. The duration of the project is scheduled to be 32 months. The Greek firm will use steam generators purchased from the US’ GE in 2008. The client for the project is the Electricity Ministry. Iraq is facing a severe shortage of power capacity in the short term. Total installed capacity is 7,500MW and peak demand in the summer of 2013 is expected to reach 16,000MW. At MEED’s Iraq Energy Projects conference in Dubai in March, Alaa Disher Zamil, director-general and adviser for production affairs at the Electricity Ministry, said it is planning to spend $27bn on electricity projects by 2017 in an effort to expand the country’s power capacity. Turkish firms win $ 29 bn airport deal REUTERS Saturday 4 May 2013 77 Global Project Opportunities: June, 2013 Last Update 4 May 2013 1:21 am ANKARA: A consortium of Turkish construction firms made the winning 22 billion euro ($ 29 billion) bid to build and operate a third airport in Istanbul, which Turkey hopes will become one of the world’s largest by passenger numbers. The consortium of Cengiz, Kolin, Limak, Mapa and Kalyon bid 22.15 billion euros for the build-operatetransfer project, which includes a 25-year lease, outbidding rivals including TAV Holding and Germany’s Fraport. The project reflects the emergence of Istanbul, Europe’s largest city straddling Europe and Asia, as a major regional transport hub in tandem with the country’s economic rise over the past decade. “Such an airport ... will carry Turkey to a different level on the international stage,” said Prime Minister Tayyip Erdogan, who is seeking to carve out a greater role for Turkey on the international stage. The airport is planned to have a total of six runways and eventually be able to handle 150 million passengers per year. “We aim to start the construction in a year,” said Limak Chairman Nihat Ozdemir, adding the group would initially invest 10.25 billion euros. “We will pay the amount in 25 equal annual instalments, and the airport will be start services toward the end of 2018.” Ozdemir said the consortium would seek financing from both within and outside Turkey but said he did not anticipate any difficulty raising the funds. Transport Minister Binali Yildirim has said the airport would be the largest in the world by passengers at full capacity, though it was not clear when this would be. Turkish Airlines, already one of the world’s fastest-growing carriers, will be a major beneficiary, with much of its growth expected to come from transfer passengers through Istanbul. It shares rose as much as 4.5 percent after the tender result. The airline carried 39 million passengers last year and expects to reach 46 million passengers this year, growing to almost double that by the end of the decade. A consortium of Turkish firm IC Ictas and Fraport, which operates Frankfurt airport in Germany, had placed the highest initial bid of 20 billion euros but dropped out of the process after the Turkish consortium entered a higher offer. TAV Holding, in which France’s Aeroports de Paris (ADP) holds a stake, had been one of the favorites in the process. Its shares slid almost 8 percent after it also withdrew. ADP said it fully supported both TAV’s offer and its decision not to exceed an “amount that appeared reasonable.” The project will involve costly engineering. Quarries are located in the area near the Black Sea on the European side of Istanbul where the airport is to be built and filling them alone will cost some 2-2.5 billion euros, a challenge which discouraged wider foreign interest, sources familiar with the process said. Airport operators from Singapore, Britain and the Netherlands had initially expressed interest but were not among the bidders for the project 78 Global Project Opportunities: June, 2013 7.0 WORLD DEVELOPEMNT NEWS ASIA Thailand gets green signal for a major oil refinery in Vietnam Viet Nam News, 14-05-2013 Prime Minister Nguyen Tan Dung has given the green light to a US$27-billion oil refinery project in the coastal province of Binh Dinh. Deputy Chairman of the Binh Dinh provincial People's Committee Ho Quoc Dung made this public during an online forum organised by the government. The development is set to receive investment from the Petroleum Authority of Thailand (PTT). The provincial official confirmed that Binh Dinh had signed a memorandum of understanding (MoU) with their Thai partners in April 2013 agreeing to the project, which will be the largest of its kind in the country. The positive outcome was reached after three years of negotiations. The refinery will be built in the Nhon Hoi Economic Zone (EZ). Dung reassured the public that the mammoth project was feasible, saying the local administration had already carefully appraised the Thai group's financial capacity. He said PTT was a large financial group with total assets of more than US$150 billion, ranking among the world's top 100 financial giants. The company records annual revenues of over US$80 billion and earns nearly US$3.5 billion in profit. The Thai group has decided to invest in Nhon Hoi EZ as the zone has good infrastructure, a low-cost labour force and the lowest land rental in the region. It also has a deep-water seaport located along the national north-south trade route, which also connects Viet Nam with overseas markets. Head of the Ministry of Planning and Investment's (MPI) Economic Zones Management Department, Vu Dai Thang, said that while the project was very large given the current difficulties facing the economy, the MPI had regularly evaluated the viability of the project. Construction of the refinery is expected to begin in 2016 before becoming operational by 2020. The refinery has been designed to turn out 30 million tonnes of products annually. Crude oil will be imported from the Middle East, Africa and South America to feed the plant, which is to produce more than 20 types of products for export. According to the MoU, PTT will contribute as much as 60 percent of the project's total investment and the remaining sum will be mobilised from both domestic and international investors. Man Ngoc Ly, head of provincial Industrial Zone Management said Deputy PM Hoang Trung Hai had signed a document assigning Binh Dinh People's Committee with setting up the project along with the PTT. The province reported to the Ministry of Industry and Trade, who reported to the Prime Minister, the leader responsible for granting approval. In addition, the project also needed appraisal by the Ministry of Natural Resources and Environment. Although the Vietnam Oil and Gas Group claims that the Nhon Hoi project may cause an imbalance in the supply and demand of oil, the Ministry of Industry and Trade as well as provincial authorities and several experts have supported the implementation. 79 Global Project Opportunities: June, 2013 Laos plans to produce 12,500 MW electricity by 2020 Vientiane Times,Publication Date : 09-05-2013 Laos expects to see a big surge in electricity production over the next seven years with a number of hydropower plants currently under construction. According to a report from the Ministry of Energy and Mines' Energy Policy and Planning Department, installed capacity of Lao power plants will reach 12,500MW in 2020, up from 3,200MW at present. The huge increase in power production capacity will be possible when eight hydro plants and one lignitefired power plant become operational over the next seven years. The first two hydropower plants scheduled for completion in 2015 are the 88MW HouayLamphan dam in LuangNamtha province and the 130MW Nam Khan-2 dam in LuangPrabang province. Also in 2015, the 1,800MW Hongsa lignite-fired plant in Xayaboury province will be completed and begin generating electricity. In 2016 it is planned that the 180MW Nam Ngiep hydropower plant in Vientiane province, the 240MW Nam Ou-5 dam and the 180MW Nam Ou-6 dam in LuangPrabang province will be complete and start generating electricity. In 2017, the 120MW Nam Ou-2 dam and the 60MW Nam Khan-3 dam, both in LuangPrabang province, will be complete and become operational. The largest dam under construction in Laos, the 1,260MW hydropower plant in Xayaboury province, is scheduled to become operational in 2019. This dam is the first to be built on the lower Mekong mainstream, while there are several dams further upstream in China. Economists say the huge increase in electricity generation will not only play a significant role in securing power supplies for domestic consumption but will also help to generate much-needed foreign exchange for the purchase of imported products. About 85 percent of the power to be generated by the under-construction dams is intended for export to Thailand, which needs more power to feed its growing industry and further boost economic growth. Thailand has agreed to purchase up to 7,000MW of electricity from Laos by 2020. According to the Ministry of Energy and Mines, Laos exported about US$500 million worth of hydropower in 2012. Increasing power production will also help to protect Laos from climate change as the industry is free of carbon emissions. The ministry says the 12,500MW of installed capacity, or 60,000 GWh of electricity generated per year, will replace 5 million tonnes of fossil fuels and cut CO2 emissions by 30-60 million tonnes. The government has committed to build hydropower plants as part of efforts to secure a sustainable source of energy. Laos is cooperating with the international community on the sustainable development of dams. 80 Global Project Opportunities: June, 2013 World Bank resumes support for hydropower in Laos Vientiane Times, 10-05-2013 The Lao government has gained a new partner to back its hydropower development policy after the World Bank resumed its support for the construction of dams. According to a report published in the Washington Post this week, the bank is making a major push to develop large-scale hydropower projects in Africa and Asia after a decade of backing away from such projects. “Large hydro is a very big part of the solution for Africa and South Asia and Southeast Asia. I fundamentally believe we have to be involved,” said Rachel Kyte, the bank's vice president for sustainable development as quoted in The Washington Post. The earlier move out of hydro “was the wrong message. That was then. This is now. We are back.” According to the US newspaper, World Bank lending for hydropower has scaled up steadily in recent years, and officials expect the trend to continue amid a world wide boom in water-fueled electricity. Such projects were shunned in the 1990s, in part because they can be disruptive to communities and ecosystems. But the World Bank is opening the taps for dams, transmission lines and related infrastructure as its president, Jim Yong Kim, tries to resolve a quandary at the bank's core: how to eliminate poverty while adding as little as possible to carbon emissions. The bank backed out of large-scale hydropower because of the steep trade-offs involved. Big dams produce lots of cheap, clean electricity, but they often uproot villages in dam-flooded areas and destroy the livelihoods of the people the institution is supposed to help. A 2009 World Bank review of hydropower noted the “overwhelming environmental and social risks” that had to be addressed but also concluded that Africa and Asia's vast and largely undeveloped hydropower potential was key to providing dependable electricity to the hundreds of million s of people who remain without it. “What's the one issue that's holding back development in the poorest countries? It's energy. There's just no question,” Kim said in an interview. The World Bank and Asian Development Bank played an important role in helping Laos to develop the Nam Theun 2 dam in Khammuan province, the largest existing hydropower plant in Laos. The dam became operational in 2010. The Lao government aims to develop dams in ways that are sustainable as part of efforts to generate revenue for poverty reduction projects. The government believes the use of dams as an energy source will help to reduce greenhouse gas emissions, which is a major problem faced by the global community. Laos has the potential to build about 100 dams with a combined generating power of about 26,000MW. At present, Laos has only 14 dams with a combined installed capacity of about 3,200MW. 81 Global Project Opportunities: June, 2013 Laos, Myanmar, Thailand, Vietnam expand east-west economic corridor Vientiane Times, 17-05-2013 Laos, Myanmar, Thailand and Vietnam have welcomed the expansion of the East-West Economic Corridor (EWEC) to boost mutual cooperation. Deputy Ministers of Foreign Affairs of the four nations that form the EWEC noted the importance of the expansion at their second annual meeting held in the Lao central province of Savannakhet from May 1516. The corridor now runs from Sabang port in Bangkok, Thailand, through Vientiane and on to Hanoi and Haiphong in Vietnam, a press release from the Lao Ministry of Foreign Affairs said. Lao Deputy Minister of Foreign Affairs Bounkeut Sangsomsak presided over the meeting, which was attended by more than 140 representatives from the relevant sectors. The meeting also noted that La os and Thailand have agreed to launch a ‘one-stop' inspection system at the border crossing in Savannakhet province with Thailand's Mukdahan province by the end of the year to streamline procedures and facilitate the flow of goods, the press release said. In addition, Laos and Vietnam agreed to sign a memorandum of understanding on the final stage of implementation of the one-stop service at the Savan-Laobao border crossing. This would take place before the next annual meeting scheduled in Thailand next year. The participants noted the importance of setting up the Transport Association of the Mekong Sub-region, whose main office will be in Vientiane. According to the press release, the participants recognised the need to work together to address any difficulties and barriers including repairing damaged roads and improving and streamlining documents and procedures to facilitate goods inspection and other related work. The meeting also recognised the importance of encouraging countries in the Mekong Sub-region to quickly sign and ratify various documents related to the agreement on cross-border transport within the sub-region. This was necessary to accelerate the process to achieve full and effective implementation. Meeting participants reviewed the progress made over the year since the last meeting which was held in Vietnam, as well as highlighting unfinished agendas and shortcomings. They also discussed future cooperation plans. The participants highly valued the important role the corridor is playing in the development of the provinces that lie along it, particularly in infrastructure improvements, facilities construction and the provision of services. These have been made possible thanks to the valuable assistance of development partners, particularly the government of Japan and the Asian Development Bank. The meeting adopted two documents – the Savannakhet Declaration on the Process of the East-West Economic Corridor Development and the meeting's Joint Statement on the East-West Economic Corridor Development. Representatives from the Japanese Embassy to Laos, Asian Development Bank and the Japan International Cooperation Agency were present at the meeting. 82 Global Project Opportunities: June, 2013 MIDDLE EAST Bids sought for Jazan plant REUTERS, May 2013 ALKHOBAR: Saudi Aramco has invited bids for the construction of a 2,400 megawatt (MW) power plant in Jazan, near a 400,000 barrel-per-day oil refinery which it is currently building, two industry sources said. The plant will use integrated gasification combined cycle (IGCC) technology to convert vacuum residue fuel from the refinery into a synthetic gas, the oil company said in a description of the project distributed at a signing ceremony for the refinery, which is due to come on line in 2016. Bids are invited by mid-August and the gas produced is expected to help power Saudi Arabia’s west coast cities. “IGCC is one way of increasing the efficiency of the consumption of hydrocarbons, especially fuel oil, liquid fuels,” Ahmad Al-Khowaiter, a chief engineer at Aramco, told a power conference in Dammam. “So that is what we are trying to do, move to newer technology that allows us to get the most value from those liquids Kuwait extends deadline for Doha Link bridge 20 May 2013, 10:26 GMT | By Andrew Roscoe Consortiums now have until 18 June to submit bids for causeway project Kuwait’s Public Works Ministry has yet again extended the bid deadline for the contract to design and build the estimated $1bn Doha Link bridge, which will link Shuwaikh to the port village of Doha in the Jahra region of Kuwait. Prequalified consortiums now have until 18 June to submit bids for the tender. The previous submission date was 19 May. It is the sixth time the deadline has been extended, with bids initially due in November. The proposed Doha Link bridge will be about 16 kilometres long and will contain three traffic lanes and an emergency lane in each direction. The Public Works Ministry hopes the bridge will reduce road congestion in Shuwaikh and along Ghazali Road, as it believes many large trucks exiting from Shuwaikh port would use the new link instead. The Doha Link bridge will connect with the planned $2.6bn Subiya Causeway scheme, for which the main construction contract was awarded in October 2012. 83 Global Project Opportunities: June, 2013 Turkish contractors face losses in post-war Libya 19 May 2013, 11:06 GMT | By Bernadette Ballantyne Cumulative losses of Turkish contractors working in Libya could top $4.1bn Turkish contractors working in Libya prior to the civil war are facing losses of $4.1bn comprising unpaid progress payments, performance bonds and equipment losses and damages. “Although two years have passed after the civil unrest, construction companies still have not received their progress payments,” said Haluk Buyukbas, secretary-general of the Turkish Contractors Association (TCA), in an interview with MEED. “Similarly, they have also not received compensation for their damages and losses.” According to the TCA, outstanding progress payments amount to $1bn, performance and advance payment bonds $1.8bn and the estimated total amount of losses and damages $1.3bn. “In order to swiftly resume their construction activities in the country, Turkish contractors expect that the damages and losses they have suffered to be detected, or at least a proper method of compensation to be determined,” said Buyukbas. Despite assurances from Libya’s Prime Minister Ali Zeidan in February that progress payments would be paid and a compensation mechanism established, no progress has yet been made. International contractors were forced to flee Libya following the start of civil war in February 2011, suspending their ongoing projects and evacuating their workers. Since then, firms have reported substantial amounts of losses and damages. “Many construction sites were damaged, the equipment, materials, offices and camps looted or destroyed. In addition to all these, they have failed to receive the payments for the projects they had completed prior to the civil unrest and the bonds were another source of serious problems,” said Buyukbas. However, despite the outstanding financial issues, the TCA says Turkish firms remain committed to Libya, which until the unrest was the most important project market in the region. Since the 1970s, Turkish contractors have delivered projects worth $27.8bn in the country. Some contractors have now re-entered the country and are working on projects in vital areas such as power generation. Firms have also undertaken work on public buildings, such as schools and hospitals, as a donation to the people 84 Global Project Opportunities: June, 2013 Saudi projects win MEED awards Maaden received the GCC Mashreq oil and gas project of the year award. JEDDAH: ARAB NEWS Saturday 18 May 2013 The Gulf region’s highest quality projects were revealed at the 2013 MEED Quality Awards for Projects. It took place in association with Ernst & Young. Saudi Arabia and Oman brought home two awards. Bahrain, Kuwait and Qatar each received one. The UAE led the region with five award-winning projects. “This year’s edition of the awards program received a higher number of entries, firmly establishing it as the most sought-after recognition initiative in the projects industry,” said Edmund O’Sullivan, chairman of the judging panel of the MEED Quality Awards for Projects, in association with Ernst & Young. “This signifies the important value placed by stakeholders on achieving quality in their projects not just by aspiring for excellence in design, engineering and construction; but also in terms of their projects’ contribution to the economy, society and the environment,” said the chairman The winning projects from Saudi Arabia include the Development of King Abdul Aziz Endowment Project (Makkah) owned by The Higher Endowment Council for King Abdulaziz Endowment for the two holy mosques / The Makkah Al-Mukkarramah Endowment Project (entered by Saudi Binladin Group) in the GCC Social Project of the Year category; and the Maaden Ammonia Plant Project owned by Maaden (entered by Samsung Engineering), a joint winner in the GCC Mashreq Oil & Gas Project of the Year category along with Oman’s Octal Petrochemicals Expansion Phase Project owned by OCTAL Petrochemicals (entered by Faithful+Gould). Dubai International Airport – Concourse A Project from Dubai Aviation Engineering Projects Corporation received the highest honor – the MEED Quality Project of the Year, in association with Ernst & Young. It also won the GCC Transport Project of the Year Award. Abraham Akkawi, partner and head of Infrastructure and PPP Advisory Services, MENA, Ernst & Young, congratulated the winners and commended the MEED Quality Awards for Projects organizers for continuing to inspire industry stakeholders across the region to aspire for quality and project excellence. “It is not just the quality that we are recognizing in the projects that have received awards tonight. We are also paying tribute to the invaluable impact that these projects have had on the development of the region as a whole. Congratulations to all the winners — your achievements are honorable examples for others to follow,” said Abraham. The Ducab HV and EHV Facility Project owned by Ducab HV (entered by Hyder Consulting Middle East) won the GCC Industrial Project of the Year award. The Siemens Head Office Project owned by the Abu Dhabi Future Energy Company (entered by Al-Faraa Contracting Group) triumphed in the GCC Lafarge Sustainable Project of the Year category. The UAE Pavilion Project on Saadiyat Island owned by Abu Dhabi’s Tourism Development and Investment Company (entered by Al-Futtaim Carillion) received the GCC Small Project of the Year award. The GCC Building Project of the Year award went to the Doha Towers Project (entered by China State Construction Engineering Company). The GCC Leisure and Tourism Project of the Year award was given to The Avenues Project owned by the Mabanee Company. 85 Global Project Opportunities: June, 2013 Meanwhile, the Replacement of Steam Turbo-Generators at No. 2 Power Plant Project owned by Bahrain Petroleum Company (entered by Tchnip France Abu Dhabi) received the GCC Power and Water Desalination Project of the Year award. The Sewage Treatment Plant of Duqm Crowne Plaza Project, owned by Omran, won the GCC Water and Water Reuse Project of the Year award. Two companies were also given special recognition by MEED – Athens-based Consolidated Contractors Company (CCC) received The Angus Hindley Award for Project Excellence 2013 for its outstanding contribution to the development of the region over the past six decades. The Saudi Arabian Mining Company (Maaden) was given the MEED Editor’s Award, an honor given each year to a person or organization that stands out not only for specific achievements, but also for what it represents in terms of leadership and vision, in being a role model for the region. Nakheel to tender Palm mall development in third quarter 15 May 2013, 6:24 GMT | By Colin Foreman Design is being reviewed to increase size Local property firm Nakheel is now planning to tender the contracts for the construction of its AED2.5bn ($681m) mall development on the Palm Jumeirah in the third quarter of this year. The developer is currently reviewing the designs to increase the project’s size and increase the retail space. Before the design review began, Nakheel was planning to tender the work in April. The development is expected to be split into two main construction packages, one covering the mall, the other for the construction of the hotel tower. Like other Nakheel construction contracts, the packages will be openly tendered. Once complete, the mall will have five levels and three basement parking levels with almost 100,000 square metres of retail space, a 1,000 sq m indoor garden and a 180-metre-high viewing deck. The mall will have about 200 shops, including a 4,200-sq m supermarket and two anchor department stores, a nine-screen cinema and six medical clinics. The five-star hotel will have 200 room and 200 apartment units. This may increase if more floors are added to the tower. The mall will have 4,000 parking spaces and will also have a station on the Palm monorail, which runs along the trunk of the Palm to Atlantis from the terminus on Beach road. Nakheel and Dubai’s Roads & Transport Authority plans to connect the monorail with the under construction Al-Sufouh tram network that will connect to the Dubai Metro network 86 Global Project Opportunities: June, 2013 Madinah needs 500 hotels in five years MADINAH: ARAB NEWS, 14 May 2013 Authorities in Madinah are faced with the pressing issue of constructing 500 hotels within the span of five years to avoid a hospitality crisis. Madinah is expected to attract 1 million visitors per month upon the completion of the expansion work at the airport and the Prophet’s Mosque, according to a board member at the Madinah Chamber of Commerce and Industry (MCCI). “Around 33,000 visitors come to Madinah everyday, which amounts to almost 1 million tourists per month. According to these figures, we will have a serious predicament unless we prepare ourselves in advance,” said Abdul Ghani Al-Ansari, the MCCI member. Al-Ansari explained that the authorities have two options to tackle this issue: To rapidly finalize the compensations of the expropriated properties from around the mosque and set a mechanism to ensure that the compensation money is used to build new hotels. The other option is to establish four or five companies, using the funds that would be allocated for the compensations, making the owners of the expropriated properties investors in the hospitality projects. He also revealed that 20 out of 214 hotels, which lie around the circumference of the Prophet’s Mosque, will be demolished for smooth construction of the expansion projects. Madinah has 17 percent of the total number of hotels in the Kingdom, in addition to 30 furnished apartment units, according to a report issued earlier by the MCCI. Madinah has nine five-star, 11 four-star and 44 three-star hotels. While there are five furnished units ranked as second tier accommodations, and 10 units categorized as third class in the city Italy’s Impregilo-led consortium confirms Doha metro contract 20 May 2013, 7:53 GMT | By Rebecca Spong Contract covers Red Line North A consortium led by Italian contractor Impregilo has won a $2.2bn contract to design and build the Red Line North metro in Doha. The consortium includes South Korea’s SK Engineering & Construction and Oman’s Galfar Engineering and Contracting. Impregilo confirmed the win in an official statement. The Red Line North will stretch approximately 13km northwards from Mushaireb station. The scope of work will include the excavation of two parallel tunnels of 11.6km in length. The line will have seven new underground stations. Awards are also expected soon for the Red Line South, the Green Line and the Golden Line. Bids were submitted by contractors at the end of 2012 and the start of this year. Contractors are also preparing bids for Doha Metro’s elevated sections of the Red, Green and Gold lines. Companies have already been prequalified for each line’s elevated sections package. Bids for the Red Line South section are due in on 13 August. The rail project will have 80 stations by the time it is completed and cover a distance of more than 300kms. The metro will link the New Doha International airport (NDIA) to the centre of Doha and will link together a number of the stadiums that will be used for the 2022 World Cup. 87 Global Project Opportunities: June, 2013 Contractors struggle to staff Saudi projects 15 May 2013, 10:51 GMT | By Cathal Gormley Growth of projects market under threat from lack of available human resources As growth in the Saudi Arabian projects market gathers speed, contractors in the region are struggling to fully resource awarded projects. The key challenge relates to the lack of available trained and skilled labour. Clients expect that upon project award the resources are available to commence work, but the bureaucratic visa process is hampering contractors’ ability to bring in the required resources. Steven Miller, senior vice-president of India’s Shapoorji Pallonji said at MEED’s Arabian World Construction Summit, that “it is difficult to manage labour in Saudi Arabia as you never know when projects are going to awarded”. In Saudi Arabia, companies are required to allocate about 10 per cent of the positions to local nationals and contractors are struggling to meet the required quota. With severe financial penalties for noncompliance, contractors are competing to secure professional nationals. Contractors state that this will be an ongoing issue as more projects get awarded. Labour costs decline in the UAE 13 May 2013, 13:18 GMT | By Cathal Gormley Significant decline in cost of skilled and unskilled labour since January The cost of skilled and unskilled labour in the UAE has fallen by 39 per cent and 19 per cent respectively since the beginning of 2013. Despite $647.8bn projects planned or under way in the UAE, a 16 per cent increase on the same period last year, the demand for labour will continue to decrease as major projects currently under execution near completion. While a number of large scale projects have been recently announced, such as the $1bn Wahat AlZaweya development in Al-Ain, project award schedules are notoriously optimistic and can suffer chronic delays in contract award. The delay in awarding these projects will place additional downward pressure on the demand for labour. With the supply of labourers far outstripping demand, it is possible that labour costs could drop further into 2014. MEED Cost Indices estimates there are currently 2.2 million labourers working on existing projects while the estimated future demand for labourers will fall by 45 per cent by 2015 to 1.47 million. In contrast, the commencement of mega projects in Saudi Arabia and Qatar will likely have a secondary impact on UAE labour costs as these countries seek to satisfy local resource shortages. 88 Global Project Opportunities: June, 2013 Salaries for skilled and unskilled labour in Saudi Arabia are on average 46 per cent higher than in the UAE, whereas salaries in Qatar are 17 per cent higher. The impact of regional demand may spur an increase in UAE labour costs, even though the local demand does not justify the increase Oman invites bids for electricity project 13 May 2013, 14:01 GMT | By Andrew Roscoe Work will involve replacing substation in northern grid station Oman Electricity Transmission Company has invited companies to submit bids for the contract to build a gas insulated substation (GIS) at the Mahada grid station in northern Oman. The work will involve replacing an existing outdoor 132kV switchyard with an indoor 132kV GIS at the northern grid station. Contractors have until 17 June to submit bids for the tender. The project is part of the sultanate’s efforts to upgrade and expand its electricity infrastructure. In February, the local Mazoon Electricity Company received bids for three contracts to build substations in the Batinah governorate. Eleven firms submitted bids for the first contract, which involves building a 33/11kV primary substation, and 33kV incoming and 11kV outgoing feeders in north Batinah. The local Civil Contracting Company submitted the lowest price of RO3.45m ($9m). The second-lowest price of RO3.48m was submitted by the local Rukun al-Yaqeen International. The second contract is for a primary substation, and 33kV incoming and 11kV outgoing feeders in south Batinah. The electricity provider received bids from 13 contractors for the deal. The lowest price of RO2.1m was submitted by Rukun al-Yaqeen International. This was marginally lower than the RO2.2m bid submitted by the local Al-Jood Trading & Contracting. The local Bahwan Engineering submitted a price of RO2.4m. $ 600 bn Saudi projects to be awarded in 2013 The GCC projects industry is expected to have another stellar year in 2013. JEDDAH: ARAB NEWS Sunday 12 May 2013 The GCC projects industry is expected to have another stellar year in 2013 as the value of contracts to be awarded is expected to reach $1.35 trillion by year-end, significantly higher than the $ 730 billion total last year. “The huge projects being delivered across the GCC today are the foundation for the region’s long-term success,” said an industry expert. “Through the MEED Quality Awards for Projects, in association with Ernst & Young, we seek to support this vital activity by recognizing and celebrating the best achievements in the GCC projects industry,” added Edmund O’Sullivan, chairman, MEED Events, organizer of the event. 89 Global Project Opportunities: June, 2013 Data from MEED shows that Saudi Arabia leads the region with close to $ 600 billion projects to be awarded, followed by the UAE with slightly more than $ 350 billion contracts and Kuwait with a little over $ 150 billion. Between Qatar, Oman, and Bahrain, more than $ 250 billion are expected to be awarded this year. Among the companies which have made outstanding contributions to the growth of the projects industry in the region, two will be given special recognition by MEED at the forthcoming MEED Quality Awards for Projects, in association with Ernst & Young, to be held on May 14 in Abu Dhabi. Saudi Arabian Mining Company (Maaden) will receive the MEED Editor’s Award, an honor given each year to a person or organization that stands out not only for specific achievements, but also for what it represents in terms of leadership and vision, in being a role model for the region. Since its formation by royal decree in 1997 with a mandate to develop the Kingdom’s mineral resources, Maaden has expanded the Saudi mining sector from a focus on gold mining to four major business lines covering gold and base metals, phosphates, aluminum, and industrial minerals. Through this award, MEED seeks to recognize Maaden’s vision and success in developing the mining and minerals sector as a major new pillar of Saudi industry. Maaden’s achievements will provide careers for generations of young Saudi nationals and will support the diversification of the Kingdom’s economic base. Athens-based Consolidated Contractors Company (CCC) will receive The Angus Hindley Award for Project Excellence 2013 for its outstanding contribution to the development of the region over the past 6 decades. CCC was one of the first Arab construction companies when it was established in 1952. Since then it has grown to become one of the world’s biggest construction companies and has installed more than 16,000 kilometers of pipeline and constructed facilities for the production of more than four million barrels a day of oil. It has set the benchmark for excellence in project execution and reliability in the region. CCC’s portfolio of landmark projects includes the Pearl GTL project in Qatar, the world’s largest gas-toliquids project and the winner of the MEED Quality Awards for Projects supreme GCC award last year; and the Borouge Ethylene Cracker 2 in Abu Dhabi, the largest ethylene cracker in the world. The Angus Hindley Award for Project Excellence 2013 seeks to commemorate the life and work of MEED’s former research director, Angus Hindley, who distinguished himself as one of the world’s leading experts on the Middle East. Richard Thompson, editor, MEED, said: “The region’s projects industry has made remarkable strides, completing some of the biggest and most complex projects in the world which have contributed to the impressive growth of GCC economies on the whole.” Thompson added: “We congratulate the winners of the special awards for their commitment to project excellence and look forward to their continued success.” The highlight of the 2013 MEED Quality Awards for Projects, in association with Ernst & Young, will be the announcement of the GCC winners in 11 different categories — Mashreq Oil & Gas Project of the Year, Industrial Project of the Year, Power and Water Desalination Project of the Year, Water Reuse Project of the Year, Leisure and Tourism Project of the Year, Transport Project of the Year, Social Project of the Year, Building Project of the Year, Lafarge Sustainable Project of the Year and the MEED Quality Project of the Year – with thirty of the highest quality projects in Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the UAE competing for the projects industry’s most sought-after quality recognition program. Now in its third year, MEED, the leading supplier of business intelligence in the Middle East, will celebrate the amazing success of the projects sector in the GCC at the 2013 MEED Quality Awards for Projects, in association with Ernst & Young. 90 Global Project Opportunities: June, 2013 The awards aim to raise standards through benchmarking best practice specified in the project brief and excellence provided in the project delivery. Winning an award will send a message to the market that quality is essential in all parts of the project management process; from design planning to engineering and construction. The five criteria are economic and environmental impact as well as engineering, design and construction challenges New railway projects to link eastern and western regions JEDDAH: IBRAHIM NAFFEE 9 May 2013 New railway projects will flourish the regional transportation in Saudi Arabia through linking the west to east of the Kingdom. It will also provide facilities to trade transportation through connecting Jeddah Islamic Port with Riyadh and Dammam. The project is expected to have a positive impact on the transport of the Kingdom. It will allow cargo goods imported from East Asian countries through King Abdul Aziz Port in Dammam, and from Europe and North America through Jeddah Islamic Port, resulting in more transit cargo and savings in regional freight economy. “The railway line would start from Jeddah Islamic Port to Riyadh and will be connected with the existing 450-kilometer line between Riyadh and Dammam. A second 115-kilometer new line is also planned to connect Dammam with Jubail,” said SAR Board Chairman Mansour Al-Maiman. The $ 7 billion railway project linking Riyadh with Jeddah gathered steam with the state-owned Public Investment Fund (PIF) signing a SR 270 million ($ 72 million) contract with Fluor, a US company, to provide management consultancy. The contract is a part of the plan that has been ordered by Custodian of the Two Holy Mosques King Abdullah to complete the railway infrastructure of the Kingdom and in line with a decision of the Council of Ministers to construct a railway line connecting the Kingdom’s west coast with its east shoreline. The SAR is currently implementing the North-South Railway (NSR) project, the world’s largest railway project and the longest route to adopt the European Train Control System (ETCS) to date. It is a 2,400-km passenger and freight rail line originating in Riyadh, in the northwest of the country, to Al-Hudaitha, near the border with Jordan. The North-South railway represents a top priority over the other projects due to its strategic importance to the national economy. It is an integral part of the planned phosphate and bauxite mining projects in the northern region of the country that are available in commercial quantities and can be exported from the processing facilities at Raz Al-Zwar on the Gulf coast. This will make Saudi Arabia as the second largest exporter of minerals in the world. The North-South Railway will have 107 bridges and 2,679 culverts along the 2,400-km freight and passenger line. The stretch involves construction of a 280-km rail line in the Al-Nafude desert between Hail and Al-Jawf. 91 Global Project Opportunities: June, 2013 The land bridge project is part of the Saudi Railways Organization’s railway expansion program, which will be the first rail link between Red Sea and the Gulf. “The land bridge along with North-South Railway and Haramain Railway will have a big impact on social and economic development of the country,” said Transport Minister Jabara Al-Seraisry Hilton to introduce 2 new hotels in Riyadh DUBAI: ARAB NEWS, 9 May 2013 Hilton Worldwide yesterday signed an agreement with Mawten Hospitality LLC to introduce the company’s first dual branded property to the rapidly growing city of Riyadh. The single-site development for Hilton Garden Inn Riyadh Financial District, KSA and DoubleTree Suites by Hilton Riyadh — Financial District, KSA will be located in the dynamic, upcoming area North of Riyadh, close to King Abdullah Financial District (KAFD). Currently under construction, KAFD will be home to many leading international banks, financial institutions and legal firms as well as the site of the headquarters of the Capital Market Authority and Tadawul, the KSA stock exchange. The district will include around 40 multi-use designer towers which is set to redefine the skyline and landscape of the capital city. Rudi Jagersbacher, president, Hilton Worldwide Middle East & Africa said: "Today’s announcement for our first dual branded property in the Middle East signifies Hilton Worldwide’s intent to become the preeminent hospitality provider in Saudi Arabia." The 260-room Hilton Garden Inn development and the 110 serviced apartments of DoubleTree Suites by Hilton will share a host of business facilities including a large, multi-purpose function room, eight meeting rooms and four boardrooms. Individually, the Hilton Garden Inn Riyadh Financial District property will feature a business center, swimming pool and health club as well as a restaurant and lobby lounge. The 110 serviced apartments of DoubleTree Suites by Hilton Riyadh — Financial District will include a full range of options from studios to one and two bedroom apartments. The dual development is expected to open Winter 2015. Raeyd Al-Dakheel, CEO of Mawten Hospitality LLC, owner and developer of the dual hotel project, said: "This project furthers our commitment to the City of Riyadh to deliver much needed high quality hotel rooms and suites." project along with others shows our strong confidence in the Saudi hospitality market." Adrian Kurre, global head, Hilton Garden Inn said: "Hilton Garden Inn is gaining real momentum in growing business hubs such as Riyadh. This latest signing in such a prominent development will help us to further establish our uncompromising value for money credentials." John Greenleaf, global head, DoubleTree by Hilton said: "Today’s announcement marks the fourth DoubleTree by Hilton property planned for Saudi Arabia and its second in the capital Riyadh." 92 Global Project Opportunities: June, 2013 Riyadh changes fuel allocation for Rabigh 2 power plant 8 May 2013, 9:31 GMT | By Matthew Martin Fuel allocation move part of broader plan to cease burning oil for power production Riyadh has said it will no longer provide oil for new power projects in the kingdom, prompting a lastminute change in the configuration of the Rabigh 2 power plant, despite the contract already being awarded. Sources in the kingdom say the change has come from Saudi Aramco, which no longer wants to waste oil that could be more lucratively exported. Instead, the state will provide gas for future power plants. “Aramco has said there will be no more liquid fuel for power generation,” says one source in Riyadh. “They don’t have an issue with providing gas for power production, the gas shortage is for industrial purposes in things like petrochemicals plants.” Rabigh 2 is the first project to be affected. It has forced a consortium led by the local Acwa Power, which was awarded the contract to build Rabigh 2 in January, to change the configuration of the plant. As a result, the plant’s $2.2bn development cost is expected to drop significantly, to perhaps less than $1.5bn, according to some sources involved in the scheme. “The project is still a 2,000MW plant, but the fuel allocation has changed,” says Paddy Padmanathan, president and chief executive officer of Acwa. “We are still working on what the new budget will be.” As Acwa had already secured funding for the project, each lender will be reduced pro rata to reflect the reduced budget, he adds. Financial close is targeted for the end of May. Sources close to the project say the rising demand for power means Saudi Electricity Company (SEC), the government body procuring the project, could not afford the time it would take to rebid the project with the changed fuel source. It is not the first time Riyadh has changed fuel allocations for power production. The Qurayyah power plant, which was also eventually awarded to Acwa, was originally envisaged as an oil-fired scheme, before being changed to a gas project, and subsequently back to oil. Acwa power is working towards a listing on the Saudi Stock Exchange in late 2014, says Padmanathan. “The reason for us to do an IPO [initial public offering] is not to raise money, as we have a lot of cash on our balance sheet, but we want the Saudi public to share in the growth story of Acwa,” he adds. Acwa is also planning its first sukuk (Islamic bond) issue in Saudi Arabia later this year. Railways witness massive expansion JEDDAH: ARAB NEWS Tuesday 7 May 2013 Last Update 7 May 2013 1:55 am Railways have witnessed tremendous development under the reign of Custodian of the Two Holy Mosques King Abdullah, according to Mohammed K. Al-Suwaiket, chairman of the Saudi Railways Organization (SRO). Al-Suwaiket said that the past eight years of King Abdullah’s reign have witnessed important breakthroughs for railways at various levels including the organization, development and expansion of the network. Various projects have been undertaken in various parts of the Kingdom in order to achieve economic, industrial and educational development. 93 Global Project Opportunities: June, 2013 “Railways in the Kingdom are being strengthened to benefit the citizens and residents with safe and comfortable travel between all regions,” he said. “This period has witnessed the issuance of a number of important decisions aimed at organizing this activity and the development of its infrastructure and network expansion, based on the concept that railway transport services would be useless if limited to a certain range within the Kingdom.” Al-Suwaiket said it can be beneficial only if it spans the Kingdom, with an integrated network linking the population to major ports and economic cities. He said that the high-speed train project for the Two Holy Mosques, which is one of the most important railway projects in the Kingdom, is of great interest to the king. “In a very brief period, we have seen the project leap forward in the field of building and construction according to the highest specifications and standards followed internationally,” he said. According to him, trains are expected to play an important role in activating the movement and transfer of passengers between Makkah and Madinah via Jeddah and the King Abdullah Economic City in Rabigh. High-speed trains with sophisticated designs and latest techniques will be operated. The project will have a clear impact on overall transport activities and will put the Kingdom among the countries that provide rapid rail transport services. The era has also seen developments in the quality and quantity of the existing network between Riyadh and Dammam. The focus has been on passenger services, efficiency, raising the level of safety, improving methods of maintenance and building modern yards. Arab News is not responsible for the view points, opinions and actions expressed Bugshan, Shantui to tap heavy equipment market JEDDAH: ARAB NEWS, May 2013 A new business partnership is emerging between Arabian Bugshan Group and Chinese Shantui company, according to senior company executives. Arabian Bugshan Group (ABG) held its first meeting with China’s Shantui for Heavy Equipments in Jeddah recently. Abdullah Ahmed Bugshan, chairman of ABG, who chaired the meeting, said the new business relationship will be a breakthrough in the heavy equipment industry to cater to the requirement of the Saudi market compatible with the Kingdom’s sustainable development. Abdullah Bugshan stressed that the enormous development of infrastructure projects in the Kingdom has become the focus of major international players in construction and machinery industries around the world. “Their contention is that the Kingdom has become the land of opportunity for its ever-booming building and construction sector and related machinery based on its future economic programs,” he added. Bugshan said the group has a proven track record of achievements and reputation over the past five decades, which makes it capable of reaching new milestones in the future. This step comes in accordance with the group’s plans targeting the areas of investments in various fields commensurate with their aspirations and market mechanisms. Wang Fei, president of Shantui, said his company is not only one of the major Chinese entities in the field of heavy equipment but one of the largest international companies specialized in this field worldwide. 94 Global Project Opportunities: June, 2013 He expressed his happiness over the collaboration with ABG, a major Saudi player in the field of heavy equipment. Fei expects more successes and promising developments in the coming years, depending on their extensive experience and potential deals in this area, especially in a large market like Saudi Arabia, which is emerging as the fastest growing construction market in the region. The meeting also reviewed the size of Saudi construction market, especially the large-scale projects that need infrastructure and road and transportation projects that are being built across the Kingdom. The meeting was attended by Yasser Marie Bugshan, and Faisal Abdullah Buqshan and Ahmed Abdullah Buqshan, both members of the board of directors of ABG, in addition to the group’s Managing Director Yunus Ibrahim and Executive Director Mohammed Taman. Taman said the business relationship between two firms began in 2012. The objective of Shantui business delegation’s first tour to the Kingdom is to achieve greater coordination and cooperation in several areas that serve the interests of both parties, which will be reflected positively on the heavy equipment market in the Kingdom. Taman added that ever since the relations began with Shantui, things are developing and there are many future joint ventures that will help ABG take a big leap in the market. Cheng Zhaohong, managing director of Shantui spoke about the company’s future plans in the Arab region, particularly in Saudi Arabia. He outlined the strategic plans in the areas of manufacturing and marketing, especially in heavy equipment. The two-day meeting also set schedules for future visits both to the Kingdom and China, in order to strengthen mutual business relationship between the two parties Rail projects to boost business opportunities JEDDAH: IBRAHIM NAFFEE, 5 May 2013 Railways are playing an increasing role in the Saudi transportation sector. Its several projects that are underway will provide facilites that will create business opportunities and which will also attract the foreign investments to the Kingdom. The government has launched a number of initiatives to develop this sector through major expansion projects connecting the different regions of the Kingdom. The current value of executed projects is estimated at SR 50 billion. Saudi Arabia’s Railway Master Plan (SRMP) shows about SR 365 billion will be invested for railway infrastructure by 2040. The Kingdom’s growing economy, on the back of high oil prices, has led to heavy investments in railway infrastructure. The North-South railway is considered the largest freight rail project that will have a strategic importance for freight exports to the Gulf. At 2,750 km long, it is valued at an estimated SR 20 billion. The Land bridge project is another important freight line estimated to cost SR 26.6 billion. Owned by SAR, it will link the port cities of Jeddah, Dammam and Jubail, passing through Riyadh. The Haramain High Speed rail project, owned by SRO, is built to transport pilgrims and Umrah visitors from and to the holy cities passing by Jeddah and Rabigh. The project consists of two phases, costing about SR 51.5 billion. It is expected that Saudi business investments in coordination with the Ministry of Transport will contribute to develop this sector through finding out several business opportunities. There will be also other dimensions to solve the economic problem such as unemployment; this sector will create many job 95 Global Project Opportunities: June, 2013 opportunities through attracting a lot of Saudis to work within railway stations. The activation of rail’s role will be reflected positively on the national economy through stopping migration from rural areas to cities and contribute to stimulate industrial and agricultural production in various cities and villages of the Kingdom. The Kingdom plans to construct more railway lines to link all parts of Saudi together. Several projects, worth SR 93 billion, will be awarded in 2013 and 2014. Under the 9th Development Plan, it is expected that the number of railway passengers will increase to reach 3.37 million passengers by 2014 using the existing railway system, North-South line, and the Haramain high-speed rail. As for freight, 15 million tons of goods and materials are expected to be transported through railways by 2014, of which about 3.51 million tons will be transported by existing lines, while the North-South line is likely to transport about 10.35 million tons of mineral products, the NCB report said. The Saudi Railway Organization (SRO) and Saudi Railway Company (SAR) are government-owned entities that oversee and manage the railway system. SRO supervises the existing railway system, which connects Riyadh with Dammam, while SAR manages the implementation and operation of the NorthSouth project. SRO aims to improve operation standards as well as the quality of materials and equipment. These developments have led the railway sector to push for privatization by inviting national and foreign investments. Chinese firm involved in two mega projects RIYADH: ABDUL HANNAN TAGO, 5 May 2013 China Civil Engineering Construction Corporation (CCECC), one of China’s major construction firms, is currently involved in two of the most prestigious railway projects — the Haramain High Speed Rail Phase 1 (Package 1) project; and the Civil and Track Works Contract CTW400, from Az Zabirah Junction to King Khalid International Airport. In an interview with Arab News, Wen Wu, general manager and project director, CTW400-Track, said that through these projects they will bring technical knowhow to the railway network through cost effectiveness and their financial strength. The following is the text of the interview: When did your company start operations in the Kingdom? We started in the late 1990s. In the first 10 years or so, we were involved in the construction of buildings and structural works such as bridges and underpass. Which was the first railway project in which your firm participated in the Kingdom? We began with Civil and Track Works Contract (CTW400 – Az Zabirah Junction to King Khalid International Airport) and Haramain High Speed Rail Project Phase 1 (Package1). We have received good cooperation from our local partners for over a decade now. What do you think of the construction sector in the Kingdom? We have noticed huge investment in almost all sectors of the Saudi economy benefiting people from all walks of life thanks to the Custodian of the Two Holy Mosques, King Abdullah. This trend will continue for the foreseeable future, especially in railways and metros, such as Riyadh metro, Makkah metro, the Riyadh- Jeddah railway of the Land Bridge etc. It is estimated to be a SR 365 billion investment plan in railway and metro projects until the year 2040. How do you evaluate relations between China and the Kingdom? China and the Kingdom of Saudi Arabia have maintained friendly and strategically important relations. Our involvement in the economic and construction sectors will enhance such ties. 96 Global Project Opportunities: June, 2013 What is your strength in the railway project here in the Kingdom? As a strategic partner, we can bring technical know-how to the railway network by making it cost effective. An example of this is the current Civil and Track Works Contract CTW400 — Az Zabirah Junction to King Khalid International Airport and the Haramain High Speed Rail Project Phase I (Package1). The China Civil is ready to handle more such projects in the railway and metro network of the Kingdom. Can you brief us on the company's track record in railroad construction? China Civil was established in 1979 according to the approval of the State Council of the People’s Republic of China. As one of the pioneers in international contracting and economic cooperation, it has been developed from the earlier Foreign Aid Bureau of the Ministry of Railways of China into a large-scale state-owned enterprise with Chinese National Super Grade Qualification for railway project contracting. Our company has been listed among the world’s top 225 international contractors for many years by the Engineering News Record. How about your projects in other countries? Since its execution of Tanzania-Zambia Railway, the biggest economic-aid project undertaken by China in 1960s, China Civil has been in constant development. At present, China Civil’s business scope covers project contracting, civil engineering design and consultancy, real estate development, import and export trading, hotel management etc. The business activities of China Civil are spread across 60 countries in Asia, Africa, America, Europe and Oceania with its overseas offices or subsidiaries established in more than 40 countries. By the end of 2011, the number of core staff of China Civil had exceeded 3,000 and that of foreign employees exceeded 10,000, with a newly signed annual contract value of $ 8.466 billion, through which a turnover of $ 1.119 billion had been achieved. What are your major achievements? Recently, China Civil has been executing numerous key projects ranging from railway, light rail, expressway to bridges, buildings, and municipal works. It has successfully signed the contracts for many large-scale projects in the past three years, such as Algerian 175 km Double Line Electrified Railway Project (contract value:1.728 billion Euros) in 2009, Nigerian Railway Modernization Project (AbujaKaduna) (contract value: $ 850 million) in 2010, and many other large-scale railway and expressway projects in Ethiopia, Djibouti, Nigeria and Chad in 2011, among which the contract value of the Railway Project between Ethiopia and Djibouti hit $ 1.702 billion. By the end of 2011, the number of China Civil’s projects under execution amounted to 128 with total contract value of $ 8.385 billion, which in turn guarantees China Civil for its sustainable business development and ever growing strength for project contracting. While consolidating and expanding its project contracting market, China Civil is also focusing on developing its diversified business and specialized professional edges, thus achieving a steadily strengthened financing capacity and an increasingly widened business scope. Adhering to the concept of “people-oriented, scientific development,” China Civil will continue to carry out an even more extensive and deeper cooperation with friends all over the world in a win-win partnership in our mutual interest by offering best service to our clients and the society. 97 Global Project Opportunities: June, 2013 SR 983 m municipal projects approved RIYADH: ARAB NEWS, 4 May 2013 Minister of Rural and Municipal Affairs Prince Mansour bin Miteb has signed 19 contracts worth SR 983 million for a number of projects in Riyadh, Makkah, Jeddah and Al-Ahsa municipalities. “The contracts signed by the minister include projects for maintenance and improvement of rainwater networks and draining of ground water in various residential districts and a bridge at the intersection of King Fahd Road with Hera Street in Jeddah at a cost of SR 350 million,” ministry spokesman Hamad AlOmar said in a statement yesterday. The projects in Makkah include the engineering and consultancy services for the execution of a number of intersections on Ring Road 4 at a cost of SR 68.33 million and the construction of a bridge to cross flooded wadis in the Mudrikah branch municipality at a cost of SR 47.97 million. Another contract is for the construction of concrete bridges for safe transport during flooding in various villages in the Makkah municipality at a cost of SR 44.87 million. The new projects in Riyadh province include 11 works for asphalting, pavement construction and streetlights in the municipalities of Dawadmi, Nafy, Bajadiya, Jamash and Arwa costing SR 12.9 million and in Quwaeiya, Jullah, Tabrak, Roudah, Halban, Hufairah Al-Hasah and Al-Rain at a cost of SR 40.67 million, apart from the maintenance of gardens and farms in the Roudah branch municipality in Riyadh city at a cost of SR 32 million. The project of digging canals in the districts of Nafal, Ghadir, Sahafa and Rabi will cost SR 129 million while the asphalting, pavement construction, and street lighting in the municipalities of Majma, Hawta Sudair, Roudah Sudair, Jalajil, Tamir and Artawiyah are at the cost of SR 31.65 million. The project for beautification of municipal entrance to Al-Kharj, Wadi Al-Dawaser, Dalam, Sulail and Hauta Bani Tamam is at the cost of SR 18.3 million. Another contract of SR 26 million is for cleaning and maintenance of toilets and public squares in the Riyadh city, while a SR 70 million contract has been awarded for asphalting streets in districts in south Riyadh. Habtoor Leighton Group in AED 250 m project JEDDAH: ARAB NEWS, 2 May 2013 Habtoor Leighton Group (HLG) has secured a contract worth AED 250 million in Abu Dhabi, reinforcing its capabilities in the oil and gas sector. HLG said the contract is for the design and construction of an accommodation camp and associated utilities on two artificial islands, S1 & S2, as part of the Satah Al-Razboot (SARB) oilfield development, located 120 km north-west of Abu Dhabi, for Abu Dhabi Marine Operating Company (ADMA-OPCO). Jose Antonio Lopez-Monis, HLG CEO and managing director, said the new project reinforces the group’s capabilities in the oil and gas sector and builds on the Group’s reputation as one of the leading diversified international contractors in the Middle East and North Africa. “Oil and gas-related projects such as the SARB project align perfectly with HLG’s building and infrastructure expertise, and the Group’s ability to deliver specialist projects in remote locations,” said Lopez-Monis. 98 Global Project Opportunities: June, 2013 HLG’s scope of work comprises the design, procurement, construction, testing and commissioning of accommodation, offices and associated utilities on two artificial islands, including: Two office buildings, four accommodation buildings, diesel generation units and sewage and water treatment plants. HLG will also be responsible for the management and supervision of off-shore installation works on the two SARB artificial islands. “This is the third oil and gas-related project to be awarded to HLG in the past six months and we remain focused on securing more work in the sector,” said Lopez-Monis. “Working with ADMA-OPCO on the SARB artificial islands provides HLG with an opportunity to further demonstrate our oil and gas expertise, and secure additional oil and gas-related contracts on both the SARB oil field development and other oil and gas projects across the region,” Lopez-Monis said. The project will commence immediately and is anticipated to be completed mid-2014. SR 1 billion housing deal unveiled at Riyadh expo RIYADH: MD RASOOLDEEN | ARAB NEWS STAFF Tuesday 30 April 2013 Last Update 1 May 2013 7:37 pm Property developers and investors need more solid information on available opportunities in the Kingdom and ways and means of securing them, a major real estate show in Riyadh was told yesterday. A number of financiers and developers specialized in the field say that the Saudi real estate market is expected to grow by 20 percent this year. Housing Minister Showisha Al-Duwaihi inaugurated the Real Estate and Housing and Urban Development (Ristx) show at the Riyadh Exhibition and Convention Center. Speaking at the event, the minister confirmed that his ministry had signed an SR 1 billion contract with a private sector national company to prepare the infrastructure for the construction of 7,000 housing units on a 5 million sq m land in Riyadh. According to the minister, the project, first of its kind, located on the Othman bin Affan road in the northwest of King Khalid International Airport in Riyadh. The project is being implemented following royal directive to allocate lands for the housing ministry to help citizens with loans to build homes. The project which is to be completed within 24 months, will provide water power, sanitation, wastewater, sidewalks for pedestrians on an area of 350,00 sq m. Provisions have also been made for schools for boys and girls, mosques and parks. At the show, the exhibitors expressed their satisfaction for the support given by the public sector to the private sector in the development of properties throughout the Kingdom. Over the past few years, around 50 new real estate developers have been licensed in the Kingdom to address needs of the construction pipeline currently estimated to be worth SR 2.35 trillion, with the residential, education, health care and industrial sectors as focal areas. It was pointed out that this year will witness a boom in the real estate market, as housing projects with affordable prices for citizens with limited income will be implemented, stressing that growth in this sector will exceed 20 percent. 99 Global Project Opportunities: June, 2013 Another study by Banque Saudi Fransi showed that public and private construction companies will need to build 275,000 housing units annually until 2015 to meet the demand for 1.65 million new houses. "We are very optimistic about this year. We think that mortgage finance will stimulate the sector, especially in the aftermath of the regulations issued last July and the draft of Saudi Arabian Monetary Agency (SAMA) that was issued in November, “an exhibitor said. Injaz Development Co., a leading real estate developer in the Kingdom, is highlighting some of the country’s strategic property segments at the show. Its key projects such as its Al-Gamra and Al-Marina developments were the focus of the event. “While there is no doubt that Saudi Arabia represents one of the most vibrant property markets in the Arab region, interested developers and investors need to have solid information on available opportunities and how to go about securing them,” said Omar Al-Kadi, CEO and MD, Injaz Development Co. He said: “Injaz considers Restatex an ideal platform to share and acquire expertise and best practices while introducing our own projects to a broader regional and global audience. It is also an exciting channel to strengthen ties and form partnerships with market players.” According to a recent study, the Kingdom needs 300,000 residential units every year over the next 15 years, a total of 4.5 million. In Riyadh, the lack of affordable homes is especially acute - a shortage of 225,000 residential units. Established by a Royal Decree No.(23), dated 11-6-1974H. Real Estate Development Fund (REDF) started its activities at the beginning of fiscal year 1975 to provide loans to citizens to help them construct their own homes and for investment purposes. It commenced operations with a capital of SR 250 million and later increased to SR 82,769 million. During the first 25 years from its inception, REDF has granted 443,842 private loans as well as 2,488 investment loans, with a total value of SR 120,144 million, resulting in the construction of 555,866 residential units. REDF's services have so far reached 3976 cities, villages and remote areas all over the Kingdom. “The Kingdom's real estate market is the largest in the region and it is estimated at SR 55 billion and its smooth development would boost the country's economy,” Hamad Al-Shuwair, chairman of the National Real Estate Committee of the Council of Saudi Chambers, said. He also said that around 60 percent of the Saudi population is below the age of 18 years and the country would need a large number of houses when these youths have families after their marriage. Speaking about the funding of the real estate sector, Al-Shuwair said that there is no cause for hesitation for financial institutions in providing funds to the real estate business since the the state mortgage scheme would provide the necessary security for their investments in the sector 100 Global Project Opportunities: June, 2013 Five invited to bid for Kuwait transformer stations 5 May 2013, 12:43 GMT | By Richard Thompson Tender bids for Kuwaiti transformer stations to be submitted by 18 June Kuwait’s Ministry of Electricity & Water (MEW) has invited bids from five groups of prequalified local and international contractors to supply and install 400/132/11kV main transformer substations at Al-Khairan. The contractors must submit bids by 18 June 2013. A pre-tender meeting will held on 22 May. The five qualified groups are: Mitsubishi Electric Corporation (Japan)/Middle East Electric Company (local) Hyundai Engineering & Construction Company (South Korea)/United Gulf Construction Company (local) National Contracting Company (Saudi Arabia)/National Contracting Company (local) Siemens Electronics & Electrical Services Company (local) Toshiba Corporation (Japan)/Ali Alghanim and Sons Company (Local) Investment in electricity is critical for Africa 1 May 2013, 12:40 GMT | By Rebecca Spong, Rebecca Spong Power investment will drive infrastructure development in Africa Investing in power and electricity is critical if Africa wants to develop its infrastructure, said Jean-Louis Ekra, president of the Egypt-based Afreximbank. “How do you build a factory without electricity,” he said. In line with other speakers at the Africa Global Business Forum held in Dubai on 1 May, he said Africa would be wise to emulate the Dubai model of development. “If you look at Dubai, Dubai started to build infrastructure and then investment followed. We should do the same,” he said. He gave the example of a road built in Cote D’Ivoire heading out of the capital Abijan towards Mali. Initially there was little interest in this project, which was regarded as “a road to the middle of nowhere”. Ekra says this road now carries about 80 per cent of the trade between Cote d’Ivoire and Mali 101 Global Project Opportunities: June, 2013 Consultants compete for three Saudi rail projects 15 May 2013, 11:45 GMT | By Rebecca Spong Bids submitted for project management contract Consultants are competing to project manage the construction of three rail lines in the Eastern Province of Saudi Arabia. The contract covers the 115-kilometre line connecting Jubal to Dammam, the 220km Jubail Industrial City network and the 200km northern branches connecting to Waad al-Shamal, Turaif and Arrar. Bids were submitted to the Saudi Railway Company (SAR) in April for the project management contract and consultants are awaiting a decision from the rail authority. Consultancy firms are also waiting for Saudi Arabia to award the project management office consultancy contract for the proposed Mecca public transport programme in Saudi Arabia. Bids were submitted in early March for the SR60bn ($16.5bn) project. At the heart of the masterplan is the planned Mecca mass rail transit (MMRT) project, which includes the construction of four rail lines, 88 stations and more than 180km of track. Consultants were expecting to see a decision made in April or early May, but as yet no award has been made Abu Dhabi approaches contractors for metro 6 May 2013, 7:09 GMT | By Colin Foreman, Colin Foreman Abu Dhabi project involves metro, light rail and bus networks The Department of Transport (DoT) has invited contractors to express interest in construction contracts the planned Abu Dhabi Metro scheme. In meetings with contractors in early May, the DoT outlined its schedule for the project, which once commenced, will be one of the largest construction schemes in the emirate. After receiving expressions of interest in May, it will invite companies to submit prequalification applications in July and draw up a list of prequalifiers by October this year. It then plans to tender the first contracts in the first quarter of 2014. There are two main components of the system. The first is a single 18-kilometre line between Zayed Sports City and the Mina Zayed/central business district area. There will be 17 stations on the line, 13 of which will be elevated. The second is two light rail transit (LRT) systems and one bus rapid transport (BRT) system. The first LRT line will run from Marina Mall to Reem Island. Known as the Blue line, it will be 15km long and will have 24 stations. A second LRT line will run from Karama to Saadiyat Island. Known as the Green line, it will be 13km long and will have 21 stations. 102 Global Project Opportunities: June, 2013 The BRT line, which is known as the Orange line, will be a 14km loop connecting 25 stations serving the islands northern areas such as Khalidiya and Al-Maryah. The DOT plans to split the metro line into three separate contracts. The first will cover the civil works for the above ground structures which will be awarded as design and build contracts. The second will be for the underground construction work, which again will be awarded using a design and build contract. The third covers the rail system, the rolling stock and the operation and maintenance for the line. That will be awarded using a design, build, operate and maintain contract. The LRT and BRT systems will be delivered using design, build, operate and maintain contracts. The study and preliminary design contract for Abu Dhabi’s metro system was awarded to a consortium comprising US-based consultancy firms Aecom and Parsons Brinckerhoff and Germany’s DB International in November last year. The consortium, known as the Adapt Group, also completed the feasibility study for the scheme. The original masterplan for the metro involved the construction of 131 kilometres of line, supported by tram and bus feeder services Saudi Arabia pushes forward Jeddah metro plans 1 May 2013, 6:16 GMT | By Rebecca Spong Market awaits release of tenders for Jeddah metro projects The newly created Jeddah Metro Company is reviewing its options on how to develop the planned metro network in Jeddah. The company is said to be looking to work with companies that can ensure the metro is fully integrated with other forms of transport such as overland rail lines and bus networks within the city of Jeddah. According to local press reports, Minister of Municipal and Rural Affairs Mansour bin Miteb said in late April that the tenders for the metro project are to be released soon. The Jeddah Metro Company was set up in March as a joint venture of the Jeddah Municipality and the Jeddah Urban Development Company (JUDC). A senior official at the JUDC, Ibrahim Katabkhana, was appointed the company’s chief executive officer (CEO). The metro will have three major lines. A 67-kilometre Orange Line will connect Mecca Road with Obhur, including 22 stations, and include a branch line that will run east along Sari Street. The 24km Blue Line will contain 17 stations and will link King Abdulaziz International airport to the Old Airport Road. The Green Line will run alongside Palestine Road for 17km. It will also contain a branch line to the old airport at the end of the Haramain Railway, along with seven stations. French firm Egis is continuing to work with the authorities on the early designs for the project 103 Global Project Opportunities: June, 2013 Contractors prepare bids for Muscat palace underpass 8 May 2013, 8:19 GMT | By Colin Foreman Tunnel will serve the Bait al-Baraka on the outskirts of Muscat Contractors have been invited to bid by 14 May for a contract to build a new underpass serving the Sultan’s palace on the outskirts of Muscat. The Bait al-Baraka underpass will be built under the route 1 highway to the north of Muscat that connects the capital and Sohar in the Batinah Governorate. The consultant is the local Renardet. The client is the Diwan of the Royal Court. Oman to prequalify contractors for Musandam road project 7 May 2013, 7:07 GMT | By Colin Foreman New Omani highway will include at least seven tunnels Oman’s Transport and Communications Ministry is preparing to invite contractors to prequalify for work on a major new road project in the Musandam Governorate. The proposed scheme involves building a new road that will connect the town of Khasab on the peninsula’s north coast and the remote town of Lima on the eastern coast that is not currently accessible by road. Khasab is connected to the emirate of Ras al-Khaimah in the UAE to the south by a road running along the peninsula’s west coast. The project, which is expected to be tendered as one single design and build contract to be completed in phases, will involve digging at least seven tunnels through the mountainous region. This means local and regional contractors are currently active in Oman will have to tie up with firms that have specialised tunnelling expertise. Muscat is developing new projects to improve the road infrastructure in the Musandam peninsula. The Regional Municipalities and Water Resources Ministry recently awarded a RO1.7m ($4.41m) contract to the local Ali & Company Trading & Contracting for the construction of a dual carriageway at the entrance to Khasab. Other infrastructure projects are also moving ahead. In January, The Musandam Power Company invited contractors to express interest in building a 120MW independent power project (IPP) in Musandam. The plant will be primarily fuelled by natural gas, with a back-up facility for using fuel oil. The facility’s technology will be based on reciprocating engines or gas turbines, in open or combined-cycle configuration. The Musandam Power Company is a new entity being established by a consortium of the Oman Oil Company and South Korea’s LG International Corporation. The power plant is being built in parallel with the Musandam gas plant, which will have the capacity to treat 45 million cubic feet a day (cf/d0 of gas and 20,000 barrels a day (b/d) of crude oil. The $600m gas processing plant is currently being built by South Korea’s Hyundai Engineering. 104 Global Project Opportunities: June, 2013 AFRICA AfDB, Federal Government of Nigeria sign US $300 Million Loan Agreement 31/05/2013 May 27th 2013 marked the beginning of yet another important relationship between the African Development Bank and The Federal Government of Nigeria. A loan agreement to support the transport sector was signed by the Minister of Finance, Ngozi Okonjo Iweala, and the Resident Representative of the Nigeria Field Office, Ousmane Dore. The US $300 million will be used as budget support for the transport sector and economic governance reform program over two years. The program’s overarching development objective is to promote inclusive growth through strengthening road transport sector governance and greater transparency and accountability of public financial management. The loan shall contribute to the financing of the budget deficit for the fiscal years 2013 and 2014. The Minister expressed appreciation of the Bank’s commitment towards sustainable development in Nigeria, saying that the funds will go a long way towards strengthening transport sector reforms. AfDB Funds Mozambique’s Massingir Dam Emergency Rehabilitation Project 29/05/2013 The African Development Bank on May 28 in Marrakech, Morocco, granted a supplementary loan of US $33.213 million to the government of Mozambique for the rehabilitation of the country’s Massinger Dam. The funds will ensure effective sustainability of the Massingir Dam by preventing its collapse in the event of a heavy downpour. The Massinger Dam is located in the Limpopo National Park and is part of the Great Limpopo Trans frontier Park, a breeding ground for Nile crocodiles. Its rehabilitation will directly benefit the communities living in the project area and help improve food production. When completed and fully operational, the upgraded dam will also contribute to poverty reduction in the region by supplying water for irrigation to towns and villages further away. Rehabilitation of the dam will also increase its hydropower generation. Signing the agreement, the Bank’s Vice-President for Sector Operations, Aly Abou-Sabaa, said the rehabilitation of the dam fell within the Bank’s strategy to support Africa’s development through the funding of sustainable energy infrastructure. He said the project was a milestone in the collaboration between Mozambique and the AfDB. Mozambique Minister of Planning and Development, Aiuba Cuerencia, expressed his country’s gratitude to the Bank for its support to his country’s development in general and in its infrastructure sector, in particular. Cuerencia is also a Governor of the African Development Bank. 105 Global Project Opportunities: June, 2013 INDIA NEWS L&T Construction secures orders worth Rs 2,542 cr L&T Construction has won orders valued at over Rs 2,542 crore during the months of April and May L&T Construction has won orders valued at over Rs.2542 crore during the months of April and May. The Building and Factory segment had the biggest piece of the pie, with orders worth Rs 1,021 crore. This included orders for construction of residential towers, a cement plant and a factory, according to an exchange update. The Heavy Civil Infrastructure Business also secured orders, this time worth Rs 866 crore for the Kochi Metro Rail Project. The Transportation Infrastructure Business secured an order worth Rs 315 crore. The order was for the design and construction of electrification, signaling, telecommunication and associated works for a double track railway line between Karwandiya to Durgauti section of the eastern corridor. The Water & Renewable Energy Business has secured EPC(Engineering, Procurement and Construction) orders worth Rs 148 crore from the Public Health Engineering Department, Rajasthan for a water supply system to 97 villages. Additional orders have been received for Rs 192 crore, under the power transmission and distribution business. Larsen and Toubro was up 0.88%, compared to a 0.11% rise in the Sensex, and trading at Rs 1,594.3 at the time of writing. Besides construction, Larsen and Toubro is involved in the technology, manufacturing and financial services segments. ADB to finance construction of Indo-Myanmar road Asian Development Bank would finance the construction of the 417-km long Indo-Myanmar Road connecting Moore in Myanmar with Sutarkandi in Karimganj bordering Bangladesh. The first phase of the road, to be laid under ADB's 'Proposed Road Consulting Mission', would be from Moore in Myanmar to Imphal in Manipur while the second phase would be from Imphal to Sutarkandi via Silchar, official sources said here on Thursday IVRCL surges on winning new orders worth Rs 639 crore IVRCL has surged 6% to Rs 20.45 after the company announced that its various divisions have bagged fresh orders amounting to Rs 639 crore. The company’s transportation division has bagged orders worth Rs 445.54 crore for road and drain improvement works in Karnataka, construction and upgradation of road in Madhya Pradesh and construction of roadbed, station buildings and passenger amenities for east coast railway, IVRCL said in a statement. 106 Global Project Opportunities: June, 2013 The building division secured orders worth Rs 183.61 crore. The works involves construction of secondary technical school in Umm Al Quwain in UAE and construction on integrated office building for ISRO in New Delhi. Also, the company has bagged various orders worth Rs 9.73 crore pertain to various other miscellaneous works. Capital-strapped PPP projects look for easy way out In a move to keep players in the cash-strapped roads sector engaged, the National Highways Authority of India (NHAI) is pushing to renegotiate terms with them which could have wideranging and longterm implications for the economy. The NHAI cleared a proposal by GMR group to revive the Rs 7,200 crore Kishangarh-Udaipur-Ahmadabad expressway project. But, the finance ministry and planning commission representatives in the authority have recorded their objections to this decision. In a case which has some parallels to the renegotiation of telecom licences, NHAI has recommended the proposal, which seeks to reschedule the premium payable to NHAI over the concession period by paying lower premium at the initial stages and then enhancing subsequent payments, for final approval by the centre. While the road ministry is of the view that the government erred in projecting a high growth rate in sector, and given the changed scenario there is no other way to salvage the projects, the critics of the move have questioned if the concessionaire would have asked for renegotiation had the economy grown higher than projected. The NHAI decision was taken in a meeting held in late March, according to officials familiar with the development. NHAI is headed by RP Singh and comprises eight members including finmin and plan panel representatives. In January, GMR Kishangarh-Udaipur- Ahmedabad Expressways Ltd, the concessionaire pulled out of the project as there was a delay in satisfying several “conditions precedent” such as issuance fee notification and procurement of environmental clearance by NHAI. The concessionaire also on its part had not procured several applicable permits required for starting construction. The dispute moved to Delhi High Court. In February, after NHAI issued the fee notification and procured the environment clearances, GMR submitted the proposal for revival of the project. Apart from the rescheduling of the premium payments, GMR also sought one-time compensation for increase in project cost on the plea that project economics have changed since the award of the project in 2011 and overall costs have gone up. It also wanted NHAI to ensure that environmental clearances for land acquisition, cutting of trees and shifting of utilities are in place. The authority did not want to set a precedent by awarding one-time compensation and taking any stand on green clearances as “reopening of these issues will create problems in other projects. But it considered the GMR proposal to rework premium “crucial to implement the project.” One of the key considerations for NHAI was the falling traffic growth and its impact on the lenders’ confidence in several NHAI projects and ultimately their viability. “Rejection of this proposal could mean a loss of revenue to the government and it is a better option to come to a negotiated amicable settlement of issues, since the concessionaire has offered to protect the NPV value of the premium in the original bid,” the authority said in a note. BOT projects bid out during 2011-12 had received aggressive bids. 25 projects received premium bids including Kishangarh-Udaipur-Ahmedabad awarded to GMR. From these projects NHAI is to get premium amounting to Rs.98,115 crores over the concession period. These projects are unable to start execution because of their inability to raise the required equity. However, both finance ministry and planning commission took a different view. In a dissent note finance secretary RS Gujral said, “It was pointed out that the schedule of premium payable by M/s GMR is as laid down in a legally binding contract drawn up at the conclusion of an open bidding process, in which premium payable as also the schedule was a clear bidding parameter. Therefore varying the payment 107 Global Project Opportunities: June, 2013 schedule at this stage implies departure from a legally binding contract, an action that cannot be supported.” He also expressed concerns about this becoming a precedent for other contracts in similar distress. “It should be appreciated that the bidders are expected to have done due diligence and factored in all commercial risks before bidding.” The dissent note also pointed out how the concessionaire would not have agreed to a revision of terms had the economy had grown faster than projected. The finance ministry also took exception to GMR issuing termination letter without seeking to invoke provisions that allow for extension of time in case of delays in environmental clearances. The ministry also recommended stringent action with maximum possible penalty and black listing against GMR, “taking note of huge losses on account of prospective termination of the contract and that fact that as on date NHAI obligations regarding “conditions precedent” are fully complied with.” Plan panel secretary Sindhushree Khullar said in her note without wanting to be recorded as “dissent”, “Such whimsical changes in legally binding contracts is a poor reflection on the credibility of government and its agencies. Moreover reopening a legally binding contract mitiates against the principle of sanctity of contracts and should not be resorted to on a case to case basis.” In response to an email seeking comments, NHAI chairman said the authority has put in enough safeguards. “While recommending rescheduling of premium we have proposed following caveats which would ensure the commitment of the Concessionaires: a. In case the project revenues is more than projected, NHAI will have the right to pre-pone the payments in consultation with the Senior lenders. b. During the first 12 years, ie., during the period of debt repayment, the concessionaire shall not pay any dividend to itself, but shall use the cash flows solely to service it’s obligations to NHAI and lenders and project requirements. c. A corporate guarantee of the parent company covering the highest annual difference between the original premium flows and the rescheduled, at their current NPV value,” he said. The chairman added that there is an argument made by some officers in the Government that these are done deals and should not be renegotiated. If this argument is accepted then most of the projects will get terminated and the developers debarred. “This will unsettle the entire road sector, affecting the economy of the country very seriously. We will have to forget the PPP mode for delivery of infrastructure. The Government would then have to borrow or make budgetary allocation to execute these projects as cash contracts.” NHAI said the move was win-win and did not have any financial implication for the government. It added, “We are against blacklisting the concessionaires.” ADB finds lending to India a challenge due to tough financial condition The Asian Development Bank (ADB) could find maintaining its existing lending level to India a big challenge in the coming years as its income from surplus resources invested in advance countries dips due to softening global interest rates, President of the multi-lateral lending agency Takehiko Nakao said today. Addressing a press conference, on the occasion of the 46th Annual Meeting Of its Board of Governors, Nakao said though they would like to increase its lending to India, but even maintaining the current level would be challenge because of the difficult financial conditions that the bank faces. “Our income from surplus resources is lower than ever due to diminishing interest rates in advance countries, hence even maintaining the current level of lending will be a challenge,” Nakao said. According to the ADB’s website, ADB’s sovereign lending assistance to India increased from an annual average of about $1.16 billion in 2000–2006 to $1.85 billion in 2007–2012 and the country has been ADB’s largest borrower for the last 3 years (2010–2012). He said overall economic growth in Asia would be more robust than European nations and the developed world because of strong domestic demand and robust production capacities. “The advance economies would grow slower than even post-Lehman period,” Nakao said. On the concept of Brics bank and its challenge to global financial agencies like ADB, Nakao said he welcomed the 108 Global Project Opportunities: June, 2013 formation of the Brics bank and would cooperate with it, but banking business is difficult as finding good projects, monitoring it, lending etc is a challenge. The concept of a Brics Bank has been floated by the conglomeration of five major emerging global economies Brazil, China, India, Russia and South Africa. Nakao said that though expansionary monetary policy in many advance economies has been blamed for creating a bubble, more so in assets and commodity prices, but he thinks that its spill over on emerging economies across the world will be limited. “I feel that expansionary monetary policy if it causes inflow in emerging economies is welcome and if there is an assets bubble then countries can manage those inflows,” Nakao said, adding that if advance economies did not embarked on a regime of expansionary monetary policy the global recession would have been worse. On currency depreciation in Japan and its negative impact on the world financial markets, the Presiden of ADB said that his personal view was that the depreciation was necessary to bring out Japan from years of deflation. He also refuted criticism that Japan being the biggest shareholder in ADB has a monopoly over the post of President, saying that Japan has always favoured a open, transparent system of President ship of ADB and will have no problem if another worthy contender comes. Nakao is the ninth consecutive year when Japanese has become President. He said the Board of Governors meeting will focus on infrastructure and poverty reduction as growth in infrastructure not only helps in faster overall economic growth but also helps in quicker elimination of poverty. “Without infrastructure like transport, roads, etc access to health, education etc is limited,” Nakao said Private equity set to pounce on cut-price infrastructure Private equity investment in Indian infrastructure is poised to pick up following a lengthy dry patch as debt-stressed operators of toll roads and other projects come under pressure from banks to offload assets to strengthen balance sheets. This time, would-be investors such as KKR , the Blackstone Group and Macquarie Group are looking at buying into completed projects, a relatively safe bet, tempted by valuation expectations that have fallen roughly 25-30% over the past two years, fund managers and bankers said. A previous wave of private equity investment in Indian infrastructure was often in early stage projects, many of which were bogged down by delays, eroding prospects for returns. Adding to their woes, developers are saddled with outstanding bank loans of roughly $200 billion. "Quite a number of infrastructure projects were excessively geared when they were built ... they are struggling to meet their debt obligations today. This is the opportunity for us," said Suresh Goyal, CEO of SBI Macquarie Infrastructure Fund. The $1.2 billion fund, run by State Bank of India and Australia's Macquarie, in February bought a controlling stake in a road from debt-laden GMR Infrastructure . "Many sponsors or developers do not want to and in some cases cannot support these projects and are therefore looking to sell. Many of these projects are good quality assets which comfortably fit our investment mandate," he said. Among potential deals, NCC Ltd , which is backed by Blackstone, is in talks to sell its 51% stake in a 78km toll road in Uttar Pradesh to Morgan Stanley's infrastructure fund, sources with direct knowledge of the matter said. 109 Global Project Opportunities: June, 2013 The road has been generating revenue for two years. Morgan Stanley declined to comment while NCC did not respond to an e-mail seeking comment. GVK Power and Infrastructure is talking to funds to sell about 25% of its airport business by the end of 2013 and may also rope in an investor for its road building business, director Issac George told Reuters. Another debt-heavy developer, Lanco Infratech , has hired Macquarie and Infrastructure Development Finance Corp to sell part of its power assets and some of its road projects, sources said. Lanco declined to comment. If the deals come to fruition, it would reinvigorate a market that saw just $741 million in private equity money invested in Indian infrastructure last year, compared to $3.2 billion in 2011, according to deals tracker VCCircle. This year, the sector has seen $463 million worth of private equity deals. "We will see funds taking stakes - including controlling stakes - in developed assets where risks are lower," said Raj Balakrishnan, managing director and co-head of investment banking at Bank of AmericaMerrill Lynch in Mumbai. Debt and delay Private equity firms have shieded away from Indian roads, ports and power projects in the last couple of years as the credit profiles of many builders deteriorated amid delays in project approvals or access to fuel for power plants. Infrastructure accounted for around 23% of corporate debt restructurings for Indian banks at the end of March, up from 20.5% a year ago, Fitch Ratings said in a note. "The infrastructure sector is likely to be the biggest risk for Indian banks in the year ending March 2014," it said. Most Indian banks, especially state lenders such as State Bank of India and Punjab National Bank as well as top private sector lender ICICI bank , have heavy exposure to infrastructure, with some of them at the sector limit imposed by the central bank. Bank of Baroda expects a $457 million loan restructuring in the June quarter, mostly covering the infrastructure sector, because of project delays, Chairman S S Mundra said on Tuesday. In the absence of mature bond market and banks' reluctance to lending more, equity is needed to fund infrastructure in a country infamous for bumpy roads and power outages. Several funds, however, were burned putting so-called growth capital into uncompleted projects. Blackstone earlier this year called off its $111 million investment in Visa Power, which is building power plants, according to its website, after the company failed to meet certain milestones and other terms, according to a source with direct knowledge of the matter. Visa Power did not respond to an email seeking comment. Blackstone declined to comment. In their renewed infrastructure push, funds are demanding assurances such as a pre-determined rate of return over a fixed period. Most important, investors are looking at projects that are already generating 110 Global Project Opportunities: June, 2013 8.0 PROJECT CONSTRUCTION ITEMS : OVERSEAS INQUIRIES Bathroom Fittings & Accessories Unique International, Dhaka Importers of all kinds of bathroom fittings. Address: 20/25, North South Road, Siddique Bazar, Habib Market, 3rd Floor, Dhaka, Bangladesh Phone: +(880)-(2)-9566254 Fax: +(880)-(2)-9566254 Mobile / Cell Phone: +(880)-171536146 Plasztikform Kft Importers of stainless steel bathroom units. Address: Baross Utca 167, Budavrs - 2040, Hungary Phone: +(36)-(23)-423001 Fax: +(36)-(23)-423003 Otari Ghana Limited Buyers of all types of bathroom fittings. Address: No.:10, Dadeban Loop, North Industrial Area, Accra, Ghana Phone: +(233)-(21)-237796 Fax: +(233)-(21)-237796 Mobile / Cell Phone: +(233)-24670780 Microdata Associates Limited Buyers of bathroom accessories such as shower curtain, toothbrush holders etc. Address: 79, Roseville Road, Hayes, London - UB34QY, United Kingdom Phone: +(44)-(208)-5731391 Fax: +(44)-(790)-2098281 Mobile / Cell Phone: +(44)-7812339669 Vision Accomplished Ventures Limited Buyers of bathroom fittings. Address: 4, Ogunlana drive, Surulere - 34562, Paraguay Phone: +(234)-(1)-8033048516 Haider Limited Buyers of bathroom fittings. Address: 15 Hollinbank Lane, Lee - WF16 9NF, United Kingdom Phone: +(44)-(7979)-920555 Bellagio, Sarl Buyers of bathroom fitting. Address: Tabaris Square, Achrafieh, Beirut, Lebanon Phone: +(961)-(1)-204042 Enter-American Importers of bathroom accessory. Address: Rruga Don Bosco, Tirana - 121 212, Albania Phone: +(355)-(43)-57057 Fax: +(355)-(43)-57057 Plumb Crazy Buyers of all plumbing, bathroom, hardware products. Address: 100 Voortrekker Road, Salt River, Cape Town - 7925, South Africa Phone: +(27)-(21)-5117818 Fax: +(27)-(21)-5117873 Mobile / Cell Phone: +(27)-834634649 111 Global Project Opportunities: June, 2013 M. G. Systems Importer of sinks. Address: Arti 328, Rue Paul Claudel Strret, Evry - 91000, France Phone: +(33)-(1)-60775460 Fax: +(33)-(1)-60776410 Swadesh Bidesh Buyers of bathroom accessories. Address: 64, Aziz Super Market, 1st Floor, Dhaka - 1000, Bangladesh Phone: +(880)-(2)-861025 Fax: +(880)-(2)-8613958 Mobile / Cell Phone: +(880)-11875686 Kudos Shower Products Limited Buyers of cotton bath and shower mats. Address: Elmsfield Park Holme Cumbria, Manchester - LA61RJ, United Kingdom Phone: +(44)-(1539)-564040 Fax: +(44)-(1539)-564141 Newise International Limited Importer of bathroom sinks. Address: 1/F, Kai Kwong Commercial Bldg Lockhart Road Wanchai, Wan Chai - 332334, China (Hong Kong S.A.R.) Phone: +(852)-(852)-25117008 Fax: +(852)-(852)-28917187 Pinnacle Exclusives, Inc. Importers of bathroom accessories. Address: 4655, Bonavista Avenue Suite 208, Montreal - H3W 2C6, Canada Phone: +(1)-(514)-4824166 Fax: +(1)-(514)-4824166 Multitrade International Ltd. deals in bathroom fittings Address: Data General Building, 666 Gt South Rd., Ellerslie, P O Box : 62503, Central Park, Auckland, New Zealand Phone: +(64)-(9)-5259721 Fax: +(64)-(9)-5250471 Jash Technical Services Co. Limited Importers of bath accessories. Address: P. O. Box 173, Riyadh - 11411, Saudi Arabia Phone: +(966)-(1)-4767780 Fax: +(966)-(1)-4776662 E-buy Radiators Direct Limited Buyers of bathroom fixture and fittings such as taps, showers, baths sinks etc. Address: 15, Longfield Avenue, Fareham - PO141DA, United Kingdom Phone: +(44)-(1329)-519465 Fax: +(44)-(1329)-519465 Mebra, Sa Importers of sanitary brass plumbing fittings, shower sets, bathroom acessories etc. Address: Lugar Do Barreiro, Apart. N.- 4, Vila De Prado - Braga - 4734908, Portugal Phone: +(351)-(253)-929600 Fax: +(351)-(253)-929625 Mobile / Cell Phone: +(351)-963931719 Samra Bath Center Engaged in importing of bathroom accessories, bathroom mirrors and bathroom other products. Address: 23, King George Street, Tel Aviv - 63290, Israel Phone: +(972)-(52)-4669609 Fax: +(972)-(3)-5273506 112 Global Project Opportunities: June, 2013 Aqua Tec Importers of spare parts for sink. Address: 25 Moaz Aldawla, Nser City Mkram Abeed, Cairo - 11241, Egypt Phone: +(2)-(2)-6708075 Fax: +(2)-(2)-2729651 Mobile / Cell Phone: +(2)-0020124595870 Curtiss AS. Importers of products related to bathroom. Address: Keramikkveien 32, Stavanger - 4032, Norway Phone: +(47)-(51)-800805 Roca Sanitario SA Importers of bathroom fittings and products. Address: Avda. Diagonal, 513, Barcelona - 08029, Spain Phone: +(34)-(93)-3661200 Cixi Star Light Sanitary Ware Company Limited Buyers of shower. Address: Cang Tian Industrial Area, Changhe, Cixi, Ningbo - 315 326, China Phone: +(86)-(574)-63406416 / 63415898 Fax: +(86)-(574)-63409125 / 63415786 T. K. Interior Design & Decoration S/b Importers of bathroom accessories. Address: 750/D, Taman Ecorich Jalan Tanjung Batu, Bintulu - 97000, Malaysia Phone: +(6)-(86)-332729 Fax: +(6)-(86)-332729 Mobile / Cell Phone: +(6)-0138338430 Comfort Line AS Buyers of steam shower, bath tub and heatpump. Address: Rigedalen, 52, Kristiansand - 4626, Norway Phone: +(47)-(984)-82373 Construction Machinery Hanmi International Company Limited Buyers of used construction equipments and spare parts. Address: #121-246, Dangsandong 6, Ga Youngdeungpogu, Seoul - 150 808, Korea Phone: +(82)-(2)-26755013 Fax: +(82)-(2)-26327883 Mobile / Cell Phone: +(82)-112815200 Halong Traseco Buyers of all types of construction machine. Address: 39 Le Lai Street, NGoquyen Dist Hai phong, Haiphong City - 10000, Vietnam Phone: +(84)-(31)-768412 Fax: +(84)-(31)-767638 Mobile / Cell Phone: +(84)-0903245444 T. Lishman & Sons Buyers of construction equipments. Address: The Winnings, Ingleton, Lancaster - LA63DU, United Kingdom Phone: +(44)-(152)-4241082 Fax: +(44)-(152)-4241935 Yabhana Group Importers of construction equipments. Address: 12, Dunchurch Crescent Sutton Coldfield, Birmingham - B73 6QN, United Kingdom Phone: +(44)-(7909)-526410 113 Global Project Opportunities: June, 2013 Alghanim International & General Trading Buyers of construction equipments. Address: Shuaikh, Behind Old Pepsi Company, Safat - 2118, Kuwait Phone: +(965)-(1)-804044 / 9149534 Fax: +(965)-(1)-4822490 Mobile / Cell Phone: +(965)-965789 Birdi Civil Engineers Importers of construction plants. Address: P. O. Box 58223, Nairobi - 00010, Kenya Phone: +(254)-(20)-823620 Fax: +(254)-(20)-891017 Dabaywa Trading & Contracting Co. Importer of construction equipment, construction materials and construction machineries etc Address: 2, W2, Mosque Street Ibnauf Suliman Building, Khartoum - 11111, Sudan Phone: +(249)-(9)-12953816 / 12843934 Lumbini Trade Centre Nepal Private Limited Importers of construction equipment Address: Trispureshore, K. K. M. Building Satdobato, Lalitpur - Na, Nepal Phone: +(977)-(1)-4260058 / 5524362 Fax: +(977)-(1)-4226711 Induztrial Toyz Corporation Buyers of road construction equipments. Address: 169, Forrest Drive, Sherwood Park - T8A6A9, Canada Phone: +(1)-(780)-9451161 Fax: +(1)-(780)-4493747 Wahyu Mandiri Importers of all types of construction equipments. Address: Basuki Rahmat 56, Sumatera Selatan - 12430, Indonesia Phone: +(62)-(711)-421557 Mobile / Cell Phone: +(62)-8127132333 J. L. International Limited, Partnership Buyers of machineries and raw material for construction industry. Address: No. 889, Thai C. C. Tower, Room No. 242, South Sathorn Road, Yanawa, Sathorn, Bangkok 10120, Thailand Phone: +(66)-(2)-6723444 Mobile / Cell Phone: +(66)-896610896 Haider Bearing & Machinery Centre Importers of all types of construction machinery. Address: No. A-87, Jinnah Road, Rawal Pindi - 46000, Pakistan Phone: +(92)-(51)-5870342 / 5554446 Fax: +(92)-(51)-5776067 JB System Inc. Engaged in import of construction equipments such as excavators, bulldozers, wheel loaders, motor graders, cranes, road rollers, forklifts, dump trucks, concrete mixture trucks, garbage compactor trucks, generators. Also imports used ship, cargo etc. Address: No. 4-4-29, Nishi Sakado, Sakado-Shi - 350 0247, Japan Phone: +(81)-(492)-793455 Fax: +(81)-(492)-793456 Mobile / Cell Phone: +(81)-9034053162 Hire Station Limited Buyers of general construction machineries. Address: Fields Farm Road Long Eaton, Nottingham - NG103FZ, United Kingdom Phone: +(44)-(845)-6045337 Fax: +(44)-(845)-6688999 Mobile / Cell Phone: +(44)-7711958183 114 Global Project Opportunities: June, 2013 Precise Engineering Services Importers of construction equipment. Address: Plot 43, Oboja Road, Kampala - 19780, Uganda Phone: +(256)-(772)-742053 Fax: +(256)-(38)-400258 Go Industry A. S Buyers of construction equipments. Address: Sak R Kesebir Cad. 36/13, Balmumcu Besiktas, Istanbul - 80700, Turkey Phone: +(90)-(212)-2114348 Fax: +(90)-(212)-2114348 Jepak Holdings Sdn Bhd Buyers of concrete mixer trucks and batching plants. Address: 76, C. F. Park, Jalan Tun Hussein Onn, Bintulu - 97000, Malaysia Phone: +(60)-(86)-333019 Fax: +(60)-(86)-332700 Door Knobs, Handles, Knockers, Stoppers & Other Door Hardware Newise International Limited Importers of door closers, door handles and door hinges. Address: 1/F, Kai Kwong Commercial Building, 332-334 Lockhart Road, Wanchai - ., China (Hong Kong S.A.R.) Phone: +(852)-(852)-25117008 Fax: +(852)-(852)-28917187 John Phillips Investments Limited Distributor and supplier of door locks and door closers. Address: 5, East Hill, London - HA9 9PT, United Kingdom Phone: +(44)-(20)-89049407 Emmanuella Consult Importers of door handle. Address: Plot 22, Victor Hugo Dakar, Dagana - 221, Senegal Phone: +(221)-(820)-12819 Fax: +(221)-(820)-45221 Willimco Buyer of door, door lock, door handles, etc. Address: 22, Watson Street, Aberdeen - 4850, United Kingdom Phone: +(44)-(7)-20482314 Fax: +(44)-(7)-23547563 Kin Kei Hardware Industries Limited Importer of door closers, door handles, door hinges, door knob locks and door viewers. Address: Room 704, 7/F Eastern Centre, 1065 King's Road,, Tai Koo - .., China (Hong Kong S.A.R.) Phone: +(852)-(852)-25616788 Fax: +(852)-(.)-25639115 Jazco Company Importers of door knnobs and knobs products. 115 Global Project Opportunities: June, 2013 Address: Banani Road -5, Block F , House No. 88 Third Floor, Dhaka - 1206, Bangladesh Phone: +(880)-(12)-8824395 Anurasiri Furnitures Private Limited Importers of door pulls, hingers, cam locks, plywood etc. Address: 701/A, Peradeniya Road Mulgampola, Kandy, Sri Lanka Phone: +(94)-(81)-2228173 Fax: +(94)-(81)-2233279 General Building Hardware Traders Rajabdeen & Sons Limited Importers of builders hardware. Address: 192, Nawala Road, Colombo - 5, Sri Lanka Phone: +(94)-(11)-2807500/2807500 Fax: +(94)-(11)-2807500 Almacen El Arquitecto Buyers of builders hardware accessories. Address: Cra 42, No. 75-83, Local 148, Itagui, Colombia Phone: +(57)-(4)-3741718 Fax: +(57)-(4)-3741718 Shisham Furnitures Buyers of building hardware. Address: 15, Shadman, Jail Road, Lahore - 54000, Pakistan Phone: +(92)-(42)-7533282 Fax: +(92)-(42)-7587506 J. Hassanali Hardware Store Buyers of building hardware. Address: P O Box 1485, Daressalaam - , Tanzania Phone: +(255)-(22)-2115793 Fax: +(255)-(22)-2130341 Total Rehab BA Buyers of equipment for building. Address: Torggata 33, Oslo - N-0183, Norway Phone: +(47)-(47)-23157418 Fax: +(47)-(47)-23157401 Indenza Limited Buyers of builders hardware. Address: 142 Westchester Dr, Wellington - 6004, New Zealand Phone: +(64)-(4)-477 3555 Mike Gepp Developments Buyers of building related products. Address: 8, Point Road Monaco, Nelson - 7001, New Zealand Phone: +(64)-(3)-5479853 Fax: +(64)-(3)-5479008 The Stanley Works Buyers of builder hardware. 116 Global Project Opportunities: June, 2013 Address: 3F, 338 Wen Lin Road, Taipei - 111, Taiwan Phone: +(886)-(2)-81451465 Chifley Exim Australia Importers and distributors of builder's hardware in brass, steel, iron and few products of general merchandise. Address: 2, St.Martins Crt., Wantirna South, Melbourne - 3152, Australia Phone: +(61)-(3)-98010799 Fax: +(61)-(3)-98005798 Maroc Motif Buyers of building hardware. Address: 22, Rue Ennarjisse Benjdia, Casablanca Maroc - 20000, Morocco Phone: +(212)-(2)-2225702 Fax: +(212)-(2)-2225716 Allu Metal Maghrebin Buyers of various builder hardwares. Address: 40-44, Rue Abou, Amrane Al Fassi, Casablanca - 20100, Morocco Phone: +(212)-(22)-981058 Fax: +(212)-(22)-981055 Vijay Hardware Buyers of building hardwares. Address: Algoz Industrial Area No. 3, Dubai - 41396, United Arab Emirates Phone: +(971)-(4)-3479200 Fax: +(971)-(4)-3479733 Ananta International Trading, Inc. Importers of all types of builders hardware and hand tools. Address: 7-1285, Bristol Road West, Mississauga - L5V 2H5, Canada Phone: +(1)-(905)-2860274 Fax: +(1)-(905)-2860163 Granite, Marble, Sandstone & Slate Stone Excellence Integrated Solutions Importers of limestone. Address: Old Mazda Road, Fabric Care Building, 203, Abu Dhabi - 52596, United Arab Emirates Phone: +(971)-(2)-6711197 Fax: +(971)-(2)-6711158 Mobile / Cell Phone: +(971)-506421157 Avner Mart Import Export Buyers of marble. Address: 1, HaDror, Kiryat-Ono - 55602, Israel Phone: +(972)-(50)-590488 Maha Co. Importers of marble, granite, limestone, onyx etc. Address: # 34, No.3, Golfam Building, Golfam Street, Africa Ave,, Tehran - 0098, Iran Phone: +(980)-(21)-22020251 / 22055860 Fax: +(980)-(21)-22055860 Mobile / Cell Phone: +(980)-9121271665 117 Global Project Opportunities: June, 2013 Charcon Specialist Products Importers of granites. Address: Marions Way, Coventry Road, Leicester - LE9 3GP, United Kingdom Phone: +(44)-(1455)-288241 Fax: +(44)-(1455)-285284 Be-Modern Group Buyers of marble sheets, marble fire surrounds etc. Address: Unit 11 Shaftsbury Avenue, Simonside Industrial Estate, Jarrow, Newcastle Upon Tyne NE323TJ, United Kingdom Phone: +(44)-(191)-4563220 Fax: +(44)-(191)-4553376 Mobile / Cell Phone: +(44)-7713315905 Pak Onyx Importers Of Marble And Granite. Address: Plot # 20-A, Unit # II, I-9, Islamabad - 44000, Pakistan Phone: +(92)-(51)-4440322 Fax: +(92)-(51)-4433501 Future Comptech Importers of marble, granite, stones and slates. Address: 603, Novo Star Dr., Mississauga - L5W 1C7, Canada Phone: +(1)-(416)-6295563 Boutique De Net Buyers of Indian green marble. Address: 1, Golf Road, G. O. R. - I, Lahore - 54410, Pakistan Phone: +(92)-(42)-6375707 Fax: +(92)-(42)-6368872 Lionvest Trading Uk Limited Buyers of stones, marble, granite, limestones, sandstones etc. Address: Unit 7, Riverside Business Centre Brighton Road, Shoreham-By-Sea, Shoreham-By-Sea BN436RE, United Kingdom Phone: +(44)-(1273)-453500 / 453501 / 453504 Fax: +(44)-(1273)-453900 / 453901 Shirkooh Yazd Tile Importers of all types of ceramic and tiles. Address: Apartment 1, 9th Floor, Mellat Tower, Vali Asr Street, Tehran - Na, Iran Phone: +(98)-(21)-88784678 Fax: +(98)-(21)-88784678 Quang Dieu Co. Limited Importers of marble, granite, sandstone, slate etc. Address: 364, Cong Hoa Street, Etown Building, Ho Chi Minh, Vietnam Phone: +(84)-(88)-8122606 Fax: +(84)-(88)-8122282 Mobile / Cell Phone: +(84)-8918319699 Entity Holdings Private Limited Importers of gypsum boards. Address: 410/3, Bauddhaloka Mawatha, Colombo - 7000, Sri Lanka Phone: +(94)-(11)-4737828 Fax: +(94)-(11)-5362588 Mobile / Cell Phone: +(94)-777667657 Xiamen Yueyang Stone Company Limited Importers of importing rough granite blocks. Address: Unit 7b, Bldg A, Baolong Center, No. 297, Jiahe Road, Xiame, Xiamen - 361 012, China Phone: +(86)-(592)-5328291 Al-Murad Tiles Buyers of marbles and granites. 118 Global Project Opportunities: June, 2013 Address: Howley Park Road East Morley Leeds West Yorkshire, Leeds - LS27OBN, United Kingdom Phone: +(44)-(1132)-537766 Fax: +(44)-(1132)-537766 Fujian Nanan Lian Feng Mei Stone Co. Ltd. Importers of marble. Address: Pushan Industrial Area, Shuitou Town, Nanan, Fujin - 362342, China Phone: +(86)-(595)-86989553 Fax: +(86)-(595)-86909553 Copro Group Importers of all types of marbles. Address: Kosuyolu Mah. D. Blok, Daire No. 4 Emlakbankas, Istanbul - 34000, Turkey Phone: +(90)-(532)-2401125 Balography Nig Limited Engaged in importing of granite. Address: Omoh 20 Funsho Kinoshi Street , Avenue B Stop, Okota Ago, Palace Way, Lagos - ., Nigeria Phone: +(234)-(709)-313766 Mobile / Cell Phone: +(234)-8086797706 Taj Trading Buyers of marble. Address: 17, Buxton Avenue, Oranjezicht, Cape Town - 8001, South Africa Phone: +(27)-(21)-4231505 Fax: +(27)-(21)-4231505 Mobile / Cell Phone: +(27)-824549383 Pipe Fittings & Tube Fittings Esmil Trading Buyers of pipes, solid bar and fittings. Address: P.O. Box 129, 8500 Ac Joure, Heerenveen - 8500AC, The Netherlands Phone: +(31)-(513)-528810 Fax: +(31)-(513)-528842 S. K. F. Corporation Limited Buyers of pipes. Address: 300/4, Hatirpool, Dhaka - 1215, Bangladesh Phone: +(880)-(2)-8620274 C. T. E. C. Trading & Construction, Inc. Buyers of pvc pipes and fittings. Address: No. 10, Jasmine Street, Ubalde Village, Agdao, Davao City - 8000, Philippines Phone: +(63)-(82)-2349855 Fax: +(63)-(82)-3008865 Mobile / Cell Phone: +(63)-9177020147 Handal Mandiri Buyers of steel pipes. Address: Jl. DI. Panjaitan, Gang Sederhana No. 01, Balikpapan - 76123, Indonesia Phone: +(62)-(542)-423315 Fax: +(62)-(542)-420537 Mobile / Cell Phone: +(62)-811-547493 Sag Stahl GmbH Importers of steel pipes. Address: Ruetersbarg, 48, Hamburg - 22529, Germany Phone: +(49)-(40)-6447077 Fax: +(49)-(40)-64428490 119 Global Project Opportunities: June, 2013 Al Aswar Technology Group Co. Buyers of ductile pipes. Address: Farhan Building, Fadala Street Block No.11,Salmiya, P.O. Box 6213, Hawalli - 32037, Kuwait Phone: +(965)-(2)-5629205 Fax: +(965)-(2)-5628176 Valvulas Worcester Buyers of forged steel threaded flanges. Address: Ma?Z #263 Col, Valle De Santiago - 09819, Mexico Phone: +(52)-(55)-56705155 / 54450276 / 54450120 Fax: +(52)-(55)-55827243 Mahmoud For Trading Pipes & Fittings Importres of pipes and fittings. Address: 14 El Sayegh St El Sabteya Ramsis,cairo,egypt, Al Q�Hirah - 11111, Egypt Phone: +(2)-(2)-5775321 Mobile / Cell Phone: +(2)-102828362 Egypipe Buyers of all types of hdpe pipes. Address: 157 Al Harm St Giza, Cairo - 12556, Egypt Phone: +(20)-(48)-600098 Fax: +(20)-(48)-600819 Hakan Plastic Buyers of pvc, pprc, pe pipes and fittings. Address: Organize Sanayi Bolgesi Gaziosmanpasa Mah. Istiklal Cad, Cerkezkoy - 59500, Turkey Phone: +(90)-(282)-7266443 Fax: +(90)-(282)-7269467 Mobile / Cell Phone: +(90)-5334738964 G Rgenler AS Importers of seamless pipes. Address: No. 1, Organize Sanayi, Bolgesi Avar, CAD. No. 4, Ankara - 06935, Turkey Phone: +(90)-(312)-2670969 Fax: +(90)-(312)-2670881 Tig Group Importers of pe pipes. Address: Botelkamp 38, Hamburg - D-22529, Germany Phone: +(49)-(40)-790000 / 245117 Fax: +(49)-(40)-790099 Kwan Hing Metal Manufacturing Co. Limited Buyers of pipes. Address: Unit 2713A, 27/F., Asia Trade Center, 79 Lei Muk Road, Kwai Chung - Na, China (Hong Kong S.A.R.) Phone: +(852)-24211322 Fax: +(852)-24215322 Decor Limited Importers of stainless steel pipes. Address: St Riznikovski, 1 A, Kharkov - 61025, Ukraine Phone: +(380)-(57)-7122037 Fax: +(380)-(57)-7102239 Mobile / Cell Phone: +(380)-506306686 Comdo Italia SRL Buyers of iron pipes for bed mechanisms. Address: Via Dell Orzo 53/55/57, Z. I., Altamura - 70022, Italy Phone: +(39)-(80)-3101078 Fax: +(39)-(80)-3103449 Wahab Trading Company Importers of m.s pipes, m.s fittings and pipe fittings. 120 Global Project Opportunities: June, 2013 Address: 8, Sindh Madrasah, Shahra- E- Liaquat, Karachi - 74000, Pakistan Phone: +(92)-(21)-2426804 Fax: +(92)-(21)-6638697 Mobile / Cell Phone: +(92)-3002354045 A Tech Comapny Importers of titanium plated stainless steel pipes. Address: A-919, Sam Ho Building, #275-1, YangJae-Dong, SeoCho-Ku, Seoul - 137 941, Korea Phone: +(82)-(2)-5537555 Viking Johnson Buyers of pipe couplings. Address: 46-48 Wilbury Way, Hitchin, Hertford - SG40UD, United Kingdom Phone: +(44)-(1462)-443322 Fax: +(44)-(1462)-443311 S. S. Trade Link International Private Limtied Buyers of steel pipe, steel pipe fittings, upvc pipe fittings. Address: 11, Haji Osman Goni Road, Dhaka - 1000, Bangladesh Phone: +(880)-(2)-9554805 / 7164364 Fax: +(880)-(2)-9554755 / 7164362 Mobile / Cell Phone: +(880)-11846662 Viking Cives Limited Buyers of steel flange beams. Address: RR#4 Norpark Drive, Mount Forest - N0H 2k0, Canada Phone: +(1)-(519)-3234433 Fax: +(1)-(519)-3234608 Technical Oilfield Supplies Centre Importers of all types of pipes, tube fittings, flanges, expansion joints etc. Address: Post Box No. 2647, Abu Dhabi - 2647, United Arab Emirates Phone: +(971)-(2)-6734042 Fax: +(971)-(2)-6734041 Mobile / Cell Phone: +(971)-507514327 I. B. N. Al Nafees General Trading Establishment Importers of used steel pipes type F51, ST52, external dia 168 mm, 20mm wallthick, 6 m long, seamless or welded etc. Address: P. O. Box 61835, Dubai - 971, United Arab Emirates Phone: +(971)-(4)-2850500 Fax: +(971)-(4)-2855782 Mobile / Cell Phone: +(971)-504577100 Swecomex S. A. De C. V. Buyers of flanges, pipes etc. Address: Calle 5 # 899, Zona Industrial, Guadalajara - 44940, Mexico Phone: +(52)-(33)-31451767 Fax: +(52)-(33)-31451777 Raj Arab International Buyers of pipes and pipe fittings. Address: Flat No. 3, 79 Hussein Street, Mohandesein, Cairo, Egypt Phone: +(20)-(2)-7495194 Fax: +(20)-(2)-7495194 Mobile / Cell Phone: +(20)-122388564 121 Global Project Opportunities: June, 2013 Scaffolding, Scaffolding Fittings & Formwork Accessories Abdul Kreem Company Engaged in importing of cuplock sysstm, scaffolding fitings, forklif. Address: Jabl Al Zhor Road, Amman - Na, Jordan Phone: +(962)-(6)-4162847 / 4383121 Fax: +(962)-(6)-4166463 Mobile / Cell Phone: +(962)-795452062 Echafauds Plus, Inc. Dealing into scaffolding, temporary fence on rental. Address: 2897, Francis, Laval - H7L 3S8, Canada Phone: +(1)-(450)-6631926 Fax: +(1)-(450)-6636276 Bakht Kabir Company Buyers of all types of scaffolding couplers. Address: No. 4, Yazdchi All., Vahdat Eslami Street, Tehran - Na, Iran Phone: +(98)-(21)-66487632 / 66487633 Fax: +(98)-(21)-66487632 A. A Scaffolding Importers of all types of galvanised scaffold tubes. Address: 10, Cots Wold Way Enfeild, Enfeild - Na, United Kingdom Phone: +(44)-(208)-3633930 Fax: +(44)-(208)-3633930 Wall & Floor Tiles Qreitem Trading Company Buyers of porcelan granite tiles, marbonite tiles, bathroom tiles etc. Tradenetwork Fountoulakis Buyers of tiles. Address: Andrea Miaouli, 116, Keratsini - 18755, Greece Phone: +(30)-(210)-4009327 Fax: +(30)-(210)-4004374 Mobile / Cell Phone: +(30)-6977427669 Venetto Ceramicas Importers of tiles. Address: 145/1, Green Road., Dhaka - 1205, Bangladesh Phone: +(88)-(2)-9144949 Fax: +(88)-(2)-8314400 Mobile / Cell Phone: +(88)-171037609 Indi - Stone Design Buyers of dimensioned stone. Address: 681, Timboon - Colac Road, Scotts Creek - 3267, Australia Phone: +(61)-(3)-55959206 Fax: +(61)-(3)-55959206 Mobile / Cell Phone: +(61)-4005763758 Steel City Renovation & Engineeering Sdn Bhd Buyers of tiles. Address: Plot 41, Elseidale Estate, Mount Erskine - 10470, Malaysia Phone: +(60)-(4)-8909594 Sofag Buyers of various types of tiles. 122 Global Project Opportunities: June, 2013 Address: 74, Route De Bethune, Sainte Catherine Les Arras - 62223, France Phone: +(33)-(3)-21509393 Fax: +(33)-(3)-21509394 Atabuild Importers of wall and floor tiles. Address: 8b adekunle fajuyi crescent,off adeniyi jones av., Ikeja - 10609, Nigeria Phone: +(234)-(1)-7753073 Fax: +(234)-(1)-4973571 Mobile / Cell Phone: +(234)-08033026009 Rosean Company Limited Buyers of ceramic tiles. Address: 15-3 Doida, Matsuyama - 790-0056, Kenya Phone: +(81)-(89)-9311700 Fax: +(81)-(89)-9311703 Mobile / Cell Phone: +(81)-60-12-3190414 Mohammed Osman Ahmed Al Fattani Estate Buyers of all kinds of stone tiles, multi colored tiles, white tiles, kitchen wall tiles, decorative wall tiles etc. Address: Al Dahab, Behind Atlas Hotel,, Jeddah - 21425, Saudi Arabia Phone: +(966)-(2)-6458316 / 6420491 Fax: +(966)-(2)-6458308 Mobile / Cell Phone: +(966)-966505506286 Sikder Trading International Importers of all kinds of tiles. Address: 1613, Hamzarbag Colony, Muradpur, Chittagong, Bangladesh Phone: +(880)-(31)-682127 Fax: +(880)-(31)-655711 Mobile / Cell Phone: +(880)-0176328881 Maksoors Shopping Centre Cisco Tile Importers of ceramic glazed tile, decorative tiles etc. Address: Soto 280 Int. 1, Ensenada, B.C. - 22840, Mexico Phone: +(52)-(646)-1766325 Fax: +(52)-(646)-1766325 Potent Solutions Buyers of tiles. Address: 14, Twynyrefail Place, Gwaun Cae Gurwen, Ammanford - SA181HY, United Kingdom Phone: +(44)-(1269)-823039 Fax: +(44)-(1269)-823039 Associated Industries, UK Buyers of flooring products etc. Address: 9, Norfolk Road, Industrial Estate, Gravesend - DA122PS, United Kingdom Phone: +(44)-(1474)-328111 Fax: +(44)-(1474)-328222 Dennis Plink Builder Pty Limited Importers of building products like tiles and ceramics. Address: P. O. Box 247, Blackheath - 2785, Australia Phone: +(61)-(2)-63552003 Mobile / Cell Phone: +(61)-414 825711 Moods Fine Furniture Co. Buyers of tiles. Address: Killymitten, Ballinamallard, Enniskillen - BT942FW, United Kingdom Phone: +(44)-(28)-6638882 Fax: +(44)-(28)-66388881 123 Global Project Opportunities: June, 2013 Wood Floorings, Timber, Plywood & Laminates E Corner Buyers of sawn timber. Address: No. 54, Jalan S.P. 1/5 Taman Saujana, Puchong - 47100, Malaysia Phone: +(60)-(3)-80602095 Mobile / Cell Phone: +(60)-60123815330 Shree Shivshakti Hardware And Sanitary Suppliers Freight Link International Co. Limited Importer of commercial dbbcc plywood, mdf radiata pine planks and pine plywood. Address: SIR VIRGIL NAZ STREET, Port Louis - NIL, Mauritius Phone: +(230)-(233)-0101 Fax: +(230)-(211)-5410 Ocean Star Shipping & Trading Sdn Bhd. Buyers of all kinds of timber. Address: AE7, Jalan Kukuban Satu, Taman Setapak, Kuala Lumpur - 53000, Malaysia Phone: +(60)-(3)-21665868 Fax: +(60)-(3)-31685886 Mobile / Cell Phone: +(60)-193211582 Ferna SA Buyers of parquet floorings, timber, plywood and laminates. Address: Barrio La Virgen, N 35, El Barraco, Spain Phone: +(34)-(920)-281114 Fax: +(34)-(920)-281564 Khalili, Oman Buyers of wood. Address: Khuwair, Muscat, Ruwi - NIL, Oman Phone: +(968)-(7)-699098 Mobile / Cell Phone: +(968)-9371434 Zaki Sons Buyers of timber products. Address: Zaibunisa Hospital Timber Market, Karachi - 74700, Pakistan Phone: +(92)-(300)-8236792 Fax: +(92)-(21)-6672015 Maxlink Far East Intl Cargo Service Chine Ltd Buyers of timbers. Address: Room 5b-5c No.2 Xushida Mingyuan Building Xinan 4th Road, Baoan 34 Area, Shenzhen 518100, China Phone: +(86)-(755)-27852776 / 27852778 / 27852779 Fax: +(86)-(755)-27852990 Phiali Company Importers of high pressure laminates. Address: No. 61-3, Houhu Rd., Linkou Shiang, Taipei Hsien, Taipei - 244, Taiwan Phone: +(886)-(2)-2603493 Fax: +(886)-(2)-26034954 Hobapol Ag Importers of all kinds of timber products. Address: Semslach 39, Obervellach - 9821, Austria Phone: +(43)-(4782)-29848 Fax: +(43)-(4782)-29848 Mobile / Cell Phone: +(43)-664 569 2596 124 Global Project Opportunities: June, 2013 Vivek Industries Limited Buyers of plywood. Address: Mombasa Road, Nairobi, Kenya Phone: +(254)-(20)-531783 Fax: +(254)-(20)-531587 Mobile / Cell Phone: +(254)-733311335 Laidebao Furniture Company Limited Buyers of woods, logs etc. Address: Chumen Section, Sci-Tech Industrial, Yuhuan - 317 605, China Phone: +(86)-(576)-7427356 Fax: +(86)-(576)-7427358 Mobile / Cell Phone: +(86)-8613566859068 Rimaju (Asia Pacific) Sdn. Bhd. Importers of unfinished and prefinished t & g timber floorings, laminated timber floorings etc. Address: Lot 14, 1st Floor, Kolam Centre, Jalan Lintas, Luyang, Kota Kinabalu - 88300, Malaysia Phone: +(60)-(88)-232551 Fax: +(60)-(88)-211313 Engel Timber Importers of mahogany plywood. Address: Babenbergerstrasse No. 9, Vienna - A-1010, Austria Phone: +(43)-(1)-5876343 Fax: +(43)-(1)-5873936 Al Bahjah Buyers of plywood. Address: Karama, Bur Dubai, Dubai - 34633, United Arab Emirates Phone: +(971)-(50)-6760089 Rudwan Workshop Buyers of meranti, mahagany and teak wood. Address: A'amran Street, Sana'A - 326, Yemen Phone: +(967)-(1)-325224 Fax: +(967)-(1)-325224 Mobile / Cell Phone: +(967)-71124009 Ultident Importers of dentsply etc. Address: 4028 Steinberg, St.Laurent - H4R 2G7, Canada Phone: +(1)-(514)-3353433 Fax: +(1)-(514)-3350992 125 Global Project Opportunities: June, 2013 9.0 POLICY & PROCEDURES RBI/2012-13/507 DBOD.Dir.BC.No.94/04.02.001/2012-13 May 24, 2013 All Scheduled Commercial Banks and Exim Bank (excluding RRBs) Dear Sir/ Madam, Rupee Export Credit - Interest Subvention Please refer to our circular DBOD.Dir.(Exp).BC.No.70/04.02.001/2012-13 dated January 14, 2013 wherein interest subvention of 2% was extended w.e.f. January 1, 2013 to March 31, 2014 on pre and post shipment rupee export credit for certain employment orientated export sectors. 2. In continuation of the above circular it has been decided to widen the interest subvention scheme to the following sectors for the period April 1, 2013 to March 31, 2014, on the same terms and conditions: 1. ITC(HS) and Textiles good to 6 tariff lines as per the list given in the Annex –I. 2. Additional 101 tariff lines in engineering good sector in addition to the existing 134 lines as per the list given in Annex- II. 3. A directive No. DBOD.Dir.BC.No.93/04.02.01/2012-13 dated May 24, 2013 issued in this regard is enclosed. 4. All other terms and conditions mentioned in our circular dated January 14, 2013 remain unchanged. Yours faithfully, (Prakash Chandra Sahoo) Chief General Manager Encl: As above 126 Global Project Opportunities: June, 2013 DBOD.Dir.BC.No.93/04.02.001/2012-13 May 24, 2013 Rupee Export Credit - Interest Subvention In exercise of the powers conferred by Sections 21 and 35 A of the Banking Regulation Act, 1949, the Reserve Bank of India, being satisfied that it is necessary and expedient in the public interest so to do, in partial modification of directive DBOD.Dir.(Exp).BC.No.69 / 04.02.001 /2012-13 dated January 14, 2013, hereby notifies as under: 2. It has been decided to widen the scheme to following sectors for the period April 1, 2013 to March 31, 2014 on the same terms and conditions: 1. ITC (HS) and Textiles good to 6 tariff lines as per the list given in the Annex -I 2. Additional 101 tariff lines in engineering good sector in addition to the existing 134 lines as per the list given in Annex- II (B.Mahapatra) Executive Director Encl: As above Annexure-1 1 6301 BLANKETS AND TRAVELLING RUGS 2 6302 BED LINEN, TABLE LINEN, TOILET LINEN AND KITCHEN LINEN 3 6303 CURTAINS (INCLUDING DRAPES) AND INTERIOR BLINDS; CURTAIN OR BED VALANCES 4 6305 SACKS AND BAGS, OF A KIND USED FOR THE PACKING OF GOODS 5 6306 TARPAULINS, AWNINGS AND LANDCRAFT; CAMPING GOODS 6 6307 OTHER MADE UP ARTICLES, INCLUDING DRESS PATTERNS SUNBLINDS; 127 TENTS; SAILS FOR BOATS, SAILBOARDS O Global Project Opportunities: June, 2013 Annexure-2 Export of Engineering items (4‐digit ITCHS wise) for the year 2012‐13 Description of Items ITC(HS) 1 6601 UMBRLS & SUN‐UMBRLS(INCL WLKNG‐STCK UMBRLS GRDN UMBRLS & SMLR UMBRLS) 2 7216 ANGLS,SHAPES & SCTNS OF IRON/NON‐ALLOY STL 3 7217 WIRE OF IRON OR NON‐ALLOY STEEL 4 7218 STAINLESS STEEL IN INGOTS OR OTHER PRIMARY FORMS; SEMI‐FINISHED PRODUCTS OF STAINLESS STEEL 5 7219 FLT‐RLLD PRDCTS OF STAINLESS STL OF WDTH>=600 MM 6 7221 BARS AND RODS, HOT‐ROLLED, IN IRREGULARLY WOUND COILS, OF STAINLESS STEEL 7 7223 8 7225 WIRE OF STAINLESS STEEL FLT‐RLLD PRDCTS OF OTHR ALLOY STL OF WDTH 600 MM OR MORE 9 7226 FLT‐RLD PRDCTS OF A WIDTH OF <600 MM 10 7228 OTHR BARS,RODS,ANGLS,SHPS,SCTNS OF OTHR ALLOY STL,HOLLOW DRILL BARS & RODS OF ALLOY OR NON‐ALLOY STL 11 7302 RLY & TRMY TRACK CONSTRCTN MATRL OF IRON OR STL,E.G.RALS,RACK RALS ETC SWTCH BLADS SLEEPRS,TIES & OTHR MATRL FOR FIXNG RAILS 12 7407 COPPER BARS, RODS AND PROFILES 13 7604 ALUMINIUM BARS, RODS AND PROFILES 14 7605 ALUMINIUM WIRE 15 16 7606 7608 ALMNM PLTS,SHTS & STRP OF THCKNS>0.2 MM ALUMINIUM TUBES AND PIPES 17 7609 ALUMINIUM TUBE OR PIPE FITTINGS (FOR EXAMPLE, COUPLINGS, ELBOWS, SLEEVES) 18 7610 ALMNM STRCTRS & PRTS OF STRCTRS(BRDGS TOWRS,ROOFS ETC.)ALMNM PLATES‐RODS PROFILES ETC.PRPD FOR USE IN STRCTR 19 7616 OTHER ARTICLES OF ALUMINIUM 20 8301 PDLCKS LOCKS(KEY ETC) OF BASE MTL;CLSPS & FRMS WTH CLSPS,INCRPRTNG LCKS,OF BASE MTL;KEYS FOR FRGNG ARTCLS OF BASE METAL 21 8302 BASE METAL MOUNTINGS, FITTINGS AND SIMILAR ARTICLES SUITABLE FOR FURNITURE, DOORS, STAIRCASES, WINDOWS, BLINDS, COACHWORK, SA 22 8303 ARMORD/REINFRCD SAFES STRONG BOXS & DOORS & SAFE DPOST LCKRS FR STRNG ROOMS CSH/DEEDBOXS ETC OF BASE METAL 23 8304 FILING, CABINETS, CARD‐INDEX CABINETS, PAPER TRAYS, PAPER RESTS, PEN TRAYS, OFFICE‐STAMP STANDS AND SIMILAR OFFICE OR 24 8305 FITNGS FR LOOSE LEAF BINDRS/FILS LETR CLPSLETR CRNRS PAPR CLPS INDXNG TGS & SMLR OFFCE ARTCLS STPLS IN STRIPS OF BS MTL 25 8306 BELS GONGS & THE LIKE NON ELCTRC OF BSE METL STATUETTES ETC OF BSE METL PHOTGRPH PICTR,FRMS,MIRRORS ETC OF BSE METL 26 8307 27 8308 FLXBL TUBNG OF BSE METL WTH/WTHOUT FTNGS CLASPS, FRAMES WITH CLASPS, BUCKLES, BUCKLE‐CLASPS, HOOKS, EYES, EYELETS AND THE LIKE, OF BASE METAL, OF A KIND USED FO 128 Global Project Opportunities: June, 2013 28 8309 STPPRS,CAPS ETC INCL CROWN CORKS,SCRW CAPSETC CAPSLS FR BOTLS,THRD BUNGS,BUNG COVRS,SEALS & OTHR PCKNG ACCSSRS,OF BS MTL 29 8310 SIGN PLTS,NAME PLTS,ADDRS PLTS & SMLR PLTSNUMBRS,LTTRS & SYMBOLS,OF BS MTL EXCLD OF HDG NO.9405 30 8311 WIRE,RODS,ELCTRDS ETC OF BS MTL/MTL CRBIDSCOATD/CORED WTH FLX MTRL FR SLDRNG BRAZNG ETC OF MTL/MTL CRBDS WIRE ETC FR MTL SPRNG 31 8401 NUCLEAR REACTRS;FUEL ELMNTS (CARTRIDGES), NON‐IRRADIATED,FR NUCLR REACTRS;MCHNRY AND APPARATUS FOR ISOTOPIC SEPARATION 32 8407 SPARK‐IGNITION RECIPROCATING OR ROTARY INTERNAL COMBUSTION PISTON ENGINES 33 8408 COMPRESSION‐IGNITION INTERNAL COMBUSTION PISTON ENGINES (DIESEL OR SEMI‐DIESEL ENGINES) 34 8413 PUMPS FOR LIQUIDS, WHETHER OR NOT FITTED WITH A 35 8414 AIR/VACUUM PUMPS,AIR/OTHR GAS COMPRSRS & FANS;VNTLTNG/RCYCLNG HOODS INCRPRTNG A FAN,W/N FITTED WITH FILTERS 36 8426 DERRICKS;CRNS,INCL CABLE CRNS;MOBL LFTNG FRMS,STRDL CRRS & WRKS TRCKS FTD WTH A CRN 37 8477 MCHNR FR WRKNG RUBBR/PLSTCS/FR THE MNFCTR OF PRDCTS FROM THESE MTRLS,N.E.S. 38 8479 MCHNS & MCHNCL APPLNCS HVNG INDVDL FUNCTNS,N.E.S. 39 8481 TAPS, COCKS, VALVES AND SIMILAR APPLIANCES FOR PIPES, BOILER SHELLS, TANKS, VATS OR THE LIKE, INCLUDING PRESSURE‐REDUCING VALV 40 8482 BALL OR ROLLER BEARINGS 41 8483 TRNSMSN SHFTS & CRNKS;GEARS;BALL SCREWS; BEARING HOUSING &OTHR PLAIN SHFT BEARINGS SPD CHNGRS INCL TORQUE CNVRTRSFFLYWHEELS; 42 8484 GASKETS & SMLR JOINTS OF MTL SHTNG CMBND WTH OTHR MTRL;SETS/ASSRTMNTS OF GSKTS & SMLR JOINTS,PUT UP IN POUCHES,ENVLPS ETC 43 8486 MACHINES AND APPARATUS OF A KIND USED SOLELY FOR THE MANUFACTURE OF SEMICONDUCTOR BOULES OR WAFERS, DEVICES, E 44 8501 ELCTRC MOTRS & GENRTRS(EXCL GENRTNG SETS) 45 8502 ELECTRIC GENERATING SETS AND ROTARY CONVERTERS 46 8506 47 8511 PRIMARY CELLS AND PRIMARY BATTERIES ELCTRCL IGNTN/STRTNG EQPMNT FR SPRK‐IGNTN ETC GNRTRS ETC & CUT OUTS OF A KIND USED IN CONJUNCTION WTH SUCH ENGINES 48 8512 ELECRCL LIGTNG/SIGNALLING EQPMNT (EXCL ARTCLS OF HD NO.8539)WIND SCRN ETC USED FOR CYCLES/MOTOR VEHICLES 49 8513 PORTBL ELCTRC LAMPS DESIGNED TO FUNCTION BY THEIR OWN SOURCE OF ENERGY OTHR THN LIGHTING EQPMNTS OF HDG NO.8512 50 8544 INSULATED (INCLUDING ENAMELLED OR ANODISED) WIRE, CABLE (INCLUDING CO‐AXIAL CABLE) AND OTHER INSULATED ELECTRIC CONDUC 129 Global Project Opportunities: June, 2013 51 8545 CRBN ELCTRDS,CRBN BRSHS,LAMP CRBNS ETC. OTHR ARTCLS OF GRAPHITE/OTHR CRBN,WTH/ WTHOUT MTL OF A KND USED FOR ELCTRCL PURPS 52 8546 ELECTRICAL INSULATORS OF ANY MATERIAL 53 8547 INSLTNG FTTNGS FR ELCTRCL MCHNS ETC. ELECTRCL CONDUIT TUBING & JOINTS THEROF OFBSE MTL LINED WTH INSLTNG MATRL 54 8548 WAST & SCRAP OF PRIMARY CELLS,BATRS & ELECTRC ACUMULTRS; SPENT PRMRY CELS, BATRSELCTRC ACUMULTRS,ELCTRCL PRTS OF MACH 55 8601 RAIL LOCOMOTIVES POWERED FROM AN EXTERNAL SOURCE OF ELECTRICITY OR BY ELECTRIC ACCUMULATORS 56 8603 SELF‐PROPELLED RAILWAY OR TRAMWAY COACHES, VANS AND TRUCKS, OTHER THAN THOSE OF HEADING 8604 57 8604 RLWAY/TRMWAY MAINTNANC/SRVC VHCLS,W/N SLF PRPLD(E.G.WRKSHOPS,CRNS,BALAST TMPRS, TRCKLNRS,TSTNG COCHS & TRCK INSPCTN VHCLS) 58 8606 RALWY/TRMWY GOODS VAN & WAGN,NT SELF‐PRPLD 59 8607 PRTS OF RLWAY/TRMWAY LCMTVS/ROLLNG‐STOCK 60 8608 RLWAY/TRMWAY TRCK FXTRS & FTNGS;MCHNCL & ELCTRO‐MCHNCL SGNLNG,TRFC CNTRL EQPMNT FR ROADS,INLND WTRWAYS ETC,PRTS OF THE ABOVE 61 8609 CONTAINERS (INCLUDING CONTAINERS FOR THE TRANSPORT OF FLUIDS) SPECIALLY DESIGNED AND EQUIPPED FOR CARRIAGE BY ONE OR MORE M 62 8712 BICYCLES AND OTHER CYCLES (INCLUDING DELIVERY TRICYCLES), NOT MOTORISED 63 8713 INVALID CARRIAGES,W/N MOTIRISED/OTHERWISE MECHANICALLY PROPELLED 64 8802 OTHER AIRCRAFT (FOR EXAMPLE, HELICOPTERS, AEROPLANES); SPACECRAFT (INCLUDING SATELLITES) AND SUBORBITAL AND SPACECRAFT 65 8804 PARACHUTES (INCLUDING DIRIGIBLE PARACHUTES AND PARAGLIDERS) AND ROTOCHUTES; PARTS THEREOF AND ACCESSORIES THERETO 66 8805 AIRCRAFT LAUNCHING GEAR; DECK‐ARRESTOR OR SIMILAR GEAR; GROUND FLYING TRAINERS; PARTS OF THE FOREGOING ARTICLES 67 8901 CRUISE SHIPS, EXCURSION BOATS , FERRY‐ BOATS, CARGO SHIPS, BARGES AND SIMILAR VESSELS FOR THE TRANSPORT OF PERSONS OR GO 68 9005 BINOCULAR & OTHR OPTCL TLSCOPS & MOUNTINGSTHRFR;OTHR ASTRNMCL INSTRUMNT & MOUNTNGS THRFR EXCPT THE INSTRMNT FOR RAD 69 9006 PHTOGRPHC(EXCL CINEMATOGRAPHIC)CAMERAS PHOTOGRAPHIC FLSHLGHT APPARATUS & FLSHBLBSEXCPT DSCHRG LMPS OF HDG NO.8539 70 9007 CINEMATOGRAPHIC CAMERAS AND PROJECTORS, WHETHER OR NOT INCORPORATING SOUND RECORDING OR REPRODUCING APPARATUS 71 9010 APARATS & EQPMNT FR PHOTOGRPHC(INCLD CINEMATOGRAPHC)LABORATORIS N.E.S.IN THIS CHAPTER;NEGATOSCOPES PROJECTION SCREENS 130 Global Project Opportunities: June, 2013 72 9011 CMPND OPTCL MICROSCOPES,INCL THOSE FR MCROPHOTOGRPHY,MCROCENMTGRPHY/MICROPRJCTN 73 9013 LIQD CRYSTL DVCS NT CNSTITUNG ARTCLS PRVDDFR MORE SPCFCLY IN OTHR HDNGS;LSRS,NT LSR DIODS;OTHR OPTCL APLNCS & INSTRMNTS N 74 9015 SURVEYING,HYDROGRAPHIC,OCEANOGRAPHIC, HYDROLOGICAL,METEOROLOGICAL/GEOPHYSICAL INSTRMNTS & APPLNCS,EXCL COMPSS;RNGEFNDRS 75 9016 76 9017 BLNCS OF A SNSTIVTY OF 5 CG/BTR,W/N WTH WT DRWNG,MRKNG‐OUT/MTHMTCL CLCLTNG INSTRMNTS;INSTRMNTS FOR MSRNG LNTH,FR USE IN THE HND(E.G.MICROMTRS,CALLIPRS)N.E.S.IN THIS C 77 9018 INSTRMNTS & APPLNCS USED IN MDCL,SURGCL, DNTL/VTRNRY SCNCS,INCL SCNTGRPHC APPRTS ELCTRO‐MDCL APPRTS & SIGHT‐TSTNG INSTRMNT 78 9019 MCHNO‐THRPY APLNCS;MSGE APRTS;PSYCHOLGCL APTTUD‐TSTNG APRTS;OZON THRPY,OXYGN THRPY,AERSL THRPY,ARTFCL RSPRTN APPRTS ETC 79 9021 ORTHPDC APLNCS,ARTFCL PRTS OF TH BODY;HRNGAIDS & OTHR APLNCS WHCH ARE WRN/CRRD/ IMPLNTD IN THE BODY TO CMPNST DFCT/DSABLTY 80 9023 INSTRMNTS,APRTS P MODLS DSIGND FOR DEMONSTRATIONAL PRPS,UNSUTBL FR OTHR USES 81 9024 MCHNES & APLNCS FR TSTNG THE HRDNSS, STRNGTH,ELSTCTY,COMPRSSBLTY ETC OF MATRLS 82 9025 HYDROMETERS & SMLR FLOATING INSTRUMENTS, THERMOMETERS,PYROMETERS ETC,RCORDNG/NT & ANY CMBNTN OF THESE INSTRMNTS 83 9026 INSTRMNTS & APRTS FR MSRNG/CHKNG THE FLOW,LEVL,PRSR/OTHR VARIABLES OF LIQUID/GASES EXCL APPRTS OF HDG 9014,9015,9028/9032 84 9027 INSTRUMENTS AND APPARATUS FOR PHYSICAL OR CHEMICAL ANALYSIS (FOR EXAMPLE, POLARIMETERS, REFRACTOMETERS, SPECTROMETER 85 9028 GAS,LQD/ELECTRICITY SUPPLY/PRODUCTION METERS,INCL CALIBRATING METERS THEREFOR 86 9029 REVOLUTION COUNTERS, PRODUCTION COUNTERS, TAXIMETERS, MILEOMETERS, PEDOMETERS AND THE LIKE; SPEED INDICATORS AND TACHOMETERS 87 9031 MEASURING OR CHECKING INSTRUMENTS, APPLIANCES AND MACHINES, NOT SPECIFIED OR INCLUDED ELSEWHERE IN THIS 88 9033 PRTS & ACCESSORIES FR MACHINES,APPLIANCES,INSTRUMENTS/APPARATUS OF CHAPTER 90,NES 89 9101 WRIST‐WATCHES, POCKET‐WATCHES AND OTHER WATCHES, INCLUDING STOP‐WATCHES, WITH CASE OF PRECIOUS METAL OR OF METAL CLAD 90 9102 WRIST‐WATCHES, POCKET‐WATCHES AND OTHER WATCHES, INCLUDING STOP WATCHES, OTHER THAN THOSE OF HEADING 9101 WRIST‐WATCHES, 91 9103 CLOCKS WITH WATCH MOVEMENTS, EXCLUDING CLOCKS OF HEADING 9104 131 Global Project Opportunities: June, 2013 92 9104 INSTRUMENT PANEL CLOCKS AND CLOCKS OF A SIMILAR TYPE FOR VEHICLES, AIRCRAFT, SPACECRAFT OR VESSELS 93 9107 TIME SWITCHES WITH CLOCK OR WATCH MOVEMENT OR WITH SYNCHRONOUS MOTOR 94 9108 WATCH MOVEMENTS, COMPLETE AND ASSEMBLED 95 9109 CLOCK MOVEMENTS, COMPLETE AND ASSEMBLED 96 9110 CMPLT WTCH/CLOCK MVMNTS,UNASSMBLD/PRTLY ASSMBLD (MVMNT SETS);INCMPLT WTCH/CLOCK MVMNTS,ASSMBLD;ROUGH WTCH/CLOCK MVMNTS 97 9111 WATCH CASES AND PARTS THEREOF 98 9112 CLOCK CASES AND CASES OF A SIMILAR TYPE FOR OTHER GOODS OF THIS CHAPTER, AND PARTS THEREOF 99 9113 WATCH STRAPS, WATCH BANDS AND WATCH BRACELETS, AND PARTS THEREOF 100 9402 MEDCL,SURGCL,DENTAL/VETRNRY FURNITR ETC BARBERS' CHAIRS & SMLR CHAIRS;PRTS OF THE FOREGOING ARTICLES 101 9405 LMPS & LIGHTING FTTNGS INCL SEARCH LIGHTS AND SPOTLIGHTS ETC N.E.S.ILLUMINATD SIGNS & THE LIKE WTH PRMNANT LGHT SORCE &PRTSNES 132 Global Project Opportunities: June, 2013 GOVERNMENT REVISES MARKET DEVELOPMENT ASSISTANCE FOR AGGRESSIVE EXPORT PROMOTION NOW BIGGER EXPORTERS ELIGIBLE FOR MDA Date : 23 May 2013 Location : New Delhi In a major push to market development in Latin America, Government has removed the upper ceiling of with regard to eligibility for Market Development Assistance (MDA) for participation in Buyer-seller Mission BSMs/fairs/exhibitions abroad to explore new markets in focus countries of Latin America for export of their specific product(s) and commodities from India in the initial phase. The revised guidelines for MDA have also doubled upper eligibility limit for other regions also. Now exporting companies with an f.o.b. value of exports of upto Rs. 30 crore in the preceding year will be eligible for MDA assistance. Earlier this limit was 15 crore. It was felt that penetration in LAC region, key region for Government’s market diversification scheme in the wake of slowdown in the traditional markets, is costly. Therefore, the big exporters with more than f.o.b of Rs.30 crores can aggressively venture LAC region after this relaxation. The revised guidelines have also substantially enhanced in the financial ceiling for participation in Trade Fairs & Exhibitions from Rs.1,80,000/- to Rs.2,50,000/- for focus Latin American countries, from Rs.1,50,000/- to Rs.2,00,000/- for focus African countries, focus CIS countries, focus ASEAN, Australia and New Zealand and from Rs.80,000/- to Rs.1,50,000/-. This rise is in response to escalation in cost and appreciation of international currency. Furthermore, international exhibitions where the number of participants exceed 75, Export Promotions Councils will be eligible for a higher financial support to the tune of Rs. 40 lakhs. Revised guidelines should motivate exporters in their market development efforts. Export promotion continues to be a major thrust area for the Government. In view of the prevailing macro economic situation with emphasis on exports and to facilitate various measures being undertaken to stimulate and diversify the country’s export trade, Marketing Development Assistance (MDA) Scheme is under operation through the Department of Commerce to assist exporters for export promotion activities abroad, assist Export Promotion Councils (EPCs) to undertake export promotion activities for their product(s) and commodities, Assist approved organizations/trade bodies in undertaking exclusive nonrecurring innovative activities connected with export promotion efforts for their members and assist Focus export promotion programmes in specific regions abroad like FOCUS (LAC), Focus (Africa), Focus (CIS) and Focus (ASEAN + 2) programmes. **** 133 Global Project Opportunities: June, 2013 10.0 ARTICLES OF INTEREST Roads: The arteries of Korea's development Seo Jee-yeon The Korea Herald, 2 1 - 0 5 - 2 0 1 3 South Korea has invested in making its roads more efficient by combining routes with transport systems based on information technology South Korea's road infrastructure played a critical role in the rapid recovery from the Korean War and economic growth. Under the law, the nation’s roads are classified into seven categories: national expressways, national highways, metropolitan roads, city roads, provincial roads, county roads and district roads. The nation’s road network is mainly made up of expressways and highways, which are linked to major urban areas and small cities. Road construction was a starting point for the nation’s economic revival in the 1960s. It also contributed to balanced regional development and improved living standards. The opening in 1970 of the 416-km Gyeongbu expressway, which links Seoul and Busan, is considered the most important infrastructure achievement in the country’s modern history. In the 1980s, the hosting of the 1986 Asian Games and 1988 Summer Olympics rapidly increased vehicle registrations and, consequently, traffic congestion. However, investment in large-scale road construction projects slowed during this period. Only two express lines ― the 88 Olympic Expressway (182.9 km) and the Jungbu Expressway (117.8 km) ― were built. The renaissance of expressway construction was in the 1990s. Nineteen expressways, totaling 1,853 km in length, were built with the introduction of a systematic road network plan and new laws for securing financial resources. City roads and urban transport policy As in most other developed countries, most Koreans today live in cities. Korea has invested in making its roads more efficient by combining routes with transport systems based on information technology. Seoul City’s road policy and public transport system, in particular, buses, have become benchmarks for many cities in developing countries. City roads have been expanded along with urban development and rising demand for cars. However, urban road expansion in the 1990s became more difficult because of the rapid rise in the cost of land and relocation issues. Increasing the efficiency of existing infrastructure and interest in public transport were more important than the construction of new facilities. As a result, transport system management and transport demand management policies were proposed as major components of urban transport policy. Transport system management deals with improving the efficiency of existing roads by changing road design and operation techniques. 134 Global Project Opportunities: June, 2013 New crossroads of Asia Syed Mansur Hashim The Daily Star, 21-05-2013 That is how Myanmar is being portrayed, and not without reason. For both China and the United States, the stakes couldn’t be higher. China has invested heavily in the country. According to an article published recently in the New York Times “the pipelines are finished. The oil storage tanks gleam in the tropical sun. The deep-sea port set in jade-coloured waters awaits the first ships bearing crude from the Middle East.” Yes, billions have been poured into infrastructure projects, and yes, China helped the impoverished country giving it a lifeline during the long years it was under a UN embargo. Yet, with the “Myanmar spring,” not to be confused with the overthrowing of decades-old regimes in the Mid-East, the gradual relaxation of control has provided its people with some voice; voice to vent opposition to many projects led by giant Chinese corporations today. What has vexed the Chinese leadership more than the protests is the fact that the Myanmar leadership is actively engaging with the West that is being reciprocated in the West, particularly in Washington. The stakes couldn’t be higher for China. It is standing on the verge of gaining a western seaboard to fuel the double-digit development that its cities on the eastern coast have been experiencing. As pointed out by David Piling in a recent article in Financial Times, “An 800km gas pipeline will connect Kunming, capital of Yunnan province, to the Bay of Bengal, passing through central Myanmar. Next year an oil pipeline will open the same route. Road and rail will follow.” Well, that pipeline is now finished. Little wonder that China views with dismay the budding signs of democracy taking root in a country which until very recently was led by an iron-fisted military. It was much easier to deal with a one-party system, where State-to-State deals were the norm of the day. Well, times have changed. And the rules of the game have changed too. But have they changed so far as to tilt Myanmar towards the West? Or merely given its leadership a chance to play off one against the other? Institutionalisation of full democracy has a long way to go in Myanmar. The first cautious steps have been taken. Building of democratic institutions, holding of genuine elections, establishment of a true-multi party political system and an army that will uphold a constitution are all works in progress that will take years of political manoeuvring to achieve. Given China’s dominance over Myanmar over the preceding decade and a half, it is difficult to imagine a Myanmar without a significant Chinese presence. The pipeline that has been built is more than just about tapping into the vast reserves of natural gas Myanmar possesses. As pointed out by the outgoing president Hu Jintao, China must find a way out of the “Malacca Dilemma.” Presently about 80 per cent of the oil China imports from the Mid-East must pass through the Malacca strait — one that is very much under the control of the US navy. The new oil pipeline provides a way out of this. The deep sea port that has been built will berth the oil tankers and the pipeline will divert as much as a third of the total imports now passing through Malacca Straits. And the new gas pipeline that has an annual capacity of handling some 12 billion cubic metres constituting approximately 28 per cent of China’s total gas imports is the second lifesaver for the country. It is natural for the Myanmar leadership to feel dwarfed by China. Over the decades, China has invested billions in every major conceivable infrastructure project, be it dams or mines. The West has responded overwhelmingly in the positive with the first signs of relaxation. It explains why the tilt towards the West was perhaps necessary. The release of political prisoners, cautious relaxation of the right to expression has been met with a return of aid agencies and technical assistance. Myanmar’s leadership ordering inquiry into alleged excesses committed by Chinese companies including seizure of land and causing damage to the ecology are warning signs for Beijing. The writing is clear on the wall. At least it is for China. It must tread very carefully if it wishes to protect its investments in its neighbouring country. Indeed, a new line of thinking apparently is already on the 135 Global Project Opportunities: June, 2013 cards. The move to engage affected communities by some of the largest Chinese state-owned companies to “publicly embrace Western-style corporate social responsibility practices toward the people who live near their vaunted projects” is seen as a damage-control effort to promote “social obligations of Chinese state-run corporations.” It will be highly interesting to see how the game is going to be played out among the tripartite leadership of Myanmar, China and the United States. One thing is clear beyond the shadow of a doubt. China will have to get its act together really fast in order to survive the new rules of the game. Riyadh to turn to private sector to deliver housing programme 16 May 2013, 9:55 GMT | By Andrew Roscoe Housing Ministry was set up in 2011 to oversee development of 500,000 homes for local people Saudi Arabia’s Housing Ministry is to turn to the private sector to deliver the first phases of its $70bn housing programme, which is scheduled to build 500,000 new homes for local citizens. In March 2011, King Abdullah announced that Riyadh was going to build 500,000 homes for local people as part of efforts to stem the kingdom’s housing deficit. The Housing Ministry was created by Royal decree to oversee the ambitious programme, which was aimed to provide almost half of the estimated 1.1 million new homes that the kingdom is expected to require in the next five years. However, more than two years after its creation, the ministry is now preparing to hand over land to private developers and individuals to build the homes. According to sources within the kingdom, the ministry has cancelled the first major housing packages for the first phase, that were awarded to contractors in early April, and is now planning to tender land improvement packages, before handing over the responsibility to private developers and individuals to build the houses. “The contracts for the first large packages were awarded, but were cancelled very shortly after,” says one contracting source in Riyadh. “As far as we understand the ministry is just going to tender infrastructure packages and then open the door for private developers to build the homes.” The cancelled construction contracts include the project to build 7,000 villas in Riyadh, for which contractors had submitted bids in November last year. It was the largest housing package that had been tendered by the ministry since its creation. The Housing Ministry appointed the US’ Parsons in November 2011 to provide masterplanning, infrastructure design and the design of various housing types for the first phase. The firm was also set to provide construction supervision on all eleven developments. The first phase was scheduled to cover a total area of 32 million square metres divided into 11 sites spread across the kingdom. Little progress with the programme has been achieved since the appointment of the US firm, and the cancellation of the first major packages appears to have contributed to the shift in Riyadh’s strategy to tackle the housing crisis. Although, it is unclear what will happen with future phases of the housing initiative, it is expected that the ministry will encourage developers and individuals to build their own homes on the proposed sites, rather than tendering major construction contracts for housing developments. “Nothing has been made official yet, but if the Ministry is not building homes for the first phase, we expect that this will be the case for the rest of the projects,” says a consultant based in Riyadh. The news that the ministry will not build the houses for the first phase of the programme follows a recent statement from the Housing Minister that the ministry is working on a regulatory framework to encourage the private sector to take on a greater role in ending the country’s chronic shortage in housing. In April, a 136 Global Project Opportunities: June, 2013 royal decree was issued that orders ministries to give up land to the Housing Ministry for housing schemes. According to the Housing Ministry’s website, it is currently overseeing the development of 27,850 housing units under construction throughout the kingdom, the majority of which were started before it was created in 2011. It is estimated that Saudi Arabia needs to build 1.1 million new homes by 2015 to meet the housing requirements of its rapidly expanding population, which is currently growing by more than 2 per cent a year. About 60 per cent of Saudi Arabians are estimated to live in rented accommodation, rather than properties they own. Infrastructure financing: How to raise $1 trillion Date 2 May 2013 Publication Business Standard By Carrasco, Bruno The author is with the South Asia Department, Asian Development Bank The recent slowdown of the Indian economy has brought to light a critical challenge facing policy makers, namely how to shift infrastructure spending into higher gear. Without a significant increase in investment, the country will not be able to raise growth rates to its full potential, build up infrastructure and, in turn, attract greater private investment in the economy. It would also slow progress in raising households out of poverty. Underscoring this challenge, the Planning Commission has identified $1 trillion in infrastructure investment finance requirements over the next five years. The good news is that the government was largely successful in meeting its earlier five-year target. The helpful news is that over the next five years, the government is not alone and can depend on the private sector, including through public-private-partnership initiatives, to help finance nearly half of the $1 trillion investment needed. The ability to meet this target will critically depend on two factors. First, the authorities' ability to successfully increase reliance on the bond market as an alternative source of financing to bank loans and, second, their ability to implement fiscal consolidation as a means of freeing up bank lending and reducing upward pressure on interest rates. The two are closely linked. India will need to borrow increasingly in the domestic market if it is to meet this target, since it has limited fiscal space and faces ceilings in terms of instruments such as external commercial borrowings. More generally, it faces a widening current account deficit - the latest figure reaching 6.7 per cent of the gross domestic product, or GDP (October-December 2012) - that constrains its scope to expand domestic investment and its balance of payments position. So far, banks have been the main providers of infrastructure financing. While this is not an optimal arrangement, given the long-term financing required for infrastructure investment, banks have been successful in financing greenfield projects. However, they are now facing a number of barriers to expand lending to infrastructure, including regulatory constraints such as exposure limits to groups (infrastructure companies) as well as sectors to prevent the build-up of asset liability mismatches in the system. Financial stability considerations warrant a focussed enforcement of these measures as the Reserve Bank of India (RBI) is undertaking. This raises the fundamental question of where India is to source funding of further infrastructure expansion. The logical choice is the domestic bond market. India is in a relatively strong position to develop the market as it sits on over 30 per cent of gross domestic savings as a share of GDP. This large savings rate reflects favourable demographics, rising income per capita, and the supply of an increasing set of savings instruments for corporations and households. India also has a flourishing government bond market that provides an important stepping stone towards the development of the corporate bond market. Developing the corporate bond market, including for infrastructure bonds, will allow more effective mobilisation of long-term financing. Indeed, insurance companies and pension funds in India - 137 Global Project Opportunities: June, 2013 eager for long-term assets to match their long-term liabilities - are estimated to hold $330 billion in funds that are currently largely invested in government securities. While there are challenges that need to be addressed to make more productive use of these funds, such as investment guidelines that restrict investment by insurance funds to investment grade-rated instruments, there are practical solutions that can address these challenges, including use of credit enhancements. Indeed, international financial institutions such as Asian Development Bank (ADB) have recognised that bond market development is the other side of the coin of infrastructure financing. Accordingly, ADB is supporting innovative pilot demonstration projects by providing partial credit guarantees as a means to enable take-out financing through the bond market. This serves the double objective of freeing bank balance sheets to support greenfield projects while bond holders, who have a relatively lower tolerance for risk, provide financing of post-construction or brownfield projects, improving allocation of funding across the market. Success indicators over the medium term on this front include the creation of project infrastructure bonds as an asset class in the Indian market and establishing a commercially-oriented guarantee fund to credit enhance bonds. ADB is also actively supporting the latter. A critical question that has not made it into the mainstream policy debate is: what is the cost of financing the trillion-dollar infrastructure bill? Currently, India has among the highest interest rates among the BRICS (Brazil, Russia, India, China and South Africa) nations. The current yield on the 10-year government bond in India is slightly over eight per cent compared with below four per cent in the People's Republic of China. Lower interest rates could generate substantial financial savings for India even as it borrows heavily for infrastructure. A back-of-the-envelope calculation suggests that a 300 basis points drop in interest rates on $1 trillion of borrowing over 10 years would lead to a savings of approximately $195 billion over the first five years alone. Delving deeper, what holds back the lowering of interest rates? With inflation above target, the RBI will use its policy rate to stabilise inflation. While recognising the finer arguments of the impact of cost-push and demand-pull factors on inflation, the appropriateness of the monetary policy stance and its transmission to longer-term interest rates, the supply-side constraints reflecting the poor state of infrastructure in the country is indeed a leading factor explaining cost-push inflation. Lax fiscal policy also places further pressure on interest rates and the central bank is forced to keep policy rates higher than what would otherwise be the case with a lower fiscal deficit. With reduced fiscal deficits, the large amount of bank lending tied up in buying government securities could fall and lending could be directed to other areas in the economy such as capital formation through working capital loans, thereby further contributing to investment in the economy. ADB continues to support fiscal consolidation at the state level in India as a means to improve productive spending - from recurrent to capital expenditure. While large upfront fiscal consolidation may not be realistic, steady and incremental consolidation targeting expenditure containment will have to be steadfastly pursued. The 14th Finance Commission is expected to continue setting the bar high in terms of improving state finances. Equally important, the central government needs to push through with the timely introduction of Goods and Services Tax legislation, which could reduce the fiscal deficit and relieve pressure on banks to finance the deficit through large directed purchases of government securities. To summarise, from a public policy perspective, the Government of India faces some hard choices to better support infrastructure financing in the economy and overall growth. It has within its reach the means to address bond market development and fiscal consolidation challenges. With persistence and resilience, the two challenges can be addressed in a virtuous cycle in the interest of enhancing growth and social welfare gains. 138 Global Project Opportunities: June, 2013 Railway expansion will link major cities RIYADH: MOHAMMED RASOOLDEEN Sunday 5 May 2013 Last Update 4 May 2013 11:31 pm The Kingdom has embarked on a massive expansion plan to provide rail links from north to south and east to west covering all strategic commercial, industrial and social points. The idea of constructing a railway line in Saudi Arabia was first introduced in the mid 1940s, when need became apparent for a port on the Gulf coast to handle materials dispatched to The Arabian American Oil Company (Aramco). Such goods had to be conveyed inland from the port to the company’s warehouses in Dhahran. The idea provided by Aramco for establishing a railway from Dammam to Riyadh included the construction of a large commercial port able to receive the ships carrying the needs and equipment of the oil industry as well as the immense benefits of this port to the national economy. The idea of constructing such a railway line was presented to King Abdul Aziz Al Saud who approved the project and instructed the line to be extended to Riyadh. Construction work commenced in September 1947 and on the Oct. 20, 1951, the line was officially inaugurated by King Abdul Aziz. In the beginning, the railway line was run by Aramco, but it was subsequently entrusted to the Ministry of Finance, at which time it was known as the Railway Department. On May 13, 1966, a Royal decree was issued establishing the Saudi Railways Organization (SRO) as a public corporation having full legal status. A board of directors was appointed to lead the organization on commercial principles. “Rail transport is a vital support to growth and development in any country,” said Abdulaziz Al-Hokail, president of the Saudi Railways organization (SRO). The Saudi government, realizing the value of rail transport adds to national development, had launched several initiatives to bring this vital service at par with the developmental needs of the country. These initiatives include major expansion projects to connect the Western regions of the Kingdom with the Eastern region, the northern with the central and to link the holy places as well as the Kingdom with the GCC countries. The development initiatives also include moving toward privatizing SRO and opening the door for national and foreign investments to bolster its ability to support national development. The official inauguration of Riyadh Dry Port took place on May 24, 1981. Statistics show that the number of containers handled at Riyadh Dry Port, since its inception, had increased dramatically. For example, in 1981-82, the number of standard containers (TEU’s) handled was 21,000. Twenty years later, in 2008 the number reached more than 398,000. SRO operates a network of railways with a total length of approximately 1,380 kilometers, extending from King Abdul Aziz Port in Dammam and the City of Dammam itself to Riyadh, passing by Abqaiq, Hofuf, Haradh, Al-Tawdhihiyah and Al-Kharj. Railroads operated by SRO include the Passenger Line, which is a 449-kilometer line that connects Riyadh to Dammam through Al-Ahsa and Abqaiq; the Cargo Line, a 556-kilometer line starting at King Abdul Aziz Port in Dammam and ending in Riyadh, passing by Al-Ahsa, Abqaiq, Al-Kharj, Haradh and AlTawdhihiyah; and the Branch Lines witha total length of 373 kilometers that connect some industrial and agricultural production sites and some military sites with export ports and some residential areas. The Haramain high-speed rail project, announced by the Saudi Railway Organization, involves a 450kilometer rail link between Makkah and Madinah. It will also pass through Jeddah and Rabigh. 139 Global Project Opportunities: June, 2013 Other components of the project include high-speed trains fitted with the latest equipment and five ultramodern passenger stations — one in Makkah, two in Jeddah, one at King Abdul Aziz International Airport and one in Madinah. About 27 percent of the Haramain rail stations in Jeddah and 13 percent in Makkah have been completed. The project will be completed on time, according to Muhammad Al-Suwaiket, assistant deputy minister of transport. He said that the second phase of the train project will begin after construction of stations is completed, he said. Building four stations in Makkah, Madinah, Jeddah and King Abdullah Economic City in Rabigh is the second and last part of the project’s first phase. The project’s second and last phase will involve the installation of tracks, signal and communication systems and the railway electrification system and 35 passenger vehicles. The second stage will also see the establishment of six power stations to meet the project’s power requirements. The project is expected to operate by the end of 2014. Al-Suwaiket said the Haramain high-speed rail project is one of the main parts of the Kingdom’s rail expansion project. Transport Minister Jabara Al-Seraisry said: “The land bridge along with the North-South Railway and the Haramain Railway will have a big impact on the social and economic development of the country.” The project will allow freight of cargo imported from East Asian countries via King Abdul Aziz Port in Dammam, and from Europe and North America via Jeddah Islamic Port. This would result in more transit cargo and savings in regional freight economy. The contract is part of the plan ordered by Custodian of the Two Holy Mosques King Abdullah to complete the railway infrastructure of the Kingdom and in line with a decision of the Council of Ministers to construct a railway line connecting the Kingdom’s west coast with its east coast. With the construction of the Jeddah-Riyadh rail link, the time taken for passenger transport will be six hours instead of the current 10 to 12 hours by bus. For freight, trains the maximum travel time will be 12 hours. The design speed of passenger trains is expected to be 250 kilometers per hour and 140 km/h for freight trains, making the trip between Dammam and Jeddah around 12 hours for cargo. Sea-borne freight can take up to nine days to travel between the two destinations. PIF will fund the massive project and a supporting team drawn from the ministries of Transport, Finance and Saudi Railways Company (SAR) was formed to supervise the project. SAR Board Chairman Mansour Al-Maiman said the line would start from Jeddah Islamic Port to Riyadh to be connected with the existing 450 km line between Riyadh and Dammam, with a second 115-km new line planned to connect Dammam with Jubail on the Arabian Gulf. The 958-km dual track railway passing through different geographical areas will necessitate construction of a series of tunnels and bridges. The SAR will closely work with Fluor for scheduling all construction work based on the highest quality and standards, he said. The SAR is fully owned by the PIF and is currently implementing the North-South Railway (NSR) project. It is the world’s largest railway construction and the longest route to adopt the European Train Control System (ETCS) to date. It is a 2,400-km passenger and freight rail line originating in the capital city Riyadh, in the northwest of the country, to Al-Hudaitha, near the border with Jordan. According to Al-Maiman, the north-south railway project will roughly cost SR20 billion and will depend mainly on goods transportation as a major source of its revenue rather than passengers. Al-Maiman made this announcement after signing a contract with Spain’s CAF Company valued at more than SR 553 million. CAF will manufacture five passenger train sets for SAR and deliver them within two 140 Global Project Opportunities: June, 2013 years. He said the government will finance the project either through issuance of sukuks, direct government funding from state budget or PIF. The major revenues of the project will come from cargo where some agreements have been signed with certain companies such as Aramco and agricultural companies for transportation of their products. The signing of the passenger train sets followed signing of similar contracts for the construction of six passenger stations in Riyadh, Majmaa, Qasim, Hail, Jouf, and Quriyyat, to be completed and operational by 2014. The five-passenger train sets will form the first group of SAR passenger trains that will be increased in line with increased operation levels for customers in the future. To contribute socially, economically, industrially, agriculturally, and commercially to the growth and development of the cities that the railway lines pass by, SAR will provide general freight transportation services by rail. SAR rail network will support multiple industries in the North Province of the kingdom. General freight train will consist of two-locomotives with a horsepower of (3,400-3,600) and 90 wagons. SAR provides nine Intermodal Yards (Shipping Yards) in Riyadh, Sudair, Qassim, Hail, Ras Al-Khair, Jubail, Al-Jawf, Al-Basaita, and Al-Haditha On SAR’s Railway network, there will be several locations that provide support and services. There will be six passenger stations, which will be in Riyadh at King Khaled International Airport, Majma’a, Qassim, Hail at Prince Abdulaziz Bin Mussa’ad Economic City, Al-Jawf, and Al-Qurayyat. Additionally, there will be nine Intermodal Yards (Shipping Yards) in Al-Haditha, Al-Jawf, the agricultural city of Al-Besaitaa, Hail at Prince Abdulaziz Bin Mussa’ad Economic City, Qassim, Sudair, Riyadh, Ras Al-Khair, and Jubail. There will be 17 maintenance buildings for the maintenance staff across the railway network. Phosphate Transportation service was started in May 2011 from Al-Jalamid Mine located in the Northeast of the Kingdom to the processing plant for Ma’aden Company located at Ras Al-Khair on the Arabian Gulf. The Phosphate trains transport 5 million tons of phosphate annually. An American company called Electro-Motive Diesel (EMD) manufactures the locomotives. The Phosphate wagons were manufactured by a Chinese company called CSR. Bauxite Transportation service will start in 2014. Bauxite, which is used to produce aluminum, will be transported from Al-Baitha Mine in Qassim province to the processing plan at Ras Al-Khair. The Bauxite trains will transport more than 3 million tons annually. According to the SAR project timeline, the passenger train service will start in 2014. SAR would provide six passenger stations in Riyadh, Majma’a, Qassim, Hail, Al-Jawf and Al-Qurayyat Climatic conditions slow down some projects JEDDAH: IBRAHIM NAFFEE Sunday 5 May 2013 Last Update 4 May 2013 11:31 pm The railway projets currently underway in the Kingdom in large scale is however faced with a crisis of qualified contractors as also due to lack of adequate rail financing. The main challenge is shortage of the qualified companies that can complete projects’ phases within the scheduled time to meet deadline. The Saudi government has embarked on a huge infrastructure plan that need more professional companies for its implementation with high technology descriptions and a commitment to finish on schedule. The governmental agencies are expected to issue a new package of obstacles. The government committees have put about 12 proposals, governmental projects and contractors. The committees have also procedures and the bank guarantee, according 141 measures in order to resolve including new procedures for put proposals for facilitating to a local media. Global Project Opportunities: June, 2013 However, the Saudi Railway Organization (SRO) ensures safety with the help of modern technologies like integrated signals and communication systems. Besides challenges with the length of the railway line, the Saudi Arabia’s climate and natural environment represent additional challenges to railway projects. The government has also started examining the construction of railways within heavily populated cities to alleviate congestion. One such project includes the SR 9.3 billion Riyadh light rail. It is owned by Al-Riyadh Development Authority and is still in the bidding phase and is expected to be completed by 2018. The Jeddah Metro is another planned project, which is budgeted at approximately SR 35 billion and owned by the Ministry of Transportation. It was expected to be awarded this year. Saudi Arabia is planning to invest heavily in its railway infrastructure with SR 365 billion ($ 99.4 billion) by 2040. The government plans to launch a number of initiatives in this sector, according to The National Commercial Bank’s (NCB) latest research. The present value of projects executed is estimated at SR 50 billion ($ 13.6 billion). Several projects worth SR 93 billion ($ 25.3 billion) will be awarded this year and 2014. The number of railway passengers is expected to reach 3.37 million passengers by 2014. In terms of freight, about 15 million tons of goods and materials is expected to be transported through the railways by 2014. However, the biggest challenge of railway projects is the sand. There is no a project like this that has been established in the desert, particularly when it deals with rapidly changing weather conditions of wind, high temperatures and rain. It is predicted certain points along the 444 km will have a much bigger problem with the sand. Routes run north and south, with many kilometers running along the Red Sea coastline. The sea causes wind that brings sand clouds. This wind also forms and moves sand dunes. A Spanish consortium is building protection walls and fencing to block the sand build-up along these points. These barriers are made out of bituminous asphalt concrete, which is known to be more durable, with the added bonus of being successful at blocking the train’s noise on the other side, according to a local newspaper 142 Global Project Opportunities: June, 2013 11.0 COUNTRY PROFILE : TUNISIA Tunisia at a glance Full Name: Tunisian Republic Capital: Tunis Area: 163,610 sq km Population (2010 est.): 10,588,025 (growth rate: 1.0%) Currency: Tunisian dinar (TND) $1 = TND 1.46 (August 2010) Religions: Muslim 98%, Christian 1%, Jewish/other 1% Languages: Arabic (official), French International organisations: Maghreb Arab Union, IAEA, IMF, UN, WTO Located on the coast of North Africa, Tunisia has a 1,148-kilometre Mediterranean coastline to the north and east and borders Algeria to the west and Libya to the southeast. Major settlements are concentrated on the coastline, while the interior features mountains in the north, hot, dry plains in the centre and a semi-arid southern region bordering the Sahara Desert. Since it gained independence from France in 1956, President Zine el-Abidine Ben Ali took over from Habib Bourguiba in a bloodless coup on 7 November 1987. Bourguiba had been president for 30 years and Ben Ali said that never again would there be a president for life. But the constitution was twice changed during his tenure to allow him to remain in power, until the Arab uprisings in 2011. Government changes In October 2011, moderate Islamist party Ennahda was officially announced as the winner in Tunisia’s first elections since former president Zine el-Abidine Ben Ali fled the country in January. The assembly will now write the new constitution and appoint an interim government. Moncef Marzouki (Congress for the Republic) is president, Hamadi Jebali (Ennahda) is prime minister and Mustafa Ben Jafar (Ettakatol) is speaker for the assembly. At the start of 2011, however, Ben Ali’s presidency came to an abrupt end as he was forced to flee to Saudi Arabia amid a popular uprising. Protestors took to the street in late December 2010 in support of a Mohammed Bouazzi, an unemployed graduate who died by setting himself on fire after police prevented him selling fruit and vegetables without a licence. In the weeks that followed, protests over unemployment, food price rises and corruption escalated and demonstrators called for the president to stand down. The unrest continues; a state of emergency has been declared and a new government is in the process of being formed. Tunisia was then run by an interim unity government under Prime Minister Mohammed Ghannouchi before elections were held in 2011. Tunisia’s interim government suspended all meetings of the Democratic Constitutional Rally (RCD), the party of former president Zine el-Abidine Ben Ali. The interim government also ordered all RCD party offices or meeting places to be closed down ahead of a decision to dissolve the party entirely. 143 Global Project Opportunities: June, 2013 Tunisian police opened fire on protesters killing two people in the north-western town of Kef. Protesters later set fire to the police station in response and tried to march on the town prison before troops intervened. In the central town of Kebili, another person was killed in clashes after being hit by a teargas canister. The uprising in Tunisia was the catalyst for a series of protests across the Arab world, including Egypt, Iran, Bahrain and most violently in Libya. Government Tunisia is a presidential republic with a bicameral parliamentary legislature. The president is elected by popular vote for a five-year term. Members are elected to the 189-member Chamber of Deputies (lower house) from single-seat constituencies for a five-year term, with 80 per cent of the seats allocated to the ruling party and 20 per cent to the opposition. The 126-member Chamber of Councillors (upper house) has 126 members, 85 of them indirectly elected by members of the Chamber of Deputies and city council members and 41 appointed by the president. The political system is dominated by the Democratic Constitutional Rally (RCD), which was the country’s only legal party for 25 years. There are now six opposition parties. Last presidential election: 2011 Ennahda - 90 of the 217 seats Congress for the Republic party - 30 seats Ettakatol party, or the Democratic Forum for Labour and Freedoms - 21 seats Economy Tunisia relies heavily on trade with the European Union, with France, Italy and Germany being the most significant trading partners. The North African state survived the global economic crisis relatively well due to limited foreign liabilities and the declining value of the Tunisian dinar against the euro. GDP slowed to 3 per cent in 2009 from 4.6 per cent in 2008. Government unemployment figures are around 14 per cent but analysts believe that figure is higher among university graduates. The 2010 Tunisian budget includes a $500m stimulus package to lower unemployment in the country. Foreign direct investment in Tunisia totalled $1.62bn in 2009 with the country’s hydrocarbon sector receiving $945m and manufacturing receiving $450m. The World Economic Forum’s Global Competitiveness Report 2009-10 ranks Tunisia at number 40 in regards to its economic environment and scope for future growth. Tunisia is considered one of the most stable of the north African Arab states in regards to liberalisation of trade and business. Oil & Gas Exploration began in Tunisia in 1966 with the exploration of the El Borma plains. But compared with its North African neighbours Algeria and Libya, Tunisia has modest oil and gas reserves. Tunisia reached peak oil output in 1998 with 110,000 barrels a day (b/d). In 2009, Tunisia’s oil production was 91,379 b/d, its highest daily production since 1994. Tunisia’s consumption of oil in 2009 was 88,947 b/d. 144 Global Project Opportunities: June, 2013 Estimated oil reserves in the country stand at around 1.7 billion barrels while proven gas reserves are just over 65 billion cubic metres. According to projects tracker MEED Projects, Tunisia has around $3.75bn worth of oil and gas projects on-going as of August 2010. Due to Tunisia’s current low refining capacity, the centrepiece of the country’s hydrocarbon plans is Qatar Petroleum’s (QP) $3bn La Skhira Refinery, which will be built at the port city of La Skhira, 300km south of Tunis. The refinery will have a capacity of 120,000 barrels a day of gasoline, diesel, petroleum coke, bitumen and vacuum gas-oil (VGO), as well as other clean fuels when completed in the fourth quarter of 2013. The La Skhira project owner is Qatar Petroleum and the company has been offered a build, own operate deal that will see it manage the facility for 30 years. Most of Tunisia’s other oil and gas projects are onshore and offshore exploration permits ranging in value from $5m up to $50m and more than 30 international oil companies (IOCs) operate in the country mostly involved in oil and gas exploration and production. Power & water Tunisia is investing heavily in its power and water sector to both meet domestic demand, which is growing at a rate of around 5 per cent per annum. Most of the major projects currently under way are independent power projects (IPP) that will allow Tunisia to increase capacity without needing to find billions of dollars for the initial investment. The power produced will be bought by the state-controlled utility Societe Tunisienne de l’Electricite & du Gaz (Steg) under a power-purchase agreement (PPA). The rest will be exported to foreign markets such as Italy. Major projects currently under construction or being planned include the 400MW Bizerte IPP, the 1,200MW El-Haouaria and the 400MW Sousse Plant. Tunisia also plans to increase renewable energy’s contribution to 175 MW by 2010-11 - around 4.2 per cent of total electricity capacity. Construction & transport Substantial investment is also being directed to improving the country’s transport infrastructure with current projects including a $2.1bn high-speed rail network, a $400m roads rehabilitation and the Tunis Light railway project. The $1.65bn Enfidha Deepwater Port 60km south of Tunis is also being constructed 60km south of Tunis. The port development will have eventual capacity of 6-8 million twenty-foot equivalent units and be home to a large free zone and logistics park. A series of real estate projects are also being developed with the largest the $25bn Mediterranean Gate in Tunis. The development will provide housing for around 500,000 people and be centred around Tunis’ old harbour. Other major projects include the $3bn Tunis Financial Harbour and the $5bn Tunis Sports City. 145 Global Project Opportunities: June, 2013 12.0 PEPC : WORKING COMMITTEE MEMBERSCHAIRMAN Shri Avinash C Gupta Vice Chairman Project EPC & Chairman & Managing Director Technofab Engineering Ltd. Plot NO.5 Sector 27 C Mathura Road Faridabad: 121003 VICE CHAIRMAN Shri Gurjeet Singh Johar Chairman C&C Constructions Ltd. 70, Institutional Sector 32 Gurgaon-122001 Tel. 95124 4536666 MEMBERS : WORKING COMMITTEE Shri B. Seenaiah Managing Director BSCPL Infrastructure Ltd. 6-2-913/914, 5th Floor Progressive Towers, Khairatabad Hyderabad- 500004 Shri V.C. Verma Executive Director Oriental Structural Engineers Pvt. Ltd 21, Commercial Complex Malcha Marg New Delhi 110 021. Shri Mohan Dass Saini CEO (Construction Division) Shapoorji Pallonji & Co. Ltd. SP Centre 41/44 Minoo Desai Marg Colaba, Mumbai: 400005 Shri Abhijit Rajan Chairman & Managing Director Gammon India Ltd Gammon House Veersavarkar Marg, Prabhadevi, Mumbai – 400 020 S Shri Abhay Sancheti Managing Director SMS Infrastructure Ltd. 267, Ganesh Phadnavis Bhavan Near Triangular Park, Dharampeth Nagpur-440010 Shri Ajit Gulabchand Chairman & Managing Director Hindustan Construction Co. Ltd. Hincon House Lal Bhadur Shastri Marg Vikhroli (West), Mumbai-400 083 S Shri R.N. Yadav Managing Director U.P. Rajkiya Nirman Nigam Ltd. Vishweshwariya Bhawan Gomto Nagar Lucknow-226010 S Shri Mohinder Singh Saini Chairman Mokul Infrastructure Pvt. Ltd. 16-D, Basant Lok Vasant Vihar New Delhi-110057 Shri S.N. Subrahmanyan Senior Vice President & Buildings and Infrastructure Larsen & Toubro Ltd. Engg. Construction Division Mount Poonamallee Road Manapakkam P.O. Box 979 Chennai- 600089. 146 Global Project Opportunities: June, 2013 INSTITUTIONS Shri S.K. Sharma Deputy Secretary, EP(OP) Department of Commerce Ministry of Commerce & Industry,Govt. Of India Udyog Bhawan New Delhi- 110 011 Shri Prabhat Kumar Joint Secretary (ES & ITP) Ministry of External Affairs Room No. 3057, A Wing, 3rd Floor Jawahar Lal Nehru Bhawan, Janpath New Delhi - 110003 Smt. Vanitha K. Venugopal General Manager Reserve Bank Of India Exchange Control Deptt. Amar Building, 5th Floor Mumbai 400 023. Ms. Tapasi De Dy. General Manager (Project Export Branch) ECGC Ltd. “The Metropolitan”, 7th Floor Plot No. C-26/27 Bandra Curla Complex Bandra (E) Mumbai 400 051 Ph. 9522 26572329 09967541671 Shri Sriram Subramaniam Dy. General Manager Exim Bank Of India Ground Floor, Statesman House 148 Barakhamba Road New Delhi 110001 23326625, 23326254, 233221622, 23321742, 23721393Extn.211 Fax: 23321719, 23322758 E-Mail: Eximnd@Vsnl.Com EX-OFFICIO MEMBER SECRETARY Shri S.K. Sharma Deputy Secretary, Deptt.of Commerce & Executive Director Project Exports Promotion Council Of India 147 Global Project Opportunities: June, 2013 13.0 FINANCIAL ASSISTANCE There is no specific scheme to promote the exporting firms in the country. However, some assistance is provided to exporters under Marketing Development Assistance (MDA) Scheme and Market Access Initiative (MAI) Scheme. Other schemes for export promotion include Duty Neutralisation Schemes like DEPB, Advance Licence, duty concession schemes like EPCG and Reward Schemes like Served from India, Vishesh Krishi and Gram Udyog Yojana, Focus Market Scheme and Focus Product Scheme. These schemes are reviewed periodically and necessary corrective measures are taken. ANNEXURE-I 4.1 MARKET DEVELOPMENT ASSISTANCE (MDA) SCHEME EXPORT PROMOTION ASSISTANCE GIVEN BY GOVERNMENT The Government of India encourages Indian project/product exporters by providing financial assistance under the following export promotion assistance schemes: a. Market Development Assistance (MDA) Scheme b. Scheme for Export Promotion by Small Scale Manufacturers c. Market Access Initiative (MAI) Scheme MARKET DEVELOPMENT ASSISTANCE (MDA) SCHEME Under this scheme assistance is given to individual exporters for participation in following export promotion activities abroad Trade Delegations BSMs Trade Fairs/Exhibitions Eligibility Criteria/Conditions (i) Exporting companies with an f.o.b. value of exports of upto Rs. 30 crore in the preceding year. No such ceiling is applicable for participation in Focus LAC region. (ii) The exporter should have complete 12 months membership with concerned EPC etc (iii) Assistance would be permissible on travel expenses by air, in economy excursion class fair and/or charges of the built up furnished stall. This would, however, be subject to an upper ceiling mentioned in the table per tour. S No. (1) Area/Sector (2) No. of visits (3) 1. Focus LAC 1 Maximum Financial ceiling per event (4) Rs. 2,50,000 2. 1 Rs. 2,00,000 3. FOCUS AFRICA ( including WANA Countries) FOCUS CIS 1 Rs. 2,00,000 4. FOCUS ASEAN+2 1 Rs. 2,00,000 5. General Areas 1 Rs. 1,50,000* TOTAL 5 148 Global Project Opportunities: June, 2013 AMMENDMENTS REVISED GUIDE LINE FOR MARKETING DEVELOPMENT ASSISTANCE (MDA) SCHEME FOR EXPORT PROMOTION ACITIVITIES: The competent authority has now decided that FIEO and ITPO will henceforth be treated as eligible grantee organizations for reimbursement MDA grants to the exporters who are also the members of other EPCs etc. and participating in the events organized/sponsored by FIEO and ITPO. However, for this purpose FIEO and ITPO will obtain a ‘NO OBJECTION CERTIFICATE’ as per the Annexure from the concerned EPCs of which the exporter is the member. The existing Guidelines for MDA stand modified to that extent, superceding relevant provisions/instructions and will be effective from 1.12.2007. (Vide MOC&I letter no.2/11/2004 E-MDA (Part) dated 26th November,2007) ………………………………………………………………………………………………………………………………………………………………………… ANNEXURE “_____________________EPC/Commodity Board Sl. No. Name of the exporters alongwith address Date of acquiring membership of PEC by the exporter Turnover of the exporter during the last Financial Year (FY) Number of proposals of exporter already approved in the current FY Details of the participation made with MDA assistance in the current FY alongwith name of the participant Details of the participations made with MDA assistance in the past in the same event along with the name of the participant Focus Area/ General Area NO OBJECTION CERTIFICATE This is to certify that “ ___________EPC/Commodity Board” has no objection for the participation of the firm whose details are mentioned above, in the event namely”________________________________” organized /sponsored by ITPO/FIEO. EXECUTIVE DIRECTOR EPC/Commodity Board 149 Global Project Opportunities: June, 2013 SCHEME FOR EXPORT PROMOTION BY SMALL SCALE MANUFACTURERS There is a separate scheme designated as Marketing Development Assistance for SSI Exporters meant to encourage small scale manufacture exporters along the following lines: (A) Exporters eligible for assistance: (i) Exporting unit must be registered as SSI / SSSBE. (ii) Exporting unit must be a member of FIEO / EPC. (iii) Exporting units with aggregate exports of Rs. 2 crores and above over the last three financial years (Rs. 1 crore for ISO 9000 certified exporters) are eligible for assistance from the Ministry of Commerce & Industry through EPCs/other grantee organisations. SSI units with aggregate exports less than this limit would now be eligible for direct assistance from the Office of DC(SSI) under this scheme. SSI units which have not yet commenced exports are not eligible for assistance. (iv) An exporting unit would be eligible for assistance under SSI-MDA only once in a financial year. (B) Activities eligible for financing (i) Individual participation in overseas fairs/exhibitions. (ii) Individual overseas study tours/as member of a trade delegation going abroad. (iii) Production of material for overseas publicity. (C) Permissible binding limits: 90% of cost of return ticket by economy class subject to an upper ceiling of Rs.60,000/- (Rs. 90,000/for Latin American countries). In case excursion fare is cheaper than economy class fare, the excursion fare will be considered. (ii) (D) 25% of the cost of production of publicity material limited to Rs.15,000/- in a financial year. Other conditions: (i) Assistance shall be available for travel by one permanent employee/director/partner/proprietor of the SSI unit in economy class by Air India. Air travel by airlines other than Air India would be permissible provided that their economy class airfare is not higher than Air India. (ii) Applications must reach the Office of the DC(SSI) at least one month before the start of the event in question. (iii) The SSI unit should not have been charged/prosecuted/debarred/ blacklisted under the export and import policy or any other law relating to export and import business. Total MDA assistance under SSI-M[DA scheme shall be inclusive of MDA assistance received from all Government Bodies/FIEO/EPCs/Commodity Boards/Grantee Organiations etc. 150 Global Project Opportunities: June, 2013 ANNEXURE-II MARKET ACCESS INITIATIVE (MAI) SCHEME The scheme is formulated on focus product- focus country approach to evolve specific strategy for specific market and specific product through market studies/survey. Assistance would be provide to Export Promotion Organizations/ Trade Promotion Organizations / Exporters etc. for enhancement of export through accessing new markets or through increasing the share in the existing markets. Under the Scheme the level of assistance for each eligible activities has been fixed. The following activities will be eligible for financial assistance under the Scheme : Research studies consistent with the priorities; WTO Studies for evolving WTO compatible strategy; To support EPCs/Trade Promotion Organistions in undertaking market studies/survey for evolving proper strategies. To support marketing projects abroad based on focus product - focus country approach. Under marketing projects, the following activities will be funded: o o o o o o o o o o o o Opening of Showrooms Opening of Warehouses Display in international departmental stores Publicity Campaign and Brand Promotion Participation in Trade Fairs, etc., abroad Research and Product Development Reverse visits of the prominent buyers etc. from the project focus countries Export Potential Survey of the States; Registration charges for product registration abroad for pharmaceuticals, bio-technology and agro-chemicals; Testing charges for engineering products abroad; To support Cottage and handicrafts units; To support Recognized associations in industrial clusters for marketing abroad Details of approved purposes for the scheme and level of assistance Activity Market Study Opening of Showrooms and Warehouses Display in International Departmental Stores Publicity Campaign Participation in Trade Fairs, BSMs etc. abroad Assistance 75% of the total cost However, for studies assigned by the D/Commerce for the cause of export promotion, 100% assistance would be provided 75%, 50% and 25% of leasing / rental charges in the first, second and the third year, respectively Maximum Assistance Rs.75.00 lakh/each study 50% of rental charges of display space Rs. 50.00 lakh per annum/each product 50% assistance for two years in a particulr market 2/3 rd of the actual expenditure. The expenditure on TA/DA would be met by each participant. Rs. 50.00 lakh per annum/ per market Rs. 50.00 lakh for each fair N.B.: More specific details can be obtained on request. 151 Rs. 50.00 lakh for each market/ product per annum. Global Project Opportunities: June, 2013 ANNEXURE-III SCREENING COMMITTEE- GUIDELINES Objectives The objective of screening by the Screening Committee is to assess the suitability of an Indian engineering contracting company from all points of view- technical, financial and managerial competence- before it is allowed to participate in tenders for overseas construction engineering contracts (civil/ electro-mechanical etc.). Screening Committee approval is generally accorded selectively for activities for which applicant companies have established capability in one or more of the following construction engineering activities involving: i. Dams, canals, irrigation works, tunnels and earthworks. ii. Roads, bridges, flyovers, airports. iii. Water and sewage treatment plants, pipelines. iv. Buildings including commercial and factory complexes, hotels, schools and hospitals. v. Special foundations and structural works, docks and sea water works/ports. vi. Electrification, air-conditioning and utilities. vii. Any other structure, infrastructure, utility or activity to be determined by the Screening Committee. viii. General contractors with capabilities in combination of two or more areas in the above range of activities. Scope The coverage of Screening Committee includes all companies wishing to undertake overseas construction engineering projects involving design, construction, erection and/or commissioning. Indian companies wishing to export project construction items or consultancy services are outside the purview of the Screening Committee. Types of Clearance Clearance may be accorded to an applicant company for one or more of the following: i. Prime Contractor or ii. Sub Contractor to a Foreign Contracting Company or iii. Sub Contractor to Indian Company The clearance may be given either on a specific value basis or for regular overseas operations, depending on the track record within the country, financial position, management expertise and in-house capability. Minimum Criteria: Contractors are normally expected to fulfill following requirements before they can gain approval of the Screening Committee. i) company should be a member of Project EPC. ii) company should be a limited company - either private limited or public limited or a Government undertaking/department iii) company should have a minimum turnover of Rs. 10 crores (last three years) for getting approval by the screening committee. 152 Global Project Opportunities: June, 2013 iv) company should have minimum tangible net worth and operating experience as under: Contractor description Networth(Rs.) Minimum experience * as Prime-Contractor 01 crore 10years as Sub-Contractor to a foreign Prime-Contractor 25 lakhs 07 years as Sub-Contractor to an Indian Prime-contractor 10 lakhs 03 years * An applicant company being considered as Prime-contractor should have a minimum experience of 10 years, in undertaking some comparable type of works in India. Similarly in case of Sub contractor to Foreign Prime-contractor the minimum experience should be 7 years. In the case of a Sub-contractor to an Indian Prime-Contractor, the experience in the line of activity in India should be a minimum of 3 years. iv) In respect of newly formed firms/companies, joint-ventures or SPV’s created with a view to undertaking and executing overseas projects, the criteria for any one of the Indian or overseas constituents / partners would form the basis for granting approvals Screening Procedure: Applications from applicant company should be submitted in 12 copies in the prescribed form, allowing for a 4 weeks time for decision so as to enable receipt of reports from company’s bankers on the standing credit worthiness and dealings and also to enable suitable appraisal. PEPC will scrutinise and supplement data to the extent necessary to make the facts complete and ensure that the applications reach the Committee Members atleast 10 days before the scheduled date of the meeting. Screening Committee accords clearance after taking into account the following factors: i) Constitution of Board of Directors of a company including the qualifications, background and experience of directors; ii) Track record of a company regarding projects executed in India and overseas, as also the nature of works undertaken. Particular emphasis is placed on record of timely completion; and value of single largest contract executed; iii) Exposure of a company’s management and personnel in dealing with international organisations, and in executing works to international specifications. This is of particular relevance if the company seeks clearance as Sub-contractor to a foreign company (from a third country); iv) Qualifications and experience of key-personnel currently in full - time employment of company. v) Financial position of a company, including contingent liability and bank loans as a proportion to the net-worth; and paid up capital; vi) Approach to international marketing and information systems. Ability of the company to furnish information required by institutions, from time to time. vii) The plant and machinery owned by the company, the nature and size of which would commensurate with the volume of business proposed to be undertaken. Though these equipments may not be of use overseas, considering their unsuitability to the job proposed, this factor will give the Committee an idea of the applicant company’s status in the business and his familiarity in handling equipment, a factor that is very important for the purpose of deciding his suitability for undertaking contracts overseas. 153 Global Project Opportunities: June, 2013 These are broad criteria for approval of companies. However, the Screening Committee in its discretion may approve a particular company to take up jobs abroad or renew the approval. Validity of Clearance: Clearance accorded by the Screening Committee is valid for a period of three years after which company must approach Screening Committee afresh. Renewal applications shall have to be submitted in the prescribed format for clearance by the Screening Committee of the Council. Review of Companies already screened Review occurs in the following situations: i) Those seeking change in status (e.g. from Sub-contractor to Prime-contractor or from one-shot to regular) ii) Companies whose guarantees have been invoked, or where recurring disputes have arisen either with clients or with Sub-contractors, leading to litigation etc. iii) Company whose management/ownership has undergone major change since the date of original approval. For the above, PEPC works out a procedure for obtaining information from their members on a quarterly basis. In case of adverse reports about a screened firm reported to the Screening Committee by any of its members, the Screening Committee will be entitled to take such action as it may deem fit including reduction in value limits approved or de-listing from the approved list. Quorum of the Meeting: Three members shall be the quorum of Meeting of the Screening Committee provided the three members shall include one member representing Government Department, one representing Financial Institution and one from industry. Presence of Company’s representative : The committee may ask the applicant company to depute its representative at the meeting for clarifications or the company may depute its representative with the permission of the Committee. PROCEDURES FOR PROJECT EXPORTS – CONSULTANCY SERVICES Under the procedures prescribed in the Project Export Manual, consultancy projects to be undertaken by Indian Consultancy Organizations are required to be approved by a Competent Authority, both at pretender and post tender stages. If the consultancy contract is for less than Rs. 5 crore, then these clearances have to be obtained from the respective Authorized Dealer of foreign exchange and if the value of the contract is between Rs. 5 crore and Rs.10 crore, then the approval is required from Exim Bank. If it exceeds Rs. 10 crore, the approval is to be obtained from the Working Group consisting of members form Exim Bank, RBI, ECGC and the Authorized Dealer/Commercial Bank of the Consultant. The requirement of getting prior clearance from the concerned authorities for such consultancy contracts which are on cash basis and are with the Overseas Government Agencies and are also funded by multilateral funding agencies may be dispensed with by suitable amendments in PEM procedures and FEMA. 154 Global Project Opportunities: June, 2013 PROCEDURE FOR CLEARANCE OF PROPOSALS OF PROJECT EXPORTS -– Construction/turnkey Engineering (i) All applications to the Working Group are required to be submitted by the exporters through their bankers (who must be authorised dealers in foreign exchange) in the prescribed form in the required number of copies sufficiently in advance to enable the Working Group to hold a meeting of its members for consideration of the proposal. When a proposal is approved by the Working Group, a package clearance is granted by Exim Bank, on behalf of all the members of the Working Group and conveyed to the exporters’ bankers through whom the proposal was received. The Working Group’s clearance will ordinarily be given within a period of seven days from the date of receipt of the application, provided it is complete in all respects. (ii) Exporters desiring to submit bids for execution of projects abroad including service contracts will not be required to obtain clearance for submission of bids from the authorised dealer /Exim Bank/ Working Group. However, exporters in such cases are required to ensure that the conditions as laid down in the Memo PEM are complied with. (iii) On the basis of experience gained over the years and in order to enable the exporters to expeditiously obtain clearance for contracts for supply of engineering goods on deferred payment terms, turnkey contracts and civil construction contracts, powers have been delegated to authorised dealers and Exim Bank to grant post-award clearances in cases where the contract value does not exceed U.S. Dollar 100 Million. Proposals for undertaking such export contracts up to the value of U.S. Dollar 100 Million will, therefore, be cleared by authorised dealers / Exim Bank . Proposals for undertaking such contracts exceeding U.S. Dollar 100 Million in value will need to be cleared by the Working Group. “As regards civil construction contracts, the Working Group will consider proposals only from contractors who are on the approved list of Ministry of Commerce and Industry, Government of India in order to ensure that only contractors having the necessary competence and capability undertake overseas construction contracts”. (iv) In the case of contracts for export of services on cash payment terms requiring fund-based and/or non-fund based facilities, as also those involving deferred payment terms, authorised dealers and Exim Bank have been empowered to grant clearance upto the value of U.S. Dollar 100 Million. Proposals for undertaking such export contracts will, therefore, be cleared by authorised dealers/Exim Bank upto the value of U.S. Dollar 100 Million. Proposals for undertaking such contracts exceeding U.S. Dollar 100 Million in value will need to be cleared by the Working Group. (v) Proposals for deferred payment export or turnkey projects against Buyers’ Credits as well as for export of managerial / technical consultancy services on deferred payment terms as also those on cash payment terms involving grant of any fund-based and/or non-fund based facilities in excess of the monetary limits mentioned in sub-paragraph (iv) above will need the prior approval of the Working Group. EXPORT PROMOTION SCHEMES - SERVED FROM INDIA SCHEME Government of India has introduced "Served from India Scheme" to facilitate exporter of various type of services. The objective of this scheme is to accelerate growth in export of services so as to create a powerful and unique 'Served From India' brand, instantly recognized and respected world over. Under this scheme, Service Providers of more than 100 services like Professional Services, Computer Related services, Hotels, Restaurants, Educational Services, Research and Development services, Communication Services, Construction and Related Engineering Services, Distribution Service, Environmental related Services, Tourism and Transport related Services, Health Related Social Service, Recreational, Cultural and Sporting Services etc. (List is at Appendix 10 of Hand Book of Procedure on DGFT Website- http://www.dgft.gov.in under "Downloads") are entitled for Duty Credit Scrip. Service providers, who have a total foreign exchange earning of at least Rs.10 Lakhs in preceding or current financial year shall qualify for Duty Credit Scrip. For Individual Service Providers, the criterion is reduced to Rs.5 Lakhs of foreign exchange earnings. 155 Global Project Opportunities: June, 2013 However under Para 3.18.1 of Handbook of Procedure~ Vol. I, many types of services and / or remittances are not eligible for benefits under the scheme. These are: 1. Sources of foreign exchange earnings such as equity or debt participation, donations, receipts of repayment of loans etc. and any other inflow of foreign exchange, unrelated to rendering of service, would be ineligible. 2. Foreign Exchange remittances: I. related to Financial Services Sector 1. Raising of all types of foreign currency Loans; 2. Export proceeds realization of clients; 3. Issuance of Foreign Equity through ADRs / GDRs or other similar instruments; 4. Issuance of foreign currency Bonds; 5. Sale of securities and other financial instruments; 6. Other receivables not connected with services rendered by financial institutions; and II. earned through contract / regular employment abroad (e.g. labour remittances); 3. Payments for services received from EEFC Account; 4. Foreign exchange turnover by Healthcare Institutions like equity participation, donations etc. (However, remittances received on account of medical treatment, surgery, testing, consultancy and health care provided by the institution shall be eligible); 5. Foreign exchange turnover by Educational Institutions like equity participation, donations etc. (However remittances received on account of the course fees and consultancy provided by the institution shall be eligible); 6. Export turnover relating to services of units operating under SEZ / EOU / EHTP / STPI / BTP Schemes or supplies of services made to such units; 7. Clubbing of turnover of services rendered by SEZ / EOU / EHTP / STPI / BTP units with turnover of DT A Service Providers; and 8. Export of Goods. Service Providers (except Hotels, Restaurants and other Service Providers in Tourism Sector) are entitled to Duty Credit Scrip of 10% of foreign exchange earned during preceding financial year. Hotels of onestar and above (including managed hotels) and heritage hotels approved by Department of Tourism and other Service providers in tourism sector registered with Department of Tourism shall be entitled to 5% while Stand-alone restaurants are entitled for 10% of foreign exchange earned by them in preceding financial year. "Duty Credit Scrip" may be used for import of any capital goods including spares, office equipment and professional equipment, office furniture and consumables, provided it is part of their main line of business. In the case of hotels and stand-alone restaurants, the duty credit entitlement may also be used for the import of food items and alcoholic beverages. The utilization is with AU Condition and Nontransferable except within a Group Company or Managed Hotel. 156 Global Project Opportunities: June, 2013 This benefit of Duty Credit Scrip is granted from Regional Offices of DGFT, spread all over the country. Duty Credit Scrip of nearly Rs.1000 Cr is granted annually, based on previous years Foreign Exchange earned by Service Providers. Further, details of this Scheme may be seen in Chapter III of Foreign Trade Policy 2004-2007 and Chapter III of Hand Book of Procedure Vol. -I. These Documents are available at DGFT Websitehttp://www.dgft.gov.in Directorate General of Foreign Trade (DGFT), Ministry of Commerce & Industry New Delhi, October 31, 2007 157 Global Project Opportunities: June, 2013 14.0 SOURCES OF INFORMATION You would be pleased to know that the information that reaches your desk from PROJECT EPC including “Global Project Opportunities” is complied using various inputs both printed and electronic and are listed below:i) Tender Notices & Commercial Reports from Indian High Commissions & Embassies abroad ii) Magazines/Journals:- a) c) e) g) i) k) m) ENR UN Development Business Print Edition ADB Business Opportunities Print Edition Economic & Political Weekly Gulf News Eximius: Export Advantage Civil Engineering & Construction Review, iii) We also subscribe to websites like UN Development Business Web edition and take inputs from various other web-sites which include: a) c) e) g) h) j) l) m) n) p) r) t) u) v) w) x) y) z) Asian Development Bank Website (b) World Bank ENR Web-edition (http://enr.com/) (d) The Economist Web-edition www.construction.com (f) http://www.tradeport.org http://www.tradezone.com/buyers/tobuyboard.html http://trade.swissinfo.net/ (i) http://www.buyersguide.com http://thaipost.com (k) http://www.itenders.com http://www.constructionqld.asn.au/tenders.htm International Monetary Fund Website OPEC Fund Web site (o) MEED Web-site Abu Dhabi Chamber of Commerce & Industry (q) www.ConstructionFutures.co.uk Reserve Bank of India (http://www.rbi.org.in), (s) Ministry of Finance and many others…. http://www.new-technologies.org/ECT/Other/arcad.htm http://www.contractorsunlimited.co.uk/ http://commerce.nic.in http://www.eximbankindia.com/ http://ficci.com/ http://dir.indiamart.com/foreignimporters/ devbusiness.com (b) (d) (f) (h) (j) (l) and MEED BCI Asia Construction Monitor Business Today TIME Magazine The Economist Circulars from various Ministries many others…. While every effort has been made to ensure the accuracy of the information, PROJECT EPC is in no way responsible for any errors : typographic or otherwise. The information produced in this newsletter has been put up after considerable amount of reading & screening from various sources including the internet and as listed in the Sources of Information* 158