Replacement of NYS Thruway (I-87) Bridge over Central ParK Avenue (Rt. 100) Project Name: Replacement of NYS Thruway (I-87) Bridge over Central Park Avenue (Rt. 100) Location: Yonkers, NY Client: New York State Thruway Authority Services Construction Inspection Quality Control Contract Administration Contractor Coordination Maintenance/Protection of Traffic Description of Project: The RBA Group was responsible for the construction inspection of this project, which included all quality control, contract administration, and coordination between contractors, NYS Thruway Authority, NYSDOT, local municipalities, and Yonkers Police Department. This high-profile emergency project was made necessary when a tanker truck explosion destroyed the existing bridge. This unique project posed extraordinary difficulties by requiring interpretation and enforcement of specifications to ensure quality construction while expediting the work to enable completion in about half the normal time and through a winter season. The work involved structural concrete removal, extensive substructure rehabilitation, and complete replacement of the superstructure utilizing inverset bridge deck panels. Traffic was maintained during construction by using two temporary bridges. All work was governed by the NYS Steel Construction Manual and NYSDOT standard specifications. www.rbagroup.com E233 (11.11)