Truss Bridge Testing and Analysis Objective: To understand the importance of studying device failure to be able to improve design, as part of the engineering design process. Engineers need to know failure mode of materials and structures to be able to design technology to withstand a given stress Previous testing method- batteries- did not work with shorter bridge New testing device will suspend loads from bridge Use water bottles as test weights 1 water bottle= _______gm Record failure weight, exact mode of failure- exactly what broke? Efficiency= failure load/bridge weight How can you strengthen the bridge?