PURCHASING, PAYABLES AND DISBURSEMENTS PROCUREMENT OFFICE The Procurement Office is responsible for the purchase of supplies, materials, equipment and services for the various schools, colleges and other units within the University. Additionally, it oversees and administers the purchasing card (P-card) program and the fuel card program. Summary of Major Accomplishments Order Activity The total dollar amount for formal orders increased from $164,398,690 to $180,392,793 and the total number of formal orders issued increased from 29,938 to 39,952 when comparing Fiscal Year 2010 to Fiscal Year 2011. The increase in the number of orders is partially a result of a change in procedure under the new purchasing system. New orders for ongoing maintenance and lease agreements were issued rather than processing a renewal as a purchase order correction. Support Functions The Procurement Office staff provided information regarding the campus entry system and purchasing policies and procedures to University personnel through one-on-one training and small group sessions. In October, the Procurement Office participated in the University System of Georgia South Regional Small and Minority Business Expo to foster relationships with these classifications of vendors. Additionally, the University of Georgia held its third annual Minority and Small Business Expo in March in the Grand Hall of the Tate Student Center. The event is part of UGA’s effort to increase the amount of business conducted with local small and/or minority-owned businesses. Approximately 120 vendors met with representatives from 60 campus units and community agencies. In addition to hosting this Expo at UGA, Procurement staff held three informational sessions: 1) “How to do Business with UGA”; 2) “How to Register in Team Georgia Marketplace”; and 3) “Construction and Architectural/Engineering Firm Selection Process” during the Expo. In May 2011, UGA Procurement staff presented “How to Do Business with UGA” at a UGA Small Business Development Center event. Purchasing Card The purchasing card (P-card) program saw a decrease in the number of cards, the number of transactions processed on the cards and in the total amount spent. The decrease in card numbers is attributed to ongoing reaction to changes in P-card policy and procedure as a result of House Bill 1113 and Department of Administrative Services and Board of Regents policies, as well as to the functionality of the new UGAmart system. While fewer cards resulted in fewer transactions, budget reductions also contributed to reduced expenditures. The fiscal year began with 1,366 cards in the program and ended with 1,249 cards. During the fiscal year, cardholders initiated 107,066 transactions totaling $28,010,880. This equates to a 5.6% decrease in transactions and a 2.9% decrease in dollar value. The office continues to offer training F-85 on P-card policy and procedures plus training on the Web-based reconciliation system for purchasing card transactions. Procure-to-Pay and Vendor Database During FY 2011, the new procure-to-pay system, formally known as UGAmart, became the official purchasing system for the University with only limited use of the old system. All UGA units received training on use of the system in the prior fiscal year. In conjunction with UGAmart, the new vendor database is being utilized. Vendors are recorded in the new database and passed into UGAmart for potential order issuance. The database contained 2,549 vendors at the beginning of the fiscal year, and that number had grown to 7,029 by the end of the year. Purchasing Authority The delegated purchasing authority from DOAS State Purchasing Department remained the same during FY 2011. Procurement’s delegated purchasing authority was $250,000 for requests for proposal with an unlimited dollar designation for requests for quote. The state’s competitive bid threshold remained at $5,000, and the moratorium implemented by the Governor’s Office on the purchase of motor vehicles remained in place. The DOAS State Purchasing Division’s Process and Audits Department conducted a Compliance – Delegated Purchasing Authority Validation Review in March/April 2009. UGA received a letter of suggestion in lieu of a final report since extensive time elapsed between the audit and the report. Procurement-Issued Purchase Orders Formal orders include those issued on field purchase orders through the University’s Procurement Office and those issued on state purchase orders by State Purchasing against requisitions from the Procurement Office (excluding verbal and petty cash orders issued by University departments). Activity for the past 10 years is shown in the following chart: FORMAL PURCHASING DOLLARS Millions of Dollars $200 $150 $135 $112 $117 $117 2003 2004 2005 $165 $165 $156 $164 2007 2008 2009 2010 $180 $131 $100 $50 $0 2002 2006 Fiscal Year F-86 2011 The number of formal orders increased from 29,938 to 39,952. The following chart indicates the number of formal purchases made over a 10-year period: Thousands NUMBER OF FORMAL PURCHASES 60 50 40 30 20 10 0 50.6 41.1 2002 2003 39.9 38.6 33.5 2004 2005 29.8 27.7 26.4 26.3 2006 2007 2008 2009 29.9 2010 2011 Fiscal Year Supply Contract Releases The dollar amount of purchases made under supply contracts increased 12.7% from $42,408,076 to $47,810,068, while the number of individual contract purchases increased from 14,473 to 22,091. The following chart shows the dollar value of supply contract orders (additional information may be seen in Exhibit 1): Millions of Dollars SUPPLY CONTRACT DOLLARS 60 50 40 30 20 10 0 35.8 2002 30.8 2003 36.8 39.5 37.4 2004 2005 2006 42.5 41.5 40.6 42.4 2007 2008 2009 2010 47.8 2011 Fiscal Year Unauthorized Purchases The Procurement Office has the responsibility for screening payment requests to ensure that all are within the limits delegated to University departments. In FY 2011 there were 153 unauthorized purchases, a decrease of 10% when compared to FY 2010 (171). A F-87 report on unauthorized purchases is included in Exhibit 2. Urgent Orders The number of urgent order transactions increased from 2,927 to 4,513. The percentage of urgent orders to formal orders increased from 9.8% to 11.3% in FY2011. This increase is partially attributed to a change in the purchasing system. The old system did not allow statewide contract purchase orders to be marked as urgent upon release, whereas the new system does allow this process. A comparison of the volume of urgent transactions for the past 10 years is shown in the following chart: NUMBER OF URGENT ORDERS 4513 5000 4000 3000 2000 1000 0 3427 2519 2275 2002 2003 2004 3003 2964 3059 2005 2006 2007 3456 3347 2008 2009 2927 2010 2011 Fiscal Year The dollar volume of urgent orders increased, as did the percentage of the dollar volume of emergency orders to the total dollar volume of formal orders, rising from 4.0% to 4.6%. The comparison for the past 10 years follows: URGENT ORDER DOLLARS Millions of Dollars 12 9 10 8 6.8 6 4 3.6 9.8 7.4 6.8 8.3 5.6 4.6 4.3 2 0 2002 2003 2004 2005 2006 2007 Fiscal Year F-88 2008 2009 2010 2011 Construction The University Procurement Office bids and awards construction contracts and issues field purchase orders on certain construction contracts awarded by the Board of Regents and funded through the University. In FY 2011 the University’s authority for local administration of construction contracts remained at $5,000,000. A comparison of construction awards for the past five years follows. Figures for minor construction orders ($5,000 or under) have been omitted. Fiscal Year Number of Construction Contracts Awarded Dollar Amount of Construction Contracts Awarded 2007 341 $55,388,883 2008 250 $29,005,150 2009 255 $31,770,175 2010 278 $42,162,046 2011 231 $34,785,751 A listing of construction contracts of $25,000 or more for the fiscal year is shown in Exhibit 3. SUMMARY OF FY 2012 GOALS Pursuing Cost Savings As always, a major goal of the Procurement Office is to pursue cost savings for the campus. By analyzing expenditures to ascertain trends, savings can be realized through strategic sourcing initiatives and the development of agency contracts for like or similar type items. This goal will be greatly facilitated through the implementation and ongoing use of UGAmart. Procurement will strive to increase the number of agency contracts and obtain catalog pricing from agency contract vendors to facilitate an enriched shopping environment within UGAmart. Agency contracts traditionally provide cost savings to the University through aggregation of spend resulting in discounted pricing from the vendors. UGAmart provides an online shopping experience populated with contract items allowing the University to direct more spend to established contracts and obtain greater value through a side-by-side comparison of products. The department will continue to provide data to DOAS State Purchasing as that office pursues strategic sourcing on statewide contracts. UGAmart The staff will continue to develop user guides to be posted along with video training and tutorials for campus users. F-89 Vendor Database The staff continues working to increase the number of suppliers in the new vendor database in order to facilitate utilization of UGAmart. The current input process is timeconsuming and labor-intensive, and an effort is underway to enable online data entry by suppliers. Procurement is working in conjunction with Accounts Payable and Enterprise Information Technology Services on this project. The staff will work with campus and vendors to upload additional vendors into the new vendor database and sync them to UGAmart. P-Card Changes The department will continue to provide P-card and WORKS training on a monthly basis, as well as to meet unique individual needs. P-card policies and procedures will be updated as needed, and the staff will continue to monitor transactions to ensure ongoing compliance with the P-card policies and procedures. In accordance with DOAS and BOR policy, P-card refresher training is ongoing. The staff will meet with State Purchasing Department representatives as needed. Training Procurement will continue to avail itself to training offered by the DOAS State Purchasing Department (SPD). Procurement staff holding a “professional” title will be taking classes and exams to strive towards SPD certification or to retain their certification. Promoting Business with Small and Minority-Owned Businesses Procurement continues to strive to gain exposure to small and minority businesses. The department also plans to hire a business development coordinator to enhance awareness of small and minority vendors across campus. Statistical Information The following exhibits depict Procurement activities during the fiscal year: Exhibit 1 Exhibit 2 Exhibit 3 Exhibit 4 Exhibit 5 - Report of Supply Contracts for FY 2011 - Report of Unauthorized Purchases During FY 2011 - Report of Construction and Public Works Contracts of $25,000 or more for FY 2011 - FY 2011 Purchasing Volume in Dollars - FY 2011 Purchasing Volume by Orders Organization Chart F-90 EXHIBIT 1 REPORTS OF SUPPLY CONTRACTS For the Fiscal Years 2010 – 2011 I. FY 2010 FY 2011 Percentage Change 12,640 378 0 1,286 169 0 14,473 21,899 0 0 0 192 0 22,091 73 -100% 0% -100% 14% 0% 53% 48% 55% 38,812,334 373,014 0 2,291,916 930,812 0 42,408,076 46,647,630 0 0 0 1,162,438 0 47,810,068 26% 27% Comparative Volume: Number of Contract Releases Procurement Campus Scientific Stores Central Office Supply Central Research Stores Physical Plant Printing Department Total Number of Releases Number of Releases as a Percentage of Total Formal Orders Dollar Amount of Contract Releases Procurement Campus Scientific Stores Central Office Supply Central Research Stores Physical Plant Printing Department Total Dollar Amount of Releases Dollar Amount as a Percent of Total Formal Orders Dollars 20% -100% 0% -100% 25% 0% 13% EXHIBIT 2 Report of Unauthorized Purchases Description FY 2010 FY 2011 No. of Unauthorized Purchases 171 153 No. of Unauthorized Purchases as a .09% .07% Percentage of Total Purchases Dollar Amount of Unauthorized Purchases 1,585,024 1,301,613 Dollar Amount of Unauthorized Purchases as .74% .48% a Percentage of Total Dollar Purchases Average Dollar Amount of Unauthorized 9,269 8,507 Purchases % Increase/Decrease -10% -22% -18% -35% -8% *Note: Unauthorized purchase data was not maintained for the months of July and August 2009 (FY 2010). F-91 EXHIBIT 3 Page 1 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Above and Beyond Professional Services $65,045.00 Exterior Painting and Pressure Washing $76,716.00 Interior Painting, Building 1512 $31,400.00 $241,853.00 $739,207.00 $60,000.00 $100,000.00 All Painting Contractors, Inc. All Painting Contractors, Inc. Anderson Development & Construction, Inc. Anderson Development & Construction, Inc. Anderson Development & Construction, Inc. Athens-Clarke County Unified Government Dept. of Public Works Bilmar Bona Fide Construction and Renovation Bona Fide Construction and Renovation Bona Fide Construction and Renovation Bon Building Services, Inc. Project Description Interior Painting, Family and Graduate Housing Fire Truck Access Improvements at the Davison Life Sciences Complex Furnish and Install Chilled Water Extension, Snelling Hall to Georgia Center Ground Floor Renovation of Tanner Building Construction Management Agreement Repair and Repave Green Park Drive and Parking Area E-12 $40,000.00 *Unit Cost Contract, Asbestos Abatement $44,677.80 $124,900.00 $38,899.00 $274,969.00 F-92 Re-roof J.W. Fanning Institute, BOR Building #1675 Window Renovation and Storm Sash Installation, Candler Hall Rock Eagle Senior Pavilion Outdoor Dining Renovation Rock Eagle Sutton Hall Renovation, Phase 1 EXHIBIT 3 Page 2 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Bone Dry Roofing Co. $115,500.00 Bone Dry Roofing Co. Bone Dry Roofing Co. $208,000.00 Bone Dry Roofing Co. $202,300.00 Bone Dry Roofing Co. Bone Dry Roofing Co. Bone Dry Roofing Co. Brasfield & Gorrie, LLC Brasfield & Gorrie, LLC CDB Construction, Inc. CDB Construction, Inc. Dalton Carpet DSI Construction Group DSI Construction Group DSI Construction Group Contract Amount Project Description Rock Eagle Talmadge Auditorium Re-roof $36,495.00 $219,000.00 Furnish and Install Labor and Materials to Reroof Vet-Med 6 - BOR Building #1073 Furnish Labor and Materials to Re-roof Poultry Science - BOR Building #1013 Furnish and Install Re-roof, Performing Arts Center Partial Re-roof, Ramsey Center $117,500.00 Re-roof Peabody Hall $141,000.00 Partial Re-roof, Brooks Hall $330,491.00 Hull Street Realignment, Contract A $350,000.00 $32,414.00 $58,414.00 $263,900.00 $330,200.00 $1,500,000.00 $62,700.00 F-93 Expansion of Vision Clinic at University Health Center Countertop Replacement, Building 1512 Live-In Staff Apartment Renovation, Boggs Hall Furnish and Install Flooring and Wall Covering for the Georgia Center, Building 1640 Ground Floor Renovation of Park Hall Construction of Childcare Center, Health Sciences Building Construction Management Agreement Live-In Staff Apartment Renovation, Morris Hall EXHIBIT 3 Page 3 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Dusty Greer Roofing $269,000.00 $113,740.00 $181,000.00 $894,250.00 $360,156.19 $27,807.50 $46,500.00 $99,160.69 $264,210.50 $299,500.00 $27,683.00 $26,570.00 $158,934.00 Engineered Restorations, Inc. E. Sam Jones Distributor E. Sam Jones Distributor Essential Energy Services Federal Signal Corporation Fortis Contracting Group LLC Fortis Engineering Solutions, LLC Fortis Engineering Solutions, LLC Garrard Construction Group Inc. Garrison Construction Co., Inc. Georgia Atlantic Contractors Georgia Atlantic Contractors F-94 Project Description Re-roof Hodgson School of Music Caldwell Hall Masonry Distress Repairs ARRA Lighting Upgrades - South Campus Parking Deck ARRA Furnish and Install Lighting Upgrades, Main and Science Libraries ARRA Lighting Upgrades - Griffin Campus, 22 Buildings Furnish and Install Outdoor Warning Siren Aderhold Hall Smoking Pavilion and Concrete Paving Rock Eagle Water Main Replacement, Phase IV Rock Eagle Water Treatment Building Renovations for Food Science Building Teaching Labs Clear-Span Steel Shelter for Plant Genetics Resources Conservation Unit Furnish and Install Concrete Cutting and Coring Task Order Release Furnish and Install Electric Labor - Family Housing Building P Task Order Release EXHIBIT 3 Page 4 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Georgia Atlantic Contractors $588,899.00 $28,526.00 $25,377.00 $128,404.00 $76,350.00 $31,031.00 $54,574.00 $34,448.00 $160,798.00 $100,921.00 $1,140,847.00 Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors F-95 Project Description Improve Fire Truck Access, Pedestrian Amenities and Storm Water Management in Performing and Visual Arts Center Quad Install Owner Furnished UPS and Additional Work Task Order Release ADA Ramp and Railing Task Order Release Furnish and Install Exterior and Interior Renovation Task Order Release Remove and Replace HVAC System, Room 101, Thomas Street Art Building Task Order Release Renovations for Jewelry Department Task Order Release Repair Metal Panels and Add HVAC System, Radiation Storage Building Task Order Release Furnish and Install Equipment Room and Install Satellite Dish Task Order Release Furnish and Install Plumbing and Sewer Repairs at Sanford Stadium Task Order Release Furnish and Install New Pre-Engineered Metal Building, Center for Applied Isotope Studies Task Order Release Furnish and Install Storm Sewer Repairs, Grounds Department Task Order Release EXHIBIT 3 Page 5 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Georgia Atlantic Contractors $107,849.00 $89,532.00 $48,242.00 $247,354.00 $79,487.00 $372,451.00 $901,700.00 Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Georgia Atlantic Contractors Gwinnett Sprinkler Company Hill Company Industrial Mechanical, Inc. John F. Pennebaker Co., Inc John F. Pennebaker Co., Inc John F. Pennebaker Co., Inc Project Description Furnish Electrician Labor at Family Housing Building P Task Order Release Install Cooling Fans for Greens for University Golf Course Task Order Release Maintenance Upgrade, 1st and 2nd Floors of Four Towers Task Order Release Renovations, Alpha Chi Omega Task Order Release Renovations to Suite 143 and Room 135, Journalism Task Order Release Carpet and Painting Throughout Building, Rivers Crossing Task Order Release Psychology - Journalism Buildings Fire Protection Sprinkler System $99,046.69 De-humidification Equipment - Creswell Hall $40,000.00 **Unit Cost Contract, Asbestos Abatement $106,199.00 $738,000.00 $980,868.00 F-96 Furnish and Install Emergency Cooling for UPS Rooms, Boyd Grad ARRA Furnish and Install Riverbend, Vet Med, Science Buildings Chilled Water Improvements ARRA Furnish and Install Griffin Campus Melton Building HVAC Upgrades EXHIBIT 3 Page 6 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Johnson USA $105,700.00 $860,000.00 $2,275,000.00 $1,125,000.00 $203,480.00 $28,656.00 $58,000.00 $715,000.00 MCG Mechanical, Inc. $409,100.00 Melton Painting, Inc. $172,680.00 $103,041.00 Partial Re-roof of Moore College $120,000.00 Re-roof McPhaul A-D Buildings (Total of 4) $48,851.00 Juneau Construction Company Juneau Construction Company Juneau Construction Company Klein Contracting Corp L.A. Brett & Sons, Inc. Malone Design/Fabrication Martin Mechanical Contractors, Inc. Midwest Maintenance, Inc. Midwest Maintenance, Inc. MSI F-97 Project Description Furnish and Install Electrical Switchboards, Journalism and Psychology Buildings HVAC Renovations for Payne Hall Renovation of the Mary Lyndon Residence Hall Construction Management Agreement Masters Hall Renovations for the Georgia Center (Building #1640) Furnish and Install Re-roof, Ramsey Volleyball Area Irrigation Installation, Midville Design and Construction of a New Trophy Display Case for the Swim/Dive Team at the UGA Ramsey Center ARRA Steam Pipe Insulation - North Campus HVAC System Replacement for the Law Library Annex (Building No. 0043) Zolatone Treatment of Cabinets, Creswell and Russell Halls Furnish and Install Partial Re-roof, Science Library EXHIBIT 3 Page 7 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Multiplex, LLC $43,734.00 Multiplex, LLC $113,000.00 Multiplex, LLC $101,236.00 Multiplex, LLC $32,936.00 Multiplex, LLC $110,214.00 Multiplex, LLC $47,071.00 Multiplex, LLC $26,982.00 Multiplex, LLC $31,645.00 Multiplex, LLC $26,803.00 Multiplex, LLC $104,499.00 Multiplex, LLC $25,510.00 F-98 Project Description Furnish and Install New Window, Family Housing Building P Task Order Release Furnish and Install Pavilion Behind Building P, Family Housing Task Order Release HVAC Upgrade Task Order Release Furnish and Install Structural Repairs and Additional Work Task Order Release Furnish and Install Sprinkler System, Underground Main, Asphalt Repair, 6" Water Tap, and Concrete Cutting/Coring Task Order Release Furnish and Install Re-roof, Ag Services Lab Task Order Release Furnish and Install HVAC Rezoning at Grad Studies Task Order Release Furnish and Install Coils at Ramsey Center Task Order Release Furnish and Install Plumbing Upgrades at Crop and Soil Greenhouse Task Order Release Furnish and Install Replacement Carpet at Tate Center Task Order Release Furnish and Install ADA Sidewalk, Central Campus Task Order Release EXHIBIT 3 Page 8 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Multiplex, LLC $228,992.00 Multiplex, LLC $32,630.00 Multiplex, LLC $37,677.00 Multiplex, LLC $120,956.00 Multiplex, LLC $221,010.00 Multiplex, LLC $900,000.00 Multiplex, LLC $34,410.00 Multiplex, LLC $78,704.00 Multiplex, LLC $64,600.00 Multiplex, LLC $36,000.00 Multiplex, LLC $37,158.00 F-99 Project Description Furnish and Install Remove and Replace Roof, Oglethorpe Dining Task Order Release Furnish and Install High Performance Fume Hood, Chemistry Task Order Release Re-roof Poultry Diagnostic Research Center Tech Services Building Task Order Release HVAC Upgrade, Wood Utilization Lab Task Order Release Remove and Replace Roof at Oglethorpe Dining Task Order Release Renovation of 1324 South Lumpkin for the International Education Department Construction Management Agreement Landscaping, Family Housing Office Task Order Release Correct Moisture Problems at the Center for Applied Technologies Task Order Release Furnish and Install Renovations to Rooms 401, 403 and 415, Aderhold Hall Task Order Release HVAC Controls Upgrade, East Campus Housing Task Order Release Renovations to Journalism Building, Room 309 Task Order Release EXHIBIT 3 Page 9 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Multiplex, LLC $52,696.00 Multiplex, LLC $115,477.00 Multiplex, LLC $49,081.00 Multiplex, LLC $658,000.00 $40,430.00 Premier Elevator Co. $224,000.00 R. L. Construction $195,435.00 Rob Griggs $36,000.00 $139,598.00 $63,945.00 $53,943.00 $2,187,196.00 Poultry Technical Services, Inc. Safe Aire Heating & Cooling Co., Inc. Sams Co Heating & Air, Inc. Smith Steel Structures, Inc. Spacesaver Storage Systems, Inc. F-100 Project Description Renovations to Rooms 22C and 29, Ecology Building Task Order Release HVAC Upgrade at Poultry Diagnostic Research Center Task Order Release Renovation and Conversion to a Server Room at the Psychology Building, Room 127 Task Order Release Renovations to Thomas Street Art Complex for Jewelry and Metals (Building Nos. 2600, 2606 and 2680) Furnish and Install Ventilation and Correct Electrical Codes, Poultry Brooding House E Furnish and Install Elevator Modernization, 2 Traction Elevators at Psychology Marine Extension Dormitory Storefront Replacement, Skidaway Island Furnish and Install Crushed, Ground Concrete on Animal Science Drive at the Animal and Dairy Science Farm Tifton BSL III Lab HEPA Filtration System Fresh Air Equipment Installation, Creswell Hall Three Lean-to-Shelters for the Vidalia Onion Research Center Furnish and Install Steel Shelving and Mechanical Guide System, Special Collections Library EXHIBIT 3 Page 10 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Southern Flooring & Interiors, Inc. $344,899.00 $86,772.00 $571,711.76 Strack, Inc. $467,900.66 Structural Resources $58,500.00 $631,782.00 $73,523.90 $121,000.00 $259,600.00 Trison Group, Inc. $41,982.02 Trison Group, Inc. $31,540.91 Trison Group, Inc. $29,887.42 Southern Roof and Wood Care, Corp. Stiles Heating & Cooling, Inc. Suncoast Restoration and Waterproofing Sylvania Lighting Services ThyssenKrupp Elevator ThyssenKrupp Elevator TMS South, Inc. $21,025.00 F-101 Project Description Carpet/Vinyl Replacement, Building 1512 Re-roof Buildings 100, 200 and 300 at Jekyll Island 4-H Center Vet Med Building #10 CVM Anatomy Lab HVAC Replacement River Road Sanitary Sewer Rehabilitation, Lines A, B and C Accessible Route Improvements, Various Locations UGA Parking Deck Restoration ARRA Lighting Upgrades - Georgia Center and Veterinary Medicine Animal Quarters Furnish and Install Elevator Modernization, One Traction Elevator, Forestry Furnish and Install Elevator Modernization, Two Hydraulic Elevators, Conner Hall Shower Door Installation, Brumby Hall Install Elevator at the Cowart Building per UGA Drawings and Specifications Task Order Release Demolition and Construction of Redding Building Labs 268 and 219, Griffin Campus Task Order Release Demolition and Installation of New Floor Coverings and Base at the Cowart Building, Griffin Campus Task Order Release EXHIBIT 3 Page 11 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount Trison Group, Inc. $32,661.91 Trison Group, Inc. $29,551.43 Trison Group, Inc. $35,483.87 Trison Group, Inc. $30,837.01 TSAV $195,700.00 $83,616.19 $30,129.97 $106,649.40 $173,200.25 $101,800.00 Tyson Steel Building Products Tyson Steel Building Products Tyson Steel Building Products Unified Government of Athens-Clarke County WBM Construction, Inc. F-102 Project Description Demolition and Construction of Labs 252, 120 and 118 in the Redding Building Task Order Release Remove and Re-install Gypsum Board Walls, ACT Ceilings, Repaint Area, Add Doors, Relocated Sprinkler Lines, and Remove/Reinstall Floor, Griffin Campus Task Order Release Demolition and Installation of New Metal Roof for Mule Barn Task Order Release Renovations in the Stuckey Building, Rooms 136-139, 141-143, and 146-148 Task Order Release Fine Arts Theater Performance Audio and Video System Furnish and Install Chicken House Shelter in Plains Furnish and Install Pre-Engineered Metal Equipment Storage Shelter for the NW Georgia Research and Education Center in Rome Furnish and Install Warehouse Facility in Plains Assorted Materials for Roadway, Sidewalk Crossing, Drainage and Traffic Control Signal Upgrades at Intersection of CloverHurst Ave., Finley St. and University Court Jekyll Island 4-H Center Dormitory Window Replacement EXHIBIT 3 Page 12 of 12 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in FY 2011 Executed Agreements Over $25,000 Contractor’s Name Contract Amount WBM Construction, Inc. $49,800.00 $63,255.42 $78,049.00 $1,313,922.00 $487,961.00 $698,000.00 Weatherproofing Technologies, Inc. Webster Construction Company Whiting-Turner Contracting Company Whiting-Turner Contracting Company Woodwind Construction Company **Not to Exceed F-103 Project Description Bathtub Replacement, Building 1512 Furnish and Install New Storage Building at the Ramsey Center Under DOAS EZIQC Contract #GA01-111908-WTI-2010 Furnish and Install Phase II Upgrade of the Commodity Feed Storage Shelter, Building No. 4789 Renovation of 3rd Floor of the Pharmacy Facility Construction Management Agreement Improvements to Directional Airflow at ABSL and BSL 3AG Labs, Animal Health Construction Management Agreement Hull Street Realignment, Contract B EXHIBIT 4 FY 2011 PURCHASING VOLUME BY TYPE OF ORDER Total Dollars: $270,370,216 Cash <$500 2.9 Supply Contract 47.8 Other Procurement 97.8 P-Card 28.0 Construction 34.8 Books & Perishables 8.1 Check Request 50.9 MILLIONS OF DOLLARS F-104 EXHIBIT 5 FY 2011 PURCHASING VOLUME BY TYPE OF ORDER Total Orders: 208,244 Other Procurement 17.7 Construction 0.2 Check Request 44.3 Books & Perishables 1.7 P-Card 107.0 Supply Contract 22.1 Cash < $500 15.2 Thousands of Orders F-105 PURCHASING, PAYABLES AND DISBURSEMENTS PROCUREMENT OFFICE ORGANIZATION CHART Procurement Officer Annette Evans Assistant Donna Dorsey Admin Assoc II Sarah ConkinAnderson Assistant Procurement Officer Chad Cox Sr. Procurement Specialist (Vacant) Sr. Procurement Specialist Jessica Beri Sr. Procurement Specialist Claire Boyd Pcard Administrator Jill Haag Assistant Christy McLendon Pcard Administrator Lynn Stephens Assistant (Vacant) Procurement Specialist Angela Varnes Procurement Specialist Elizabeth Lemerande Associate Procurement Specialist Don Layton Procurement Specialist Lauren Muth Procurement Specialist (Vacant) Procurement Specialist Katy Stephens Associate Procurement Specialist Josephine Westman Associate Procurement Specialist Krista Casto F-106 Associate Procurement Specialist Kristen Miller Procurement Specialist Deanna Wang Procurement Specialist Amanda Pruitt