19
20
21
22
23
Split AirConditioner
(2 T)
AirConditioningPlant
Lifts
External light & sign
Board
Any Others
(a) Total Sanctioned Load in KW:
(b) Total Connected Load in KW:
(c) Whether Sanctioned Load is less than the connected load:
(d) Has branch/offices applied for additional load (If Answer is 'NO' of above C):
(e) Has branch paid any penalties for excessive load:
(f) Electrical Load Utilizations:
(Separate for each electrical meter)
(g) Electrical Load on UPS (separate for each UPS):
(h) Incoming Main (Separate for each electrical meter)
(I) Installed Generator Capacity (KW):
2
3
4
1
(J) Percentage of Generator Load of Total connected load: c.
Main Panel measurements:
S.No
Description Volt(V) Current (A)
R y B N R Y B N
Power(W) Remarks
Electrical Safety Audit (GSAD, PNB)
.
is
.
2
,
--
'"
'"'""
~
/"
.r-
.....
D.
"
(i) Whether Distribution of load is done and is satisfactory:
(ii) Condition of Electrical Wiring:
(iii) Type/Quality of wiring used:
(iv) Electrical wiring layout:
(v) No. of MCBs and ELCBs:
(vi) Whether MCBsand ELCBare of required ratings:
(vii) Whether Electrical Equipment are BIS mark
(viii) Rating of fuses/Junction Box:
(ix) Whether rating of fuses/Junction Box are correct:
(x) Whether Single Isolating switch available for whole premises:
(xi) Whether Earthling is done properly to equipment:
(xii) No. of Earthling Pits available:
(xiii) Voltage Between Neutral to Earth:"
--
(Should be less than 0-3 volt)
-
(xiv) If connection is available on HT then
Condition of transformer & HT panel: a) Last maintenance done:
(xiv) Any other information:
Electrical Safety Audit (GSAD,PNB)
3