Appendix I List of Geotechnical Features

advertisement
(Sample)
MAINTENANCE MANUAL
MM (H) XX/201Y
FEATURE NO. 11SE-A/ND12
BRAEMAR HILL ROAD,
NORTH POINT
AUTHOR
This manual has been prepared for the sole and specific use of the
Government of the Hong Kong Special Administrative Region. Any other
persons who use any information in it do so at their own risk.
October 2013
Landslip Preventive Measures Division 2
GEO
Maintenance Manual No. MM XX/201Y
Revision Record
Revision
Date
number
B
7/201Y
A
1/201Y
Description
Prepared
Checked
Approved
General revision to format
General revision to format
ABC
DEF
GHI
2
Maintenance Manual No. MM XX/201Y
Foreword
Feature No. 11SE-A/ND12 is situated at Braemar Hill
Road, North Point.
LPM Division 2 of the Geotechnical Engineering Office
(GEO), Civil Engineering and Development Department
(CEDD) carried out / [Name of Consultant] was commissioned
by the Geotechnical Engineering Office (GEO), Civil
Engineering and Development Department (CEDD) under
Consultancy Agreement No. CE XX/YYYY (GE) to carry out*
a Stage 3(H) Study (Stage 3(H) Report No. S3(H)R xx/yyyy) for
the Natural Terrain Hazard Mitigation Measures.
This Maintenance Manual summarizes the LPMit works
carried out and the maintenance requirements of the NS/ND*
feature. This Manual also contains the results of the design
review during construction. Depending on the outcome of the
review, the design model finally adopted and therefore shown in
this report may be different from that in the corresponding Stage
3(H) Study Report.
(
)
Chief Geotechnical Engineer/LPM Division 2
*Approved by: ________________________
<Name>
Project Director
[Name of Consultant]
*Delete as necessary.
3
Maintenance Manual No. MM XX/201Y
Contents
Page
No.
PART 1
General Advice
5
PART 2
Recommended Maintenance
6
PART 3
Contract/Works Details
8
PART 4
Record Sheets and As-built Drawings
9
Appendix I
List of Geotechnical Features
10
Appendix II
Location Plan of Geotechnical Features Listed in Appendix I
12
Appendix III
Records of Geotechnical Features Listed in Appendix I
14
Appendix IV
Records of Routine Maintenance Inspections and Works
20
Appendix V
Details of Contract and Summary of LPMit Works Carried
Out
26
Appendix VI
Design Approach, Parameters and Method of Analysis
28
Appendix VII
Verification of the Design Geological Model
30
Appendix VIII
Brief Records of Construction Review
32
Appendix IX
Summary of Previous Studies Carried Out
34
Appendix X
As-built Drawings
36
Appendix XI
Other Specific Maintenance Requirements for the
Geotechnical Features
39
Certificate of Design and Completion of Geotechnical
Features
40
GEO Checking Certificate for Geotechnical Features
43
APPENDICES
GCD 103
GCD 104
4
Maintenance Manual No. MM XX/201Y
This maintenance manual consists of four parts:
PART 1
General Advice
1.1
The list geotechnical features (see Appendix I) and their locations (see Appendix II), at
Braemar Hill Road, North Point for which you have maintenance responsibility have been
constructed under the Landslip Prevention and Mitigation Programme (LPMitP) managed by the
Geotechnical Engineering Office (GEO), Civil Engineering and Development Department.
1.2
Maintenance requirements for natural terrain hazard mitigation measures, i.e. NS (i.e.
stabilization measures constructed on natural hillside to prevent failure) and ND (i.e. defense
measures to contain landslide or boulder fall from the natural terrain above) features are provided
in Geoguide 5 - Guide to Slope Maintenance (2003) published by the GEO.
1.3
Maintenance departments were informed by the GEO on 9 August 2013 that Routine
Maintenance Inspections (RMIs) are no longer necessary for soil-nailed hillsides completed
under the LPM or LPMit Programme, but inspection and maintenance of existing maintenance
staircases and drainage channels at soil-nailed hillsides will still be required.
1.4
Where maintenance departments are required to undertake tree risk assessment and/or
landscape maintenance in connection with the maintenance of natural terrain hazards mitigation
works, they should refer to the latest guidelines for Tree Risk Assessment issued by
Development Bureau and GEO Publication No. 1/2011 respectively.
1.5
Maintenance departments are urged not to replace vegetation on NS feature by chunam or
sprayed concrete as part of routine maintenance works. WBTC No. 25/93 includes guidelines on
the ‘Control of Visual Impact of Slopes’.
1.6
For the continued satisfactory performance of the NS/ND features, regular maintenance
including the upkeep of their physical integrity is essential, and the recommendations contained
in the relevant Circular/Geoguide/GEO Publication should be followed.
1.7
This manual provides information and specific advice for your future maintenance of the
NS/ND features. You should follow the specific recommendations on maintenance given in Part
2 of this Manual.
1.8
Parts 3 and 4 of this Manual provide you with the construction details and other relevant
information for your maintenance works.
5
Maintenance Manual No. MM XX/201Y
PART 2
Recommended Maintenance
2.1

Routine Maintenance Inspection to be carried out once every year/ xx years (Note 1);
(Others to be specified) (Note 2);
2.2
Routine Maintenance Inspection
Routine Maintenance Inspections should preferably be carried out between October and
February, and any required maintenance works should be completed before the onset of the wet
season in April. These maintenance inspections should be undertaken by your Assistant Clerk of
Works, Technical Officer, Works Supervisor or above, as appropriate, who should make
recommendations with regard to the following maintenance items (such inspecting officers are
expected to have the knowledge of and experience in recommending the list of maintenance
items):
1

clearance of accumulated debris from drainage channels, catch trenches and pits,
containment basins and straining structures;

removal of accumulated debris behind the debris/rockfall resisting barriers(Note 3);

repair of or replacement of damaged/corroded components of the debris/rockfall
resisting barriers;

repair of cracked or damaged drainage channels or maintenance access;

repair of or replacement of rusted steel furniture;

removal of any vegetation that has caused severe cracking of drainage channels or
hard surface;

unblocking weep-holes and drainage outlet;

repair of or reinstatement of the ground adjoining the measures if affected by
severe erosion;
Refer to paragraph 1.3 of this Manual and Sections 7.3 and 7.4 of Geoguide 5 (3 rd Edition)
2
Engineer inspections for Maintenance are not normally required unless specified by the designer or in special
provisions. Geoguide 5 (3rd Edition) Section 7.5 refers.
3
For flexible barriers, an immediate maintenance inspection should be carried out after the occurrence of
landslide. Arrangement should be made to clear the landslide debris as quickly as possible in order to avoid
potential instability due to prolonged period/accumulation of surcharge, and to ensure the continuing functioning of
the flexible barriers.
6
Maintenance Manual No. MM XX/201Y

repair of or reinstatement of the pavement of the vehicular maintenance access;

repair of/notification to relevant parties of leaky exposed water-carrying service;
(others to be specified to upkeep the integrity and function of the measures, e.g.
specific maintenance requirement from the supplier of any defense measures).
Records of the geotechnical features (see Appendix III) and records of routine
maintenance inspections and works (see Appendix IV) should be properly made and kept.
In cases where unusual conditions or problems are observed during routine maintenance
inspections or immediate maintenance inspections, e.g. a check dam filled up with a large
amount of landslide debris or significant movement observed at boulders supported by buttresses,
the owner or the party required to maintain the mitigation measures should seek advice from a
professionally-qualified geotechnical engineer and inform the Landslip Investigation Section of
LPM Division 1 of GEO.
2.3
Other Specific Maintenance Requirements for the Geotechnical Features
Details shall refer to Appendix XI.
7
Maintenance Manual No. MM XX/201Y
PART 3
Contract/Works Details
3.1
The details of the Contract and a summary of the LPMit works carried out are given in
Appendix V.
8
Maintenance Manual No. MM XX/201Y
PART 4
Record Sheets and As-built Drawings
4.1
The records of geotechnical features given in Appendix III provide detailed information
with regard to:

Technical information such as types, number and the dimensions of
stabilization/defense measures adopted;

Location plan and site plan showing the extent of the geotechnical features to be
maintained;

Layout plan of water-carrying services on or adjacent to the geotechnical features;

Record photographs.
4.2
The following drawings are the as-constructed drawings for the slope and are given in
Appendix X:

Drawing No.

Drawing No.
9
Maintenance Manual No. MM XX/201Y
Appendix I
List of Geotechnical Features
10
Maintenance Manual No. MM XX/201Y
Appendix I
List of Geotechnical Features – Submissions and File Reference
Consultant’s File Ref. No.
GEO’s File Ref. No.
Relevant Documents Checked
GEO Feature
No.(1)
Drg. No.
Report Title
Memo Reference
Memo Reference
and Date of
and Date of
Documents
Checker's
Submission to
Comments
Checker
Remarks
Notes:
(1)
If GEO Feature No. is not available, provide a reference no. shown in the location plans at Appendix II.
11
Maintenance Manual No. MM XX/201Y
Appendix II
Location Plan of Geotechnical Features Listed in Appendix I
12
Maintenance Manual No. MM XX/201Y
Outline the boundary of
natural hillside catchment and
highlight the extent of the
feature required maintenance
in this location plan with
different legend.
Appendix II – Location Plan of Geotechnical Features listed in Appendix I
13
Maintenance Manual No. MM XX/201Y
Appendix III
Records of Geotechnical Features Listed in Appendix I
14
Maintenance Manual No. MM XX/201Y
RECORDS OF GEOTECHNICAL FEATURE
(for NS/ND features)
(SHEET 1 OF 5)
GEOTECHNICAL FEATURE REFERENCE NO. (1)
LOCATION OF GEOTECHNICAL FEATURE
Map co-ordinates
Easting
(1980 DATUM)
Northing
Toe Elevation ( mPD)
TECHNICAL INFORMATION (Continue on separate sheets if necessary)
Stabilisation Measure (NS Feature) (2)
Defence Measure (ND Feature) (3)
Type of Stabilisation
Measures
Type of Defence
Measures
Flexible barrier/ Rigid Barrier/
Earth Bund/ Others*
Design Retention
Material
Landslide Debris / Boulder *
Soil Nail/ Buttress/ Rock dowel/
Others*:
Number
Soil Nail
Retention Volume (m3)
if applicable
Face Angle
length (m)
Height (m)
Number
Length (m)
Buttress
Height (m)
Number
Manufacturer
Proprietary Product
Rock dowel
Energy Rating (kJ)
if applicable
Length (m)
Remarks
Model No.
Remarks
(e.g. warranty conditions)
(empirical/analytical design)
Brief description of
associated measures(4)
if any
Brief description of
associated measures(4)
if any
OTHER INFORMATION
Location and size of services:
Notes : * Delete as necessary
(1) Upon request, the Geotechnical Engineering Office can provide a geotechnical feature reference number if
applicable.
(2) Stabilisation measures (e.g. buttress and soil nail) constructed in the vicinity can be combined and treated
as one geotechnical feature for record and registration purposes.
(3) Use a separate Sheet 1 for each defence measure.
(4) The associated measures could be flexible barriers prescribed under the holistic risk mitigation strategy or
any other stabilization or defence measures prescribed with no analytical or empirical design. The feature
numbers for these associated measures should be included or otherwise traceable.
Appendix III – Records of Geotechnical Features Listed in Appendix I (Sheet 1 of 5)
15
Maintenance Manual No. MM XX/201Y
RECORDS OF GEOTECNICAL FEATURE
(SHEET 2 OF 5)
GEOTECHNICAL FEATURE REFERENCE NO.
GEOTECHNICAL FEATURE LOCATION (ADDRESS)
INFORMATION ON CONSEQUENCE-TO-LIFE CATEGORY
What facilities will be affected if this geotechnical feature collapses (e.g. school, market, playground, highway,
country park, etc)?
AT CREST
(a) Type(s) of facility
(b) Distance(s)
AT TOE
(a) Type(s) of facility
(b) Distance(s)
Consequence-to-life category of the geotechnical feature (refer to PNAP 234) :
GENERAL INFORMATION
Date of ground investigation :
Date of construction :
Name & Address of Contractor :
Name & Address of Contractor :
Designed by (Firm) :
As-constructed drawing no.(s) :
Nearest raingauge(s)(1) :
Stability Assessment carried out
Evidence of checking by GEO
Remarks :
Record sheet prepared by :
Firm :
Signature :
Date :
Note: (1) Upon request, the Geotechnical Engineering Office can provide information about the locations
of raingauges.
Appendix III – Records of Geotechnical Features Listed in Appendix I (Sheet 2 of 5)
16
Maintenance Manual No. MM XX/201Y
RECORDS OF GEOTECNICAL FEATURE
(SHEET 3 OF 5)
GEOTECHNICAL FEATURE REFERENCE NO.
GEOTECHNICAL FEATURE LOCATION (ADDRESS)
LOCATION PLAN (with scale) AND SITE PLAN (1:1000)
Note : Any associated measures in connection with this geotechnical feature may be included in the plans.
Appendix III – Records of Geotechnical Features Listed in Appendix I (Sheet 3 of 5)
17
Maintenance Manual No. MM XX/201Y
RECORDS OF GEOTECNICAL FEATURE
(SHEET 4 OF 5)
GEOTECHNICAL FEATURE REFERENCE NO.
GEOTECHNICAL FEATURE LOCATION (ADDRESS)
LAYOUT PLAN OF WATER-CARRYING SERVICES ON OR ADJACENT TO GEOTECHNICAL
FEATURES (with date)
[Layout plan of water-carrying services on or adjacent to Geotechnical Feature No. XXXX]
Notes : All dimensions are in millimeters and all levels are in meters above Principal Datum
Appendix III – Records of Geotechnical Features Listed in Appendix I (Sheet 4 of 5)
18
Maintenance Manual No. MM XX/201Y
RECORDS OF GEOTECNICAL FEATURE
(SHEET 5 OF 5)
GEOTECHNICAL FEATURE REFERENCE NO.
GEOTECHNICAL FEATURE LOCATION (ADDRESS)
RECORD PHOTOGRAPHS (with comments, date and reference numbers)
Note : Add additional record sheets for photographs as necessary.
Photos for the associated measures in connection with this geotechnical feature may be included as
necessary
Appendix III – Records of Geotechnical Features Listed in Appendix I (Sheet 5 of 5)
19
Maintenance Manual No. MM XX/201Y
Appendix IV
Records of Routine Maintenance Inspections and Works
20
Maintenance Manual No. MM XX/201Y
RECORDS OF ROUTINE MAINTENANCE INSPECTIONS
(SHEET 1 OF 4)
GEOTECHNICAL FEATURE REFERENCE NO. (1)
Location (address)
Date of Inspection:
Weather Condition at Time of Inspection:
Maintenance Action Item
Location
Reference
Action
Required
No
Works
Completion
Date
Yes
Clearance of debris from drainage
channels, catch trenches and pits,
containment basins and straining
structures.
Removal of accumulated debris behind
the debris/rockfall resisting barriers.
Repair or replace damaged/corroded
components of the debris/rockfall
resisting barriers (e.g. wire ropes, anchor
ropes and posts, etc.).
Repair of cracked or damaged drainage
channels or maintenance access.
Repair or replace rusted slope furniture
(e.g. steel gates, boundary fences and
stairs).
Removal of any vegetation that has
caused severe cracking of drainage
channels or hard surface.
Unblocking weepholes and drainage
outlet
Repair or reinstate the ground adjoining
the measures affected by severe erosion
Repair or reinstate pavement of vehicular
maintenance access
Repair of/notification to relevant parties
of leaky exposed water-carrying service
Others (specify works and give details)
Recommended Date for Completion of Above Works:
Notes:
(1) Upon request, the Geotechnical Engineering Office can provide a feature reference number if applicable.
Appendix IV - Records of Routine Maintenance Inspections (Sheet 1 of 4)
21
Maintenance Manual No. MM XX/201Y
RECORDS OF ROUTINE MAINTENANCE INSPECTIONS
(SHEET 2 OF 4)
GEOTECHNICAL FEATURE REFERENCE NO.
SITE PLAN (Reference numbers should be assigned to locations of man-made items for
which maintenance works are required. The corresponding reference numbers should be
quoted in the photographic records.)
Notes:
(1) Add additional record sheets for site plan as necessary.
Appendix IV - Records of Routine Maintenance Inspections (Sheet 2 of 4)
22
Maintenance Manual No. MM XX/201Y
RECORDS OF ROUTINE MAINTENANCE INSPECTIONS
(SHEET 3 OF 4)
GEOTECHNICAL FEATURE REFERENCE NO.
Immediate advice from professionally-qualified geotechnical engineer needed (Yes/No)
(1)
?
Immediate arrangement for investigation and repair of exposed water-carrying
(Yes/No)
services needed?
OTHER OBSERVATIONS (continue on separate sheets if necessary)
Inspected by:
(Name of person undertaking inspection)
of
(Organisation)
Signature:
Date:
Due date of next inspection:
Received by:
(Name of owner or his authorised representative)
of
(Organisation)
Signature:
Date:
Note:
(1) Where unusual conditions or problems are observed, e.g. a check dam filled up with a large amount of
landslide debris or significant movement observed at boulders supported by buttresses, the case should be
reported to the owner or party responsible for the maintenance of the mitigation measures.
Appendix IV - Records of Routine Maintenance Inspections (Sheet 3 of 4)
23
Maintenance Manual No. MM XX/201Y
RECORDS OF ROUTINE MAINTENANCE INSPECTIONS
(SHEET 4 OF 4)
GEOTECHNICAL FEATURE REFERENCE NO.
RECORD PHOTOGRAPHS (with descriptions, date, and reference numbers as given on the
site plan)
Notes:
(1) Add additional record sheets for photographs as necessary.
(2) Record photographs should show in detail areas where maintenance works are required and be annotated
with descriptions.
Appendix IV - Records of Routine Maintenance Inspections (Sheet 4 of 4)
24
Maintenance Manual No. MM XX/201Y
RECORDS OF ROUTINE MAINTENANCE WORKS
(SHEET 1 OF 1)
GEOTECHNICAL FEATURE REFERENCE NO.
Maintenance works arranged by:
(Name)
of
(Organisation)
Signature:
Date:
Maintenance works carried out by:
(Name)
of
(Organisation)
Signature:
Date:
Maintenance works carried out on:
RECORD PHOTOGRAPHS (with descriptions, date, and reference numbers as given on the
site plan)
Notes:
(1) Add additional record sheets for photographs as necessary.
(2) For clearing debris from defence measures, e.g. check dam, the estimated volume of debris removed
should be recorded.
(3) Record photographs should show in detail areas where maintenance works have been carried out and be
annotated with descriptions.
(4) Record photographs before and after the execution of maintenance works should be taken from the same
vantage points.
Appendix IV - Records of Routine Maintenance Works (Sheet 1 of 1)
25
Maintenance Manual No. MM XX/201Y
Appendix V
Details of Contract and Summary of LPMit Works Carried Out
26
Maintenance Manual No. MM XX/201Y
DETAILS OF CONTRACT AND SUMMARY OF
LANDSLIP PREVENTION AND MITIGATION WORKS
(SHEET 1 OF 1)
GEOTECHNICAL FEATURE REFERENCE NO. 11SE-A/ND12
LOCATION (ADDRESS)
Braemar Hill Road, North Point
MAINTENANCE OFFICE
LANDSLIP PREVENTION AND MITIGATION CONTRACT DETAILS
Contract No:
GE/xxxx/yy
Contractor:
Works commenced:
Works completed:
Maintenance period expired on:
Brief Description of Works Carried Out
Appendix V – Details of Contract and Summary of LPMit Works Carried Out (Sheet 1 of 1)
27
Maintenance Manual No. MM XX/201Y
Appendix VI
Design Approach, Parameters and Method of Analysis
28
Maintenance Manual No. MM XX/201Y
DESIGN APPROACH, PARAMETERS AND
METHOD OF ANALYSIS
(SHEET 1 OF 1)
DESIGN APPROACH
PARAMETERS
Soil Type
Colluvium
Completely Decomposed Granite
Highly Decomposed Granite
STABILITY ANALYSES
Factor of Safety
Bulk
Weight Cohesion
3
(kN/m )
(kPa)
19
4
19
7
19
10
Before stabilization works
Angle of friction
(°)
28
37
40
After stabilization works
PLAN
Outline the design approach adopted and the method of analysis for the
stabilization/defence measure as appropriate
CRITICAL SECTION
Appendix VI – Design Approach, Parameters and Method of Analysis (Sheet 1 of 1)
29
Maintenance Manual No. MM XX/201Y
Appendix VII
Verification of the Design Geological Model
30
Maintenance Manual No. MM XX/201Y
VERIFICATION OF THE DESIGN GEOLOGICAL MODEL
Original Design
Verification / Amendments
during Construction
Date
(SHEET X OF Y)
Verified by
(Name/
Post/
Qualif.)
ign ic
s
e
ph
ed
a
h
r
t
og
of
t
o
n
ph
tio
,
a
n
c
ifi , wh e
c.)
t
r
e
e
d,
f v hom
e
o
s
s)
s
r
o
l
i
e
w
p
f
ex
re
eta g. by
s
d
2
i
.
o
ce
nd el (e.
a
N
a
f
s
e
ot
pe
ng
od
i
o
N
l
d
m
s
e
Fin gical n the ida nc
e
lo
u
geo ds wh ical G
or
hn
c
e
re c
T
O
(GE
Appendix VII – Verification of the Design Geological Model (Sheet X of Y)
31
Maintenance Manual No. MM XX/201Y
Appendix VIII
Brief Records of Construction Review
32
Maintenance Manual No. MM XX/201Y
BRIEF RECORDS OF CONSTRUCTION REVIEW
Design Details
Construction Review
Date
Fi
g
n
i
nd
s
c
d
n
a
h
(SHEET X OF Y)
Reviewed by Approved
(Name/
by
Post/
(Name/
Qualif.)
Post/
Qualif.)
s
e
g
an
Appendix VIII - Brief Records of Construction Review (Sheet 1 of 1)
33
Maintenance Manual No. MM XX/201Y
Appendix IX
Summary of Previous Studies Carried Out
34
Maintenance Manual No. MM XX/201Y
SUMMARY OF PREVIOUS STUDIES CARRIED OUT
Type of study
LPMit Consultant/GEO Division
Appendix IX - Summary of Previous Studies Carried Out
35
(SHEET 1 OF 1)
Date
Maintenance Manual No. MM XX/201Y
Appendix X
As-built Drawings
36
Maintenance Manual No. MM XX/201Y
[DRAWING NO. GED XXXXX/XX]
37
Maintenance Manual No. MM XX/201Y
[DRAWING NO. GED XXXXX/XX]
38
Maintenance Manual No. MM XX/201Y
Appendix XI
Other Specific Maintenance Requirements for the Geotechnical Features
39
Maintenance Manual No. MM XX/201Y
GCD 103
Certificate of Design and Completion of Geotechnical Features
40
Maintenance Manual No. MM XX/201Y
Certificate of Design and Completion of Geotechnical Features
(to be completed by Project or Maintenance Department/Office or their Consultants)
Name of Government Department/Office :
Name of Consultants :
Agreement No. and Title :
Contract No. and Title :
Appendix I : List of Geotechnical Features - Submissions and File Reference.
Appendix II : Location Plans of Geotechnical Features Listed in Appendix I
Appendix III : Records of Geotechnical Features Listed in Appendix I
Part 1 : Certificate of Design
We certify that :(a) we have exercised all reasonable skill and care to be expected of a professionally
qualified and competent person, experienced in work of a similar nature and scope, in
the performance of duties relating to the preparation, review, checking and certification
of the design and amendments of design of the geotechnical features as shown and
described in the submissions listed in Appendix I;
(b) the design and amendments of design shown in Appendix I complied with the relevant
standards at the time when they were carried out and an in-house independent check has
been undertaken and completed to confirm that they are complete, adequate, and valid,
and all conditions imposed under the Geotechnical Engineering Office’s checking
procedures in relation to these designs and amendments of design have been complied
with; and
(c) the design and amendments of design shown in Appendix I have been conveyed
accurately and completely to the Engineer for the Contract for execution.
Date :
Signed :
Name :
Designation:
Part 2 : Certificate of Completion
I certify that the geotechnical works for the geotechnical feature(s) listed in Appendix I have
been completed in accordance with the design and amendments of design as conveyed to me
by the designer.
Date :
Signed :
Name :
Designation:
GCD103 (1/2)
41
Maintenance Manual No. MM XX/201Y
Appendix I
List of Geotechnical Features - Submissions and File Reference
Consultant’s File Ref. No.
GEO’s File Ref. No.
Relevant Documents Checked
GEO Feature
No.(1)
Drg. No.
Report Title
Memo Reference
Memo Reference
and Date of
and Date of
Documents
Checker's
Submission to
Comments
Checker
Remarks
Notes:
(1)
If GEO Feature No. is not available, provide a reference no. shown in the location plans at Appendix II.
GCD103 (2/2)
42
Maintenance Manual No. MM XX/201Y
GCD 104
GEO Checking Certificate for Geotechnical Features
43
Maintenance Manual No. MM XX/201Y
File ref. :
To
(Project Office/Department)
GEO Checking Certificate for Geotechnical Features
Checking Certificate No.: ---
Agreement No. and Title :
Contract No. and Title :
GCD 102/103* Certificate of Stability Assessment / Design and Completion* of
Geotechnical Features (Submitted by the Consultant / In-house Design
Team*)
1.
I confirm that the stability assessment / design* of the geotechnical feature(s)
included in the Certificate of Stability Assessment / Design and Completion* of
Geotechnical Features as given in GCD 102/103* has been found to be satisfactory
under the Geotechnical Engineering Office's checking requirements.
2.*
(Other qualifying statements, in accordance with DPN 137, to be included as
appropriate, if any)
Date :
Signed :
(
)
Deputy Head of the Geotechnical Engineering Office
(Landslip Preventive Measures)
Civil Engineering and Development Department
* Delete whichever is not applicable.
GCD104 (1/1)
44
MM (H) XX/201Y