RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II TABLE OF CONTENTS A. Overarching Plans ……………………………………………….…………………...……………6 B. Standards & Assessments.………………………………………….…………………….......…..12 1. *Expand Lesson Study -(B)(3)(1).……..…………………...……….……………………………14 2. Expand STEM Career and Technical Program Offerings – (B)(3)4....………….…………….…16 3. Increase Advanced STEM Coursework – (B)(3)5….………………………….…………………19 4. Bolster Technology for Improved Instruction and Assessment – (B)(3)6 …………………….....24 5. Improve Access to State Data – (C)(2) …………………………………………...……………...27 6. Use Data to Improve Instruction – (C)(3)(i) and (iii)………………………………………….…30 7. Providing high-quality pathways for aspiring teachers and principals (D)(1)……………………43 8. Improve Teacher and Principal Evaluation Systems – (D)(2)(i)(ii)(iii)………………………….47 9. Ensure Use Data Effectively in Human Capital Decisions –(D)(3)…………………..………….56 10. Focus Professional Development – (D)(5)…………………………………………………….…61 11. **Drive Improvement in Persistently Low-Achieving Schools – (E)(2)1.-2…………………….68 12. **Implement Proven Programs for School Improvement – (E)(2)3………………………...……70 13. Charter schools and other innovative schools (F)(2)……………………………………..75 Grey = Not Applicable (MCSD does not have any persistently low performing schools) 1 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II APPENDICES Form A(1) ………………………………………………………………………………………80 Survey of Interest / Knowledge of IB ……………………………………………...………….91 IB Coursework ………………………………………………………………………..………..94 IB Implementation Plan ..………………………………………………………...……………98 Educational Performance Incentive Compensation (EPIC) plan …………………………100 Union Collaboration ………………………………………………………………………….133 Team Summary Vitas ……………………………………………..…………………….……135 Letter of School Board Support ………………………………………………………...……139 Evidence of Collaboration ……………………………………………………………………141 Conceptual Framework ………………………………………………………………………142 Milestones Chart ……………………………………………………………………………...143 Professional Development Tracking System ………………………………………………..144 Teacher Expectations …………………………………………………………………………145 Administrator Evaluation ……………………………………………………………………149 Charter Consent Letters ...………..…………………………………………………………..182 2 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II General This Final Scope of Work template provides a format for LEAs to provide quarterly detail for FY 2010/11 work plans, and strategic plans for years 2011/12, 2012/13, and 2013/14. As with all grants, it is envisioned that the strategic elements in the last three years of the work plan may be amended as LEAs work through initial implementation, more comprehensive planning, and the collective bargaining process. While collective bargaining should be a Supporting Activity in the Final Scope of Work where applicable, the bargaining does not have to be completed before the Final Scope of Work is submitted to or approved by the state. Unless otherwise indicated in the MOU, all timelines shall reflect a complete implementation for all schools before the end of the grant period. Template Overview The Final Scope of Work is divided into sections A through F. Section A asks LEAs to describe their overarching project plans and complete Form (A)1. LEA Student Goals and Measures (attached to this template). Sections B through F correspond to the MOU and require completion of Work Plan Tables. Please provide a Table of Contents for the Final Scope of Work. The budget will be completed using the same web-based system for ARRA money that LEAs should be familiar with. Specific instructions as well as the website link will be available at www.fldoe.org/arra/racetothetop.asp. An Appendix is allowed, and must include a Table of Contents. Appendices and page numbers must be referenced in the appropriate box of the Work Plan Table. Participating LEAs must address all applicable criteria of the MOU, now grouped into 13 Projects. A Work Plan Table is required for each of the following Projects: 1. Expand Lesson Study – (B)(3)1.* 2. Expand STEM Career and Technical Program Offerings – (B)(3)4. 3. Increase Advanced STEM Coursework – (B)(3)5. 4. Bolster Technology for Improved Instruction and Assessment – (B)(3)6. 5. Improve Access to State Data – (C)(2) 6. Use Data to Improve Instruction – (C)(3)(i) and (iii) 7. Provide Support for Educator Preparation Programs – (D)(1)(ii) 8. Improve Teacher and Principal Evaluation Systems – (D)(2)(ii)-(iii) 9. Use Data Effectively for Human Capital Decisions – (D)(2)(iv)(b)(c)(d), (D)(3), and (E)(2)4.-5. 10. Focus Effective Professional Development – (D)(5), (B)(3)2.-3., (C)(3)(ii), (D)(2)(iv)(a) and (D)(3)(ii)2. 11. Drive Improvement in Persistently Low-Achieving Schools – (E)(2)1.-2.** 12. Implement Proven Programs for School Improvement – (E)(2)3.** 13. Include Charter Schools in LEA Planning– (F)(2) *Required for LEAs with a persistently lowest-achieving school; optional for other LEAs. **Applicable only to LEAs with a persistently lowest-achieving school. 3 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II If an LEA can provide evidence that it has already satisfied an element, it must provide narrative as to how it was satisfied and attach evidence in the Appendix. Florida’s MOU was numbered to correspond to sections of the grant application required by USDOE (letters and numbers in parentheses) and FLDOE used bullets under each to indicate what would be required. Those bullets have now been changed to numbers or lowercase letters not in parentheses for easier reference, for example (B)(3)4. and (D)(2)(iv)(b)1.a. LEAs must describe their plan to address implementation of the criteria through the following items in the provided Work Plan Table: Project Goal (MOU requirement; pre-populated) Deliverables (minimum required evidence; pre-populated but LEAs are encouraged to add their own; intended to support Florida’s student achievement goals) Key Personnel Supporting Activities (be very specific for Year One) Timelines (i.e., Year One - quarterly, Year Two, Year Three, Year Four) Budget Summary (Budget detail must also be provided via web-based system) Sustainability Factors Supporting Narrative (optional) Appendices (if applicable) Receipt of Funds Funds will be available on a cash advance basis; however, the amounts available will be limited to those funds identified in the budgets (or amended budgets) needed for each quarter’s operation. FLDOE monitoring staff will track the submission of deliverables and coordinate the review of each deliverable. Should an LEA miss target dates for submitting deliverables and/or submit substandard deliverables, fiscal staff will review the district’s status and implement appropriate actions which could include further restrictions on the availability of funds, adjusted timelines, more frequent monitoring, etc. Submission Instructions • Return the information listed on the “Submission Checklist” electronically by 11:59 pm EDT on October 13, 2010. Earlier submissions are encouraged. • A signed, electronic copy in PDF format (excluding budget) must be sent to RaceToTheTop@fldoe.org. The budget must be completed in the web-based system. • A hard copy with original signatures (excluding budget) must be sent to Holly Edenfield, 325 West Gaines Street, Room 1502, Tallahassee, Florida, 32399. The hard copy must be received by October 15, 2010. 4 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Submission Checklist Form DOE 100A – Project Application (superintendent signature required) Attachment I – Program-Specific Assurances (superintendent signature required) Attachment II – Three-Party Assurances (superintendent, school board chair, and representative of local teachers’ union signatures encouraged) Form DOE 101-RTTT (Budget submitted in web-based system) Final Scope of Work: Table of Contents Section A Narrative Form (A)1. LEA Student Goals and Measures Work Plan Tables for 13 Projects Appendix with Table of Contents (if applicable) 5 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II A. OVERARCHING PROJECT PLANS 1. Describe the LEA’s comprehensive reform plan that connects and coordinates all of the assurance areas. Include (a) how the reform plan will support the state’s Theory of Action (highly effective teachers and leaders make the difference in student achievement, see pp. 11-12 of Florida’s application), (b) how the reform plan will contribute to the state’s student achievement goals (see pp. 24-34 of Florida’s application), and (c) the LEA’s current status with respect to the various reform elements, including strengths and challenges. Enter narrative for (A)1. here. Complete the attached Form (A)1. LEA Student Goals and Measures by setting LEA targets to address Florida’s Race to the Top student achievement goals. Monroe County School District (MCSD) will comply with all requirements and assurances set forth but the Florida Department of Education within the Race to the Top competition. (a) Theory of Action, the MCSD will complete a performance based incentive program for teachers & administrators that adheres to Florida Statute. Teacher and Administrators performance will be measured in part upon student achievement. (b) The MCSD plan aligns with the state achievement goals in a number of ways illustrated in the body of this grant application. (c) MCSD current status regarding the State’s Key Achievement Goals in the areas below are as follows: 1. Double the number of students entering college successfully 2. Cut the achievement gap by ½ by 2015 3. Increase the number of proficient at or above by 2015 beyond to or beyond the highest performing states Areas 1, 2, 3 are to be addressed in several ways. MCSD will create a high quality, rigorous international education opportunity for all its students by offering a district Pre-K-12th grade whole access International Baccalaureate (IB) continuum in each of three regions of the Florida Keys within the next five years. Once each school has received authorized status, MCSD will be Florida’s first IB school district. Current status of the MCSD with respect to the State’s plan are as follows: 1. Standard (B)(3)1, Expand Lesson Study – N/A Monroe County has no persistently low achieving schools Not required as MCSD currently has no “low achieving or persistently low achieving schools”. However Lesson study is part of our plan to improve instruction and student achievement woven into other areas of the application 2. Standard STEM (B)(3)4, (B)(3)5 Career and Technical – Fully developed plan included. We are developing a plan to address this area. We currently have an exciting biodiesel program that is fully functional and we hope to expand this project 6 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II as well as addition of other certification fields. 3. Standard (B)(3)6, (C)(3)(i)(ii) Technology to Improve Instruction – Narrative. We currently have many elements in place and they will be outlined in the narrative section of the application Standard (D) (1) Pathway for Aspiring Principals – Narrative We currently have an aspiring principals program that is explained it the narrative section of the application. 4. Standard (D)(2), (D)(2)(ii) Principal Effectiveness & Evaluations – Fully developed plan included. MCSD is working on a plan to implement a performance based incentive program based on Charlotte Danielson’s model. We have completed a great deal of collaboration with the stakeholders and union to begin the process already. 5. Standard (D) (3) Equitable Distributions of Effective Teachers and Principals – Narrative. Full details of the plan are included in this application 6. Standard (C)(3)(i) Data to Improve Instruction. We currently have many elements in place and they will be outlined in the narrative section of the application 7. Standard (D)(I)(ii) Educator Preparation Programs – Narrative. We currently have many elements in place and they will be outlined in the narrative section of the application as well as a full description under attachment 8 8. Standard (D)(2)(i)(ii)(iii) Teacher / Principal Evaluations MCSD is working on a plan to implement a performance based incentive program based on Charlotte Danielson’s model. We have completed a great deal of collaboration with the stakeholders and union to begin the process already. 9. Standard(D)(5) Professional Development – Narrative. We currently have many elements in place and they will be outlined in the narrative section of the application 10. (D)(5) Focus on Professional Development(D)(5) implementing the multiple elements of the Race to the Top project contains many professional development components throughout the plan. 11. Standard (E) (2) – (E)(2)3 Turning Around Low Achieving Schools – NA Monroe County has no persistently low achieving schools 12. Standard (E)(2)(3)Proven Programs for School Improvement N/A Monroe County has no persistently low achieving schools 7 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 13. Standard (F)(2) High performing Charters – Narrative APPROVED 2. Provide a detailed LEA-wide management plan for implementing Race to the Top. The plan should include but is not limited to: Involvement of all stakeholders (e.g., parents, teachers, administrators, local institutions of higher education as appropriate, teachers’ unions, business leaders, community organizations, etc.) Identification of the leadership/management team(s) Strategies for monitoring implementation An overall implementation timeline (i.e., Summary of Year One, Year Two, Year Three, Year Four). Detailed timelines are required in each Work Plan Table. Unless otherwise indicated in the MOU, all timelines shall reflect a complete implementation for all schools before the end of the grant period. A summary budget is required for all years of the grant period as well as detailed budgets for each activity within each reform area (submitted in web-based system). The release of funds will be contingent upon the successful progress toward completion of identified deliverables in the management plan and detailed budgets. Enter narrative for (A)2. here: Stakeholders in the application have been limited due to the time allotted to complete the application. However, the planning phase and in particular the performance based incentive plan will have a large component of stakeholder engagement. The Monroe County Educational Performance Incentive Compensation plan (EPIC) will require intensive collaboration between many stakeholders. The EPIC stakeholders are the district administrative team, teachers, union representation, school board and site administrators. Each of the aforementioned plays and important role in the development of the performance plan. The International Baccalaureate program (IB) also requires a large group of stakeholders in the process of becoming the first district in the state to achieve full pre-k-12 implementation. Stakeholder Roles Professional Development Committee - this team will consider the data elements, evaluation tools, the review process and individual needs to provide high quality professional development and will determine elements needed to assist in the awareness and implementation of the program. Education of stakeholders is a key element in our program. Each school will also have a committee member on the team so that all schools will have first-hand knowledge and input into the process. Current Professional Development Committee Members are: Linda Diaz (Title I Director), Fran Herrin (Principal), and Wendy McPherson (Assistant Principal) with others to be determined. Communication Committee - will create and analyze the communication needs of our teachers, administrators and community. Our goal is to share information regularly and in a concise manner which provides all the stakeholders ease of access to the project, the goals and the outcomes. The committee will also have a schedule and regular releases of information and will provide meeting notices in a variety of 8 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II formats. The Communication Committee Members are: Dr. Jesus Jara (Chief Operations Officer), Dr. Lesley Salinero (Director of Student Services & Project Director), Cheryl Allen (Human Resources Director) with others members to be determined. Teacher Focus Committee - each school will have a school-level point of contact. As part of the committee, they plan and process the ideas with their colleagues, determine obstacles and receive feedback to share with the project director and committees. Teacher Focus Committee Members are: Cheryl Allen (Director of Human Resources) with others to be determined. Career Placement Committee - will consider the levels and placement of new staff on the instructional and administrative career ladder.. The Career Placement Team will review the teacher performance-based indicators and growth measures as well as the evaluation tools and outcomes. The Career Placement Committee Members are: Dr. Lesley Salinero (Project Director), Dr. Jesus Jara (Chief Operations Officer), Fran Herrin (Principal), Cheryl Allen (Human Resources Director), with others to be determined. Data Management Committee - will review and analyze the evaluation instruments and growth measurement vendors available and assist the group in examining the data management tools. They will ensure that the measures selected are valid and reliable for use as performance-based measures. Data Management Committee Members are: Janet Meinke (Director of Assessment and Accountability), David Richardson (Director of Administrative Technology), David Murphy (Principal) with others to be determined. Timeline & Evaluation Committee - will be managed by a university management or evaluation consultant in order to provide objectivity and external controls to ensure management of the funding and resources follow federal guidelines and are performed in a transparent and effective manner. This committee will be essential in monitoring the timeline to keep the project moving at the scheduled pace and the evaluation process on track. The Timeline Committee Members will be determined. Implementation Timeline Year 1 IB – Teams of administrators and teachers from each high school will begin the IB training program and on-site trainings will be provided in the per certification process EPIC plan – The stakeholders (including union) will begin the process for evaluation of the plan and how to prepare the draft evaluation instrument. The teams will develop and implement the pilot evaluation including a validation to ensure that the results are reliable regardless of the observer. The evaluation will be modified as needed throughout the process. Training is a key component to this success; it is embedded at each stage. Careers STEM – The Adult Education coordinator will review programs and determine the most effective STEM career certification programs to consider. He will work with the high school administrators, students and families in the selection of the modules. 9 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Technology – in order to ensure our data management system is prepared and capable of the demands this first year will be assessing the capacity and training the IT staff on the new products. Year 2 IB – the second year many more staff we attend the required training and master schedules and staffing will be evaluated. The high school principals will review and plan for year 3 which is contingent upon our district being certified to be an IB district. EPIC plan- implementation, following year one pilot, verification and modification of the evaluation tool with a strong PD component imbedded. Each administration will again receive intensive training as will the staff to be evaluated using the new tool. Teachers & administrators will have their performance evaluated and tied in part to student achievement. For the first time, earning a milestone based on performance achievement from one category to the next will result in a significant incentive increase (see chart on page 139). The evaluation tool is projected to go “live” at the beginning of the 2011-2012 school year. Careers STEM- the Adult Education coordinator will have completed the review and discussions with stakeholders prior to purchase of the industry certifications. The starting point for implementation of the new courses is the 2011-2012 school year. Marathon High School will start a Building Construction STEM program during the 11-12 school year. Money from this year will also be used for the planning stages of a pre-engineering program at Key West High School through Project Lead the Way. Technology – further training is projected for the IT team in order to meet the demands of the many systems ensuring that the student data is adequately tracked with the teachers as part of the evaluation system. Beyond year two this need will be sustained by the district. Year 3 IB – the plan calls for the IB certification process to be in the final stages. Our district should have a solid core of teachers & administrators trained and ready to begin implementation. Attention will be paid to the careful construction of master schedules and adherence to the IB program requirements. Additional teachers & administrators will be trained as needed. EPIC plan- will now be in fully implemented. Teachers and administrators will be receiving performance based incentives based in part on student achievement. They will also receive a significant increase when milestones are achieved. The process will include semiannual PD with modifications and adjustments made annually. Careers STEM – the career options and industry certifications program will be up and running. Additional courses and certifications will be added based on student interests and certifications available. Project Lead the Way will be debut at Key West High School. Year 4 IB –expansion of the IB program to middle school. Training for K-8 and middle school administrators. Additional training and support for new teachers and administrators. Beyond year four this need will be sustained by the district. EPIC plan- the teacher incentive plan is fully functioning throughout the school district. . Professional development will continue to ensure that the tool is effectively utilized across the district. The evaluation team will begin to evaluate each programs success for final reporting. Beyond year four this need will be sustained by the district. 10 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Careers STEM- the career options and industry certifications program will be up and running. Additional courses and certifications will be added based on student interests and certifications available. Beyond year four this need will be sustained by the district. Coral Shores High School is projected to start a Biomedical STEM program. Summary Budget Year 1 $204,500.00 Year 2 $210,000.00 Year 3 $150,000.00 Year 4 $119,080.00 APPROVED 3. Indicate steps that the LEA will take to evaluate progress in implementing the project (in addition to participating in the statewide evaluation efforts). Enter narrative for (A)3. here: The RTT Coordinator will work with a committee composed of school based leaders and district staff to design a timeline for evaluation. The timeline will include specific target dates and milestones for each Project in the Final Scope of Work listed on the Work Plan Table. Formative evaluation consisting of regularly scheduled meetings to analyze data for each Project on the Work Plan Table will allow for timely feedback and modification of the Projects if necessary and assure that deliverables are on track. Key players such as the union representative, experts and community members will be included as needed. The RTT Coordinator will also work with the FLDOE evaluation consultants. This evaluation is for the entire RTT implementation and not limited to principal and teacher evaluation. APPROVED 4. Provide an overview of how the LEA will ensure sustainability of RTTT reforms beyond the grant period. Enter narrative for (A)4. here: The 3 main projects (EPIC plan, IB and career STEM courses) will be sustained over the coming years in several ways. The performance incentive plan is being developed to completely replace the existing, arbitrary salary schedule and to match FL Statute 1012.34(2) (3). The plan will be sustained and supported by districts transition of the current salary schedule into the performance model to accurately measure educators’ performance based in part upon student achievement. The IB program is an expanding program that will initiate in the high schools, followed by the middle years program and then to the primary level program. Following this path our school district projects and ambitious accomplishment in 5 years. The STEM career courses will be sustained based upon the local need for certified students in the employable fields of need. Each year we complete a community needs assessment to determine the emerging needs for our students and to assess the employer needs, this allows us to keep the program growing, flexible and most importantly, serving the students and their employment needs. APPROVED 11 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 5. Describe how other funding sources will be integrated with Race to the Top funds during the four-year grant period (e.g., Title II-A, School Improvement Grant). Amounts are not necessary in this description. Enter narrative for (A)5. here: The funding sources in addition to the Race to the Top grant award are as follows: • Title II part A, to supplement and enhance initiatives in this grant. • District sources, to provide the additional staff for a number of positions required for example within the IB program configuration • Local sources, we have already secured agreements form local financial institutions to provide matching funds for our I3 grant that we are planning for next year. • Finally, additional grants, while our district does not have a great writer, our teams work together on grants such as this grant to provide the much needed financial supports our district requires APPROVED B. STANDARDS AND ASSESSMENTS N/A Monroe County Currently has no persistently low achieving schools (B)(3) Supporting the transition to enhanced standards and high-quality assessments 1. Persistently lowest-achieving schools (schools in the [state’s] lowest 5%) must modify the school schedules to accommodate lesson study. The LEA may modify school schedules for other schools to allow for common planning time by grade level (elementary) or subject area (secondary). Such planning time may be dedicated to lesson study focused on instructional quality, student work, and outcomes, without reducing time devoted to student instruction. Where lesson study is implemented, the LEA will devote a minimum of one lesson study per month for each grade level or subject area. Complete Work Plan Table for (B)(3)1. 2. The LEA will ensure that professional development programs in all schools focus on the new common core standards, including assisting students with learning challenges to meet those standards (such as through accommodations and assistive technology). Such professional development will employ formative assessment and the principles of lesson study. Include Work Plan in Table for (D)(5). 3. The LEA will implement a system to evaluate the fidelity of lesson study and formative assessment implementation that is tied to interim and summative student assessments. Include Work Plan in Table for (D)(5). 4. The LEA will implement at least one additional high school career and technical program that provides training for occupations requiring science, technology, engineering, and/or math (STEM). The LEA will pay, or secure payment for the industry certification examination for graduates of such programs. These programs must lead to a high-wage, high-skill career for a majority of graduates that supports one of the eight targeted sectors identified by Enterprise Florida and result in an industry certification. The LEA will ensure that these programs will 12 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II include at least one Career and Technical Education course that has significant integration of math or science that will satisfy core credit requirements with the passing of the course and related end-of-course exam. Complete Work Plan Table for (B)(3)4. APPROVED 5. The LEA will increase the number of STEM-related accelerated courses, such as Advanced Placement, International Baccalaureate, AICE, dual enrollment, and industry certification. Complete Work Plan Table for (B)(3)5. 6. The LEA will ensure that each school possesses the technology, including hardware, connectivity, and other necessary infrastructure, to provide teachers and students sufficient access to strategic tools for improved classroom instruction and computer-based assessment. Complete Work Plan Table for (B)(3)6. APPROVED 13 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Expand Lesson Study – (B)(3)1. Note: This Work Plan Table is optional for LEAs without a persistently lowest-achieving school; however, criterion (B)(3)2. states that professional development programs in all schools will “employ formative assessment and the principles of lesson study.” (B)(3)2. is included in the Table for (D)(5). Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: An LEA with a persistently lowest-achieving school will modify these schools’ schedules to devote a minimum of one lesson study per month for each grade level or subject area. N/A Monroe County Currently has no persistently low achieving schools Deliverables (minimum required evidence): 1. Submission of school schedule for each persistently lowest-achieving school that includes regularly scheduled blocks of time dedicated to lesson study for each grade level or subject area. 2. Annual submission of monthly grade level and content area Next Generation Sunshine State Standard lesson used to teach, observe, study evidence of student learning and design improved instruction. 3. Rosters of school administrator(s) and grade level and content area teaching staff who participated in the lesson study 4. Submission of one participating teacher’s improved lesson plan based on the submitted grade level and content area Next Generation Sunshine State Standard lesson study with amendments due to participation in lesson study noted. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: nd rd th 2 3 4 Quarter Quarter Quarter The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): Submission of school schedule for each 2nd 3rd 4th persistently lowest-achieving school that Quarter Quarter Quarter includes regularly scheduled blocks of time dedicated to lesson study for each grade level or subject area. 2010-11 2011/12 2012/13 2013/14 Supporting Activities (indicate each year activity will be conducted and include 2nd 3rd 4th collective bargaining, if applicable): Quarter Quarter Quarter 14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Deliverable (required): Annual submission of monthly grade level and content area Next Generation Sunshine State Standard lesson used to teach, observe, study evidence of student learning and design improved instruction. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable (required): Rosters of school administrator(s) and grade level and content area teaching staff who participated in the lesson study. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable (required): Submission of one participating teacher’s improved lesson plan based on the submitted grade level and content area Next Generation Sunshine State Standard lesson study with amendments due to participation in lesson study noted. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Project Budget Summary: 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2011/12 2012/13 2013/14 2 Quarter 2010-11 3rd 4th Quarter Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2nd Quarter nd 2010-11 3 Quarter nd 2011/12 rd 2 Quarter 2013/14 4 Quarter 0 0 2012/13 th 0 0 0 0 Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Supporting Narrative (optional): N/A Monroe County Currently has no persistently low achieving schools 15 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Expand STEM Career and Technical Program Offerings – (B)(3)4. Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will implement at least one additional high school career and technical program that provides training for occupations requiring science, technology, engineering, and/or math (STEM). The LEA will pay, or secure payment for the industry certification, and/or examination for graduates of such programs. These programs must lead to a high-wage, high-skill career for a majority of graduates that supports one of the eight targeted sectors identified by Enterprise Florida and result in an industry certification. The LEA will ensure that these programs will include at least one Career and Technical Education course that has significant integration of math or science that will satisfy core credit requirements with the passing of the course and related end-of-course exam. Deliverables (minimum required evidence): 1. Submission of a 4-year LEA timeline and implementation plan based on the analysis of employer needs in the community to initiate one of the RTTT-approved career and technical programs. Baseline data for the plan should include documentation of the STEM career and technical programs that meet the requirements of RTTT available to students in your district for 2009-2010 including for each school site: name of program, courses offered as part of the program, student enrollment in each course, and number of students for 20092010 who were awarded industry certifications. 2. Evidence of funding allocated to provide for the costs associated with student candidates’ industry certification exams. 3. Documentation of implementation of a complete program that results in industry certification including for each school site: name of program, courses offered as part of the program, student enrollment in each course, and number of students for 2009-2010 who were awarded industry certifications. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter Jeff Arnott – Director of Adult & Career X X X X X X Education Dr. Jesus Jara -Chief Operating Officer X X X X X X Dr. L. Salinero -Executive Director, Student X X X X X X Services and Curriculum The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): 2nd 3rd 4th Submission of a 4-year district timeline Quarter Quarter Quarter and implementation plan based on the X X X X analysis of employer needs in the community to initiate one of the RTTT16 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II approved career and technical programs. Baseline data for the plan should include documentation of the STEM career and technical programs that meet the requirements of RTTT available to students in your district for 2009-2010 including for each school site: name of program, courses offered as part of the program, student enrollment in each course, and number of students for 2009-2010 who were awarded industry certifications. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Creation of STEM (Building Construction) at Marathon HS. Creation of STEM (Project Lead the Way) at Key West HS Creation of STEM (Medical) at Coral Shores HS Deliverable (required): Evidence of funding allocated providing for the costs associated with student candidates’ industry certification exams. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Industry Exams for CTE Courses in Culinary, Computers, Final Cut Pro Industry Exams for remaining CTE Classes. Timeline will be created for each CTE program in Monroe County. Deliverable (required): Documentation of implementation of a complete program that results in industry certification. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): CTE Teacher Academy for teachers interested in teaching in CTE Academies Training for Teachers to earn credentials to give exams. Project Budget Summary: 2010-11 3rd Quarter 2nd Quarter $0 $0 2nd Quarter 2010-11 3rd 4th Quarter Quarter X 2011/12 2012/13 2013/14 X X X nd 2 Quarter 2nd Quarter 2nd Quarter 2nd Quarter X 2010-11 3rd 4th Quarter Quarter X 2010-11 3rd 4th Quarter Quarter X 2010-11 3rd 4th Quarter Quarter X 2010-11 3rd 4th Quarter Quarter X 2011/12 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 X X X X X 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 X X 2012/13 X 2013/14 4th Quarter $0 $ 10,000.00 17 $ 5,000.00 $ 4,080.00 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Sustainability Factors: One Project Lead the Way is established with the funds, Federal Perkins and Workforce dollars will be used to sustain the program at Key West High School. In addition, general school district funds may be used to sustain the program along with funding that will be received from CAPE (Career and Professional Academy) funding authorized by the Florida State Legislature for students obtaining industry credentials. Supporting Narrative (optional): In 2011-12, Marathon High School will be starting a building construction STEM program. Money that same year will be used to plan for a engineering program through Project Lead the Way at Key West High School. The program will start in 2012-13. A biomedical program is projected for Coral Shores High School in 2013-14. APPROVED Title and Page Number of Appendices for this Project (if applicable): 18 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Increase Advanced STEM Coursework – (B)(3)5. (Appendices to be attached: 3) Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will increase the number of STEM-related acceleration courses, such as Advanced Placement, International Baccalaureate, AICE, dual enrollment, and industry certification. Deliverables (minimum required evidence): 1. Submission of a district timeline and implementation plan to increase the number of STEM accelerated courses. Baseline data for this plan includes documentation of courses provided at each high school in 20092010. This plan should also take into consideration 2010 legislative requirements (Senate Bill 4) requiring that by 2011-2012 each high school offer an International Baccalaureate program, Advanced International Certificate of Education program, or at least four courses in dual enrollment or Advanced Placement including one course each in English, mathematics, science, and social studies. 2. Documentation of increased STEM accelerated course offerings, including a comparison of baseline data to end-of-grant period data. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: nd rd th 2 3 4 Quarter Quarter Quarter Dr. Jesus Jara -Chief Operating Officer X X X X X X Dr. L. Salinero -Executive Director, Student X X X X X X Services and Curriculum TBA- District International Baccalaureate X X X X X X (IB) Coordinator Jeannie Sanford X X X X X X School Principals X X X X X X School IB Coordinators X X X X X X The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): Submission of a district timeline and 2nd 3rd 4th implementation plan to increase the number Quarter Quarter Quarter of STEM accelerated courses. Baseline data X for this plan includes documentation of X X X X X courses provided at each high school in 2009-2010. This plan should also take into consideration 2010 legislative requirements (Senate Bill 4) requiring that by 2011-2012 each high school offer an International Baccalaureate program, Advanced 19 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II International Certificate of Education program, or at least four courses in dual enrollment or Advanced Placement including one course each in English, mathematics, science, and social studies. ________________________________ Our district already meet s the requirement of offering 4 AP core courses in each of our three high schools. In addition, we have designed (and are currently in the 1st year of) a five year plan to create a Pre-K through 12th grade International al Baccalaureate continuum in each region of the Keys, leading to the authorization of the MCSD as an IB district. Please see the see MCSD IB District Implementation Chart [appendix__} and the Description of IB Activities [appendix___] to see both the timeline/plan for implementing the three phases of the IB authorization process as well as the supporting activities required by the schools in each of our regions. Deliverables will include: 1.) record of IB trainings attended by administrators and faculty; 2.) submission of IB applications A and B; and 3.) report from IB following authorization visits for each of the eleven district schools. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Implement strategic plan for International Baccalaureate Pre-K-12th grade continuum, beginning with the Diploma Programme (DP) for grades 11 and 12[see Appendix__] Implement consideration phase of plan for DP [see appendix__] Implement candidate year 1 phase of plan for DP Implement consideration phase of plan for Primary Years Programme (PYP) and Middle Years Programme (MYP) [see appendix__] Implement candidate year 2 phase of plan for DP Implement candidate year 1 phase of plan for PYP/MYP 2nd Quarter X 2010-11 3rd 4th Quarter Quarter X X X X X 2011/12 2012/13 2013/14 X X X X Authorization for DP Implement candidate year 2 phase of plan X 20 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II for PYP/MYP Authorization for PYP/MYP, soon after DP authorization Deliverable (required): Documentation of increased STEM accelerated course offerings, including a comparison of baseline data to end-of-grant period data. ________________________________ Our district already meet s the requirement of offering 4 AP core courses in each of our three high schools. We will use the 20092010 data on AP courses offered and students who took the courses as our baseline [see appendix __]. At the end of the grant period, we will use the same data plus the additional IB high school courses students will have taken to show increases in advanced courses in MCSD high schools . Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The district will continue its efforts to increase both participation and performance in Advanced Placement courses through scaffolding support strategies such as vertical team planning by secondary core teachers, AVID, and additional mentoring activities. The district will implement the 1st IB course offerings in each of our high schools, following IB authorization. Project Budget Summary: nd 2 Quarter $21,000 2010-11 3 Quarter rd $4,000 X 2nd Quarter 2nd Quarter X 2010-11 3rd 4th Quarter Quarter X 2011/12 2012/13 X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 X 2013/14 X 2013/14 X X X 2011/12 2012/13 2013/14 th 4 Quarter $10,000 $60,000 $50,000 $50,000 Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Our school district is committed to funding the IB school coordinators and world language teachers necessary for each IB school. We will fund continual professional development costs for the IB program via our Title II, Part A monies. In addition, through the implementation of the IB professional development activities throughout the grant period, we will create an IB Train the Trainer model to build in house capacity for future training needs. Additionally, we have secured the interest and support of at least two banks that serve the entire Florida Keys for this proposal. We anticipate that their interest and support for this proposal will grow as they are able to see the tangible results of the program 21 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II implementation. From a business standpoint, they are excited about the prospect of being able to tell future employees interested in relocating to the Keys that we are an authorized IB district. Finally, we may be allocating a portion of funds generated and provided to the school district through a half cent sales tax in Monroe County toward maintenance costs for the IB program, district-wide. Supporting Narrative (optional): Monroe County School District will provide a high quality, rigorous international education opportunity for all its students by offering a district Pre-K-12th grade whole access International Baccalaureate continuum in each of three regions in the Florida Keys within the next five years. While MCSD and the Florida Keys are geographically isolated, we are part of the South Florida region---considered the hub of major international trade and commerce for both the Caribbean and Latin America. This makes our region an attractive and important gateway for exchanges--- economic, educational and cultural. Students need to be exposed to a global curriculum with a second language component to be able to compete for world class jobs and take advantage of the opportunities that are on their doorstep. The IB Diploma Programme was introduced in 1968 and its original purpose was to facilitate the international mobility of students, by providing schools with curriculum and qualifications recognized by universities around the world. Today, IB education is available to students aged 3 to 19, including the years from pre-kindergarten to pre-university. The IB Primary Years Programme (PYP; grades Pre-K5) focuses on the development of the whole child as an inquirer, both in the classroom and the world outside. The IB Middle Years Programme (MYP; grades 6-10) provides a framework of academic challenge that encourages students to embrace and understand the connections between traditional subjects and the real world, and to become critical and reflective thinkers. The IB Diploma Programme (DP; grades 11-12) is an academically challenging and balanced program of education with final examinations that prepares students for success in college/university as well as in life beyond. It is taught in state and private, national and international schools. The IB standards and assessments easily correlate to and in many cases exceed Florida’s Next Generation Sunshine State Standards (NGSSS). Our plan includes: Implementing the Pre-K through 12 grade International Baccalaureate (IB) Prorgamme in all eleven schools in Monroe County schools. Most often, schools have implemented individual IB Programmes, but no district in Florida currently offer a Pre-K through 12th grade IB continuum. ALL three IB Programmes highlight both an inquiry-based and interdisciplinary approach, an emphasis on in-depth research and critical thinking, community service or action components, as well as a second language requirement embedded within. They employ a powerful curriculum and assessment framework that empowers teachers and students. Implementing the IB Programme with “whole school access”. Many schools have implemented parts of the IB Programme but employ such rigorous entry criteria that only the most elite of the students are accepted. With the Pre-K to 12th grade continuum, all MCSD students will be given the opportunity to experience the IB curriculum throughout their school experience. Scaffolding strategies and programs will be built in to our plan to create an “academic pipeline” in earlier grades to make sure that more of our students will be successful in the rigorous IB Diploma Program. Implementing the IB “District Coaching” model. The IB Americas Regional Office is piloting a 22 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II coaching component as well as an IB District Coach model for our district IB plan. In addition to providing an extra layer of support from the IB office, this pilot project will provide IB with additional measures for program scalability, capacity building and longitudinal data collection across an educational continuum. Planning for this ambitious project has already begun in Monroe County Schools. To date, district and school-based administrators have researched the IB program (particularly the DP Programme), solicited input from teachers, parents, school board and a variety of community groups that serve residents in all areas of the Keys. Letters of support have been received from our local Teachers’ Union (United Teachers of Monroe) and two prominent banks that serve our entire Keys community (First State Bank and Centennial Bank). In February of this year (2010), we surveyed parents as to their interest in IB programs. Nearly 2 out of 3 (64 percent) parents surveyed in each of the three regions of the Keys responded that they would definitely want their child to have an opportunity for an IB diploma (see Appendix). Staff from the IB Americas office has provided assistance and collaboration and we have already started to send selected faculty and administrators to IB trainings in order to complete the very rigorous and precise requirements necessary for each of the 11 schools in our district to be authorized as IB schools. APPROVED Title and Page Number of Appendices for this Project (if applicable): 1.) MCSD Parent Survey Re: International Baccalaureate Program appendix(B)(3)(5);page 91) 2.) MCSD IB District Implementation Chart, 2010-2015 appendix(B)(3)(5); page 98) 3.) Description of IB Activities: by Level and by Category appendix(B)(3)(5);page 94) 23 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Bolster Technology for Improved Instruction and Assessment – (B)(3)6. Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will ensure that each school possesses the technology to provide sufficient access to strategic tools for improved classroom instruction and computer-based assessment. Deliverable (minimum required evidence): 1. Readiness for computer-based testing (FCAT 2.0, End-of-Course Exams, Florida Assessments for Instruction in Reading) as certified through completion and submission of Florida’s online certification tool. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter Nick Osterhoudt – Director of Instructional X X X X X X Technology Network Analysis Miguel Gonzales X X X X X X Network Analysis Joy Nulisch X X X X X X Network Analysis Andrew Hish X X X X X X Help Desk Technician/Webmaster X X X David Richardson- Director of Information X X X X X X Technology Janet Meinke – Director Assessment & Accountability X X X X X X The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): Completion and submission of computer2nd 3rd 4th based testing readiness certification through Quarter Quarter Quarter Florida’s online tool. X X X X 2010-11 2011/12 2012/13 2013/14 Supporting Activities (indicate each year activity will be conducted and include 2nd 3rd 4th collective bargaining, if applicable): Quarter Quarter Quarter Review Current District capacity and infrastructure for online test administration X X X X X for anticipated demand. Participate in Statewide infrastructure trail X Participate in a district infrastructure trail X X X X X Utilize NEFEC’s Instructional Technology X X X X department for assistance in district 24 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II readiness. Provide professional development for IT department and teachers for online assessments Server for STEM Programs Carrels for CBAT (300) Project Budget Summary: 2nd Quarter $ X X X X X 2010-11 3rd Quarter $3,500.00 X 2011/12 2012/13 2013/14 4th Quarter $ $5,000.00 $ $ Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Supporting Narrative (optional): Deliverables: 1. MCSD readiness for computer-based testing: we just completed computer based assessment certification plan and specification on the 24th of September. This assessment test was for the FCAT Math Retakes, FCAT Grade 10 Math, Algebra 1 EOC Assessment, Geometry and Biology EOC Assessment Field tests and FCAT reading retakes. We have also been completing FAIR testing with a minimum number of issues during latter half of testing. As the testing implementation for additional grade levels and curriculum is added in the next two-three schools years, our technology department will have to upgrade to have the ability to handle the requirements to ensure students ability to complete the testing period. Year 2008 2008 2009-2010 2010-2011 2010-2011 2011-2012 2011-2012 2011-2012 On-line test FAIR Discovery Ed/Think link FCAT Retakes FCAT EOC EOC EOC EOC Assessment YES Yes Subject --------------------------------- Grade levels --------------------------- Yes Yes Yes Yes Yes Yes Mathematics Mathematics Algebra 1 US History Biology Geometry -------------10th ----------------------------------------------------APPROVED Title and Page Number of Appendices for this Project (if applicable): 25 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II C. DATA SYSTEMS TO SUPPORT INSTRUCTION (C)(2) Accessing and using State data 1. The LEA will assist in the design, testing, and implementation of initiatives to improve customer-friendly access and information to district leaders, teachers, principals, parents, students, community members, unions, researchers, and policymakers to effectively use state data systems. Examples of areas where the LEA will be required to assist the Department include providing assistance on defining state-level educational data that can be used to augment local data systems, implementing a single sign-on to access state resources, providing data to the Department, and testing other mechanisms that will enhance the usability of existing state-level applications to improve instruction and student learning. 2. The LEA will use state-level data that is published for use, along with local instructional improvement systems, to improve instruction. Complete Work Plan Table for (C)(2). (C)(3) Using data to improve instruction: APPROVED (i) Use of local instructional improvement systems 1. The LEA will use customer-friendly front end systems that are easy for students, teachers, parents, and principals to use and that show growth of students, teachers, schools, and districts disaggregated by subject and demographics. 2. An LEA that has an instructional improvement system will ensure that the system is being fully utilized; an LEA that does not have an instructional improvement system will acquire one. (iii) Availability and accessibility of data to researchers 1. The LEA will provide requested data from local instructional improvement and longitudinal data systems to the Department to support the Department’s efforts to make data available to researchers for the purpose of evaluating the effectiveness of instructional materials, strategies, and approaches for educating different types of students and to help drive educational decisions and policies. Complete Work Plan Table for (C)(3)(i) and (iii). (ii) Professional development on use of data 1. The LEA will provide effective professional development to teachers and administrators on the use of its instructional improvement system. 2. The LEA will provide effective professional development to teachers and administrators on the use of state level data systems developed during the term of the grant. Include Work Plan for (C)(3)(ii) in Table for (D)(5). 26 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Improve Access to State Data – (C)(2) Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: LEAs will integrate with the Department to provide single sign-on access to state-level applications and data by their users. The LEA will incorporate state-level data into local instructional improvement systems to improve instruction in the classroom and operations at the school and district levels, and to support research. Deliverables (minimum required evidence): 1. For teachers, principals, and other LEA staff, provide a report on the following: a. Number of each type of staff in the district b. Number of each type of staff accessing state resources via single sign-on Baseline report based on 2009-10 is due by December 31, 2010. Reports based on the prior two quarters completed are due by September 30 and March 31 of each year. Bi-annual reporting shall begin the first applicable period after single sign-on integration with the Department. The Department will provide a report template. 2. Single Sign-on Integration Readiness Certification. Certification forms will be provided by the Department for LEA signature. 3. Single sign-on integration with the Department. 4. For state-level data downloads, provide a report of the following: a. Name of the download b. Date of most recent download Reports are due by September 30 and March 31 of each year and based on the prior two quarters completed. Reporting shall begin the first applicable period after receipt and incorporation of state-level data into local instructional improvement systems. The Department will provide a report template. Note: Additional evidence regarding the state-level data downloads is collected with Section (C)(3)(i). The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: nd rd th 2 3 4 Quarter Quarter Quarter Nick Osterhoudt – Director of Instructional X X X X X X Technology Janet Meinke – Director Assessment & Accountability X X X X X X David Richardson- Director of Information Technology District Network Staff X X X X X X X X X X X X 27 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. Note: Deliverables will be dependent on an LEA’s current status with respect to technology and data systems. During Year 1, LEAs will provide feedback to the Department regarding single sign-on implementation and state-level data downloads. Work should be completed by Year 4. Deliverable (required): For teachers, principals, and other LEA staff, provide a report on the following: a. Number of each type of staff in the district b. Number of each type of staff accessing state resources via single sign-on Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Provide data and staff support working with Specifications outlined in DOE report template. Integrating district Active Directory information with districts Personnel database. Deliverable (required): Single Sign-on Integration Readiness Certification Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Integrate Active Directory access and other Personnel Data with the DOE to provide SSO to users. Acquire and provide technical assistance , support and resources to fully implement FDOE’s SSO plan. Submit SSO Integration Readiness Certification to the FDOE. Deliverable (required): Single sign-on integration with the Department Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): 2nd Quarter 2010-11 3rd 4th Quarter Quarter X 2nd Quarter 2011/12 X 2010-11 3rd 4th Quarter Quarter X X X X 2011/12 2012/13 X 2012/13 2013/14 X 2013/14 X X X X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 nd 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 nd 2 Quarter 2 Quarter 28 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Implement technical changes to district’s active directory, and/or personnel database that may be required to comply with the FDOE SSO plan. Provide ongoing training of staff to implement SSO integration: IT Network Specialist, End Users, etc. Deliverable (required): For state-level data downloads, provide a report of the following: a. Name of the download b. Date of most recent download Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Obtain a list of the data sets from the FDOE when published. Provide data and/or reports to FDOE according to the format that will be described in the FDOE single sign on plan. Project Budget Summary: 2010-11 3rd Quarter 2nd Quarter $0 $0 X X X X X X X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter X X X X X X 2011/12 2012/13 2013/14 4th Quarter $0 $0 $0 $0 Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Supporting Narrative (optional): The Monroe County School District will be working with its vendors to implement SSO solution for users for all of its various instructional and administrative software solutions. Currently one of our projects was to implement the district’s new hosted web site solution via School Fusion. This was successfully implemented in 2 pilot schools and will have full district roll-out of the project by January 2011. This project allows our user (teachers, administrator, etc) to sign on by utilizing the district Active Directory database, thus creating a single sign on solution for this project. The district has also implemented integration of the districts Active Directory database with our personnel database, giving us the ability now to work with other vendors on making any necessary changes to the user tables to utilize a single sign-on solution. One of our goals is to raise the percent of tax via slight tax increase to maintain the project Title and Page Number of Appendices for this Project (if applicable): 29 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criteria: Use Data to Improve Instruction – (C)(3)(i) and (iii) Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will use systems that are easy for students, teachers, parents, and principals to use and that show growth of students, teachers, schools, and districts disaggregated by subject and demographics. An LEA that has an instructional improvement system will ensure that the system is being fully utilized; an LEA that does not have an instructional improvement system will acquire one. The LEA will provide requested data from local instructional improvement and longitudinal data systems to the Department as requested. Deliverables (minimum required evidence): 1. For local instructional improvement systems, provide a report that includes the following: a. Name of the system b. How the system has been adopted and used in the classroom, school, and at the district level to support instruction in the classroom, operations at the school and district levels, and research c. How the system is accessed and used by students and parents d. How state-level data downloads are accessed and used in the classroom, school, and at the district level to support instruction in the classroom, operations at the school and district levels, and research [Ref. to Section (C)(2)]. This section should be included when it becomes applicable. e. A description of the student growth data available to users on the system f. How frequently students, teachers, parents, and principals are accessing the system The baseline report for 2009-10 is due by December 31, 2010. Subsequent reports are due annually by September 30 for the prior year. 2. The LEA will provide timely, accurate, and complete information in Department technology assessments and surveys to verify the LEA’s local instructional improvement system meets the minimum standards. LEAs will provide the name, title, phone number, and email address of a staff member responsible for receiving such requests from the Department. 3. The LEA will provide data from local instructional improvement and longitudinal data systems to the Department, as requested. LEAs will provide the name, title, phone number, and e-mail address of a staff member responsible for receiving such requests from the Department. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter X X X X X X Director of Assessment and Accountability Director of Instructional Technology Director of Information Technology X X X X 30 X X X X X X X X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): For local instructional improvement 2nd 3rd 4th systems, provide a report that includes the Quarter Quarter Quarter following: a. Name of the system b. How the system has been adopted and used in the classroom, school, and at the district level to support instruction in the classroom, operations at the school and district levels, and research c. How the system is accessed and used by students and parents d. How state-level data downloads are accessed and used in the classroom, school, and at the district level to support instruction in the classroom, operations at the school and district levels, and research [Ref. to Section (C)(2)]. This section of the report should be included when it becomes applicable X e. A description of the student growth data available to users on the system f. How frequently students, teachers, parents, and principals are accessing the system Monroe County currently uses the following resources as components of a student instructional improvement system: TERMS, Pinnacle Gradebook, SnapShot, Thinkgate, MyLearningPlan and SchoolFusion. Though some of these system components interface, the overarching goal would be to create a comprehensive system with enhanced accessibility for all datadriven, decision-making stakeholders. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Collaborate with DOE in the development of the minimum standards 2nd Quarter X 2010-11 3rd 4th Quarter Quarter X X 31 2011/12 2012/13 2013/14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II for the instructional improvement system. X Analyze current local system for compatibility with DOE specification and minimum standards once established. X Determine what data sources/systems need to be integrated into the Local Instructional Improvement System. X X Develop and maintain the interface to integrate local and state systems that will support instructional decisions based on local and state data. X X X Determine what documents need to be downloaded from DOE and define what local technology needs to be in place to receive them. X X X Determine how state-level data downloads will be accessed and by whom; and how it will be used to inform/support instruction. X X X Determine how the data will be accessed and used at the district, school, classroom, student and parent level. X X Establish how data (assessment, learning gains, and other student data, i.e. attendance and discipline) will be used to inform instructional decisions for all stakeholders (e.g., teachers, principals, students, etc.) X X X Determine how data uploaded to DOE will interface with the local instructional improvement system. X X X Create evaluation components to determine the effectiveness of the instructional decisions based on the data accessed through the Local Instructional Improvement System. X X Develop an annual action plan for the implementation, monitoring and evaluation and modification (if necessary) of Local Instructional Improvement System. X X Establish a mechanism by which to collect Local Instructional Improvement System usage statistics and collect the data. 32 X X X X X X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II X Participate in DOE’s System Exchange resources. Deliverable (required): The LEA will provide timely, accurate, and complete information in Department sponsored technology assessments and surveys to verify the LEA’s local instructional improvement system meets the minimum standards. LEAs will provide the name, title, phone number, and email address of a staff member responsible for receiving such requests from the Department. X X 2011/12 2012/13 2013/14 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X X X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 2nd Quarter X nd The director of instructional technology will be responsible for this requirement. Contact information will be provided. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Collect all necessary information to complete DOE’s annual technology survey. Participate in DOE’s annual technology survey. Provide DOE with the contact information of the person responsible for sponsored technology assessments and surveys to verify local compliance with minimum standards. Deliverable (required): The LEA will provide data from local instructional improvement and longitudinal data systems to the Department, as requested. LEAs will provide the name, title, phone number, and e-mail address of a staff member responsible for receiving such requests from the Department. nd 2 Quarter X X X X X X X X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 X X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 The director of information technology will be responsible for this requirement. Contact information will be provided. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Determine what supplementary data needs to be collected and provided to DOE. Collaborate with DOE Research nd 2 Quarter X 33 X X X X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Consortium in establishing a focused research agenda. X X X X Review and revise local research request policies and procedures consistent with FERPA regulations. X X X X Provide DOE with the contact information of the person responsible for receiving and processing research requests. Project Budget Summary: 2010-11 3rd Quarter 2nd Quarter $0 $0 2011/12 X X X X 2012/13 2013/14 4th Quarter $0 $0 $0 $0 Sustainability Factors: System components currently in place are funded through existing sources. Future funding requirements will be contingent on the results of overall improved system developments. Supporting Narrative (optional): Teachers and administrators in Monroe County Schools can make instructional decisions 24/7 based on multiple sources of student formative and summative assessment data accessible though SnapShot and Thinkgate. These are interactive reporting tools accessible via the web. Individual student demographic and trend data can be displayed, exported and aggregated in multiple ways, such as subgroups. Subject area reports include charts for learning gains by teacher, grade and school. Data analysis and interpretation are key to the instructional decision making processes for increasing student achievement and reducing the achievement gap. APPROVED Title and Page Number of Appendices for this Project (if applicable): 34 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II D. GREAT TEACHERS AND LEADERS (D)(1) Providing high-quality pathways for aspiring teachers and principals (ii) Alternative routes to certification that are in use 1. The LEA will coordinate with institution preparation programs to provide effective district personnel to supervise pre-service teacher and educational leadership candidates. Such district supervising personnel will be highly effective teachers. 2. The LEA will use data from student performance and other continued approval standards in Rule 6A-5.066, F.A.C., to annually review and improve its alternative certification program and will deliver any professional development associated with the program in accordance with the state’s protocol standards for professional development. Complete Work Plan Table for (D)(1)(ii). 35 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (D)(2) Improving teacher and principal effectiveness based on performance (i) Measure student growth 1. The LEA will measure student growth based upon the performance of students on staterequired assessments and, for content areas and grade levels not assessed on state-required assessments, the LEA will use state assessments or district-selected assessments that are aligned to state standards and developed or selected in collaboration with LEA stakeholders, or will use valid, rigorous national assessments. (ii) Design and implement evaluation systems 1. The LEA will design and implement a teacher evaluation system with teacher and principal involvement that: a. Utilizes the state-adopted teacher-level student growth measure cited in (D)(2)(i) as the primary factor of the teacher and principal evaluation systems. Student achievement or growth data as defined in the grant must account for at least 50% of the teacher’s evaluation as follows: By the end of the grant, the LEA shall include student growth as defined in (D)(2)(i), for at least 40% of the evaluation, and student growth or achievement as determined by the LEA for 10% of the evaluation. The LEA may phase-in the evaluation system but will use, at a minimum, student growth as defined in (D)(2)(i) for at least 35% of the evaluation and student growth or achievement as determined by the LEA for 15% of the evaluation. Implementation of the requirements for the LEA evaluation systems beginning in the 2011-12 school years applies, at a minimum, to teachers in grades and subjects for which student growth measures have been developed by the Department in collaboration with the advisory body as described in (D)(2)(i). The 2010-11 school year will be considered a development year for the evaluation systems. However, an LEA that completed renegotiation of its collective bargaining agreement between July 1, 2009, and December 1, 2009, for the purpose of determining a weight for student growth as the primary component of its teacher and principal evaluations, is eligible for this grant as long as the student growth component is at least 40% and is greater than any other single component of the evaluation. b. Includes the core of effective practices, developed in collaboration with stakeholders that have been strongly linked to increased student achievement for the observation portion of the teacher evaluation. The principal, direct supervisor, and any other individual performing observation will use, at a minimum, this same core of effective practices. c. Includes at least one additional metric to combine with the student performance and principal observation components to develop a “multi-metric” evaluation system for, at a minimum, the teachers who are in the year prior to a milestone career event, such as being 36 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II awarded a multi-year contract, a promotion, or a significant increase in salary. Examples of additional metrics include, but are not limited to, observations by master teachers or instructional coaches, student input, peer input, and parental input. d. Includes a comprehensive range of ratings beyond a simple satisfactory or unsatisfactory, that must include “effective” and “highly effective.” 2. The LEA will design and implement a principal evaluation system with teacher and principal involvement that: a. Utilizes the state-adopted teacher-level student growth measure cited in (D)(2)(i) as the primary factor of the teacher and principal evaluation systems. Student achievement or growth data as defined in the grant must account for at least 50% of the principal’s evaluation as follows: By the end of the grant, the LEA shall include student growth as defined in (D)(2)(i), for at least 40% of the evaluation, and student growth or achievement as determined by the LEA for 10% of the evaluation. The LEA may phase-in the evaluation system but will use, at a minimum, student growth as defined in (D)(2)(i) for at least 35% of the evaluation and student growth or achievement as determined by the LEA for 15% of the evaluation. Implementation of the requirements for the LEA evaluation systems applies, at a minimum, to grades and subjects for which student growth measures have been developed by the Department in collaboration with the advisory body as described in (D)(2)(i). The 2010-11 school year will be considered a development year for the evaluation systems. b. Utilizes for the remaining portion of the evaluation the Florida Principal Leadership Standards with an emphasis on recruiting and retaining effective teachers, improving effectiveness of teachers, and removing ineffective teachers. c. Includes a comprehensive range of ratings beyond a simple satisfactory or unsatisfactory, that must include “effective” and “highly effective.” 3. The LEA will submit teacher and principal evaluation systems to the Department for review and approval. 4. The LEA will utilize student performance data on statewide assessments as a significant factor in the annual evaluations of district-level staff with supervisory responsibilities over principals, curriculum, instruction, or any other position directly related to student learning. 5. The LEA will report the results of evaluations of each teacher, principal, and district-level supervisor [as described in (D)(2)(ii)] to the Department during Survey 5. (iii) Conduct annual evaluations For Teachers: 37 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 1. The LEA will conduct multiple evaluations for each first-year teacher that are integrated with the district’s beginning teacher support program and include observations on the core effective practices described in (D)(2)(ii)2. and reviews of student performance data. 2. The LEA will conduct “multi-metric” evaluations as described in (D)(2)(ii) for teachers who are in the year prior to a milestone career event, such as being awarded a multi-year contract, a promotion, or a significant increase in salary. The LEA plan will include a definition of milestone career event. 3. The LEA will conduct evaluations as described in (D)(2)(ii)1, 2, and 4. for all other teachers at least once per year. For Principals: 4. The LEA will conduct evaluations as described in (D)(2)(ii) for principals at least once per year. Complete Work Plan Table for (D)(2)(i)(ii)(iii). 38 APPROVED RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (iv)(a) Use evaluations to inform professional development. The LEA will use results from teacher and principal evaluations as described in (D)(2)(ii) in its professional development system as follows: For Teachers: 1. Establish an Individual Professional Development Plan (IPDP) for each teacher that is, in part, based on an analysis of student performance data and results of prior evaluations. 2. Individualize the support and training provided to first-and second-year teachers and determine the effective teachers who will provide coaching/mentoring in the district’s beginning teacher support program. For Principals: 3. Establish an Individual Leadership Development Plan (ILDP) for each principal that is based, in part, on an analysis of student performance data and results of prior evaluations. Include Work Plan for (D)(2)(iv)(a) in the Table for (D)(5). (iv)(b) Use evaluations to inform compensation, promotion, and retention 1. The LEA will implement a compensation system for teachers that: a. Ties the most significant gains in salary to effectiveness demonstrated by annual evaluations as described in (D)(2)(ii). b. Implements statutory requirements of differentiated pay in s. 1012.22(1)(c)4., F.S., through bonuses or salary supplements. Categories for differentiated pay are additional academic responsibilities, school demographics, critical shortage areas (including STEM areas and Exceptional Student Education), and level of job performance difficulties (including working in high-poverty, high-minority, or persistently lowest-achieving schools). c. Provides promotional opportunities for effective teachers to remain teaching in addition to moving into school leadership positions and bases promotions on effectiveness as demonstrated on annual evaluations as described in (D)(2)(ii), including a multi-metric evaluation in the year prior to promotion. 2. The LEA will implement a compensation system for principals that: a. Ties the most significant gains in salary to effectiveness demonstrated by annual evaluations as described in (D)(2)(ii), rather than to degree level or years of experience. b. Implements statutory requirements of differentiated pay in s. 1012.22(1)(c)4., F.S., through bonuses or salary supplements. Categories for differentiated pay are additional academic responsibilities, school demographics, critical shortage areas, and level of job performance difficulties (including working in high-poverty, high-minority, or persistently lowest-achieving schools). 39 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 3. The LEA may scale up the compensation system beginning with a cohort of schools, such as those that are considered persistently low-performing (the lowest 5% of schools in the state), as long as by the end of the grant, the compensation system applies district-wide. 4. The LEA will provide annually to the Department its salary schedule indicating how this requirement has been met. (iv)(c) Use evaluations to inform tenure and/or full certification 1. The LEA will base decisions to award employment contracts to teachers and principals on effectiveness as demonstrated through annual evaluations as described in (D)(2)(ii). (iv)(d) Use evaluations to inform removal 1. The LEA will base decisions surrounding reductions in staff, including teachers and principals holding employment contracts, on their level of effectiveness demonstrated on annual evaluations as described in (D)(2)(ii). When this factor yields equal results, seniority and other factors may be used in decisions. 2. The LEA will hold principals, their supervisors, and all LEA staff who have a responsibility in the dismissal process accountable for utilizing the process and timeline in statute (ss. 1012.33 and 1012.34, F.S.) to remove ineffective teachers from the classroom. 3. The LEA will report annually to the Department through Survey 5 the teachers and principals who were dismissed for ineffective performance as demonstrated through the district’s evaluation system. 4. The LEA will report annually to the Department through Survey 5 the highly effective teachers and principals who have resigned or who are no longer employed by the District. Time Line: Year 1 IB – Teams of administrators and teachers from each high school will begin the IB training program and on-site trainings will be provided in the per certification process EPIC plan – The stakeholders (including union) will begin the process for evaluation of the plan and how to prepare the draft evaluation instrument. The teams will develop and implement the pilot evaluation including a validation to ensure that the results are reliable regardless of the observer. The evaluation will be modified as needed throughout the process. Training is a key component to this success; it is embedded at each stage. Careers STEM – The Adult Education coordinator will review programs and determine the most effective STEM career certification programs to consider. He will work with the high school administrators, students and families in the selection of the modules. Technology – in order to ensure our data management system is prepared and capable of the demands this first year will be assessing the capacity and training the IT staff on the new products. 40 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Year 2 IB – the second year many more staff we attend the required training and master schedules and staffing will be evaluated. The high school principals will review and plan for year 3 which is contingent upon our district being certified to be an IB district. EPIC plan- implementation, following year one pilot, verification and modification of the evaluation tool with a strong PD component imbedded. Each administration will again receive intensive training as will the staff to be evaluated using the new tool. Teachers & administrators will have their performance evaluated and tied in part to student achievement. For the first time, earning a milestone based on performance achievement from one category to the next will result in a significant incentive increase (see chart on page 139). The evaluation tool is projected to go “live” at the beginning of the 2011-2012 school year. Careers STEM- the Adult Education coordinator will have completed the review and discussions with stakeholders prior to purchase of the industry certifications. The starting point for implementation of the new courses is the 2011-2012 school year. Marathon High School will start a Building Construction STEM program during the 11-12 school year. Money from this year will also be used for the planning stages of a pre-engineering program at Key West High School through Project Lead the Way. Technology – further training is projected for the IT team in order to meet the demands of the many systems ensuring that the student data is adequately tracked with the teachers as part of the evaluation system. Beyond year two this need will be sustained by the district. Year 3 IB – the plan calls for the IB certification process to be in the final stages. Our district should have a solid core of teachers & administrators trained and ready to begin implementation. Attention will be paid to the careful construction of master schedules and adherence to the IB program requirements. Additional teachers & administrators will be trained as needed. EPIC plan- will now be in fully implemented. Teachers and administrators will be receiving performance based incentives based in part on student achievement. They will also receive a significant increase when milestones are achieved. The process will include semiannual PD with modifications and adjustments made annually. Careers STEM – the career options and industry certifications program will be up and running. Additional courses and certifications will be added based on student interests and certifications available. Project Lead the Way will be debut at Key West High School. Year 4 IB –expansion of the IB program to middle school. Training for K-8 and middle school administrators. Additional training and support for new teachers and administrators. Beyond year four this need will be sustained by the district. EPIC plan- the teacher incentive plan is fully functioning throughout the school district. . Professional development will continue to ensure that the tool is effectively utilized across the district. The evaluation team will begin to evaluate each programs success for final reporting. Beyond year four this need will be sustained by the district. Careers STEM- the career options and industry certifications program will be up and running. Additional courses and certifications will be added based on student interests and certifications available. Beyond year four this need will be sustained by the district. Coral Shores High School is projected to start a Biomedical STEM program. 41 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Complete Work Plan Table for (D)(2)(iv)(b)(c)(d) and (D)(3) – one table covers all. APPROVED 42 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (D)(3) Ensuring equitable distribution of effective teachers and principals: Narrative (i) High-poverty and/or high-minority schools 1. The LEA will develop a plan, with timetables and goals, that uses effectiveness data from annual evaluations as described in (D)(2)(ii) to attract and retain highly effective teachers and principals to schools that are high-poverty, high-minority, and persistently lowest-achieving. The LEA plan may also be designed to attract and retain new teachers from high performing teacher preparation programs as defined by the Department in the grant to these schools. Include Work Plan for (E)(2)4. and 5. in the (D)(3) Work Plan Table, if applicable. 2. The LEA will implement a compensation system as described in (D)(2)(iv)(b) to provide incentives for encouraging effective teachers and principals to work in these schools. 3. The LEA will present a plan that includes strategies in addition to compensation to staff these schools with a team of highly effective teachers led by a highly effective principal, including how the success of these individuals will be supported by the district. 4. The LEA will report the effectiveness data of all teachers and principals annually during Survey 5. (ii) Hard-to-staff subjects and specialty areas 1. The LEA will implement a compensation system as described in (D)(2)(iv)(b) to provide incentives for the recruitment of effective teachers in these subjects and areas. 2. The LEA will implement recruitment and professional development strategies to increase the pool of teachers available in the district in these subject areas. Include (D)(3)(ii)2. in Work Plan Table for (D)(5). Complete Work Plan Table for (D)(2)(iv)(b)(c)(d) and (D)(3) – one table covers all. (D)(5) Providing effective support to teachers and principals: (i) Quality professional development 1. The LEA will implement a district professional development system that utilizes the state’s protocol standards for effective professional development as follows: For Teachers: a. Persistently lowest-achieving schools (schools in the lowest 5%) must modify the school schedules to accommodate lesson study. The LEA may modify school schedules for other schools to allow for common planning time by grade level (elementary) or subject area (secondary). Such planning time may be dedicated to lesson study focused on instructional quality, student work, and outcomes, without reducing time devoted to student instruction. Where lesson study is implemented, the LEA will devote a minimum of one lesson study per month for each grade level or subject area. 43 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II b. The LEA will ensure that professional development programs in all schools focus on the new common core standards, including assisting students with learning challenges to meet those standards (such as through accommodations and assistive technology). Such professional development will employ formative assessment and the principles of lesson study. c. Implement IPDPs for teachers based on analysis of student performance data and results of prior evaluations as described in (D)(2)(ii). d. Implement a beginning teacher support program for teachers in the first and second year that integrates data from multiple evaluations, coaching/mentoring, and assistance on using student data to improve instruction; builds in time for observation of effective teachers; includes collaboration with colleges of education, as appropriate; and defines a clear process for selecting and training coaches/mentors. For Principals: e. Implement professional development programs at all schools that focus on the new common standards, including assisting students with learning challenges to meet those standards. f. Implement professional development based on the principles of lesson study and formative assessment as described by the Department in this grant and the process needed to implement lesson study in a school. g. Implement ILDPs for principals based on analysis of student performance data and results of prior evaluations as described in (D)(2)(ii). (ii) Measure effectiveness of professional development 1. The LEA will evaluate professional development based on student results and changes in classroom/leadership practice (as appropriate for the teacher/principal). Complete Work Plan Table for (D)(5). Include (B)(3)2. and 3., (C)(3)(ii)1. and 2., (D)(2)(iv)(a), and (D)(3)(ii)2. in Work Plan Table for (D)(5). APPROVED Toward the absolute priority of comprehensive education reform: The LEA will document the use of Title II, Part A, funds specifically to supplement and enhance the initiatives implemented in this grant. This element of the MOU should be addressed in the response to (A)5. 44 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Provide Support for Educator Preparation Programs – (D)(1)(ii) Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will improve the support of candidates in teacher preparation programs by collaborating with providers in assigning effective personnel as mentors and supervising teachers and using candidate performance data for program improvements. Deliverables (minimum required evidence): 1. Plan for collaboration with institutions or other program providers (include list) to assign supervising teachers. 2. Plan for determining qualifications for selecting effective and highly effective teachers and administrators, including clinical educator training, as supervising teachers and peer mentors for teacher and principal leadership candidates. 3. Description of qualifications to supervise program interns or serve as a peer mentor. 4. Reporting teachers and principals who are selected for these positions (the staff database will be updated with a data element for this purpose). 5. Annual District Program Evaluation Plan (DPEP) reports for district alternative certification programs and annual reports for School Leadership programs reflect requirements met for Continued Approval Standard Three (regarding use of data for continuous program improvement and the assignment and training of peer mentors). The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: nd rd th 2 3 4 Quarter Quarter Quarter Dr. Jesus Jara - Chief Operations Officer X X X X X X Cheryl Allen- Director of Human Resources X X X X X X Linda Diaz- Director of Title I & x x x x x x Professional Development The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): Plan for collaboration with institutions or 2nd 3rd 4th other program providers (include list) to Quarter Quarter Quarter assign supervising teachers. X X X X Monroe County School District consists of rural communities with no institutions for higher education within its boundaries. State universities create relationships with districts within close proximity of campuses to facilitate ease of supervision and 45 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II implementation for faculty and staff. MCSD is prepared to assign supervising teachers to candidates from teacher preparation programs by maintaining a pool of supervising teachers who have completed clinical educator training. Interns from universities and colleges of education are occasionally placed within Monroe County School District, but no formal relationships are established. Clinical educator training is offered annually in the district, and a system for refreshing existing completers is established. Clinical educator training is provided annually through agreement with the local union, United Teachers of Monroe, and qualifies participants to act as mentors/peers for the new teaching induction program in addition to fulfilling the role of intern supervisor. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Clinical educator training is provided annually to maintain a qualified pool of supervising teachers. Clinical educator training is provided annually through agreement with the local union, United Teachers of Monroe, and qualifies participants to act as mentors/peers for the new teaching induction program in addition to fulfilling the role of intern supervisor. Deliverable (required): Plan for determining qualifications for selecting effective and highly effective teachers and administrators, including clinical educator training, as supervising teachers and peer mentors for teacher and principal leadership candidates. The District Director of Professional Development maintains a list of qualified supervising teachers and works with school principals to assign student teachers based on placement criteria from the university and school dynamics. The MCSD Leadership Plan is under revision for the 2010-2011 school year and will include criteria for high performing principals to nd 2 Quarter X 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 X 2010-11 3rd 4th Quarter Quarter 2011/12 X X 46 2012/13 X 2012/13 X 2013/14 X 2013/14 X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II mentor leadership candidates. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Clinical educator training is provided annually to maintain a qualified pool of supervising teachers. The MCSD Leadership Plan revision will be completed. Deliverable (required): Description of qualifications to supervise program interns or serve as a peer mentor. Supervising teachers will successfully complete Clinical Educator Training and maintain certification to be qualified to supervise a student teacher. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Clinical Educator Training will be available annually. Clinical educator training is provided annually through agreement with the local union, United Teachers of Monroe, and qualifies participants to act as mentors/peers for the new teaching induction program in addition to fulfilling the role of intern supervisor. Deliverable (required): Reporting teachers and principals who are selected for these positions (the staff database will be updated with a data element for this purpose). Reports to DOE will be provided on the established timeline during the data survey windows. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Survey data is provided on the established timeline. Deliverable (required): Annual APEP reports for district alternative certification programs and annual reports for School Leadership programs reflect requirements met for Continued Approval Standard Three (regarding use of data for continuous program improvement and the nd 2 Quarter X 2010-11 3rd 4th Quarter Quarter 2011/12 X X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2010-11 3rd 4th Quarter Quarter X X 2011/12 2nd Quarter X 2010-11 3rd 4th Quarter Quarter 2011/12 2 Quarter X X X 2nd Quarter X nd 2 Quarter 2010-11 3rd 4th Quarter Quarter X X 2011/12 2010-11 3rd 4th Quarter Quarter 2011/12 X X 47 X 2013/14 X X 2nd Quarter X nd 2012/13 2012/13 X 2012/13 X 2012/13 X 2012/13 X 2012/13 X 2013/14 X 2013/14 X 2013/14 X 2013/14 X 2013/14 X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II assignment and training of peer mentors). Reports to DOE will be provided on the established timeline during the data survey windows. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Survey data is provided on the established timeline. Internal processes will be reviewed annually to ensure reported data are complete, accurate, and timely. Project Budget Summary: 2010-11 3rd Quarter 2nd Quarter $0 $0 2nd Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 X 2011/12 X 2013/14 X 2012/13 2013/14 4th Quarter $0 $0 $0 $0 Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Clinical Educator training is an existing piece of the professional development offerings. The revision of the MCSD Leadership Plan has already begun, and will encompass required elements of RttT. The primary resource to support this project is building capacity with existing personnel, and sustainability of the program will be a primary element when constructing the project parameters. Supporting Narrative (optional): APPROVED Title and Page Number of Appendices for this Project (if applicable): 48 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criteria: Improve Teacher and Principal Evaluation Systems – (D)(2)(i)(ii)(iii) Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will design and conduct teacher and principal evaluations through systems that meet the requirements of law and of the MOU. Deliverables (minimum required evidence): 1. A completed teacher appraisal system that reflects the inclusion of and implementation process for each of the content and design requirements listed in s. 1012.34, F.S., and in the MOU in (D)(2)(i)-(iii). See combined checklist at the end of the template document. 2. A timetable for implementing the teacher evaluation system. 3. A completed principal appraisal system that reflects the inclusion of and implementation process for each of the content and design requirements listed in s. 1012.34, F.S., and in the MOU in (D)(2)(i)-(iii). See combined checklist at the end of the template document. 4. A timetable for implementing the principal evaluation system. 5. Annually report evaluation results for teachers and principals through the regular student and staff survey. 6. Submit revisions to the teacher and principal evaluations annually, if revisions are made. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: nd rd th 2 3 4 Quarter Quarter Quarter Dr. Joseph Burke - Superintendent of X X X X X X Schools Dr. Jesus Jara - Chief Operations Officer X X X X X X Dr. L. Salinero – Executive Director of X X X X X X Student Services & Curriculum Cheryl Allen - Human Resources Director X X X X X X TBA - RTT Project manager X X X X X x The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): A completed teacher appraisal 2nd Quarter 3rd Quarter 4th system that reflects the inclusion of Quarter and implementation process for PLANNING PLANNING Implementation No X X X each of the content and design later requirements listed in s. 1012.34, than F.S., and in the MOU in (D)(2)(i)May 1 (iii). 2010-11 2011/12 2012/13 2013/14 Supporting Activities (indicate each year activity will be 2nd Quarter 3rd Quarter 4th 49 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II conducted and include collective bargaining, if applicable): Collective bargaining negotiations to include salary schedule and teacher evaluation instrument are in process. Quarter In process Deliverable (required): A timetable for implementing the teacher evaluation system (this may be adjusted annually). Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Project manager hired (3 years) RFQ for Value Added consultant to facilitate the k-3 and 11th and 12th grade as well as non-tested areas (one year) Work group created and assigned tasks (2 years) To develop the instrument the LEA In process 2nd Quarter X 2nd Quarter X X No later than May 1 X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter X X X X 2011/12 2012/13 2013/14 X X will measure student growth based upon the performance of students on staterequired assessments and, for content areas and grade levels not assessed on state-required assessments, the LEA will use state assessments or district-selected assessments that are aligned to state standards and developed or selected in collaboration with LEA stakeholders, or will use valid, rigorous national assessments. It utilizes the state-adopted teacher-level student growth measure as the primary factor of the teacher and principal evaluation systems. Student growth component is at least 40% and will be greater than any other single component of the evaluation. Evaluation will be completed at least once a year for all teachers, with several formative evaluations prior to the final evaluation, including coaching from the administrator. The product will be a multi-metric approach combining with the student performance and principal observation components to develop a “multi-metric” evaluation system for, at a minimum, the teachers who are in the year prior to a 50 X X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II milestone career event, such as being awarded a multi-year contract, a promotion, or a significant increase in salary. Examples of additional metrics include, but are not limited to, observations by master teachers or instructional coaches, student input, peer input, and parental input. Additionally both evaluation tools will include a comprehensive range of ratings beyond a simple satisfactory or unsatisfactory, that must include “effective” and “highly effective.” Stakeholder involved development of the instrument, modifications. The stakeholders will include the core of effective X X X X X X X practices, developed in collaboration with stakeholders that have been strongly linked to increased student achievement for the observation portion of the teacher evaluation. The principal, direct supervisor, and any other individual performing observation will use, at a minimum, this same core of effective practices Training for evaluators and stakeholders Field testing of instrument, validity checks Review results and modify instrument/ training as needed. The evaluation tool will utilize the state-adopted teacher-level X X X X X X X X X student growth measure as the primary factor of the teacher and principal evaluation systems. Training for all stakeholders on the new tools Begin full implementation of instrument, modify as needed Deliverable (required): A completed principal appraisal system that reflects the inclusion of and implementation process for each of the content and design requirements listed in s.1012.34, F.S., and in 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 X 51 2012/13 2013/14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II the MOU in (D)(2)(i)-(iii). See combined checklist attached. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The principal evaluation is currently in use and incorporates the required elements. The nd 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 X X X X X X \evaluation tool utilizes for the Florida Principal Leadership Standards with an emphasis on recruiting and retaining effective teachers, improving effectiveness of teachers, and removing ineffective teachers. Evaluation will be completed at least once a year for all administrators. Training and modification as needed Deliverable (required): A timetable for implementing the principal evaluation system (this may be adjusted annually). Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The principal evaluation is in the first year of implementation for the 2010-2011 school year. Collective bargaining is not applicable for administrators in Monroe County. The LEA will conduct “multi- X 2nd Quarter X 2nd Quarter X X X 2010-11 3rd 4th Quarter Quarter X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 2010-11 3rd 4th Quarter Quarter X 2010-11 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 X X X metric” evaluations for administrators who are in the year prior to a milestone career event, such as being awarded a multi-year contract, a promotion, or a significant increase in salary. The LEA plan will include a definition of milestone career event. Deliverable (required): Annually report evaluation results for teachers and principals through the regular student and staff survey. Supporting Activities (indicate each year nd 2 Quarter 52 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II activity will be conducted and include collective bargaining, if applicable): Survey data is provided on the established timeline. Deliverable (required): Submit revisions to the teacher and principal evaluation systems annually, if revisions are made. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Revisions to the performance evaluation systems will be submitted as required. Project Budget Summary: 2nd Quarter $66,000.00 2010-11 3rd Quarter $ 50,000.00 2nd Quarter X 3rd Quarter X 4th Quarter X 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2nd Quarter 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 X 2011/12 X 2012/13 X X 2013/14 4th Quarter $ 50,000.00 $135,000.00 $ 95,000.00 (Evaluation) $ 65,000.00 Sustainability Factors: Monroe County School Board has already reviewed and implemented the evaluation system for administrators. Funding to sustain the performance-based component of the plan is a high priority for the Monroe County School Board. The board is committed to have the highest paid and highest performing educators in the state of Florida. Therefore, the performance based compensation plan (EPIC) will replace the current salary schedule and will reward teachers and principals based upon performance indicators including student achievement. Supporting Narrative (optional): Monroe County is located in a remote area of the Florida Gulf Coast. Our district is connected to the continental United States by over one hundred miles of two lane roads and bridges. Our cost of living in this isolated area is the second highest in the state. We have significant difficulty recruiting and retaining educators in our school district, even though we offer the highest beginning teacher salary in the State of Florida. In addition, our island community is under threat of hurricanes and commercial disasters such as the largest oil spill in US history in the Gulf of Mexico. Our rural community is fully dependent upon the fishing and tourism industries and has no other means to sustain this fragile economy. Additionally, many of the students and families in Monroe County are economically disadvantaged, with many schools having more than 60% or more students qualifying for Free and Reduced Lunch (FRL) and our district average is nearly 50% FRL. We also have a large population of students for whom English is a Second Language (ESL). Currently, in our schools we have students speaking 60 different languages. Our total enrollment is approximately 8200 students, with 22% ESE population (including gifted). The Monroe County Incentive program is called the EPIC plan (Educational Performance Incentive Compensation Plan). The EPIC plan is designed to offer teachers and school administrators a pathway toward significant incentives for exemplary educational practices. Our plan aligns with the state Differentiated Accountability Model. EPIC Plan will enable educators, at many places in their careers, to 53 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II set a course for success in the field of education. Time Line Year 1(2010-2011) –The plan is developed by a joint, school and administration team, with multiple sub-committees ensuring that each group has a voice in the plan development, implementation and review. Selection of supports from research based, university and experts in the field will be contacted to support our initiative and program evaluation. Major benchmarks include: Finalize the compensation model Determine value added methodology and metrics Conduct communication meetings throughout the year Hire the Program Manager Pilot evaluation tool A complete list of first year benchmarks can be found on below: November – December 2010 Each school will review the 2009- 2010 student data with site-based data coaches. School administrator will meet with individual teachers to plan professional development needs for the school year as evidenced by Teacher IPDPs Team will utilize reflection from Committees in making modifications to the plan Each administrator will meet with the Chief Operations Officer & Executive Director of Student Services & Curriculum to discuss school-wide student data and review plans for the school year as evidenced by the SIP process Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives Create job description and advertisement for Project Manager is prepared and will be posted RFQ for Value Added consultant, evaluation consultant; applications are prepared and posted Committees meet regularly to discuss and prioritize activities Committees review and analyze evaluation tools as well as a career ladder for administrators Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives Following each Progress Monitoring (PM) interval the administrator and instructors will review the results. Note PM Intervals vary depending on the school type and administration of the instrument. Each administrator will meet (monthly) with the Chief Operations Officer & Executive Director of Student Services & Curriculum to discuss school-wide progress 54 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Review and select consultant, university support, evaluation consultant schedule trainings. Monthly committee meetings, create public / school board communication Data coaches will meet with school administrators to review school wide data Administrators will meet individually with teachers to discuss professional development needs for instructional staff Chief Operations Officer will meet (monthly) with the principals regarding their school-wide data and their individual professional development focus. Team will utilize reflection from Committees in making modifications to the plan Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives January – February 2010 – Milestone Teacher evaluation instrument should be well developed Each administrator will meet (monthly) with the Chief Operations Officer, Project Manager and Executive Director of Student Services & Curriculum to discuss school-wide progress Monthly committee meetings continue Value Added training and supporting consultant training should be making significant progress Prepare the intensive training modules for the teachers and administrators for January Team will utilize reflection from Committees in making modifications to the plan Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives March – April 2011 Final vetting process for the evaluation tool Intensive educator vetting with staff regarding the evaluation tools continue Completion of the training and implementation of Value Added. Monthly committee meetings continue Each administrator will meet (monthly) with the Chief Operations Officer to discuss school-wide progress Procedures of evaluation should be completed and ready to begin training pilot Committees will work on communication and professional development relating to the evaluation instrument 55 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Team will utilize reflection from Committees in making modifications to the plan Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives should be completed April 2011 Final review and preparation for evaluation pilot Request volunteers for the pilot evaluation Training for the observers using the instrument Monthly committee meetings Team will utilize reflection from Committees in making modifications to the plan Each administrator will meet (monthly) with the Chief Operations Officer to discuss school-wide progress Intensive training on the evaluation instrument to ensure inter-rater reliability May 2011 Pilot implementation begins Each administrator will meet (monthly) with the Chief Operations Officer to discuss school-wide progress Intensive training on the evaluation instrument to ensure inter-rater reliability Review the evaluation process and compare the results Monthly committee meetings continue Team will utilize reflection from Committees in making modifications to the plan May- June 2011 (Tentative) Union ratifies the evaluation and the team verifies the evaluation responses Each administrator will meet (monthly) with the Chief Operations Officer to discuss outcomes and overall student progress Plans for training needs are projected for 2012-2013 Team will utilize reflection from Committees in making modifications to the plan June – August 2011 Prepare the policy and procedure manual / complete training modules for administrators and teachers August 2011-June 2012 Full Performance-based compensation incentive implementation begins. 56 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Throughout the planning year we will explore what the best practices are based on the experts in the field. Our goal is to create a program that is exemplary in all aspects. Year 2 (2011-2012) – Implementation begins with all of our 11 schools participating in the EPIC Plan. Monroe County School District is dedicated to ensuring that ALL teachers and administrators in our county are included. Teachers and administrators will be placed in the appropriate location on the career ladder by the Human Resources Department and Career Placement Committee using guidelines developed in year one. Each educator will receive the placement information and professional development offerings based upon identified area(s) of support and student need. The specific performance-based compensation break-out for year two is as follows: 2011-2012 = 35% student performance on assessments/ 15% local data/ 50% observations and other measures (as determined in year 1). Year 3 (2012-2013)–This will be the first year that movement within the career ladder is possible. Prior year data will result in modifications to strengthen areas of weakness in the current plan. Professional Development will be an expected and ongoing part of the process. Each year the Human Resources Department and Career Placement Committee will review and provide placement designations. The evaluation break-out is as follows: 2012-2013 = 40% student performance data / 10% local data / 50% observations and other supporting data (as determined in year 1). Year 4 (2013-2014)–This will be the second year of full implementation of the performance based incentive program. The continuous improvement model will be utilized to review data from prior years and to continue to modify the program as needed. The spotlight now shifts to sustainability as our goal of maintaining the program beyond the grant cycle. The educators have the potential to transition to the Accomplished and Distinguished levels. Educators wishing to move across the career ladder will follow application procedures to indicate interest. The Human Resources Department and Career Placement Committee will review applications. The break-out is as follows: 2013-2014 = 45% student performance data / 10% local data / 45% observation and other data (as determined in year 1). Year 5 (2014-2015)–This will be the third year of full implementation of the performance based incentive program. Planning for the future of the project will be completed and the trainings, communications and evaluation processes should all be highly efficient and established as a regular part of our HR program. The break-out is as follows: 2014-2015= 50% student performance data / 10% other data / 40% observation and other data (as determined in year 1). The program is 100% viable and sustained by local and federal sources. The evaluation measures are both valid and reliable and applied fairly and transparently. Teachers and administrators understand the clear career pathways and are able to navigate the program with ease. Title and Page Number of Appendices for this Project (if applicable): APPROVED Plan Appendix (D)(2)(i-iii) 57 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criteria: Use Data Effectively in Human Capital Decisions – (D)(3), including (D)(2)(iv)(b)(c)(d) and (E)(2)4.-5. Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will use results from teacher and principal evaluations to inform each of the human capital processes listed in the MOU. Deliverables (minimum required evidence): 1. Annually submit the teacher and principal salary schedules that reflect the basis of determining the pay scale and supplements. The salary schedule will reflect the use of evaluation data and the requirements of the MOU based on the district-determined implementation timeline. 2. Submit a revised teacher and principal evaluation system that reflects the process for using evaluation data to make each of the human capital decisions listed in the MOU (date submitted will be based on the districtdetermined implementation timeline.) 3. Submit a staffing plan that reflects the assignment of effective and highly effective teachers and principals as defined in the grant notice to the district’s schools that have the highest percentages of low income students and minority students. Revisions to the plan, if made, should be submitted annually. 4. Annually submit the district’s collective bargaining agreement. The agreement that shows the use of teacher evaluation data to inform human capital decisions listed in the MOU will be submitted based on the districtdetermined implementation timeline. 5. Submit documentation of the accountability process for administrators to utilize evaluation results for teachers and principals in human capital decisions (list the documentation and the timeline for submission in Related Activities). 6. Report all bonuses and salary augmentations by teacher through the regularly-scheduled student and staff survey. 7. Annually report terminations through the regularly-scheduled student and staff survey. 8. Report and update as necessary during the school year the assignment of teachers and principals through the regularly-scheduled student and staff surveys. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter Dr. J. Burke - Superintendent of Schools X X X X X X Dr. J. Jara - Chief Operations Officer X X X X X X C. Allen - Human Resources Director X X X X X X The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): 58 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Annually submit the teacher and principal salary schedules that reflect the use of evaluation results. The salary schedule will reflect the use of evaluation data and the requirements of the MOU based on the district-determined implementation timeline. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The principal evaluation is board reviewed the new performance incentive plan to include performance elements which are currently under development. Collective bargaining negotiations to include salary schedule and teacher evaluation instrument are in process. Deliverable (required): Submit a revised teacher and principal evaluation system that reflects the process for using evaluation data to make each of the human capital decisions listed in the MOU (date submitted will be based on the districtdetermined implementation timeline). Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The principal evaluation system is in place and can be viewed in the appendices of this document. Collective bargaining negotiations to include salary schedule and teacher evaluation instrument are in process. Deliverable (required): Submit a staffing plan that reflects the assignment of effective and highly effective teachers and principals as defined in the grant notice to the district’s schools that have the highest percentages of low income students and minority students. Revisions to the plan, if made, should be submitted annually. Supporting Activities (indicate each year activity will be conducted and include 2nd Quarter 2nd Quarter X 3rd Quarter 4th Quarter X 2010-11 3rd 4th Quarter Quarter X X X X X X 2011/12 X X X X 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2nd Quarter X 2nd Quarter X X 2010-11 3rd 4th Quarter Quarter X 2012/13 X 2012/13 2010-11 3rd 59 X 2013/14 X X X X X 2011/12 2011/12 4th 2013/14 X 2012/13 X 2nd 2013/14 X 2011/12 X 2012/13 X X 2010-11 3rd 4th Quarter Quarter X X nd X 2012/13 2013/14 X 2013/14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II collective bargaining, if applicable): Staffing plan will be developed following the development of the teacher evaluation model in conjunction with the principal evaluation system. Criteria will be established with concrete procedures to make staffing adjustments to support the schools that serve the highest percentage of low income and minority students. Quarter Quarter Quarter X X X Deliverable (required): Annually submit the district’s collective bargaining agreement. The agreement that shows the use of teacher evaluation data to inform human capital decisions listed in the MOU will be submitted based on the district-determined implementation timeline. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Collective bargaining agreement will be submitted. Deliverable (required): Submit documentation of the accountability process for administrators to utilize evaluation results for teachers and principals in human capital decisions (list the documentation and the timeline for submission in Related Activities). Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The principal evaluation system is in place and can be viewed in the appendices of this document. Annual evaluation results will impact potential salary increases and longevity for principals. Collective bargaining negotiations to include performance plan and teacher evaluation instrument are in process. Deliverable (required): Report all bonuses and salary augmentations by teacher through the regularly-scheduled student and staff survey. 2010-11 3rd 4th Quarter Quarter X 2011/12 2010-11 3rd 4th Quarter Quarter X 2011/12 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 2nd Quarter X nd 2 Quarter 2nd Quarter X 2nd Quarter X X 2010-11 3rd 4th Quarter Quarter X 60 X X 2012/13 X 2012/13 X 2013/14 X 2013/14 X X X X X X X 2011/12 X 2012/13 X 2013/14 X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Survey data is provided on the established timeline. Deliverable (required): Annually report terminations through the regularly-scheduled student and staff survey. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Survey data is provided on the established timeline. Deliverable (required): Report and update as necessary during the school year the assignment of teachers and principals through the regularly-scheduled student and staff surveys. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Survey data is provided on the established timeline. Project Budget Summary: 2010-11 3rd Quarter 2nd Quarter $0 $0 2nd Quarter X 2nd Quarter 2nd Quarter X nd 2 Quarter nd 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2010-11 3rd 4th Quarter Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 2010-11 3rd 4th Quarter Quarter X 2011/12 2010-11 3rd 4th Quarter Quarter X X 2011/12 X X X X X X 2012/13 X 2013/14 X X 2012/13 X 2011/12 2013/14 2013/14 X X 2012/13 2013/14 4th Quarter $0 $0 $0 $0 Sustainability Factors: Monroe County School Board is currently implementing the performance based evaluation system for administrators. Funding to sustain the performance-based component of the plan is a high priority for the Monroe County School Board. The board is committed to have the highest paid and highest performing educators in the state of Florida. Therefore, the proposed performance based system will reward teachers and principals based upon performance indicators including student achievement. Supporting Narrative (optional): APPROVED Title and Page Number of Appendices for this Project (if applicable): D 3 – Principal’s Performance Evaluation Plan 61 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criteria: Focus Professional Development – (D)(5), including (B)(3)2. and 3., (C)(3)(ii), (D)(2)(iv)(a), (D)(3)(ii)2., and, if applicable, (E). Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will revise its professional development system to include the elements described in the Race to the Top grant, will utilize data from teachers’ and principals’ evaluations to plan and evaluate professional development, and will evaluate the effectiveness of professional development based on changes in practice and student outcomes. Evidence: 1. A revised district professional development system that meets the requirements of Florida’s Protocol Standards for Professional Development and reflects the inclusion of each of the content and design requirements in the MOU sections listed above. See combined checklist attached, to be submitted with this Table. 2. A timetable for implementing the new elements into the professional development system for teachers and principals in the district. 3. A revised teacher and principal evaluation system that reflects the use of evaluation results to plan and provide professional development. 4. A component of the district’s professional development system reflecting a revised process for evaluating the district’s professional development in accordance with Protocol Standards, the requirements of the MOU, and as described in the grant. 5. A timetable for implementing the evaluation of professional development in the district. 6. Annually report evaluation results of the professional development for teachers and principals as part of the review of the district’s professional development plan. 7. Submit revisions to the professional development system annually, based on the district-determined timetable for implementation. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter Dr. Jesus Jara - Chief Operations Officer X X X X X X Linda Diaz - Director of Professional X X X X X X Development Committee of High Performing Principals X X X X X X The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): 62 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II A revised district professional development system that meets the requirements of Florida’s Protocol Standards for Professional Development and reflects the inclusion of each of the content and design requirements in the MOU sections listed above. See combined checklist attached. The Professional Development System is updated as requirements and expectations change. The Master Inservice Plan is a key component of the system, and includes components that embrace program requirements. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Update the District Master Inservice Plan annually. An annual report will be generated detailing any revisions to the Master Inservice Plan to comply with RttT grant requirements. Deliverable (required): A timetable for implementing the new elements into the professional development system for teachers and principals in the district. Revisions and plans will occur during the 2010-2011 school year, and will be implemented throughout the term of the award. Administrator revisions will be addressed by the committee working to revise the MCSD Leadership Plan. The MCSD Professional Development System incorporates the Florida Professional Development Protocol Standards and provides support for professional development offerings including jobembedded opportunities such as Lesson Study and Professional Learning Communities. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Creation of a timetable for teacher PD. Revision of the MCSD Leadership Plan. Deliverable (required): A revised teacher and principal evaluation system that reflects the use of evaluation 2nd Quarter X nd 2 Quarter X 3rd Quarter X 4th Quarter X 2010-11 3rd 4th Quarter Quarter X 2nd Quarter 2010-11 3rd 4th Quarter Quarter X 2011/12 X 2012/13 X 2013/14 X X X X X X 2011/12 X 2012/13 X 2013/14 X 2010-11 3rd 4th Quarter Quarter X X X X 2011/12 2012/13 2013/14 2nd Quarter X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2nd Quarter 63 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II results to plan and provide professional development. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): The principal evaluation system is in place and can be viewed in the appendices of this document. Collective bargaining negotiations to include performance based incentives and teacher evaluation instrument are in process. Deliverable (required): A component of the district’s professional development system reflecting a revised process for evaluating the district’s professional development in accordance with Protocol Standards, the requirements of the MOU, and as described in the grant. As indicated by the state protocol, at least 10% of the district’s professional development activities will have formal evaluations. Professional development related to the new teacher evaluation system will be evaluated by an independent evaluator. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Development of the teacher performance evaluation instrument and supporting program. Administer PD Needs Assessment related to teacher evaluation system elements Professional development related to the new teacher evaluation system. Implementation of the teacher evaluation system. Evaluation of the professional development related to the system. Deliverable (required): A timetable for implementing the evaluation of professional development in the district. Evaluation will occur following the implementation cycle. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Development of the teacher performance nd 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X X X X 2011/12 2012/13 X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2nd Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2nd Quarter X X 2013/14 X 2012/13 X 2013/14 X 2012/13 2013/14 X X X X X X X nd 2 Quarter X nd 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2010-11 3rd 4th Quarter Quarter X X 2011/12 64 X X 2012/13 X 2012/13 2013/14 X 2013/14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II evaluation instrument and supporting program. Administer PD Needs Assessment related to teacher evaluation system elements Professional development related to the new teacher evaluation system. Implementation of the teacher evaluation system. Evaluation of the professional development related to the system. Deliverable (required): Annually report evaluation results of the professional development for teachers and principals as part of the review of the district’s professional development plan. Professional development will be documented and tracked each year. The evaluation will occur at the end of the cycle. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Professional development related to the new teacher evaluation system will be evaluated by an independent evaluator. Deliverable (required): Submit revisions to the professional development system annually, based on the district-determined timetable for implementation. The Master Inservice Plan and other key elements of the Professional Development System will be updated based on teacher participation and areas identified through the needs assessment process. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Develop the teacher evaluation system. Administer PD Needs Assessment related to teacher evaluation system elements Professional development related to the new teacher evaluation system. Implementation of the teacher evaluation system. Evaluation of the professional development related to the system. Project 2nd Quarter 2010-11 3rd Quarter X X X X X X X X Field test X X X X 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 X nd 2 Quarter 2nd Quarter X 2nd Quarter X X 2010-11 3rd 4th Quarter Quarter X 2011/12 2010-11 3rd 4th Quarter Quarter X X 2011/12 2010-11 3rd 4th Quarter Quarter X X X 2011/12 2012/13 X X X 2012/13 X 2013/14 X 2013/14 X 2013/14 X 2012/13 2013/14 X X X X Field test X X X X 2011/12 4th Quarter 65 2012/13 2013/14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Budget Summary: $0 $0 $0 $0 $0 $0 Sustainability Factors: Ease of access to professional development activities is already established in the district and the capacity for teachers to access and attend sessions is scheduled by the district leadership team. Schoolbased leadership teams will utilize appropriate opportunities to provide job-embedded professional teachers for all stakeholders. Supporting Narrative (optional): As stated under the core areas, the Monroe County School District EPIC Plan is designed to mirror the State of Florida Race to the Top and the Common Core Standards initiatives. The EPIC plan will have a career ladder for both teachers and school-based administrators that is clear and meaningful in support of the high needs students and schools. The project emphasizes the need for high quality educators and their impact on student achievement. Further, we recognize that the hard to staff positions can be impacted by incentives and performance compensation. In order to retain the highly effective staff, the performance-based compensation is a natural way to meet the needs of the students and recognize excellent educators. Definitions of teacher expectations draft can be found in Attachment J. A significant portion of the performance-based compensation plan will depend on student achievement. As shown in our comparison schools, our district underperforms comparison schools. We will be utilizing at least two years of data to place educators on the career ladder. Milestone movement to a higher level within the plan will come with significant salary increase and responsibility for both teachers and administrators. To determine movement to a higher level of achievement the team will develop a detailed rubric containing specific indicators, to rate the employees. As the teachers and administrators progress up the career ladder, they will receive reward as well as additional responsibilities. Reward will be in the form of significant performance based salary incentives and the responsibility will be mentoring for struggling and new staff and leadership roles / opportunities. As we develop the final plan, we will determine what “effective” is and exactly how “effective” will be measured. APPROVED 66 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Checklist for Professional Development System Revisions under RTTT (Return with Final Scope of Work) Item from RTTT MOU and corresponding Protocol standards 1. Teacher content knowledge with a focus on the common core state standards (aligns with Protocol 1.2.2; 2.2.2; 3.2.2) 2. Instructional strategies and methods for implementation of the common core state standards (aligns with Protocol 1.2.2; 2.2.2; 3.2.2) 3. Methods, strategies, and the conceptual background appropriate to differentiating instruction (aligns with Protocol 1.2.3; 2.2.3; 3.3.3) 4. Use of formative assessment and the principles of lesson study to guide instruction [Ref. MOU criterion (B)(3)2.] (aligns with Protocol 1.2.1; 1.4.2; 1.4.4; 2.2.1; 3.2.1) 5. Effective use of common planning time to focus on teaching and learning improvements (aligns with Protocol 1.2.6; 2.2.6; 3.2.6) 6. Teacher and principal use of data systems involving assessment information on student learning (aligns with Protocol 1.4.4; 2.4.4; 3.4.4) 7. Methods for using student learning data to formulate targets for improvement in IPDP and ILDP (aligns with Protocol 1.1.3; 2.1.5) 8. Effective beginning teacher support programs based on evaluation data of student learning and teacher performance (aligns with Protocol 1.3.1; 1.3.2; 2.3.2; 3.3.2) 9. Instructional practices that target high-needs students (aligns with Protocol 1.2.3; 2.2.3; 3.3.3) 10. Training administrators and other school leaders on methods of classroom observation, feedback and coaching for improvement, and using lesson study and related protocols to focus and support teacher work on improving instructional and assessment practices (aligns with Protocol 3.1.6) 11. A comprehensive plan to deliver professional development to teachers, principals, and administrators on how to access local instructional improvement and state level data systems for the purpose of improving instruction. [Ref. Section ©, Data Systems] (aligns with Protocol 1.2.5; 2.2.5; 3.2.5) 12. If the district has schools in the 5% of persistently lowest performing schools and is participating in the Leadership Academy, include the Academy in the plan [Ref. Section (E), Struggling Schools]. 67 Page shown in Final Scope of Work Page 17 Page 28 Page 17 Page 48 Page 48 Page 28 Page 28 Page 53 Page 28 Page 53 Page 53 Page 41 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II E. TURNING AROUND THE LOWEST-ACHIEVING SCHOOLS IF YOU ARE AN LEA THAT DOES NOT HAVE A PERSISTENLY LOWESTACHIEVING SCHOOL, SECTION (E) DOES NOT APPLY TO YOU AND YOU DO NOT NEED TO COMPLETE IT. SEE APPENDICES B AND C TO FLORIDA’S MOU FOR LIST OF SCHOOLS. INFORMATION FOR ITEMS BELOW SHOULD BE THE SAME AS IN YOUR SCHOOL IMPROVEMENT GRANT (SIG) APPLICATION. YOU MAY INCLUDE RELEVANT PARTS OF YOUR SIG APPLICATION IN THE APPENDIX. N/A Monroe County Does Not Have Low Performing /Turn Around Schools (E)(2) Turning around the lowest-achieving schools 1. The LEA will select and implement one of the four school intervention models described in the grant application in all persistently lowest-achieving schools located in the district (see Appendix A to the MOU). The Department will identify the schools based upon the school categories devised for school accountability under s. 1008.33, F.S., and set forth in Rule 6A1.099811, F.A.C. (see Appendices B and C to the MOU). 2. An LEA with more than nine persistently lowest-achieving schools will not select the transformational option for more than one-half of the schools. All actions undertaken by the LEA under this element of the grant will be in accordance with the requirements of s. 1008.33, F.S. (Differentiated Accountability). Complete Work Plan Table for (E)(2)1.-2. 3. The LEA will submit a plan for the Department’s approval that implements one or more of the following programs in each persistently lowest-achieving school and within the feeder pattern of each persistently lowest-achieving high school: • In Intervene schools, the LEA will implement a schedule that provides increased learning time beyond the minimum 180 days and/or implement an extended school day, beyond the current hours of instruction. • The LEA will offer prekindergarten on a full day basis using the Department’s Title I Full Day PreK model, for children residing in the attendance zone of such schools. • The LEA will expand opportunities for students to attend career and professional academies, especially STEM academies, under s. 1003.493, F.S. • The LEA will expand or introduce proven programs to encourage advanced classes, positive behavior support systems, mentoring, and curriculum that provide high-need students with college-ready, career-ready, or other postsecondary skills.. • The Department may approve other programs that demonstrate a strong record of improving student achievement in these district schools. 68 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Complete Work Plan Table for (E)(2)3. 4. The LEA will use effectiveness data from annual evaluations to determine incentives for the most effective teachers to work in the district’s elementary, middle, and high schools that are the persistently lowest-achieving. Include Work Plan for (E)(2)4. in Table for (D)(3). 5. The LEA will only assign new teachers (those in their first and second year) in the district’s schools that are the persistently lowest-achieving if these teachers have completed or are participating in a high-performing teacher preparation program, as defined in the grant application. The LEA will ensure that such teachers are provided additional support by staffing a mix of new and proven teachers across all content areas and grade levels in the school. Include Work Plan for (E)(2)5. in Table for (D)(3). 69 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criteria: Drive Improvement in Persistently Low-Achieving Schools – (E)(2)1.-2. Note: This Work Plan Table is applicable only to LEAs with a persistently lowest-achieving school. Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: LEAs will select one of the four school intervention models in all schools identified as persistently lowest-achieving by the Department of Education. LEAs with more than nine persistently lowest-achieving schools will not select the transformation model option for more than one-half of the schools. All actions must be in accordance with Differentiated Accountability. N/A Monroe County Does Not Have Low Performing /Turn Around Schools Deliverables (minimum required evidence): 1. LEA will select School Intervention Model from list of four options (see Appendix A of MOU). 2. LEA will provide documentation that supports the selection of the intervention model to include: - Teacher performance data regarding student learning gains in reading and mathematics. - Documentation that reflects the placement of the Principal and his/her record of “turn around” success. - Documentation relating to staff turnover/replacement. Note: Please attach relevant parts of your School Improvement Grant in the Final Scope of Work Appendix. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable (required): nd rd th LEA will select Intervention Model from list 2 3 4 of four options (see Appendix A of MOU). Quarter Quarter Quarter X X X X 2010-11 2011/12 2012/13 2013/14 Supporting Activities (indicate each year activity will be conducted and include 2nd 3rd 4th collective bargaining, if applicable): Quarter Quarter Quarter 70 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Deliverable (required): LEA will provide documentation annually that supports the selection of the intervention model to include: Documentation detailing staff (including coaches) as it relates to their student learning gains in reading and/mathematics over a three year period. For those with less than three years of experience learning gains will be based upon the number of years taught. For teachers and coaches other than those of reading and mathematics, retention must be based on increased student achievement. LEA will provide detailed report regarding Principal and administrative team as it relates to their qualifications as outlined in Appendix A of the MOU. Documentation relating to staff turnover/replacement. Detailed report regarding Principal and administrative team as it relates to their qualifications as outlined in Appendix A of the MOU. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Project Budget Summary: 2nd Quarter 2010-11 3 Quarter nd $ 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 X 2010-11 3rd 4th Quarter Quarter 2011/12 2011/12 rd 2 Quarter $ 2nd Quarter X X 2013/14 X 2012/13 2012/13 2013/14 2013/14 th 4 Quarter $ $ $ $ Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Supportive Narrative (optional): Title and Page Number of Appendices for this Project (if applicable): APPROVED 71 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Implement Proven Programs for School Improvement – (E)(2)3. Note: This Work Plan Table is applicable only to LEAs with a persistently lowest-achieving school. Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will submit a plan that implements one or more of the following programs in each persistently lowestachieving school and within the feeder pattern of each persistently lowest-achieving high school: • • • • • In Intervene schools, the LEA will implement a schedule that provides increased learning time beyond the minimum 180 days and/or implement an extended school day, beyond the current hours of instruction. The LEA will offer prekindergarten on a full day basis using the Department’s Title I Full Day Pre-K model, for children residing in the attendance zone of such schools. The LEA will expand opportunities for students to attend career and professional academies, especially STEM academies, under s. 1003.493, F.S. The LEA will expand or introduce proven programs to encourage advanced classes, positive behavior support systems, mentoring, and curriculum that provide high-need students with college-ready, careerready, or other postsecondary skills. The Department may approve other programs that demonstrate a strong record of improving student achievement in these district schools. N/A Monroe County Does Not Have Low Performing /Turn Around Schools Deliverables (minimum required evidence): Note: will vary based on the program(s) implemented 1. Submission of each school schedule for identified Intervene schools that demonstrates extended learning time. 2. Submission of developed full day Pre-K model for students in attendance zones for identified schools. 3. Submission of a district timeline and implementation plan to increase the number of STEM accelerated courses. Baseline data for this plan includes documentation of courses provided at each high school in 20092010. This plan should also take into consideration 2010 legislative requirements (Senate Bill 4) requiring that by 2011-2012 each high school offer an International Baccalaureate program, Advanced International Certificate of Education program, or at least four courses in dual enrollment or Advanced Placement including one course each in English, mathematics, science, and social studies. 4. Documentation of increased STEM accelerated course offerings, including a comparison of baseline data to end-of-grant period data. 5. Submission of a 4-year district timeline and implementation plan based on the analysis of employer needs in the community to initiate one of the RTTT-approved career and technical programs. Baseline data for the plan should include documentation of the STEM career and technical programs that meet the requirements of RTTT available to students in your district for 2009-2010 including for each school site: name of program, courses offered as part of the program, student enrollment in each course, and number of students for 20092010 who were awarded industry certifications. 6. Evidence of funding allocated to provide for the costs associated with student candidates’ industry certification exams. 7. Documentation of implementation of a complete program that results in industry certification including for each school site: name of program, courses offered as part of the program, student enrollment in each course, and number of students for 2009-2010 who were awarded industry certifications. 8. Submission of a district timeline and implementation plan to increase the number of accelerated courses. 72 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 9. 10. 11. 12. Baseline data for this plan includes documentation of courses provided at each school in 2009-2010. This plan should also take into consideration 2010 legislative requirements (Senate Bill 4) requiring that by 2011-2012 each high school offer an International Baccalaureate program, Advanced International Certificate of Education program, or at least four courses in dual enrollment or Advanced Placement including one course each in English, mathematics, science, and social studies. Documentation of increased accelerated course offerings, including a comparison of baseline data to end-ofgrant period data. Submission of a district timeline and implementation plan to provide mentoring and positive behavioral support programs. Baseline data for this plan includes documentation of behavioral/disciplinary data for each school in 2009-2010. Documentation of mentoring and/or positive behavioral support programs, including a comparison of baseline data to end-of-grant period data. Documentation of “other” research based programs that demonstrate a strong record of improving student achievement in these district schools. The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. Key Personnel by Title: 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 2010-11 2011/12 2012/13 2013/14 Deliverable: Submission of each school schedule for 2nd 3rd 4th identified Intervene schools that Quarter Quarter Quarter demonstrates extended learning time. X X X X 2010-11 2011/12 2012/13 2013/14 Supporting Activities (indicate each year activity will be conducted and include 2nd 3rd 4th collective bargaining, if applicable): Quarter Quarter Quarter Deliverable: Submission of developed full day Pre-K model for students in attendance zones for identified schools. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable: Submission of a district timeline and implementation plan to increase the number of STEM accelerated courses. Baseline data for this plan includes documentation of courses provided at each high school in nd 2 Quarter X 2nd Quarter 2nd Quarter X 2010-11 3rd 4th Quarter Quarter 2010-11 3rd 4th Quarter Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 2011/12 2012/13 2013/14 X 73 X X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 2009-2010. This plan should also take into consideration 2010 legislative requirements (Senate Bill 4) requiring that by 2011-2012 each high school offer an International Baccalaureate program, Advanced International Certificate of Education program, or at least four courses in dual enrollment or Advanced Placement including one course each in English, mathematics, science, and social studies. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable: Documentation of increased STEM accelerated course offerings, including a comparison of baseline data to end-of-grant period data. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable: Submission of a 4-year district timeline and implementation plan based on the analysis of employer needs in the community to initiate one of the RTTT-approved career and technical programs. Baseline data for the plan should include documentation of the STEM career and technical programs that meet the requirements of RTTT available to students in your district for 2009-2010 including for each school site: name of program, courses offered as part of the program, student enrollment in each course, and number of students for 20092010 who were awarded industry certifications. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable: Evidence of funding allocated to provide for the costs associated with student candidates’ industry certification exams. Supporting Activities (indicate each year 2nd Quarter 2nd Quarter X 2nd Quarter nd 2 Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X 2nd Quarter nd 2 Quarter X X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 2010-11 74 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II activity will be conducted and include collective bargaining, if applicable): 2nd Quarter 3rd Quarter 4th Quarter 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 2011/12 2012/13 2013/14 X X X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 Deliverable: Documentation of increased accelerated 2nd course offerings, including a comparison of Quarter baseline data to end-of-grant period data. X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X X X Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X X X Deliverable: Documentation of implementation of a complete program that results in industry certification. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable: Submission of a district timeline and implementation plan to increase the number of accelerated courses. Baseline data for this plan includes documentation of courses provided at each school in 2009-2010. This plan should also take into consideration 2010 legislative requirements (Senate Bill 4) requiring that by 2011-2012 each high school offer an International Baccalaureate program, Advanced International Certificate of Education program, or at least four courses in dual enrollment or Advanced Placement including one course each in English, mathematics, science, and social studies. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): 2nd Quarter X 2nd Quarter nd 2 Quarter X 2nd Quarter nd 2 Quarter Deliverable: Submission of a district timeline and 2nd implementation plan to provide mentoring Quarter and positive behavioral support programs. X Baseline data for this plan includes documentation of behavioral/disciplinary data for each school in 2009-2010. 2010-11 3rd 4th Quarter Quarter 2010-11 3rd 4th Quarter Quarter 2010-11 3rd 4th Quarter Quarter 75 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 Deliverable: Documentation of mentoring and/or positive 2nd behavioral support programs, including a Quarter comparison of baseline data to end-of-grant X period data. 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X X X Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Deliverable: Submission of other research based program that demonstrates a strong record of improving student achievement. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): Project Budget Summary: 2nd Quarter $0 2010-11 3rd Quarter $0 nd 2 Quarter 2nd Quarter 2nd Quarter X 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 4th Quarter $0 $0 $ $0 Sustainability Factors: (short description or list of factors that will contribute to the sustainability of the results of this Project after Race to the Top funding ends) Supportive Narrative (optional): APPROVED Title and Page Number of Appendices for this Project (if applicable): 76 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II F. GENERAL (F)(2) Ensuring successful conditions for high-performing charter schools and other innovative schools 1. The LEA will offer charter schools located within their district the opportunity to participate in the grant on the same terms as any other district school. 2. Consistent with federal requirements, the LEA will ensure that participating charter schools receive a commensurate share of any grant funds and services funded by the grant. 3. The LEA will provide data and reports necessary for the evaluation of the grant conducted by the Department’s evaluation team and will require charter schools to provide the LEA with the data necessary for such evaluations. Narrative To be completed by Dr. Jara 77 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Work Plan Table Project/MOU Criterion: Include Charter Schools in LEA Planning – (F)(2) Please indicate one LEA point of contact for this Project. Name: Dr. Lesley Salinero Title: Executive Director of Student Services & Curriculum Phone #: 305.293.1400 x 53323 E-mail Address: lesley.salinero@keysschools.com Project Goal: The LEA will offer charter schools located within their district the opportunity to participate in the grant on the same terms as any other district school. Consistent with federal requirements, the LEA will ensure that participating charter schools receive a commensurate share of any grant funds or services funded by the grant. The LEA will provide data and reports necessary for the evaluation of the grant conducted by the Department’s evaluation team and will require charter schools to provide the LEA with the data necessary for such evaluations. Narrative To be completed by Dr. Jara Deliverables (minimum required evidence): 1. The LEA will provide documentation of its efforts to engage and include charter schools in discussions of its RTTT efforts. The documentation must include dates, times, and attendees of any and all RTTT meetings with charter schools. (Quarterly as appropriate – whenever discussions are held) 2. The LEA will provide signed statements from each charter school that they have been fully informed of their opportunity to participate in the RTTT grant, and their decision to participate or opt-out. (Quarterly as appropriate) 3. The LEA will submit documentation that participating charter schools have been invited to participate in RTTT-funded activities. (Quarterly as appropriate) 4. The LEA will submit a budget that provides commensurate share of grant funds to participating charter schools. (Quarter 1) 5. The LEA will submit expenditure reports that demonstrate that participating charter schools have received their commensurate share of funds or services. (Quarter 4) 6. The LEA will provide a signed agreement from each participating charter school that states that the charter school will provide all necessary data and reports. (Quarter 1) 7. The LEA will provide documentation that FDOE was notified if any charter school fails to provide the necessary data and reports. (Quarterly as appropriate) The Key Personnel box below should include both new positions funded through RTTT and existing staff responsible for implementation of this Project. List titles in the first column and indicate each year of involvement with an X. 2010-11 2011/12 2012/13 2013/14 Key Personnel by Title: 2nd 3rd 4th Quarter Quarter Quarter Dr. Jesus Jara - Chief Operations Officer X X X X X X The Deliverable box below should list each deliverable and its Supporting Activities. Indicate the year each Deliverable will be accomplished and each Supporting Activity will occur with an X. The box repeats for each additional deliverable as necessary. LEAs are encouraged to propose additional deliverables as appropriate. Deliverables and Supporting Activities should support student achievement targets in Form (A)1. 78 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Deliverable (required): The LEA will provide documentation of its efforts to engage and include charter schools in discussions of its RTTT efforts. The documentation must include dates, times, and attendees of any and all RTTT meetings with charter schools. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): (F) (2) a. Steps for notification of draft and development of draft assurances Require charter school board review and vote during October 1-25 timeline if recommended by school director Provide timeline for review and decision to charter schools Point out deliverable and sustainability requirements (must sign off on these as part of assurances) Assurance that the charter school will provide all necessary data and reports (F) (2) b. Notify charter school of interm steps and processes as needed or required (F) (2) c. Develop and send out to each charter school a detailed explanation of RTTT, MOU and final district plan for review. (F) (2) d. Provide support and information to stakeholders as they go through the decision-making process. Deliverable (required): The LEA will provide signed statements from each charter school that they have been fully informed of their opportunity to participate in the RTTT grant, and their decision to participate or opt-out. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): (F) (2) e. Require charter school to sign an assurance page for each of the items that the charter school is responsible to provide or participate in for funding. (F)(2) f. Review state guidance regarding charter schools and determine what requirements this guidance places on the 2nd Quarter X nd 2 Quarter X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2010-11 3rd 4th Quarter Quarter X X 2011/12 X X X X 2012/13 X 2012/13 2013/14 X 2013/14 X X X X X X X X X X X 2nd Quarter X 2nd Quarter X 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X 79 X X X RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II district and the school board. (F)(2) g. Receive from each of the charter schools either: a single page indicating that they will not participate in Monroe’s RTTT plan, or the lengthy document with signed assurances and a sustainability plan indicating that they intend to participate. Deliverable (required): The LEA will submit documentation that participating charter schools have been invited to participate in RTTT-funded activities. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): (F)(2) h. Determine the individual costs of dollars or services to each of the charter schools based on whether or not they choose to participate and the level of participation as determined by factors identified in the Monroe’s RTTT plan. (F)(2) i. Review the assurances pages and sustainability plans of the participating charter schools to determine the levels of dollars and services to be provided and notify charter schools of the services and dollars to be provided based on assurances and sustainability plans. Deliverable (required): The LEA will submit a budget that provides commensurate share of grant funds to participating charter schools. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): (F)(2) j. Develop a budget based on prorated share tied to number of students per site Deliverable (required): The LEA will submit expenditure reports that demonstrate that participating charter schools have received their commensurate share of funds or services. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): X 2nd Quarter 2nd Quarter 2010-11 3rd 4th Quarter Quarter X 2010-11 3rd 4th Quarter Quarter X 2011/12 2012/13 2013/14 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter X 2010-11 3rd 4th Quarter Quarter X 2011/12 2012/13 2013/14 2011/12 2012/13 2013/14 2010-11 3rd 4th Quarter Quarter 2011/12 2012/13 2013/14 X 2nd Quarter 2nd Quarter 2nd Quarter X 2nd Quarter 2010-11 3rd 4th Quarter Quarter 80 2011/12 X 2012/13 X 2013/14 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (F)(2) k. Review expenditure reports for fidelity of participating charter schools and confirm that their share of funds is commensurate. Deliverable (required): The LEA will provide a signed agreement from each participating charter school that states that the charter school will provide all necessary data and reports. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): (F)(2) l. Identify charter school responsibilities in each section of the Monroe Plan for RTTT. (F)(2) m. Identify district responsibilities to charter school in each section of the Monroe plan for RTTT. (F)(2) o. Identify the deliverables that charter schools must provide and/or implement. Deliverable (required): The LEA will provide documentation that FDOE was notified if any charter school fails to provide the necessary data and reports. Supporting Activities (indicate each year activity will be conducted and include collective bargaining, if applicable): (F)(2) p. Report on charter school compliance with data and reporting requirements. Project Budget Summary by Year: 2010-11 3rd Quarter 2nd Quarter $0 $0 X X X 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 2nd Quarter 2010-11 3rd 4th Quarter Quarter X X 2011/12 2012/13 2013/14 2nd Quarter 2011/12 2012/13 2013/14 X 2011/12 X 2012/13 X 2013/14 X X 2nd Quarter 2010-11 3rd 4th Quarter Quarter 2nd Quarter 2010-11 3rd 4th Quarter Quarter X 2011/12 X X 2012/13 2013/14 4th Quarter $0 $0 $0 $0 Sustainability Factors: The sustainability of the results of this project after Race to the Top funding ends will be built into the assurances document. In this document each charter is asked to identify the charter school responsibilities in each of the sections for the Monroe plan for RTTT. In addition, the charter will be asked to define the sustainability factors in this document. Monroe County School District maintains a collaborative and supportive relationship with all charter schools in the district. Supportive Narrative (optional): APPROVED Title and Page Number of Appendices for this Project (if applicable): 81 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II FORM (A)1. LEA Student Goals and Measures INSTRUCTIONS: Indicate the outcomes your LEA will achieve on the following measures. Please provide annual and overall targets. STUDENT ACHIEVEMENT Florida set goals for student achievement on NAEP. Since all districts and schools do not administer NAEP, LEAs will need to track performance and set targets on the statewide assessment (FCAT 2.0) at a minimum. Since FCAT 2.0 will be administered for the first time in 2010-11, and standards will not be set until the fall of 2011, LEAs do not need to set overall targets and annual goals on FCAT 2.0 at this time. However, when standards are set and scores are available, districts will need to set targets at that time, keeping in mind the statewide goals established for NAEP. LEAs may provide additional student achievement goals using other measures, as noted below. Please provide additional tables to capture the other measures, if the LEA so chooses. 2010-11 2011-12 2012-13 2013-14 2014-15 (Baseline) % Scoring Level 4 or 5 on FCAT 2.0, 4th Grade Reading TBD, when standards are set in the Fall of 2011 (STATE GOAL: 50% AT OR ABOVE PROFICIENT ON NAEP BY 2015) % Scoring Level 4 or 5 on FCAT 2.0, 4th Grade Mathematics TBD, when standards are set in the Fall of 2011 (STATE GOAL: 60% AT OR ABOVE PROFICIENT ON NAEP BY 2015) % Scoring Level 4 or 5 on FCAT 2.0, 8th Grade Reading TBD, when standards are set in the Fall of 2011 (STATE GOAL: 45% AT OR ABOVE PROFICIENT ON NAEP BY 2015) % Scoring Level 4 or 5 on FCAT 2.0, 8th Grade Mathematics TBD, when standards are set in the Fall of 2011 (STATE GOAL: 55% AT OR ABOVE PROFICIENT ON NAEP BY 2015) (OPTIONAL) Other District-Determined Student Achievement Goals Examples: Other FCAT 2.0 Grade Levels and Subjects End-of-Course Assessments AP, Dual Enrollment, IB, AICE, and/or Industry Certification Performance and Participation PSAT, PLAN, SAT, and/or ACT Participation and Performance 82 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II FORM (A)1. LEA Student Goals and Measures CLOSING THE ACHIEVEMENT GAP Florida set goals for closing the achievement gap on NAEP. Since all districts and schools do not administer NAEP, LEAs will need to track performance and set targets for closing the achievement gap on the statewide assessment (FCAT 2.0) at a minimum. Since FCAT 2.0 will be administered for the first time in 2010-11, and standards will not be set until the fall of 2011, LEAs do not need to set overall targets and annual goals for closing the achievement gap on FCAT 2.0 at this time. However, when standards are set and scores are available, LEAs will need to set targets at that time, keeping in mind the statewide goals established for NAEP. LEAs may provide additional closing the achievement gap goals using other measures, as noted below. Please provide additional tables to capture the other measures, if the LEA so chooses. 2010-11 2011201220132014-15 (Baseline) 12 13 14 % Reduction in White/African-American achievement gap on FCAT 2.0 (STATE GOAL: REDUCE THE ACHIEVEMENT GAP IN HALF BY 2015) 2011 FCAT 2.0 Grade 4 Reading TBD, when standards are set in the Fall of 2011 FCAT 2.0 Grade 4 Mathematics TBD, when standards are set in the Fall of 2011 FCAT 2.0 Grade 8 Reading TBD, when standards are set in the Fall of 2011 FCAT 2.0 Grade 8 Mathematics TBD, when standards are set in the Fall of 2011 % Reduction in White/Hispanic achievement gap on FCAT 2.0 (STATE GOAL: REDUCE THE ACHIEVEMENT GAP IN HALF BY 2015) FCAT 2.0 Grade 4 Reading TBD, when standards are set in the Fall of 2011 FCAT 2.0 Grade 4 Mathematics TBD, when standards are set in the Fall of 2011 FCAT 2.0 Grade 8 Reading TBD, when standards are set in the Fall of 2011 FCAT 2.0 Grade 8 Mathematics TBD, when standards are set in the Fall of 2011 (OPTIONAL) Other District-Determined Closing the Achievement Gap Goals Examples: Other FCAT 2.0 Grade Levels and Subjects End-of-Course Assessments AP, Dual Enrollment, IB, AICE, and/or Industry Certification Performance and Participation PSAT, PLAN, SAT, and/or ACT Participation and Performance 83 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II FORM (A)1. LEA Student Goals and Measures HIGH SCHOOL GRADUATION RATE, COLLEGE ENROLLMENT RATE, AND COLLEGE CREDIT ATTAINEMENT RATE STATE GOALS INSTRUCTIONS: Indicate the ultimate target your LEA will achieve with the high school graduating class of 2015 on the following measures: High School Graduation Rate (using the Federal Uniform Rate methodology) College Going Rate (College enrollment is defined as the enrollment of students who graduate from high school and who enroll in an institution of higher education within 16 months of graduation.) College Credit Attainment Rate (College credit is measured as credit earned that is applicable to a degree within two years of enrollment in an institution of higher education.) Percent of 9th Graders Who Eventually Earn at Least a Year’s Worth of College Credit (this is a calculation based on the graduation rate multiplied by the college going rate multiplied by the college credit attainment rate. For example, Florida’s goals are 85% graduating, 74% going to college, and 70% earning credit. That translates into 85% x 74% x 70% = 44% of 9th graders ultimately graduating, going to college, and earning credit). Be sure to include annual targets to ensure that progress is being made toward the ultimate goals for the class of 2015. Given the inherent time lags in these measures (i.e., two years following high school graduation and two years following college enrollment), all actual data for the class of 2015 will not be available until 2019 (2017 for the college enrollment measure and 2019 for the credit attainment measure). On the following page are the state goals and annual targets for the four graduation and postsecondary outcome measures as a reference. Please indicate the LEA targets for the four measures below by filling in the shaded boxes in the table labeled “LEA GOALS”. 84 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II FORM (A)1. LEA Student Goals and Measures STATE GOALS State Goals for the Class of 2015: For the every 100 incoming high school freshmen in 2011-12, 85 will graduate from high school in 2015. Of the 85 students who graduate, 63 (or 74%) will go on to college by 2017. Of the 63 students who went on to college, 44 (or 70%) will earn at least a year’s worth of college credit by 2019 High School Graduating Class of: Graduation Rate 2005 (Baselin e) 59 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 59 60 63 66 68 69 72 76 80 College Going Rate 58 58 60 61 62 63 64 65 67 71 College Credit Earning Rate 63 63 64 64 64 65 65 66 67 68 22 22 23 25 26 27 29 31 34 39 85 74 70 44 2013 2014 2015 79 83 72 74 87 77 75 50 th Percent of 9 Graders Who Eventually Earn at Least a Year’s Worth of College Credit LEA GOALS Note: The un-shaded boxes will be pre-populated for each LEA by the DOE. High School Graduating Class of: 2005 2006 2007 2008 2009 2010 2011 2012 (Baseline) Graduation Rate 64 61 63 66 64 67 71 75 College Going Rate 59 61 60 62 64 66 68 70 College Credit Earning Rate 65 66 67 68 69 70 71 72 73 74 25 25 25 28 28 31 34 38 42 45 85 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II TEACHER AND PRINCIPAL EVALUATION SYSTEMS REVIEW DISTRICT: ____MONROE____________________________________________ MOU section D(2)(ii) requires that “the LEA will submit teacher and principal evaluation systems to the department for review and approval”. SBE rule 6B-4.010 requires that where a district “…makes substantive modifications to an approved school district instructional personnel assessment system, the modified system shall be submitted to the department of education for review and approval.” The following checklist combines the Race to the Top (RTTT) requirements for developing and conducting teacher and principal evaluation systems with those required in section 1012.34, Florida Statutes, and Rule 6B-4.010, F.A.C. This checklist will assist LEAs in ensuring that they have met the requirements for the RTTT grant in this area, while also satisfying requirements for Florida Statutes and State Board Rule. The checklist will also speed the review process so that LEA feedback can be returned quicker. Instructions. To complete the checklist, provide the page number in your evaluation system documentation where the criterion or element is addressed. NOTE: This checklist is NOT due with the Final Scope of Work. It should be submitted with the district’s evaluation system documentation in spring 2011. It is provided now with the Final Scope of Work template as a tool and reference for district planning and completing the Final Scope of Work. Elements of State Reform Plans to be addressed in LEAs’ Teacher and Principal Evaluation Systems Citation in RTTT MOU and/or Section 1012.34, F.S. TEACHER EVALUATION SYSTEM Part 1: System Development Involvement: The LEA has designed and committed to implement an evaluation system with teacher and principal involvement. Phase-in Option: The LEA may phase-in the evaluation system but will use, at a minimum, student growth as defined in (D)(2)(i) for at least 35% of the evaluation and MOU D(2)(ii)(1) MOU D(2)(ii) 86 Page # in Documentation RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Elements of State Reform Plans to be addressed in LEAs’ Teacher and Principal Evaluation Systems student growth or achievement as determined by the LEA for 15% of the evaluation. Implementation of the requirements for the LEA evaluation systems beginning in the 2011-12 school years applies, at a minimum, to teachers in grades and subjects for which student growth measures have been developed by the Department in collaboration with the advisory body as described in MOU (D)(2)(i). Citation in RTTT MOU and/or Section 1012.34, F.S. Development year: The 2010-11 school year will be considered a development year for the evaluation system. MOU (D)(ii) Determines need for special procedures and criteria for other teaching fields 1012.34(2)(d) Supports district and school level improvement plans 1012.34(2)(a) Supports continuous quality improvement of the professional skills of instructional personnel Provides for district’s annual review of instructional personnel assessment systems 1012.34(2)(b) 1012.34(7) Part 2: Evaluation Criteria Page # in Documentation Page # Student Growth Measure: The teacher evaluation system utilizes the state-adopted teacher-level student growth measure cited in (D)(2)(i) as the primary factor of the evaluation system. MOU (D)(2)(ii)(1) Student achievement or growth data as evaluation element, as defined in the grant, must account for at least 50% of the teacher’s evaluation as follows: By the end of the grant, the LEA shall include student growth as defined in (D)(2)(i), for at least 40% of the evaluation, and student growth or achievement as determined by the LEA for 10% MOU (D)(2)(i) and (ii) 1012.34(3)(a) Primarily uses data and indicators of improvement in student performance 1012.34(3)(a) Student performance must be measured by state assessments required under s. 1008.22 and by local 87 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Elements of State Reform Plans to be addressed in LEAs’ Teacher and Principal Evaluation Systems of the evaluation. Citation in RTTT MOU and/or Section 1012.34, F.S. assessments for subjects and grade levels not measured by the state assessment program 1012.34(3)(a)(1) performance of students assigned to their classrooms or schools, as appropriate Early Bargaining Provision: An LEA that completed renegotiation of its collective bargaining agreement between 7/1/09 and 12/1/09 for the purpose of determining a weight for student growth as the primary component of its teacher evaluations, is eligible for this grant as long as the student growth component is at least 40% and is greater than any other single component of the evaluation. MOU D (2)(ii) Core of Effective Practices – Florida Educator Accomplished Practices: Includes the core of effective practices, developed in collaboration with stakeholders that have been strongly linked to increased student achievement for the observation portion of the teacher evaluation. The principal, direct supervisor, and any other individual performing observation will use, at a minimum, this same core of effective practices Incorporates the newly-adopted Florida Educator Accomplished Practices (scheduled for adoption by the State Board of Education in December 2010) into the evaluation system. Special provisions for evaluating subject knowledge for out-of-field teachers 1012.34(3)(a)(3) Additional Metric Evaluation Element: Includes at least one additional metric to combine with the student MOU (D)(2)(ii)(3) MOU (D)(2)(ii) 1012.34(2)(d): addressing generic teaching competencies 1012.34(3)(a): basing assessment on contemporary research in effective educational practices 1012.34(3)(a)(2,4-7): Ability to maintain appropriate discipline; Knowledge of subject matter, including; Ability to plan and deliver instruction and the use of technology in the classroom; Ability to evaluate instructional needs; Ability to establish and maintain a positive collaborative relationship with students’ families to increase student achievement; Other professional competencies and requirements in State Board of Education rules and local school board policies 88 Page # in Documentation RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Elements of State Reform Plans to be addressed in LEAs’ Teacher and Principal Evaluation Systems performance and principal observation components to develop a “multi-metric” evaluation system for, at a minimum, the teachers who are in the year prior to a milestone career event, such as being awarded a multi-year contract, a promotion, or a significant increase in salary. Examples of additional metrics include, but are not limited to, observations by master teachers or instructional coaches, student input, peer input, and parental input. Evaluation ratings: Includes a comprehensive range of ratings beyond a simple satisfactory or unsatisfactory, that must include “effective” and “highly effective.” Citation in RTTT MOU and/or Section 1012.34, F.S. 1012.34(2)(c) Provides a mechanism for parental input, when appropriate MOU (D)(2)(ii)(4) State board rule 6B-4.010(1)(c)2: providing for determination of satisfactory, unsatisfactory and outstanding performance levels Part 3: Conducting Evaluations First Year Teachers: The LEA will conduct multiple evaluations for each first-year teacher that are integrated with the district’s beginning teacher support program and include observations on the core effective practices described in MOU (D)(2)(ii)2. and reviews of student performance data. Page # in Documentation Page # MOU (D)(3) 89 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Elements of State Reform Plans to be addressed in LEAs’ Teacher and Principal Evaluation Systems Citation in RTTT MOU and/or Section 1012.34, F.S. Other Teachers’ Evaluations: The LEA will conduct evaluations as described in MOU (D) (2) (ii) 1, 2, and 4. for all other teachers at least once per year. Milestone career event(s) evaluations: The LEA will conduct “multi-metric” evaluations as described in MOU (D)(2)(ii) for teachers who are in the year prior to a milestone career event, such as being awarded a multi-year contract, a promotion, or a significant increase in salary. The LEA plan will include a definition of milestone career event. MOU (D)(2)(iii) Supports continuous quality improvement of the professional skills of instructional personnel: describe how information from the evaluation system will be returned to the teacher for individual continuous improvement. Provides training in the proper use of assessment criteria and procedures to all personnel with appraisal responsibilities. Fully informs all personnel of the criteria and procedures associated with the appraisal process before the appraisal takes place. 1012.34(2)(b) 1012.34(2)(f) 1012.34(3)(b) Page # in Documentation MOU (D)(2)(iii) 1012.34(3) (a) to provide for an assessment conducted for each employee at least once a year PRINCIPAL EVALUATION SYSTEM Part 1: System Development Involvement: The LEA has designed and committed to implement a principal evaluation system with teacher and principal involvement Page # MOU D(2)(ii) 90 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Phase in option: The LEA may phase-in the evaluation system but will use, at a minimum, student growth as defined in (D)(2)(i) for at least 35% of the evaluation and student growth or achievement as determined by the LEA for 15% of the evaluation. Implementation of the requirements for the LEA evaluation systems applies, at a minimum, to grades and subjects for which student growth measures have been developed by the Department in collaboration with the advisory body as described in MOU (D)(2)(i) MOU D(2)(ii) Development year: The 2010-11 school year will be considered a development year for the evaluation systems. MOU (D)(ii) Supports district and school level improvement plans 1012.34(2)(a) Supports continuous quality improvement of the professional skills of instructional personnel Provides a mechanism for parental input, when appropriate 1012.34(2)(b) 1012.34(2)(c) Provides for district’s annual review of instructional personnel assessment systems 1012.34(7) Page # Part 2: Evaluation Criteria Student growth measure: The principal evaluation system utilizes the state-adopted teacher-level student growth measure cited in (D) (2) (i) as the primary factor of the principal evaluation system. Leadership Standards evaluation component: Utilizes for the remaining portion of the evaluation the Florida Principal Leadership Standards, with an emphasis on recruiting and retaining effective teachers, improving the effectiveness of teachers, and removing ineffective teachers. MOU (D)(2)(ii)(1) MOU D(2)(ii) 91 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Student achievement or growth data evaluation component as defined in the grant must account for at least 50% of the principal’s evaluation as follows: By the end of the grant, the LEA shall include student growth as defined in MOU (D) (2) (i), for at least 40% of the evaluation, and student growth or achievement as determined by the LEA for 10% of the evaluation. Range of ratings: Includes a comprehensive range of ratings beyond a simple satisfactory or unsatisfactory, that must include “effective” and “highly effective MOU D(20(ii) 1012.34(3)(a): primarily use data and indicators of improvement in student performance 1012.34(3)(a): student performance must be measured by state assessments required under s. 1008.22 and by local assessments for subjects and grade levels not measured by the state assessment program , 1012.34(3)(a)(1: performance of students assigned to their classrooms or schools, as appropriate MOU D(2)(ii) Page # Part 3: Conducting Evaluations Annual evaluation: The LEA will conduct evaluations as described in MOU (D)(2)(ii) for principals at least once per year. MOU D(2)(ii) 1012.34(3)(a) to provide for an assessment conducted for each employee at least once a year Provides training in use of assessment criteria and procedures Fully informs all personnel of the criteria and procedures associated with the appraisal process before the appraisal takes place. 1012.34(2)(f) 1012.34(3)(b) 92 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Monroe County Schools (B)(3)(5) STEM Parent Survey re: International Baccalaureate Program Which statement best describes your knowledge of the IB Diploma Programme? ___ I am very familiar with the IB Diploma Programme. ___ I have heard of IB, but am not very familiar with what it is about. ___ I have never heard of the IB Diploma Programme before this. Are you aware that a student who graduates with an IB diploma from a Florida high school receives 100% tuition to attend a Florida public university? ___ Yes, I am aware. ___ No, I am unaware. Are you aware that a student who scores well on an IB test given near the end of the school year may earn college credits while still in high school? ___ Yes, I am aware. ___ No, I am unaware. If the IB Diploma Programme were available at your school, How interested would you be in having your son or daughter pursue an IB diploma? ___ I would definitely want my child to have the opportunity for an IB diploma. ___ I might be interested in having my child pursue an IB diploma. ___ I would definitely not want my child to have an IB diploma. How interested are you in learning more about the IB Diploma Programme? ___ I am very interested in learning more about IB. ___ I am indifferent toward learning more about IB. ___ I am definitely not interested in learning more about IB . If my child enrolls in the IB Diploma Programme, I am interested in being involved in a parental support organization. ___ Yes. ___ Maybe. 93 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II ___ No. HOB KWHS SLS MHS CSHS PKS 11 5 1 3 15 2 25 57 6 9 40 10 34 85 26 10 62 23 20 38 2 7 KLS 1 2 1 27 6 2 49 110 31 15 89 29 29 43 6 8 32 4 39 104 27 19 85 31 46 92 24 17 73 17 21 48 8 5 43 20 1 2 3 0 0 2 4 1 0 1 2 58 103 22 21 89 29 3 0 8 41 9 1 25 5 1 3 1 0 2 0 0 94 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 1 32 47 14 10 89 8 30 82 13 10 25 25 2 0 3 17 6 2 2 Out of 71 147 33 22 118 3 38 3 95 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Categories of IB Phases Consideration Phase (B)(3)(5) Advanced Coursework Primary Years Programme Middle Years Program (PYP) (MYP) Note: shaded areas Note: shaded areas indicate indicate deliverables deliverables ---Contact Regional IB ---Contact Regional IB District District Coach Coach ---Send school officials and ---Send school officials and pedagogical leaders to IB pedagogical leaders to IB Orientation Training Orientation Training ---Gain support from teachers, ---Gain support from teachers, administration, school administration, school district/board and students district/board and students ---Inform IB of intention to ---Inform IB of intention to apply; prepare and submit apply; prepare and submit Interested Schools form Interested Schools form ---Order the IB PYP Starter Order the IB MYP Starter Pack Pack ---Contact or visit IB World ---Contact or visit IB World Schools offering the MYP Schools offering the PYP Designate a MYP coordinator Designate a PYP coordinator ---Begin sending staff to ---Begin sending staff to Category 1 workshops (two 6 Category 1 workshops (two 6 hour days, minimum) hour days, minimum) ---Prepare application form part ---Prepare application form part A using the MYP Guide to A using the PYP Guide to school application school application ---Submit application form part ---Submit application form part A using the MYP guide to A using the PYP guide to school application by 1 October school application by 1 October 96 Diploma Program (DP) Note: shaded areas indicate deliverables ---Contact Regional IB District Coach ---Identify resources (financial) for implementation ---Send school officials and pedagogical leaders to IB Orientation Training ---Gain support from teachers, administration, school district/board and students ---Inform IB of intention to apply; prepare and submit Interested Schools form*** ---Order the IB Publications ---Contact or visit IB World Schools offering the Diploma Programme ---Designate a Diploma Programme coordinator ---Develop a strategic plan for implementation (Identify choices for hexagon, from each high school)*** ---Begin sending staff to Category 1 workshops(two 6 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II hour days, minimum) ---Prepare application form part A using the Diploma Programme Guide to school application ---Submit application form part A using the DP guide to school application by 1 October Candidate Year 1 Candidate Year 2 ----Submit application form B by April ---Work with an IB-appointed consultant for a two-day on-site visit and 20 remote hours ---Continue attendance at workshops (category 1) ---Set up teacher accounts to the Online Curriculum Centre ---Develop systems for teachers collaborative planning and reflection ---Consider offering an inschool category 1 workshop for whole staff ---Develop the following documents in alignment with the PYP requirements: a. Programme of inquiry b. Units of inquiry c. School assessment policy d. School language policy ---Continue work with an IB- ---Submit application form B by April ---Work with an IB-appointed consultant for a two-day on-site visit and 20 remote hours ---Continue attendance at workshops (category 1) ---Set up teacher accounts to the Online Curriculum Centre ---Develop systems for teachers collaborative planning and teaming ---Consider offering an inschool category 1 workshop for whole staff ---Develop the following documents in alignment with the MYP requirements: a. Vertical and horizontal curriculum planning documents b. School assessment policy c. School language policy 97 Submit application form B by April ---Work with an IB-appointed consultant for a two-day on-site visit and 20 remote hours ---Continue attendance at workshops (category 1) ---Set up teacher accounts to the Online Curriculum Centre ---Develop systems for teachers collaborative planning and teaming ---Consider offering an inschool category 1 workshop for whole staff ---Review documentation for the authorization visit ---Course outlines for all IB courses must be submitted by September 1st RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Candidate Year 2 appointed consultant for an additional 20 remote hours ---Prepare application form part B using the PYP guide to school application ---Continue attendance at workshops (category 1) and provide evidence in application form part B of how the school is going to achieve the requirement that all staff in the PYP will have attended an official IB PYP workshop by the time of authorization ---Continue work with an IBappointed consultant for an additional 20 remote hours ---Prepare application form part B using the MYP guide to school application ---Continue attendance at workshops (category 1) ---Required: by the time of the submission of application form part B, complete workshop training for a minimum of 1 teacher per subject group, the coordinator and principal from each school in a partnership ---Review the PYP School Guide to the Authorization Visit ---Continue attendance at category 1 workshops ----submit application form Part B ---The IB visit will take place subsequent to the submission of application form part B ---The IB visiting team will determine a school’s preparedness to implement the programme By the time of authorization: ---All staff must have attended ---Review the MYP School Guide to the Authorization Visit ----submit application form Part B ---The IB visit will take place subsequent to the submission of application form part B ---The IB visiting team will determine a school’s preparedness to implement the programme 98 ---Train all teachers proposed to teach in the Diploma Programme at a category 1 workshop by the time of implementation as an authorized school ---The visit will take place subsequent to the submission of application form part B ---The IB visiting team will determine a schools’ preparedness to implement the programme. RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II an official IB PYP workshop (regional or in-school) ---The school must have completed and documented six (6) units of inquiry per grade level (all units must be planned, written and reflected upon) Implementation Year, 1st ***Data on DP program will be gathered and analyzed; modifications made as needed ***Data on DP program will be gathered and analyzed; modifications made as needed Implementation Year, 2nd *** Data will be gathered beyond the RTTT grant period; though a necessary part of our 5 year plan and will be used 99 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (B)(3)(5) International Baccalaureate Implementation Year 1 (2010-11) Year 2 (2011-12) Year 3 (2012-13) Year 4 (2013-14) Year 5*** (2014-15) IB (Upper Keys) Coral Shores HS; Key Largo School; Plantation Key School Consideration Phase: Diploma Programme (DP) (11,12) Candidate Yr 1: DP Candidate Yr 2: DP Implementation; gather data, DP (1st) Implementation; gather data ,DP (2nd) Consideration Phase: Middle Years Program (MYP) Candidate Yr 1: Middle Years Program (MYP) Candidate Yr 2: Middle Years Program (MYP) Implementation; gather data (1st) Consideration Phase: Primary (PYP; PK-5) Candidate Yr 1: Primary (PYP; PK-5) IB (Middle Keys) Marathon Middle/HS; Switlik Elementary School IB (Lower Keys/KW) Key West High School; Horace O’Bryant Middle School; Gerald Adams, Consideration Phase: Primary (PYP; PK-5) and Middle Years Program (MYP; 6-10) and Diploma Programme (DP; 11,12) Candidate Yr 1: PYP and MYP/DP Candidate Yr 2: PYP and MYP/DP Implementation; gather data (1st) PYP and MYP/DP Implementation; gather data; DP (2nd) PYP and MYP/DP Consideration Phase: Diploma Programme (DP; 11,12) Candidate Yr 1: DP Consideration Phase: : Middle Years Program (MYP) Candidate Yr 2: DP Candidate Yr 1: Middle Years Program (MYP) Implementation; gather data DP (1st) Implementation; gather data DP (2nd) Implementation; gather data (1st) Consideration Phase: Primary (PYP; PK-5) Candidate Yr 1: Primary (PYP; PK-5) Candidate Yr 2: Middle Years Program (MYP) 100 Candidate Yr 2: Primary (PYP; PK-5) Candidate Yr 2 Primary (PYP; PK-5) RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Poinciana and Glynn Archer elementary schools *** We recognize that the grant is for four years; we will complete our 5 year plan that will bring all 11 Keys’ schools on board with IB authorization using the resources/strategies outlined in the sustainability section of (B)(3)(5). 101 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (D)(2) Educator Evaluations - Teachers Differentiated Compensation The differentiated compensation program will link our performance based system to the Common Core Standards that the State of Florida is expected to adopt in the near future. Our curricular focus is supporting the students and educators in meeting the national standards. Additionally, we are focusing our evaluation measures based the nationally recognized research of Charlotte Danielson and the Florida Principal Effectiveness Standards. The evaluation instrument will contain a prescriptive rubric for each of the incentive levels on the career ladder. Professional development is the key to the success of the initiative. Our plan aligns with the Florida application for the Race to the Top initiative and also with the state Differentiated Accountability Model. In preparation for the grant, the Monroe County School District (MCSD) and United Teachers of Monroe (UTM) recently attended an American Federation of Teachers (AFT) National Conference in Minneapolis to learn the best practices for performance-based compensation. Together we have a significant investment in the collaborative process as evidenced by our work together. (Attachment A). We plan to continue providing opportunities for union and non union members with other consultants in the development of our performance-based plan. The Educational Performance Incentive Compensation Plan (EPIC Plan) for performance-based compensation will require a year of careful planning to complete and ensure that all core areas are fully included in the program. In the planning year, we will work with consultants and experts in the field of education compensation to determine the most appropriate methods for implementing the compensation plan for our district. 102 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II The project development team includes: teachers, administrators, district staff, union members (both the union leadership and union teachers group) to evaluate the information and select the most successful programming for our district. Teacher and administrator effectiveness will be considered using multiple measures with an emphasis on student data and student growth. (a) In the first year of implementation, 35% of the evaluation will be based on student growth from state-wide standardized assessments and increasing each year until 50% is reached. For example, the first year (2011-2012), will require 35 % of the evaluation based upon state-wide student data, the second year (2012-2013) will require 40% based on state-wide student data, and the third year (2013-2014) will require 50% state-wide student data. Upon reaching the 50% level, the student data will stabilize and maintain at 50% for the future evaluations. In regards to administrator evaluations, we will be considering factors such as graduation rate, state-wide student assessment data and other measures to determine effectiveness. Finally, we agree as a team, that in order for the incentives to be effective they must be substantial enough to make a difference. Therefore we are reviewing a number of options to meet this need including a percentage of the annual salary, a flat rate for reaching specific milestones and/or a combination of incentives that are substantial in nature. As we work to finalize the specific incentive amounts, we will provide a detailed rationale for the determination of incentives during the planning year. Our goal is to ensure that the incentives are significant enough to create a change in behavior, for both current and prospective educators that will ultimately improve student outcomes. (b) The remaining portion of the evaluation will consist of observations conducted at least twice a year and other measures. Trained evaluators who have reached a level of inter-rater reliability are needed to ensure that the evaluation tool is fair and reliable. We plan to offer intensive training and a pilot program for all evaluators to ensure that the project meets this criterion. In addition, each 103 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II individual being observed will have a pre-observation meeting with the school administrator and a post-debriefing. Following the first year of implementation (2011-2012) we are projecting to have a valid and reliable rubric in place to measure student growth based on a growth model using a research based Value Added (VA) process. Florida is in the final stages of determining a state-wide Value Added (VA) model. Until that is complete, the district will seek outside support via consultation in development of our Value Added model. (c) Other measures for the non-tested grades and non-core educators will be developed within the planning year. In order to measure the full scope of the educators’ practice, we believe that inclusion of other measures is an important element of the evaluation. We will be working with the schools and committees to develop other measures that are consistent across the schools. For example, we currently have End of Course Exams (EOC) for several subjects. We would consider a pretest and the outcomes from the EOC to provide data in our growth model plan. Significance of the incentive is of primary concern when developing the scale from one level of performance to the next. We will ensure that our union team is offered opportunities to working alongside our district team every step of the way in order to develop the best possible program to increase and maintain student achievement with our performance-based compensation system. Subcommittees will be formed to review and to modify the program throughout the process. Committee Members and Project Director provided resumes to document areas of experience and expertise (Attachment B). Some of the established committees are: Professional Development Committee - this team will consider the data elements, evaluation tools, the review process and individual needs to provide high quality professional development and will determine elements needed to assist in the 104 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II awareness and implementation of the program. Education of stakeholders is a key element in our program. Our plan includes efforts to make the knowledge acquisition clear and concise in order to assist in the EPIC Plan roll-out. We plan to provide multiple professional development opportunities to accommodate a variety of learning styles including delivery through face-to face trainings, web based trainings and individual conferencing. Each school will also have a committee member on the team so that all schools will have first-hand knowledge and input into the process. Current Professional Development Committee Members are: Linda Diaz (Title I Director), Fran Herrin (Principal), and Wendy McPherson (Assistant Principal) with others to be determined. Communication Committee - will create and analyze the communication needs of our teachers, administrators and community. Our goal is to share information regularly and in a concise manner which provides all the stakeholders ease of access to the project, the goals and the outcomes. The committee will also have a schedule and regular releases of information and will provide meeting notices in a variety of formats. The Communication Committee Members are: Dr. Jesus Jara (Chief Operations Officer), Dr. Lesley Salinero (Director of Student Services & Project Director), Cheryl Allen (Human Resources Director) with others members to be determined. Teacher Focus Committee - each school will have a school-level point of contact. As part of the committee, they plan and process the ideas with their colleagues, determine obstacles and receive feedback to share with the project director and 105 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II committees. Teacher Focus Committee Members are: Cheryl Allen (Director of Human Resources) with others to be determined. Career Placement Committee - will consider the levels and placement of new staff on the instructional and administrative career ladder.. The Career Placement Team will review the teacher performance-based indicators and growth measures as well as the evaluation tools and outcomes. The Career Placement Committee Members are: Dr. Lesley Salinero (Project Director), Dr. Jesus Jara (Chief Operations Officer), Fran Herrin (Principal), Cheryl Allen (Human Resources Director), with others to be determined. Data Management Committee - will review and analyze the evaluation instruments and growth measurement vendors available and assist the group in examining the data management tools. They will ensure that the measures selected are valid and reliable for use as performance-based measures. Data Management Committee Members are: Janet Meinke (Director of Assessment and Accountability), David Richardson (Director of Administrative Technology), David Murphy (Principal) with others to be determined. Timeline & Evaluation Committee - will be managed by a university management or evaluation consultant in order to provide objectivity and external controls to ensure management of the funding and resources follow federal guidelines and are performed in a transparent and effective manner. This committee will be essential in monitoring the timeline to keep 106 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II the project moving at the scheduled pace and the evaluation process on track. The Timeline Committee Members will be determined. _________________ Financial Stability (a) Our main focus is to create a plan that is self-sustaining long after the grant has reached completion. We have offered our union members multiple opportunities to participate and have a strong commitment from all stakeholders to the continuation of the EPIC Plan beyond the grant period. The stakeholders believe that in order to create a seamless process we make certain that all schools have the full opportunity for advancement in the performance-based system. Evidence of this commitment is found in the letters of support (Attachment C) for the sustainability of the project from the Superintendent (Dr. Joseph Burke) and the School Board Chair (Andy Griffiths). (b) The Monroe County School District performance-based compensation plan design will create a strong program that is sustainable with our local funding increasing as the grant funding decreases as proposed in the chart below. Each year the federal funding reduces and the local effort increases in order to maintain the incentive program for teachers and school administrators. Year Expenditures (1) 2010-2011 (Planning Year) $166,000.00 (2) 2011-2012 (Implementation) $135,000.00 (3) 2012-2013 $95,000.00 (4) 2013-2014 $65,000.00 (outside evaluator) 107 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Based on various regional economic forecasts for the state of Florida and the Florida Keys the Monroe County School District should be able to sustain the increased costs associated with the incentive program with the additional revenue received by the district. Traditionally the district has incurred additional compensation costs due to the current structure of step increases and costs of living adjustments. Based on the current staffing and rate of compensation a one percent increase in compensation would cost the district approximately $327,000. In the past an increase of 2 to 3 percent including additional compensation for step increases was common. A similar increase would cost as much as $981,000 which is similar to that being proposed in the current model. _________________ Approach to Performance Based Compensation System EPIC Plan is the Monroe County School District’s comprehensive approach to the performance-based compensation that will be developed fully over the 2010-2011 school year. EPIC Plan will include differentiated incentives for teachers and school-based administrators exclusively in this program. All other personnel incentive needs will be addressed separately via the Human Resources Department, superintendent’s office and school board. It has been determined jointly, by the team, that we will apply the primary focus to the site-based teachers and administrators. Our goal is to ensure that the EPIC Plan continues beyond the grant period as a foundation of our career ladder for teachers and administrators at the school sites. The Monroe County proposed draft Conceptual Framework (Attachment D) illustrates the categories of teachers and the performance based opportunities at the many levels of teacher performance. Attachment D illustrates the draft definitions of the characteristics of educators at each level of expertise. The criteria and evaluation instruments will be developed during the planning year; however, the proposed chart (Attachment D) provides an estimated timeline for achievement and movement between career milestones. Existing teachers will be placed into the various 108 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II categories based upon multiple measures including student assessment data and observations from the previous two years. The Human Resources Department and Career Placement Committee will utilize specific guidelines to be developed in the planning year. The placements will be consistent and fair to all instructional staff. This process is consistent with career milestone requirements in the Florida Race to the Top and aligns with the Florida Principal Effectiveness Standards. Educators will have four potential paths to achievement of performance based incentives. 1. Movement within the same category up to the next vertical step, if they have not yet reached a transition stage based on experience. These educators have the potential to receive an incentive for exemplary performance while within a level designation (Attachment E). 2. Educators can move between the categories of educators (Professional, Accomplished or Distinguished) and receive incentives based upon exemplary performance. 3. Remain in place with satisfactory performance. 4. May return to an earlier stage with two year of unsuccessful performance. Teachers and administrators who have two consecutive years of unacceptable performance may not be renewed. These determinations are used specifically to strengthen the educator workforce and to be utilized in tenure and retention decisions. Monroe County recognizes that as important as the measurement of educator and student performance is, there must be appropriate, ongoing supports in place to assist educators to improve and strengthen their practice. Supports are critical for all educators to grow and move forward in their careers as is the evaluative component. Our plan includes focused, individualized, high quality professional development with targeted supports to be made available for all staff based on the students’ and educators’ needs. As our teams reviewed many different types of teacher and administrator evaluations, we have narrowed the models to a nationally recognized and research based model similar to the Charlotte Danielson’s core. We will be investigating further via national experts 109 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II and university researchers to determine the most effective evaluations tools for our district. The evaluation instrument will contain a prescriptive rubric for each of the incentive levels on the career ladder. Our Teacher Focus Committee is an essential element to the selection of the proper evaluation tool and to the possible modification of the selected tool that best meets our needs. One of the main focuses of the evaluation is to ensure that there are multiple measures. For example, we intend to have at least two instructional observations per academic year. In addition to observations, educators will have access to feedback via the Classroom Walk Through (CWT) protocol. In the past, the CWT was for school-wide analysis only. However, we have agreed to expand the CWT to include direct feedback to subject area teachers to support their growth and expansion of professional development opportunities. This will assist in developing teachers’ skills and effectiveness within the classroom throughout the school year. Part of the observation process will include a pre-observation in which the teacher and administrator have a dialog regarding the upcoming lesson and the lesson objectives. At that point, the administrator can gain clarification and specifics before ever observing the classroom teacher. Following the observation, the administrator and teacher will meet again to reflect on the observation and consider the overall success of the lesson. The fundamental goal of our plan is based on educator support, improvement and advancement. We believe that the focus of any evaluation system must encourage, support and sustain educator effectiveness and student achievement. Finally, throughout the EPIC Plan pilot we will be conducting continuous review and improvement. We will be meeting at least monthly to consider the elements and modify the plan to best measure student and educator performance. As part of the comprehensive approach, the district outline for the plan is as follows: 110 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II __________________________________________________________________ Time Line Year 1(2010-2011) –The plan is developed by a joint, school and administration team, with multiple sub-committees ensuring that each group has a voice in the plan development, implementation and review. Selection of supports from research based, university and experts in the field will be contacted to support our initiative and program evaluation. Major benchmarks include: Finalize the compensation model Determine value added methodology and metrics Conduct communication meetings throughout the year Hire the Program Manager Pilot evaluation tool A complete list of first year benchmarks can be found on page 21 to page 26. Year 2 (2011-2012) – Implementation begins with all of our 11 schools participating in the EPIC Plan. Monroe County School District is dedicated to ensuring that ALL teachers and administrators in our county are included. Teachers and administrators will be placed in the appropriate location on the career ladder by the Human Resources Department and Career Placement Committee using guidelines developed in year one. Each educator will receive the placement information and professional development offerings based upon identified area(s) of support and student need. The specific performance-based compensation break-out for year two is as follows: 111 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 2011-2012 = 35% student performance on assessments/ 15% local data/ 50% observations and other measures (as determined in year 1) Year 3 (2012-2013)–This will be the first year that movement within the career ladder is possible. Prior year data will result in modifications to strengthen areas of weakness in the current plan. Professional Development will be an expected and ongoing part of the process. Each year the Human Resources Department and Career Placement Committee will review and provide placement designations. The evaluation break-out is as follows: 2012-2013 = 40% student performance data / 10% local data / 50% observations and other supporting data (as determined in year 1) Year 4 (2013-2014)–This will be the second year of full implementation of the performance based incentive program. The continuous improvement model will be utilized to review data from prior years and to continue to modify the program as needed. The spotlight now shifts to sustainability as our goal of maintaining the program beyond the grant cycle. The educators have the potential to transition to the Accomplished and Distinguished levels. Educators wishing to move across the career ladder will follow application procedures to indicate interest. The Human Resources Department and Career Placement Committee will review applications. The break-out is as follows: 2013-2014 = 45% student performance data / 10% local data / 45% observation and other data (as determined in year 1) Year 5 (2014-2015)–This will be the third year of full implementation of the performance based incentive program. Planning for the future of the project will be completed and the trainings, communications and evaluation processes should all be highly efficient and established as a regular part of our HR program. The break-out is as follows: 2014-2015= 50% student performance 112 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II data / 10% other data / 40% observation and other data (as determined in year 1). The program is 100% viable and sustained by local and federal sources. The evaluation measures are both valid and reliable and applied fairly and transparently. Teachers and administrators understand the clear career pathways and are able to navigate the program with ease. ________________________________________________ Value Added & Data Management Monroe County is one of the strongest technology-based districts in the State of Florida. Being in a remote location has helped us develop a very strong communication lines and data management infrastructure. For example, our ESE department was rated superior for accuracy and management of data relating to the ESE students (source: www.fldoe.org). There are multiple technology based applications currently in use in Monroe County. Our district has the capacity to utilize video and web based conferencing, as well as high speed wireless internet access at all schools. Web based video conferencing, enables us to communicate, in real time, with our schools that are more than three hours drive from our district office. All our School Board meetings are televised and available to the entire county, keeping our community informed of projects and grants. Teachers and administrators are well-skilled in data use and analysis. Each school currently has a “data coach” who assists school-based teams in reviewing, planning and evaluating the data at the district level, school level, classroom level and to the individual student level. Even with our local level of expertise, data management is a critical area that will require knowledge beyond our current level. In order to accommodate this new direction, we recognize the need for additional support. (1) Our plan includes reviewing the best research and most effective Value Added programs available to link the performance-based compensation plan to student data, our focus will be on K-3 and 11th and 12th grades (since the state is providing the 4-10th grade VA program). We will be reviewing 113 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II vendors for validity and reliability as well as vetting the “other measures” we feel are essential in understanding the whole performance picture. (2) While the selection of the specific VA program design is currently under review, we are dedicated to the VA process as it provides the most accurate measure of student growth. Our team has reviewed the VA process in general terms and agrees it is essential to the program’s fair and balanced application. Data management is especially critical when looking at non-tested grades and special subjects such as students with special needs and special area teachers in non-tested grades. Most recently, our district was a pilot for the Florida Response to Intervention (RTI) project from the State of Florida and University of South Florida. We have had great success with RTI and Positive Behavior Interventions Support Systems at our schools and the performance based compensation system is the next logical step for our county. Our proposal includes initiating an RFQ to investigate the many options available to us via vendors, researchers and universities regarding VA models. One essential element is to include a Program Manager to facilitate and coordinate the many facets. The exact process and procedures for data management will be developed in the first year of planning along with expectations for this position. 114 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II ___________________ Recruitment & Retention As discussed earlier, recruitment and retention for the Monroe Counts School District is a challenge for our schools, even though we provide the highest beginning teacher salary in the State of Florida. The cost of living in the Florida Keys is also one of the highest in the state. In addition, the expense of everyday items is higher than the same item on the mainland. For example, the cost for gasoline according to the national average is $2.74 (source: www.ela.doe.gov), while the cost of gasoline in Key West Florida is almost $4.00! This is consistent with the vast majority of daily expenses in the Florida Keys. To compound, our economy is based primarily upon the tourism and fishing industries which have been impacted by recent events. An additional challenge for our recruitment and retention of highly qualified staff is in relation to our housing prices. Monroe has few apartment complexes and those we do have are quite expensive. The national average apartment rent for the State of Florida is $686.00 per month, while in the Florida Keys, the same apartment would cost $1,200.00 per month plus, first, last and full security required (source www.nationalrelocation.com). Our median home price continues to hover at $300,000.00, which is far out of reach of most educators. (1) Our schools that meet the “high-need” status are identified by site in Attachment F, based upon local school data for Free and Reduced Lunch (FRL) under the Richard B. Russell National School Act. These schools have at least 50% of the student population with low-income status. It is important to point out the fact that middle and high schools also have the same low income students yet their data does not reflect the need in their FRL status. Many students in the middle and high school are resistant to declare their lowincome status. Therefore the great needs evident at the feeder schools substantiate the associated needs at the middle and high schools. 115 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (2) In order to staff the hard to fill positions the team will explore and determine precisely what “effective and likely to be effective” educators criteria will be, and to staff such positions with “effective or likely to be effective educators”. The determination of what is “effective” and “likely to be effective” will be established over the course of the planning year. Once those designations are determined, the definition of “effective and likely to be effective” will be communicated with the educators. These determinations will assist us in placing the educators in the most appropriate position to benefit student success. Further development of this core element will be completed within our initial planning year. ______________ Communication Communication - in educating school personnel and the community regarding the performance-based incentive program, we will follow the recommendations from the Communication Committee. The proposal is to have a “point of contact” (POC) at each school selected in the planning year and continuously throughout the grant. The point of contact at each school will be part of a committee. The committee assignment will be based upon their interest areas and the needs of the project. Communication will be delivered utilizing a variety of approaches such as: Connect Ed, professional development modules, direct communications, and web based delivery. We will also incorporate the recommendations from the experts in the field who have experience in the area of performancebased compensation programs. _____________ Involvement and Support Involvement - each site-based point of contact will attend the committee meetings and work with their school staff to develop and collect input from the stakeholders on possible program modifications. The Communication Committee will create a process for the 116 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II site-based point of contact committee members to provide the site input. This will provide a two-way consistent communication model from the school to the committees and back. The point of contact at each school will provide site-based collaborative sessions with the teachers and administrators at their schools. Our plan has district staff partnered with teachers, administrators and union members provided opportunities to participate. Evidence of the core team who have been working on this grant is found in Attachment G, which is the sign in sheet from our meetings and the topics covered. Each core member has also reviewed the application and provided valuable input into the plan. _____________ Rigor and Transparency Rigor and Transparency – While many parts of the plan are being developed, there is a plan under construction that utilizes student data as a significant portion of the evaluation. Teachers will have full understanding of the other measures needed to demonstrate the full picture of the teachers’ practice. (1) Our plan includes creation of a rubric that will ensure objectivity in the review process. All evaluation staff will participate in the pilot before the performance-based evaluation is put into practice in year 2012-2013 school year (2) Observations will occur at least twice per school year, with both pre-conference and post-observation follow up. While not evaluative in nature, the proposed plan contains the intermediate inclusion of the CWT protocol to provide educators frequent feedback on their progress. (3) We will be developing the collection and organization of the data via our committees and Program Manager. (4) Inter-rater reliability will be achieved using the timeline below. The plan includes a pilot period in which the evaluation tool will be carefully evaluated for reliability. We plan to solicit teachers to volunteer for participation in the pilot. None of the evaluations completed in the pilot will be 117 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II reflected in teachers’ final observations and it will be made clear that the pilot is to check for the observer reliability only and not to perform evaluations. There will be multiple observers evaluating the volunteer teachers. Then the results will be compared and the process will be modified until we have reached a high level of reliability between observers. The Monroe County School District plans to secure an outside evaluator to ensure that the grant and its components are clearly defined and the process is transparent and managed as required under the federal guidelines. Our development team determined that the plan must adhere to a high level of transparency. Our focus is to place the maximum emphasis on the schools’ performance-based incentive program. ________________ Data Management The goal of the plan is that two or more raters will report the same or very similar results observing the same instructor. Data Management will comply with Family Rights and Privacy Act (FERPA) including the regulations in 34 CFR Part 99. (d) The data management system is also under development; however, it will be managed by the program assistant/ data manager to ensure that human resources, instructional technology department and payroll are linked appropriately. We plan to hire 1 full time staff member who will be a full-time employee for the first three years. In addition, we will have a leadership work group that will work regularly on the process, instruments and training modules. All data management will absolutely comply with FERPA rules including the regulations in 34 CFR Part 99. 118 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II _____________ Understanding Measures Professional development is essential to help the stakeholders have a voice in the program. While this area is under construction, we plan to have intensive training modules developed throughout the school year. The site-based point of contact will assist in the delivery and clarification of information. We have a timeline established below that outlines the projected targets. _________________ Planning Period (a) The district will provide an interim and annual evaluation report to verify that the expenses and activities are delivered as proposed in this application. Additionally, our plan includes an outside evaluator who has expertise in performance-based measures to support and evaluate our progress. All data and information regarding the grant and its application will be transparent, fair and open to review. Below is the projected timeline. September 2010– Each school will review the 2009- 2010 student data with site-based data coaches. School administrator will meet with individual teachers to plan professional development needs for the school year as evidenced by Teacher IPDPs Team will utilize reflection from Committees in making modifications to the plan 119 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Each administrator will meet with the Chief Operations Officer & Executive Director of Student Services & Curriculum to discuss school-wide student data and review plans for the school year as evidenced by the SIP process Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives Create job description and advertisement for Project Manager is prepared and will be posted RFQ for Value Added consultant, evaluation consultant; applications are prepared and posted Committees meet regularly to discuss and prioritize activities Committees review and analyze evaluation tools as well as a career ladder for administrators Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives October - November 2010 Hire Project Manager, provide intensive training and organizational directives Following each Progress Monitoring (PM) interval the administrator and instructors will review the results. Note PM Intervals vary depending on the school type and administration of the instrument. 120 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Each administrator will meet (monthly) with the Chief Operations Officer & Executive Director of Student Services & Curriculum to discuss school-wide progress Review and select consultant, university support, evaluation consultant schedule trainings. Monthly committee meetings, create public / school board communication Data coaches will meet with school administrators to review school wide data Administrators will meet individually with teachers to discuss professional development needs for instructional staff Chief Operations Officer will meet (monthly) with the principals regarding their school-wide data and their individual professional development focus. Team will utilize reflection from Committees in making modifications to the plan Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives December 2010 – Milestone Evaluation instrument should be well developed 121 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Each administrator will meet (monthly) with the Chief Operations Officer, Project Manager and Executive Director of Student Services & Curriculum to discuss school-wide progress Monthly committee meetings continue Value Added training and supporting consultant training should be making significant progress Prepare the intensive training modules for the teachers and administrators for January Team will utilize reflection from Committees in making modifications to the plan Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives January – February 2011 Final vetting process for the evaluation tool Intensive educator vetting with staff regarding the evaluation tools continue Completion of the training and implementation of Value Added. Monthly committee meetings continue Each administrator will meet (monthly) with the Chief Operations Officer to discuss school-wide progress 122 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Procedures of evaluation should be completed and ready to begin training pilot Committees will work on communication and professional development relating to the evaluation instrument Team will utilize reflection from Committees in making modifications to the plan Major topics of development: Value Added, educator incentive program and non-core areas performance-based incentives should be completed March 2011 Final review and preparation for evaluation pilot Request volunteers for the pilot evaluation Training for the observers using the instrument Monthly committee meetings Team will utilize reflection from Committees in making modifications to the plan Each administrator will meet (monthly) with the Chief Operations Officer to discuss school-wide progress Intensive training on the evaluation instrument to ensure inter-rater reliability 123 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II April 2011 Pilot implementation begins Each administrator will meet (monthly) with the Chief Operations Officer to discuss school-wide progress Intensive training on the evaluation instrument to ensure inter-rater reliability Review the evaluation process and compare the results Monthly committee meetings continue Team will utilize reflection from Committees in making modifications to the plan May 2011 (Tentative) Union ratifies the evaluation and the team verifies the evaluation responses Each administrator will meet (monthly) with the Chief Operations Officer to discuss outcomes and overall student progress Plans for training needs are projected for 2012-2013 Team will utilize reflection from Committees in making modifications to the plan June – August 2011 124 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Prepare the policy and procedure manual / complete training modules for administrators and teachers August 2011-June 2012 Full Performance-based compensation incentive implementation begins. Throughout the planning year we will explore what the best practices are based on the experts in the field. Our goal is to create a program that is exemplary in all aspects. ______________ Professional Development Our goal for professional development will be based upon a needs assessment and directly tied to the student data. Training for educators will be individualized enabling them to tailor their practice to the areas of student need. In order to achieve the goal of high quality professional development, as stated in section 9101(34) of the ESEA, the team will gather student data, consider input from external experts, consultants, researchers and other professionals while developing the program. We are basing the professional development on the areas of weakness of the high need schools combined with identified areas of growth for teachers. The determination of high needs schools is based on a 50% or greater percentage of Free and Reduced Lunch (FRL) status. The most current FRL designation, at the school level, under the Richard B. Russell National School Act can be located in Attachment F. (1) Professional development will be focused on the specific needs of the high need schools in the Monroe County School District. With the goal of linking professional development to student achievement data and ultimately to performance incentives. (2) Professional Development will be targeted for individuals, teachers and administrators based on the specific areas of need. 125 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (3) Professional development will: (A) Provide training for educators who did not achieve performance-based incentives. Support will be provided including the tools and skills that educators need to (a) assist exemplary educators improve their practice and raise student achievement (b) and successful and effective educators the ability to successfully assume additional and leadership roles. (4) Professional Development will assist educators in a better understanding of performance based measures as a result of the high quality training and improvement of their overall practice. (5) Finally, consistent evaluation of the Professional Development offerings in order to monitor the effectiveness of the Professional Development and to make modifications based upon the evaluation to future training. Following our planning year, effective educators will receive substantial incentive for their performance. Additionally, those educators who have achieved advanced and distinguished levels of achievement according to the draft Conceptual Framework (Attachment D) will be given leadership opportunities including mentoring, coaching, tutoring, lesson study etc. The focus is to support other educators’ development and advancing the practice of the accomplished and distinguished educators within the county. It is important to note this framework is a draft and the administrator framework is currently under development. Monroe County School District currently has a data management portal. (Attachment H). This web-based system is an organized tool for tracking and managing professional development evaluation and follow up activities. This tool has been utilized in the district for 126 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II over five years, and teachers are proficient in accessing the portal. Our district is currently investigating a data warehouse program that will enable any educator to review multiple data points for the district, school and individual students. Training principals will be the first step to enable them to assist their faculty in the understanding of the program components. It is essential that everyone in the school district receive the same message with the same details. Part of the plan is to start with a train-thetrainer model enabling our site administrators and committee members to be the most knowledgeable staff at each school regarding the EPIC Plan. As mentioned earlier, the point of contact for each school will also be a committee member on one of the established committees. Each committee member will receive a supplement to incentivize their participation and provide for stable teams. Team members will assist in training development and provide stakeholders the same information. Training produced will offer each point of contact, school-based committee member, with the specific scripting to enable them to share the information accurately in the same manner at each school. Site administrators will assist teachers in selecting professional development or may assign a mentor to assist them in perfecting their practice and strengthen their program. Each administrator will additionally receive monthly guidance from the Chief Operations Officer to assist in supporting the teachers and providing guidance to overall school improvement. 127 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II ____________ School Level Data Specific school-level data are provided in Attachment F, under the Richard B. Russell National School Act and ESEA (20 U.S.C. 6313(a)(5)). The middle and high schools listed qualify due to the fact that the feeder schools have over 50% FRL status. It is important to note that in the State of Florida there are no exact comparisons for one of our schools which are a grades 6-12 composition. Therefore the 6-12 school was measured against other high schools of similar FRL status. As the core areas are developed during the planning year, the team will use the continuous improvement model to make system improvements. Our plan is to provide the principals and teachers intensive and frequent training and input into the program and its development. _________________________________________________________________________________________Need for Project (1) Specific school level data are provided in Attachment F, all schools listed meet the criteria as stated in the grant application. The middle and high schools listed qualify due to the fact that the feeder schools have over 50% FRL status. (i)Monroe County School District has a significant need for this project. Our district is located in a remote, rural region on Florida that spans the entire Florida Keys. We are linked to the mainland via a two-lane road that covers over one-hundred miles of highway and bridges linking the island chain to the continental United States. Our district is dwarfed by our closest neighbor, Miami Dade which is the 5th largest school district in America. There are no four-year universities located in the Florida Keys and the closest is over four 128 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II hours away, so the option of student teachers is minimal. We currently have over 8200 students enrolled in our public schools and of that total our Exceptional Student Education (ESE) population is 22% (including gifted). In the Monroe County School District we have a district average nearly 50% Free and Reduced Lunch (FRL) status district-wide and many schools at 65% and higher. We have a very high mobility rate and a significant number of students for whom English is a Second Language (ESL). In fact, in our schools we have children who speak over 60 languages other than English! We are located just 90 miles from the coast of Cuba and receive many immigrant students and families who are ESL students. Most recently, we have seen an influx from Haiti following the earth quake of 2010. (ii)With this very complicated and diverse student population we have the additional challenge of our economy being based on commercial fishing and tourism. There are no farms or factories in the Florida Keys; we have no livestock, no dairies, and no commercial production of any kind. Consequently, many of our families struggle financially just to survive. They also have the ever present threat of disasters both natural and manmade that disrupt the economy. Being a chain of islands between the Atlantic and Gulf of Mexico leaves us vulnerable to frequent hurricanes that sweep our coast, and the most recent threat is a man made: the BP oil spill just off the coast of Florida. Together these may difficulties create an extremely challenging task of recruitment and retention for our school district. In addition, while the nation struggles with unemployment and falling housing prices, the average home price in the Florida Keys reflects that this is still one of the most expensive places in the State of Florida to live. While Monroe County offers the highest salary in the state for beginning teachers, our cost of living is so high that it does not make a difference in retention of staff. Our current salary schedule 129 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II does not account for exemplary performance nor does it incentivize or reward performance. Unlike most areas, we do not have an abundance of apartments nor apartment complexes, and home ownership is simply out of reach for many educators. _______________________________________________________________________________________________Project Design As stated under the core areas, (1) the Monroe County School District EPIC Plan is designed to mirror the State of Florida Race to the Top and the Common Core Standards initiatives. (i)The EPIC plan will have a career ladder for both teachers and school-based administrators that is clear and meaningful in support of the high needs students and schools. The project emphasizes the need for high quality educators and their impact on student achievement. (ii)Further, we recognize that the hard to staff positions can be impacted by incentives and performance compensation. In order to retain the highly effective staff, the performance-based compensation is a natural way to meet the needs of the students and recognize excellent educators. Definitions of teacher expectations draft can be found in Attachment J. (iii)A significant portion of the performance-based compensation plan will depend on student achievement. As shown in our comparison schools, our district underperforms compared to the “like” schools seen in Attachment I. We will be utilizing at least two years of data to place educators on the career ladder. Educators who show achievement will receive incentive pay. As the teachers and administrators progress up the career ladder, they will receive reward and responsibility for achievement. The reward will be in the form of incentives and the responsibility will be in the form of mentoring and other supports for struggling staff and students. As we develop the final plan, we will determine what “effective” is and exactly how “effective” will be measured. (2)Throughout the 130 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II program development there will be involvement of the teachers, administrators, district and union members providing input into the development, review and evaluation process. (3)As discussed, Rigor and Transparency – While many parts of the plan are being developed, there is a portion under construction that utilizes student data as a significant piece of the evaluation process. (4) The goal of the plan is that two or more raters will report the same or very similar results observing the same instructor. Data Management will comply with Family Rights and Privacy Act (FERPA) including the regulations in 34 CFR Part 99. (5) Our goal for professional development will be based upon a needs assessment directly tied to the student data. Training for educators will be individualized enabling them to tailor their practice to the areas of student need. In order to achieve the goal of high quality professional development, as stated in section 9101(34) of the ESEA, the team will gather student data and consider input from external experts, consultants, researchers and other professionals. _______________________________________________________________________________________Adequacy of Support (1)As discussed in the elements above, the management plan is adequate to meet to the project objectives. This element is a work in progress and will be fully developed during the planning period. However, we have been coordinating with the teachers, administrators and union members to create this grant application. The letters of support and meeting attendance sheets are found in Attachments C and G. The letters are from the Monroe County Superintendent and the Chairman of the School Board, in support of the proposed program. The school district has many components in place for in-kind support currently. Additionally, we chose not to use the grant funding for substitutes, coaches and other personnel in order to demonstrate our local effort of the project and that we have established support for this initiative. 131 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Roles and ResponsibilitiesPoint of Contact: Dr. Lesley Salinero, District Point of Contact, will attend any grant required meetings and or conference calls. The POC will monitor the grant committees, assist in conflict resolution and oversee the grant development over the term of the grant. Project Manager – TBD this role will be development over the course of the first two months. Our projection is that this individual will be a contact between the schools and the project director. He or she will have a broad knowledge of data analysis with Value Added experience. Chief Operations Officer: Dr. Jesus Jara, he is the Chief Operations Officer and is a direct supervisory role over the school administrators. As part of the EPIC Plan team he will implement and ensure fair application of the evaluation process for educators in the County. His role includes data review with the site administrators, providing feedback and guidance for administrators on providing the same supports for teachers. Committee Members: there are approximately 11 site based committee members who represent the individual schools. Of the 11 committee members, there will be a mixture of union and non-union staff. It is essential that all stakeholders have a voice in the project development. District Staff: specific district staff members who are essential for this grant to progress listed below: Assessment and Evaluation – Janet Meinke, she is responsible for all assessments within our school district. Her role is to also provide schools and the school board with accurate and reliable student data. She can assist in ensuring that the data is both qualitative and quantitative. 132 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Professional Development - Linda Diaz coordinates the professional development district-wide. She manages the MyLearningPlan and ensures that professional development is done in a clear and orderly manner. ESE – Catherine Kanagy represents the non-core teachers and staffs that are also eligible for the performance based incentives. She is a supervisor coordinator of the ESE department and provides the team with support for non-tested subjects. Union President -Leon Fowler is the president of the United Teachers of Monroe. He is an important part of our team as many areas require negation with the teachers union. Human Resources – Cheryl Allen is the director for human resources. She will be working to assist the Career Placement Committee in making appropriate determinations and the creation of the criteria for placements. Instructional Technologies – TBA (position is open at this time). This individual manages our TERMS data management and our technology department district-wide. In this position, the district data and software programs are evaluated and managed for compatibility. Vitas for all the core team are included in Attachment A verifying each team members' qualifications are excellent and commensurate with managing the program. (3)The proposed project has local funding and support included throughout the proposal and will be capable of maintaining the project beyond the grant period. (5)Finally, the projected costs of initiating the project are clearly developed and will substantially support the instantiation of the performance based measures in our county. Quality of Local Evaluation 133 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (1)This element is a work in progress and will be fully developed during the planning period and will include strong measures of performance that will be measurable and monitored. (2)The Monroe County EPIC Plan will utilize and outside evaluator to ensure that the data is both qualitative and quantitative. (3) The outside evaluator will provide the Monroe County School District with high quality, efficient and accurate evaluation results. Our internal process is based on the continuous improvement model which will provide feedback and improvement through the project. 134 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 135 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 136 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Attachment B –Vitas Dr. Jesus Jara Jesús Jara is chief operations officer in Monroe County School District in Key West, Fla. Previously, Jara was senior educational manager for the New England Regional Office, where he was responsible for leading K-12 programs and services. Jara joined the College Board in 2005 after serving public school systems in Florida and Massachusetts as teacher and administrator. He earned his doctorate from Nova Southeastern University in Florida. Dr. Lesley Salinero Dr. Salinero has 20 years experience in education; she is currently the Director of Student Services and Exceptional Student Education. Her BA was earned form St. Leo College in Tampa, Florida and her MA from Troy State University in Alabama, her Ed.D. from Nova Southeastern University in Florida. Dr. Salinero’s leadership roles include: president of the Council for Exceptional Children Monroe, board of directors for the Florida Keys Children’s Shelter, board of directors for the Monroe County Human Services Advisory board, and Key West Rotary. She holds certification in sociology, ESE K-12, ESOL, and educational leadership. Cheryl Allen Cheryl Allen has been the director of human resources for the Monroe County School District for the past 7 years and has an additional 20 years experience in public education administration. She graduated from Florida Keys Community College with an AA, St. Leo College with a BA and Troy State with a MA. Linda Diaz 137 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Mrs. Linda Diaz has 15 years experience as an educator. Mrs. Diaz earned her BA and MA from Nova Southeastern University. She is certified in Education Leadership as well as leadership roles as the board member at large for the Florida Association of Staff Developers, member of the National Staff Development Council, a Reading First Developer, and a board member for Florida Council for Teachers of Mathematics. She is currently the Title I and Professional Development Coordinator for the school district. She has also been a webmaster for school web site, administrator for electronic grade book, teacher leader, adjunct professor at Barry University, certified learning styles trainer St. John’s University, New York. Dr. Frannie Herrin Dr. Herrin has more than 22 years experience in the field of education. She earned her BA from University of South Florida, MA from Troy State and her Ed.D. from Walden University. Her leadership roles include, school based principal, assistant principal, member of FASA and ASCD. She is certified in education and education leadership Michael Kinneer Mr. Kinneer is currently the Chief Financial Officer for the Monroe County School District. He has a BA form Ohio State University, and a JD from Capital University Law School. He has 14 years experience with school finance and as a CFO. M. Leon Fowler Leon Fowler has 22 years experience as a classroom teacher. Mr. Fowler is President of the United Teachers of Monroe which serves the bargaining units for teachers and school related personnel in Monroe County. Locally Fowler has served as the Union’s President and Chief Negotiator since 1985. At the state level he has served on the Governance Board of the Florida Education Association, the 138 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Goals and Budget Committee and the Legislative Committee. Mr. Fowler earned his BA in mathematics from Stetson University in Deland, Florida, his MA in math education from the University of Miami. Kimberly Kasper Lowell Kimberly Lowell has 17 years of experience as a classroom teacher in a public school system. She has earned her teaching degree from Miami Dade Community College and a bachelors and masters degree from University of Florida. She is certified in State of Florida, Elementary Grades 1 – 6, ESOL Endorsement and is a National Board Certified Middle Childhood Generalist. Her leadership experiences are as the Monroe County National Board Certified Teacher Liaison at Key Largo School, Third Grade Team Leader and United Teachers of Monroe Upper Keys Vice President. Finally, her area of specialization is in Children’s Literature and Sociology Lourdes Dick Mrs. Lourdes Dick’s classroom experience extends over 17 years. Her degrees include a BA in linguistics with minor in secondary education from Queens College, City University of New York, a MS in educational leadership and policy studies at Florida State University in Florida. She has teaching credentials in three academic subjects and two vocational areas including Commercial Art Technology & Television Production, Art, Grades K-12, Educational Leadership, Elementary Education, grades K-6, ESOL, grades K–12, Florida Reading Endorsement. She has assumed numerous leadership roles in support of school improvement. Holly Hummell-Gorman Mrs. Holly Hummell- Gorman has eight years of successful teaching experience. She holds a BA from Florida State University, with a major in Spanish and a minor in multicultural / multilingual education. She has held many leadership roles over the years such as vice 139 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II president, United Teachers of Monroe, vice president, Alpha Delta Kappa, career ladder / performance committee member, MCSD health insurance committee member, Intel ® Master Teacher, and the Florida Reading First professional developer. Patricia A. Tielkemeier Patricia Tielkemeier has over a decade of teaching experience. She graduated with a BA from Ohio State University, Columbus, Ohio. She has had leadership roles including; union repetitive for the United Teacher of Monroe, State of Florida instructional materials committee member, and the district K-12 reading adoption. 140 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 141 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 142 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 143 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Attachment D – Draft Conceptual Framework Teachers develop over time more sophisticated skill sets and improved effectiveness. Based on the research of Dr. David Berliner and the ASU team we can describe four distinct stages or levels of teacher performance. We propose to design a salary schedule with four teacher levels. Each level will be described in relation to performance / behaviors. Teachers will apply to move from one salary level to another at particular points in their career (promotion zones). To be considered for the next level a teacher must have demonstrated “effectiveness,” as defined by federal and state guidelines for at least 2 consecutive years. Teachers will progress on a base salary schedule with a regular annual increment of 1-1.5%. Outstanding annual performance on the evaluation instrument, plus “effective” results will allow for a 3% annual increase from base. Teachers who successfully move from one level to another will receive an adjustment in base pay between $5,000 up to $8,000. Longevity steps will be frozen starting with 2010-2011. No teacher may move to step 15, 20 or 25. No teacher will get a reduction in pay. Teachers who receive an unsatisfactory evaluation for one year receive no salary increase. A second consecutive year may result in dismissal. Systematic supports will be provided by administrators and/or expert teachers which are designed to assist any teacher who receives unsatisfactory rating. 144 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II 145 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Attachment G – MyLearningPlan.com My Learning Plan offers the district the ability to plan professional development offerings to be viewed by all district staff including our Charter schools, for open registration. The offerings can either be self-selected or assigned by site administrator. Each PD offering has the following steps included: 1. 2. 3. 4. 5. 6. 7. Notice to all staff of PD opportunities Registration for all intended participants Verification of participation Follow up activities Verification of follow up activities Complete recordkeeping of all successfully completed professional development sections. School administrators use this information when determining PD needs and appropriate assignment for staff. The PD results are also included in the final evaluation process for each educator. 146 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Attachment I -Teacher Expectations Categories of Teachers Defined. The definitions below are a summary draft of the teacher level expectations that we have developed. Recognizing that all elements of excellent teaching are important at every level, teachers’ develop their skills at different stages. This defining of the teachers’ expectations at each level will be further developed in year 1. 1. Teacher (entry level) 0-5 years teaching experience Required: a BA, Florida license or waiver as appropriate. Expectations: 95% attendance rate, demonstrates that 35% (year 1) of students are performing within acceptable range AND provides successful or exemplary “other measures” AND receives satisfactory or exemplary observations. Expectations of a Competent Teacher: Demonstrate a knowledge of Florida curriculum, standards and instruction is aligned Instruction matches the student pace of learning and is modified as needed throughout the school year with evidence of differentiation of the curriculum Structures the learning environment to best meet student learning needs, demonstrates the belief that “all children can learn” Provides adaptations and modifications for students with disabilities, and ESL students. Matches instruction to individual student needs Aligns professional development to support areas of weakness or as directed by the site administrator and applies training into the classroom setting Demonstrates classroom management and positive behavior supports successfully Works with mentor teacher to improve student achievement and participates in learning communities 2. Professional Teacher 4-10 years of successful teaching experience Required: a BA, Florida license and at least 4 years successful teaching experience. Expectations: To move to this category the teacher must provide substantial evidence that he or she is performing above the average in multiple areas. All areas and criteria will be developed in year 1. Additionally, each teacher must have 95% attendance rate, demonstrate that 35% (year 1) of students are performing within acceptable range AND provides successful or exemplary “other measures” AND receives satisfactory or exemplary observations. Expectations of a Competent Teacher: 147 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Has demonstrated a clear knowledge of Florida curriculum, standards and implements successfully within the classroom. Instruction is aligned successfully with required curriculum Instruction matches the student pace of learning and is modified as needed throughout the school year with evidence of differentiation of curriculum Structures the learning environment to best meet student learning needs, demonstrates the belief that “all children can learn” Successfully provides adaptations and modifications for students with disabilities and ESL students. Provides evidence that instruction matches the individual student needs Aligns professional development to support areas of weakness or as directed by the site administrator and shows evidence of application of the training within the classroom Successfully demonstrates classroom management and positive behavior supports Works with a mentor teacher to improve student achievement and participates in learning communities as well as provides support for peer teachers Provides students with specific feedback regarding their progress and offers support Assists the school-based leadership team in the school-wide initiatives to improve student achievement 3. Accomplished Teacher 7-14 years of successful teaching experience Required: a BA, Florida license and at least 7 years successful teaching experience. Expectations: To move to this category the teacher must provide substantial evidence that he or she is performing above the average in multiple areas. All areas and criteria will be developed in year 1. Additionally, each teacher must have 95% attendance rate, AND demonstrate that 35% (year 1) of students are performing within acceptable performance range AND provides successful or exemplary “other measures” to demonstrate proficiency AND receives satisfactory or exemplary observations. Expectations of a Competent Teacher: Knows and implements curriculum framework successfully as well as individualization of the curriculum Matches instructional materials to meet students needs and successfully paces material Provides evidence of framing the lesson by contextualizing the content Aligns professional development to support areas of weakness or as directed by the site administrator and provides PD trainings for teachers at previous levels on the career ladder 148 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Successfully applies professional development to application within the classroom setting and demonstrates the belief that “all children can learn” Evidence of successful differentiation of curriculum by providing adaptations and modifications for students with disabilities and ESL students Regularly utilizes higher order questioning as part of the lesson Successfully implements classroom management and positive behavior supports Structures the learning environment to engage and increase achievement of the students, including the struggling learners Demonstrates improvement in the learning gains of the students who are typically resistant learners Participates in leadership opportunities to strengthen instructional practice in the school Works as a mentor to assist teachers at previous levels in order to improve student achievement Leads and participates in learning comminutes and provides training/ modeling for other teachers Provides targeted mentoring for new and beginning teachers Designs professional development school-wide Provides classroom coaching activities for teachers who are at previous levels 4. Distinguished Teacher 10 years or more of successful teaching experience Required: a BA, Florida license and at least 10 years successful teaching experience. Expectations: To move to this category the teacher must provide substantial evidence that he or she is performing above the average in multiple areas. All areas and criteria will be developed in year 1. Additionally each teacher must have 95% attendance rate, AND demonstrates that 35% (year 1) of students are performing within acceptable performance range AND provides successful or exemplary “other measures” to demonstrate proficiency AND receives satisfactory or exemplary observations AND provides successful mentoring. Expectations of a Competent Teacher: Knows and understands a broad base of curriculum and integration of subject areas and assists peer teachers in program development Uses standards based instruction successfully to improve student achievement 149 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Consistently and successfully matches instructional materials to meet students needs and demonstrates the belief that “all children can learn” Successfully and consistently frames the learning by contextualizing the content Pacing material to match the students needs and provides clear and consistent expectations for students Includes students as part of the assessment process and deliberately structures the learning environment to ensure all students are engaged Models exemplary educational practices for other teachers within his or her school and at district trainings Provides mentoring or supports teacher in previous levels Designs and presents professional development, school-wide, to improve student achievement and engagement Works with the site based administrators to create the Schoool Improvement Plan 150 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Monroe County School District Principal Evaluation Timeline 2010: Step 1: Professional Development of New Evaluation Tool Training will be provided for all Principals on the new evaluation tool and timeline. August: Step 2: Pre-Evaluation Planning Principals will individually complete a comprehensive needs assessment as required by the School Improvement Process and establish priority goal areas. August: Step 3: Meeting with Superintendent/ Designees Principals will meet individually with the district Superintendent or a designee to discuss the result of the needs assessment, and to propose performance goals along with the evidence and data to be gathered for the evaluation process. The Principal and Superintendent will agree on the data, evidence, and artifacts necessary to complete the evaluation process and confirm the Principals’ performance goals. September: Step 4: Data Collection The Principal will collect the data agreed upon in Step 3. The data may include the artifacts listed for each standard on the rubric; feedback from parents, students, school community, and other data to document achievement of performance goals. January: Step 5: Mid Year Update/ Review Check on the status of goals’ attainment. June: Step 6: Prepare a Consolidated Performance Portfolio The Principal will synthesize the information obtained under Step 4 in order to prepare a consolidated assessment or comprehensive view of performance throughout the year. The narrative regarding the data and artifacts used to demonstrate performance should be provided to the Superintendent/designee at a specified time prior to the performance review. June: Step 7: Meeting Between Principal and Superintendent/ Designee The Principal and Superintendent/designee will meet at the school to discuss progress in completing the evaluation process. At this meeting, the Principal and Superintendent/designee will discuss the Overall Performance Rating Sheet and recommendations for a professional growth plan will be considered as necessary. Note: Principal assignments would need to be made prior to completion of the needs assessment. 151 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Monroe County Principal Evaluation System The Monroe County Principal Evaluation Process uses an instrument designed to focus on the Florida Principal Leadership Standards. These standards which were developed by the Florida Department of Education are divided into three areas. They are Strategic Leadership, Operational Leadership, and School Leadership. Within these main areas are specific skills: under Strategic Leadership are the skills of Instructional Leadership, Managing the Learning Environment, and Learning Accountability and Assessment. Under Operational Leadership, the skills defined are Decision Making Strategies, Technology, Human Resource Development, and Ethical Leadership. Under the area of School Leadership are the skills of Vision, Community and Stakeholder Partnerships, and Diversity. To develop the evaluation instrument each skill has been defined through the use of indicators. These indicators are the benchmarks that must be met to document performance in a particular skill area. In the areas of Strategic Leadership, Managing the Learning Environment, Learning Accountability and Assessment, Operational Leadership, Technology, and Human Resource Development, a special project may be agreed to between the Principal and the Superintendent. The indicators would be satisfied through completion of the project. The special project would require thorough documentation to satisfy this leadership skill. A timeline has been established which will assist you with planning. In order to complete the evaluation process, prescribed steps must be followed: 1. A comprehensive needs assessment for your school must be conducted. 2. You must review the evaluation instrument and decide how you will document each skill that you select. 3. A meeting with the Superintendent or his designee must occur to review the needs assessments and to discuss the leadership skills which you will document for the upcoming year. 4. A coaching relationship between the Principal and the evaluator should be established to advance the goals for the year. 5. A portfolio of artifacts and a narrative for each skill must be presented at a time set by the district. Based on the results of the evaluation a bonus between 0% and 5% may be incurred by the Principal. The decision regarding this bonus rests with the Superintendent or his designee. The following criteria will be used. Rubric for Principal Competency Documentation Distinguished – 5% Accomplished- 4% Proficient – between 1-3% Developing – between 0-1% 152 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Unsuccessful – 0% ______________________________ Employee Name _________________________________________________ Evaluation Period _______________________________ Position __________________________________________________ Planning Dates Major Target Goals 1. 2. 3. 153 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Comments: 154 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II (D)(2)Principal Evaluation Systems comprised of instructional leadership, managing the learning environment, and learning accountability, and assessments. Indicators for Instructional Leadership The High Performing Leader: Developing 1 point Proficient 2 points Accomplished 3 points Distinguished 4 points Unsuccessful 0 Points 1. Works with staff, students, parents, and students to achieve annual learning gains, school improvement goals, and other targets. Identifies actions for improvement of student learning Systematically improves student achievement and engages stakeholders in the process Adapts and varies leadership to meet needs of school and implements new strategies to enhance student performance Is a driving force behind major initiatives to prepare students for the 21st century 2. Uses multiple sources of data to plan and assess instructional improvement. Aligns learning, Ensures that the Develops new teaching, alignment of initiatives to ensure Collects and analyzes data in curriculum learning, teaching, student success adherence with instruction and curriculum, which are supported instructional assessment to instruction is by data analysis for requirements maximize student focused to both students and learning maximize student staff and creates a 155 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II learning and creates a culture which makes sure that all students are successful 3. Engages staff in ongoing study of current practices. Describes where Bases curricular culture which is typified by growth and positive change Demonstrates increased academic research, applied decisions on achievement based ongoing study of theory, and research, applied on research, applied current practice and informed practice theory, and theory, and reads research on were used in informed practice informed practice applied theory and making curricular and demonstrates that are in place in informed practice decisions their effectiveness the delivery of instruction 4. Supervises Testing Program and uses student performance evaluation to improve instruction. Understands and promotes conditions Develops and that enhance the Identifies Demonstrates implements plans curriculum needs of staff’s desire to knowledge of for improvements in different focus energy on student performance student learning populations and achieving evaluation and based on builds a positive educational delegates staff to performance school culture for excellence through ensure the effective evaluations and learning; ensures analysis of student operation of the understands the the effectiveness of performance and testing program importance of the the testing program ensures testing program effectiveness of the testing program 5. Understands, recognizes, and provides resources and motivation for: balanced reading instruction, curriculum integration, active teaching and learning strategies, standards-based instructional programs, the use of technology for instructional purposes, and the alignment of classroom assessments to standards. Engages staff in 156 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Aligns content Total Points: (Items 1-5) ____________ Demands Is familiar with the relationship between content and instruction Recognizes the need for student performance evaluation Awareness of the process for identifying curriculum needs Relates content and instruction to the achievement of the established standards Has identified skills necessary for planning and implementation of improvements for student learning Assesses curriculum needs in a specific setting content and instruction that ensures student achievement of established standards Develops skills necessary for the planning and implementation for improvement of student learning Identifies curriculum needs for different student populations 157 and instruction that ensures student achievement of established standards Uses skills necessary for the planning and implementation of improvement of student learning Assesses the varying curriculum needs of the school and develops curriculum aligned to the state standards based upon the needs of the students, the community, and the goals of the school RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Indicators for Managing the Learning Environment The High Performing Leader: Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Develops and administers policies that provide for a safe school environment. Consistently develops and administers Develops policies that administers provide for a safe Administers and policies that policies that school provide a safe provide a safe environment school school Recognizes the Consistently environment environment need for a safe demonstrates Attends to school environment Manages techniques and student the daily organizational learning goals operations of skills necessary to in the daily the school lead/manage a operation of complex and the school diverse organization 2. Follows state board rules and School Board Policy in the overall administration of the school. Recognizes the Administers legal and ethical policies that Administers Consistently standards in the relate to the policies that conforms to legal management of the legal and relate to the and ethical 158 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II learning environment ethical standards in the management of the learning environment legal and ethical standards in the management of the learning environment Creates a culture where ethics and standards are emphasized standards in the management of the learning environment Creates a culture of appreciation for policy and standards in management of the learning environment 3. Submits in a timely manner all school financial reports and oversees financial operations within federal, state, and district guidelines. Recognizes the need for efficient/effective budget planning Uses an Uses an efficient budget efficient budget planning planning process that process involves staff and community Develops an efficient budget planning process that is driven by school priorities and involves staff and community 4. Establishes and implements operational plans and processes to accomplish strategic goals. Understands the Establishes Consistently importance of implements Plans for the operational resource allocation accomplishment plans and operational plans for the of strategic processes to and processes to accomplishment of goals accomplish accomplish strategic goals strategic goals strategic goals 5. Ties the daily operation of the school to school and student learning gains. Manages Attends to Consistently Is familiar with the daily student ties the daily the daily operations operations of learning goals operations of the of the school the school in the daily school to school 159 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Total Points: (Items 1-7) ____________ Indicators for Learning, Accountability, and Assessment The High Performing Leader: operation of the school and student learning goals 6. Identifies and organizes resources to achieve curricular and instructional goals. Identifies Identifies, Uses and analyzes analyzes and fiscal the major works to improve Understands the various and non-fiscal sources of importance of the major sources resources for fiscal and nonresource allocation of fiscal and nonthe school fiscal resources for the fiscal resources including for the school accomplishment of for the school business and including strategic goals including business community business and and community resources community resources resources 7. Implements a comprehensive plan for counseling and student services, which incorporates D.O.E. tools for student planning and explores all available options like Alternative Education for student success. Monitors methods to monitor student progress and align to postsecondary needs and assesses student progress and the alignment of activities to meet postsecondary goals Developing 1 Point Proficient 2 Points Can identify Assesses Consistently student progress using a variety of techniques and information assesses student progress using a variety of appropriate techniques and informational sources Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Uses multiple sources of data to manage the accountability and instructional improvement process. Under-stands Uses Uses 160 Consistently RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Total Points: (Items 1-3) ____________ Standard 2: Operational Leadership – comprised of decision making strategies, technology, human resource development, and ethical leadership. Indicators for Decision-Making Strategies The High Performing Leader: the importance of using data to assess and monitor school improvement multiple multiple uses multiple sources of data sources of data sources of data to make to manage the to manage the informed accountability accountability decisions about process and the school the improvement instructional process improvement process 2. Monitors and assesses instructional programs, activities, and materials. Uses the Consistently Demonstrat methods and uses methods and es an Is familiar with understanding principles of principles of the principles of program program of the methods program evaluation in evaluation in the and principles evaluation the school school of program improvement improvement evaluation process process 3. Uses the methods and principles of standards assessment in the school improvement process. Trains the Consistently Uses staff in the use Has an diagnostic tools uses diagnostic awareness of of diagnostic tools to assess, to assess, diagnostic tools to tools to assess, identify and identify and assess, identify and identify and apply apply apply instructional apply instructional instructional improvement instructional improvement improvement improvement 161 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Defines success based on results. Understands the importance of establishing goals and targets Uses others in the accomplishment of the organization’s goals Delegates tasks clearly to accomplish organization’s goals Focuses on student learning as a driving force for curriculum instruction and institutional decision making. Uses goal and target attainment for future planning Delegates authority and responsibility clearly to attain organization’s goals Focuses on student learning as driving force Builds family and community involvement in program planning. 2. Frames, analyzes, and resolves problems using appropriate problem solving techniques and decisionmaking skills. 162 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Understands the importance of problem solving and decisionmaking Has a repertoire of problem-solving techniques Explains and defends decisions Uses a variety of problem solving and decision making skills to resolve a problem Recognizes situations that require forcefulness and self-confidence in making decisions Routinely views events from multiple perspectives Leads and decides from a position of confidence Evaluates the quality of information being used when making decisions 3. Promotes the creation and encourages full implementation of the School Level RtI Plan. Creates a process for Develops Involves all continual Understands plan to meet the stakeholders in problem-solving the RtI process. needs of students plan to meet students with skill deficits implementation academic and behavioral needs 4. Promotes development of a functional School-Based Learning Team that meets on a regular basis with a clear focus on Tier 1, 2, and 3 data. Uses a Consistently Uses a variety repertoire of uses RtI methods of problemproblem-solving to improve solving skills to techniques that student improve learning focus on data achievement 5. Promotes ongoing professional development to support the Problem Solving Process at all levels of educational decision making. Can identify the importance of regular meetings with RtI team. Recognizes the importance of Builds schedule for RtI Works with staff to develop Consistently uses the methods 163 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II RtI Professional development meetings and professional development the skills to and principles of ensure that all RtI to improve students are teaching and benefiting from learning the problemsolving model 6. Promotes student learning as the driving force for curriculum, instruction, and institutional decisionmaking. Total Points: (Items 1-6) ____________ Understands the importance of creating student learning goals Plans for the accomplishment of strategic goals Establishes operational plans to meet student learning goals with specific targets and evaluative criteria Implements operational plans and processes that are driven by strategic goals Consistently identifies resources to accomplish student learning goals 164 Indicators for Technology The High Performing Leader: RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Proficient 2 Points Developing 1 Point Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Manages the staff and teachers in their use of technology, telecommunications and information systems to enrich curriculum, instruction, and assessment with a clear vision for technology integration. Communicates and gets feedback for a technology plan for the school Works with tech savvy staff to plan for increased technology usage Implements a plan for technology integration Provides support for teachers to use technology in the school and in classrooms Communicates a clear vision for Recognizes technology integration the importance Provides of technology educational and integration technical support to increase the use of technology already in the school/ classroom 2. Plans for increased implementation of technology and provides staff development to meet these needs. Can identify Develops an Develops an appropriate effective teacher effective professional Develops content for an professional development plan for effective teacher effective teacher development plan individual teachers and professional professional to increase the entire school for development development to technology usage to technology integration plan which increase technology support curriculum- throughout the teaching promotes usage based integration and learning technology practices environment integration 3. Uses technology for student assessment and to evaluate the impact of technological and instructional initiatives. Recognizes Uses technology Uses Uses technology for the need for as a tool in support of technology to student assessment and access to educational activities support analysis the evaluation of the 165 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Total Points: (Items 1-3) ____________ instructional technologies and use of student assessment data impact of technological and instructional initiatives Indicators for Human Resource Development The High Performing Leader: Proficient 2 Points Developing 1 Point Accomplished 3 Points Distinguished 4 Points Unsuccessful (Comment Required) 0 Points 1. Works collaboratively with teachers to plan for individual professional development tied to student learning and other school goals. Recognizes the need for teachers to plan for individual professional development Uses multiple data sources to work with teachers to plan for individual professional development Manages a program of continuous professional development tied to student learning and other school goals Consistently applies adult learning strategies to professional development Creates a staff culture of continuous professional development tied to student learning and other school goals 2. Operates within the provisions of each contract as well as established enforcement and grievance procedures. 166 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Can identify methods and principles of personnel evaluation Utilizes a variety of supervisory skills to improve teaching and learning Consistently utilizes a variety of supervisory models to improve teaching and learning Uses supervisory models appropriate to individual staff members to improve teaching and learning 3. Sets high expectations and standards for performance of all teachers and staff. Recognizes the importance for setting high expectations and standards for the performance of all teachers and staff Sets expectations that will ensure that all students are engaged in active learning Sets and communicates high expectations and standards for the performance of all teachers and staff Consistently sets and communicates high expectations and standards for the performance of all teachers and staff 4. Hires and retains high quality teachers and holds them responsible for student learning. Is familiar with the processes necessary for hiring and retention of high quality teachers Uses the processes necessary for hiring and retention of high quality teachers Works with staff so they have the skills to ensure that all students are engaged in active learning Consistently works with staff so they have the skills to ensure that all students are engaged in active learning 4. Builds capacity by working with teachers to increase instructional effectiveness. 167 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Total Points: (Items 16) ____________ Recognizes the importance of providing opportunities for teachers to think, plan, and work together Makes efforts to provide opportunities for teachers to think, plan, and work together Provides opportunities for teachers to think, plan, and work together Consistently provides opportunities for teachers to think, plan, and work together 5. Fosters an environment for the development of leadership skills and leadership roles in the building. Recognizes the relationship between professional growth plan, professional development and teacher and school learning goals Empowers others to achieve personal, professional and organizational goals Empowers the staff to achieve personal, professional, and organizational goals 168 Consistently empowers the staff to achieve personal, professional, and organizational goals RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Indicators for Ethical Leadership The High Performing Leader: Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Makes decisions based on the legal, moral, and ethical implications of policy options and complies with School Board Policy. Is familiar Consistently with decisions makes decisions Understands based on the based on the Demonstrat legal, moral, and ethical and legal legal, moral, and es ability to ethical concerns educators ethical make decisions implications of face in the teaching implications of within an policy options and learning policy options ethical context and complies environment and complies with School with School Board Policy Board Policy 2. Creates, models, and implements a set of values for the school. Develops a Develops well Recognizes personal code reasoned the need to of ethics Manifests a educational beliefs create, model, embracing professional code based upon an and implement a diversity, of ethics and understanding of set of values for integrity and values teaching and the school the dignity of learning all people 3. Acts in accordance with federal and state constitutional provisions, statutory standards, and regulatory applications. 169 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Total Points: (Items 1-3) ____________ Standard 3: School Leadership - Is familiar with federal and state constitutional provisions, statutory standards, and regulatory applications Communicates with the staff the federal and state constitutional provisions, statutory standards, and regulatory applications Monitors and enforces the staff to act in accordance with federal and state constitutional provisions, statutory standards, and regulatory applications Consistently acts in accordance with federal and state constitutional provisions, statutory standards, and regulatory applications comprised of Vision, Indicators for Community and Stakeholder Partnerships, and Indicators for Diversity. 170 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Indicators for Vision The High Performing Leader: Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Facilitates the development and implementation of a shared vision and strategic plan. Develops a Recognizes the importance of working with staff, students, and families to achieve the school’s vision Develops a shared vision and strategic plan for the school shared vision that places student and faculty learning at the center based on the identified needs Develops and implements a plan to shape/use the external influences that impact upon the school As part of the planning process, works with faculty and other stakeholders to identify needs Creates conditions that motivate staff, students, and families to achieve the school’s vision 2. Uses collaborative process to establish plans and to accomplish goals. Understands Identifies Shares Shares the need for a needs that will be leadership and leadership and 171 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II shared vision targeted in a decision-making decision-making and strategic shared vision and within the school within the school plan for the strategic plan and with others in school the community 3. Relates the vision, mission, and goals to the welfare and learning needs of students. Facilitates the development Is familiar Can relate Works with of a shared with the ways in instructional faculty to vision that places which student objectives and identify student and and family curricular goals instructional and faculty learning conditions within a shared curricular needs at the center affect learning vision based on the identified needs 4. Articulates and reinforces the vision in written and spoken communications. Understands the importance Actively Consistently Proactively of articulating articulates and articulates and articulates and and reinforcing reinforces the reinforces the reinforces the the vision in vision in written vision in written vision in written written and and spoken and spoken and spoken spoken communications communications communications communications 172 Total Points: (Items 1-4) ____________ RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Indicators for Community and Stakeholder Partnerships Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points Not Demonstrated (Comment Required) 0 Points 1. Communicates the school’s vision, mission, and priorities to the community. Demonstrates Consistently concern for the image interacts with of the school via communication community impressions created by the school’s concerning the the students and staff, vision, mission school’s vision, and priorities to and serves as primary mission, and spokesperson in the the community priorities community 2. Shares leadership and decision-making with others in the community and within the school. Understands the Begins the importance of Works to create a Develops a building a process of having a community of learners community of community of community of among the staff, learners centered on learners working learners working students and faculty student learning together on student together learning 3. Mobilizes the resources of the families, business, and community members in support of the school’s goals. Identifies major Manages and Understands opinion leaders in the markets the image of the importance of Provides community and their the school via identifying opportunities to relationships to school impressions created resources from involve family and goals and programs by the students and families, and community in a broad business and range of school Seeks resources of staff community activities families, business, and Develops and members that community members sustains family- Understands the importance of communicating the school’s vision, mission and priorities Plans for the 173 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II The High Performing Leader: Total Points: (Items 1-4) ____________ could support the school in support of the school’s goals school-communityhigher education partnerships, coalitions, and networks 4. Continuously builds family and community involvement in appropriate policy implementation, program planning, and assessments. Uses major opinion leaders in the Understands community to support the importance Identifies opinion Involves family and promote school and community in of involving goals and programs leaders in the appropriate policy family and community and their Actively engages implementation, community in relationship to the program planning, and the community in a broad range school creating shared assessment efforts of school responsibility for activities student and school success 174 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Indicators for Diversity The High Performing Leader: Not Demonstrated Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points (Comment Required) 0 Points 1. Promotes multicultural awareness, gender sensitivity, and racial and ethnic appreciation in all aspects of the educational organization. Represents the school and the Serves as a role educational model in relations with establishment in various cultural, ethnic, relations with Interacts racial and special various cultural, Understands effectively interest groups in the ethnic, racial and with diverse the importance community special interest individuals of interacting Works with the staff groups in the and groups with various to develop instructional cultural, ethnic, Is involved community content that provides for racial and in planning for Conforms to the diverse perspectives special interest legal and ethical hiring, appropriate to the groups in the standards related to developing situation community and retaining a diversity Handles crisis diverse staff Consistently communication and interacts effectively conflict management with diverse effectively individuals and groups 2. Arranges for students and families whose home language is not English to engage in school activities to strengthen home school communications. 175 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Total Points: (Items 12) ____________ Can identify methods to improve relations with various cultural, ethnic, racial and special interest groups in the community Provides Arranges opportunities to involve school community in a broad range of school activities Is perceptive and tactful in dealing with diverse populations for students and families whose home languages is not English to engage in school activities and communication through oral and written translations Communicates with various cultural, ethnic, racial and special interest groups in the community 176 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Crosswalk Between Standards and Recommended Artifacts Leadership Standards Recommended Artifacts 1 2 3 School Improvement Plan X X X Statement of school vision, values, belief, and goal statements X X X Building Level Planning Team (BLPT) (agendas, minutes) X X X Professional Learning Communities (PLC) (agendas, minutes) X X X Student Achievement Data X X X RtI Problem Solving Documentation X X X Master Schedule X X Instructional Focus Calendars (IFC) X Individual Professional Development Plan (IPDP) X School Financial Plan X X X RTI School Level Plan X Professional Development Documentation (through My Learning Plan) X Teacher Retention Data X School Advisory Council (SAC) (agendas, minutes) X Parent Survey X Records of Teacher Observations X 177 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II End of Year Evaluations X Documentation of School Outreach events (agendas, minutes) X School Crisis Plan X Lesson Study Implementation X X Curriculum Programs (SUMS, FRI, IB) X X Five Star School Portfolio X Classroom Walk Through X Leadership Standards: 1 = Strategic Leadership 2 = Operational Leadership 3 = School Leadership 178 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II MAJOR GOAL AREAS GOAL Developing 1 Point Proficient 2 Points Accomplished 3 Points Distinguished 4 Points 179 Not Demonstrated (Comment Required) 0 Points RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Comments: Principal Signature: __________________________________________________________Date:_______ Supervisor Signature: _________________________________________________________Date:_________ Overall Performance Rating Sheet Point Totals for Leadership and Major Goal Areas Points/Other Projects Total/Designation Leadership 160 _______ Major Goal Areas 12 _______ 180 RACE TO THE TOP LEA FINAL SCOPE OF WORK – EXHIBIT II Formula: (___/160) X (100/1) X (60/100) = (___/12 ) X (100/1) X (40/100) = ______ ______ Leadership points Major Goal Points Scoring Guide 88-100 Distinguished* 69-87 Accomplished** 44-68 Proficient 25-43 Developing *Cannot have any individual ratings below Accomplished **Cannot have any individual ratings below Proficient Overall Rating: District Administrator Signature: Superintendent/Administrator Signature: Date: Date: Compensation Recommendation: 181