SUBJECT TO CONTRACT ANNEX C SCHEDULE 01 In Span Handover Link 1. Definitions 1.1 In this Schedule, a reference to a paragraph, unless stated otherwise, is to a paragraph of this Schedule. Words and expressions have the meaning given in Annex D. 2. Description of Service 2.1 BT shall provide each Point of Handover on a public highway or, unless otherwise agreed, on a prospectively maintainable public highway, with BT’s portion of the Line System being provided by BT on its side of the Point of Handover. The Operator shall provide its portion of the Line System on its side of the Point of Handover. 2.2 The Point of Handover shall be outside a Cable Station or outside an ITC, as specified by the Operator in its order for an ISH Link. 2.3 The Point of Handover is the point where the Operator’s duct is joined to the wall of the BT jointing chamber. 2.4 The Point of Handover shall not be located at such distance from the relevant BT building such that signal regeneration is required to be carried out by BT. 2.5 The Point of Handover shall be established by the Operator installing its cable to the BT jointing chamber at, subject to paragraph 2.6, a precise physical location agreed between the Parties where it shall be:- 2.5.1 jointed to the BT cable in the jointing chamber; or 2.5.2 handed over to BT to be drawn by BT into: (a) a BT building; or (b) another jointing chamber if the Operator’s cable meets the Cable Specification. 2.6 If the Parties locate the jointing chamber at a distance which is greater than 100 metres from the curtilage of the BT building, the Operator shall pay duct charges in accordance with BT’s Retail Price List. 2.7 Subject to paragraph 2.6, Page 1 of 6 Revised IFA Schedule 01 Issue 3.1 01/12/04 SUBJECT TO CONTRACT 2.7.1 the jointing chamber shall be provided, owned and maintained by BT at its own expense; and 2.7.2 BT shall provide, own, maintain and be responsible for all ducting, plant and equipment and will bear its own costs for the ducting, cabling, and maintenance of the Line System on its side of the Point of Handover and the Operator shall do likewise in relation to the Line System on its side of the Point of Handover; and 2.7.3 if continuous cable is used, the Operator agrees that ownership of that part of the cable on the BT side of the Point of Handover passes to BT. 2.8 Diagrams A and B are diagrammatic representations of the In Span Handover arrangements and are included in this schedule for illustration purposes only. 3. Path Protection 3.1 The Operator may request, whereupon BT shall provide, Path Protection between the Cable Station and the Point of Handover or between the ITC and the Point of Handover, as the case may be, using: (a) a single BT jointing chamber with a single cable and two separate pairs of fibre in that cable; or (b) a single BT jointing chamber with two separate cables; or (c) two separate BT jointing chambers with two separate cables into those BT jointing chambers; and a suitable transmission switching mechanism without a change to the cable or cables. 3.2 If the Operator requests Path Protection as referred to in paragraph 3.1 using two jointing chambers, BT shall endeavour to use a suitable existing jointing chamber (the “protection jointing chamber”). 3.3 At the Operator’s request, BT shall provide a written quotation for the installation by BT of a protection jointing chamber if a suitable existing protection jointing chamber cannot be identified or used. 3.4 If the quotation referred to in paragraph 3.3 is accepted, BT shall install the protection jointing chamber for the second cable. 3.5 For the avoidance of doubt, the protection jointing chamber shall be installed, owned and maintained by BT. Page 2 of 6 Revised IFA Schedule 01 Issue 3.1 01/12/04 SUBJECT TO CONTRACT 4. Charging 4.1 For services under this Schedule, the Operator shall pay to BT the appropriate charges for multiplexor, Line System and Path Protection (if applicable) specified from time to time in the Carrier Price List. 4.2 The connection and rental charges shall be payable by the Due Date. Rental charges shall be payable quarterly in advance. 4.3 BT shall be entitled to charge for any Point of Handover independently of whether the charge for any Cross Connection ordered under Schedule 02 shall have become due and payable unless the scheduled Ready for Test Date for both services is the same and there is delay in the provision of the Cross Connection due to no fault of the Operator. 4.4 In addition to the charges specified from time to time in the Carrier Price List, each Party shall, if applicable, make the additional payments specified in Appendix B of Annex A. 4.5 Path Protection charges shall be the sum of the relevant charges specified in the Carrier Price List. Each cable splice required for the provision of Path Protection has a separate charge. Connection and rental charges shall be payable for each ISH Link used for Path Protection. Rental shall be payable for a minimum of 12 months. Subject to payment being made for the then current minimum period of 12 months, rental charges shall be payable until the Operator requests BT in writing to cease that Path Protection. 5. Term 5.1 The minimum period of service for any ISH Link shall be 12 months commencing on the Ready for Service Date. 5.2 Any ISH Link Augmentation shall be subject to its own minimum period of service of 12 months commencing on the Ready for Service Date. 5.3 The Operator may terminate, within 6 weeks of notification of an increase in BT’s charges, any ISH Link by 3 months’ notice in writing provided such an increase in BT’s charges is greater than RPI. 5.4 The Operator may terminate any ISH Link by 3 months’ notice in writing expiring on or after the end of the minimum period of service applicable to such ISH Link. 5.5 If the Operator terminates any ISH Link because of any increase greater than RPI in the charge payable for service, no increase in such charge shall become effective during any period of notice properly given under paragraph 4.4. Page 3 of 6 Revised IFA Schedule 01 Issue 3.1 01/12/04 SUBJECT TO CONTRACT 5.6 BT may terminate any ISH Link by 3 months’ notice in writing expiring on the scheduled expiry of the life of the Cable System as notified by the person who owns or controls the submarine cable capacity in the Cable System. Page 4 of 6 Revised IFA Schedule 01 Issue 3.1 01/12/04 SUBJECT TO CONTRACT Diagram A TYPICAL SDH IN SPAN HANDOVER ARRANGEMENTS Operator System Line System BT Cable Station S L T E DXC Submarine Cable Capacity A D M POH Optical Fibre Cable A D M ISH Link DXC Facility Operator System Line System BT Cable Station S L T E DXC BT ITC DXC A D M POH Optical Fibre Cable A D M DXC DXC Facility Backhaul Capacity Facility ISH Link DXC POH SLTE - DXC Facility Point of Handover Submarine Line Terminating Equipment Page 5 of 6 Revised IFA Schedule 01 Issue 3.1 01/12/04 SUBJECT TO CONTRACT Diagram B TYPICAL PDH IN SPAN HANDOVER ARRANGEMENTS Operator System Line System BT Cable Station S L T E Mu x+ LT E D D F Optical Fibre Cable POH O L T E IBL Facility Submarine Cable Capacity ISH Link Note: Only available for contiguous 140 Mbit/s in cable system Operator System Line System BT Cable Station S L T E D D F O L T E BT ITC O L T E D D F M U X O L T E POH Optical Fibre Cable O L T E IBL Facility Backhaul Capacity ISH Link Submarine Cable Capacity DDF MUX OLTE SLTE IBL - Digital Distribution Frame 140 Mbit/s - 2 Mbit/s Multiplexor Optical Line Terminating Equipment Submarine Line Terminating Equipment Intra Building Link Page 6 of 6 Revised IFA Schedule 01 Issue 3.1 01/12/04