SHANKAR SINGH NAGARKOTI

advertisement
RAKESH KUMAR SAHA
Contact no.: 00974-30142136
E-mail: rakesh738073@gmail.com
B.E. Electrical with more than 12 years of cross-functional expertise
in Commissioning, Design and Estimation (Oil, Gas & Power sector)
for ELV system. Presently working as Assistant Manager – Projects
at CGC Qatar.
About CGC-Established in 1987, Consolidated Gulf Co., CGC, is one of the first technology companies in
Qatar with diversified interests in Technology, Engineering and Mobile Telephony domains. Certified to the Quality Management System ISO 9001:2008,
Environmental Management System ISO 14001:2004 and Occupational Health and Safety Management System OHSAS 18001:2007, CGC has been catering to
the wide-ranging technological requirements of almost all big giants in Qatar for last 25 years now, offering total turnkey solutions and in-depth services ranging
from Consultancy to Engineering Design, Planning, Procurement, Project Management, Enterprise Technology Infrastructure Setup & Commissioning, Technical
Manpower Outsourcing and long term Operations & Maintenance services.
I would like to associate with the organization that has ample scope for growth. This I feel shall enable
me to utilize my skills and ability to the maximum extent and thereby contribute to the goals and
milestones of Organizations.
PERSONAL
PROFILE:




Ability & willingness to lead from the front.
Ability to view things from other person’s point of view.
Loyal with very high personal & professional integrity.
Can work well under pressure.
EDUCATIONAL
QUALIFICATION:
B.E. (Bachelor of Engineering) from NIT Jamshedpur
Electrical Engineering, 1999.
OTHER QUALIFICATION/
CERTIFICATIONS:
Attended IMS (Integrated Management System)
Program – A CGC Operational excellence strategies.
Attended ACE (Achieving Competitive Excellence)
Program – A United Technologies Corporation worldwide
Operational excellence strategies.
Proficient in computer MS Office, Visio.
WORK EXPERIENCE:
1. Presently working with Consolidated Gulf Company (Qatar) as Assistant ManagerProjects from 01/07/2012 to till date.
 Understanding the client requirement and based on that preparing the detailed Design
Drawing for panel, Fire detection layout, Panel component selection etc.
 Interaction with consultant for getting the final approval in design and shop drawing.
 System architecture preparation.
 Datasheet preparation.
 Giving Technical support to execution team at site.
1











Preparation of bill of quantity.
Supervising Panel wiring based on the design wiring drawing after client's approval.
Giving technical support in the commissioning of the fire alarm Panel at site (Siemens
Make) from design and functionality perspective.
Designing of PA system based on the consultant design drawing for PA system to suit
Bosch Make PA system.
Preparation of System architecture For Fire alarm system (Siemens), PA system
(Bosch) and CCTV system (Sony) based on the respective make.
Preparation of detail design drawing for the fire alarm, Public address and CCTV
system.
PLC I/O list preparation.
Preparation of interface schedule between fire Alarm and protection system and client
DCS based on the technical specification.
Giving Help in preparation of Graphics for fire water pump system i.e.SCADA screens.
Fire water pump system logic design.
Pressure transmitter, Level transmitter adjustment using HART communicator.
Projects in hand:

Abu Homour Mall ELV system consists of Fire Alarm system, CCTV, Public Address and
SMATV System (under execution).
2. Agnice Fire Protection Limited from 01/04/2012 to 26/06/2012 as Dy.Manager-Projects
transferred from UTC Fire and Security India Limited where I worked as Assistant
Manager – Design (Industrial) from 11/02/2008 to 31/03/2012.Total Duration:- 4 yrs & 4.5
months.
 Customer interaction to define requirements and work out solutions.
 Interact with relevant units (India & Abroad) for technical inputs & costing and other UTC
branch units for joint bidding.
 Interact with customer for any commercial and technical clarifications and attending pre
bid meetings.
 Customer follow-up, techno-commercial discussions & negotiations, order finalization.
 Transfer of contract to execution team or fulfill the post mortem analysis.
 Understanding the client requirement and based on that preparing the detailed Drawing
for the system which includes basically instrumentation part and Fire detection and
protection part as per the technical specification.
 Datasheet preparation.
 Preparation of interfacing signal schedule between the various equipments.
 Giving Technical support to execution team at site.
 Preparation of bill of quantity.
 PLC I/O list preparation.
 Fire water pump house logic design.
 Pressure transmitter, Level transmitter adjustment/settings using HART communicator.
 Supervising Panel wiring based on the design wiring drawing after client's approval.
 Installation and commissioning of the Fire alarm system at site.
 Programming of BS320 (Autronica), EST-3(Edward),Quick Start(Edward) and Vigilant
(GE) fire panel & Commissioning of Fire detection system as per standards and design
which includes flame Detectors, smoke detectors, early warning smoke detectors like
HSSD etc,Infra red detectors, Hydrocarbon Gas detectors etc.
 Technically competent Instrumentation & control engineer with rich in-depth exposure to
the entire spectrum of engineering, automation, instrument installation and control
systems.
2
Major Clients handled:
National Thermal Power Corporation, Bharat Heavy Electricals Limited, Engineers India Limited,
GODREJ, Indian Oil Corporation Limited, Chennai Petrochemicals Limited, TamilNadu Electricity
Board, Reliance Industries, Steel authority of India Limited,TOYO,BGR,Siemens,Doosan,Naveli
Lignite Corporation.
Projects Handled in UTC:










3.
NTPC – Farakka, Korba about 25 crores.
NTPC – Kahalgaon about 18 crores. 3 x 500 MW
Lanco Infratech Limited – 2 x 507.5 MW 15 crores.
Punj Lloyd Ltd. – 2 X 250 MW Chaabra, Rajasthan – 9 crores.
Larsen and Toubro, Baroda – MSQ up gradation project - 5 crores.
BHEL Santaldih – 5 Crores.
CPCL-Chennai-Fire Detection and Alarm System for Euro-IV project – 6 crores.
BSNL-Hyderabad Telephone Exchange – 02 crores.
Tata power- Mundra-4000MW power plant.
Mettur Thermal power plant-TNEB
MCE Middle East WLL, Bahrain. As Senior Engineer(C & I) from 22/02/2007 to 20/11/2007.
Duration:-8.9 months
 Designing wiring diagrams for the various kind of machine under up gradation from
Conventional panel to PLC Control panels.
 Designing P & ID drawing as per client requirements.
 Understanding the client requirement and based on that preparing the detailed Design
Drawing.
 Supervising Panel wiring based on the design wiring drawing after approval.
 Installation and commissioning of the entire system at the Client End.
 Preparation of BOQ and calculation of Man hours as per project requirements.
 Installation & Commissioning of Fire detection system as per design drawing (Includes
Flame Detectors, smoke detectors, fire panel etc).
4. Al-Majal International Trading and Contracting Company (Qatar) Site Engineer from
11/10/2006 to 21/02/2007. Duration:-4.4 months
 Complete responsibility of electrical, Plumbing (Coordination), HVAC (Coordination)
Work in Grand Hyatt Phase:-2 (5 STAR HOTEL under Construction) at West Bay in
Qatar.
 Looking after all the construction activities related to the electrical works.
 Installation and commissioning services for fire alarm, security, gas detection and
Automatic fixed gaseous fire extinguishing systems.
5. Worked as Project Manager (AL-Khobar residential project) for Al-Rafgha Contracting Est. in
Dammam (K.S.A). 16/03/04 to 16/06/06. Duration:-02 years & 3months.






Complete responsibility of electrification works in construction & maintenance
Projects.
Making Maintenance strategies to improve the functioning of projects.
Preparing monthly reports, monthly invoices and doing necessary steps to get 100%
Payments from client.
Making quick decisions during critical situations at the site.
Handing more than 40 electricians, supervisor in coordination with civil Engineers.
Preparing various maintenance programs and necessary documents as per Client’s
3

Requirements.
Installation and commissioning services for fire alarm and automatic gaseous fire
Extinguishing suppression systems.
6. Worked with Elmatics engineers pvt ltd specialized in electrical and instrumentation field
(Installation and Commissioning) as electrical Engineer from 01/09/2003 to 10/03/2004 (New
Mumbai, India). Duration:-6.3 months


Inspection of circuits or appliances, prepare and assemble tools,
Materials and Measuring Equipment. Diagnose wiring or equipment fault using various
Electrical measuring Instruments.
Locating Cable fault and arrange for repair. Dismantle electrical equipment and Replace
Or repair Parts, Test Insulation and reassemble making proper internal & external
Connections. Ensure that all Regulatory and Safety devices, such as Fuses, Circuit
Breakers, etc. are properly installed.
7. Worked with POLYMER PAPERS LTD as Electrical engineer from 07/11/2000 to
18/08/2003(Faridabad). Duration:-02 years & 9.3 months









Execution of various Design and production activities like proposal review, Vendor
approval at initial stage, drawing approval, QA and Technical specifications approval.
Coordination with planning & production departments for timely delivery & after sales
service etc.
Reporting to General Manager –Engineering regarding the project status.
Installation & maintenance of different kinds of machines like pleating Machine, curing
ovens, and expanded sheet metal machines ECT used in Filter manufacturing industry.
Logbook maintenance as per schedule.
Looking after breakdowns.
Inspecting and maintaining all machines in good condition.
Preparing and strictly following the preventive maintenance schedule in Coordination
with co staff and superiors.
Panel design and wiring based on the requirement raised by client.
8. Worked with ACME PROCESS HEAT FURNANCE from 02/04/2000 to 15/10/2000(Faridabad)
as installation and commissioning engineer. Duration:-6.4 months


Installation and maintenance of different kind of process furnaces used in heat
Treatment plants. Like twin chamber furnace, where carbonizing, diffusion, Quenching is
done on metals.
Installation and commissioning of all the process equipments like pressure transmitter,
pressure switches, temperature sensors, proximity switches etc.
9. Worked as Web Developer in Kaashyap Radiant Systems Limited New Delhi from 01/09/1999
to 12/03/2000 (New Delhi). Duration:-6.3 months
 As part of a team involved in development of functional web sites the job
Responsibilities Entails interacting with clients, understanding their web site
Requirements, proposing efficient custom solutions and finally development of
various software modules their Coding, testing and hosting.
Advanced Professional Training:
1. Sucessesfully completed EST3 Programming and Networking Course of Edward
system on EST-3 Fire Alarm panel (Two times certified).
2. Attended preliminary training on Panel Programming of Siemens XLS-Fire finder
system using ZEUS software.
4
3. Attended training on in-depth Programming of BS320 fire alarm panel of Autronica
make.
4. Knowledge of Programming of Quick Start fire alarm panel of Edward system.
5. INDUSTRIAL AUTOMATION INFORMATION TECHNOLOGY at M/S New Era Control
Devices Pvt. Ltd., Gurgaon (NCR). The company is a part of New Era Group engaged in
promoting Industrial Automation on turnkey basis to Industries. The training module
consisted of Study of Different types of Sensors used in process Industries.
 Architecture and Programming of Various Industrial PLCs of following make
 Siemens PLCs
 S5 Series (S5 90/95 U): Programming in STL
 S7 Series (S7 200)
: Programming in LAD
 Logo
: Programming in CSF
 Modicon Supreme PLCs
 Premium
: Programming in LAD
 Quantum
: Programming in LAD
 Technical Description about Installation & Commissioning of PLCs.
 Supervisory Control & Data Acquisition System (SCADA)
 Application & Development of SCADA system using AFCON Pcim6.54, Introduction to
Wizcon
 Knowledge of Various Electrical Drives, Selection Criteria of the drives of following
make Telemechanique, Altivar (Group Schneider), ABB (ACS 140), Dan Foss
Computer knowledge:
 Programming Languages: FORTRAN, C and Visual Basic 6.0.
 Database: Access, SQL Server 7.0.
 Operating Environments: Windows 98/NT 4.0.
 Other Tools: MS-Office, Visual Interdev.
 Designing Tools: AutoCAD, Visio.
Other Details:
 Attended entrepreneurship awareness camp in R.I.T Jamshedpur.
 Member of N.S.S in R.I.T Jamshedpur.
 Attended ISO9001-2000 Internal auditors program organized by M/S Polymer papers ltd.
 Undergone the four basic familiarization-training courses (Marine industry) i.e.
Elementary first Aid, Personal survival techniques, Fire prevention and fire fighting and
Personal safety and Social Responsibilities at B.P.Marine Academy Belapur (Mumbai)
Prescribed vide sub-Rule 33 of merchant Shipping rules, 1998.
 Having valid Indian CDC License number MUM-115730, Rank: -Electrical officer.
PERSONAL DATA:
Present Address
Permanent Address
Date of Birth
Nationality
Marital Status
Rakesh Kumar Saha
Assistant Manager-Projects,CPD Department,
6’th Floor, JAFCO Tower, near Muntazah Park, P.O. Box 1231,
Doha – Qatar
Rakesh Kumar Saha
Flat#119, SATKO Palm Tree, 1’st floor, Munekolou Village Road,
Mahatama Gandhi Road, Main Road Marathalli Bridge,Opp Purva
Rivera,Bangalore-560037(India).
25th Oct 1976.
Indian
Married
5
Passport No.
Validity
Skype Id
Present CTC
Total experience
Z-2193169
21/01/2011 to 20/01/2021
rakesh738073
17800/- Qatari Riyal Per month + yearly Bonus + Bachelor
Accommodation
12 years
6
Download