KMD ARCHITECTURE TOP FLOOR, 3 WESTLAND SQUARE, PEARSE STREET, DUBLIN 2, IRELAND TEL: 353 1 677 0077 Mob 086 8223952 / 353 1 677 0827 E-MAIL: jreynolds@kmd.ie – edunne@kmd.ie WEB: www.kmd.ie Station Building , At Platform Deck . Park Place Hatch Street upper , Dublin ,2, for Clancourt Management . Marketing Specification . 30 03 2015 Outline Description for the materials and finishes specification . Walls 1-Grey Kelpstone exposed and sealed in part of western wall and on pilaster columns along Platform deck .Walls are washed by recessed floor luminaire . 2-Gypsum Gyproc metal stud Partition walls to toilet and duct enclosures and forming protected shaft to around protected fire escape stairs along southern gable . 3- former openings from Harcourt Station entrance featured in slight raised sand /cement with exposed quoin surrounds for decorative /marketing applications and lit by suspended Luminaire Track Concord beacon fitting . 4-End gables and party wall finished with insulated plaster board . Door Screens – 1-Entrance and escape doors to be new 12mm toughened glass complete with corner door patch fittings ,centre lock and floor springs action with new draught stripping to leading edges at meeting stiles . Entrance surround highlighted by LED goal post fitting in opal Perspex panel to present visibility presence from Hatch Street 2- Existing infilled double glazed screens supported by laminated glass fins and stainless steel patch fittings with black silicone flush acrylic jointing . 3- Window board cill finished in veneered Walnut with HW edge lipping overhanging matching skirting and supporting radiators located within glazing bays . Internal Doors . DIRECTORS: EUGENE F. DUNNE, B.ARCH.,F.R.I.A.I., R.I.B.A., BARRY MACKEN,DIP.ARCH.,B.ARCH.SC., M.R.I.A.I.,R.I.B.A., M.R.A.I.A., GARY O’HARE, DIP.ARCH,B.ARCH.SC.,M.R.I.A.I., JOHN F. REYNOLDS, B.ARCH., F.R.I.A.I.,R.I.B.A.,DIP.PROJ.MAN . ASSOCIATES: ANDREW HAYDEN, DIP.ARCH., B.ARCH.SC., M.R.I.A.I FERGAL O’DOHERTY, DIP.ARCH.,B.ARCH.SC.,DIP.ARCH.TECH., KEANE MURPHY DUFF LIMITED, COMPANY REGISTRATION NUMBER:155935 QUALITY SYSTEM – I.S. EN ISO 9001:2000 1-Fire rated 30min /60 min solid core doors with American black walnut veneer with HW edging in solid walnut frames with matching architraves complete with contemporary Allgood ironmongery . External Doors . 1-Steel fire doors made from folded 1.2 mm steel sheet with 45 mm thick composite honeycomb core in steel folded frames in grey RAL finish painted . Toilet Partitions . 1-Propriatory Toilet cubicles system complete with 2-Cubicle doors 44mm flush HPL in oiled walnut F5487, 3-Divider panels 20mm in white with 4-HPL back panelling compact grade in oiled walnut F5487with 1100 mm high concealed cistern housing with limestone AZUL shelf all fitted with flush mounted sanitary ware from Jasper Morrison Range with stainless steel ironmongery and integrated WC and urinal flush valves . Sanitary Range . WC units –Jasper Morrison wall mounted WC E 6217. WHB –Jasper Morrison 50 mm vesal WHB E 6210. Urinals –Jasper Morrison Rim Flushing Urinal E 6215. Complete with accessories incl soap dispenser ,hand driers ,toilet tissue dispenser ,grab rails ,waste bins etc . Shower units provided enclosed in waterproof /tanking flush floor wall and tiled system complete with thermostatic valve control and glazed shower door screen . Toilet Finishes Floors . 600x600 x10 mm Atlas Concorde Seastone greige matt with R9 slip resistance . Walls. 600x300 RT blanc ceramic . Mirrors . Full height above vanity units lit on ground floor by recessed perimeter edge detail by LED strip fitting fitted within MF plasterboard ceiling system . Floors . 1-Ground Floor . Kingspan Access flooring system TLM 26 screw down 26mm panel in 600mm module to meet class O BS 478 fire rating with galvanised encapsulated particle board core to accept UDL of 8 Kn /m2. 2-First Floor . 19mm ply on timber joisting 175x75 @400mm centres spanning 2.300 m between structural castellated Westox Beams c 500 mm deep . 1 hour fire resistance provided to mezzanine floor by application of 2 layers of plasterboard and skim painted white to timber with intumescent paint coating factory applied to steel columns ,primary and secondary steelwork and touched up on site . 3-Access and power grommets will be provided within RAF at ground floor fed from power track busbar under floor . 4-Floor boxes lined with intumescent pads to maintain fire resistance and integrity will be provided by landlord for tenant fitting to agreed method statement ,fed from power track system located to underside of mezz and fire sealed where it penetrates the plasterboard . Balustrade . 1- Balustrade protection to mezzanine floor provided by 75mmx12mm flat S/S uprights grade 304 polished 180/240 with 50 diam handrail with 10mm toughened glass infill set in U channel fixing . 2- Stairs Balustrade as above 3- Stair Treads as black Walnut 40x 325 with insert Altread E 400 10mm x 7mm carborundum slip resistant strip full width with end grain edge closer piece ,all supported on structural steel 300x100 rhs painted 9010 steel box sections with trays to accept tread. Ceiling Suspended Ecophon Solo freehanging sound absorbing panel suspended by adjustable hangers to partially conceal service ways and cable trays to underside of mezzanine with mechanical discharge linear grilles and suspended Luminaire Linea Light Shore 1.200 mm lighting ,fully co-ordinated between ceiling panels . Truss level . Service runs within existing original steel Victorian truss include electrical cable trays ,insulated refrigerant pipework ,condensate water discharge ,data cable trays ,supply ductwork ,extract ductwork incl branch duct connections to DX units ,have been carefully arranged and co-ordinated and hung on unistrut brackets ,fully painted black ,to run and service fittings in an orderly manner complete with suspended luminaire Linea Light Shore 1.800 . DX VRF units are suspended with insulated swirl boxes grille discharges fully coordinated to provide an even air distribution within the open exposed truss and pitched roof profile . Existing truss steel work ,supporting purlins are finished in painted black ,with exposed SW timber sheeting finished in white “Zero Flame “ Class 1 fire retardant paint finish . Rooflights 2 no rows of existing double glazed rooflights run along the eastern and western roof slope .approx 1.200 m and 2.3 00 m wide respectively and are provided with motorised rooflight sunshade blinds with sun sensor to control direct sunlight ,glare and overheating and are controlled by wall mounted zonal channel switches and handsets . Access and Security . Total perimeter security is provided along Hatch Street with additional new controlled secure gate access at end of semi circular stairs access from deck . External protected Lift and 2 no straight flight discreetly illuminated stairs provide pedestrian access to Station Building entrance level . Prominent perimeter Signage and way finding points have been identified to highlight and easily locate the entrance to property for visitors . Regards, Jackie John F Reynolds B.Arch,Hons ,FRIAI,RIBA,Dip Proj Man KMD ARCHITECTURE Top Floor, 3 Westland Square, Pearse Street, Dublin 2, Éire. jreynolds@kmd.ie : +353 (01) 6770077 : +353 (0)86 8223952